FOREWORD
This manual was compiled to assist civil and structural engineering staff at Eskom’s power stations in
their maintenance and inspection activities. It provides guidance for maintenance planning of the
various civil and structural assets at Eskom’s Power Stations.
CONTROLLED DISCLOSURE
When downloaded from the EDMS, this document is uncontrolled and the responsibility rests with the user to ensure it is in line
with the authorised version on the database.
Inspection Manual for Civil Works at Eskom’s Unique Identifier: 240-99527377
Power Stations Revision: 2
Page: 3 of 113
CONTENTS
Page
FOREWORD ................................................................................................................................................................ 2
EXECUTIVE SUMMARY .............................................................................................................................................. 9
1. SUPPORTING CLAUSES ...................................................................................................................................... 10
1.1 SCOPE ............................................................................................................................................................ 10
1.1.1 Purpose ................................................................................................................................................... 10
1.1.2 Applicability.............................................................................................................................................. 10
1.2 NORMATIVE/INFORMATIVE REFERENCES ................................................................................................ 10
1.2.1 Normative References ............................................................................................................................. 11
1.2.2 Informative References ........................................................................................................................... 11
1.3 ABBREVIATIONS ............................................................................................................................................ 11
1.4 DEFINITIONS .................................................................................................................................................. 12
1.5 ROLES AND RESPONSIBILITIES .................................................................................................................. 12
2. MOTIVATION AND OBJECTIVES ........................................................................................................................ 13
2.1 SAFETY AND LEGISLATION ......................................................................................................................... 13
2.2 TRAINING AND EXPERIENCE ...................................................................................................................... 13
2.3 INSPECTIONS OBJECTIVES ......................................................................................................................... 13
3. OVERVIEW OF INSPECTION MANUAL REQUIREMENTS ................................................................................ 14
4. MAINTENANCE POLICY ....................................................................................................................................... 15
5. GENERAL INSPECTION AND MONITORING REQUIREMENTS ....................................................................... 16
5.1 CONDITION CATEGORIES ............................................................................................................................ 16
5.2 VISUAL INSPECTIONS SAFETY ................................................................................................................... 16
5.2.1 Accompanying Person ............................................................................................................................ 16
5.2.2 Induction .................................................................................................................................................. 17
5.2.3 Risk Assessment ..................................................................................................................................... 17
5.2.4 Access and Lighting ................................................................................................................................ 17
5.2.5 Equipment ............................................................................................................................................... 17
5.3 INSPECTION PLANNING ............................................................................................................................... 17
6. INSPECTION SCHEDULE ..................................................................................................................................... 18
6.1 SCHEDULING INSPECTIONS ....................................................................................................................... 18
6.2 FREQUENCY OF ENGINEERING VISUAL INSPECTIONS .......................................................................... 18
7. REPORTING AND FOLLOW-UP........................................................................................................................... 18
7.1 REPORTING ................................................................................................................................................... 18
7.2 FOLLOW-UP ................................................................................................................................................... 20
8. STRUCTURAL INSPECTIONS .............................................................................................................................. 21
8.1 COOLING TOWERS ....................................................................................................................................... 21
8.1.1 Description............................................................................................................................................... 21
8.1.2 Typical Problems in Cooling Tower Structures ....................................................................................... 21
8.1.3 Inspections .............................................................................................................................................. 22
8.1.4 Testing ..................................................................................................................................................... 24
8.2 CHIMNEY STRUCTURES .............................................................................................................................. 24
8.2.1 Description............................................................................................................................................... 24
8.2.1.1 Single Flue Chimneys: .................................................................................................................... 24
8.2.1.2 Multiple flue chimneys: .................................................................................................................... 24
8.2.2 Typical Problems in Chimney Structures ................................................................................................ 26
8.2.3 Inspections .............................................................................................................................................. 27
8.2.3.1 External Inspections ........................................................................................................................ 28
8.2.3.2 Internal Inspections ......................................................................................................................... 28
8.2.4 Testing ..................................................................................................................................................... 28
CONTROLLED DISCLOSURE
When downloaded from the EDMS, this document is uncontrolled and the responsibility rests with the user to ensure it is in line
with the authorised version on the database.
Inspection Manual for Civil Works at Eskom’s Unique Identifier: 240-99527377
Power Stations Revision: 2
Page: 4 of 113
8.2.4.1 Brick Lining ...................................................................................................................................... 28
8.3 CONCRETE SILOS ......................................................................................................................................... 28
8.3.1 Description............................................................................................................................................... 28
8.3.2 Typical Problems in Concrete Silos ........................................................................................................ 29
8.3.3 External Inspections ................................................................................................................................ 29
8.3.3.1 Internal Inspections ......................................................................................................................... 29
8.4 LIQUID CONTAINING STRUCTURES ........................................................................................................... 29
8.4.1 Description............................................................................................................................................... 29
8.4.2 Typical Problems in Liquid Containing Structures................................................................................... 30
8.4.3 Inspections .............................................................................................................................................. 30
8.4.3.1 External Inspections ........................................................................................................................ 30
8.4.3.2 Internal Inspections ......................................................................................................................... 30
8.5 CONVEYOR STRUCTURES .......................................................................................................................... 30
8.5.1 Description............................................................................................................................................... 30
8.5.2 Typical Problems in Conveyor Structures ............................................................................................... 30
8.5.3 Inspections .............................................................................................................................................. 30
8.5.3.1 Internal Inspections ......................................................................................................................... 30
8.6 STEEL STRUCTURES.................................................................................................................................... 31
8.6.1 Description............................................................................................................................................... 31
8.6.2 Typical Problems Associated with Steel Structures ................................................................................ 31
8.6.2.1 Rusting ............................................................................................................................................ 31
8.6.2.2 Structural Deficiencies .................................................................................................................... 31
8.6.2.3 Non-Structural Deficiencies ............................................................................................................. 31
8.7 BUILDINGS ..................................................................................................................................................... 31
8.7.1 Description............................................................................................................................................... 31
8.7.2 Typical Problems in Buildings ................................................................................................................. 32
8.7.2.1 Deterioration .................................................................................................................................... 32
8.7.2.2 Foundation failure ........................................................................................................................... 33
8.7.2.3 Brickwork and partition walling failure ............................................................................................. 33
8.7.2.4 Damp penetration and condensation .............................................................................................. 33
8.7.2.5 Windows and doors failure .............................................................................................................. 34
8.8 OTHER POWER STATION STRUCTURES ................................................................................................... 34
8.8.1 Description............................................................................................................................................... 34
8.8.1.1 Boiler house structures ................................................................................................................... 34
8.8.1.2 Turbine house structures ................................................................................................................ 35
8.8.1.3 Coal staithes.................................................................................................................................... 35
8.8.1.4 Blow-down sumps ........................................................................................................................... 35
8.8.1.5 Precipitators & bag filter plant ......................................................................................................... 35
8.8.1.6 Auxiliary bays .................................................................................................................................. 35
8.8.1.7 Flue ducts ........................................................................................................................................ 35
8.8.1.8 Machine foundations ....................................................................................................................... 35
8.8.1.9 Boiler bottom ash sumps................................................................................................................. 35
8.8.1.10 Workshops and stores .................................................................................................................. 35
8.8.1.11 Pump houses ................................................................................................................................ 35
8.8.1.12 High voltage yards ........................................................................................................................ 35
8.8.1.13 Sub-stations .................................................................................................................................. 35
8.8.2 Problems ................................................................................................................................................. 36
8.8.2.1 Boiler House Structures .................................................................................................................. 36
8.8.2.2 Turbine House Structures ............................................................................................................... 36
8.8.2.3 Coal Staithes ................................................................................................................................... 36
8.8.2.4 Blow down Sumps ........................................................................................................................... 36
8.8.2.5 Precipitators & Bag filter Plant ........................................................................................................ 37
8.8.2.6 Auxiliary Bays .................................................................................................................................. 37
8.8.2.7 Flue Ducts ....................................................................................................................................... 37
8.8.2.8 Machine/Equipment Foundations ................................................................................................... 37
8.8.2.9 Boiler Bottom Ash Sumps ............................................................................................................... 38
8.8.2.10 Workshops and Stores .................................................................................................................. 38
8.8.2.11 Pump houses ................................................................................................................................ 38
8.8.2.12 High Voltage Yards ....................................................................................................................... 38
CONTROLLED DISCLOSURE
When downloaded from the EDMS, this document is uncontrolled and the responsibility rests with the user to ensure it is in line
with the authorised version on the database.
Inspection Manual for Civil Works at Eskom’s Unique Identifier: 240-99527377
Power Stations Revision: 2
Page: 5 of 113
8.8.2.13 Sub-stations .................................................................................................................................. 38
9. ROADS ................................................................................................................................................................... 39
9.1 DESCRIPTION ................................................................................................................................................ 39
9.2 INSPECTIONS ................................................................................................................................................ 40
9.2.1 Visual Assessment .................................................................................................................................. 40
9.2.1.1 Assessment procedure ................................................................................................................... 41
9.2.1.2 Distresses........................................................................................................................................ 41
9.2.1.3 Visual Assessment of Surfaced and Unsurfaced Roads ................................................................ 43
9.2.2 Instrument Assessment ........................................................................................................................... 47
9.2.2.1 Dynamic Cone Penetrometer (DCP) Analysis ................................................................................ 48
9.2.2.2 Structural adequacy ........................................................................................................................ 49
9.2.2.3 California Bearing Ratio (CBR)-Trial Pits ........................................................................................ 49
9.3 PAVEMENT CONDITION INDICES ................................................................................................................ 49
9.4 INSPECTION FREQUENCY ........................................................................................................................... 50
9.4.1 Monitoring ................................................................................................................................................ 50
9.5 REMEDIAL ACTIONS ..................................................................................................................................... 50
9.5.1 Flexible Pavements ................................................................................................................................. 50
9.5.2 Rigid pavements (Concrete Roads) ........................................................................................................ 52
9.5.3 Unsurfaced pavements (Gravel Roads) .................................................................................................. 54
9.5.4 Drainage and Drainage Structures .......................................................................................................... 54
10. CULVERTS .......................................................................................................................................................... 55
10.1 PROBLEMS ................................................................................................................................................... 55
10.2 INSPECTION FREQUENCIES ..................................................................................................................... 55
10.3 REMEDIAL ACTIONS ................................................................................................................................... 55
10.3.1 Vegetation Management and Control ................................................................................................... 55
11. RAILWAY LINES AND SIDING ........................................................................................................................... 56
11.1 EARTHWORKS ............................................................................................................................................. 56
11.2 BRIDGES AND CULVERTS.......................................................................................................................... 56
11.3 BALLAST ....................................................................................................................................................... 57
11.4 RAILS ............................................................................................................................................................ 57
11.5 SLEEPERS .................................................................................................................................................... 57
11.6 TURNOUTS ................................................................................................................................................... 57
11.7 RAIL FURNITURE ......................................................................................................................................... 57
11.8 OVERALL ...................................................................................................................................................... 58
12. SURFACE DRAINS.............................................................................................................................................. 59
12.1 DESCRIPTION .............................................................................................................................................. 59
12.1.1 Stormwater drains, Clean water drains and Diversion canals .............................................................. 59
12.1.2 Dirty water drains and central drains ..................................................................................................... 59
12.1.3 Dissipater structures .............................................................................................................................. 60
12.1.4 Silt traps ................................................................................................................................................. 60
12.1.5 Low flow Sluice gates ............................................................................................................................ 61
12.2 PROBLEMS ................................................................................................................................................... 61
12.2.1 Drains and canals .................................................................................................................................. 61
12.2.2 Silt traps ................................................................................................................................................. 61
12.3 INSPECTION FREQUENCY ......................................................................................................................... 62
12.3.1 Monitoring .............................................................................................................................................. 62
12.4 REMEDIAL ACTIONS ................................................................................................................................... 63
12.4.1 Drains and Canals ................................................................................................................................. 63
12.4.2 Silt traps ................................................................................................................................................. 64
13. SUB-SURFACE DRAINS ..................................................................................................................................... 65
13.1 DESCRIPTION .............................................................................................................................................. 65
13.2 PROBLEMS ................................................................................................................................................... 65
13.3 REMEDIAL ACTIONS ................................................................................................................................... 66
13.4 MAINTANENCE LIMITATIONS ..................................................................................................................... 66
CONTROLLED DISCLOSURE
When downloaded from the EDMS, this document is uncontrolled and the responsibility rests with the user to ensure it is in line
with the authorised version on the database.
Inspection Manual for Civil Works at Eskom’s Unique Identifier: 240-99527377
Power Stations Revision: 2
Page: 6 of 113
14. ASH DAMS ........................................................................................................................................................... 67
14.1 DESCRIPTION .............................................................................................................................................. 67
14.1.1 Wall Building .......................................................................................................................................... 67
14.1.2 Daywall, Night-wall and Innerwall sections ........................................................................................... 67
14.1.3 Pool on top of the ash dam ................................................................................................................... 67
14.1.4 Filter Drains ........................................................................................................................................... 68
14.1.5 Penstocks .............................................................................................................................................. 68
14.1.6 Stormwater Management ...................................................................................................................... 68
14.1.7 Solution Trenches ................................................................................................................................. 68
14.1.8 Stormwater Diversion Canals ................................................................................................................ 68
14.1.9 Walkways to Penstocks ......................................................................................................................... 68
14.1.10 Piezometers......................................................................................................................................... 68
14.2 PROBLEMS ................................................................................................................................................... 68
14.3 INSPECTION FREQUENCY ......................................................................................................................... 69
14.3.1 Ash Dam Monitoring .............................................................................................................................. 71
14.3.1.1 Monthly monitoring ........................................................................................................................ 71
14.3.1.2 Weekly monitoring ......................................................................................................................... 72
14.3.1.3 Daily monitoring ............................................................................................................................ 73
14.3.2 Piezometer Monitoring .......................................................................................................................... 73
14.3.3 Ash Water Return Dam Monitoring ....................................................................................................... 73
14.3.3.1 Monthly monitoring ........................................................................................................................ 73
14.3.3.2 Daily monitoring ............................................................................................................................ 73
14.3.4 Ash Dam Contour Survey...................................................................................................................... 74
14.3.5 Legal and Safety Requirements ............................................................................................................ 74
14.3.6 Groundwater Monitoring ........................................................................................................................ 74
14.3.7 Settlement Monitoring ........................................................................................................................... 74
14.3.8 Rainfall Monitoring ................................................................................................................................. 74
14.4 REMEDIAL ACTIONS ................................................................................................................................... 75
14.4.1 Compliance with O&M Manual Requirements ...................................................................................... 75
14.4.2 Emergency Situations and Procedures ................................................................................................. 75
14.4.2.1 Emergency situation: Evacuation .................................................................................................. 75
14.4.2.2 Emergency situation: Preparedness ............................................................................................ 76
14.4.2.3 Emergency situation: Uncertainty ................................................................................................ 76
15. ASH DUMPS ........................................................................................................................................................ 77
15.1 DESCRIPTION .............................................................................................................................................. 77
15.1.1 Mechanical Components ....................................................................................................................... 77
15.1.1.1 Conveyors ..................................................................................................................................... 77
15.1.1.2 Spreader machines ....................................................................................................................... 77
15.1.1.3 Stacker machines .......................................................................................................................... 77
15.1.2 Drainage Systems ................................................................................................................................. 77
15.1.3 Erosion Protection ................................................................................................................................. 78
15.1.4 Emergency Ashing System ................................................................................................................... 78
15.1.5 Dust Suppression System ..................................................................................................................... 78
15.1.5.1 Smooth drum roller compaction .................................................................................................... 78
15.1.5.2 Water ............................................................................................................................................. 78
15.1.5.3 Polymers ....................................................................................................................................... 78
15.1.5.4 Soil cover....................................................................................................................................... 78
15.1.6 Topsoiling and Rehabilitation ................................................................................................................ 78
15.1.7 Road Network (see Chapter 15);........................................................................................................... 79
15.2 PROBLEMS ................................................................................................................................................... 79
15.2.1 Dust Problems ....................................................................................................................................... 79
15.2.2 Slope Stability Problems ....................................................................................................................... 80
15.2.2.1 Poor underlying ground conditions ............................................................................................... 80
15.2.2.2 Safe edge distance (S.E.D.) not achieved .................................................................................... 80
15.2.2.3 Inadequate pozzolanic cementing action ...................................................................................... 80
15.2.2.4 Inadequate drainage ..................................................................................................................... 80
15.2.3 Checklists .............................................................................................................................................. 80
15.3 INSPECTION FREQUENCY ......................................................................................................................... 85
CONTROLLED DISCLOSURE
When downloaded from the EDMS, this document is uncontrolled and the responsibility rests with the user to ensure it is in line
with the authorised version on the database.
Inspection Manual for Civil Works at Eskom’s Unique Identifier: 240-99527377
Power Stations Revision: 2
Page: 7 of 113
15.3.1 Dust Suppression Monitoring ................................................................................................................ 87
15.3.2 Slope Stability Monitoring ...................................................................................................................... 87
15.3.2.1 Underlying ground conditions ........................................................................................................ 87
15.3.2.2 Safe edge distance (S.E.D.) for strategic stacking plant .............................................................. 87
15.3.2.3 Pozzolanic cementing action......................................................................................................... 87
15.3.2.4 Drainage systems ......................................................................................................................... 88
15.3.2.5 Legal and Safety aspects .............................................................................................................. 89
15.3.3 Survey and Setting out .......................................................................................................................... 89
15.3.3.1 Control beacons and bench marks ............................................................................................... 89
15.3.3.2 Audit surveys ................................................................................................................................. 89
15.4 REMEDIAL ACTIONS ................................................................................................................................... 89
16. COAL STOCKYARDS ......................................................................................................................................... 91
16.1 DESCRIPTION .............................................................................................................................................. 91
16.2 PROBLEMS ................................................................................................................................................... 91
16.3 EROSION & SPONTANEOUS COMBUSTION CONTROL.......................................................................... 91
16.3.1 Stockpile Construction Geometry .......................................................................................................... 92
16.3.2 Compaction ........................................................................................................................................... 92
16.3.2.1 Vibrating rollers: ............................................................................................................................ 92
16.3.2.2 Impact rollers: ................................................................................................................................ 92
16.3.3 Reclamation of a Stockpile .................................................................................................................... 93
16.3.4 Quality Control ....................................................................................................................................... 93
16.3.4.1 Dynamic Cone Penetrometer test - side slopes:........................................................................... 93
16.3.4.2 Dynamic Cone Penetrometer test - terrace layers: ....................................................................... 93
16.3.4.3 Sand Replacement test - side slopes and base layer: .................................................................. 93
16.3.4.4 Other tests: .................................................................................................................................... 93
16.4 INSPECTION FREQUENCY ......................................................................................................................... 93
16.4.1 Monitoring .............................................................................................................................................. 94
16.5 REMEDIAL ACTIONS ................................................................................................................................... 94
16.5.1 Contingency Measures .......................................................................................................................... 95
17. DAMS ................................................................................................................................................................... 96
17.1 DESCRIPTION .............................................................................................................................................. 96
17.1.1 Dam Walls ............................................................................................................................................. 96
17.1.2 Spillways ................................................................................................................................................ 96
17.1.3 Upstream and Downstream areas ........................................................................................................ 96
17.1.4 Inlet and Outlet works ............................................................................................................................ 96
17.1.5 Environmental Requirements ................................................................................................................ 97
17.2 PROBLEMS ................................................................................................................................................... 97
17.2.1 All Dams: ............................................................................................................................................... 97
17.2.2 Dirty Water Dams: ................................................................................................................................. 97
17.2.3 Dam Wall ............................................................................................................................................... 98
17.2.4 Spillways ................................................................................................................................................ 99
17.2.5 Downstream Areas ................................................................................................................................ 99
17.2.6 Inlet and Outlet works ............................................................................................................................ 99
17.2.7 Sluice Gate Calibration (For Dirty water dams)..................................................................................... 99
17.2.8 EXAMPLE OF A ROUTINE INSPECTION FORM .............................................................................. 100
17.2.9 Completion of the Routine Inspection Form ........................................................................................ 101
17.3 INSPECTION FREQUENCY ....................................................................................................................... 101
17.3.1 Monitoring ............................................................................................................................................ 102
17.4 REMEDIAL ACTIONS ................................................................................................................................. 103
17.4.1 Earthfill Dam Walls .............................................................................................................................. 103
17.4.2 Concrete and Masonry Structures ...................................................................................................... 104
17.4.3 Spillways .............................................................................................................................................. 104
17.4.4 Downstream Toe ................................................................................................................................. 104
17.4.5 Inlet/ Outlet Works ............................................................................................................................... 104
17.4.6 Contingency Measures ........................................................................................................................ 104
17.4.6.1 Seepage and piping .................................................................................................................... 105
17.4.6.2 Cracking ...................................................................................................................................... 105
CONTROLLED DISCLOSURE
When downloaded from the EDMS, this document is uncontrolled and the responsibility rests with the user to ensure it is in line
with the authorised version on the database.
Inspection Manual for Civil Works at Eskom’s Unique Identifier: 240-99527377
Power Stations Revision: 2
Page: 8 of 113
17.4.6.3 Sliding failure on embankment .................................................................................................... 105
17.4.6.4 Cracks on spillway ...................................................................................................................... 105
17.4.7 Emergency Situations and Procedures ............................................................................................... 105
17.4.7.1 Emergency situation: Evacuation ................................................................................................ 105
17.4.7.2 Emergency situation: Preparedness .......................................................................................... 106
17.4.7.3 Emergency situation: Uncertainty .............................................................................................. 106
18. AUTHORISATION .............................................................................................................................................. 108
19. REVISIONS ........................................................................................................................................................ 108
20. DEVELOPMENT TEAM ..................................................................................................................................... 108
APPENDIX A : CIVIL WORKS INSPECTION CHECKLIST TEMPLATE ............................................................... 109
APPENDIX B : ROADS VISUAL INSPECTION SHEETS....................................................................................... 110
FIGURES
Figure 9-1 Typical multiple flue chimney .................................................................................................................... 25
Figure 9-2 Typical cross section of a flue lift at support slab level ............................................................................. 25
Figure 9-3 Typical cross section of a flue lift at support slab level ............................................................................. 27
Figure 10-1 Classification of Pavement Types based on Materials [16] .................................................................... 39
Figure 10-2: Types of Road Condition Assessments ................................................................................................. 40
Figure 10-3: Diagrammatical illustration of extent [14] ............................................................................................... 42
Figure 10-4: Visual Assessment Elements for Flexible Pavements ........................................................................... 43
Figure 10-5: Visual Assessment Elements for Rigid Pavements ............................................................................... 45
Figure 10-6: Types of Instrument Assessments ......................................................................................................... 48
Figure 16-1: Ash dump checklist ................................................................................................................................ 85
TABLES
Table 6-1: Condition Categories ................................................................................................................................. 16
Table 8-1: Prioritisation of Elements ........................................................................................................................... 19
Table 9-1: Number off and Location of Concrete Silos .............................................................................................. 29
Table 10-1: Visual inspection standards ..................................................................................................................... 40
Table 10-2 : Summary of definitions of degrees of distress ....................................................................................... 44
Table 10-3: Sound, warning and severe categories for roads ................................................................................... 45
Table 10-4: Street hierarchy and traffic class (after TMH9) ...................................................................................... 48
Table 10-5: Pavement Condition Indices.................................................................................................................... 49
Table 10-6: Frequency of inspections for roads ......................................................................................................... 50
Table 13-1: Frequency of inspections ........................................................................................................................ 62
Table 15-1: Frequency of inspections ....................................................................................................................... 70
Table 16-1: Frequency of inspections ........................................................................................................................ 85
Table 17-1: Frequency of inspections ........................................................................................................................ 94
Table 18-1: Frequency of inspections for Dams ....................................................................................................... 101
CONTROLLED DISCLOSURE
When downloaded from the EDMS, this document is uncontrolled and the responsibility rests with the user to ensure it is in line
with the authorised version on the database.
Inspection Manual for Civil Works at Eskom’s Unique Identifier: 240-99527377
Power Stations Revision: 2
Page: 9 of 113
EXECUTIVE SUMMARY
A coal-fired power station comprises a vast number of civil infrastructures. In these assets a variety of
building materials are used and they are often combined in the same structure. These materials, in
turn, are subjected to diverse environmental and exposure conditions which may cause some
deterioration of the structures over time. The great majority of the civil structures at power stations are
typically constructed with reinforced concrete and structural steel. These structures need to be
regularly inspected to ensure that any structural defect or degradation will not compromise their
structural stability and at the same time to allow intervening in time either to repair the problem or to
follow up with a more stringent site inspection and laboratory tests.
This inspection manual provides guidelines for best precautionary measures in identification and
rectification of defects. It is therefore recommended that each Power Station should develop and
implement an individual maintenance plan.
Following each inspection, the condition of civil and structural assets must be reported and recorded.
The guideline defines five condition categories, ranging from 1 being excellent/new condition, to 5
being deterioration to the extent that the assets are unusable. A Plant Engineer must provide a
comprehensive report on findings and liaise with the Centre of Excellence (CoE) to ensure that all
safety critical findings are adequately addressed as soon as possible.
CONTROLLED DISCLOSURE
When downloaded from the EDMS, this document is uncontrolled and the responsibility rests with the user to ensure it is in line
with the authorised version on the database.
Inspection Manual for Civil Works at Eskom’s Unique Identifier: 240-99527377
Power Stations Revision: 2
Page: 10 of 113
1. SUPPORTING CLAUSES
1.1 SCOPE
This manual provides recommendations for Inspections and Maintenance Management of civil
engineering assets in Power Stations within Eskom. All civil engineering assets (for example: Cooling
towers, Silos, Chimneys, Bridges, Boiler structures, Dams, Coal staithes, Conveyor Structures, Water
Treatment Plants etc.) are included.
The document also provides guidance on typical problems and recommended inspection approach on
each of the civil and structural engineering assets.
The scope also includes building and general infrastructure such as roads, railways and stormwater
drains. Procedures for formal monitoring and assessment of structural vibration are excluded from this
guideline, although observed vibration may be noted in an inspection report. This guideline also does
not cover inspections of mechanical or electrical equipment, or other associated plant and equipment.
It is intended to provide practical guidelines to assist plant maintenance personnel with the following in
respect of the plant structures:
a) What should be inspected and monitored?
b) How should inspection and monitoring be accomplished?
c) At what intervals should inspections and monitoring be done?
d) What should be expected in an inspection report?
e) What are the typical defects to be noted?
f) What follow-up actions are required?
This manual does not provide guidance for the design or construction of Power Station Civil and
Structural engineering assets. Some guidance is provided for remedial work required where small
amount of deterioration has occurred. Reference should be made to the relevant Eskom Specifications
for the design and construction of Civil and Structural infrastructure. This guideline does not cover
structural inspections that are necessary following incidents such as fire, flooding, impact from vehicles
or falling objects or structural failure. It is only intended to cover regular, scheduled inspections and
maintenance management.
1.1.1 Purpose
This Civil and Structural inspection manual has been developed to provide guidelines for Inspections
and Maintenance Management at all Power Stations within Eskom. Listed below are the main
objectives of the document.
To incorporate latest OHS Act inspections requirements
Provide consistent procedures for inspecting civil engineering assets and reporting
To proactively prevent structural failures that may result to loss of life and financial loss.
1.1.2 Applicability
This document applies to Technology Engineering, Generation (Gx).
CONTROLLED DISCLOSURE
When downloaded from the EDMS, this document is uncontrolled and the responsibility rests with the user to ensure it is in line
with the authorised version on the database.
Inspection Manual for Civil Works at Eskom’s Unique Identifier: 240-99527377
Power Stations Revision: 2
Page: 11 of 113
1.2.1 Normative References
[1] 240-77801161: Inspection of Boiler Structural Supports – Conventional Fossil Fuel Fired Power
Stations Standard
[2] Civil and Building Works Strategic Report
[3] ISO 9001 Quality Management Systems
1.3 ABBREVIATIONS
Abbreviation Description
AM Asset Management
CBR California Bearing Ratio
COE Centre of Excellence
COTO Committee of Transport Officials
DCP Dynamic Cone Penetrometer
ECSA Engineering Council of South Africa
ERAP Engineering Risk Assessment Process
CONTROLLED DISCLOSURE
When downloaded from the EDMS, this document is uncontrolled and the responsibility rests with the user to ensure it is in line
with the authorised version on the database.
Inspection Manual for Civil Works at Eskom’s Unique Identifier: 240-99527377
Power Stations Revision: 2
Page: 12 of 113
Abbreviation Description
FD Forced Draft
GTE Group Technology Engineering
Gx Generation Division
ID Induced Draft
ISO International Organization for Standardization
LOPP Life of Plant Plan
OHSA Occupational Health Safety Act
SANRAL South African National Roads Agency Limited
TMH Technical Methods for Highways
TRH Technical Recommendations for Highways
1.4 DEFINITIONS
For the purpose of this document, the following definitions will apply;
Safety Critical item: A safety item is any asset element where the deteriorated condition constitutes
an immediate risk to the safety of personnel in the plant.
Inspection: Activities which by means of examination, observation or measurement, determine the
conformance of material, parts, components, etc. to predetermined specifications and quality
requirements.
Maintenance: All activities required retaining an item of plant in, or to restore it to acceptable condition,
including the examination and evaluation of the actual condition.
Maintenance Philosophy: The principle approach decided upon for performing maintenance, such as
pro-active or reactive maintenance.
Maintenance Strategy: Management method used in order to achieve the maintenance objectives.
Furthermore it is the choice of routine maintenance tasks and the timing of those tasks, designed to
ensure that an item of equipment continues to fulfil its intended functions.
Testing: All activities required determining the actual performance or condition of an item.
Civil or Structural Engineering Designer: An Engineer specialising in the Civil or Structural
Engineering field, having experience in the design and construction of Civil or Structural Engineering
infrastructure.
Engineer: A registered Professional Engineer or a registered Professional Engineering Technologist,
specialising in and having experience in the design and construction of respective civil engineering
assets.
Inspector: A competent civil or structural Designer, Engineer, Plant/Power Station Engineer or Plant
Foreman who have been specifically trained in how to conduct structural inspections, and has
experience in structural inspections.
CONTROLLED DISCLOSURE
When downloaded from the EDMS, this document is uncontrolled and the responsibility rests with the user to ensure it is in line
with the authorised version on the database.
Inspection Manual for Civil Works at Eskom’s Unique Identifier: 240-99527377
Power Stations Revision: 2
Page: 14 of 113
It is envisaged that the initial inspection will either be visual or carried out with a mechanised system,
depending on the asset to be inspected. After the inspection, a report must be submitted. This report
will be kept on record for the OHSA inspector. The report shall indicate, depending on the type of the
asset to be inspected, how the inspection was carried out, supported by photographs and sketches. It
must also provide recommendations on possible repair methods. If needed, recommendations are to
be provided on how to proceed with more detailed investigations or to deem the structure structurally
sound.
CONTROLLED DISCLOSURE
When downloaded from the EDMS, this document is uncontrolled and the responsibility rests with the user to ensure it is in line
with the authorised version on the database.
Inspection Manual for Civil Works at Eskom’s Unique Identifier: 240-99527377
Power Stations Revision: 2
Page: 15 of 113
4. MAINTENANCE POLICY
It is strongly recommended that each Power Station should develop a civil engineering maintenance
policy, based on the principles outlined in these guidelines. The primary purpose of a maintenance
policy is to ensure that all civil engineering assets are maintained in such a way that personnel working
in the plant can do so safely, with minimal production interruption, and that the value of the assets is
protected. Attached in Appendix A is a Civil Engineering Status Tracking Checklist Guideline that may
be used by stations as a guide.
CONTROLLED DISCLOSURE
When downloaded from the EDMS, this document is uncontrolled and the responsibility rests with the user to ensure it is in line
with the authorised version on the database.
Inspection Manual for Civil Works at Eskom’s Unique Identifier: 240-99527377
Power Stations Revision: 2
Page: 16 of 113
% Original Typical
Category Description
Strength Remedial Action
The plant assets are in excellent/new condition
or have slight evidence of surface deterioration,
1 100 None Required
but to an extent that there is no reduction in
strength.
CONTROLLED DISCLOSURE
When downloaded from the EDMS, this document is uncontrolled and the responsibility rests with the user to ensure it is in line
with the authorised version on the database.
Inspection Manual for Civil Works at Eskom’s Unique Identifier: 240-99527377
Power Stations Revision: 2
Page: 17 of 113
that this person is familiar with all safety and operational procedures in the plant, and will guide the
Inspector according to these procedures, so that the visual inspection does not compromise the safety
of anybody involved.
5.2.2 Induction
Where an induction is required, the Client must make the necessary arrangements and inform the
Inspector in advance. The Client must communicate requirements for personal protective equipment to
the Inspector upfront. This requirement should be specified in the scope of work of enquiry documents
for the procurement of professional services.
5.2.5 Equipment
The following equipment will generally be required depending on the infrastructure to be inspected:
Camera
Binoculars
Crack width gauge
Geologist hammer
Torch
CONTROLLED DISCLOSURE
When downloaded from the EDMS, this document is uncontrolled and the responsibility rests with the user to ensure it is in line
with the authorised version on the database.
Inspection Manual for Civil Works at Eskom’s Unique Identifier: 240-99527377
Power Stations Revision: 2
Page: 18 of 113
6. INSPECTION SCHEDULE
7.1 REPORTING
All reports described in this section must be retained in both electronic and hardcopy format. Listed
below are the minimum requirements for all inspection reporting;
The date of the inspection, name and affiliation of the Inspector.
The names of plant personnel present during the inspection.
What assets were inspected, and what portions of those assets were inspected. It must not be
assumed that where a report records nothing there were no problems. Reasons for not inspecting
certain portions must also be documented e.g. restricted or unsafe access.
CONTROLLED DISCLOSURE
When downloaded from the EDMS, this document is uncontrolled and the responsibility rests with the user to ensure it is in line
with the authorised version on the database.
Inspection Manual for Civil Works at Eskom’s Unique Identifier: 240-99527377
Power Stations Revision: 2
Page: 19 of 113
The condition category for all elements of the plant assets inspected, using the categorisation
described in Table 5-1.
Recommended actions to be taken by the maintenance personnel at the plant. Where any
structural member or portion of any structure is identified as 4 or 5, recommendations regarding
repairs or replacement must be provided as soon as possible, especially if the structure is at risk of
failure and therefore a safety risk. As the intention of the visual inspection does not include design
remedial measures, the recommendation may simply be that an Engineer must be contracted to
provide a design.
Clearly labelled photographs identifying defects, showing their condition and location.
Marked up layouts indicating locality of infrastructure.
Details of any alterations made to or improper usage of infrastructure, including exposure to
conditions not generally designed for.
Possible root causes of defects.
A written report must contain a summary of all remedial actions recommended, and these must be
prioritised according to the priorities defined in Table 7-1 below
Table 7-1: Prioritisation of Elements
Priority Description
X Where a plant asset or portion thereof cannot be used for its intended purpose
in its current condition, but may not be required to be used for some time, it
must be recorded as Priority X.
A. All members in condition category 5, any primary structural members in
conditions category 4, and any other members where the deterioration leads to
risk to personnel safety must be recorded as Priority A.
Repair or replacement of the structural members, or other recommended work,
requires urgent, immediate action.
B. All secondary or tertiary members in condition category 4, and any other
structural members requiring repair or replacement in the short term must be
recorded as Priority B.
Repair or replacement of the structural members, or other recommended work,
should be scheduled as soon as possible, but not later than one year from date
of this report.
C. Repair of the structural members, or other recommended work, will be required
within the next three years.
A written report must be submitted to the Plant Engineer within four weeks after the date of the
inspection. Depending on the scope of the inspection, the report may be submitted sooner or later
as agreed prior to the start of the inspection.
All safety critical findings must be communicated to the Plant Engineer immediately or at the end of
that day of inspection.
A brief written report of all safety critical findings must be submitted within three days after the date
of inspection. Safety critical items include only those items that are considered by the Inspector to
constitute an immediate hazard to the safety of personnel in the plant.
All inspection reports submitted must be signed by an Engineer or Technologist professionally
registered with ECSA.
CONTROLLED DISCLOSURE
When downloaded from the EDMS, this document is uncontrolled and the responsibility rests with the user to ensure it is in line
with the authorised version on the database.
Inspection Manual for Civil Works at Eskom’s Unique Identifier: 240-99527377
Power Stations Revision: 2
Page: 20 of 113
The inspection report must be captured on the relevant document management system.
Recommendations made should be captured and progress tracked ensuring that remedial actions
are implemented timeously.
7.2 FOLLOW-UP
Within one month of receiving the Report of Safety critical Items, the Client must submit to the
Inspector a statement of what actions has been taken to rectify each of the safety critical items
identified, and recommendations issued. Should this statement not be received, the Inspector must
then request it from the Client, or must visit the site to ensure that appropriate action has been taken.
Within six months of receiving the inspection report, the Client must submit to the Inspector a statement
of what action has been taken as a result of the report, and what further action is planned, in
addressing the recommendations made in the report.
CONTROLLED DISCLOSURE
When downloaded from the EDMS, this document is uncontrolled and the responsibility rests with the user to ensure it is in line
with the authorised version on the database.
Inspection Manual for Civil Works at Eskom’s Unique Identifier: 240-99527377
Power Stations Revision: 2
Page: 21 of 113
8. STRUCTURAL INSPECTIONS
8.1.1 Description
Eskom power stations use the following cooling systems:
a) Wet-cooling: the wet-cooling system follows the counter-flow concept in which air flows upward
through the fill section and interfaces counter-currently with falling hot water; or
b) Indirect dry-cooling: the dry cooling system follows the concept where air flows upwards through
the piping or radiators situated at the bottom of the shell filled with flowing with hot water and so
thus cooling it down.
c) Direct dry-cooling: direct dry cooling involves directly cooling of steam from the turbine e.g. using
air cooled condensers instead of a cooling tower.
Generally cooling tower shells are cast in rings by means of a climbing formwork system and supported
on inclined columns, which in turn are supported on ring-shaped foundations.
Typically cooling towers are measured at the foundation annular ring beam. The foundation ring beams
are typically supported on augered reinforced concrete piles. In other cases they may be supported by
mass concrete bases under diagonal columns taken to the bedrock.
Typically pond floors, in areas of made-up or back-filled ground, are supported on augered piles.
CONTROLLED DISCLOSURE
When downloaded from the EDMS, this document is uncontrolled and the responsibility rests with the user to ensure it is in line
with the authorised version on the database.
Inspection Manual for Civil Works at Eskom’s Unique Identifier: 240-99527377
Power Stations Revision: 2
Page: 22 of 113
8.1.3 Inspections
Visual inspections should be performed on all cooling towers up to a height not exceeding 10m; above
which this height mechanised systems should be used. The visual inspection shall comprise of the
following:
a) Shell
Outer surface for the first 10m;
Inner surface, if possible;
b) Supporting columns;
c) Cooling pond with floor and wall
Water distribution channels;
Packing and drift eliminators supports;
Walkways.
Photographic records should be compiled to assist and document the inspection. Observations should
be referenced to the photographs.
Typically inspections of cooling towers should include the following:
a) Check for major geometrical imperfections in any of the cooling tower shells. Edge shearing strain
effects will generally be noticeable in cooling towers and manifested in the form of hairline bending
cracks at the skirt level. These may be of insignificant concern.
b) Check for signs of cracks in the shell. Cracking at the skirting is usually specifically ascribed to
temperature from solar radiation. Shells are generally provided with reinforcement at both faces
(some of the old cooling towers are reinforced with a single layer of reinforcing placed in the middle
of the shell) to cater for horizontal bending moments that could be caused by the distribution of
wind pressure and/or an uneven rise in temperature. Localised bulging; meridianal bulging; as well
as circumferential bulging due to bad setting out of shutters during construction; may be evident.
Large meridianal or vertical cracks in the shell will be cause for concern. Cracking on the outer
surface of the shell, attributable to inadequate concrete compaction, may also be evident. In
addition, during concrete casting, large aggregate may have been retained between the upper
shutter and the diagonal reinforcement and, as a result, voids could have formed underneath it.
From these voids hairline cracks might develop and propagate to the surface.
c) Check for water seeping through the shell. This takes place where grout leakage has occurred,
and generally occurs at the horizontal construction joints at the concrete casting lifts. It can be
particularly noticeable on the negative slopes.
d) Check for any signs of localised spalling. Spalling is typically more evident lower in the shell and
up to the sixth construction ring. The probable cause is reduced cover in parts of the shell where
the reinforcement is very congested. The typical concrete cover on the outer surface of the shell
should be established from the drawings.
e) Check the cooling tower components for signs of biochemical attack by algae or other micro-
organisms.
f) Check the condition of the shell-supporting columns. Where scale deposits (presumably calcium
sulphate) are evident on the surface; this is caused by wind-driven falling water. It may then be
necessary to scratch the surface with a sharp instrument in order to reveal the quality of the
concrete underneath. Concrete samples are usually sent to a laboratory to analyse the percentage
of sulphate in the concrete. Check for cracks in the columns and plinths or column blocks. Some
columns may display minor cracks. Concrete spalling may be evident as a consequence of the
small cover provided to the hoop steel.
CONTROLLED DISCLOSURE
When downloaded from the EDMS, this document is uncontrolled and the responsibility rests with the user to ensure it is in line
with the authorised version on the database.
Inspection Manual for Civil Works at Eskom’s Unique Identifier: 240-99527377
Power Stations Revision: 2
Page: 23 of 113
g) Check the joints between the foundation and the cooling water duct inlets for spalling. Check for
visible signs of sandpaper texture formation as a result of condensate attack.
h) Check water-distribution channels and drainage trenches for blockages by grass, leaves and other
debris.
i) Check the condition of the packing support structure. Check the column and beam system
supporting the drift eliminators for any awkward eccentricities or movement caused by the volume
changes in the asbestos louvres, even though packing is regarded as a part of the operating plant.
Maintenance and repair thereof is therefore considered part of the normal maintenance. Check
whether drift eliminator louvres have fallen and caused damage to the fill, distribution pipes or
sprayers. Misalignment can result from a best-achievable fit at the time of construction. In such
cases, check for visible sliding movement at the interface. Also swelling of asbestos components
can push the ribbed beams away from their original position. Where the displacement cannot be
recovered during the contraction of the asbestos; and the catchment slots in the beams are not
deep enough to hold the louvres in position; then local collapse may result. Check for blockage of
drift eliminators as a result of algae growth. Check for localised spalling in the precast columns.
Check for cracks in the connections of bracing components. As the drift eliminators expand during
the normal operation of the cooling tower, and contract when not in operation, check whether the
allowance for expansion has been reached and whether the drift eliminators bear directly onto the
eliminator support beams. (Any movement in the drift eliminators may then result in a lateral push
on the support beam and over a period of time, especially during periods of rapid expansion
immediately after an outage, and the induced force may be sufficient to push the support beam
from its support.)
j) Check safety of walkways, handrails and cat ladder, even though safety issues are regarded as a
part of the normal plant operating procedures. Check whether walkway support beams rest fully on
their supports, or whether they slide on them. If in timber, deterioration is usually the result of the
intermittent dry and wet conditions experienced.
k) Check the pond wall and the precast packing supports. The minimum cover to reinforcement
should be established from the drawings. If the cooling pond is emptied for the purpose of
inspection, check the pond walls for shrinkage cracks. Pond wall expansion joints generally require
replacement at certain intervals. Check the pond floor slab for cracks.
l) Check for Vertical cracks. Vertical cracks in the top third of cooling towers tend to occur as a
consequence of wind-induced vibration; foundation movements; and thermal conditions inherent in
the operation of the towers.
There are many unknown factors affecting a Cooling Tower, which could in fact affect the integrity and
result in of the collapse of the structure.
The principal factors are:
The wind speed on its own is already an uncertainty:
The wind uprating factor, which is applied to the tower, may be different. The Design Engineer
normally decides on this value from certain values, which are given in the Code.
The distribution of the wind around the tower could be influenced by the position of the towers and
the materials of the tower could differ from those accepted i.e. the crushing and tensile strength of
the concrete; the effect of the reinforcing on the concrete; and the reinforcing on its own.
The lengths, depths and spacing of the existing vertical cracks in the shell.
For those cooling towers which were mothballed, it is recommended that, prior to any cooling tower
being placed back into operation; a detailed inspection is to be performed.
CONTROLLED DISCLOSURE
When downloaded from the EDMS, this document is uncontrolled and the responsibility rests with the user to ensure it is in line
with the authorised version on the database.
Inspection Manual for Civil Works at Eskom’s Unique Identifier: 240-99527377
Power Stations Revision: 2
Page: 24 of 113
8.1.4 Testing
In the case that testing is recommended following the visual inspection, these shall be performed by a
specialist company. These tests shall comprise of but not limited to the following:
Reading of Concrete Surface Hardness to provide indication of concrete strength;
Depth of Carbonation;
Concrete Strength of Cored Samples;
Chemical Tests on the Cooling Water and Condensate;
Chemical tests on concrete samples;
If possible, chemical analysis of the soils under the slab of the Ponding Area and foundations;
3D Survey to assess possible foundation settlements.
8.2.1 Description
Chimneys at Eskom power stations are:
Single flue chimneys: The typical single flue chimney consists of a concrete shell, serving
between two to five generating units; with an interior brick-lining supported at regular intervals on
corbels on the shell. A non-accessible air space exists between shell and lining.
Multiple flue chimneys: The typical multiple flue chimney consists of a reinforced concrete
windshield with three brick flues supported on intermediate concrete floors.
CONTROLLED DISCLOSURE
When downloaded from the EDMS, this document is uncontrolled and the responsibility rests with the user to ensure it is in line
with the authorised version on the database.
Inspection Manual for Civil Works at Eskom’s Unique Identifier: 240-99527377
Power Stations Revision: 2
Page: 25 of 113
a) Concrete windshield;
o The top 40m of the chimney is treated with acid resistant paint. Rainwater falling onto the top
support slab drains off through a series of weep holes in the windshield.
b) Brick flues
Figure 8-2 Typical cross section of a flue lift at support slab level
CONTROLLED DISCLOSURE
When downloaded from the EDMS, this document is uncontrolled and the responsibility rests with the user to ensure it is in line
with the authorised version on the database.
Inspection Manual for Civil Works at Eskom’s Unique Identifier: 240-99527377
Power Stations Revision: 2
Page: 26 of 113
e) Lightning protection, earthing connections and other fixtures at the chimney top;
f) Waterproofing at the top slab;
o Typically waterproofing consists of acid resistant ceramic tiles on top of a mortar screed. The
tiles have an adequate slope to drain rainwater away. The jointing material is also acid
resistant.
g) Chimney lift;
o The steel gantry tower is braced back to the windshield at regular intervals.
h) Steel staircase and steel platforms;
o The stairs provide access. The steel structure is supported on columns on plinths at ground
level anchored to the windshield at regular intervals.
i) Thermal insulation;
o Mineral wool is used as thermal insulation.
Generally the typical layout and elevation of a power station’s chimneys; the concrete used; and the
concrete strength; is indicated on the construction drawings. These drawings are, in most instances,
stored at the Power Station.
CONTROLLED DISCLOSURE
When downloaded from the EDMS, this document is uncontrolled and the responsibility rests with the user to ensure it is in line
with the authorised version on the database.
Inspection Manual for Civil Works at Eskom’s Unique Identifier: 240-99527377
Power Stations Revision: 2
Page: 27 of 113
c) The concrete slabs may develop cracks that fall outside the specified limits for reinforced concrete
sections in bending. Creep deformation; and lateral movement between the support slabs and the
windshield may also take place.
d) Rotation or distortion of the bearing pads may occur.
e) The acid resistant ceramic water proofing tiles may have an adequate slope to drain the rainwater
away and may deteriorate. The condition of the jointing material may also deteriorate.
f) The acid resistant paint at the top 40m of the chimney may no longer be intact resulting in signs of
deterioration. Rainwater falling onto the top support slab could be acidic and stain the chimney.
g) The anchors of the lightning protection may loosen.
h) Acidic conditions at the chimney top may affect any galvanized steel items – which will lose their
protective coating and become corroded.
i) Creep deflections of the support slabs have taken place at all of Eskom’s multi flue chimneys.
These deflections have been large enough to cause complete gap closure at many of the flue
intersections. Thermal expansion takes place when hot flue gasses pass through the flue. The
inclination is for the flue to contract again when the unit is switched off. A closed gap between lifts
will cause friction forces to develop during expansion or contraction of the flue. Gap closure at
other stations has resulted in severely cracked brickwork in the top 3m to 8m of most of the flue
lifts.
8.2.3 Inspections
The aim of this inspection is to locate all possible degradation peculiar to chimney structures and their
operational environmental conditions.
Figure 8-3 Typical cross section of a flue lift at support slab level
CONTROLLED DISCLOSURE
When downloaded from the EDMS, this document is uncontrolled and the responsibility rests with the user to ensure it is in line
with the authorised version on the database.
Inspection Manual for Civil Works at Eskom’s Unique Identifier: 240-99527377
Power Stations Revision: 2
Page: 28 of 113
8.2.4 Testing
If testing is required it shall be carried out by a specialised company. This can comprise the following:
Chemical testing of Flue Gases.
Depth of Carbonation
Concrete Strength on Cored Samples
Chemical tests on concrete samples
8.3.1 Description
The latest generation of the existing Eskom coal-fired power generation fleet use coal storage silos.
These power stations include Lethabo, Tutuka, Matimba and Majuba. The former three stations have a
six in line arrangement with the overland coal conveyor feeding over the top of each silo whilst Majuba
has three silos with the overland conveyor feeding to the top of the central silo and splitting via two
over-silo conveyors to feed the two flanking silos. The former three stations’ silos have hoppers lined
CONTROLLED DISCLOSURE
When downloaded from the EDMS, this document is uncontrolled and the responsibility rests with the user to ensure it is in line
with the authorised version on the database.
Inspection Manual for Civil Works at Eskom’s Unique Identifier: 240-99527377
Power Stations Revision: 2
Page: 29 of 113
with 3CR12 liners whilst the Majuba hoppers are currently being retrofitted with the same with a change
in the slope of the hoppers to improve material flow.
The fleet includes a few stations with ash (Duvha, Matla, Lethabo and Tutuka) and lime (Duvha, Matla
and Majuba) silos. Table 10-1 identifies the location and number of silos at the various stations.
Table 8-1: Number off and Location of Concrete Silos
Duvha - 3 5
Matla - 3 6
Majuba 4 6 -
Matimba 6 - -
Lethabo 6 - 3
Tutuka 6 - 4
Medupi 3 6 -
Kusile 2 6 -
8.4.1 Description
There are a number of liquid retaining structures in a typical power plant and these include but not
limited to:
Water treatment plants
Water storage tanks
CONTROLLED DISCLOSURE
When downloaded from the EDMS, this document is uncontrolled and the responsibility rests with the user to ensure it is in line
with the authorised version on the database.
Inspection Manual for Civil Works at Eskom’s Unique Identifier: 240-99527377
Power Stations Revision: 2
Page: 30 of 113
8.4.3 Inspections
8.5.1 Description
All stations consist of bulk material handling systems in the form of overland and elevated conveyors
for the conveyance of coal from the stockyards to the silos or staithes and from these containment
structures to the boilers as well as ash from the boiler to ash dumps or dams.
8.5.3 Inspections
Conveyors located at ground level up to a height of no more than 10m could be inspected from ground
level; above which visual external inspections requiring crane lifted man-cages or mechanised visual
inspections in the form of drones will be required. The latter may not be a feasible option to obtain
closer inspection of under gantry members and connections.
CONTROLLED DISCLOSURE
When downloaded from the EDMS, this document is uncontrolled and the responsibility rests with the user to ensure it is in line
with the authorised version on the database.
Inspection Manual for Civil Works at Eskom’s Unique Identifier: 240-99527377
Power Stations Revision: 2
Page: 31 of 113
8.6 STEEL STRUCTURES
8.6.1 Description
There are typically many steel structures at a power station such as the boiler house structure; the
turbine house structure; workshops and stores; HV yard structures; conveyor structures; and several
crawl beams.
8.6.2.1 Rusting
Steel rusting can be present at different level. A patina of rust indicates lack of maintenance and it
does not compromise the structural stability of the structure, however it is a sign that the corrosion
protection has been compromised and deterioration will be accelerated leading to deep rusting and
pitting seriously compromising the structural stability.
Base plates and holding down bolts can be heavily affected by rust. The water tends to pool around
them causing heaving rusting.
Pipes must be checked for pitting. Pitting can actually create holes in the pipes weakening them. Rust
can also form at the pipe supports reducing the pipe wall thickness thus compromising the pipe
stability.
Bolted connections must be inspected to ensure that there are not missing bolts or heavily rusted bolts
and the connection is not badly rusted.
Welded connections must be inspected for rust and cracks which may be caused by rust.
8.7 BUILDINGS
8.7.1 Description
Buildings at a typical power station, and included in this chapter, would include but not limited to the
following:
Turbine house and switchgear buildings;
Main administration building;
Medical / fire station buildings;
CONTROLLED DISCLOSURE
When downloaded from the EDMS, this document is uncontrolled and the responsibility rests with the user to ensure it is in line
with the authorised version on the database.
Inspection Manual for Civil Works at Eskom’s Unique Identifier: 240-99527377
Power Stations Revision: 2
Page: 32 of 113
The main structures at power station are the turbine and the boiler house. This is generally a reinforced
concrete and steel structure framed structure with brick infill and/or metal sheet cladding. The roof is
generally a steel structure with metal roof sheeting.
Other power station buildings are typically steel-framed structures with galvanised steel cladding or
concrete frames with brick infill panels. The roofs are generally also steel cladded although some roofs
may be concrete.
Elements of buildings include:
Foundations;
Superstructure (walls, floors etc.);
Floor covering (tiles, etc.)
Roofs;
Stairs;
Damp proof course and waterproofing.
Ceilings, partitions etc.;
Floor covering (carpeting, vinyl tiles, etc.);
Windows, doors, handrails, ironmongery, etc.;
Insulation;
Wall finishes (painting);
Curtain walling;
Timber / joinery etc.;
Gutters and downpipes.
8.7.2.1 Deterioration
Deterioration of buildings occurs due to:
Weather;
Vandalism, abuse & theft;
Differential movements;
Wear & tear;
CONTROLLED DISCLOSURE
When downloaded from the EDMS, this document is uncontrolled and the responsibility rests with the user to ensure it is in line
with the authorised version on the database.
Inspection Manual for Civil Works at Eskom’s Unique Identifier: 240-99527377
Power Stations Revision: 2
Page: 33 of 113
Condensation;
Atmospheric pollution;
Lack of maintenance;
Defective materials; and
Pests.
Typically the problems experienced are:
CONTROLLED DISCLOSURE
When downloaded from the EDMS, this document is uncontrolled and the responsibility rests with the user to ensure it is in line
with the authorised version on the database.
Inspection Manual for Civil Works at Eskom’s Unique Identifier: 240-99527377
Power Stations Revision: 2
Page: 34 of 113
8.8.1 Description
Power station structures included in this chapter include the following:
Boiler house structures;
Turbine house structures;
Coal staithes;
Blow-down sumps;
Precipitators & bagfilter plant;
Auxiliary bays;
Boiler bottom ash sumps;
Flue ducts;
Machine foundations;
Workshops and stores,
Pump houses;
High voltage yards;
Sub-stations.
CONTROLLED DISCLOSURE
When downloaded from the EDMS, this document is uncontrolled and the responsibility rests with the user to ensure it is in line
with the authorised version on the database.
Inspection Manual for Civil Works at Eskom’s Unique Identifier: 240-99527377
Power Stations Revision: 2
Page: 35 of 113
8.8.1.2 Turbine house structures
The turbine house structure provides protection to the turbine generator and related plant. This building
is usually a combination of reinforced concrete and structural steel elements.
8.8.1.13 Sub-stations
Sub-stations are mostly brick structures with timber roof trusses and metal roof sheeting. A reinforced
concrete floor supports the switchgear equipment and slotted openings provide access to the cables in
the sub-station basement.
CONTROLLED DISCLOSURE
When downloaded from the EDMS, this document is uncontrolled and the responsibility rests with the user to ensure it is in line
with the authorised version on the database.
Inspection Manual for Civil Works at Eskom’s Unique Identifier: 240-99527377
Power Stations Revision: 2
Page: 36 of 113
8.8.2 Problems
Typically the following problems experienced are:
CONTROLLED DISCLOSURE
When downloaded from the EDMS, this document is uncontrolled and the responsibility rests with the user to ensure it is in line
with the authorised version on the database.
Inspection Manual for Civil Works at Eskom’s Unique Identifier: 240-99527377
Power Stations Revision: 2
Page: 37 of 113
resulting in the internal steel pipework to be corroded, concrete wall to be deteriorated, and the
concrete discharge pipe to be blocked with ash and aggregate rubble
No lining of sump to protect concrete surface from deteriorating due to thermal shock and chemical
attack from contaminated demineralised water.
The overflow line at the blow down sump sometimes drains into the boiler bottom ash sump from
where the overflow water gets pumped to the ash dams. The overflow pipeline becomes blocked
with ash, resulting in unacceptable pressures building up in the blow-down sump.
Temperature cracks; corrosion; spalling; and exposure of aggregates in the concrete.
No lining of sumps where concrete has deteriorated.
Inadequate drainage capacity of the blow down sumps in the form of misaligned, cracked, and
corroded overflow steel pipelines and concrete drainage pipelines. This induces downstream
blockages resulting in unacceptable backflow pressures building up in the blow-down sump which
may lead to the rupture of the concrete slab within the blow down sump at the basement level.
Holes in walls to drain the quenching water. This prevents proper quenching of the blow down.
Surplus quenching water should drain via an overflow pipe into the overflow sump.
The blow down Sump is a critical asset as a unit cannot be on load if the sump is not available to
facilitate the quenching process and drainage requirements. The blow down Drainage System has
no redundancy making it critical to the operation of the units.
CONTROLLED DISCLOSURE
When downloaded from the EDMS, this document is uncontrolled and the responsibility rests with the user to ensure it is in line
with the authorised version on the database.
Inspection Manual for Civil Works at Eskom’s Unique Identifier: 240-99527377
Power Stations Revision: 2
Page: 38 of 113
Transformer rails often get water and debris trapped in grooves depending on its design. This may
aggravate and increase corrosion.
8.8.2.13 Sub-stations
The sub-stations do not always provide adequate dust-proof protection to sensitive electrical
equipment.
Sub-stations are currently not designed to withstand large internal pressures caused by an
explosion that could result from a short circuit in the switchgear.
Poor expansion joint details have resulted in cracks developing in the brickwork.
Fire sealing in buildings also to be inspected and maintained as the lifespan is limited.
CONTROLLED DISCLOSURE
When downloaded from the EDMS, this document is uncontrolled and the responsibility rests with the user to ensure it is in line
with the authorised version on the database.
Inspection Manual for Civil Works at Eskom’s Unique Identifier: 240-99527377
Power Stations Revision: 2
Page: 39 of 113
9. ROADS
9.1 DESCRIPTION
The information covered in this manual gives an overview of the activities involved in the inspection of
surfaced and unsurfaced roads (also referred to as sealed or unsealed roads). Road pavement types
can classified into surfaced and unsurfaced in accordance to the type of materials used to construct the
upper layer of the road as indicated in Figure 9-1below.
CONTROLLED DISCLOSURE
When downloaded from the EDMS, this document is uncontrolled and the responsibility rests with the user to ensure it is in line
with the authorised version on the database.
Inspection Manual for Civil Works at Eskom’s Unique Identifier: 240-99527377
Power Stations Revision: 2
Page: 40 of 113
The roads are generally shaped and provided with stormwater drains and culverts, where necessary, to
convey runoff water.
9.2 INSPECTIONS
Road inspections broadly fall into two categories, visual survey and instrument survey as indicated in
Figure 9-2 below.
The visual assessment is the most common and cost effective method for road condition assessment;
whereas instrument assessments are conducted to supplement the visual assessment information.
Inspections are conducted to determine:
Road condition indices;
Maintenance and rehabilitation needs;
Prioritisation
CONTROLLED DISCLOSURE
When downloaded from the EDMS, this document is uncontrolled and the responsibility rests with the user to ensure it is in line
with the authorised version on the database.
Inspection Manual for Civil Works at Eskom’s Unique Identifier: 240-99527377
Power Stations Revision: 2
Page: 41 of 113
9.2.1.1 Assessment procedure
For inspection and reporting purposes, roads should be labelled; preferable in accordance with the
official names found on the power station drawings. In the absence of such information, relevant power
station layout drawings should be marked up with the naming convention adopted for the respective
roads. It is advisable to adopt naming conventions in consultation with the client to ensure alignment.
The naming convention used in previous inspections should be adopted in subsequent inspections for
continuity.
Where the length of the road is more than 5km; it is recommended that the road be divided into 5 km
segments, and an assessment sheet completed for each segment. Segments can also be adopted
where the road consists of different material types. It is recommended that previously used segments
should be adopted for subsequent inspections.
Where inspections are carried out via driving, these should be carried out at speeds less than 20km/h,
with stops at least once per kilometre. Inspections should be carried out by two inspectors to allow one
inspector to focus driving and the second inspector to conduct the visual inspection.
For accurate results it is recommended that visual assessments be carried out in dry conditions, as it
becomes difficult to observe distresses on a wet road. It is further recommended that subsequent visual
assessments are carried out in the same period each year.
9.2.1.2 Distresses
Problems in roads are termed as distresses and these are as a result of deterioration of the strength of
the pavement structure caused by poor surfacing, ingress of water, traffic, climate, quality of material in
pavement layers and the age of the pavement. Visible distresses are an important input in determining
the condition of a pavement.
During the visual assessment distresses are recorded by the following attributes:
Type;
degree; and
extent
Distress types which manifest in the pavement with time are dependent on the road pavement type.
These are discussed in detail in the relevant guidelines, and discussed briefly in the subsequent
section. The information in the guidelines is not repeated in this manual, but reference to it is made
where necessary.
The degree of a particular type of distress is a measure of its severity. The degree of a distress is
usually expressed as a number, e.g. in TMH 9 degree 1 termed “slight” indicates first evidence of a
particular type of distress, degree 3 is termed “warning” and degree 5 termed “severe” which indicates
the worst degree of a particular distress type. It should be noted the degree of a distress is applied
differently for the different pavement types and distresses. TMH9 and TMH 12 include detailed
descriptions of degree of distress including photographic plates illustrating condition for each of the
distress types.
The extent of a distress type is a measure of how widespread the distress occurs over the length of a
segment/road under consideration. Figure 9-3 below adopted from TMH 9 is a diagrammatic illustration
of the extent of a distress and the associated classification.
CONTROLLED DISCLOSURE
When downloaded from the EDMS, this document is uncontrolled and the responsibility rests with the user to ensure it is in line
with the authorised version on the database.
Inspection Manual for Civil Works at Eskom’s Unique Identifier: 240-99527377
Power Stations Revision: 2
Page: 42 of 113
Attention should be paid to section A2.5 of TMH9 which provides the following examples for the
combined use of degree and extent.
“ If longitudinal cracking of degree 5 occurs seldom (i.e. extent 1) and longitudinal cracking of
degree 3 occurs extensively (i.e. extent 5), the degree 3/extent 5 cracking is recorded as the best
average indication of the severity of longitudinal cracking over the specific pavement segment in
terms of possible rehabilitation/reseal action. In such a case the degree 5 cracking will be viewed
as an area of localised distress requiring routine attention.
If longitudinal cracking of degree 5 and extent 2, and longitudinal cracking of degree 1 and extent 4
occurs, degree 5/extent 2 is recorded as the average indication of the problem that is most
significant in terms of possible action. (Cracking of degree 1 is not considered significant in terms
of possible action.)”
CONTROLLED DISCLOSURE
When downloaded from the EDMS, this document is uncontrolled and the responsibility rests with the user to ensure it is in line
with the authorised version on the database.
Inspection Manual for Civil Works at Eskom’s Unique Identifier: 240-99527377
Power Stations Revision: 2
Page: 43 of 113
9.2.1.3 Visual Assessment of Surfaced and Unsurfaced Roads
Visual inspection of flexible pavements is carried out in accordance with TMH9. During a visual
assessment the following elements of a flexible pavement are assessed:
Below is a brief description of some of the distress types, failure mechanisms and root causes.
a) Deformation
This is a development or change in the profile of the surface of the road surface. A typical example is
the formation of depressions. Deformations are assessed via rutting and undulations/settlement.
b) Cracking
This refers to the cracks that appear on the surface of the road pavement. Examples associated with
this mode of distress include transverse cracks, longitudinal cracks and crocodile cracks.
Transverse cracks – line cracks across the road surface;
Longitudinal cracks – line cracks running longitudinally along the road surface. Often located near
the edge of the pavement.
Crocodile cracks – cracking in a polygon pattern where the average diameter of the polygons is
less than 300mm.
Block cracks – the cracks have a definite block pattern. They are caused by the shrinkage of
treated (stabilised) pavement layers.
The mechanism of failure can be caused by shrinkage of the bituminous surfacing as a result of
decreased binder volume. This is caused when the binder ages, losing its lighter oils and aromatics.
The initial cracking usually consists of short longitudinal and transverse cracks randomly spaced over
the full road width. The severity of the cracking increases with ageing to form a diamond pattern. In
CONTROLLED DISCLOSURE
When downloaded from the EDMS, this document is uncontrolled and the responsibility rests with the user to ensure it is in line
with the authorised version on the database.
Inspection Manual for Civil Works at Eskom’s Unique Identifier: 240-99527377
Power Stations Revision: 2
Page: 44 of 113
this state secondary traffic induced cracking around the shrinkage cracks is often evident. If
maintenance is poor the condition can deteriorate so that the basic patterns of shrinkage cracks are not
obvious.
c) Disintegration of surfacing
This is the break-up and loss of the surfacing as manifested in potholes and patches.
Potholes are the cylindrical holes found in pavements.
Patches are areas from which surfacing material has been lost and reinstated by patching.
d) Smoothing of surface texture
Smoothing of the surface texture involves the loss of the macro texture and/or micro texture of the
surface with a resultant loss in skid resistance. The most common manifestation of this mode of
distress is bleeding. Bleeding occurs when the binder moves upward relative to the aggregate at the
surface of the pavement thus reducing surface texture depth. Bleeding is usually due to the
embedding or punching of the aggregate into the underlying base layer.
e) Construction related problems
Construction related problems include lack of quality control exercised during the manufacture and
construction of the surface; and poor reinstatement of service crossings.
The inspection sheet (Appendix B) provides a useful checklist for inspections of flexible pavements and
should be completed for each road segment. The grading sheets (Table 9-2 and Table 9-3) that follow
will assist to determine the degree of distress. Limits of the "sound", "warning" and "severe" categories
are provided for.
Table 9-2 : Summary of definitions of degrees of distress
CONTROLLED DISCLOSURE
When downloaded from the EDMS, this document is uncontrolled and the responsibility rests with the user to ensure it is in line
with the authorised version on the database.
Inspection Manual for Civil Works at Eskom’s Unique Identifier: 240-99527377
Power Stations Revision: 2
Page: 45 of 113
X = % OF UNIT LENGTH
MODE OF DISTRESS REMARKS SOUND WARNING SEVERE
Crocodile cracks Degree C3-C5 considered x < 10 10 < x < 20 x > 20
Longitudinal cracks Degree C3-C5 considered x < 50 50 < x < 80 x > 80
Potholes Degree C3-C5 considered x < 10 10 < x < 20 x > 20
Depressions Degree C3-C5 considered x < 10 10 < x < 20 x > 20
As noted in the figure above, concrete pavements have similar distresses as for flexible pavements
with additional distresses unique to concrete pavements, such as spalling, scaling, and map-cracking of
the concrete surfaces.
a) Map-cracking
Map cracking is distinguished by irregular cracking over the pavement surface.
CONTROLLED DISCLOSURE
When downloaded from the EDMS, this document is uncontrolled and the responsibility rests with the user to ensure it is in line
with the authorised version on the database.
Inspection Manual for Civil Works at Eskom’s Unique Identifier: 240-99527377
Power Stations Revision: 2
Page: 46 of 113
b) Spalling
Spalling is a chipping or splintering of sound pavement and usually occurs along the joints or cracks in
the pavement.
c) Scaling
Scaling is caused by the deterioration or disintegration of the concrete and may occur anywhere on the
pavement surface.
The inspection sheet (Appendix B) provides a useful checklist for inspections of concrete pavements
and should be completed for each road segment.
Parameters to be assessed
TMH12 lists the following road characteristics to be assessed:
General performance
Moisture condition
Gravel quantity/layer thickness
Gravel profile/shape as an assessment of water shedding capacity
Road drainage in terms of removal of water form roadside
Riding quality and influencing factors
Dust
Trafficability
Potholes
Rutting
Erosion
CONTROLLED DISCLOSURE
When downloaded from the EDMS, this document is uncontrolled and the responsibility rests with the user to ensure it is in line
with the authorised version on the database.
Inspection Manual for Civil Works at Eskom’s Unique Identifier: 240-99527377
Power Stations Revision: 2
Page: 47 of 113
Corrugation
Loose material
Stoniness
Cracks
Slipperiness and skid resistance
Isolated problems (above localised distresses)
Below is a brief description of some of the distress types, failure mechanisms and root causes.
a) General performance of the road / riding quality
The riding quality of the road is a major performance parameter affecting driver and passenger comfort
and safety. The road roughness will be influenced by the maintenance frequency, quality of grader
maintenance and material properties.
b) Moisture condition
Disturbance of windrows or loose material will usually indicate whether the material is wet. The
assessment of the condition is limited to a subjective rating of “wet” (damp) or “dry”
c) Gravel quantity/ layer thickness
This actually requires actual measurements of the layer thickness, or judgement by the Inspector taking
into account the material quality, traffic and any evidence of subgrade exposure.
Adequate cover of material over pipe drains and culverts can be a good indicator, bearing in mind that
all culverts/pipes should have sufficient cover to protect the structures from traffic loads.
d) Gravel quality and influencing factors
The properties contributing to good gravel are particle size distribution and cohesion. The gravel should
have a range of particles sizes ranging from very fines up to about 40mm stone in order to provide a
strong framework of stones interlocked by a tight matrix of fines. Rating should be classified as
excessive clay/silt, sandy, oversize stones and/or loose gravel.
e) Road profile/ shape as an assessment of water shedding capacity
The road with good profile tends to shed water rapidly avoiding the development of potholes. Where
the profile is flat, water tends to pond.
The inspection sheet (see Appendix B-3) provides a useful checklist for inspections of unpaved
pavements and should be completed for each road segment.
CONTROLLED DISCLOSURE
When downloaded from the EDMS, this document is uncontrolled and the responsibility rests with the user to ensure it is in line
with the authorised version on the database.
Inspection Manual for Civil Works at Eskom’s Unique Identifier: 240-99527377
Power Stations Revision: 2
Page: 48 of 113
The following guidelines provide information on the planning, devices, procedure and data
interpretation:
COTO guidelines for Network Level Measurement of Road Roughness
COTO guidelines for Network Level Measurement of Skid Resistance and Texture
COTO guidelines for Network Level Measurement of Pavement Deflection
COTO guidelines for Network Level Measurement of Rutting
COTO guidelines for Network Level Imaging and GPS Technologies
Below is a brief description of some of the test types.
DESIGN CUMULATIVE
FUNCTIONAL
TRAFFIC EQUIVALENT DESCRIPTION
CLASS
CLASS E80 / LANE
Major arterial E3 1.2 x 106 High volume and/ or any
heavy vehicles
Minor arterial E2 0.8 x 106 Medium volume of traffic,
few heavy vehicles
CONTROLLED DISCLOSURE
When downloaded from the EDMS, this document is uncontrolled and the responsibility rests with the user to ensure it is in line
with the authorised version on the database.
Inspection Manual for Civil Works at Eskom’s Unique Identifier: 240-99527377
Power Stations Revision: 2
Page: 49 of 113
9.2.2.2 Structural adequacy
The required structural capacity number (DSN800 = the number of blows necessary to penetrate
800mm of pavement) for the short- and long- term design periods is 70 and 105 respectively. The
DSN800 of each road is then determined.
However, the pavement depth should not just have the required total DSN800 value, but the strength
should also be distributed throughout the pavement in a balanced way. Most of the strength should be
vested in the top layers where stress caused by tyre contact pressure is highest.
The adequacies are further determined by comparing the in situ DCP profiles with the required TRH12
pavement design curves for light, medium and heavy traffic classes. Generally, points lying to the right
of the DCP design curve represent material of inadequate quality for that position. Any inadequate
zones are determined for the various traffic classes. Light traffic comprises mainly cars as well as a
very few heavy vehicles (E0 = < 0.2 x 106 E80 / lane). Light traffic comprising mainly cars, light
delivery and agricultural vehicles as well as a very few heavy vehicles has a value of E1 = 0.2 – 0.6
x 106 E80 / lane). Medium and high traffic classes have medium or high volumes of traffic and many
heavy vehicles with values of E2 – E3 = 0.8 – 12 x 106 E80 / lane).
Degree Description
1 Very few or no structural defects.
Very Good
2 Few structural structural defects.
Good
3 General occurrence of which most are only local occurrences if
degree is severe.
Fair
4 General occurrence of which a large number is severe.
CONTROLLED DISCLOSURE
When downloaded from the EDMS, this document is uncontrolled and the responsibility rests with the user to ensure it is in line
with the authorised version on the database.
Inspection Manual for Civil Works at Eskom’s Unique Identifier: 240-99527377
Power Stations Revision: 2
Page: 50 of 113
Degree Description
Poor
5 Many structural defects of which the majority is severe.
Very Poor
ACTION FREQUENCY
ROADS
a) Perform a visual assessment of all roads. Annually
b) Analyse information and produce a report with photographic record. Annually
9.4.1 Monitoring
In addition to inspections, the inspector would usually undertake to regularly monitor the roads. The
following is provided as a guide:
a) Weekly: Check if dust from gravel roads is a safety hazard (only on frequently used gravel roads).
b) Monthly during rainy season: Check all road surfaces for low spots where puddles form.
c) Monthly during rainy season: Check all road surfaces for water seepages.
d) Annually: Check roads for deformations; cracking; disintegration of surfacing; smoothing of
surface texture; construction problems; lack of drainage etc.
e) Summer: Check spread of invader/pioneer plants.
CONTROLLED DISCLOSURE
When downloaded from the EDMS, this document is uncontrolled and the responsibility rests with the user to ensure it is in line
with the authorised version on the database.
Inspection Manual for Civil Works at Eskom’s Unique Identifier: 240-99527377
Power Stations Revision: 2
Page: 51 of 113
The following activities are considered to be long-term rehabilitation measures and must be undertaken
by a specialist contractor:
Structural repair; and
Fog spraying or resurfacing.
Weaknesses develop in these surfaces due to weathering, the action of alternate cold and hot
conditions or failure of the base or subgrade. The maintenance of these surfaces may be divided into
four distinct operations:
Patching;
fog spraying;
scarifying;
Resealing.
Before maintenance repairs are made to the surface, it is important to make the usual investigation for
the cause of failure. If failure indicates poor drainage, this should be corrected before any repairs are
made on the surface.
Patching may consist simply of an application of a thin coat of bituminous material to an area where
cracking or ravelling appears and spreading a course mineral aggregate over the affected area. Care
should be taken in the application of the proper amount of bituminous material in order to prevent
bleeding with the resulting slipperiness of the repaired surface.
In areas where the surface shows ravelling and disintegration, a bituminous mixture may be placed
over the weakened area and then compacted. Both hot and cold bituminous mixtures are used, with
asphaltic concrete and sheet asphalt being the most common. Where the surface has disintegrated to
a depth of 50 or 75mm, the failed area should be cut out, all loose material removed, the base course
made true and firm, and the bituminous patching material placed in the hole. The edge of the hole
should be cut vertically and should receive a coat of bituminous material to seal out any moisture that
may enter the subgrade. The final patch should conform to the grade and contour of the existing
surface.
Patches may also be made by a penetration method that consists of filling the hole with aggregate,
compacting the aggregate, and then applying the bituminous material. Crushed stone is then applied
and the patch is rolled. Many different patching methods are used with good results. The method used
will depend on the type of bituminous surface and current practice prevailing in the particular locality.
Fog spraying is essentially a preventive maintenance operation. Its purpose is to seal the surface to
prevent penetration of water and to strengthen the wearing surface. The work consists of applying a
thin coating of bitumen over the surface and placing fine stone chips, peastone, or coarse sand over
the patched area. The patch is then broomed and rolled with a light roller.
Seal coats and surface treatments are widely used to rejuvenate old bituminous surfaces or to correct a
slippery condition. Slipperiness is usually caused by an excess of bitumen on the road surface. This
may be due to the application of too much bituminous material or an improper gradation of aggregate,
or it may be caused by the kneading action of heavy traffic pushing the asphalt binder to the surface.
Skid-proofing may be achieved by application of a surface treatment using sharp, angular aggregate
such as blast furnace slag or by disking the surface. Slurry seal coats are widely used for this purpose.
In severe cases the complete surface may have to be reworked in order to correct slipperiness.
When maintenance operations become excessively expensive, it is difficult to maintain an adequately
smooth surface, the pavement has to be widened or for other reasons, the old pavement may be
resurfaced. Before undertaking a resurfacing project, a careful study of its economic justification
should be made. A general rule of thumb is that resurfacing will probably be economical when from 2 -
3% of the total pavement area requires patching each year. Both the availability of money and the
priority of the project will influence the decision. A comprehensive study of the condition of the existing
CONTROLLED DISCLOSURE
When downloaded from the EDMS, this document is uncontrolled and the responsibility rests with the user to ensure it is in line
with the authorised version on the database.
Inspection Manual for Civil Works at Eskom’s Unique Identifier: 240-99527377
Power Stations Revision: 2
Page: 52 of 113
surface and related factors is desirable before undertaking a resurfacing project. Included among the
factors that must be given detailed consideration are the following:
History of pavement.
Existing physical condition.
Character of existing and anticipated traffic.
Relation of geometric design to safe and efficient operation of anticipated traffic.
Corrective measures that may be required in the preparation of an old surface for resurfacing may be
very considerable in extent or some-what minor, depending on the type and condition of the existing
surface and its adequacy to serve its new function as a base course. For example, major
reconstruction measures may be required when substantial changes in grade, profile, or crown are
called for in the new surface. Recommended reductions in grade and crown may be accomplished by
scarifying and re-compacting old surfaces such as water-bound macadam or stabilized soils, higher
types of surfaces may require removal and reconstruction to the desired grade and section. Changes
in width are generally accomplished by duplicating the original construction as closely as possible, with
particular attention being paid to the development of adequate supporting power in the widened section
so that this section will not subside under service to a lower elevation than exists in the original
pavement.
The old surface, regardless of its type, may be rough, with waves and bumps that are too considerable
in magnitude to be compensated for by a relatively thin wearing surface. These bumps and waves may
be removed by scarifying and re-compacting certain surface types. When old bituminous wearing
surfaces have these defects and are to be resurfaced, the bumps and waves may be removed by
cutting or burning away the old surface with a healer planer. Burners in a big, insulated furnace heat
and soften the surface, which is then scarified and remixed if desired, with additional bituminous
material added as needed. Sometimes it may be more desirable to correct existing surface
irregularities by the construction of a special levelling course, which may be the same bituminous
mixture used in the original construction or a new mix. The construction of a levelling course is a major
operation that usually is quite similar to the placing of a bituminous wearing surface. The course will
have a variable thickness and will be constructed to the desired section and grade. The levelling
course will have lower bitumen content than the wearing course. Holes and depressions that occur in
the existing surface must also be corrected before resurfacing (or the placing of a levelling course) may
begin. The holes are filled with the same mixture used in the original construction or with a special
patching mixture.
In many cases the preparation of the surface may consist simply of the removal of loose material on the
surface by the use of rotary brooms or power blowers. If excessively dusty or unconsolidated areas
remain after this treatment, they may have to be primed before construction may proceed. When
preparations are complete, the new surface is constructed.
CONTROLLED DISCLOSURE
When downloaded from the EDMS, this document is uncontrolled and the responsibility rests with the user to ensure it is in line
with the authorised version on the database.
Inspection Manual for Civil Works at Eskom’s Unique Identifier: 240-99527377
Power Stations Revision: 2
Page: 54 of 113
The slurry mixtures used vary a great deal, but for the most part they consist of a combination of loam,
cement, and water, or of asphaltic materials. Two widely used mixtures are as follows:
Soil 60 to 84 percent, cement 40 to 16 percent.
Soil 77 percent, cement 16 percent, and cut-back asphalt (SC-250), (MC-70), (RC-250), 7 percent.
The mix used should be fluid enough to spread rapidly and flow into small cavities.
The buckling or blow-up of old concrete pavements is a continuing problem; it is usually caused by
longitudinal expansion and the failure of transverse expansion joints to function properly. When this
occurs, it is often necessary to remove the damaged portion of the pavement and replace it with a
patch of concrete or bituminous material. Suckling or blow-ups may be prevented, when evidence of
extreme compression is noted in the pavement, by cutting a wider expansion joint if one already exists
or providing a new joint across the pavement.
Contingency Measures
If invasive species occur, then they should be eradicated.
CONTROLLED DISCLOSURE
When downloaded from the EDMS, this document is uncontrolled and the responsibility rests with the user to ensure it is in line
with the authorised version on the database.
Inspection Manual for Civil Works at Eskom’s Unique Identifier: 240-99527377
Power Stations Revision: 2
Page: 55 of 113
10. CULVERTS
Culverts provide vehicular access over watercourses and open stormwater drains; they typically
comprise precast box sections on an in-situ cast base slab or pipes.
Culverts are generally designed to take the full volume of water from a 1:50 year flood. They must also
be able to withstand the loads caused by large plant normally used on power station properties. In
some cases provision is also made for loads caused by abnormal traffic.
10.1 PROBLEMS
In polluted areas, possible blockages could result in overflow of contaminated water into adjacent
unpolluted vlei and veld areas.
The consequences of these typical problems would include potential contamination for grazers,
browsers, birds etc. and changes in floral species.
Common problems associated with culvert deterioration are:
Open or separated joints
Pipe settlement and shape deformation
High debris load causing sedimentation and blockage
Loss of material due to corrosion and/or abrasion
Cracking, spalling, scaling, exposed rebar
Evidence of fill material inside the culvert through an open joint
CONTROLLED DISCLOSURE
When downloaded from the EDMS, this document is uncontrolled and the responsibility rests with the user to ensure it is in line
with the authorised version on the database.
Inspection Manual for Civil Works at Eskom’s Unique Identifier: 240-99527377
Power Stations Revision: 2
Page: 56 of 113
11.1 EARTHWORKS
A visual inspection must be carried out on all embankments, cuttings and the formation to ensure that
there are no cracks, landslides and/or rock falls present.
It must also be observed that the formation is dry because this is pre-requisite for a stable track
structure.
Regarding the drainage all drains must be kept clean to allow water to flow freely.
The frequency of inspections is at least once a year.
CONTROLLED DISCLOSURE
When downloaded from the EDMS, this document is uncontrolled and the responsibility rests with the user to ensure it is in line
with the authorised version on the database.
Inspection Manual for Civil Works at Eskom’s Unique Identifier: 240-99527377
Power Stations Revision: 2
Page: 57 of 113
Loose or ineffective handrails and/or walkways and where bridge or culvert openings are
inadequate.
The frequency of inspections is at least once a year.
11.3 BALLAST
During the visual inspection of the ballast, attention to the following must be given, namely:
The ballast profile according to the classification of the Railway line and/or siding.
The condition of the ballast – To what percentage is the ballast foaled with other material.
The frequency of inspections is at least once a year.
11.4 RAILS
Visually observe for any wear and tear on the crown of the rail. Inspect the rails for visual cracks,
misalignment and measure the gauge of the track i.e. between the two rails usually 1065mm from
centre to centre.
Where the rails have been welded to form a continuous rail, these welds must be inspected for cracks
visually.
The frequency of inspections is at least once a year.
11.5 SLEEPERS
The sleeper, after rail, is the most important component of track superstructure in conventional railway
lines and sidings. Keeping track geometry, bearing loads acted from rails and transferring to the ballast
is the main duty of the sleepers.
Visual inspection of the sleepers is looking for the following;
Bending cracks – this happens in the centre of the sleeper transversal and/or diagonal.
Sleeper breakage due to derailment.
Cutting cracks – This usually appears in the rail seating area and in a distance between plug holes
transversally along rail longitudinal axis.
Sleeper instability in the fastening area – Ballast is not supporting the sleeper properly.
Overall condition of the sleeper.
During this inspection attention must also be given to the condition of the fastenings and the pads used
to seat the rails. The frequency of inspections is at least once a year.
11.6 TURNOUTS
Turnouts, slips and diamond crossings (collectively called ‘sets’) are expensive to replace, costly to
maintain and are the weak links in the track structure. These items need to be visually inspection
regarding their condition and reported on. The frequency for these inspections is at least once a month
CONTROLLED DISCLOSURE
When downloaded from the EDMS, this document is uncontrolled and the responsibility rests with the user to ensure it is in line
with the authorised version on the database.
Inspection Manual for Civil Works at Eskom’s Unique Identifier: 240-99527377
Power Stations Revision: 2
Page: 58 of 113
Clearance markers
Road signage like stop signs, speed signs etc.
The rail furniture will be visually inspected to determine the condition of said items.
The frequency of inspections is on a three monthly basis.
11.8 OVERALL
The visual assessment reports as describe above will be used to determine if any further tests,
assessments, etc. is required. Based on this then these specialised test and/or assessments will be
outsourced.
CONTROLLED DISCLOSURE
When downloaded from the EDMS, this document is uncontrolled and the responsibility rests with the user to ensure it is in line
with the authorised version on the database.
Inspection Manual for Civil Works at Eskom’s Unique Identifier: 240-99527377
Power Stations Revision: 2
Page: 59 of 113
12.1 DESCRIPTION
The elements included are:
stormwater drains;
clean water drains and diversion canals,
dirty water drains and central drains;
dissipator structures;
silt traps;
low flow sluice gates.
Drains are typically designed for a 1:25 year flood. However, depending on the specific circumstances
prevailing at a particular power station, this allowance may, in some cases, be increased up to a 1:100
year flood capability.
CONTROLLED DISCLOSURE
When downloaded from the EDMS, this document is uncontrolled and the responsibility rests with the user to ensure it is in line
with the authorised version on the database.
Inspection Manual for Civil Works at Eskom’s Unique Identifier: 240-99527377
Power Stations Revision: 2
Page: 60 of 113
In areas of low soil permeability, ground water pressures are contained by seepage through open
construction joints. In other areas, a system of subsoil drains may be used to ensure no excessive
buoyancy forces are exerted on the lining. Joints in these areas may be sealed with a hot-poured
bitumen sealant.
The dirty water canals preferably flow through an energy dissipater; silt traps and then into the pollution
control dam (for polluted flows) or into a by-pass canal (for diluted flows).
A central drain at a coal stockyard, for example, comprises a shallow-dished drain, as opposed to a
canal, running centrally along the length of the area to be drained. Some drains are lined with
interlocking concrete paving blocks (e.g. at Majuba power station coal stockyard).
In certain cases a central drain may also serve as a vehicle access route through an area under wet
conditions. Such drains may be designed as a flat, broad drain to cater for the anticipated quantity of
water and also to provide a rideable surface, with side slopes being negotiable for light and heavy-duty
vehicles. The drain should typically be lined, for example with concrete blocks, to prevent scour and for
use as a road-wearing course. The foundation layers would then be designed for light traffic over the
life of the power station.
CONTROLLED DISCLOSURE
When downloaded from the EDMS, this document is uncontrolled and the responsibility rests with the user to ensure it is in line
with the authorised version on the database.
Inspection Manual for Civil Works at Eskom’s Unique Identifier: 240-99527377
Power Stations Revision: 2
Page: 61 of 113
12.1.5 Low flow Sluice gates
Low sluice gates may be situated in a diversion box at the exit to the silt traps. Sluice gates are
typically of stainless steel construction. Water enters the diversion box through "V" notches in the silt
trap walls. The sluice gates operate in such a way that, during low flows, all polluted water enters the
pollution control dam. Higher flows (when the pollution load is reduced by dilution) pass over the canal
walls and into a diversion canal. Since the pollution load varies during the life of a power station, the
setting of the sluices is continuously monitored. The primary sluice settings and diversion box wall
levels are constructed to cater for the expected pollutant load. As this may vary because of various
other influences during a power station’s life-cycle, these levels are then adjusted to obtain optimal
operation.
12.2 PROBLEMS
CONTROLLED DISCLOSURE
When downloaded from the EDMS, this document is uncontrolled and the responsibility rests with the user to ensure it is in line
with the authorised version on the database.
Inspection Manual for Civil Works at Eskom’s Unique Identifier: 240-99527377
Power Stations Revision: 2
Page: 62 of 113
The ash or coal silt removed from the silt trap is not disposed to either the ash dam / dump or
stockpile disposal facility. The heaps of silt are being washed into the surrounding veld or into a
pollution control dam thereby reducing the holding capacity of the dam.
The consequences of these typical problems could be:
Serious pollution of the clean surface water diversion canal can occur as well as downstream into a
natural watercourse or vlei area.
A health hazard to grazers, browsers, small mammals and birds exists, if contaminated water is
being used for drinking purposes.
The aquatic ecosystem could be adversely affected resulting in species change (fauna/flora). The
downstream natural watercourses or vlei areas could also be adversely affected. (Vlei areas are
regarded as sensitive ecosystems).
Perform a visual inspection on surface drainage. This can form part of Every year
the visual assessment of the roads.)
Produce a report with photographic record.
Give maintenance guidelines (O&M manuals to be consulted).
b) Security fence area
Perform visual inspection (after rainfall season). Every year
Identify erosion areas.
Produce a report with photographic record
Give maintenance guidelines.
12.3.1 Monitoring
In addition to inspections, the artisan or assistant would usually undertake to regularly monitor the
drains and canals. The following is provided as a guide:
a) Drains & Canals
After rain: Check canals for silt deposition of more than 150mm.
After rain: Check for erosion on sides of canal.
Weekly: Check diversion canals for bare patches and any washed-out areas.
Quarterly: Check competency of joint sealant.
Annually: Check canal concrete lining for cracking or spalling:
5-Yearly: Check overall functioning of joints.
CONTROLLED DISCLOSURE
When downloaded from the EDMS, this document is uncontrolled and the responsibility rests with the user to ensure it is in line
with the authorised version on the database.
Inspection Manual for Civil Works at Eskom’s Unique Identifier: 240-99527377
Power Stations Revision: 2
Page: 63 of 113
b) Silt Traps
After rain: Check silt level in silt traps (±50mm maximum).
After rain: Check for silt in dissipater structure.
After rain: Check for debris in diversion box and sluice gate.
Weekly: Check silt level in silt traps (±50mm maximum).
Weekly: Check for silt in dissipater structure.
Weekly: Check for debris in diversion box and sluice gate.
Quarterly: Check competency of joint sealant.
5-Yearly: Check overall functioning joints.
Contingency Measures
CONTROLLED DISCLOSURE
When downloaded from the EDMS, this document is uncontrolled and the responsibility rests with the user to ensure it is in line
with the authorised version on the database.
Inspection Manual for Civil Works at Eskom’s Unique Identifier: 240-99527377
Power Stations Revision: 2
Page: 64 of 113
12.4.2 Silt traps
a) Silt heaps must be removed and the silt returned either to the ash dam / dump or a licenced
disposal facility. Silt removed from the silt trap must also be returned. Correct operation of the silt
trap and sluice gates must be undertaken so that minimal pollution of the natural stream takes
place.
b) Any silt in the veld or watercourses must be removed and returned. Where the veld is damaged
adjacent to the silt trap, the ground must be ripped, rehabilitated and revegetated.
c) The silt trap area must be fenced to prevent grazers and browsers from drinking contaminated
water.
d) If silt level in silt trap is 50mm or more, clean silt trap.
e) If silt in dissipater structure, clean dissipater by hand to prevent damage to blocks
f) If any debris in diversion box and sluice gates, clean. All debris to be removed from silt trap area.
g) If joint sealant damaged, remove damaged areas, clean joints to required depth, prime and seal
joints to manufacturer's instructions.
Contingency Measure
If silt is dumped along the side of an open drain, trench or canal, this silt should be immediately cleared
away. If the dumped silt has the potential to create an environmental hazard, then an incident report
should be filed and it should be determined who was responsible for the dumping incident.
CONTROLLED DISCLOSURE
When downloaded from the EDMS, this document is uncontrolled and the responsibility rests with the user to ensure it is in line
with the authorised version on the database.
Inspection Manual for Civil Works at Eskom’s Unique Identifier: 240-99527377
Power Stations Revision: 2
Page: 65 of 113
13.1 DESCRIPTION
A power station terrace and associated facilities, in addition to being drained by surface clean and dirty
water canals, is also drained by sub-surface drains.
The drains under consideration mainly relate to sub-surface drains on a power station terrace. At some
older power stations there is no separation between clean and dirty water drainage systems. Typically
drains can cope with the runoff occurring during a 1:10 year storm.
On newer power stations, clean water generally drains into a natural watercourse or a wetland. Dirty
water drains may drain into:
natural watercourses during high flows, usually through a dissipater
or, during low flows, into a pollution control dam through silt traps.
One of the primary functions of a pollution control works is to provide a facility to manage clean and
dirty water run off and groundwater in an environmentally responsible as well as a cost-effective
manner while meeting the requirements of the Water Act.
A pollution control system is designed to retain only polluted water. Clean water is designed to be
released into natural watercourses. Owing to the high dilution achieved during high flow periods
(rainstorms), polluted water may then be diverted past the pollution control systems. This results in
minimising the total volume of highly polluted water on any given Eskom property. Such an approach is
adopted only with the agreement of the Department of Water and Sanitation.
Sources of chemical pollutants entering into the station drains and stormwater drainage system are
from the following sources:
a) Ammonia plant: Gaseous ammonia after being dissolved in mixing tank becomes liquid ammonia.
b) Chemical laboratories and stores (bulk storage): All water treatment chemicals (acids, alkalis,
resins).
c) Contractors' yards: Herbicides and pesticides
d) Workshops: Acid baths dosed with lime.
e) Nursery: Herbicides, pesticides and fungicides.
f) Fire Training Area: Mono-ammonium phosphate; fluorinated protein foam.
g) Hydrogen Plant: Potassium hydroxide (KOH) in boiling cells.
Certain of these pollutants (notably acids) are corrosive to concrete and steel piping.
13.2 PROBLEMS
The typical problems are as follows:
Corrosion and deterioration of both steel and concrete pipes. On a power station terrace, this is
often caused by the unauthorised flushing of acid used at the water treatment plant down the
drains;
Oil-contaminated water entering the drains;
Potential blockages of drains may occur, for instance with silt/ash; which may cause backflow of
water and pipe failure.
Potential seepage of contaminated water into groundwater aquifers.
The consequences of these typical problems could be:
CONTROLLED DISCLOSURE
When downloaded from the EDMS, this document is uncontrolled and the responsibility rests with the user to ensure it is in line
with the authorised version on the database.
Inspection Manual for Civil Works at Eskom’s Unique Identifier: 240-99527377
Power Stations Revision: 2
Page: 66 of 113
Leakages;
Potential pollution to ground water;
Overflow from blocked drains into surface and groundwater resources;
Environmental damage downstream;
Overflowing from cooling tower ponds occurs. The risk of overflow is exacerbated when the cooling
tower inlet screens block up causing an increase in make-up water flow that eventually overflows.
(Cooling tower ponds contain water that has a high pH and high salinity levels, especially sulphates).
There are generally no procedures for draining cooling tower ponds or ducts, nor maintaining
stormwater trenches to minimise the risk of-polluting natural water courses through dirty water
discharges.
CONTROLLED DISCLOSURE
When downloaded from the EDMS, this document is uncontrolled and the responsibility rests with the user to ensure it is in line
with the authorised version on the database.
Inspection Manual for Civil Works at Eskom’s Unique Identifier: 240-99527377
Power Stations Revision: 2
Page: 67 of 113
14.1 DESCRIPTION
A Maintenance and Operations (O&M) Manual is generally available for all Eskom’s ash dams. These
O&M Manuals typically address the various elements of a typical ash dam and include:
CONTROLLED DISCLOSURE
When downloaded from the EDMS, this document is uncontrolled and the responsibility rests with the user to ensure it is in line
with the authorised version on the database.
Inspection Manual for Civil Works at Eskom’s Unique Identifier: 240-99527377
Power Stations Revision: 2
Page: 68 of 113
14.1.4 Filter Drains
The filter drains are a very important part of the ash dam. Goosenecks are usually provided in the filter
drain outlet pipes to reduce the formation of calcium carbonate in the filter drains. Rodding eyes are
also provided to facilitate the cleaning of sediments or other blockages.
14.1.5 Penstocks
Penstock systems on ash dams drain off ash water – and usually discharge into ash water return dams.
Typically the vertical decant tower of a penstock comprises precast concrete rings or steel rings. Steel
rings carry larger frictional shear forces i.e. from a much higher ash dam height.
Penstock rings are placed one on top of one another to form the decant tower as the level of the ash
rises. The rings are also used to control the amount of water being drawn off the ash dam. Before the
end of each day additional penstock rings are placed on the decant tower to prevent water and ash
being drawn into the decant tower during the night. In the morning the rings are removed in order to
enable water to be drawn off the ash dam.
14.1.10 Piezometers
Piezometers monitor the position of the water table within the wall of the dam so that the phreatic
surface may be compared with the maximum permissible levels.
14.2 PROBLEMS
Problems generally occur as a consequence of not following the requirements laid down in the
applicable Maintenance and Operations (O&M) Manual. Such problems include:
Problems as a consequence of incorrect wall building procedures;
Not maintaining the minimum freeboard of the maximum level of the water after a 1:100yr 24hr
storm plus at least 0.8m at all times;
The development of cracks in the ash at the transitions between insitu materials below the ash;
Inadequate compaction of berms;
Erosion of berms;
Ash slurry incorrectly channelled (e.g. a low point in a channel coinciding with a high point on an
ash dam);
CONTROLLED DISCLOSURE
When downloaded from the EDMS, this document is uncontrolled and the responsibility rests with the user to ensure it is in line
with the authorised version on the database.
Inspection Manual for Civil Works at Eskom’s Unique Identifier: 240-99527377
Power Stations Revision: 2
Page: 69 of 113
Not covering the main and toe filter drains with a layer of coarse ash as soon as possible after the
commencement of ashing resulting in ingress of dust into the drains and vegetation growing in the
filter material;
Uncontrolled driving of vehicles on an ash dam (e.g. the wheel load from a truck could break a filter
drain pipe causing an early failure of a filter drain);
No goosenecks provided in the filter drain outlet pipes causing a build up in the formation of
calcium carbonate in the drains. Also rodents could make nests in the drain pipes thereby causing
blocking of the pipes;
Additional penstock rings not placed on the decant tower before the end of each day allowing
water and ash to be drawn into the decant tower during the night;
Additional penstock rings not removed in the morning resulting in a build up of water on the ash
dam;
The water level over the penstock ring rising to more than 160mm causing pressure surges in the
pipe that could dislodge the penstock rings;
Excess stormwater not decanted from the ash dam within 3 to 4 days resulting in a build up of
water on the ash dam;
Mismanagement of stormwater (e.g. poor management of water on the ash dam could result in the
failure of the impoundment);
Erosion of the solution trench or stormwater diversion canals;
Malfunctioning of the filter drains;
Clogging of the solution trench and stormwater diversion canals with vegetation;
Timber used for the penstock walkway not being kept in good repair at all times resulting in a
dangerous situation being created for workers;
The penstock walkway platform not being regularly raised so that the platform is less than 0.5m
above the pool resulting in a dangerous situation being created for workers;
Ash pipe bursts resulting in slurry collecting in the solution trench, which in turn causes
sedimentation of the solution trench and return water dams with a consequent decrease in the
holding capacity;
In addition to non-compliance with the requirements of an O&M manual, failure of wet ash dams may
also be due to:
Poor drainage;
Poor founding material (e.g. if on a rehabilitated opencast mine);
High rate of rise (above 4m per annum);
Effluents on daywalls;
High phreatic surface;
Inadequate stormwater storage capacity;
Poor compaction of daywall berms;
Poor cementing of the ash.
CONTROLLED DISCLOSURE
When downloaded from the EDMS, this document is uncontrolled and the responsibility rests with the user to ensure it is in line
with the authorised version on the database.
Inspection Manual for Civil Works at Eskom’s Unique Identifier: 240-99527377
Power Stations Revision: 2
Page: 70 of 113
Table 14-1: Frequency of inspections
CONTROLLED DISCLOSURE
When downloaded from the EDMS, this document is uncontrolled and the responsibility rests with the user to ensure it is in line
with the authorised version on the database.
Inspection Manual for Civil Works at Eskom’s Unique Identifier: 240-99527377
Power Stations Revision: 2
Page: 71 of 113
14.3.1 Ash Dam Monitoring
Pool
Closest position of the pool to the daywall.
The area of the pool.
Penstocks
Verticality of the rings forming the decant tower.
Presence of the geofabric wrapping, if installed, around the decant towers.
Flow depth at the crest of the decant tower.
Catwalk
Availability and use of safety harnesses.
Minimum height of the platform above the pool level.
Structural integrity of the platform and handrails.
Daywall
Age of the ash that is being used in daywall construction.
Days of daywall ashing currently available.
Total freeboard between daywall and the pool level.
External and internal slope.
Presence of any wet spots on the outer slope.
Slope alignment maintained?
Road at step-ins.
Is the road sloping inward?
Is adequate drainage provided on the side slopes?
CONTROLLED DISCLOSURE
When downloaded from the EDMS, this document is uncontrolled and the responsibility rests with the user to ensure it is in line
with the authorised version on the database.
Inspection Manual for Civil Works at Eskom’s Unique Identifier: 240-99527377
Power Stations Revision: 2
Page: 72 of 113
Piezometers
Have they been installed in the areas required?
Are those already installed, in good working order?
Have the water table levels been recorded?
Is the current phreatic surface within acceptable safety limits?
Barrier fence
Is the fence still intact?
Is unauthorised entrance prevented?
Firebreaks
Check general condition.
Boreholes
Are any boreholes blocked?
Discharge points
Station responsible for closing and locking.
CONTROLLED DISCLOSURE
When downloaded from the EDMS, this document is uncontrolled and the responsibility rests with the user to ensure it is in line
with the authorised version on the database.
Inspection Manual for Civil Works at Eskom’s Unique Identifier: 240-99527377
Power Stations Revision: 2
Page: 73 of 113
Dam wall
Any wet spots on the downstream slope?
Any sign of erosion on the internal or external slopes?
Any cracks along the crest?
Any signs of settlement or movement.
Are any shrubs or trees growing on the wall?
Downstream pollution
Has any polluted water spilled into the environment?
If so, was the Environmental Manager notified immediately thereafter of the volume and the reason
for the spill?
CONTROLLED DISCLOSURE
When downloaded from the EDMS, this document is uncontrolled and the responsibility rests with the user to ensure it is in line
with the authorised version on the database.
Inspection Manual for Civil Works at Eskom’s Unique Identifier: 240-99527377
Power Stations Revision: 2
Page: 74 of 113
Dam levels
What are the dam levels?
CONTROLLED DISCLOSURE
When downloaded from the EDMS, this document is uncontrolled and the responsibility rests with the user to ensure it is in line
with the authorised version on the database.
Inspection Manual for Civil Works at Eskom’s Unique Identifier: 240-99527377
Power Stations Revision: 2
Page: 75 of 113
14.4 REMEDIAL ACTIONS
Typically the remedial actions are found in the applicable Maintenance and Operations Manual.
CONTROLLED DISCLOSURE
When downloaded from the EDMS, this document is uncontrolled and the responsibility rests with the user to ensure it is in line
with the authorised version on the database.
Inspection Manual for Civil Works at Eskom’s Unique Identifier: 240-99527377
Power Stations Revision: 2
Page: 76 of 113
The ash dam is overflowing during heavy rains and ash water is flowing over the non-overspill
crest of the wall or will do so shortly;
There has been an earthquake and the ash dam wall is damaged;
Actions to be taken:
Warning system should be put into action. Authorities / persons threatened by the ash dam break
should be warned (by telephone, radio, car, etc.) to evacuate immediately. Tick off systematically
as each person is warned.
Guards with red flag and/or warning signals should be placed at road and rail crossings
downstream of the ash dam until authorities can take over.
Place an observer at the dam. Provide him with a means of immediate communication.
Provide lighting to the problem area if at night.
Implement a monitoring program so that changes in the situation could be noted and measured.
CONTROLLED DISCLOSURE
When downloaded from the EDMS, this document is uncontrolled and the responsibility rests with the user to ensure it is in line
with the authorised version on the database.
Inspection Manual for Civil Works at Eskom’s Unique Identifier: 240-99527377
Power Stations Revision: 2
Page: 77 of 113
15.1 DESCRIPTION
A Maintenance and Operations (O&M) Manual is generally available for all Eskom’s ash dumps. These
O&M Manuals typically address the various elements of a typical ash dump:
15.1.1.1 Conveyors
Extendible and shiftable conveyors are used. These run along a platform. Initially the platforms are
built of earth but as the dumps progress they are placed on the ash surface. The actual positions of the
shiftable conveyor are dictated by the operational capabilities of the spreader / stacker machine stability
constraints.
CONTROLLED DISCLOSURE
When downloaded from the EDMS, this document is uncontrolled and the responsibility rests with the user to ensure it is in line
with the authorised version on the database.
Inspection Manual for Civil Works at Eskom’s Unique Identifier: 240-99527377
Power Stations Revision: 2
Page: 78 of 113
15.1.3 Erosion Protection
Measures are taken to prevent erosion of the ash dump. This is done to prevent instability of the dump
side slopes and advancing face as well as prevent pollution of the environment.
15.1.5.2 Water
Water applied via a sprinkler system; mobile sprinkler machine; or using a water bowser may prove
effective in controlling dust. It is applied at a sufficient rate to achieve a hard surface crust, resistant to
dust blow.
15.1.5.3 Polymers
Various polymers are available that may be used for dust control. The polymer is diluted with water
and is sprayed at a specific application rate over the compacted ash surface. These have been found
to be expensive and difficult to apply.
CONTROLLED DISCLOSURE
When downloaded from the EDMS, this document is uncontrolled and the responsibility rests with the user to ensure it is in line
with the authorised version on the database.
Inspection Manual for Civil Works at Eskom’s Unique Identifier: 240-99527377
Power Stations Revision: 2
Page: 79 of 113
which topsoiling and rehabilitation takes place on both the side slopes and the final backstack top
surface.
Topsoiling and rehabilitation of completed portions of the ash dump is carried out to ensure that:
Water running from the dump's rehabilitated surface is clean and uncontaminated by the ash.
The site may be used for other purposes once the dump is decommissioned (e.g. grazing). The
area should, therefore, be accessible and capable of sustaining future plant growth.
The completed ash dump will have as small a negative visual impact on the environment as
possible. Final grading of side slopes and crests should be such that the ground profiles are
curved, smooth and flowing rather than with sharp changes in line and gradient. Stormwater
management should, however, not be compromised in the process.
In accordance with the above, the ash dump is progressively rehabilitated. Areas where final shaping
and leveling of the ash has been completed are topsoiled and rehabilitated.
Care is taken to recover the topsoil from positions in front of the advancing ash face for use in the
topsoiling operations before it is covered by ash.
15.2 PROBLEMS
Problems generally occur as a consequence of not following the requirements laid down in the
applicable Maintenance and Operations (O&M) Manual. Such problems include:
Deterioration due to:
Poor surface drainage;
Poor sub-soil conditions;
High groundwater table phreatic surface;
Poor dump height and layout geometry and construction control;
Poor cementing of the ash.
Typical problems include:
CONTROLLED DISCLOSURE
When downloaded from the EDMS, this document is uncontrolled and the responsibility rests with the user to ensure it is in line
with the authorised version on the database.
Inspection Manual for Civil Works at Eskom’s Unique Identifier: 240-99527377
Power Stations Revision: 2
Page: 80 of 113
15.2.2 Slope Stability Problems
In addition, the frontstack area immediately in front of a stacker is still subject to settlement and stress
relief, evidenced by the usual tension cracks in the ash occurring in this area. These are expected to
occur in front of the stacker. Cracks appearing at or behind the stacker should be monitored and the
stacker moved away if the risk of failure appears high.
15.2.3 Checklists
Various aspects of the ash dump facility must be checked on a regular basis to ascertain whether any
remedial works are necessary. Such checking must be marked on a checklist so that variances can
easily be spotted. Below is an example of such a checklist. Additional items may be added to this
checklist.
CONTROLLED DISCLOSURE
When downloaded from the EDMS, this document is uncontrolled and the responsibility rests with the user to ensure it is in line
with the authorised version on the database.
Inspection Manual for Civil Works at Eskom’s Unique Identifier: 240-99527377
Power Stations Revision: 2
Page: 81 of 113
ITEM TO BE CHECKED ANSWER
ACCESS ROADS
CONTROLLED DISCLOSURE
When downloaded from the EDMS, this document is uncontrolled and the responsibility rests with the user to ensure it is in line
with the authorised version on the database.
Inspection Manual for Civil Works at Eskom’s Unique Identifier: 240-99527377
Power Stations Revision: 2
Page: 82 of 113
ITEM TO BE CHECKED ANSWER
DUMP GEOMETRY
CONTROLLED DISCLOSURE
When downloaded from the EDMS, this document is uncontrolled and the responsibility rests with the user to ensure it is in line
with the authorised version on the database.
Inspection Manual for Civil Works at Eskom’s Unique Identifier: 240-99527377
Power Stations Revision: 2
Page: 83 of 113
ITEM TO BE CHECKED ANSWER
Cleanliness Describe
REHABILITATION
DUST SUPPRESSION
– water? Y/N
– chemicals? Y/N
CONTROLLED DISCLOSURE
When downloaded from the EDMS, this document is uncontrolled and the responsibility rests with the user to ensure it is in line
with the authorised version on the database.
Inspection Manual for Civil Works at Eskom’s Unique Identifier: 240-99527377
Power Stations Revision: 2
Page: 84 of 113
ITEM TO BE CHECKED ANSWER
EVAPORATION POND
MOBILE EQUIPMENT
– available?: Describe
– satisfactory?: Comment
General
CONTROLLED DISCLOSURE
When downloaded from the EDMS, this document is uncontrolled and the responsibility rests with the user to ensure it is in line
with the authorised version on the database.
Inspection Manual for Civil Works at Eskom’s Unique Identifier: 240-99527377
Power Stations Revision: 2
Page: 85 of 113
ITEM TO BE CHECKED ANSWER
OPERATIONS PHILOSOPHY
1. Life/capacity
Ensure dump development is according to design program and that the remaining volume of the ash
dump is sufficient to meet the remaining required station life plus Lifex.
a) Geometric survey Every main
system shift
Tachy
Aerial (overall record).
Every 2 years
Calculate volume since last survey.
CONTROLLED DISCLOSURE
When downloaded from the EDMS, this document is uncontrolled and the responsibility rests with the user to ensure it is in line
with the authorised version on the database.
Inspection Manual for Civil Works at Eskom’s Unique Identifier: 240-99527377
Power Stations Revision: 2
Page: 86 of 113
e) Correlate b), c) and d) above and project to end of dump life and Every year
check that dump is not ahead of programme.
f) Check dump as-built slopes and heights vs. design requirements Every survey
2. Stability
Ensure these stormwater catchment areas do not grow bigger than the designed areas due to
operating problems and the stacker/spreader systems going out of phase.
a) Monitor dirty water runoff area and the drainage facilities (berms Every shift
etc).
Quarterly
b) Freeboard on hydraulic controls and dams:
Do a visual inspection; Every storm
Perform level survey. Every year
c) Measure dirty water dam levels: perform water balance (runoff vs. Annually before
dust suppression). Check freeboard and remaining capacity vs. rains
minimum requirements.
d) Monitor dirty water quality Monthly and
before releasing
e) Measure rainfall (continuous monitoring system). Every storm
CONTROLLED DISCLOSURE
When downloaded from the EDMS, this document is uncontrolled and the responsibility rests with the user to ensure it is in line
with the authorised version on the database.
Inspection Manual for Civil Works at Eskom’s Unique Identifier: 240-99527377
Power Stations Revision: 2
Page: 87 of 113
CONTROLLED DISCLOSURE
When downloaded from the EDMS, this document is uncontrolled and the responsibility rests with the user to ensure it is in line
with the authorised version on the database.
Inspection Manual for Civil Works at Eskom’s Unique Identifier: 240-99527377
Power Stations Revision: 2
Page: 88 of 113
15.3.2.4 Drainage systems
While a dump may now possibly be constructed much higher than previously allowed, the integrity of
the assumed strength parameters, must be maintained by good drainage practice on the dump.
Drainage systems must therefore be monitored.
Due to the importance of stormwater drainage, a competent person should inspect the system regularly
in the rainy season. Any failure of the serviceability of the drainage system, both due to erosion or
siltation, should be rectified as soon as possible, as catastrophic failures generally happen during an
extreme storm event, often at night or over the weekend when little or no staff are present to detect the
initial warning signs of such a failure and timeously move the stacker/spreader out of harms way. The
operators of such equipment should be made aware of the importance of not allowing such situations to
worsen, since any design storm event could conceivably be exceeded. Being aware of the potential
critical failure mechanisms, due to stormwater drainage failure, would allow operators to identify critical
situations and raise the alarm and even move the stacker/spreader out of harm’s way as soon as
possible if such a situation commences in the vicinity of any strategic stacking plant.
Evaporation Ponds
It is not the intention to clean out the containment areas or small berms in front of the advancing ash
face as they are continually ashed over and new ones constructed in their place.
However, the evaporation ponds should be regularly inspected. These ponds are provided to prevent
dirty water from flowing into natural watercourses. Water flowing from a dump during storms is
collected in the ponds and the silt is allowed to settle out. The water then evaporates leaving the silt
behind. The level of the silt gradually rises with each subsequent storm resulting in a reduction in the
capacity of the pond. After each rainy season, or more frequently if the occasion demands, either new
dams must be timeously provided, or the silt must be removed from the evaporation ponds and the
original capacity restored. The recovered silt should be returned to the ash dump in an area where
ashing activities are being carried out.
Where it is undertaken to desilt ponds, access may prove difficult when the silt is still wet, and it is for
that reason that the ponds should be built in pairs, one next to the other, so dirty water can be diverted
into the second pond while the first pond is allowed to dry out. This is done by constructing a channel,
which discharges into either pond. Offtakes from this channel can be closed or opened by the use of
earth bunds e.g. when cleaning has been completed, the channel can be opened and water allowed to
flow into the first pond while the second is then closed off, dried out and cleaned.
Long grass promotes rodent life, which in turn can cause problems to a dam wall because of the
formation of burrows. It is, therefore, important that grassing on the downstream slope of dam walls is
mowed at regular intervals.
Bare patches are to be re-seeded and erosion gullies repaired and grassed.
It is very important that contaminated water and sludge should not be deposited in a clean water dam.
Long grass and uncontrolled reed growth within trenches will hinder flow thus rendering the trench
inadequate during periods of high rainfall. The grassed slopes must, therefore, be mowed and reed
growth and other obstructions removed at regular intervals.
Bare patches must be re-seeded or grassed and erosion gullies must be repaired and regrassed.
CONTROLLED DISCLOSURE
When downloaded from the EDMS, this document is uncontrolled and the responsibility rests with the user to ensure it is in line
with the authorised version on the database.
Inspection Manual for Civil Works at Eskom’s Unique Identifier: 240-99527377
Power Stations Revision: 2
Page: 89 of 113
Reno Mattress Stone / Pitching Lined Trenches
Vegetation and reed growth through rocks and between mattresses is to be controlled and the wire
cages regularly inspected and repaired if necessary.
The purpose of these structures is to slow down the velocity of the water carried by the drainage
systems. They are, therefore, susceptible to siltation and will require periodic cleaning to maintain their
efficiency.
The statutory requirements, regulations and standards, which are reflected in the O&M Manual must be
maintained. In addition, all Eskom regulations must be adhered to.
The applicable SABS 1200 standards apply to civil works carried out at an ash disposal facility.
The offices and workshops made available to an ash dump operator must be maintained in good order
and kept clean at all times. The regulations laid down in the MOS Act of 1983 must also be adhered to.
CONTROLLED DISCLOSURE
When downloaded from the EDMS, this document is uncontrolled and the responsibility rests with the user to ensure it is in line
with the authorised version on the database.
Inspection Manual for Civil Works at Eskom’s Unique Identifier: 240-99527377
Power Stations Revision: 2
Page: 90 of 113
of a cheap, short life span remedy should be weighed against the advantages of a more expensive but
durable remedy.
Typically the remedial actions, not specifically provided for in an O&M Manual, would require specialist
input from a Professional Engineer.
CONTROLLED DISCLOSURE
When downloaded from the EDMS, this document is uncontrolled and the responsibility rests with the user to ensure it is in line
with the authorised version on the database.
Inspection Manual for Civil Works at Eskom’s Unique Identifier: 240-99527377
Power Stations Revision: 2
Page: 91 of 113
16.1 DESCRIPTION
A coal stockyard terrace, on which a coal stockpile is established, generally comprises an area
constructed of suitable base material – preferably in-situ material.
The terrace is required to provide a hard surface to facilitate the placing and compaction of a base layer
of coal. The terrace provides
a hard surface that limits the amount of mixing / contamination of coal at the interface during
compaction; and
a relatively impervious layer to limit the amount of stockpile pollutants entering the ground water.
Clay deposits are often associated with coal-bearing formations and thus are usually available
within the immediate vicinity of an Eskom power station.
New Coal Stockyards are now required to have a composite plastic-clay liner under the coal to
prevent ground water pollution. This may also have a concrete slab on top to prevent damage to
the liner by mobile plant and to prevent tearing of the liner as a result of horizontal forces from
settlement of the coal stockpiles.
16.2 PROBLEMS
The following typical problems occur:
The potential exists for spontaneous combustion;
Water ponding occurs;
Coal dust impacts;
Large volumes of coal silt in runoff water.
Invaders/pioneer plants occur in open, disturbed areas;
Denuded areas with evidence of erosion.
Deterioration of drainage infrastructure due to lack of maintenance i.e. earth and/or concrete
channels
The consequences of these typical problems would include:
Spontaneous combustion results in air pollution and constitutes a safety hazard;
Ponding results in larger volumes of contaminated water;
Ponding at low levels can lead to serious erosion problems;
Dust is a health hazard/nuisance;
Increased silt load in runoff water;
Visual intrusion of the coal stockpile.
Spreading of invader/pioneer plants to adjacent areas resulting in difficulties in management.
Loss of topsoil. Formation of gullies and sheet erosion.
CONTROLLED DISCLOSURE
When downloaded from the EDMS, this document is uncontrolled and the responsibility rests with the user to ensure it is in line
with the authorised version on the database.
Inspection Manual for Civil Works at Eskom’s Unique Identifier: 240-99527377
Power Stations Revision: 2
Page: 92 of 113
The following represent minimal requirements for successful control of erosion and spontaneous
combustion.
16.3.2 Compaction
Compaction is required to improve side-slope erosion resistance and, in addition, to inhibit the entry of
air into the sides of the stockpile. It is important to note that the emphasis is on uniformity in bulk
density, which helps prevent soft spot formation.
In a well-compacted stockpile, not all the water in the stockpile will drain from the coal, but will be
retained by surface tension among the coal particles. This increases the average humidity, which helps
maintain acceptable temperatures in the stockpile.
Compaction may be done with two types of rollers:
CONTROLLED DISCLOSURE
When downloaded from the EDMS, this document is uncontrolled and the responsibility rests with the user to ensure it is in line
with the authorised version on the database.
Inspection Manual for Civil Works at Eskom’s Unique Identifier: 240-99527377
Power Stations Revision: 2
Page: 93 of 113
16.3.3 Reclamation of a Stockpile
Reclamation of the strategic stockpile should only go to the top of the initial base layer (300mm above
the earth terrace) with a maximum depth of 150mm from the bottom of the base layer during normal
reclamation operations.
Reclamation should proceed in such a way that the minimum rebuilding of the terrace is required. Also
due consideration must be given to water erosion in the wet season, so that excessive silting and
resultant clogging of canals, culverts and settling basins is prevented.
After reclamation operations are completed, the terraces are to be built up again as soon as possible,
especially in the wet season, to minimise consequential erosion damage. If this is not possible,
temporary measures must be installed to minimise the risk of erosion damage.
CONTROLLED DISCLOSURE
When downloaded from the EDMS, this document is uncontrolled and the responsibility rests with the user to ensure it is in line
with the authorised version on the database.
Inspection Manual for Civil Works at Eskom’s Unique Identifier: 240-99527377
Power Stations Revision: 2
Page: 94 of 113
Table 16-1: Frequency of inspections
1. Spontaneous combustion
3. Groundwater pollution
16.4.1 Monitoring
1. Regular monitoring for spontaneous reactions and compaction density is essential.
2. After rain: Check the coal terraces for any signs of rutting due to stormwater erosion.
3. After rain: Check the coal stockpile top surface for any ponding deeper than 100mm.
4. Monitor dust generation on an on-going basis
5. Spring: Check growth of windbreak.
6. Summer: Remove and replace any dead trees from the windbreak.
7. Summer: Check the spread of invader/pioneer plants
8. After rain: Check the exposed earth terrace for any signs of rutting due to stormwater erosion or
vehicle traffic.
9. During wet or very wet conditions: No vehicles are allowed to drive on the earth terrace. Vehicles
and construction equipment are to drive on the existing coal layer or access roads only. If this is
not possible, all construction work should be stopped to prevent damage to terrace.
CONTROLLED DISCLOSURE
When downloaded from the EDMS, this document is uncontrolled and the responsibility rests with the user to ensure it is in line
with the authorised version on the database.
Inspection Manual for Civil Works at Eskom’s Unique Identifier: 240-99527377
Power Stations Revision: 2
Page: 95 of 113
3. All erosion gullies, wash-aways, ruts etc. must be repaired immediately by cutting back the sides of
the ruts to a 45° slope and re-compacting in layers of maximum thickness of 150mm. Compaction
is best done using a smooth wheeled vibrating roller. The compaction of the affected area must be
tested for compliance to specification.
4. Where ponding occurs on the stockpile top surface deeper than 100mm; pump out or siphon water
into the dirty water canals. Import coal and re-compact to eliminate the low spot.
5. Suppression dust on the coal stockpile by spraying water onto the coal stockpile surface.
6. If no existing windbreak, consider planting a windbreak comprising 2-3 rows of trees all around the
coal stockyard. The following types of trees have been successfully used for windbreaks at various
Eskom power stations: Eucalyptus Camaldilesis, Eupressus Glabra and Pinus sp. (i.e. Bluegum,
Cypress and Pine).
7. Remove invader/pioneer plants
8. Compact and rehabilitate eroded areas and revegetate.
9. All erosion marks or rutting of the earth terrace should be rectified by importing suitable backfill
material which must be compacted to 90% modified AASHTO. Before filling all loose material
should firstly be removed to a minimum depth of 150mm and the imported material compacted in
150mm layers. Repairs should only be carried out under dry terrace conditions.
CONTROLLED DISCLOSURE
When downloaded from the EDMS, this document is uncontrolled and the responsibility rests with the user to ensure it is in line
with the authorised version on the database.
Inspection Manual for Civil Works at Eskom’s Unique Identifier: 240-99527377
Power Stations Revision: 2
Page: 96 of 113
17. DAMS
17.1 DESCRIPTION
Dams at power stations are designed for the hydrological conditions found at the power station and
typically consist of an earth wall with a spillway.
The capacity of a dam should be sufficient to contain a 1:50 year rainfall event.
The elements included are:
Raw water reservoirs;
Clean water dams;
Dirty water (or pollution control) dams; and
Ash water return dams.
A pollution control dam is required to contain polluted runoff water from a power station’s polluted areas
during a 1:50 year rainfall event. The polluted water is recovered and reused by the power station in
order to reduce the total amount of polluted water being held on any Eskom's property. Such a dam
should preferably be able to withstand a 1:100 year flood, since failure of any diversion canals – usually
designed to contain a smaller flood – could result in a full flood entering the pollution control dam.
Elements of typical earthfill dams include:
Dam walls;
Spillways;
Upstream and downstream areas;
Inlet & outlet works.
17.1.2 Spillways
Spillways are typically centrally-placed and have a concrete lining with weepholes for pressure release.
Baffles on spillways can dissipate energy on the downstream-face. Spillways are typically capable of
passing a 1:100 year flood.
Access to the spillway is typically provided by a wide enough crest, which also serves as a road.
CONTROLLED DISCLOSURE
When downloaded from the EDMS, this document is uncontrolled and the responsibility rests with the user to ensure it is in line
with the authorised version on the database.
Inspection Manual for Civil Works at Eskom’s Unique Identifier: 240-99527377
Power Stations Revision: 2
Page: 97 of 113
Most new dams provide for a series of chimney and finger drains to control the phreatic surface within
the downstream face of the earth wall.
An outlet valve from a dam could be situated in a small dissipation structure on the downstream-face of
the dam wall. The valve is typically a butterfly type, which is operated manually by a handwheel. The
valve is situated before any other take off points in order that the dam may be isolated in future.
The sluice gates typically comprise stainless steel plates with frames cast into the concrete.
a) The purpose of the installed equipment is either:
to contain clean water for storage and subsequent use, in conformity with the Water Act; or
to divert water, not conforming to DWS standards, into a pollution control dam. All water
conforming to these standards (such as diluted runoff during a thunderstorm) can then be released
into the natural watercourse. This can be achieved by correct calibration of the sluice gates.
A clean water dam is often kept fairly full while a pollution control dam should be kept as empty as
possible to minimise the total volume of polluted water on Eskom's property. During normal operating
conditions this will be achieved by using the polluted water elsewhere on the station. During the
deferment period, water will probably need to be released from the dam (preferably during periods of
high flow) if the necessary permit can be obtained. Failing this, the installation of plant specifically
designed to spray polluted water for evaporation purposes, may be necessary.
17.2 PROBLEMS
The following typical problems occur:
CONTROLLED DISCLOSURE
When downloaded from the EDMS, this document is uncontrolled and the responsibility rests with the user to ensure it is in line
with the authorised version on the database.
Inspection Manual for Civil Works at Eskom’s Unique Identifier: 240-99527377
Power Stations Revision: 2
Page: 98 of 113
The consequences of these typical problems would include:
Aquatic, ecosystem (especially birds) adversely affected resulting in species change (fauna/flora).
Upstream and downstream natural watercourses or vlei areas could also be adversely affected.
(Vlei areas are regarded as sensitive ecosystems);
Potential seepage of sulphates, acids, heavy metals. Low pH water into underlying groundwater
aquifer.
It is good practice to reserve a month each year to carry out maintenance work on dams. Serious
problems should, however, receive immediate attention. Work that is of a critical nature should be
carried out under the supervision of a Professional Engineer or in accordance with his instructions.
Routine inspections should be carried out quarterly by power station personnel or a competent
consultant. The required qualifications of such persons are that they should be well acquainted with
the contents the dams’ operations and maintenance manuals. Furthermore, such persons should be
alert and endowed with sound judgement in order to know when to call for assistance.
An emergency plan (Section 17.4.6) should be consulted for a description of emergency situations and
the preparation of suitable emergency procedures. Any sign or circumstances that may threaten the
safety of a dam should be reported to the Director-General as required in Regulations 11.2 and 11.5 of
the Water Act.
An inspection form, which should be completed during each routine inspection, based on the example
in Section 17.2.8. Such a procedure should then be reflected in the appropriate Operations and
Maintenance Manual. All developments noted should be recorded, monitored and rectified, where
necessary. The inspector and the power station manager, or the person in control of the dam, should
sign the inspection form before it is filed in a suitable place for future reference.
The inspection route to be followed should include the following:
the full length of the wall crest and toe;
observations of the upstream and downstream slopes;
the spillway crest and channel;
the inlet and outlet works; and
the area downstream of the dam walls.
A routine inspection form may be used. An example of such a form is included in Section17.2.8.
The different components of the dam to be inspected are discussed in more detail below:
CONTROLLED DISCLOSURE
When downloaded from the EDMS, this document is uncontrolled and the responsibility rests with the user to ensure it is in line
with the authorised version on the database.
Inspection Manual for Civil Works at Eskom’s Unique Identifier: 240-99527377
Power Stations Revision: 2
Page: 99 of 113
suspicion. The appearance, location and extent of any movement; erosion; and caving should be
observed and recorded. If survey beacons are disturbed in any way, this should be mentioned in the
inspection report.
17.2.4 Spillways
Spillway structures, spillway channels and sides up to where they discharges into the natural
watercourses should be inspected. Undesirable plant growth, such as trees and shrubs, should be
recorded and removed as soon as possible. Erosion of the stone pitching at the inlet/outlet of spillway
channels; and undercutting of the concrete channel; should be recorded and reported if of a serious
nature.
CONTROLLED DISCLOSURE
When downloaded from the EDMS, this document is uncontrolled and the responsibility rests with the user to ensure it is in line
with the authorised version on the database.
Inspection Manual for Civil Works at Eskom’s Unique Identifier: 240-99527377
Power Stations Revision: 2
Page: 100 of 113
17.2.8 EXAMPLE OF A ROUTINE INSPECTION FORM
When last rained and how much?
Spillway structures
Do reeds, shrubs, trees or anything else block the spillway channel?
Is there any undercutting of concrete at spillway outlet or chute?
Is concrete of spillway structure in a good condition?
Inlet / outlet works
Are there any leakages in or outside the inlet/outlet works?
Are pipes, valves, all equipment and paintwork in a good condition?
Are all valves in smooth working condition?
Are there any signs of corrosion at the inlet / outlet works?
Is the concrete in a good condition?
Recommendations
Which above-mentioned points or any other should urgently be rectified?
CONTROLLED DISCLOSURE
When downloaded from the EDMS, this document is uncontrolled and the responsibility rests with the user to ensure it is in line
with the authorised version on the database.
Inspection Manual for Civil Works at Eskom’s Unique Identifier: 240-99527377
Power Stations Revision: 2
Page: 101 of 113
SIGNATURE OF INSPECTOR: DATE
HIGHEST QUALIFICATION
CONTROLLED DISCLOSURE
When downloaded from the EDMS, this document is uncontrolled and the responsibility rests with the user to ensure it is in line
with the authorised version on the database.
Inspection Manual for Civil Works at Eskom’s Unique Identifier: 240-99527377
Power Stations Revision: 2
Page: 102 of 113
Maintenance work is required on the dam walls; concrete and masonry structures; spillways;
downstream toe; and the inlet / outlet works.
It is good practice to reserve a month each year to carry out maintenance work on dams. Serious
problems should, however, receive immediate attention. Work that is of a critical nature should be
carried out under the supervision of a Professional Engineer or in accordance with his instructions.
A record book should also be kept for recording the item listed in the following table at the suggested
frequencies.
Item Frequency
Rainfall Daily
Water level in dam compartments Daily
Leakage or seepage (flow rate) Weekly
Flow released by outlet works Daily
Repair work Ad hoc
Details of important repair work, including the date repaired, should be recorded in the record book.
An emergency plan (Section 17.4.6) describing the emergency situations and emergency procedures
must be regularly updated.
17.3.1 Monitoring
a) After rain: Check if any erosion has occurred around concrete spillway.
b) After rain: Check dam wall for surface erosion.
c) After rain: Check water level in pollution control dams. No overflow of a pollution control dam is
permitted without a DWA&F permit.
d) Quarterly: Check if any cracking has occurred on the concrete works.
e) Quarterly: Check if any deterioration of joint sealant has occurred.
f) Quarterly: Check that any toe drain outlets are open and free of vegetation.
g) Quarterly: Check if the water draining from the toe drain is coloured with clay particles.
h) Quarterly: Check if there are any settlement or bulging on downstream side of wall. Maintain
records.
i) Quarterly: Check if there is any longitudinal cracking on the dam wall. Maintain survey records.
j) Quarterly: Check dam wall for animal burrows.
k) Quarterly: Check dam wall for vegetation (other than grassing).
l) Quarterly: Check dam rip rap cover.
m) Quarterly: Check dam wall for any settlement and maintain survey records.
CONTROLLED DISCLOSURE
When downloaded from the EDMS, this document is uncontrolled and the responsibility rests with the user to ensure it is in line
with the authorised version on the database.
Inspection Manual for Civil Works at Eskom’s Unique Identifier: 240-99527377
Power Stations Revision: 2
Page: 103 of 113
n) The capacity of the dam should be determined as well as the rate of sedimentation for monitoring
of silt loading. Maintain records.
o) Base line water tests should be undertaken in any natural watercourses or vlei areas downstream
of the pollution control dam to determine water quality for future reference. Monitoring of the
outflow from the dam is required for compliance to DWA&F standards and the Water Act.
p) Ground water sampling equipment for existing boreholes must be available before ground water
monitoring can be commenced with. Boreholes must exist. The implementation of a ground water
monitoring system is then required.
CONTROLLED DISCLOSURE
When downloaded from the EDMS, this document is uncontrolled and the responsibility rests with the user to ensure it is in line
with the authorised version on the database.
Inspection Manual for Civil Works at Eskom’s Unique Identifier: 240-99527377
Power Stations Revision: 2
Page: 104 of 113
17.4.2 Concrete and Masonry Structures
a) Undercutting or erosion, caused by damaged lining at the base and edges of inlet/outlet structures,
should be repaired before the stability of the structures are impaired. The lining should be repaired
and properly fixed to the concrete structures before sods are washed out through open cuts.
Damaged concrete should be repaired by using good quality concrete.
b) Any damage to the drainage manholes and concrete channels at the top of the dams should be
repaired before serious blockages occur which may reduce the stability of an earthfill wall.
c) Where leakage occurs through cracks or joints in the concrete inlet/outlet structures a suitable
sealant should be used to prevent ingress of water behind the structures.
d) The interface between earthfill and concrete structures needs particular mention. Gaps should be
filled with a suitable material, under the supervision of a Professional Engineer.
e) If cracking of the concrete occurs; or if the joint sealant deteriorates; consult Professional Engineer
for repair procedure.
17.4.3 Spillways
a) Plant growth such as trees, shrubs, grass and reeds, which obstruct and decrease the spillway
capacity should be cleared from spillway channels. Undercutting and/or erosion along spillway
channels should be repaired as soon as possible with a suitable earthfill material concrete or rip-
rap depending on circumstances. A Professional Engineer should be consulted if the damage is
serious.
b) Under no circumstances should any of the spillways be blocked off to increase storage capacity.
c) If erosion takes place around the spillway consult Professional Engineer for repair procedure.
CONTROLLED DISCLOSURE
When downloaded from the EDMS, this document is uncontrolled and the responsibility rests with the user to ensure it is in line
with the authorised version on the database.
Inspection Manual for Civil Works at Eskom’s Unique Identifier: 240-99527377
Power Stations Revision: 2
Page: 105 of 113
17.4.6.1 Seepage and piping
While some seepage is to be expected the most critical factor is piping (i.e. the erosion or washout of
the clay or sand particles from the inside of the dam wall by the flow of water through the wall along a
fault line or plane between two different layers of material and the subsequent formation of a flow path).
Piping can be identified by the presence of clay or sand particles in the seepage water (i.e.
discolouration of the leaking water).
The area next to the spillway should be checked more carefully as two different types of material
typically meet here and the risk of failure between the contact zones of two different materials is higher.
Any piping should be reported immediately to a Professional Dam Engineer for further investigation.
17.4.6.2 Cracking
Cracking along the wall (longitudinally) can imply that a slip failure is about to occur. These cracks are
normally continuous along their length.
Cracking across the wall (transversely) normally indicates that settlement and/or shrinkage is occurring.
While this is not serious unless excessive, it can be serious if accompanied by longitudinal cracks and
could lead to piping failure.
CONTROLLED DISCLOSURE
When downloaded from the EDMS, this document is uncontrolled and the responsibility rests with the user to ensure it is in line
with the authorised version on the database.
Inspection Manual for Civil Works at Eskom’s Unique Identifier: 240-99527377
Power Stations Revision: 2
Page: 106 of 113
Movement has taken place (sink holes, displacement sliding, slipping, subsidence, holes, etc.)
Relative movement of 200mm at earth walls since the previous inspection is for instance regarded
as very serious;
Earth wall is unusually damp or boggy and appears unstable;
Erosion tunnels appear on the downstream slope and flowing mud is visible.
Actions to be taken:
Warning system should be put into action. Authorities / persons threatened by the dambreak flood
should be warned (by telephone, radio, car, etc.) to evacuate immediately. Tick off systematically
as each person is warned.
Guards with red flag and/or warning signals should be placed at road and rail crossings
downstream of the dam until authorities can take over.
Place an observer at the dam. Provide him with a means of immediate communication.
Open the outlet valves fully to draw down the water level of the reservoir.
Provide lighting to the problem area if at night.
Implement a monitoring program so that changes in the situation could be noted and measured.
Mark cracks with pegs or paint and take readings of crack length, crack width or any relative
movement on a six-hourly basis.
Indicators:
a) The presence of turbid or dirty seepage water with soil particles and leaking of more than 1.0
litre/second.
b) The water level of the reservoir is unusually high, i.e. near non-overspill crest and it is still raining
heavily.
c) Situations mentioned in 3 to 5 above with a lesser degree of seriousness;
d) A blockage of the spillway during heavy rainfall, which cannot be immediately corrected.
Actions to be taken:
Put warning system into action. Authorities/persons threatened by the dambreak flood should be
warned to prepare for evacuation.
Further actions are the same as for emergency situation.
Indicators:
Should the observer be unsure of the degree of gravity, professional advice should be obtained.
a) Turbid or dirty seepage water is leaking at less than 1.0 litre/second.
b) Unusual increase in leakage of seepage water without it having rained or that the water level of the
reservoir has risen significantly.
c) Development of wet patches on the downstream slope.
CONTROLLED DISCLOSURE
When downloaded from the EDMS, this document is uncontrolled and the responsibility rests with the user to ensure it is in line
with the authorised version on the database.
Inspection Manual for Civil Works at Eskom’s Unique Identifier: 240-99527377
Power Stations Revision: 2
Page: 107 of 113
d) Deep erosion of downstream or upstream slopes.
e) Deep erosion along the spillway channel after overflowing.
f) Person in charge is unsure of the gravity of the situation.
Actions to be taken:
During this situation (should the individual in charge doubt the gravity of the situation), professional
advice should be obtained. Furthermore, the situation should be continuously monitored as
mentioned in the last point of emergency situation.
CONTROLLED DISCLOSURE
When downloaded from the EDMS, this document is uncontrolled and the responsibility rests with the user to ensure it is in line
with the authorised version on the database.
Inspection Manual for Civil Works at Eskom’s Unique Identifier: 240-99527377
Power Stations Revision: 2
Page: 108 of 113
18. AUTHORISATION
This document has been seen and accepted by:
Name Designation
Galia Dudenska Senior Manager: Civil & Structural Engineering
Maanea Mabannda Manager (Acting): Roads and Rail CoE
Gareth MacIntosh Manager (Acting): Structural Design CoE
Terrance Mavunda Manager (Acting): Geotechnical Engineering CoE
Funeka Grootboom Manager (Acting): Dams, Waterways and Hydro CoE
Qingbo Cai Chief Engineer: Structural Design CoE
Andre Kreuiter Chief Engineer: Geotechnical Engineering CoE
Riaan Venter Chief Engineer: Roads and Rail CoE
19. REVISIONS
Date Rev. Compiler Remarks
July 2015 0.1 L. Xulu First Draft prepared from 474-196 for Comments
Review Process
August 2015 0.2 L. Xulu Updated Final Draft after Comments Review Process
August 2015 1 L. Xulu Final Document for Authorisation and Publication
January 2019 1.1 N. Moodley Draft for comments review process
March 2019 1.2 N Moodley Updated Final Draft after Comments Review Process
March 2019 2 N Moodley Final Document for Authorisation and Publication
CONTROLLED DISCLOSURE
When downloaded from the EDMS, this document is uncontrolled and the responsibility rests with the user to ensure it is in line
with the authorised version on the database.
Inspection Manual for Civil Works at Eskom’s Unique Identifier: 240-99527377
Power Stations Revision: 2
Page: 109 of 113
CONTROLLED DISCLOSURE
When downloaded from the EDMS, this document is uncontrolled and the responsibility rests with the user to ensure it is in line
with the authorised version on the database.
Inspection Manual for Civil Works at Eskom’s Unique Identifier: 240-99527377
Power Stations Revision: 2
Page: 110 of 113
CONTROLLED DISCLOSURE
When downloaded from the EDMS, this document is uncontrolled and the responsibility rests with the user to ensure it is in line
with the authorised version on the database.
Inspection Manual for Civil Works at Eskom’s Unique Identifier: 240-99527377
Power Stations Revision: 2
Page: 111 of 113
CONTROLLED DISCLOSURE
When downloaded from the EDMS, this document is uncontrolled and the responsibility rests with the user to ensure it is in line
with the authorised version on the database.
Inspection Manual for Civil Works at Eskom’s Unique Identifier: 240-99527377
Power Stations Revision: 2
Page: 112 of 113
CONTROLLED DISCLOSURE
When downloaded from the EDMS, this document is uncontrolled and the responsibility rests with the user to ensure it is in line
with the authorised version on the database.
Inspection Manual for Civil Works at Eskom’s Unique Identifier: 240-99527377
Power Stations Revision: 2
Page: 113 of 113