T12@150C/C T/B T12@150C/C

S1
B1 B1
3000

T16@150C/C

T8@100C/C
C1 C1

RETAINGING 8-T20
WALL

500
1000 700 3000 700 1000

SF1 SF1

7-T20 EXISTING 7-T20


12@100C/C 12@100C/C
150 THK
FOUNDATION
P.C.C.(M20)

SECTION A-A

SCHEDULE OF FOUNDATION
SCHEDULE OF BEAMS 6-T20

LONGITUDINAL T10@100C/C

TYPE

750
L B D REINFORCEMENT TRANSVERSE TYPE BXD BOTTOM TOP STIRRUPS SFR 2-T12

BOTTOM TOP REINFORCEMENT 6-T20 20T PIN


B1 300X750 6-T20 10@100 C/C 2-T12
2 LAYER 6-T20

SF1 15000 1000 500 7-T20 7-T20 12@100C/C CB 300X750 6-T20 10@100 C/C 2-T12 300
6-T20 2 LAYER
GENERAL NOTES-
1. ALL DIMENSIONS ARE IN MILLIMETER OTHERE WISE SPECIFIED.
2. TMT BARS CONFORMING TO IS:1786 (FE-500D)SHALL BE USED AS
REINFORCEMENT
SCHEDULE OF SLAB 3. CONCRETE GRADE - M40
SCHEDULE OF COLUMN 4. DRAWING SHOULD NOT BE SCALED AND ONLY WRITTEN
DIMENSION SHOULD BE FOLLOWED.
SHORT SPAN LONG SPAN
SLAB THK. 5. LAP LENGTH FOR ANY BAR SHALL NOT BE LESS THAN 50XDIA.

VERTICAL BARS 8-20T MARK TOP BOTTOM TOP BOTTOM 6. MORE THAN 50%THE BARS SHALL NOT BE LAPPED AT ANY SECTION.
TYPE SIZE LINKS 7. CLEAR COVER FOR REINFORCEMENT BARS SHOULD BE
BEAM-30MM, COLUMN-40MM, SLAB-50MM, FOOTING-50MM,
S1 500 T12@150C/C T16@150C/C T10@200C/C T10@200C/C 8. ALL THE PRECAUTIONARY MEAURES TO BE TAKEN BEFORE
C1 400X400 8-T20 8Ø@100 C/C EXECUTING THE WORK.
T8@100C/C

NAME OF THE CONSULTANT


NAME OF DRAWING PROJECT NAME NAME OF THE CLIENT TUSPL
701, HARBHAJAN, CST RD,
STRUCTURAL DRAWING OF MAROL MAROSHI BRIHANMUMBAI MUNICIPAL VIDYANAGARI MARG, KALINA ,

N
SANTACRUZ (E), MUMBAI - 400 098.

O
CORPORATION

D
SWD BRIDGE ROAD IMPROVEMENT

N
TA
Telefax : +91 22 26655335
contact@tandonandassocaies.com|www.tandonandassociates.com
(BMC) DRG NO SCALE DATE DRN BY
BMC/MMRI/SWDB/STR/01 - 02.11.2023 P.P