You are on page 1of 266

Item

Item Name Description UMIT QUANTITY


No.

1 EARTHING SYSTEM
(01) LV. EARTHING

(01) Supply, install, connect and test of earthing system complete as specified and as shown in the
drawings the unit price shall be lump sum including earthing rods, earthing inspection pits, earthing
cables, test links, equalizer bars, excavation and backfilling and all necessary accessories and ancillary
works associated with earthing installation. ,to give resistance not more than 3 ohm
,to give resistance not more than 3 ohm L.S. 1
(02) LC. EARTHING

as above but.to give resistance not more than 0.5 ohm L.S. 1
2 Low Voltage Cables
Supply, install, connect and test of low voltage copper cables installed on cable trays / in trenches
complete including UPVC conduites ,fire barrier,cable trays,taging ,terminls and all necessary
accessories and ancillary works as described in the technical specifications and as shown in the
drawings.
(02.01) Multicore PVC/PVC Insulated copper cables:-
(02.01.01)3*95+50+50 mm2 Mt. 115
(02.01.01)3*70+35+35 mm2 Mt. 35
(02.01.02) 3*50+25+25 mm2 Mt. 115
(02.01.03)4*35+25 mm2 Mt. 60
(02.01.03)4*25+25 mm2 Mt. 20
(02.01.04) 5* 16 mm2 Mt. 100
(02.01.05) 5* 10 mm2 Mt. 110
(02.01.06) 5*6 mm2 Mt. 125
(02.01.07) 5*4 mm2 Mt. 30
(02.01.08) 3*16 mm2 Mt. 50
3 RACEWAYS, BOXES AND FITTINGS
(01) Lighting Outlets
Supply, install, connect, test and commission of wall or ceiling or outdoor lighting outlet, complete
including conduit, conduit fittings wiring,Cables,cable trays,creoss section as indicated in drawings
and all necessary accessories and ancillary works.
(01.01) Lighting outlets. No. 2786
(02) Lighting Switches Outlets
Supply, install, connect, test and commission of outlets for lighting
switches, complete including conduits, conduit fittings, wiring and all
necessary accessories and ancillary works.
(02.01) Outlet for one way one gang switch 16 A. No. 277
(02.02) Outlet for one way two gang switch 16 A. No. 122
(02. 03) Outlet for two way one gang switch 16 A. No. 10
(02. 04) Outlet for two way two gang switch 16 A. No. 38
(02.05) Outlet for one way three gang switch 16 A. No. 7
(03) Socket Outlets
Supply, install, connect, test and commission of socket outlets complete including ,sockets,conduit,
conduit fittings wiring,Cables,cable trays,creoss section as indicated in drawings and all necessary
accessories and ancillary works.
(04.01) Outlet for single phase single socket 16 A.- 220V (2P+E) No. 621
(04.02) Outlet for single phase duplex socket 16 A. - 220V (2P+E) No. 1242
(04.03) Outlet for power socket 20 A. - 220V (2P+E) IP=42 No. 41
(04.04) Outlet for power socket 20 A. - 220V (2P+E) IP=44(for hand dryer) No. 35
(05) Isolator - Outlets
Supply, install, connect, test and commission of isolators outlets, complete including isolators, conduit,
conduit fittings wiring,Cables,cable trays,creoss section as indicated in drawings and all necessary
accessories and ancillary works.
(05.01) Outlet for 220 V, 20 A, disconnect switch with indicaing lamp for water heater No. 66
(05.02) Outlet for 220 V, 25 A, disconnect switch No. 58
(05.03) Outlet for 220 V, 32 A, disconnect switch No. 113
(05.04) Outlet for 220 V, 40 A, disconnect switch No. 3
(05.05) Outlet for 380 V, 40 A, disconnect switch for elevator No. 2
4 Wiring Devices
(01) Switches
Supply, install, connect, test and commission of switches as
specified and as listed below, complete with all necessary
accessories and ancillary works.
(01.01) One way one gang switch 16 A. No. 277
(01.02) One way two gang switch 16 A. No. 122
(02. 03) Outlet for two way one gang switch 16 A. No. 10
(02. 04) Outlet for two way two gang switch 16 A. No. 38
(02.05) Outlet for one way three gang switch 16 A. No. 7
(02. 06) Floor box IP=42 with capacity as indicated in drawings No. 100
5 Main L.V.P]
(01) Supply, install, connect, test and commission of complete L.V. main distribytion boards the price
include selectvity study, UPVC pipe for incoming
cables,termination,Identifications ,labling,glands,copper luggs, as specified and as indicating drawings
. System shall be lump sum complete in every respect with all necessary accessories and ancillary
works.
(01.01) DB-G1 No. 1
(01.02) DB-G2 No. 1
(01.03) DB-G3 No. 1
(01.04) EDB-G1 No. 1
(01.05) EDB-G2 No. 1
(01.06) EDB-G3 No. 1
6 DISTRIBUTION BOARDS
(01) Supply, install, connect, test and commission of complete L.V. distribution boards the price
include selectvity study,,termination,Identifications ,labling,glands,copper luggs, as specified and as
indicating drawings . System shall be lump sum complete in every respect with all necessary
accessories and ancillary works.
LP-G1(01.01) No. 1
LP-G2(01.02) No. 1
LP-G3(01.03) No. 1
ELP-G1 (01.04) No. 1
ELP-G2(01.05) No. 1
ELP-G3 (01.06) No. 1
PP-AC-G1(01.07) No. 1
PP-AC-G2(01.08) No. 1
PP-AC-G3(01.09) No. 1
LP-1F1(01.10) No. 1
LP-1F2(01.11) No. 1
LP-1F3(01.12) No. 1
ELP-1F1 (01.13) No. 1
ELP-1F2(01.14) No. 1
ELP-1F3 (01.15) No. 1
PP-AC-1F1(01.16) No. 1
PP-AC-1F2(01.17) No. 1
PP-AC-1F3(01.18) No. 1
LP-2F1(01.19) No. 1
LP-2F2(01.20) No. 1
LP-2F3(01.21) No. 1
ELP-2F1 (01.22) No. 1
ELP-2F2(01.23) No. 1
ELP-2F3 (01.24) No. 1
PP-AC-2F1(01.25) No. 1
PP-AC-2F2(01.26) No. 1
PP-AC-2F3(01.27) No. 1
LP-SD(01.28) No. 1
LP-EX(01.29) No. 1
LP-UPS-2F1 (01.30) No. 1
PP-AC-R1(01.31) No. 1
PP-AC-R2(01.32) No. 1
PP-G3(01.33) No. 1
PP-1F3(01.34) No. 1
PP-2F3(01.35) No. 1
PP-AC-R3(01.36) No. 1

7 LIGHTING
01) Install Only , connect, test and commission of lighting fixtures as specified and as shown in
schedule of luminaires complete with lamps, electronic control gear and all necessary accessories and
ancillary works.
(01.01) Lighting Fixture type F1 No. 42
(01.02) Lighting Fixture type F2 No. 1360
(01.03) Lighting Fixture type F3 No. 78
(01.04) Lighting Fixture type S1 No. 351
(01.05) Lighting Fixture type S2 No. 422
(01.06) Lighting Fixture type S3 No. 257
(01.07) Lighting Fixture type S4 No. 46
(01.08) Lighting Fixture type S4-1 No. 9
(01.09) Lighting Fixture type S5 No. 0
(01.10) Lighting Fixture type S6 No. 0
(01.11) Lighting Fixture type C1 No. 149
(01.12) Lighting Fixture type CH No. 2
(01.13) Lighting Fixture type WM1 No. 18
(01.14) Lighting Fixture type WM2 No. 10
(01.15) Lighting Fixture type WM3 No. 11
(01.16) Lighting Fixture type UL2 No. 31
(01.17) Lighting Fixture type EX1 No. 57
(01.18) Lighting Fixture type EX2 No. 45
(01.19) Lighting Fixture flixeble led light Mt. 1000
8 (01) IP CCTV System (First Fix Only)
(01)'Supply, install, connect, and test of IP camera outlet complete as specified
including 20mm UPVC conduites,conduit fittings,pull boxes .pull wire and all necessary accessories
No. 51
and ancillary works required for complete operating system
9 . DATA NETWORK (First Fix Only)
(01)UTP Data/Tel Node Complet with conduites,20mm UPVC conduit fittings,pull boxes ,pull wire,
form each rack to the out location No. 1009

10 Fire Alarm System Fire Alarm System


(01-01) Supply, install, connect, test and commission of Main fire alarm panel (6 loop)
(MFAP),including auto dillar ,battery,charger, and all necessary accessories and ancillary works No. 1
required for complete operative system as specified and as shown on the drawings.
(02) Detectors, Call-Points and Alarms
Supply, install, connect, test and commission of fire alarm, life safety detection Devices complete
including conduits, conduit fittings, fire resistance cables 750 c-3H, as specified with all necessary
accessories and ancillary works required for complete operative system.
(02.01) Manual alarm stations by 2x1.5mm2 copper cable No. 30
(02.02) Fire alarm Bell 90db-imt 2x2.5mm2 copper cable No. 30
(02.03) Smoke detector .by 2x1.5mm2 copper cable No. 473
(02.03) Heat detector .by 2x1.5mm2 copper cable No. 3
(02.04) Control module unitby 2x1.5mm2 copper cable No. 4
(02.05) Monitor module unit by 2x1.5mm2 copper cable No. 4
(02.06) Multi detector unit by 2x1.5mm2 copper cable No. 18
11 SOUND AND PUBLICSOUND AND PUBLIC ADDRESS SYSTEM (First Fix Only)
(01) Distribution Network
Supply, install, connect and commission of sound system distribution
network complete as specified and as indicated in the drawing. The unit
shall be complete with all necessary boxes, wiring, conduits, trays, fitting
and all ancillary works.
(01.01)Wall Mounted loud speakers outlet in drama studio (empty pipe) No. 4
(01.02) Network, complete including risers, termination boxes, cables and
all necessary accessories and ancillary works. LS 1
(01-03) Mic outlet in drama studio (empty conduites by 32 mm pipe) No. 5

13 UPS U.P.S
(01)Supply , install and put into operation on line UPS ,<3% THD FOR LINEAR loads 10 KVA as
No. 1
in specification & drawing . For 15 minuites operation
14 cable trunk cable trunk

(01)Supply, install, connect, and put into operation 15 cm galvanized cable trunk (solid type) complete
including thread rods,galvanized cover ,supports and all necesary accessories,devices, and ancillary Mt. 500
works required for complete operative system

(02)as above but 20 cm Mt. 250


15 Acces control system Acces control system (first Fix Only)
(01) Supply, install, connect, test and commission of complete acces control system control panel
including ,power supply,battery,charger,software,attendat software, and all necesary accessories and
No. 1
ancillary works required for complete operative system as specified and as shown on drawings for 1
doors
(02) Supply, install, connect, test and commission of complete acces control system control panel
including ,power supply,battery,charger,software,attendat software, and all necesary accessories and
No. 1
ancillary works required for complete operative system as specified and as shown on drawings for 5
doors
(03) Supply, install, connect, test and commission of complete acces control system control panel
including ,power supply,battery,charger,software,attendat software, and all necesary accessories and
No. 1
ancillary works required for complete operative system as specified and as shown on drawings for 6
doors
(03) Supply, install, connect, test and commission of complete acces control system control panel
including ,power supply,battery,charger,software,attendat software, and all necesary accessories and
No. 1
ancillary works required for complete operative system as specified and as shown on drawings for 7
doors
(05) Supply, install, connect, test and commission of complete acces control system control panel
including ,power supply,battery,charger,software,attendat software, and all necesary accessories and
No. 1
ancillary works required for complete operative system as specified and as shown on drawings for 8
doors
(06)Supply, install, connect, test and commission of acces control devices including
cables,wires,conduites,fittings,trunking,pull boxes as specified and indicated in drawings with all
necessary accessories and ancillary works required for complete operative system.
(02-01) card reader No. 27
(02-02) door contact No. 27
(02-03)door magnetic lock No. 27
(02-04) release switch No. 27
(02-05)proximity cards with durable packing No. 135
s
t
(
s
u
p
p
l
y
&
Unit rate Total
i
n
s
t
a
ll
a
t
i
o
n
)
#REF! #REF! 3

#REF! #REF!

#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!

#REF! #REF!

#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!

#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!

#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!

#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!

#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!

#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!

#REF!
#REF!

#REF! #REF!

#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!

#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!

#REF! #REF!

#REF! #REF!

#REF! #REF!

#REF! #REF!

#REF! #REF!

#REF! #REF!

#REF! #REF!

#REF! #REF!

#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!

#REF!
Item
Item Name
No.
1 EARTHING SYSTEM

2 Low Voltage Cables

3 RACEWAYS, BOXES AND FITTINGS


4 Wiring Devices

5 Main L.V.P]

6 DISTRIBUTION BOARDS
7 LIGHTING
8

10 Fire Alarm System

11 SOUND AND PUBLIC

13 UPS
14 cable trunk

15 Acces control system


Description

G SYSTEM
(01) LV. EARTHING

(01) Supply, install, connect and test of earthing system complete as specified and as shown in the
drawings the unit price shall be lump sum including earthing rods, earthing inspection pits, earthing
cables, test links, equalizer bars, excavation and backfilling and all necessary accessories and ancillary
works associated with earthing installation. ,to give resistance not more than 3 ohm
,to give resistance not more than 3 ohm
(02) LC. EARTHING
as above but.to give resistance not more than 0.5 ohm

Supply, install, connect and test of low voltage copper cables installed on cable trays / in trenches
complete including UPVC conduites ,fire barrier,cable trays,taging ,terminls and all necessary
accessories and ancillary works as described in the technical specifications and as shown in the
drawings.
(02.01) Multicore PVC/PVC Insulated copper cables:-
(02.01.01)3*95+50+50 mm2
(02.01.01)3*70+35+35 mm2
(02.01.02) 3*50+25+25 mm2
(02.01.03)4*35+25 mm2
(02.01.03)4*25+25 mm2
(02.01.04) 5* 16 mm2
(02.01.05) 5* 10 mm2
(02.01.06) 5*6 mm2
(02.01.07) 5*4 mm2
(02.01.08) 3*16 mm2
YS, BOXES AND FITTINGS
(01) Lighting Outlets
Supply, install, connect, test and commission of wall or ceiling or outdoor lighting outlet, complete
including conduit, conduit fittings wiring,Cables,cable trays,creoss section as indicated in drawings
and all necessary accessories and ancillary works.
(01.01) Lighting outlets.
(02) Lighting Switches Outlets
Supply, install, connect, test and commission of outlets for lighting
switches, complete including conduits, conduit fittings, wiring and all
necessary accessories and ancillary works.
(02.01) Outlet for one way one gang switch 16 A.
(02.02) Outlet for one way two gang switch 16 A.
(02. 03) Outlet for two way one gang switch 16 A.
(02. 04) Outlet for two way two gang switch 16 A.
(02.05) Outlet for one way three gang switch 16 A.
(03) Socket Outlets
Supply, install, connect, test and commission of socket outlets complete including ,sockets,conduit,
conduit fittings wiring,Cables,cable trays,creoss section as indicated in drawings and all necessary
accessories and ancillary works.
(04.01) Outlet for single phase single socket 16 A.- 220V (2P+E)
(04.02) Outlet for single phase duplex socket 16 A. - 220V (2P+E)
(04.03) Outlet for power socket 20 A. - 220V (2P+E) IP=42
(04.04) Outlet for power socket 20 A. - 220V (2P+E) IP=44(for hand dryer)
(05) Isolator - Outlets
Supply, install, connect, test and commission of isolators outlets, complete including isolators, conduit,
conduit fittings wiring,Cables,cable trays,creoss section as indicated in drawings and all necessary
accessories and ancillary works.
(05.01) Outlet for 220 V, 20 A, disconnect switch with indicaing lamp for water heater
(05.02) Outlet for 220 V, 25 A, disconnect switch
(05.03) Outlet for 220 V, 32 A, disconnect switch
(05.04) Outlet for 220 V, 40 A, disconnect switch
(05.05) Outlet for 380 V, 40 A, disconnect switch for elevator

(01) Switches
Supply, install, connect, test and commission of switches as
specified and as listed below, complete with all necessary
accessories and ancillary works.
(01.01) One way one gang switch 16 A.
(01.02) One way two gang switch 16 A.
(02. 03) Outlet for two way one gang switch 16 A.
(02. 04) Outlet for two way two gang switch 16 A.
(02.05) Outlet for one way three gang switch 16 A.
(02. 06) Floor box IP=42 with capacity as indicated in drawings

(01) Supply, install, connect, test and commission of complete L.V. main distribytion boards the price
include selectvity study, UPVC pipe for incoming
cables,termination,Identifications ,labling,glands,copper luggs, as specified and as indicating drawings
. System shall be lump sum complete in every respect with all necessary accessories and ancillary
works.
(01.01) DB-G1
(01.02) DB-G2
(01.03) DB-G3
(01.04) EDB-G1
(01.05) EDB-G2
(01.06) EDB-G3
UTION BOARDS
(01) Supply, install, connect, test and commission of complete L.V. distribution boards the price
include selectvity study,,termination,Identifications ,labling,glands,copper luggs, as specified and as
indicating drawings . System shall be lump sum complete in every respect with all necessary
accessories and ancillary works.
LP-G1(01.01)
LP-G2(01.02)
LP-G3(01.03)
ELP-G1 (01.04)
ELP-G2(01.05)
ELP-G3 (01.06)
PP-AC-G1(01.07)
PP-AC-G2(01.08)
PP-AC-G3(01.09)
LP-1F1(01.10)
LP-1F2(01.11)
LP-1F3(01.12)
ELP-1F1 (01.13)
ELP-1F2(01.14)
ELP-1F3 (01.15)
PP-AC-1F1(01.16)
PP-AC-1F2(01.17)
PP-AC-1F3(01.18)
LP-2F1(01.19)
LP-2F2(01.20)
LP-2F3(01.21)
ELP-2F1 (01.22)
ELP-2F2(01.23)
ELP-2F3 (01.24)
PP-AC-2F1(01.25)
PP-AC-2F2(01.26)
PP-AC-2F3(01.27)
LP-SD(01.28)
LP-EX(01.29)
LP-UPS-2F1 (01.30)
PP-AC-R1(01.31)
PP-AC-R2(01.32)
PP-G3(01.33)
PP-1F3(01.34)
PP-2F3(01.35)
PP-AC-R3(01.36)

01) Install Only , connect, test and commission of lighting fixtures as specified and as shown in
schedule of luminaires complete with lamps, electronic control gear and all necessary accessories and
ancillary works.
(01.01) Lighting Fixture type F1
(01.02) Lighting Fixture type F2
(01.03) Lighting Fixture type F3
(01.04) Lighting Fixture type S1
(01.05) Lighting Fixture type S2
(01.06) Lighting Fixture type S3
(01.07) Lighting Fixture type S4
(01.08) Lighting Fixture type S4-1
(01.09) Lighting Fixture type S5
(01.10) Lighting Fixture type S6
(01.11) Lighting Fixture type C1
(01.12) Lighting Fixture type CH
(01.13) Lighting Fixture type WM1
(01.14) Lighting Fixture type WM2
(01.15) Lighting Fixture type WM3
(01.16) Lighting Fixture type UL2
(01.17) Lighting Fixture type EX1
(01.18) Lighting Fixture type EX2
(01.19) Lighting Fixture flixeble led light
(01) IP CCTV System (First Fix Only)
(01)'Supply, install, connect, and test of IP camera outlet complete as specified
including 20mm UPVC conduites,conduit fittings,pull boxes .pull wire and all necessary accessories
and ancillary works required for complete operating system
. DATA NETWORK (First Fix Only)
(01)UTP Data/Tel Node Complet with conduites,20mm UPVC conduit fittings,pull boxes ,pull wire,
form each rack to the out location
Fire Alarm System
(01-01) Supply, install, connect, test and commission of Main fire alarm panel (6 loop)
(MFAP),including auto dillar ,battery,charger, and all necessary accessories and ancillary works
required for complete operative system as specified and as shown on the drawings.
(02) Detectors, Call-Points and Alarms
Supply, install, connect, test and commission of fire alarm, life safety detection Devices complete
including conduits, conduit fittings, fire resistance cables 750 c-3H, as specified with all necessary
accessories and ancillary works required for complete operative system.
(02.01) Manual alarm stations by 2x1.5mm2 copper cable
(02.02) Fire alarm Bell 90db-imt 2x2.5mm2 copper cable
(02.03) Smoke detector .by 2x1.5mm2 copper cable
(02.03) Heat detector .by 2x1.5mm2 copper cable
(02.04) Control module unitby 2x1.5mm2 copper cable
(02.05) Monitor module unit by 2x1.5mm2 copper cable
(02.06) Multi detector unit by 2x1.5mm2 copper cable
SOUND AND PUBLIC ADDRESS SYSTEM (First Fix Only)
(01) Distribution Network
Supply, install, connect and commission of sound system distribution
network complete as specified and as indicated in the drawing. The unit
shall be complete with all necessary boxes, wiring, conduits, trays, fitting
and all ancillary works.
(01.01)Wall Mounted loud speakers outlet in drama studio (empty pipe)
(01.02) Network, complete including risers, termination boxes, cables and
all necessary accessories and ancillary works.
(01-03) Mic outlet in drama studio (empty conduites by 32 mm pipe)

U.P.S
(01)Supply , install and put into operation on line UPS ,<3% THD FOR LINEAR loads 10 KVA as
in specification & drawing . For 15 minuites operation
cable trunk
(01)Supply, install, connect, and put into operation 15 cm galvanized cable trunk (solid type) complete
including thread rods,galvanized cover ,supports and all necesary accessories,devices, and ancillary
works required for complete operative system
(02)as above but 20 cm
Acces control system (first Fix Only)
(01) Supply, install, connect, test and commission of complete acces control system control panel
including ,power supply,battery,charger,software,attendat software, and all necesary accessories and
ancillary works required for complete operative system as specified and as shown on drawings for 1
doors
(02) Supply, install, connect, test and commission of complete acces control system control panel
including ,power supply,battery,charger,software,attendat software, and all necesary accessories and
ancillary works required for complete operative system as specified and as shown on drawings for 5
doors
(03) Supply, install, connect, test and commission of complete acces control system control panel
including ,power supply,battery,charger,software,attendat software, and all necesary accessories and
ancillary works required for complete operative system as specified and as shown on drawings for 6
doors
(03) Supply, install, connect, test and commission of complete acces control system control panel
including ,power supply,battery,charger,software,attendat software, and all necesary accessories and
ancillary works required for complete operative system as specified and as shown on drawings for 7
doors
(05) Supply, install, connect, test and commission of complete acces control system control panel
including ,power supply,battery,charger,software,attendat software, and all necesary accessories and
ancillary works required for complete operative system as specified and as shown on drawings for 8
doors
(06)Supply, install, connect, test and commission of acces control devices including
cables,wires,conduites,fittings,trunking,pull boxes as specified and indicated in drawings with all
necessary accessories and ancillary works required for complete operative system.
(02-01) card reader
(02-02) door contact
(02-03)door magnetic lock
(02-04) release switch
(02-05)proximity cards with durable packing
UMIT QUANTITY
Materials Labour equip. Subcont. Dry cost Amount

L.S. 1 0.00 0.00 0.00 0.00 - -

L.S. 1 0.00 0.00 0.00 0.00 - -

Mt. 115 423.00 0.00 0.00 0.00 423.00 ###


Mt. 35 0.00 0.00 0.00 0.00 - -
Mt. 115 0.00 0.00 0.00 0.00 - -
Mt. 60 0.00 0.00 0.00 0.00 - -
Mt. 20 0.00 0.00 0.00 0.00 - -
Mt. 100 0.00 0.00 0.00 0.00 - -
Mt. 110 0.00 0.00 0.00 0.00 - -
Mt. 125 0.00 0.00 0.00 0.00 - -
Mt. 30 0.00 0.00 0.00 0.00 - -
Mt. 50 0.00 0.00 0.00 0.00 - -

No. 2786 184.98 16.93 6.64 0.00 208.55 ###

No. 277 0.00 0.00 0.00 0.00 - -


No. 122 0.00 0.00 0.00 0.00 - -
No. 10 0.00 0.00 0.00 0.00 - -
No. 38 0.00 0.00 0.00 0.00 - -
No. 7 0.00 0.00 0.00 0.00 - -
No. 621 0.00 0.00 0.00 0.00 - -
No. 1242 0.00 0.00 0.00 0.00 - -
No. 41 0.00 0.00 0.00 0.00 - -
No. 35 0.00 0.00 0.00 0.00 - -

No. 66 0.00 0.00 0.00 0.00 - -


No. 58 0.00 0.00 0.00 0.00 - -
No. 113 0.00 0.00 0.00 0.00 - -
No. 3 0.00 0.00 0.00 0.00 - -
No. 2 0.00 0.00 0.00 0.00 - -

No. 277 0.00 0.00 0.00 0.00 - -


No. 122 0.00 0.00 0.00 0.00 - -
No. 10 0.00 0.00 0.00 0.00 - -
No. 38 0.00 0.00 0.00 0.00 - -
No. 7 0.00 0.00 0.00 0.00 - -
No. 100 0.00 0.00 0.00 0.00 - -

No. 1 0.00 0.00 0.00 0.00 - -


No. 1 0.00 0.00 0.00 0.00 - -
No. 1 0.00 0.00 0.00 0.00 - -
No. 1 0.00 0.00 0.00 0.00 - -
No. 1 0.00 0.00 0.00 0.00 - -
No. 1 0.00 0.00 0.00 0.00 - -

No. 1 0.00 0.00 0.00 0.00 - -


No. 1 0.00 0.00 0.00 0.00 - -
No. 1 0.00 0.00 0.00 0.00 - -
No. 1 0.00 0.00 0.00 0.00 - -
No. 1 0.00 0.00 0.00 0.00 - -
No. 1 0.00 0.00 0.00 0.00 - -
No. 1 0.00 0.00 0.00 0.00 - -
No. 1 0.00 0.00 0.00 0.00 - -
No. 1 0.00 0.00 0.00 0.00 - -
No. 1 0.00 0.00 0.00 0.00 - -
No. 1 0.00 0.00 0.00 0.00 - -
No. 1 0.00 0.00 0.00 0.00 - -
No. 1 0.00 0.00 0.00 0.00 - -
No. 1 0.00 0.00 0.00 0.00 - -
No. 1 0.00 0.00 0.00 0.00 - -
No. 1 0.00 0.00 0.00 0.00 - -
No. 1 0.00 0.00 0.00 0.00 - -
No. 1 0.00 0.00 0.00 0.00 - -
No. 1 0.00 0.00 0.00 0.00 - -
No. 1 0.00 0.00 0.00 0.00 - -
No. 1 0.00 0.00 0.00 0.00 - -
No. 1 0.00 0.00 0.00 0.00 - -
No. 1 0.00 0.00 0.00 0.00 - -
No. 1 0.00 0.00 0.00 0.00 - -
No. 1 0.00 0.00 0.00 0.00 - -
No. 1 0.00 0.00 0.00 0.00 - -
No. 1 0.00 0.00 0.00 0.00 - -
No. 1 0.00 0.00 0.00 0.00 - -
No. 1 0.00 0.00 0.00 0.00 - -
No. 1 0.00 0.00 0.00 0.00 - -
No. 1 0.00 0.00 0.00 0.00 - -
No. 1 0.00 0.00 0.00 0.00 - -
No. 1 0.00 0.00 0.00 0.00 - -
No. 1 0.00 0.00 0.00 0.00 - -
No. 1 0.00 0.00 0.00 0.00 - -
No. 1 0.00 0.00 0.00 0.00 - -

No. 42 0.00 0.00 0.00 0.00 - -


No. 1360 0.00 0.00 0.00 0.00 - -
No. 78 0.00 0.00 0.00 0.00 - -
No. 351 0.00 0.00 0.00 0.00 - -
No. 422 0.00 0.00 0.00 0.00 - -
No. 257 0.00 0.00 0.00 0.00 - -
No. 46 0.00 0.00 0.00 0.00 - -
No. 9 0.00 0.00 0.00 0.00 - -
No. 0 0.00 0.00 0.00 0.00 - -
No. 0 0.00 0.00 0.00 0.00 - -
No. 149 0.00 0.00 0.00 0.00 - -
No. 2 0.00 0.00 0.00 0.00 - -
No. 18 0.00 0.00 0.00 0.00 - -
No. 10 0.00 0.00 0.00 0.00 - -
No. 11 0.00 0.00 0.00 0.00 - -
No. 31 0.00 0.00 0.00 0.00 - -
No. 57 0.00 0.00 0.00 0.00 - -
No. 45 0.00 0.00 0.00 0.00 - -
Mt. 1000 0.00 0.00 0.00 0.00 - -

No. 51
0.00 0.00 0.00 0.00 - -

No. 1009
0.00 0.00 0.00 0.00 - -

No. 1
0.00 0.00 0.00 0.00 - -

No. 30 0.00 0.00 0.00 0.00 - -


No. 30 0.00 0.00 0.00 0.00 - -
No. 473 0.00 0.00 0.00 0.00 - -
No. 3 0.00 0.00 0.00 0.00 - -
No. 4 0.00 0.00 0.00 0.00 - -
No. 4 0.00 0.00 0.00 0.00 - -
No. 18 0.00 0.00 0.00 0.00 - -

No. 4 0.00 0.00 0.00 0.00 - -

LS 1 0.00 0.00 0.00 0.00 - -


No. 5 0.00 0.00 0.00 0.00 - -
No. 1
0.00 0.00 0.00 0.00 - -

Mt. 500
0.00 0.00 0.00 0.00 - -
Mt. 250 0.00 0.00 0.00 0.00 - -

No. 1

0.00 0.00 0.00 0.00 - -

No. 1

0.00 0.00 0.00 0.00 - -

No. 1

0.00 0.00 0.00 0.00 - -

No. 1

0.00 0.00 0.00 0.00 - -

No. 1

0.00 0.00 0.00 0.00 - -

No. 27 0.00 0.00 0.00 0.00 - -


No. 27 0.00 0.00 0.00 0.00 - -
No. 27 0.00 0.00 0.00 0.00 - -
No. 27 0.00 0.00 0.00 0.00 - -
No. 135 0.00 0.00 0.00 0.00 - -
MF #REF!

Materials Labour equip. Subcont. sell Rate Total

0 0 0 0 #REF! #REF!

0 0 0 0 #REF! #REF!

48,645 0 0 0 #REF! #REF!


0 0 0 0 #REF! #REF!
0 0 0 0 #REF! #REF!
0 0 0 0 #REF! #REF!
0 0 0 0 #REF! #REF!
0 0 0 0 #REF! #REF!
0 0 0 0 #REF! #REF!
0 0 0 0 #REF! #REF!
0 0 0 0 #REF! #REF!
0 0 0 0 #REF! #REF!

515,354 47,172 18,499 0 #REF! #REF!

0 0 0 0 #REF! #REF!
0 0 0 0 #REF! #REF!
0 0 0 0 #REF! #REF!
0 0 0 0 #REF! #REF!
0 0 0 0 #REF! #REF!
0 0 0 0 #REF! #REF!
0 0 0 0 #REF! #REF!
0 0 0 0 #REF! #REF!
0 0 0 0 #REF! #REF!

0 0 0 0 #REF! #REF!
0 0 0 0 #REF! #REF!
0 0 0 0 #REF! #REF!
0 0 0 0 #REF! #REF!
0 0 0 0 #REF! #REF!

0 0 0 0 #REF! #REF!
0 0 0 0 #REF! #REF!
0 0 0 0 #REF! #REF!
0 0 0 0 #REF! #REF!
0 0 0 0 #REF! #REF!
0 0 0 0 #REF! #REF!

0 0 0 0 #REF! #REF!
0 0 0 0 #REF! #REF!
0 0 0 0 #REF! #REF!
0 0 0 0 #REF! #REF!
0 0 0 0 #REF! #REF!
0 0 0 0 #REF! #REF!

0 0 0 0 #REF! #REF!
0 0 0 0 #REF! #REF!
0 0 0 0 #REF! #REF!
0 0 0 0 #REF! #REF!
0 0 0 0 #REF! #REF!
0 0 0 0 #REF! #REF!
0 0 0 0 #REF! #REF!
0 0 0 0 #REF! #REF!
0 0 0 0 #REF! #REF!
0 0 0 0 #REF! #REF!
0 0 0 0 #REF! #REF!
0 0 0 0 #REF! #REF!
0 0 0 0 #REF! #REF!
0 0 0 0 #REF! #REF!
0 0 0 0 #REF! #REF!
0 0 0 0 #REF! #REF!
0 0 0 0 #REF! #REF!
0 0 0 0 #REF! #REF!
0 0 0 0 #REF! #REF!
0 0 0 0 #REF! #REF!
0 0 0 0 #REF! #REF!
0 0 0 0 #REF! #REF!
0 0 0 0 #REF! #REF!
0 0 0 0 #REF! #REF!
0 0 0 0 #REF! #REF!
0 0 0 0 #REF! #REF!
0 0 0 0 #REF! #REF!
0 0 0 0 #REF! #REF!
0 0 0 0 #REF! #REF!
0 0 0 0 #REF! #REF!
0 0 0 0 #REF! #REF!
0 0 0 0 #REF! #REF!
0 0 0 0 #REF! #REF!
0 0 0 0 #REF! #REF!
0 0 0 0 #REF! #REF!
0 0 0 0 #REF! #REF!

0 0 0 0 #REF! #REF!
0 0 0 0 #REF! #REF!
0 0 0 0 #REF! #REF!
0 0 0 0 #REF! #REF!
0 0 0 0 #REF! #REF!
0 0 0 0 #REF! #REF!
0 0 0 0 #REF! #REF!
0 0 0 0 #REF! #REF!
0 0 0 0 #REF! #REF!
0 0 0 0 #REF! #REF!
0 0 0 0 #REF! #REF!
0 0 0 0 #REF! #REF!
0 0 0 0 #REF! #REF!
0 0 0 0 #REF! #REF!
0 0 0 0 #REF! #REF!
0 0 0 0 #REF! #REF!
0 0 0 0 #REF! #REF!
0 0 0 0 #REF! #REF!
0 0 0 0 #REF! #REF!

0 0 0 0 #REF! #REF!

0 0 0 0 #REF! #REF!

0 0 0 0 #REF! #REF!
-

0 0 0 0 #REF! #REF!
0 0 0 0 #REF! #REF!
0 0 0 0 #REF! #REF!
0 0 0 0 #REF! #REF!
0 0 0 0 #REF! #REF!
0 0 0 0 #REF! #REF!
0 0 0 0 #REF! #REF!

0 0 0 0 #REF! #REF!

0 0 0 0 #REF! #REF!
0 0 0 0 #REF! #REF!
0 0 0 0 #REF! #REF!

0 0 0 0 #REF! #REF!
0 0 0 0 #REF! #REF!

0 0 0 0 #REF! #REF!

0 0 0 0 #REF! #REF!

0 0 0 0 #REF! #REF!

0 0 0 0 #REF! #REF!

0 0 0 0 #REF! #REF!

0 0 0 0
0 0 0 0 #REF! #REF!
0 0 0 0 #REF! #REF!
0 0 0 0 #REF! #REF!
0 0 0 0 #REF! #REF!
0 0 0 0 #REF! #REF!

Materials Labour equip. Subcont. Total


563,999 47,172 18,499 0 #REF!
ITEM No. 1- LV - EARTHING SYSTEM UNIT
Description

(01) Supply, install, connect and test of earthing system complete


as specified and as shown in the drawings the unit price shall be
lump sum including earthing rods, earthing inspection pits,
earthing cables, test links, equalizer bars, excavation and Quantity
backfilling and all necessary accessories and ancillary works
associated with earthing installation. ,to give resistance not more
than 3 ohm

Material unit quantity rate amount


0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Subtotal wastage= 1.00 0.00
Total 0.00
Labour Trade no. rate amount
Supervisor - 300.00 0.00
Forman - 280.00 0.00
skilled - 115.00 0.00
unskilled - 70.00 0.00
Total - 0.00
Prod. rate 1.00
Subcont. 0.00
ITEM No. 1- LC - EARTHING SYSTEM UNIT
Description Quantity
as above but.to give resistance not more than 0.5 ohm

Material unit quantity rate amount


0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Subtotal wastage= 1.00 0.00
Total 0.00
Labour Trade no. rate amount
Supervisor - 300.00 0.00
Forman - 280.00 0.00
skilled - 115.00 0.00
unskilled - 70.00 0.00
Total - 0.00
Prod. rate 1.00
Subcont. 0.00
ITEM No. 2- Low Voltage Cables UNIT
Description

Supply, install, connect and test of low voltage copper cables


installed on cable trays / in trenches complete including UPVC
conduites ,fire barrier,cable trays,taging ,terminls and all Quantity
necessary accessories and ancillary works as described in the
technical specifications and as shown in the drawings.

(02.01.01)3*95+50+50 mm2
Material unit quantity rate amount
cable 3*95+50 m 1 369.00 369.00
Cable 1x 50mm m 1 54.00 54.00
Cable termination pcs 1 0.00 0.00
0.00
0.00 0.00
0.00
0.00
0.00
Subtotal wastage= 1.00 423.00
Total 423.00
Labour Trade no. rate amount
operator - 300.00 0.00
ganger - 280.00 0.00
skilled - 115.00 0.00
unskilled - 70.00 0.00
Total - 0.00
Prod. rate 1.00
Subcont.
ITEM No. UNIT
Description Quantity
(02.01.01)3*70+35+35 mm2

Material unit quantity rate amount


cable 3*70+35 mm m 1 0.00
cable 1x35mm m 1 0.00
Cable termination pcs 1 0.00
0.00
0.00
0.00
0.00
0.00
Subtotal wastage= 1.00 0.00
Total 0.00
Labour Trade no. rate amount
operator - 300.00 0.00
Forman - 280.00 0.00
skilled - 115.00 0.00
unskilled - 70.00 0.00
Total - 0.00
Prod. rate 1.00
Subcont.
ITEM No. UNIT
Description Quantity
(02.01.02) 3*50+25+25 mm2
(02.01.02) 3*50+25+25 mm2

Material unit quantity rate amount


cable 3*50+25 m 1 0.00 0.00
cable 1 x 25mm m 1 0.00 0.00
Cable termination pcs 1 0.00 0.00
0.00 0.00
0.00 0.00
0.00
0.00
0.00
Subtotal wastage= 1.00 0.00
Total 0.00
Labour Trade no. rate amount
operator - 300.00 0.00
ganger - 280.00 0.00
skilled - 115.00 0.00
unskilled - 70.00 0.00
Total - 0.00
Prod. rate 1.00
Subcont.
ITEM No. UNIT
Description Quantity
(02.01.03)4*35+25 mm2

Material unit quantity rate amount


cable 4 x35mm m 1 0.00 0.00
cable 1 x 25mm m 1 0.00
cable termination pcs 1 0.00
0.00
0.00
0.00
0.00
0.00
Subtotal wastage= 1.00 0.00
Total 0.00
Labour Trade no. rate amount
operator - 300.00 0.00
ganger - 280.00 0.00
skilled - 115.00 0.00
unskilled - 70.00 0.00
Total - 0.00
Prod. rate 1.00
Subcont.
ITEM No. UNIT
Description Quantity
(02.01.03)4*25+25 mm2

Material unit quantity rate amount


cable 4 x25mm m 1 0.00
cable 1 x 25mm m 1 0.00
cable termination pcs 1 0.00
0.00
0.00
0.00
0.00
0.00
Subtotal wastage= 1.00 0.00
Total 0.00
Labour Trade no. rate amount
operator - 300.00 0.00
ganger - 280.00 0.00
skilled - 115.00 0.00
unskilled - 70.00 0.00
Total - 0.00
Prod. rate 20.00
Subcont.
ITEM No. UNIT
Description Quantity
5* 16 mm2

Material unit quantity rate amount


4x16mm m 1 0.00 0.00
1x16mm m 1 0.00 0.00
termination pcs 1 0.00 0.00
0.00
0.00
0.00
0.00
0.00
Subtotal wastage= 1.00 0.00
Total 0.00
Labour Trade no. rate amount
operator - 300.00 0.00
ganger - 280.00 0.00
skilled - 115.00 0.00
unskilled - 70.00 0.00
Total - 0.00
Prod. rate 1.00
Subcont.
ITEM No. UNIT
Description Quantity
5* 10 mm2

Material unit quantity rate amount


4 x10 mm m 1 0.00 0.00
1 x 10mm m 1 0.00 0.00
termination pcs 1 0.00
0.00
0.00
0.00
0.00
0.00
Subtotal wastage= 1.00 0.00
Total 0.00
Labour Trade no. rate amount
operator - 300.00 0.00
ganger - 280.00 0.00
skilled - 115.00 0.00
unskilled - 70.00 0.00
Total - 0.00
Prod. rate 1.00
Subcont.
ITEM No. UNIT
Description Quantity
5*6 mm2

Material unit quantity rate amount


4 x6 mm m 1 0.00 0.00
1 x 6 mm m 1 0.00 0.00
termination pcs 1 0.00
0.00
0.00
0.00
0.00
0.00
Subtotal wastage= 1.00 0.00
Total 0.00
Labour Trade no. rate amount
operator - 300.00 0.00
ganger - 280.00 0.00
skilled - 115.00 0.00
unskilled - 70.00 0.00
Total - 0.00
Prod. rate 1.00
Subcont.
ITEM No. UNIT
Description Quantity
5*4 mm2

Material unit quantity rate amount


5 x 4 mm m 0.3375 0.00 0.00
termination pcs 1 0.00 0.00
0.00
0.00
0.00
0.00
0.00
0.00
Subtotal wastage= 1.00 0.00
Total 0.00
Labour Trade no. rate amount
operator - 300.00 0.00
ganger - 280.00 0.00
skilled - 115.00 0.00
unskilled - 70.00 0.00
Total - 0.00
Prod. rate 1.00
Subcont.
ITEM No. UNIT
Description Quantity
3*16 mm2

Material unit quantity rate amount


3 x 16 mm m3 1.00 0.00 0.00
termination pcs 1 0.00 0.00
0.00 0.00
0.00 0.00
0.00
0.00
0.00
0.00
Subtotal wastage= 1.00 0.00
Total 0.00
Labour Trade no. rate amount
operator - 300.00 0.00
ganger - 280.00 0.00
skilled - 115.00 0.00
unskilled - 70.00 0.00
Total - 0.00
Prod. rate 1.00
Subcont. 0.00
ITEM No. 3 - RACEWAYS, BOXES AND FITTINGS UNIT
(01) Lighting Outlets
Description

Supply, install, connect, test and commission of wall or ceiling or


outdoor lighting outlet, complete including conduit, conduit fittings
wiring,Cables,cable trays,creoss section as indicated in drawings Quantity
and all necessary accessories and ancillary works.
(01.01) Lighting outlets.

Material unit quantity rate amount


PVC conduit & fittings mt 15.00 3.50 52.50
PVC Boxes unit 4 1.50 6.00
wires mt 45 2.81 126.45
termination unit 3 0.010 0.03
0.00
0.00
0.00
0.00
Subtotal wastage= 1.00 184.98
Total 184.98
Labour Trade no. rate amount
operator - 220.00 0.00
ganger 0.37 170.00 62.98
skilled 1.00 150.00 150.00
unskilled 1.93 80.00 154.22
Total 3.30 367.20
Prod. rate 21.69
Subcont.
ITEM No. (02) Lighting Switches Outlets UNIT
Supply, install, connect, test and commission of outlets for
lighting switches, complete including conduits, conduit
fittings, wiring and all necessary accessories and ancillary
Quantity
works.
Description
(02.01) Outlet for one way one gang switch 16 A.
(02.01) Outlet for one way one gang switch 16 A.

Material unit quantity rate amount


conduit m 3.50 0.00
Boxes pcs 1.50 0.00
wires m 2.81 0.00
termination pcs 0.01 0.00
switch pcs 0.00
Cable try 0.00
0.00
0.00
Subtotal wastage= 1.00 0.00
Total 0.00
Labour Trade no. rate amount
operator - 300.00 0.00
ganger - 280.00 0.00
skilled - 115.00 0.00
unskilled - 70.00 0.00
Total - 0.00
Prod. rate 1.00
Subcont. 0.00
ITEM No. UNIT
Description Quantity
(02.02) Outlet for one way two gang switch 16 A.

Material unit quantity rate amount


conduit m 0.00
Boxes pcs 0.00
wires m 0.00
termination pcs 0.00
switch pcs 0.00
Cable try 0.00
0.00
0.00
Subtotal wastage= 1.00 0.00
Total 0.00
Labour Trade no. rate amount
operator - 300.00 0.00
ganger - 280.00 0.00
skilled - 115.00 0.00
unskilled - 70.00 0.00
Total - 0.00
Prod. rate 1.00
Subcont.
ITEM No. UNIT
Description Quantity
(02. 03) Outlet for two way one gang switch 16 A.

Material unit quantity rate amount


conduit m 0.00
Boxes pcs 0.00
wires m 0.00
termination pcs 0.00
switch pcs 0.00
Cable try 0.00
0.00
0.00
Subtotal wastage= 1.00 0.00
Total 0.00
Labour Trade no. rate amount
operator - 300.00 0.00
ganger - 280.00 0.00
skilled - 115.00 0.00
unskilled - 70.00 0.00
Total - 0.00
Prod. rate 1.00
Subcont.
ITEM No. UNIT
Description Quantity
(02. 04) Outlet for two way two gang switch 16 A.

Material unit quantity rate amount


conduit m 0.00
Boxes pcs 0.00
wires m 0.00
termination pcs 0.00
switch pcs 0.00
Cable try 0.00
0.00
0.00
Subtotal wastage= 1.00 0.00
Total 0.00
Labour Trade no. rate amount
operator - 300.00 0.00
ganger - 280.00 0.00
skilled - 115.00 0.00
unskilled - 70.00 0.00
Total - 0.00
Prod. rate 1.00
Subcont.
ITEM No. 3 UNIT
Description Quantity
(02.05) Outlet for one way three gang switch 16 A.

Material unit quantity rate amount


conduit m 0.00
Boxes pcs 0.00
wires m 0.00
termination pcs 0.00
switch pcs 0.00
Cable try 0.00
0.00
0.00
Subtotal wastage= 1.00 0.00
Total 0.00
Labour Trade no. rate amount
operator - 300.00 0.00
ganger - 280.00 0.00
skilled - 115.00 0.00
unskilled - 70.00 0.00
Total - 0.00
Prod. rate 1.00
Subcont.
ITEM No. (03) Socket Outlets UNIT
Description
(04.01) Outlet for single phase single socket 16 A.- 220V (2P+E) Quantity

Material unit quantity rate amount


conduit and fittings m 1 0.00 0.00
Boxes pcs 0.00
wires m 0.00
socket pcs 0.00
termination pcs 0.00
Cable try 0.00
0.00
0.00
Subtotal wastage= 1.00 0.00
Total 0.00
Labour Trade no. rate amount
operator - 300.00 0.00
ganger - 280.00 0.00
skilled - 115.00 0.00
unskilled - 70.00 0.00
Total - 0.00
Prod. rate 1.00
Subcont.
ITEM No. 4/2 J UNIT
Description
(04.02) Outlet for single phase duplex socket 16 A. - 220V (2P+E) Quantity

Material unit quantity rate amount


conduit and fittings m 1.00 0.00 0.00
Boxes pcs 0.00 0.00 0.00
wires m 0.00
socket pcs 0.00
termination pcs 0.00
Cable try 0.00
0.00
0.00
Subtotal wastage= 1.00 0.00
Total 0.00
Labour Trade no. rate amount
operator - 300.00 0.00
ganger - 280.00 0.00
skilled - 115.00 0.00
unskilled - 70.00 0.00
Total - 0.00
Prod. rate 1.00
Subcont.
ITEM No. 4/2 K UNIT
Description
(04.03) Outlet for power socket 20 A. - 220V (2P+E) IP=42 Quantity

Material unit quantity rate amount


conduit and fittings no 1 0.00
Boxes no 0.00
wires no 0.00
socket n 0.00
termination no 0.00
Cable try no 0.00
0.00
0.00
Subtotal wastage= 0.00
Total 0.00
Labour Trade no. rate amount
operator - 300.00 0.00
ganger - 280.00 0.00
skilled - 115.00 0.00
unskilled - 70.00 0.00
Total - 0.00
Prod. rate 1.00
Subcont.
ITEM No. UNIT
Description (04.04) Outlet for power socket 20 A. - 220V (2P+E) IP=44(for Quantity
hand dryer)
Material unit quantity rate amount
conduit and fittings no 1 0.00 0.00
Boxes no 0.00
wires no 0.00
socket n 0.00
termination no 0.00
Cable try no 0.00
0.00
0.00
Subtotal wastage= 1.00 0.00
Total 0.00
Labour Trade no. rate amount
operator - 300.00 0.00
ganger - 280.00 0.00
skilled - 115.00 0.00
unskilled - 70.00 0.00
Total - 0.00
Prod. rate 1.00
Subcont.
ITEM No. (05) Isolator - Outlets UNIT
Description

(05.01) Outlet for 220 V, 20 A, disconnect switch with indicaing


Quantity
lamp for water heater

Material unit quantity rate amount


conduit and fittings no 0 0.00 0.00
Boxes no 0 0.00 0.00
wires no 0 0.00 0.00
socket n 0 0.00 0.00
termination no 0 0.00 0.00
Cable try no 0.00
0.00
0.00
Subtotal wastage= 1.00 0.00
Total 0.00
Labour Trade no. rate amount
operator - 300.00 0.00
ganger - 280.00 0.00
skilled - 115.00 0.00
unskilled - 70.00 0.00
Total - 0.00
Prod. rate 1.00
Subcont.
ITEM No. UNIT
Description
(05.02) Outlet for 220 V, 25 A, disconnect switch Quantity

Material unit quantity rate amount


conduit and fittings no 0 0.00 0.00
Boxes no 0 0.00 0.00
wires no 0 0.00 0.00
socket n 0 0.00 0.00
termination no 0 0.00 0.00
Cable try no 0.00
0.00
0.00
Subtotal wastage= 1.00 0.00
Total 0.00
Labour Trade no. rate amount
operator - 300.00 0.00
ganger - 280.00 0.00
skilled - 115.00 0.00
unskilled - 70.00 0.00
Total - 0.00
Prod. rate 1.00
Subcont.
ITEM No. UNIT
Description
(05.03) Outlet for 220 V, 32 A, disconnect switch Quantity

Material unit quantity rate amount


0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Subtotal wastage= 1.00 0.00
Total 0.00
Labour Trade no. rate amount
operator - 300.00 0.00
ganger - 280.00 0.00
skilled - 115.00 0.00
unskilled - 70.00 0.00
Total - 0.00
Prod. rate 1.00
Subcont.
ITEM No. UNIT
Description
(05.04) Outlet for 220 V, 40 A, disconnect switch Quantity

Material unit quantity rate amount


0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Subtotal wastage= 1.00 0.00
Total 0.00
Labour Trade no. rate amount
operator - 300.00 0.00
ganger - 280.00 0.00
skilled - 115.00 0.00
unskilled - 70.00 0.00
Total - 0.00
Prod. rate 1.00
Subcont.
ITEM No. UNIT
Description
(05.05) Outlet for 380 V, 40 A, disconnect switch for elevator Quantity

Material unit quantity rate amount


0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Subtotal wastage= 1.00 0.00
Total 0.00
Labour Trade no. rate amount
operator - 300.00 0.00
ganger - 280.00 0.00
skilled - 115.00 0.00
unskilled - 70.00 0.00
Total - 0.00
Prod. rate 1.00
Subcont.
ITEM No. 4 - Wiring Devices UNIT
(01) Switches
Description Quantity
(01.01) One way one gang switch 16 A.

Material unit quantity rate amount


0.00
0.00
0.00
0.00 0.00
0.00
0.00
0.00
0.00
Subtotal wastage= 1.00 0.00
Total 0.00
Labour Trade no. rate amount
operator - 300.00 0.00
ganger - 280.00 0.00
skilled - 115.00 0.00
unskilled - 70.00 0.00
Total - 0.00
Prod. rate 1.00
Subcont.
ITEM No. UNIT
Description
(01.02) One way two gang switch 16 A. Quantity

Material unit quantity rate amount


0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Subtotal wastage= 1.00 0.00
Total 0.00
Labour Trade no. rate amount
operator - 300.00 0.00
ganger - 280.00 0.00
skilled - 115.00 0.00
unskilled - 70.00 0.00
Total - 0.00
Prod. rate 1.00
Subcont.
ITEM No. UNIT
Description
(02. 03) Outlet for two way one gang switch 16 A. Quantity

Material unit quantity rate amount


m 1 0.00
nr 1 0.00
nr 1 0.00
nr 1 0.00
0.00
0.00
0.00
0.00
Subtotal wastage= 1.00 0.00
Total 0.00
Labour Trade no. rate amount
operator - 300.00 0.00
ganger - 280.00 0.00
skilled - 115.00 0.00
unskilled - 70.00 0.00
Total - 0.00
Prod. rate 1.00
Subcont.
ITEM No. UNIT
Description
(02. 04) Outlet for two way two gang switch 16 A. Quantity

Material unit quantity rate amount


nr 1 0.00 0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Subtotal wastage= 1.00 0.00
Total 0.00
Labour Trade no. rate amount
operator - 300.00 0.00
ganger - 280.00 0.00
skilled - 115.00 0.00
unskilled - 70.00 0.00
Total - 0.00
Prod. rate 1.00
Subcont.
ITEM No. 4/3 K UNIT
Description
(02.05) Outlet for one way three gang switch 16 A. Quantity

Material unit quantity rate amount


0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Subtotal wastage= 1.00 0.00
Total 0.00
Labour Trade no. rate amount
operator - 300.00 0.00
ganger - 280.00 0.00
skilled - 115.00 0.00
unskilled - 70.00 0.00
Total - 0.00
Prod. rate 1.00
Subcont.
ITEM No. UNIT
Description
(02. 06) Floor box IP=42 with capacity as indicated in drawings Quantity

Material unit quantity rate amount


nr 1 0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00
0.00
Subtotal wastage= 1.00 0.00
Total 0.00
Labour Trade no. rate amount
operator - 300.00 0.00
ganger - 280.00 0.00
skilled - 115.00 0.00
unskilled - 70.00 0.00
Total - 0.00
Prod. rate 1.00
Subcont.
ITEM No. 5 - Main L.V.P] UNIT

Description (01) Supply, install, connect, test and commission of complete


L.V. main distribytion boards the price include selectvity study,
UPVC pipe for incoming
cables,termination,Identifications ,labling,glands,copper luggs, as
specified and as indicating drawings . System shall be lump sum
complete in every respect with all necessary accessories and Quantity
ancillary works.
(01.01) DB-G1

Material unit quantity rate amount


0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Subtotal wastage= 1.00 0.00
Total 0.00
Labour Trade no. rate amount
operator - 300.00 0.00
ganger - 280.00 0.00
skilled - 115.00 0.00
unskilled - 70.00 0.00
Total - 0.00
Prod. rate 1.00
Subcont.
ITEM No. UNIT
Description
(01.02) DB-G2 Quantity

Material unit quantity rate amount


0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Subtotal wastage= 1.00 0.00
Total 0.00
Labour Trade no. rate amount
operator - 300.00 0.00
ganger - 280.00 0.00
skilled - 115.00 0.00
unskilled - 70.00 0.00
Total - 0.00
Prod. rate 1.00
Subcont.
ITEM No. 4/3 K UNIT
Description
(01.03) DB-G3 Quantity

Material unit quantity rate amount


0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Subtotal wastage= 1.00 0.00
Total 0.00
Labour Trade no. rate amount
operator - 300.00 0.00
ganger - 280.00 0.00
skilled - 115.00 0.00
unskilled - 70.00 0.00
Total - 0.00
Prod. rate 1.00
Subcont.
ITEM No. 4/3 K UNIT
Description
(01.04) EDB-G1 Quantity

Material unit quantity rate amount


0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Subtotal wastage= 1.00 0.00
Total 0.00
Labour Trade no. rate amount
operator - 300.00 0.00
ganger - 280.00 0.00
skilled - 115.00 0.00
unskilled - 70.00 0.00
Total - 0.00
Prod. rate 1.00
Subcont.
ITEM No. UNIT
Description
(01.05) EDB-G2 Quantity

Material unit quantity rate amount


0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Subtotal wastage= 1.00 0.00
Total 0.00
Labour Trade no. rate amount
operator - 300.00 0.00
ganger - 280.00 0.00
skilled - 115.00 0.00
unskilled - 70.00 0.00
Total - 0.00
Prod. rate 1.00
Subcont.
ITEM No. UNIT
Description
(01.06) EDB-G3 Quantity

Material unit quantity rate amount


0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Subtotal wastage= 1.00 0.00
Total 0.00
Labour Trade no. rate amount
operator - 300.00 0.00
ganger - 280.00 0.00
skilled - 115.00 0.00
unskilled - 70.00 0.00
Total - 0.00
Prod. rate 1.00
Subcont.
ITEM No. 6 - DISTRIBUTION BOARDS UNIT
Description (01) Supply, install, connect, test and commission of complete
L.V. distribution boards the price include selectvity
study,,termination,Identifications ,labling,glands,copper luggs, as
specified and as indicating drawings . System shall be lump sum
complete in every respect with all necessary accessories and Quantity
ancillary works.
LP-G1(01.01)

Material unit quantity rate amount


0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Subtotal wastage= 1.00 0.00
Total 0.00
Labour Trade no. rate amount
operator - 300.00 0.00
ganger - 280.00 0.00
skilled - 115.00 0.00
unskilled - 70.00 0.00
Total - 0.00
Prod. rate 1.00
Subcont.
ITEM No. UNIT
Description
LP-G2(01.02) Quantity

Material unit quantity rate amount


0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Subtotal wastage= 1.00 0.00
Total 0.00
Labour Trade no. rate amount
operator - 300.00 0.00
ganger - 280.00 0.00
skilled - 115.00 0.00
unskilled - 70.00 0.00
Total - 0.00
Prod. rate 1.00
Subcont.
ITEM No. UNIT
Description
LP-G3(01.03) Quantity

Material unit quantity rate amount


0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Subtotal wastage= 1.00 0.00
Total 0.00
Labour Trade no. rate amount
operator - 300.00 0.00
ganger - 280.00 0.00
skilled - 115.00 0.00
unskilled - 70.00 0.00
Total - 0.00
Prod. rate 1.00
Subcont.
ITEM No. UNIT
Description
ELP-G1 (01.04) Quantity

Material unit quantity rate amount


0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Subtotal wastage= 1.00 0.00
Total 0.00
Labour Trade no. rate amount
operator - 300.00 0.00
ganger - 280.00 0.00
skilled - 115.00 0.00
unskilled - 70.00 0.00
Total - 0.00
Prod. rate 1.00
Subcont.
ITEM No. UNIT
Description
ELP-G2(01.05) Quantity

Material unit quantity rate amount


0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Subtotal wastage= 1.00 0.00
Total 0.00
Labour Trade no. rate amount
operator - 300.00 0.00
ganger - 280.00 0.00
skilled - 115.00 0.00
unskilled - 70.00 0.00
Total - 0.00
Prod. rate 1.00
Subcont.
ITEM No. UNIT
Description
ELP-G3 (01.06) Quantity

Material unit quantity rate amount


nr 1 0.00 0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Subtotal wastage= 1.00 0.00
Total 0.00
Labour Trade no. rate amount
operator - 300.00 0.00
ganger - 280.00 0.00
skilled - 115.00 0.00
unskilled - 70.00 0.00
Total - 0.00
Prod. rate 1.00
Subcont.
ITEM No. UNIT
Description
PP-AC-G1(01.07) Quantity

Material unit quantity rate amount


nr 1 0.00 0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Subtotal wastage= 1.00 0.00
Total 0.00
Labour Trade no. rate amount
operator - 300.00 0.00
ganger - 280.00 0.00
skilled - 115.00 0.00
unskilled - 70.00 0.00
Total - 0.00
Prod. rate 1.00
Subcont.
ITEM No. UNIT
Description
PP-AC-G2(01.08) Quantity

Material unit quantity rate amount


nr 1 0.00 0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Subtotal wastage= 1.00 0.00
Total 0.00
Labour Trade no. rate amount
operator - 300.00 0.00
ganger - 280.00 0.00
skilled - 115.00 0.00
unskilled - 70.00 0.00
Total - 0.00
Prod. rate 1.00
Subcont.
ITEM No. UNIT
Description
PP-AC-G3(01.09) Quantity

Material unit quantity rate amount


nr 1 0.00 0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Subtotal wastage= 1.00 0.00
Total 0.00
Labour Trade no. rate amount
operator - 300.00 0.00
ganger - 280.00 0.00
skilled - 115.00 0.00
unskilled - 70.00 0.00
Total - 0.00
Prod. rate 1.00
Subcont.
ITEM No. UNIT
Description
LP-1F1(01.10) Quantity

Material unit quantity rate amount


nr 1 0.00 0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Subtotal wastage= 1.00 0.00
Total 0.00
Labour Trade no. rate amount
operator - 300.00 0.00
ganger - 280.00 0.00
skilled - 115.00 0.00
unskilled - 70.00 0.00
Total - 0.00
Prod. rate 1.00
Subcont.
ITEM No. UNIT
Description
LP-1F2(01.11) Quantity

Material unit quantity rate amount


nr 1 0.00 0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Subtotal wastage= 1.00 0.00
Total 0.00
Labour Trade no. rate amount
operator - 300.00 0.00
ganger - 280.00 0.00
skilled - 115.00 0.00
unskilled - 70.00 0.00
Total - 0.00
Prod. rate 1.00
Subcont.
ITEM No. UNIT
Description
LP-1F3(01.12) Quantity

Material unit quantity rate amount


nr 1 0.00 0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Subtotal wastage= 1.00 0.00
Total 0.00
Labour Trade no. rate amount
operator - 300.00 0.00
ganger - 280.00 0.00
skilled - 115.00 0.00
unskilled - 70.00 0.00
Total - 0.00
Prod. rate 1.00
Subcont.
ITEM No. UNIT
Description
ELP-1F1 (01.13) Quantity

Material unit quantity rate amount


nr 1 0.00 0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Subtotal wastage= 1.00 0.00
Total 0.00
Labour Trade no. rate amount
operator - 300.00 0.00
ganger - 280.00 0.00
skilled - 115.00 0.00
unskilled - 70.00 0.00
Total - 0.00
Prod. rate 1.00
Subcont.
ITEM No. UNIT
Description
ELP-1F2(01.14) Quantity

Material unit quantity rate amount


nr 1 0.00 0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Subtotal wastage= 1.00 0.00
Total 0.00
Labour Trade no. rate amount
operator - 300.00 0.00
ganger - 280.00 0.00
skilled - 115.00 0.00
unskilled - 70.00 0.00
Total - 0.00
Prod. rate 1.00
Subcont.
ITEM No. UNIT
Description
ELP-1F3 (01.15) Quantity

Material unit quantity rate amount


nr 1 0.00 0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Subtotal wastage= 1.00 0.00
Total 0.00
Labour Trade no. rate amount
operator - 300.00 0.00
ganger - 280.00 0.00
skilled - 115.00 0.00
unskilled - 70.00 0.00
Total - 0.00
Prod. rate 1.00
Subcont.
ITEM No. UNIT
Description
PP-AC-1F1(01.16) Quantity

Material unit quantity rate amount


nr 1 0.00 0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Subtotal wastage= 1.00 0.00
Total 0.00
Labour Trade no. rate amount
operator - 300.00 0.00
ganger - 280.00 0.00
skilled - 115.00 0.00
unskilled - 70.00 0.00
Total - 0.00
Prod. rate 1.00
Subcont.
ITEM No. UNIT
Description
PP-AC-1F2(01.17) Quantity

Material unit quantity rate amount


nr 1 0.00 0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Subtotal wastage= 1.00 0.00
Total 0.00
Labour Trade no. rate amount
operator - 300.00 0.00
ganger - 280.00 0.00
skilled - 115.00 0.00
unskilled - 70.00 0.00
Total - 0.00
Prod. rate 1.00
Subcont.
ITEM No. UNIT
Description
PP-AC-1F3(01.18) Quantity

Material unit quantity rate amount


nr 1 0.00 0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Subtotal wastage= 1.00 0.00
Total 0.00
Labour Trade no. rate amount
operator - 300.00 0.00
ganger - 280.00 0.00
skilled - 115.00 0.00
unskilled - 70.00 0.00
Total - 0.00
Prod. rate 1.00
Subcont.
ITEM No. UNIT
Description
LP-2F1(01.19) Quantity

Material unit quantity rate amount


nr 1 0.00 0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Subtotal wastage= 1.00 0.00
Total 0.00
Labour Trade no. rate amount
operator - 300.00 0.00
ganger - 280.00 0.00
skilled - 115.00 0.00
unskilled - 70.00 0.00
Total - 0.00
Prod. rate 1.00
Subcont.
ITEM No. UNIT
Description
LP-2F2(01.20) Quantity

Material unit quantity rate amount


nr 1 0.00 0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Subtotal wastage= 1.00 0.00
Total 0.00
Labour Trade no. rate amount
operator - 300.00 0.00
ganger - 280.00 0.00
skilled - 115.00 0.00
unskilled - 70.00 0.00
Total - 0.00
Prod. rate 1.00
Subcont.
ITEM No. UNIT
Description
LP-2F3(01.21) Quantity

Material unit quantity rate amount


nr 1 0.00 0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Subtotal wastage= 1.00 0.00
Total 0.00
Labour Trade no. rate amount
operator - 300.00 0.00
ganger - 280.00 0.00
skilled - 115.00 0.00
unskilled - 70.00 0.00
Total - 0.00
Prod. rate 1.00
Subcont.
ITEM No. UNIT
Description
ELP-2F1 (01.22) Quantity

Material unit quantity rate amount


nr 1 0.00 0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Subtotal wastage= 1.00 0.00
Total 0.00
Labour Trade no. rate amount
operator - 300.00 0.00
ganger - 280.00 0.00
skilled - 115.00 0.00
unskilled - 70.00 0.00
Total - 0.00
Prod. rate 1.00
Subcont.
ITEM No. UNIT
Description
ELP-2F2(01.23) Quantity

Material unit quantity rate amount


nr 1 0.00 0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Subtotal wastage= 1.00 0.00
Total 0.00
Labour Trade no. rate amount
operator - 300.00 0.00
ganger - 280.00 0.00
skilled - 115.00 0.00
unskilled - 70.00 0.00
Total - 0.00
Prod. rate 1.00
Subcont.
ITEM No. UNIT
Description
ELP-2F3 (01.24) Quantity

Material unit quantity rate amount


nr 1 0.00 0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Subtotal wastage= 1.00 0.00
Total 0.00
Labour Trade no. rate amount
operator - 300.00 0.00
ganger - 280.00 0.00
skilled - 115.00 0.00
unskilled - 70.00 0.00
Total - 0.00
Prod. rate 1.00
Subcont.
ITEM No. UNIT
Description
PP-AC-2F1(01.25) Quantity

Material unit quantity rate amount


nr 1 0.00 0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Subtotal wastage= 1.00 0.00
Total 0.00
Labour Trade no. rate amount
operator - 300.00 0.00
ganger - 280.00 0.00
skilled - 115.00 0.00
unskilled - 70.00 0.00
Total - 0.00
Prod. rate 1.00
Subcont.
ITEM No. UNIT
Description
PP-AC-2F2(01.26) Quantity

Material unit quantity rate amount


nr 1 0.00 0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Subtotal wastage= 1.00 0.00
Total 0.00
Labour Trade no. rate amount
operator - 300.00 0.00
ganger - 280.00 0.00
skilled - 115.00 0.00
unskilled - 70.00 0.00
Total - 0.00
Prod. rate 1.00
Subcont.
ITEM No. UNIT
Description
PP-AC-2F3(01.27) Quantity

Material unit quantity rate amount


nr 1 0.00 0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Subtotal wastage= 1.00 0.00
Total 0.00
Labour Trade no. rate amount
operator - 300.00 0.00
ganger - 280.00 0.00
skilled - 115.00 0.00
unskilled - 70.00 0.00
Total - 0.00
Prod. rate 1.00
Subcont.
ITEM No. UNIT
Description
LP-SD(01.28) Quantity

Material unit quantity rate amount


nr 1 0.00 0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Subtotal wastage= 1.00 0.00
Total 0.00
Labour Trade no. rate amount
operator - 300.00 0.00
ganger - 280.00 0.00
skilled - 115.00 0.00
unskilled - 70.00 0.00
Total - 0.00
Prod. rate 1.00
Subcont.
ITEM No. UNIT
Description
LP-EX(01.29) Quantity
Material unit quantity rate amount
nr 1 0.00 0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Subtotal wastage= 1.00 0.00
Total 0.00
Labour Trade no. rate amount
operator - 300.00 0.00
ganger - 280.00 0.00
skilled - 115.00 0.00
unskilled - 70.00 0.00
Total - 0.00
Prod. rate 1.00
Subcont.
ITEM No. UNIT
Description
LP-UPS-2F1 (01.30) Quantity
Material unit quantity rate amount
nr 1 0.00 0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Subtotal wastage= 1.00 0.00
Total 0.00
Labour Trade no. rate amount
operator - 300.00 0.00
ganger - 280.00 0.00
skilled - 115.00 0.00
unskilled - 70.00 0.00
Total - 0.00
Prod. rate 1.00
Subcont.
ITEM No. UNIT
Description
PP-AC-R1(01.31) Quantity

Material unit quantity rate amount


nr 1 0.00 0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Subtotal wastage= 1.00 0.00
Total 0.00
Labour Trade no. rate amount
operator - 300.00 0.00
ganger - 280.00 0.00
skilled - 115.00 0.00
unskilled - 70.00 0.00
Total - 0.00
Prod. rate 1.00
Subcont.
ITEM No. UNIT
Description
PP-AC-R2(01.32) Quantity

Material unit quantity rate amount


nr 1 0.00 0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Subtotal wastage= 1.00 0.00
Total 0.00
Labour Trade no. rate amount
operator - 300.00 0.00
ganger - 280.00 0.00
skilled - 115.00 0.00
unskilled - 70.00 0.00
Total - 0.00
Prod. rate 1.00
Subcont.
ITEM No. UNIT
Description
PP-G3(01.33) Quantity

Material unit quantity rate amount


nr 1 0.00 0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Subtotal wastage= 1.00 0.00
Total 0.00
Labour Trade no. rate amount
operator - 300.00 0.00
ganger - 280.00 0.00
skilled - 115.00 0.00
unskilled - 70.00 0.00
Total - 0.00
Prod. rate 1.00
Subcont.
ITEM No. UNIT
Description
PP-1F3(01.34) Quantity

Material unit quantity rate amount


nr 1 0.00 0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Subtotal wastage= 1.00 0.00
Total 0.00
Labour Trade no. rate amount
operator - 300.00 0.00
ganger - 280.00 0.00
skilled - 115.00 0.00
unskilled - 70.00 0.00
Total - 0.00
Prod. rate 1.00
Subcont.
ITEM No. UNIT
Description
PP-2F3(01.35) Quantity

Material unit quantity rate amount


nr 1 0.00 0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Subtotal wastage= 1.00 0.00
Total 0.00
Labour Trade no. rate amount
operator - 300.00 0.00
ganger - 280.00 0.00
skilled - 115.00 0.00
unskilled - 70.00 0.00
Total - 0.00
Prod. rate 1.00
Subcont.
ITEM No. UNIT
Description
PP-AC-R3(01.36) Quantity

Material unit quantity rate amount


nr 1 0.00 0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Subtotal wastage= 1.00 0.00
Total 0.00
Labour Trade no. rate amount
operator - 300.00 0.00
ganger - 280.00 0.00
skilled - 115.00 0.00
unskilled - 70.00 0.00
Total - 0.00
Prod. rate 1.00
Subcont.
ITEM No. UNIT
Description
(01.01) Lighting Fixture type F1 Quantity

Material unit quantity rate amount


fixture nr 1 0.00 0.00
cable gland 1 0.00
0.00
0.00
0.00
0.00
0.00
0.00
Subtotal wastage= 1.00 0.00
Total 0.00
Labour Trade no. rate amount
operator - 300.00 0.00
ganger - 280.00 0.00
skilled - 115.00 0.00
unskilled - 70.00 0.00
Total - 0.00
Prod. rate 1.00
Subcont.
ITEM No. UNIT
Description
(01.02) Lighting Fixture type F2 Quantity

Material unit quantity rate amount


nr 1 0.00 0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Subtotal wastage= 1.00 0.00
Total 0.00
Labour Trade no. rate amount
operator - 300.00 0.00
ganger - 280.00 0.00
skilled - 115.00 0.00
unskilled - 70.00 0.00
Total - 0.00
Prod. rate 1.00
Subcont.
ITEM No. UNIT
Description
(01.03) Lighting Fixture type F3 Quantity

Material unit quantity rate amount


nr 1 0.00 0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Subtotal wastage= 1.00 0.00
Total 0.00
Labour Trade no. rate amount
operator - 300.00 0.00
ganger - 280.00 0.00
skilled - 115.00 0.00
unskilled - 70.00 0.00
Total - 0.00
Prod. rate 1.00
Subcont.
ITEM No. UNIT
Description
(01.04) Lighting Fixture type S1 Quantity

Material unit quantity rate amount


nr 1 0.00 0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Subtotal wastage= 1.00 0.00
Total 0.00
Labour Trade no. rate amount
operator - 300.00 0.00
ganger - 280.00 0.00
skilled - 115.00 0.00
unskilled - 70.00 0.00
Total - 0.00
Prod. rate 1.00
Subcont.
ITEM No. UNIT
Description
(01.05) Lighting Fixture type S2 Quantity
Material unit quantity rate amount
nr 1 0.00 0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Subtotal wastage= 1.00 0.00
Total 0.00
Labour Trade no. rate amount
operator - 300.00 0.00
ganger - 280.00 0.00
skilled - 115.00 0.00
unskilled - 70.00 0.00
Total - 0.00
Prod. rate 1.00
Subcont.
ITEM No. UNIT
Description
(01.06) Lighting Fixture type S3 Quantity

Material unit quantity rate amount


nr 1 0.00 0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Subtotal wastage= 1.00 0.00
Total 0.00
Labour Trade no. rate amount
operator - 300.00 0.00
ganger - 280.00 0.00
skilled - 115.00 0.00
unskilled - 70.00 0.00
Total - 0.00
Prod. rate 1.00
Subcont.
ITEM No. UNIT
Description
(01.07) Lighting Fixture type S4 Quantity

Material unit quantity rate amount


nr 1 0.00 0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Subtotal wastage= 1.00 0.00
Total 0.00
Labour Trade no. rate amount
operator - 300.00 0.00
ganger - 280.00 0.00
skilled - 115.00 0.00
unskilled - 70.00 0.00
Total - 0.00
Prod. rate 1.00
Subcont.
ITEM No. UNIT
Description Quantity
(01.08) Lighting Fixture type S4-1
9
Material unit quantity rate amount
nr 1 0.00 0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Subtotal wastage= 1.00 0.00
Total 0.00
Labour Trade no. rate amount
operator - 300.00 0.00
ganger - 280.00 0.00
skilled - 115.00 0.00
unskilled - 70.00 0.00
Total - 0.00
Prod. rate 1.00
Subcont.
ITEM No. UNIT
Description
(01.09) Lighting Fixture type S5 Quantity

Material unit quantity rate amount


nr 1 0.00 0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Subtotal wastage= 1.00 0.00
Total 0.00
Labour Trade no. rate amount
operator #DIV/0! 300.00 #DIV/0!
ganger #DIV/0! 280.00 #DIV/0!
skilled #DIV/0! 115.00 #DIV/0!
unskilled #DIV/0! 70.00 #DIV/0!
Total - #DIV/0!
Prod. rate #DIV/0!
Subcont.
ITEM No. UNIT
Description
(01.10) Lighting Fixture type S6 Quantity

Material unit quantity rate amount


nr 1 0.00 0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Subtotal wastage= 1.00 0.00
Total 0.00
Labour Trade no. rate amount
operator #DIV/0! 300.00 #DIV/0!
ganger #DIV/0! 280.00 #DIV/0!
skilled #DIV/0! 115.00 #DIV/0!
unskilled #DIV/0! 70.00 #DIV/0!
Total - #DIV/0!
Prod. rate #DIV/0!
Subcont.
ITEM No. UNIT
Description
(01.11) Lighting Fixture type C1 Quantity

Material unit quantity rate amount


nr 1 0.00 0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Subtotal wastage= 1.00 0.00
Total 0.00
Labour Trade no. rate amount
operator - 300.00 0.00
ganger - 280.00 0.00
skilled - 115.00 0.00
unskilled - 70.00 0.00
Total - 0.00
Prod. rate 1.00
Subcont.
ITEM No. UNIT
Description
(01.12) Lighting Fixture type CH Quantity

Material unit quantity rate amount


nr 1 0.00 0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Subtotal wastage= 1.00 0.00
Total 0.00
Labour Trade no. rate amount
operator - 300.00 0.00
ganger - 280.00 0.00
skilled - 115.00 0.00
unskilled - 70.00 0.00
Total - 0.00
Prod. rate 1.00
Subcont.
ITEM No. UNIT
Description
(01.13) Lighting Fixture type WM1 Quantity

Material unit quantity rate amount


nr 1 0.00 0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Subtotal wastage= 1.00 0.00
Total 0.00
Labour Trade no. rate amount
operator - 300.00 0.00
ganger - 280.00 0.00
skilled - 115.00 0.00
unskilled - 70.00 0.00
Total - 0.00
Prod. rate 1.00
Subcont.
ITEM No. UNIT
Description
(01.14) Lighting Fixture type WM2 Quantity

Material unit quantity rate amount


nr 1 0.00 0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Subtotal wastage= 1.00 0.00
Total 0.00
Labour Trade no. rate amount
operator - 300.00 0.00
ganger - 280.00 0.00
skilled - 115.00 0.00
unskilled - 70.00 0.00
Total - 0.00
Prod. rate 1.00
Subcont.
ITEM No. UNIT
Description
(01.15) Lighting Fixture type WM3 Quantity

Material unit quantity rate amount


nr 1 0.00 0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Subtotal wastage= 1.00 0.00
Total 0.00
Labour Trade no. rate amount
operator - 300.00 0.00
ganger - 280.00 0.00
skilled - 115.00 0.00
unskilled - 70.00 0.00
Total - 0.00
Prod. rate 1.00
Subcont.
ITEM No. UNIT
Description
(01.16) Lighting Fixture type UL2 Quantity

Material unit quantity rate amount


nr 1 0.00 0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Subtotal wastage= 1.00 0.00
Total 0.00
Labour Trade no. rate amount
operator - 300.00 0.00
ganger - 280.00 0.00
skilled - 115.00 0.00
unskilled - 70.00 0.00
Total - 0.00
Prod. rate 1.00
Subcont.
ITEM No. UNIT
Description
(01.17) Lighting Fixture type EX1 Quantity
Material unit quantity rate amount
nr 1 0.00 0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Subtotal wastage= 1.00 0.00
Total 0.00
Labour Trade no. rate amount
operator - 300.00 0.00
ganger - 280.00 0.00
skilled - 115.00 0.00
unskilled - 70.00 0.00
Total - 0.00
Prod. rate 1.00
Subcont.
ITEM No. UNIT
Description
(01.18) Lighting Fixture type EX2 Quantity

Material unit quantity rate amount


nr 1 0.00 0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Subtotal wastage= 1.00 0.00
Total 0.00
Labour Trade no. rate amount
operator - 300.00 0.00
ganger - 280.00 0.00
skilled - 115.00 0.00
unskilled - 70.00 0.00
Total - 0.00
Prod. rate 1.00
Subcont.
ITEM No. UNIT
Description
(01.19) Lighting Fixture flixeble led light Quantity

Material unit quantity rate amount


nr 1 0.00 0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Subtotal wastage= 1.00 0.00
Total 0.00
Labour Trade no. rate amount
operator - 300.00 0.00
ganger - 280.00 0.00
skilled - 115.00 0.00
unskilled - 70.00 0.00
Total - 0.00
Prod. rate 1.00
Subcont.
ITEM No. UNIT
Description including 20mm UPVC conduites,conduit fittings,pull boxes .pull
wire and all necessary accessories and ancillary works required Quantity
for complete operating system
Material unit quantity rate amount
nr 1 0.00 0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Subtotal wastage= 1.00 0.00
Total 0.00
Labour Trade no. rate amount
operator - 300.00 0.00
ganger - 280.00 0.00
skilled - 115.00 0.00
unskilled - 70.00 0.00
Total - 0.00
Prod. rate 1.00
Subcont.
ITEM No. UNIT
Description (01)UTP Data/Tel Node Complet with conduites,20mm UPVC
conduit fittings,pull boxes ,pull wire, form each rack to the out Quantity
location
Material unit quantity rate amount
nr 1 0.00 0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Subtotal wastage= 1.00 0.00
Total 0.00
Labour Trade no. rate amount
operator - 300.00 0.00
ganger - 280.00 0.00
skilled - 115.00 0.00
unskilled - 70.00 0.00
Total - 0.00
Prod. rate 1.00
Subcont.
ITEM No. UNIT
Description alarm panel (6 loop) (MFAP),including auto dillar ,battery,charger,
and all necessary accessories and ancillary works required for Quantity
complete operative system as specified and as shown on the
Material unit quantity rate amount
nr 1 0.00 0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Subtotal wastage= 1.00 0.00
Total 0.00
Labour Trade no. rate amount
operator - 300.00 0.00
ganger - 280.00 0.00
skilled - 115.00 0.00
unskilled - 70.00 0.00
Total - 0.00
Prod. rate 1.00
Subcont.
ITEM No. safety detection Devices complete including conduits, conduit UNIT
Description fittings, fire resistance cables 750 c-3H, as specified with all
Quantity
necessary accessories and ancillary works required for complete
Material operative
unit system. rate
quantity amount
nr 1 0.00 0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Subtotal wastage= 1.00 0.00
Total 0.00
Labour Trade no. rate amount
operator - 300.00 0.00
ganger - 280.00 0.00
skilled - 115.00 0.00
unskilled - 70.00 0.00
Total - 0.00
Prod. rate 1.00
Subcont.
ITEM No. UNIT
Description
(02.02) Fire alarm Bell 90db-imt 2x2.5mm2 copper cable Quantity

Material unit quantity rate amount


nr 1 0.00 0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Subtotal wastage= 1.00 0.00
Total 0.00
Labour Trade no. rate amount
operator - 300.00 0.00
ganger - 280.00 0.00
skilled - 115.00 0.00
unskilled - 70.00 0.00
Total - 0.00
Prod. rate 1.00
Subcont.
ITEM No. UNIT
Description
(02.03) Smoke detector .by 2x1.5mm2 copper cable Quantity

Material unit quantity rate amount


nr 1 0.00 0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Subtotal wastage= 1.00 0.00
Total 0.00
Labour Trade no. rate amount
operator - 300.00 0.00
ganger - 280.00 0.00
skilled - 115.00 0.00
unskilled - 70.00 0.00
Total - 0.00
Prod. rate 1.00
Subcont.
ITEM No. UNIT
Description
(02.03) Heat detector .by 2x1.5mm2 copper cable Quantity

Material unit quantity rate amount


nr 1 0.00 0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Subtotal wastage= 1.00 0.00
Total 0.00
Labour Trade no. rate amount
operator - 300.00 0.00
ganger - 280.00 0.00
skilled - 115.00 0.00
unskilled - 70.00 0.00
Total - 0.00
Prod. rate 1.00
Subcont.
ITEM No. UNIT
Description
(02.04) Control module unitby 2x1.5mm2 copper cable Quantity

Material unit quantity rate amount


nr 1 0.00 0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Subtotal wastage= 1.00 0.00
Total 0.00
Labour Trade no. rate amount
operator - 300.00 0.00
ganger - 280.00 0.00
skilled - 115.00 0.00
unskilled - 70.00 0.00
Total - 0.00
Prod. rate 1.00
Subcont.
ITEM No. UNIT
Description
(02.05) Monitor module unit by 2x1.5mm2 copper cable Quantity

Material unit quantity rate amount


nr 1 0.00 0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Subtotal wastage= 1.00 0.00
Total 0.00
Labour Trade no. rate amount
operator - 300.00 0.00
ganger - 280.00 0.00
skilled - 115.00 0.00
unskilled - 70.00 0.00
Total - 0.00
Prod. rate 1.00
Subcont.
ITEM No. UNIT
Description
(02.06) Multi detector unit by 2x1.5mm2 copper cable Quantity
Material unit quantity rate amount
nr 1 0.00 0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Subtotal wastage= 1.00 0.00
Total 0.00
Labour Trade no. rate amount
operator - 300.00 0.00
ganger - 280.00 0.00
skilled - 115.00 0.00
unskilled - 70.00 0.00
Total - 0.00
Prod. rate 1.00
Subcont.
ITEM No. UNIT
Description (01.01)Wall Mounted loud speakers outlet in drama studio (empty
Quantity
pipe)
Material unit quantity rate amount
nr 1 0.00 0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Subtotal wastage= 1.00 0.00
Total 0.00
Labour Trade no. rate amount
operator - 300.00 0.00
ganger - 280.00 0.00
skilled - 115.00 0.00
unskilled - 70.00 0.00
Total - 0.00
Prod. rate 1.00
Subcont.
ITEM No. UNIT
Description (01.02) Network, complete including risers, termination boxes,
Quantity
cables and all necessary accessories and ancillary works.
Material unit quantity rate amount
nr 1 0.00 0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Subtotal wastage= 1.00 0.00
Total 0.00
Labour Trade no. rate amount
operator - 300.00 0.00
ganger - 280.00 0.00
skilled - 115.00 0.00
unskilled - 70.00 0.00
Total - 0.00
Prod. rate 1.00
Subcont.
ITEM No. UNIT
Description (01-03) Mic outlet in drama studio (empty conduites by 32 mm
Quantity
pipe)
Material unit quantity rate amount
nr 1 0.00 0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Subtotal wastage= 1.00 0.00
Total 0.00
Labour Trade no. rate amount
operator - 300.00 0.00
ganger - 280.00 0.00
skilled - 115.00 0.00
unskilled - 70.00 0.00
Total - 0.00
Prod. rate 1.00
Subcont.
ITEM No. UNIT
Description (01)Supply , install and put into operation on line UPS ,<3% THD
FOR LINEAR loads 10 KVA as in specification & drawing . For 15 Quantity
minuites operation
Material unit quantity rate amount
nr 1 0.00 0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Subtotal wastage= 1.00 0.00
Total 0.00
Labour Trade no. rate amount
operator - 300.00 0.00
ganger - 280.00 0.00
skilled - 115.00 0.00
unskilled - 70.00 0.00
Total - 0.00
Prod. rate 1.00
Subcont.
ITEM No. UNIT
Description galvanized cable trunk (solid type) complete including thread
rods,galvanized cover ,supports and all necesary Quantity
accessories,devices, and ancillary works required for complete
Material unit quantity rate amount
nr 1 0.00 0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Subtotal wastage= 1.00 0.00
Total 0.00
Labour Trade no. rate amount
operator - 300.00 0.00
ganger - 280.00 0.00
skilled - 115.00 0.00
unskilled - 70.00 0.00
Total - 0.00
Prod. rate 1.00
Subcont.
ITEM No. UNIT
Description
(02)as above but 20 cm Quantity

Material unit quantity rate amount


nr 1 0.00 0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Subtotal wastage= 1.00 0.00
Total 0.00
Labour Trade no. rate amount
operator - 300.00 0.00
ganger - 280.00 0.00
skilled - 115.00 0.00
unskilled - 70.00 0.00
Total - 0.00
Prod. rate 1.00
Subcont.
ITEM No. acces control system control panel including ,power UNIT
Description supply,battery,charger,software,attendat software, and all
Quantity
necesary accessories and ancillary works required for complete
Material operative
unit system as rate
quantity specified and as shown on drawings for 1 amount
nr 1 0.00 0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Subtotal wastage= 1.00 0.00
Total 0.00
Labour Trade no. rate amount
operator - 300.00 0.00
ganger - 280.00 0.00
skilled - 115.00 0.00
unskilled - 70.00 0.00
Total - 0.00
Prod. rate 1.00
Subcont.
ITEM No. UNIT
Description

(02) Supply, install, connect, test and commission of complete


acces control system control panel including ,power
supply,battery,charger,software,attendat software, and all
Quantity
necesary accessories and ancillary works required for complete
operative system as specified and as shown on drawings for 5
doors

Material unit quantity rate amount


nr 1 0.00 0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Subtotal wastage= 1.00 0.00
Total 0.00
Labour Trade no. rate amount
operator - 300.00 0.00
ganger - 280.00 0.00
skilled - 115.00 0.00
unskilled - 70.00 0.00
Total - 0.00
Prod. rate 1.00
Subcont.
ITEM No. UNIT
Description
(03) Supply, install, connect, test and commission of complete
acces control system control panel including ,power
supply,battery,charger,software,attendat software, and all
Quantity
necesary accessories and ancillary works required for complete
operative system as specified and as shown on drawings for 6
doors

Material unit quantity rate amount


nr 1 0.00 0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Subtotal wastage= 1.00 0.00
Total 0.00
Labour Trade no. rate amount
operator - 300.00 0.00
ganger - 280.00 0.00
skilled - 115.00 0.00
unskilled - 70.00 0.00
Total - 0.00
Prod. rate 1.00
Subcont.
ITEM No. acces control system control panel including ,power UNIT
Description supply,battery,charger,software,attendat software, and all
Quantity
necesary accessories and ancillary works required for complete
Material operative
unit system as rate
quantity specified and as shown on drawings for 7 amount
nr 1 0.00 0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Subtotal wastage= 1.00 0.00
Total 0.00
Labour Trade no. rate amount
operator - 300.00 0.00
ganger - 280.00 0.00
skilled - 115.00 0.00
unskilled - 70.00 0.00
Total - 0.00
Prod. rate 1.00
Subcont.
ITEM No. UNIT
Description
(05) Supply, install, connect, test and commission of complete
acces control system control panel including ,power
supply,battery,charger,software,attendat software, and all
Quantity
necesary accessories and ancillary works required for complete
operative system as specified and as shown on drawings for 8
doors

Material unit quantity rate amount


nr 1 0.00 0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Subtotal wastage= 1.00 0.00
Total 0.00
Labour Trade no. rate amount
operator - 300.00 0.00
ganger - 280.00 0.00
skilled - 115.00 0.00
unskilled - 70.00 0.00
Total - 0.00
Prod. rate 1.00
Subcont.
ITEM No. UNIT
Description

(06)Supply, install, connect, test and commission of acces control


devices including cables,wires,conduites,fittings,trunking,pull
boxes as specified and indicated in drawings with all necessary
Quantity
accessories and ancillary works required for complete operative
system.
(02-01) card reader

Material unit quantity rate amount


nr 1 0.00 0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Subtotal wastage= 1.00 0.00
Total 0.00
Labour Trade no. rate amount
operator - 300.00 0.00
ganger - 280.00 0.00
skilled - 115.00 0.00
unskilled - 70.00 0.00
Total - 0.00
Prod. rate 1.00
Subcont.
ITEM No. UNIT
Description
(02-02) door contact Quantity

Material unit quantity rate amount


nr 1 0.00 0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Subtotal wastage= 1.00 0.00
Total 0.00
Labour Trade no. rate amount
operator - 300.00 0.00
ganger - 280.00 0.00
skilled - 115.00 0.00
unskilled - 70.00 0.00
Total - 0.00
Prod. rate 1.00
Subcont.
ITEM No. UNIT
Description
(02-03)door magnetic lock Quantity

Material unit quantity rate amount


nr 1 0.00 0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Subtotal wastage= 1.00 0.00
Total 0.00
Labour Trade no. rate amount
operator - 300.00 0.00
ganger - 280.00 0.00
skilled - 115.00 0.00
unskilled - 70.00 0.00
Total - 0.00
Prod. rate 1.00
Subcont.
ITEM No. UNIT
Description
(02-04) release switch Quantity

Material unit quantity rate amount


nr 1 0.00 0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Subtotal wastage= 1.00 0.00
Total 0.00
Labour Trade no. rate amount
operator - 300.00 0.00
ganger - 280.00 0.00
skilled - 115.00 0.00
unskilled - 70.00 0.00
Total - 0.00
Prod. rate 1.00
Subcont.
ITEM No. UNIT
Description
(02-05)proximity cards with durable packing Quantity

Material unit quantity rate amount


nr 1 0.00 0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Subtotal wastage= 1.00 0.00
Total 0.00
Labour Trade no. rate amount
operator - 300.00 0.00
ganger - 280.00 0.00
skilled - 115.00 0.00
unskilled - 70.00 0.00
Total - 0.00
Prod. rate 1.00
Subcont.
LS

Equipment Type quantity rate amount


Activities QTY
crane 1,200.00 0.00
excavator 1,000.00 0.00 1.00
loader 800.00 0.00 -
jcb 0.00 800.00 0.00 -
Dozer 800.00 0.00 -
grader 600.00 0.00 -
roller 450.00 0.00 -
compressor 250.00 0.00 -
double drum 50.00 0.00 -
tanker 500.00 0.00
truck hiab 0.00 800.00 0.00 Average MP NO.
generator 6,000.00 0.00 Operator -
Tools 0.00 Ganger -
Total 0.00 Skilled -
Prod.Rate 1.00 UnSkilled -
Material Labour Equipment Subcont. Prod. Rate Ave. 1.00
0.00 0.00 0.00 0.00
Total Drycost 0.00
LS
1

Equipment Type quantity rate amount


Activities QTY
crane 1,200.00 0.00
excavator 1,000.00 0.00 1.00
loader 800.00 0.00 -
jcb 0.00 800.00 0.00 -
Dozer 800.00 0.00 -
grader 600.00 0.00 -
roller 450.00 0.00 -
compressor 250.00 0.00 -
double drum 50.00 0.00 -
tanker 500.00 0.00
truck hiab 0.00 800.00 0.00 Average MP NO.
generator 6,000.00 0.00 Operator -
Tools 0.00 Ganger -
Total 0.00 Skilled -
Prod.Rate 1.00 UnSkilled -
Material Labour Equipment Subcont. Prod. Rate Ave. 1.00
0.00 0.00 0.00 0.00
Total Drycost 0.00
mt.
115

Equipment Type quantity rate amount


Activities QTY
crane 1,200.00 0.00
excavator 1,000.00 0.00 Laying 115.00
loader 800.00 0.00
jcb 0.00 800.00 0.00 -
Dozer 800.00 0.00 -
grader 600.00 0.00 -
roller 450.00 0.00 -
compressor 250.00 0.00 -
double drum 50.00 0.00 -
tanker 500.00 0.00
truck hiab 0.00 800.00 0.00 Average MP NO.
generator 6,000.00 0.00 Operator -
other 0.00 Ganger -
Total 0.00 Skilled -
Prod.Rate 1.00 UnSkilled -
Material Labour Equipment Subcont. Prod. Rate Ave. 1.00
423.00 0.00 0.00 0.00
Total Drycost 423.00
mt.
35

Equipment Type quantity rate amount


Activities QTY
crane 1,200.00 0.00
excavator 1,000.00 0.00 Laying 35.00
loader 800.00 0.00
jcb 0.00 800.00 0.00 -
Dozer 800.00 0.00 -
grader 600.00 0.00 -
roller 450.00 0.00 -
compressor 250.00 0.00 -
double drum 50.00 0.00 -
tanker 500.00 0.00
truck hiab 0.00 800.00 0.00 Average MP NO.
generator 6,000.00 0.00 Operator -
other 0.00 Ganger -
Total 0.00 Skilled -
Prod.Rate 1.00 UnSkilled -
Material Labour Equipment Subcont. Prod. Rate Ave. 1.00
0.00 0.00 0.00 0.00
Total Drycost 0.00
mt.
115
Equipment Type quantity rate amount
Activities QTY
crane 1,200.00 0.00
excavator 1,000.00 0.00 Laying 115.00
loader 800.00 0.00
jcb 0.00 800.00 0.00 -
Dozer 800.00 0.00 -
grader 600.00 0.00 -
roller 450.00 0.00 -
compressor 250.00 0.00 -
double drum 50.00 0.00 -
tanker 500.00 0.00
truck hiab 0.00 800.00 0.00 Average MP NO.
generator 6,000.00 0.00 Operator -
other 0.00 Ganger -
Total 0.00 Skilled -
Prod.Rate 1.00 UnSkilled -
Material Labour Equipment Subcont. Prod. Rate Ave. 1.00
0.00 0.00 0.00 0.00
Total Drycost 0.00
mt.
60

Equipment Type quantity rate amount


Activities QTY
crane 1,200.00 0.00
excavator 1,000.00 0.00 Laying 60.00
loader 0.00 800.00 0.00
jcb 800.00 0.00
Dozer 800.00 0.00 -
grader 600.00 0.00 -
roller 450.00 0.00 -
compressor 250.00 0.00 -
double drum 50.00 0.00 -
tanker 500.00 0.00
truck 800.00 0.00 Average MP NO.
generator 6,000.00 0.00 Operator -
other 0.00 Ganger -
Total 0.00 Skilled -
Prod.Rate 1.00 UnSkilled -
Material Labour Equipment Subcont. Prod. Rate Ave. 1.00
0.00 0.00 0.00 0.00
Total Drycost 0.00
mt.
20

Equipment Type quantity rate amount


Activities QTY
crane 1,200.00 0.00
excavator 1,000.00 0.00 Excav 20.00
loader 800.00 0.00 -
jcb 0.00 800.00 0.00 -
Dozer 800.00 0.00 -
grader 600.00 0.00 -
roller 450.00 0.00 -
compressor 0.00 250.00 0.00 -
double drum 50.00 0.00 -
tanker 500.00 0.00
truck 800.00 0.00 Average MP NO.
generator 6,000.00 0.00 Operator -
other 0 0.00 500.00 0.00 Ganger -
Total 0.00 Skilled -
Prod.Rate 20.00 UnSkilled -
Material Labour Equipment Subcont. Prod. Rate Ave. 20.00
0.00 0.00 0.00 0.00
Total Drycost 0.00
mt.
100

Equipment Type quantity rate amount


Activities QTY
crane 1,200.00 0.00
excavator 1,000.00 0.00 laying 100.00
loader 0.00 800.00 0.00
jcb 800.00 0.00 -
Dozer 800.00 0.00 -
grader 600.00 0.00 -
roller 450.00 0.00 -
compressor 250.00 0.00 -
double drum 0.00 50.00 0.00 -
tanker 0.00 500.00 0.00
truck 800.00 0.00 Average MP NO.
generator 6,000.00 0.00 Operator -
other 0.00 Ganger -
Total 0.00 Skilled -
Prod.Rate 1.00 UnSkilled -
Material Labour Equipment Subcont. Prod. Rate Ave. 1.00
0.00 0.00 0.00 0.00
Total Drycost 0.00
mt.
110

Equipment Type quantity rate amount


Activities QTY
crane 1,200.00 0.00
excavator 1,000.00 0.00 laying 110.00
loader 0.00 800.00 0.00
jcb 800.00 0.00 -
Dozer 800.00 0.00 -
grader 600.00 0.00 -
roller 450.00 0.00 -
compressor 250.00 0.00 -
double drum 50.00 0.00 -
tanker 0.00 500.00 0.00
truck 800.00 0.00 Average MP NO.
generator 6,000.00 0.00 Operator -
other 0.00 Ganger -
Total 0.00 Skilled -
Prod.Rate 1.00 UnSkilled -
Material Labour Equipment Subcont. Prod. Rate Ave. 1.00
0.00 0.00 0.00 0.00
Total Drycost 0.00
mt.
125

Equipment Type quantity rate amount


Activities QTY
crane 1,200.00 0.00
excavator 1,000.00 0.00 laying 125.00
loader 0.00 800.00 0.00
jcb 800.00 0.00 -
Dozer 800.00 0.00 -
grader 600.00 0.00 -
roller 450.00 0.00 -
compressor 250.00 0.00 -
double drum 50.00 0.00 -
tanker 0.00 500.00 0.00
truck 800.00 0.00 Average MP NO.
generator 6,000.00 0.00 Operator -
other 0.00 Ganger -
Total 0.00 Skilled -
Prod.Rate 1.00 UnSkilled -
Material Labour Equipment Subcont. Prod. Rate Ave. 1.00
0.00 0.00 0.00 0.00
Total Drycost 0.00
mt.
30

Equipment Type quantity rate amount


Activities QTY
crane 1,200.00 0.00
excavator 1,000.00 0.00 laying 30.00
loader 0.00 800.00 0.00
jcb 800.00 0.00 -
Dozer 800.00 0.00 -
grader 600.00 0.00 -
roller 450.00 0.00 -
compressor 250.00 0.00 -
double drum 50.00 0.00 -
tanker 0.00 500.00 0.00
truck 800.00 0.00 Average MP NO.
generator 6,000.00 0.00 Operator -
other 0.00 Ganger -
Total 0.00 Skilled -
Prod.Rate 1.00 UnSkilled -
Material Labour Equipment Subcont. Prod. Rate Ave. 1.00
0.00 0.00 0.00 0.00
Total Drycost 0.00
mt.
50

Equipment Type quantity rate amount


Activities QTY
crane 0.00 1,200.00 0.00
excavator 1,000.00 0.00 Installation 50.00
loader 800.00 0.00 -
jcb 800.00 0.00 -
Dozer 800.00 0.00 -
grader 600.00 0.00 -
roller 450.00 0.00 -
compressor 250.00 0.00 -
double drum 50.00 0.00 -
tanker 500.00 0.00
truck 0.00 800.00 0.00 Average MP NO.
generator 6,000.00 0.00 Operator -
other 0.00 Ganger -
Total 0.00 Skilled -
Prod.Rate 1.00 UnSkilled -
Material Labour Equipment Subcont. Prod. Rate Ave. 1.00
0.00 0.00 0.00 0.00
Total Drycost 0.00
No.

2,786

Equipment Type quantity rate amount


Activities QTY
crane 0.00 1,200.00 0.00
excavator 1,000.00 0.00 Conduit Installation 2,786.00
loader 800.00 0.00 wire installation 2,786.00
jcb 800.00 0.00 Termination / Circuit 928.67
Dozer 800.00 0.00 -
grader 600.00 0.00 -
roller 450.00 0.00 -
compressor 250.00 0.00 -
double drum 50.00 0.00 -
tanker 500.00 0.00
truck 0.00 800.00 0.00 Average MP NO.
generator 6,000.00 0.00 Operator -
Power Tools 0.18 800.00 144.00 Ganger 0.37
Total 144.00 Skilled 1.00
Prod.Rate 21.69 UnSkilled 1.93
Material Labour Equipment Subcont. Prod. Rate Ave. 21.69
184.98 16.93 6.64 0.00
Total Drycost 208.55
No.

277
Equipment Type quantity rate amount
Activities QTY
crane 0.00 1,200.00 0.00
excavator 1,000.00 0.00 Installation 277.00
loader 800.00 0.00 -
jcb 800.00 0.00 -
Dozer 800.00 0.00 -
grader 600.00 0.00 -
roller 450.00 0.00 -
compressor 250.00 0.00 -
double drum 50.00 0.00 -
tanker 500.00 0.00
truck 0.00 800.00 0.00 Average MP NO.
generator 6,000.00 0.00 Operator -
other 0.00 Ganger -
Total 0.00 Skilled -
Prod.Rate 1.00 UnSkilled -
Material Labour Equipment Subcont. Prod. Rate Ave. 1.00
0.00 0.00 0.00 0.00
Total Drycost 0.00
No.
122

Equipment Type quantity rate amount


Activities QTY
crane 0.00 1,200.00 0.00
excavator 1,000.00 0.00 Installation 122.00
loader 800.00 0.00
jcb 800.00 0.00
Dozer 800.00 0.00
grader 600.00 0.00
roller 450.00 0.00
compressor 250.00 0.00 -
double drum 50.00 0.00 -
tanker 500.00 0.00
truck 800.00 0.00 Average MP NO.
generator 6,000.00 0.00 Operator -
other winch 0.00 500.00 0.00 Ganger -
Total 0.00 Skilled -
Prod.Rate 1.00 UnSkilled -
Material Labour Equipment Subcont. Prod. Rate Ave. 1.00
0.00 0.00 0.00 0.00
Total Drycost 0.00
No.
10

Equipment Type quantity rate amount


Activities QTY
crane 0.00 1,200.00 0.00
excavator 0.00 1,000.00 0.00 installation 10.00
loader 800.00 0.00
jcb 0.00 800.00 0.00
Dozer 800.00 0.00
grader 600.00 0.00
roller 450.00 0.00
compressor 250.00 0.00 -
double drum 50.00 0.00 -
tanker 500.00 0.00
truck 800.00 0.00 Average MP NO.
generator 6,000.00 0.00 Operator -
other winch 0.00 500.00 0.00 Ganger -
Total 0.00 Skilled -
Prod.Rate 1.00 UnSkilled -
Material Labour Equipment Subcont. Prod. Rate Ave. 1.00
0.00 0.00 0.00 0.00
Total Drycost 0.00
No.
38

Equipment Type quantity rate amount


Activities QTY
crane 0.00 1,200.00 0.00
excavator 0.00 1,000.00 0.00 installation 38.00
loader 800.00 0.00
jcb 0.00 800.00 0.00
Dozer 800.00 0.00
grader 600.00 0.00
roller 450.00 0.00
compressor 250.00 0.00 -
double drum 50.00 0.00 -
tanker 500.00 0.00
truck 800.00 0.00 Average MP NO.
generator 6,000.00 0.00 Operator -
other winch 0.00 500.00 0.00 Ganger -
Total 0.00 Skilled -
Prod.Rate 1.00 UnSkilled -
Material Labour Equipment Subcont. Prod. Rate Ave. 1.00
0.00 0.00 0.00 0.00
Total Drycost 0.00
No.
7

Equipment Type quantity rate amount


Activities QTY
crane 0.00 1,200.00 0.00
excavator 1,000.00 0.00 installation 7.00
loader 800.00 0.00
jcb 800.00 0.00
Dozer 800.00 0.00 -
grader 600.00 0.00 -
roller 450.00 0.00 -
compressor 250.00 0.00 -
double drum 50.00 0.00 -
tanker 500.00 0.00
truck 0.00 800.00 0.00 Average MP NO.
generator 6,000.00 0.00 Operator -
other winch 0.00 500.00 0.00 Ganger -
Total 0.00 Skilled -
Prod.Rate 1.00 UnSkilled -
Material Labour Equipment Subcont. Prod. Rate Ave. 1.00
0.00 0.00 0.00 0.00
Total Drycost 0.00
No.

621

Equipment Type quantity rate amount


Activities QTY
crane 0.00 1,200.00 0.00
excavator 1,000.00 0.00 installation 621.00
loader 800.00 0.00
jcb 800.00 0.00
Dozer 800.00 0.00 -
grader 600.00 0.00 -
roller 450.00 0.00 -
compressor 250.00 0.00 -
double drum 50.00 0.00 -
tanker 500.00 0.00
truck 0.00 800.00 0.00 Average MP NO.
generator 6,000.00 0.00 Operator -
other winch 0.00 500.00 0.00 Ganger -
Total 0.00 Skilled -
Prod.Rate 1.00 UnSkilled -
Material Labour Equipment Subcont. Prod. Rate Ave. 1.00
0.00 0.00 0.00 0.00
Total Drycost 0.00
No.
1,242

Equipment Type quantity rate amount


Activities QTY
crane 0.00 1,200.00 0.00
excavator 0.00 1,000.00 0.00 installation 1,242.00
loader 800.00 0.00
jcb 0.00 800.00 0.00
Dozer 800.00 0.00
grader 600.00 0.00
roller 450.00 0.00
compressor 250.00 0.00 -
double drum 50.00 0.00 -
tanker 500.00 0.00
truck 0.00 800.00 0.00 Average MP NO.
generator 6,000.00 0.00 Operator -
other winch 0.00 500.00 0.00 Ganger -
Total 0.00 Skilled -
Prod.Rate 1.00 UnSkilled -
Material Labour Equipment Subcont. Prod. Rate Ave. 1.00
0.00 0.00 0.00 0.00
Total Drycost 0.00
No.
41

Equipment Type quantity rate amount


Activities QTY
crane 1,200.00 0.00
excavator 1,000.00 0.00 Earthing system 41.00
loader 800.00 0.00 -
jcb 800.00 0.00 -
Dozer 800.00 0.00 -
grader 600.00 0.00 -
roller 450.00 0.00 -
compressor 250.00 0.00 -
double drum 50.00 0.00 -
tanker 500.00 0.00
truck 800.00 0.00 Average MP NO.
generator 6,000.00 0.00 Operator -
other 0.00 Ganger -
Total 0.00 Skilled -
Prod.Rate 1.00 UnSkilled -
Material Labour Equipment Subcont. Prod. Rate Ave. 1.00
0.00 0.00 0.00 0.00
Total Drycost 0.00
No.
35

Equipment Type quantity rate amount


Activities QTY
crane 1,200.00 0.00
excavator 1,000.00 0.00 Laying 35.00
loader 800.00 0.00 -
jcb 800.00 0.00 -
Dozer 800.00 0.00 -
grader 600.00 0.00 -
roller 450.00 0.00 -
compressor 250.00 0.00 -
double drum 50.00 0.00 -
tanker 500.00 0.00
truck 800.00 0.00 Average MP NO.
generator 6,000.00 0.00 Operator -
other 0.00 Ganger -
Total 0.00 Skilled -
Prod.Rate 1.00 UnSkilled -
Material Labour Equipment Subcont. Prod. Rate Ave. 1.00
0.00 0.00 0.00 0.00
Total Drycost 0.00
No.

66

Equipment Type quantity rate amount


Activities QTY
crane 0.00 1,200.00 0.00
excavator 1,000.00 0.00 Concreting 66.00
loader 800.00 0.00 -
jcb 800.00 0.00 -
Dozer 800.00 0.00 -
grader 600.00 0.00 -
roller 450.00 0.00 -
compressor 250.00 0.00 -
double drum 50.00 0.00 -
tanker 500.00 0.00
truck 0.00 800.00 0.00 Average MP NO.
generator 6,000.00 0.00 Operator -
other 0.00 100.00 0.00 Ganger -
Total 0.00 Skilled -
Prod.Rate 1.00 UnSkilled -
Material Labour Equipment Subcont. Prod. Rate Ave. 1.00
0.00 0.00 0.00 0.00
Total Drycost 0.00
No.
58

Equipment Type quantity rate amount


Activities QTY
crane 0.00 1,200.00 0.00
excavator 1,000.00 0.00 Installation 58.00
loader 800.00 0.00
jcb 800.00 0.00 -
Dozer 800.00 0.00 -
grader 600.00 0.00 -
roller 450.00 0.00 -
compressor 250.00 0.00 -
double drum 50.00 0.00 -
tanker 500.00 0.00
truck 0.00 800.00 0.00 Average MP NO.
generator 6,000.00 0.00 Operator -
other 0.00 Ganger -
Total 0.00 Skilled -
Prod.Rate 1.00 UnSkilled -
Material Labour Equipment Subcont. Prod. Rate Ave. 1.00
0.00 0.00 0.00 0.00
Total Drycost 0.00
No.
113

Equipment Type quantity rate amount


Activities QTY
crane 0.00 1,200.00 0.00
excavator 1,000.00 0.00 Installation 113.00
loader 800.00 0.00
jcb 800.00 0.00 -
Dozer 800.00 0.00 -
grader 600.00 0.00 -
roller 450.00 0.00 -
compressor 250.00 0.00 -
double drum 50.00 0.00 -
tanker 500.00 0.00
truck 0.00 800.00 0.00 Average MP NO.
generator 6,000.00 0.00 Operator -
other 0.00 Ganger -
Total 0.00 Skilled -
Prod.Rate 1.00 UnSkilled -
Material Labour Equipment Subcont. Prod. Rate Ave. 1.00
0.00 0.00 0.00 0.00
Total Drycost 0.00
No.
3

Equipment Type quantity rate amount


Activities QTY
crane 0.00 1,200.00 0.00
excavator 1,000.00 0.00 Installation 3.00
loader 800.00 0.00
jcb 800.00 0.00 -
Dozer 800.00 0.00 -
grader 600.00 0.00 -
roller 450.00 0.00 -
compressor 250.00 0.00 -
double drum 50.00 0.00 -
tanker 500.00 0.00
truck 0.00 800.00 0.00 Average MP NO.
generator 6,000.00 0.00 Operator -
other 0.00 Ganger -
Total 0.00 Skilled -
Prod.Rate 1.00 UnSkilled -
Material Labour Equipment Subcont. Prod. Rate Ave. 1.00
0.00 0.00 0.00 0.00
Total Drycost 0.00
No.
2

Equipment Type quantity rate amount


Activities QTY
crane 0.00 1,200.00 0.00
excavator 1,000.00 0.00 Installation 2.00
loader 800.00 0.00
jcb 800.00 0.00 -
Dozer 800.00 0.00 -
grader 600.00 0.00 -
roller 450.00 0.00 -
compressor 250.00 0.00 -
double drum 50.00 0.00 -
tanker 500.00 0.00
truck 0.00 800.00 0.00 Average MP NO.
generator 6,000.00 0.00 Operator -
other 0.00 Ganger -
Total 0.00 Skilled -
Prod.Rate 1.00 UnSkilled -
Material Labour Equipment Subcont. Prod. Rate Ave. 1.00
0.00 0.00 0.00 0.00
Total Drycost 0.00
No.

277

Equipment Type quantity rate amount


Activities QTY
Activities QTY
crane 0.00 1,200.00 0.00
excavator 1,000.00 0.00 Installation 277.00
loader 800.00 0.00
jcb 800.00 0.00 -
Dozer 800.00 0.00 -
grader 600.00 0.00 -
roller 450.00 0.00 -
compressor 250.00 0.00 -
double drum 50.00 0.00 -
tanker 500.00 0.00
truck 0.00 800.00 0.00 Average MP NO.
generator 6,000.00 0.00 Operator -
other 0.00 0.00 Ganger -
Total 0.00 Skilled -
Prod.Rate 1.00 UnSkilled -
Material Labour Equipment Subcont. Prod. Rate Ave. 1.00
0.00 0.00 0.00 0.00
Total Drycost 0.00
No.
122

Equipment Type quantity rate amount


Activities QTY
crane 0.00 1,200.00 0.00
excavator 1,000.00 0.00 Installation 122.00
loader 800.00 0.00
jcb 800.00 0.00 -
Dozer 800.00 0.00 -
grader 600.00 0.00 -
roller 450.00 0.00 -
compressor 250.00 0.00 -
double drum 50.00 0.00 -
tanker 500.00 0.00
truck 0.00 800.00 0.00 Average MP NO.
generator 6,000.00 0.00 Operator -
other 0.00 0.00 Ganger -
Total 0.00 Skilled -
Prod.Rate 1.00 UnSkilled -
Material Labour Equipment Subcont. Prod. Rate Ave. 1.00
0.00 0.00 0.00 0.00
Total Drycost 0.00
No.
10

Equipment Type quantity rate amount


Activities QTY
crane 0.00 1,200.00 0.00
excavator 1,000.00 0.00 Installation 10.00
loader 800.00 0.00
jcb 800.00 0.00 -
Dozer 800.00 0.00 -
grader 600.00 0.00 -
roller 450.00 0.00 -
compressor 250.00 0.00 -
double drum 50.00 0.00 -
tanker 500.00 0.00
truck 0.00 800.00 0.00 Average MP NO.
generator 6,000.00 0.00 Operator -
other 0.00 0.00 Ganger -
Total 0.00 Skilled -
Prod.Rate 1.00 UnSkilled -
Material Labour Equipment Subcont. Prod. Rate Ave. 1.00
0.00 0.00 0.00 0.00
Total Drycost 0.00
No.
38

Equipment Type quantity rate amount


Activities QTY
crane 1,200.00 0.00
excavator 1,000.00 0.00 Installation 38.00
loader 800.00 0.00 -
jcb 800.00 0.00 -
Dozer 800.00 0.00 -
grader 600.00 0.00 -
roller 450.00 0.00 -
compressor 250.00 0.00 -
double drum 50.00 0.00 -
tanker 500.00 0.00
truck 800.00 0.00 Average MP NO.
generator 6,000.00 0.00 Operator -
other 0.00 0.00 Ganger -
Total 0.00 Skilled -
Prod.Rate 1.00 UnSkilled -
Material Labour Equipment Subcont. Prod. Rate Ave. 1.00
0.00 0.00 0.00 0.00
Total Drycost 0.00
No.
7

Equipment Type quantity rate amount


Activities QTY
crane 0.00 1,200.00 0.00
excavator 1,000.00 0.00 Installation 7.00
loader 800.00 0.00
jcb 800.00 0.00
Dozer 800.00 0.00
grader 600.00 0.00 -
roller 450.00 0.00 -
compressor 250.00 0.00 -
double drum 50.00 0.00 -
tanker 500.00 0.00
truck 0.00 800.00 0.00 Average MP NO.
generator 6,000.00 0.00 Operator -
other 0.00 0.00 Ganger -
Total 0.00 Skilled -
Prod.Rate 1.00 UnSkilled -
Material Labour Equipment Subcont. Prod. Rate Ave. 1.00
0.00 0.00 0.00 0.00
Total Drycost 0.00
No.
100

Equipment Type quantity rate amount


Activities QTY
crane 0.00 1,200.00 0.00
excavator 1,000.00 0.00 Installation 100.00
loader 800.00 0.00
jcb 800.00 0.00
Dozer 800.00 0.00
grader 600.00 0.00 -
roller 450.00 0.00 -
compressor 250.00 0.00 -
double drum 50.00 0.00 -
tanker 500.00 0.00
truck 0.00 800.00 0.00 Average MP NO.
generator 6,000.00 0.00 Operator -
other 0.00 0.00 Ganger -
Total 0.00 Skilled -
Prod.Rate 1.00 UnSkilled -
Material Labour Equipment Subcont. Prod. Rate Ave. 1.00
0.00 0.00 0.00 0.00
Total Drycost 0.00
No.

Equipment Type quantity rate amount


Activities QTY
crane 0.00 1,200.00 0.00
excavator 1,000.00 0.00 Installation 1.00
loader 800.00 0.00
jcb 800.00 0.00
Dozer 800.00 0.00
grader 600.00 0.00 -
roller 450.00 0.00 -
compressor 250.00 0.00 -
double drum 50.00 0.00 -
tanker 500.00 0.00
truck 0.00 800.00 0.00 Average MP NO.
generator 6,000.00 0.00 Operator -
other 0.00 0.00 Ganger -
Total 0.00 Skilled -
Prod.Rate 1.00 UnSkilled -
Material Labour Equipment Subcont. Prod. Rate Ave. 1.00
0.00 0.00 0.00 0.00
Total Drycost 0.00
No.
1

Equipment Type quantity rate amount


Activities QTY
crane 0.00 1,200.00 0.00
excavator 1,000.00 0.00 Installation 1.00
loader 800.00 0.00
jcb 800.00 0.00
Dozer 800.00 0.00
grader 600.00 0.00 -
roller 450.00 0.00 -
compressor 250.00 0.00 -
double drum 50.00 0.00 -
tanker 500.00 0.00
truck 0.00 800.00 0.00 Average MP NO.
generator 6,000.00 0.00 Operator -
other 6,000.00 0.00 Ganger -
Total 0.00 Skilled -
Prod.Rate 1.00 UnSkilled -
Material Labour Equipment Subcont. Prod. Rate Ave. 1.00
0.00 0.00 0.00 0.00
Total Drycost 0.00
No.
1

Equipment Type quantity rate amount


Activities QTY
crane 0.00 1,200.00 0.00
excavator 1,000.00 0.00 Installation 1.00
loader 800.00 0.00
jcb 800.00 0.00
Dozer 800.00 0.00
grader 600.00 0.00 -
roller 450.00 0.00 -
compressor 250.00 0.00 -
double drum 50.00 0.00 -
tanker 500.00 0.00
truck 0.00 800.00 0.00 Average MP NO.
generator 6,000.00 0.00 Operator -
other 6,000.00 0.00 Ganger -
Total 0.00 Skilled -
Prod.Rate 1.00 UnSkilled -
Material Labour Equipment Subcont. Prod. Rate Ave. 1.00
0.00 0.00 0.00 0.00
Total Drycost 0.00
No.
1

Equipment Type quantity rate amount


Activities QTY
crane 0.00 1,200.00 0.00
excavator 1,000.00 0.00 Installation 1.00
loader 800.00 0.00
jcb 800.00 0.00
Dozer 800.00 0.00
grader 600.00 0.00 -
roller 450.00 0.00 -
compressor 250.00 0.00 -
double drum 50.00 0.00 -
tanker 500.00 0.00
truck 0.00 800.00 0.00 Average MP NO.
generator 6,000.00 0.00 Operator -
other 6,000.00 0.00 Ganger -
Total 0.00 Skilled -
Prod.Rate 1.00 UnSkilled -
Material Labour Equipment Subcont. Prod. Rate Ave. 1.00
0.00 0.00 0.00 0.00
Total Drycost 0.00
No.
1

Equipment Type quantity rate amount


Activities QTY
crane 0.00 1,200.00 0.00
excavator 1,000.00 0.00 Installation 1.00
loader 800.00 0.00
jcb 800.00 0.00
Dozer 800.00 0.00
grader 600.00 0.00 -
roller 450.00 0.00 -
compressor 250.00 0.00 -
double drum 50.00 0.00 -
tanker 500.00 0.00
truck 0.00 800.00 0.00 Average MP NO.
generator 6,000.00 0.00 Operator -
other 6,000.00 0.00 Ganger -
Total 0.00 Skilled -
Prod.Rate 1.00 UnSkilled -
Material Labour Equipment Subcont. Prod. Rate Ave. 1.00
0.00 0.00 0.00 0.00
Total Drycost 0.00
No.
1

Equipment Type quantity rate amount


Activities QTY
crane 0.00 1,200.00 0.00
excavator 1,000.00 0.00 Installation 1.00
loader 800.00 0.00
jcb 800.00 0.00
Dozer 800.00 0.00
grader 600.00 0.00 -
roller 450.00 0.00 -
compressor 250.00 0.00 -
double drum 50.00 0.00 -
tanker 500.00 0.00
truck 0.00 800.00 0.00 Average MP NO.
generator 6,000.00 0.00 Operator -
other 6,000.00 0.00 Ganger -
Total 0.00 Skilled -
Prod.Rate 1.00 UnSkilled -
Material Labour Equipment Subcont. Prod. Rate Ave. 1.00
0.00 0.00 0.00 0.00
Total Drycost 0.00
No.

Equipment Type quantity rate amount


Activities QTY
crane 0.00 1,200.00 0.00
excavator 1,000.00 0.00 Installation 1.00
loader 800.00 0.00
jcb 800.00 0.00
Dozer 800.00 0.00
grader 600.00 0.00 -
roller 450.00 0.00 -
compressor 250.00 0.00 -
double drum 50.00 0.00 -
tanker 500.00 0.00
truck 0.00 800.00 0.00 Average MP NO.
generator 6,000.00 0.00 Operator -
other 6,000.00 0.00 Ganger -
Total 0.00 Skilled -
Prod.Rate 1.00 UnSkilled -
Material Labour Equipment Subcont. Prod. Rate Ave. 1.00
0.00 0.00 0.00 0.00
Total Drycost 0.00
No.
1

Equipment Type quantity rate amount


Activities QTY
crane 0.00 1,200.00 0.00
excavator 1,000.00 0.00 Installation 1.00
loader 800.00 0.00
jcb 800.00 0.00
Dozer 800.00 0.00
grader 600.00 0.00 -
roller 450.00 0.00 -
compressor 250.00 0.00 -
double drum 50.00 0.00 -
tanker 500.00 0.00
truck 0.00 800.00 0.00 Average MP NO.
generator 6,000.00 0.00 Operator -
other 6,000.00 0.00 Ganger -
Total 0.00 Skilled -
Prod.Rate 1.00 UnSkilled -
Material Labour Equipment Subcont. Prod. Rate Ave. 1.00
0.00 0.00 0.00 0.00
Total Drycost 0.00
No.
1

Equipment Type quantity rate amount


Activities QTY
crane 0.00 1,200.00 0.00
excavator 1,000.00 0.00 Installation 1.00
loader 800.00 0.00
jcb 800.00 0.00
Dozer 800.00 0.00
grader 600.00 0.00 -
roller 450.00 0.00 -
compressor 250.00 0.00 -
double drum 50.00 0.00 -
tanker 500.00 0.00
truck 0.00 800.00 0.00 Average MP NO.
generator 6,000.00 0.00 Operator -
other 6,000.00 0.00 Ganger -
Total 0.00 Skilled -
Prod.Rate 1.00 UnSkilled -
Material Labour Equipment Subcont. Prod. Rate Ave. 1.00
0.00 0.00 0.00 0.00
Total Drycost 0.00
No.
1

Equipment Type quantity rate amount


Activities QTY
crane 0.00 1,200.00 0.00
excavator 1,000.00 0.00 Installation 1.00
loader 800.00 0.00
jcb 800.00 0.00
Dozer 800.00 0.00
grader 600.00 0.00 -
roller 450.00 0.00 -
compressor 250.00 0.00 -
double drum 50.00 0.00 -
tanker 500.00 0.00
truck 0.00 800.00 0.00 Average MP NO.
generator 6,000.00 0.00 Operator -
other 6,000.00 0.00 Ganger -
Total 0.00 Skilled -
Prod.Rate 1.00 UnSkilled -
Material Labour Equipment Subcont. Prod. Rate Ave. 1.00
0.00 0.00 0.00 0.00
Total Drycost 0.00
No.
1

Equipment Type quantity rate amount


Activities QTY
crane 0.00 1,200.00 0.00
excavator 1,000.00 0.00 Installation 1.00
loader 800.00 0.00
jcb 800.00 0.00
Dozer 800.00 0.00
grader 600.00 0.00 -
roller 450.00 0.00 -
compressor 250.00 0.00 -
double drum 50.00 0.00 -
tanker 500.00 0.00
truck 0.00 800.00 0.00 Average MP NO.
generator 6,000.00 0.00 Operator -
other 6,000.00 0.00 Ganger -
Total 0.00 Skilled -
Prod.Rate 1.00 UnSkilled -
Material Labour Equipment Subcont. Prod. Rate Ave. 1.00
0.00 0.00 0.00 0.00
Total Drycost 0.00
No.

Equipment Type quantity rate amount


Activities QTY
crane 0.00 1,200.00 0.00
excavator 1,000.00 0.00 installation 1.00
loader 800.00 0.00
jcb 800.00 0.00
Dozer 800.00 0.00
grader 600.00 0.00 -
roller 450.00 0.00 -
compressor 250.00 0.00 -
double drum 50.00 0.00 -
tanker 500.00 0.00
truck 0.00 800.00 0.00 Average MP NO.
generator 6,000.00 0.00 Operator -
other 0.00 0.00 Ganger -
Total 0.00 Skilled -
Prod.Rate 1.00 UnSkilled -
Material Labour Equipment Subcont. Prod. Rate Ave. 1.00
0.00 0.00 0.00 0.00
Total Drycost 0.00
No.
1

Equipment Type quantity rate amount


Activities QTY
crane 0.00 1,200.00 0.00
excavator 1,000.00 0.00 installation 1.00
loader 800.00 0.00
jcb 800.00 0.00
Dozer 800.00 0.00
grader 600.00 0.00 -
roller 450.00 0.00 -
compressor 250.00 0.00 -
double drum 50.00 0.00 -
tanker 500.00 0.00
truck 0.00 800.00 0.00 Average MP NO.
generator 6,000.00 0.00 Operator -
other 0.00 0.00 Ganger -
Total 0.00 Skilled -
Prod.Rate 1.00 UnSkilled -
Material Labour Equipment Subcont. Prod. Rate Ave. 1.00
0.00 0.00 0.00 0.00
Total Drycost 0.00
No.
1

Equipment Type quantity rate amount


Activities QTY
crane 0.00 1,200.00 0.00
excavator 1,000.00 0.00 installation 1.00
loader 800.00 0.00
jcb 800.00 0.00
Dozer 800.00 0.00
grader 600.00 0.00 -
roller 450.00 0.00 -
compressor 250.00 0.00 -
double drum 50.00 0.00 -
tanker 500.00 0.00
truck 0.00 800.00 0.00 Average MP NO.
generator 6,000.00 0.00 Operator -
other 0.00 0.00 Ganger -
Total 0.00 Skilled -
Prod.Rate 1.00 UnSkilled -
Material Labour Equipment Subcont. Prod. Rate Ave. 1.00
0.00 0.00 0.00 0.00
Total Drycost 0.00
No.
1

Equipment Type quantity rate amount


Activities QTY
crane 0.00 1,200.00 0.00
excavator 1,000.00 0.00 installation 1.00
loader 800.00 0.00
jcb 800.00 0.00
Dozer 800.00 0.00
grader 600.00 0.00 -
roller 450.00 0.00 -
compressor 250.00 0.00 -
double drum 50.00 0.00 -
tanker 500.00 0.00
truck 0.00 800.00 0.00 Average MP NO.
generator 6,000.00 0.00 Operator -
other 0.00 0.00 Ganger -
Total 0.00 Skilled -
Prod.Rate 1.00 UnSkilled -
Material Labour Equipment Subcont. Prod. Rate Ave. 1.00
0.00 0.00 0.00 0.00
Total Drycost 0.00
No.
1

Equipment Type quantity rate amount


Activities QTY
crane 0.00 1,200.00 0.00
excavator 1,000.00 0.00 installation 1.00
loader 800.00 0.00
jcb 800.00 0.00
Dozer 800.00 0.00
grader 600.00 0.00 -
roller 450.00 0.00 -
compressor 250.00 0.00 -
double drum 50.00 0.00 -
tanker 500.00 0.00
truck 0.00 800.00 0.00 Average MP NO.
generator 6,000.00 0.00 Operator -
other 0.00 0.00 Ganger -
Total 0.00 Skilled -
Prod.Rate 1.00 UnSkilled -
Material Labour Equipment Subcont. Prod. Rate Ave. 1.00
0.00 0.00 0.00 0.00
Total Drycost 0.00
No.
1

Equipment Type quantity rate amount


Activities QTY
crane 0.00 1,200.00 0.00
excavator 1,000.00 0.00 installation 1.00
loader 800.00 0.00
jcb 800.00 0.00
Dozer 800.00 0.00
grader 600.00 0.00 -
roller 450.00 0.00 -
compressor 250.00 0.00 -
double drum 50.00 0.00 -
tanker 500.00 0.00
truck 0.00 800.00 0.00 Average MP NO.
generator 6,000.00 0.00 Operator -
other 0.00 0.00 Ganger -
Total 0.00 Skilled -
Prod.Rate 1.00 UnSkilled -
Material Labour Equipment Subcont. Prod. Rate Ave. 1.00
0.00 0.00 0.00 0.00
Total Drycost 0.00
No.
1

Equipment Type quantity rate amount


Activities QTY
crane 0.00 1,200.00 0.00
excavator 1,000.00 0.00 installation 1.00
loader 800.00 0.00
jcb 800.00 0.00
Dozer 800.00 0.00
grader 600.00 0.00 -
roller 450.00 0.00 -
compressor 250.00 0.00 -
double drum 50.00 0.00 -
tanker 500.00 0.00
truck 0.00 800.00 0.00 Average MP NO.
generator 6,000.00 0.00 Operator -
other 0.00 0.00 Ganger -
Total 0.00 Skilled -
Prod.Rate 1.00 UnSkilled -
Material Labour Equipment Subcont. Prod. Rate Ave. 1.00
0.00 0.00 0.00 0.00
Total Drycost 0.00
No.
1

Equipment Type quantity rate amount


Activities QTY
crane 0.00 1,200.00 0.00
excavator 1,000.00 0.00 installation 1.00
loader 800.00 0.00
jcb 800.00 0.00
Dozer 800.00 0.00
grader 600.00 0.00 -
roller 450.00 0.00 -
compressor 250.00 0.00 -
double drum 50.00 0.00 -
tanker 500.00 0.00
truck 0.00 800.00 0.00 Average MP NO.
generator 6,000.00 0.00 Operator -
other 0.00 0.00 Ganger -
Total 0.00 Skilled -
Prod.Rate 1.00 UnSkilled -
Material Labour Equipment Subcont. Prod. Rate Ave. 1.00
0.00 0.00 0.00 0.00
Total Drycost 0.00
No.
1

Equipment Type quantity rate amount


Activities QTY
crane 0.00 1,200.00 0.00
excavator 1,000.00 0.00 installation 1.00
loader 800.00 0.00
jcb 800.00 0.00
Dozer 800.00 0.00
grader 600.00 0.00 -
roller 450.00 0.00 -
compressor 250.00 0.00 -
double drum 50.00 0.00 -
tanker 500.00 0.00
truck 0.00 800.00 0.00 Average MP NO.
generator 6,000.00 0.00 Operator -
other 0.00 0.00 Ganger -
Total 0.00 Skilled -
Prod.Rate 1.00 UnSkilled -
Material Labour Equipment Subcont. Prod. Rate Ave. 1.00
0.00 0.00 0.00 0.00
Total Drycost 0.00
No.
1

Equipment Type quantity rate amount


Activities QTY
crane 0.00 1,200.00 0.00
excavator 1,000.00 0.00 installation 1.00
loader 800.00 0.00
jcb 800.00 0.00
Dozer 800.00 0.00
grader 600.00 0.00 -
roller 450.00 0.00 -
compressor 250.00 0.00 -
double drum 50.00 0.00 -
tanker 500.00 0.00
truck 0.00 800.00 0.00 Average MP NO.
generator 6,000.00 0.00 Operator -
other 0.00 0.00 Ganger -
Total 0.00 Skilled -
Prod.Rate 1.00 UnSkilled -
Material Labour Equipment Subcont. Prod. Rate Ave. 1.00
0.00 0.00 0.00 0.00
Total Drycost 0.00
No.
1

Equipment Type quantity rate amount


Activities QTY
crane 0.00 1,200.00 0.00
excavator 1,000.00 0.00 installation 1.00
loader 800.00 0.00
jcb 800.00 0.00
Dozer 800.00 0.00
grader 600.00 0.00 -
roller 450.00 0.00 -
compressor 250.00 0.00 -
double drum 50.00 0.00 -
tanker 500.00 0.00
truck 0.00 800.00 0.00 Average MP NO.
generator 6,000.00 0.00 Operator -
other 0.00 0.00 Ganger -
Total 0.00 Skilled -
Prod.Rate 1.00 UnSkilled -
Material Labour Equipment Subcont. Prod. Rate Ave. 1.00
0.00 0.00 0.00 0.00
Total Drycost 0.00
No.
1

Equipment Type quantity rate amount


Activities QTY
Activities QTY
crane 0.00 1,200.00 0.00
excavator 1,000.00 0.00 installation 1.00
loader 800.00 0.00
jcb 800.00 0.00
Dozer 800.00 0.00
grader 600.00 0.00 -
roller 450.00 0.00 -
compressor 250.00 0.00 -
double drum 50.00 0.00 -
tanker 500.00 0.00
truck 0.00 800.00 0.00 Average MP NO.
generator 6,000.00 0.00 Operator -
other 0.00 0.00 Ganger -
Total 0.00 Skilled -
Prod.Rate 1.00 UnSkilled -
Material Labour Equipment Subcont. Prod. Rate Ave. 1.00
0.00 0.00 0.00 0.00
Total Drycost 0.00
No.
1

Equipment Type quantity rate amount


Activities QTY
crane 0.00 1,200.00 0.00
excavator 1,000.00 0.00 installation 1.00
loader 800.00 0.00
jcb 800.00 0.00
Dozer 800.00 0.00
grader 600.00 0.00 -
roller 450.00 0.00 -
compressor 250.00 0.00 -
double drum 50.00 0.00 -
tanker 500.00 0.00
truck 0.00 800.00 0.00 Average MP NO.
generator 6,000.00 0.00 Operator -
other 0.00 0.00 Ganger -
Total 0.00 Skilled -
Prod.Rate 1.00 UnSkilled -
Material Labour Equipment Subcont. Prod. Rate Ave. 1.00
0.00 0.00 0.00 0.00
Total Drycost 0.00
No.
1

Equipment Type quantity rate amount


Activities QTY
crane 0.00 1,200.00 0.00
excavator 1,000.00 0.00 installation 1.00
loader 800.00 0.00
jcb 800.00 0.00
Dozer 800.00 0.00
grader 600.00 0.00 -
roller 450.00 0.00 -
compressor 250.00 0.00 -
double drum 50.00 0.00 -
tanker 500.00 0.00
truck 0.00 800.00 0.00 Average MP NO.
generator 6,000.00 0.00 Operator -
other 0.00 0.00 Ganger -
Total 0.00 Skilled -
Prod.Rate 1.00 UnSkilled -
Material Labour Equipment Subcont. Prod. Rate Ave. 1.00
0.00 0.00 0.00 0.00
Total Drycost 0.00
No.
1

Equipment Type quantity rate amount


Activities QTY
crane 0.00 1,200.00 0.00
excavator 1,000.00 0.00 installation 1.00
loader 800.00 0.00
jcb 800.00 0.00
Dozer 800.00 0.00
grader 600.00 0.00 -
roller 450.00 0.00 -
compressor 250.00 0.00 -
double drum 50.00 0.00 -
tanker 500.00 0.00
truck 0.00 800.00 0.00 Average MP NO.
generator 6,000.00 0.00 Operator -
other 0.00 0.00 Ganger -
Total 0.00 Skilled -
Prod.Rate 1.00 UnSkilled -
Material Labour Equipment Subcont. Prod. Rate Ave. 1.00
0.00 0.00 0.00 0.00
Total Drycost 0.00
No.
11

Equipment Type quantity rate amount


Activities QTY
crane 0.00 1,200.00 0.00
excavator 1,000.00 0.00 installation 11.00
loader 800.00 0.00
jcb 800.00 0.00
Dozer 800.00 0.00
grader 600.00 0.00 -
roller 450.00 0.00 -
compressor 250.00 0.00 -
double drum 50.00 0.00 -
tanker 500.00 0.00
truck 0.00 800.00 0.00 Average MP NO.
generator 6,000.00 0.00 Operator -
other 0.00 0.00 Ganger -
Total 0.00 Skilled -
Prod.Rate 1.00 UnSkilled -
Material Labour Equipment Subcont. Prod. Rate Ave. 1.00
0.00 0.00 0.00 0.00
Total Drycost 0.00
No.
1

Equipment Type quantity rate amount


Activities QTY
crane 0.00 1,200.00 0.00
excavator 1,000.00 0.00 installation 1.00
loader 800.00 0.00
jcb 800.00 0.00
Dozer 800.00 0.00
grader 600.00 0.00 -
roller 450.00 0.00 -
compressor 250.00 0.00 -
double drum 50.00 0.00 -
tanker 500.00 0.00
truck 0.00 800.00 0.00 Average MP NO.
generator 6,000.00 0.00 Operator -
other 0.00 0.00 Ganger -
Total 0.00 Skilled -
Prod.Rate 1.00 UnSkilled -
Material Labour Equipment Subcont. Prod. Rate Ave. 1.00
0.00 0.00 0.00 0.00
Total Drycost 0.00
No.
1

Equipment Type quantity rate amount


Activities QTY
crane 0.00 1,200.00 0.00
excavator 1,000.00 0.00 installation 1.00
loader 800.00 0.00
jcb 800.00 0.00
Dozer 800.00 0.00
grader 600.00 0.00 -
roller 450.00 0.00 -
compressor 250.00 0.00 -
double drum 50.00 0.00 -
tanker 500.00 0.00
truck 0.00 800.00 0.00 Average MP NO.
generator 6,000.00 0.00 Operator -
other 0.00 0.00 Ganger -
Total 0.00 Skilled -
Prod.Rate 1.00 UnSkilled -
Material Labour Equipment Subcont. Prod. Rate Ave. 1.00
0.00 0.00 0.00 0.00
Total Drycost 0.00
No.
1

Equipment Type quantity rate amount


Activities QTY
crane 0.00 1,200.00 0.00
excavator 1,000.00 0.00 installation 1.00
loader 800.00 0.00
jcb 800.00 0.00
Dozer 800.00 0.00
grader 600.00 0.00 -
roller 450.00 0.00 -
compressor 250.00 0.00 -
double drum 50.00 0.00 -
tanker 500.00 0.00
truck 0.00 800.00 0.00 Average MP NO.
generator 6,000.00 0.00 Operator -
other 0.00 0.00 Ganger -
Total 0.00 Skilled -
Prod.Rate 1.00 UnSkilled -
Material Labour Equipment Subcont. Prod. Rate Ave. 1.00
0.00 0.00 0.00 0.00
Total Drycost 0.00
No.
1

Equipment Type quantity rate amount


Activities QTY
crane 0.00 1,200.00 0.00
excavator 1,000.00 0.00 installation 1.00
loader 800.00 0.00
jcb 800.00 0.00
Dozer 800.00 0.00
grader 600.00 0.00 -
roller 450.00 0.00 -
compressor 250.00 0.00 -
double drum 50.00 0.00 -
tanker 500.00 0.00
truck 0.00 800.00 0.00 Average MP NO.
generator 6,000.00 0.00 Operator -
other 0.00 0.00 Ganger -
Total 0.00 Skilled -
Prod.Rate 1.00 UnSkilled -
Material Labour Equipment Subcont. Prod. Rate Ave. 1.00
0.00 0.00 0.00 0.00
Total Drycost 0.00
No.
1

Equipment Type quantity rate amount


Activities QTY
crane 0.00 1,200.00 0.00
excavator 1,000.00 0.00 installation 1.00
loader 800.00 0.00
jcb 800.00 0.00
Dozer 800.00 0.00
grader 600.00 0.00 -
roller 450.00 0.00 -
compressor 250.00 0.00 -
double drum 50.00 0.00 -
tanker 500.00 0.00
truck 0.00 800.00 0.00 Average MP NO.
generator 6,000.00 0.00 Operator -
other 0.00 0.00 Ganger -
Total 0.00 Skilled -
Prod.Rate 1.00 UnSkilled -
Material Labour Equipment Subcont. Prod. Rate Ave. 1.00
0.00 0.00 0.00 0.00
Total Drycost 0.00
No.
1

Equipment Type quantity rate amount


Activities QTY
crane 0.00 1,200.00 0.00
excavator 1,000.00 0.00 installation 1.00
loader 800.00 0.00
jcb 800.00 0.00
Dozer 800.00 0.00
grader 600.00 0.00 -
roller 450.00 0.00 -
compressor 250.00 0.00 -
double drum 50.00 0.00 -
tanker 500.00 0.00
truck 0.00 800.00 0.00 Average MP NO.
generator 6,000.00 0.00 Operator -
other 0.00 0.00 Ganger -
Total 0.00 Skilled -
Prod.Rate 1.00 UnSkilled -
Material Labour Equipment Subcont. Prod. Rate Ave. 1.00
0.00 0.00 0.00 0.00
Total Drycost 0.00
No.
1

Equipment Type quantity rate amount


Activities QTY
crane 0.00 1,200.00 0.00
excavator 1,000.00 0.00 installation 1.00
loader 800.00 0.00
jcb 800.00 0.00
Dozer 800.00 0.00
grader 600.00 0.00 -
roller 450.00 0.00 -
compressor 250.00 0.00 -
double drum 50.00 0.00 -
tanker 500.00 0.00
truck 0.00 800.00 0.00 Average MP NO.
generator 6,000.00 0.00 Operator -
other 0.00 0.00 Ganger -
Total 0.00 Skilled -
Prod.Rate 1.00 UnSkilled -
Material Labour Equipment Subcont. Prod. Rate Ave. 1.00
0.00 0.00 0.00 0.00
Total Drycost 0.00
No.
1
Equipment Type quantity rate amount
Activities QTY
crane 0.00 1,200.00 0.00
excavator 1,000.00 0.00 installation 1.00
loader 800.00 0.00
jcb 800.00 0.00
Dozer 800.00 0.00
grader 600.00 0.00 -
roller 450.00 0.00 -
compressor 250.00 0.00 -
double drum 50.00 0.00 -
tanker 500.00 0.00
truck 0.00 800.00 0.00 Average MP NO.
generator 6,000.00 0.00 Operator -
other 0.00 0.00 Ganger -
Total 0.00 Skilled -
Prod.Rate 1.00 UnSkilled -
Material Labour Equipment Subcont. Prod. Rate Ave. 1.00
0.00 0.00 0.00 0.00
Total Drycost 0.00
No.
1
Equipment Type quantity rate amount
Activities QTY
crane 0.00 1,200.00 0.00
excavator 1,000.00 0.00 installation 1.00
loader 800.00 0.00
jcb 800.00 0.00
Dozer 800.00 0.00
grader 600.00 0.00 -
roller 450.00 0.00 -
compressor 250.00 0.00 -
double drum 50.00 0.00 -
tanker 500.00 0.00
truck 0.00 800.00 0.00 Average MP NO.
generator 6,000.00 0.00 Operator -
other 0.00 0.00 Ganger -
Total 0.00 Skilled -
Prod.Rate 1.00 UnSkilled -
Material Labour Equipment Subcont. Prod. Rate Ave. 1.00
0.00 0.00 0.00 0.00
Total Drycost 0.00
No.
1

Equipment Type quantity rate amount


Activities QTY
crane 0.00 1,200.00 0.00
excavator 1,000.00 0.00 installation 1.00
loader 800.00 0.00
jcb 800.00 0.00
Dozer 800.00 0.00
grader 600.00 0.00 -
roller 450.00 0.00 -
compressor 250.00 0.00 -
double drum 50.00 0.00 -
tanker 500.00 0.00
truck 0.00 800.00 0.00 Average MP NO.
generator 6,000.00 0.00 Operator -
other 0.00 0.00 Ganger -
Total 0.00 Skilled -
Prod.Rate 1.00 UnSkilled -
Material Labour Equipment Subcont. Prod. Rate Ave. 1.00
0.00 0.00 0.00 0.00
Total Drycost 0.00
No.
11

Equipment Type quantity rate amount


Activities QTY
crane 0.00 1,200.00 0.00
excavator 1,000.00 0.00 installation 11.00
loader 800.00 0.00
jcb 800.00 0.00
Dozer 800.00 0.00
grader 600.00 0.00 -
roller 450.00 0.00 -
compressor 250.00 0.00 -
double drum 50.00 0.00 -
tanker 500.00 0.00
truck 0.00 800.00 0.00 Average MP NO.
generator 6,000.00 0.00 Operator -
other 0.00 0.00 Ganger -
Total 0.00 Skilled -
Prod.Rate 1.00 UnSkilled -
Material Labour Equipment Subcont. Prod. Rate Ave. 1.00
0.00 0.00 0.00 0.00
Total Drycost 0.00
No.
1

Equipment Type quantity rate amount


Activities QTY
crane 0.00 1,200.00 0.00
excavator 1,000.00 0.00 installation 1.00
loader 800.00 0.00
jcb 800.00 0.00
Dozer 800.00 0.00
grader 600.00 0.00 -
roller 450.00 0.00 -
compressor 250.00 0.00 -
double drum 50.00 0.00 -
tanker 500.00 0.00
truck 0.00 800.00 0.00 Average MP NO.
generator 6,000.00 0.00 Operator -
other 0.00 0.00 Ganger -
Total 0.00 Skilled -
Prod.Rate 1.00 UnSkilled -
Material Labour Equipment Subcont. Prod. Rate Ave. 1.00
0.00 0.00 0.00 0.00
Total Drycost 0.00
No.
11

Equipment Type quantity rate amount


Activities QTY
crane 0.00 1,200.00 0.00
excavator 1,000.00 0.00 installation 11.00
loader 800.00 0.00
jcb 800.00 0.00
Dozer 800.00 0.00
grader 600.00 0.00 -
roller 450.00 0.00 -
compressor 250.00 0.00 -
double drum 50.00 0.00 -
tanker 500.00 0.00
truck 0.00 800.00 0.00 Average MP NO.
generator 6,000.00 0.00 Operator -
other 0.00 0.00 Ganger -
Total 0.00 Skilled -
Prod.Rate 1.00 UnSkilled -
Material Labour Equipment Subcont. Prod. Rate Ave. 1.00
0.00 0.00 0.00 0.00
Total Drycost 0.00
No.
1

Equipment Type quantity rate amount


Activities QTY
crane 0.00 1,200.00 0.00
excavator 1,000.00 0.00 installation 1.00
loader 800.00 0.00
jcb 800.00 0.00
Dozer 800.00 0.00
grader 600.00 0.00 -
roller 450.00 0.00 -
compressor 250.00 0.00 -
double drum 50.00 0.00 -
tanker 500.00 0.00
truck 0.00 800.00 0.00 Average MP NO.
generator 6,000.00 0.00 Operator -
other 0.00 0.00 Ganger -
Total 0.00 Skilled -
Prod.Rate 1.00 UnSkilled -
Material Labour Equipment Subcont. Prod. Rate Ave. 1.00
0.00 0.00 0.00 0.00
Total Drycost 0.00
No.
1

Equipment Type quantity rate amount


Activities QTY
crane 0.00 1,200.00 0.00
excavator 1,000.00 0.00 installation 1.00
loader 800.00 0.00
jcb 800.00 0.00
Dozer 800.00 0.00
grader 600.00 0.00 -
roller 450.00 0.00 -
compressor 250.00 0.00 -
double drum 50.00 0.00 -
tanker 500.00 0.00
truck 0.00 800.00 0.00 Average MP NO.
generator 6,000.00 0.00 Operator -
other 0.00 0.00 Ganger -
Total 0.00 Skilled -
Prod.Rate 1.00 UnSkilled -
Material Labour Equipment Subcont. Prod. Rate Ave. 1.00
0.00 0.00 0.00 0.00
Total Drycost 0.00
No.
42

Equipment Type quantity rate amount


Activities QTY
crane 0.00 1,200.00 0.00
excavator 1,000.00 0.00 installation 42.00
loader 800.00 0.00
jcb 800.00 0.00
Dozer 800.00 0.00
grader 600.00 0.00 -
roller 450.00 0.00 -
compressor 250.00 0.00 -
double drum 50.00 0.00 -
tanker 500.00 0.00
truck 0.00 800.00 0.00 Average MP NO.
generator 6,000.00 0.00 Operator -
other 0.00 0.00 Ganger -
Total 0.00 Skilled -
Prod.Rate 1.00 UnSkilled -
Material Labour Equipment Subcont. Prod. Rate Ave. 1.00
0.00 0.00 0.00 0.00
Total Drycost 0.00
No.
1,360

Equipment Type quantity rate amount


Activities QTY
crane 0.00 1,200.00 0.00
excavator 1,000.00 0.00 installation 1,360.00
loader 800.00 0.00
jcb 800.00 0.00
Dozer 800.00 0.00
grader 600.00 0.00 -
roller 450.00 0.00 -
compressor 250.00 0.00 -
double drum 50.00 0.00 -
tanker 500.00 0.00
truck 0.00 800.00 0.00 Average MP NO.
generator 6,000.00 0.00 Operator -
other 0.00 0.00 Ganger -
Total 0.00 Skilled -
Prod.Rate 1.00 UnSkilled -
Material Labour Equipment Subcont. Prod. Rate Ave. 1.00
0.00 0.00 0.00 0.00
Total Drycost 0.00
No.
78

Equipment Type quantity rate amount


Activities QTY
crane 0.00 1,200.00 0.00
excavator 1,000.00 0.00 installation 78.00
loader 800.00 0.00
jcb 800.00 0.00
Dozer 800.00 0.00
grader 600.00 0.00 -
roller 450.00 0.00 -
compressor 250.00 0.00 -
double drum 50.00 0.00 -
tanker 500.00 0.00
truck 0.00 800.00 0.00 Average MP NO.
generator 6,000.00 0.00 Operator -
other 0.00 0.00 Ganger -
Total 0.00 Skilled -
Prod.Rate 1.00 UnSkilled -
Material Labour Equipment Subcont. Prod. Rate Ave. 1.00
0.00 0.00 0.00 0.00
Total Drycost 0.00
No.
351

Equipment Type quantity rate amount


Activities QTY
crane 0.00 1,200.00 0.00
excavator 1,000.00 0.00 installation 351.00
loader 800.00 0.00
jcb 800.00 0.00
Dozer 800.00 0.00
grader 600.00 0.00 -
roller 450.00 0.00 -
compressor 250.00 0.00 -
double drum 50.00 0.00 -
tanker 500.00 0.00
truck 0.00 800.00 0.00 Average MP NO.
generator 6,000.00 0.00 Operator -
other 0.00 0.00 Ganger -
Total 0.00 Skilled -
Prod.Rate 1.00 UnSkilled -
Material Labour Equipment Subcont. Prod. Rate Ave. 1.00
0.00 0.00 0.00 0.00
Total Drycost 0.00
No.
422
Equipment Type quantity rate amount
Activities QTY
crane 0.00 1,200.00 0.00
excavator 1,000.00 0.00 installation 422.00
loader 800.00 0.00
jcb 800.00 0.00
Dozer 800.00 0.00
grader 600.00 0.00 -
roller 450.00 0.00 -
compressor 250.00 0.00 -
double drum 50.00 0.00 -
tanker 500.00 0.00
truck 0.00 800.00 0.00 Average MP NO.
generator 6,000.00 0.00 Operator -
other 0.00 0.00 Ganger -
Total 0.00 Skilled -
Prod.Rate 1.00 UnSkilled -
Material Labour Equipment Subcont. Prod. Rate Ave. 1.00
0.00 0.00 0.00 0.00
Total Drycost 0.00
No.
257

Equipment Type quantity rate amount


Activities QTY
crane 0.00 1,200.00 0.00
excavator 1,000.00 0.00 installation 257.00
loader 800.00 0.00
jcb 800.00 0.00
Dozer 800.00 0.00
grader 600.00 0.00 -
roller 450.00 0.00 -
compressor 250.00 0.00 -
double drum 50.00 0.00 -
tanker 500.00 0.00
truck 0.00 800.00 0.00 Average MP NO.
generator 6,000.00 0.00 Operator -
other 0.00 0.00 Ganger -
Total 0.00 Skilled -
Prod.Rate 1.00 UnSkilled -
Material Labour Equipment Subcont. Prod. Rate Ave. 1.00
0.00 0.00 0.00 0.00
Total Drycost 0.00
No.
46

Equipment Type quantity rate amount


Activities QTY
crane 0.00 1,200.00 0.00
excavator 1,000.00 0.00 installation 46.00
loader 800.00 0.00
jcb 800.00 0.00
Dozer 800.00 0.00
grader 600.00 0.00 -
roller 450.00 0.00 -
compressor 250.00 0.00 -
double drum 50.00 0.00 -
tanker 500.00 0.00
truck 0.00 800.00 0.00 Average MP NO.
generator 6,000.00 0.00 Operator -
other 0.00 0.00 Ganger -
Total 0.00 Skilled -
Prod.Rate 1.00 UnSkilled -
Material Labour Equipment Subcont. Prod. Rate Ave. 1.00
0.00 0.00 0.00 0.00
Total Drycost 0.00
No.
11

Equipment Type quantity rate amount


Activities QTY
crane 0.00 1,200.00 0.00
excavator 1,000.00 0.00 installation 11.00
loader 800.00 0.00
jcb 800.00 0.00
Dozer 800.00 0.00
grader 600.00 0.00 -
roller 450.00 0.00 -
compressor 250.00 0.00 -
double drum 50.00 0.00 -
tanker 500.00 0.00
truck 0.00 800.00 0.00 Average MP NO.
generator 6,000.00 0.00 Operator -
other 0.00 0.00 Ganger -
Total 0.00 Skilled -
Prod.Rate 1.00 UnSkilled -
Material Labour Equipment Subcont. Prod. Rate Ave. 1.00
0.00 0.00 0.00 0.00
Total Drycost 0.00
No.
0

Equipment Type quantity rate amount


Activities QTY
crane 0.00 1,200.00 0.00
excavator 1,000.00 0.00 installation -
loader 800.00 0.00
jcb 800.00 0.00
Dozer 800.00 0.00
grader 600.00 0.00 -
roller 450.00 0.00 -
compressor 250.00 0.00 -
double drum 50.00 0.00 -
tanker 500.00 0.00
truck 0.00 800.00 0.00 Average MP NO.
generator 6,000.00 0.00 Operator #DIV/0!
other 0.00 0.00 Ganger #DIV/0!
Total 0.00 Skilled #DIV/0!
Prod.Rate #DIV/0! UnSkilled #DIV/0!
Material Labour Equipment Subcont. Prod. Rate Ave. #DIV/0!
0.00 #DIV/0! #DIV/0! 0.00
Total Drycost #DIV/0!
No.
0

Equipment Type quantity rate amount


Activities QTY
crane 0.00 1,200.00 0.00
excavator 1,000.00 0.00 installation -
loader 800.00 0.00
jcb 800.00 0.00
Dozer 800.00 0.00
grader 600.00 0.00 -
roller 450.00 0.00 -
compressor 250.00 0.00 -
double drum 50.00 0.00 -
tanker 500.00 0.00
truck 0.00 800.00 0.00 Average MP NO.
generator 6,000.00 0.00 Operator #DIV/0!
other 0.00 0.00 Ganger #DIV/0!
Total 0.00 Skilled #DIV/0!
Prod.Rate #DIV/0! UnSkilled #DIV/0!
Material Labour Equipment Subcont. Prod. Rate Ave. #DIV/0!
0.00 #DIV/0! #DIV/0! 0.00
Total Drycost #DIV/0!
No.
149

Equipment Type quantity rate amount


Activities QTY
crane 0.00 1,200.00 0.00
excavator 1,000.00 0.00 installation 149.00
loader 800.00 0.00
jcb 800.00 0.00
Dozer 800.00 0.00
grader 600.00 0.00 -
roller 450.00 0.00 -
compressor 250.00 0.00 -
double drum 50.00 0.00 -
tanker 500.00 0.00
truck 0.00 800.00 0.00 Average MP NO.
generator 6,000.00 0.00 Operator -
other 0.00 0.00 Ganger -
Total 0.00 Skilled -
Prod.Rate 1.00 UnSkilled -
Material Labour Equipment Subcont. Prod. Rate Ave. 1.00
0.00 0.00 0.00 0.00
Total Drycost 0.00
No.
2

Equipment Type quantity rate amount


Activities QTY
crane 0.00 1,200.00 0.00
excavator 1,000.00 0.00 installation 2.00
loader 800.00 0.00
jcb 800.00 0.00
Dozer 800.00 0.00
grader 600.00 0.00 -
roller 450.00 0.00 -
compressor 250.00 0.00 -
double drum 50.00 0.00 -
tanker 500.00 0.00
truck 0.00 800.00 0.00 Average MP NO.
generator 6,000.00 0.00 Operator -
other 0.00 0.00 Ganger -
Total 0.00 Skilled -
Prod.Rate 1.00 UnSkilled -
Material Labour Equipment Subcont. Prod. Rate Ave. 1.00
0.00 0.00 0.00 0.00
Total Drycost 0.00
No.
18

Equipment Type quantity rate amount


Activities QTY
crane 0.00 1,200.00 0.00
excavator 1,000.00 0.00 installation 18.00
loader 800.00 0.00
jcb 800.00 0.00
Dozer 800.00 0.00
grader 600.00 0.00 -
roller 450.00 0.00 -
compressor 250.00 0.00 -
double drum 50.00 0.00 -
tanker 500.00 0.00
truck 0.00 800.00 0.00 Average MP NO.
generator 6,000.00 0.00 Operator -
other 0.00 0.00 Ganger -
Total 0.00 Skilled -
Prod.Rate 1.00 UnSkilled -
Material Labour Equipment Subcont. Prod. Rate Ave. 1.00
0.00 0.00 0.00 0.00
Total Drycost 0.00
No.
10

Equipment Type quantity rate amount


Activities QTY
crane 0.00 1,200.00 0.00
excavator 1,000.00 0.00 installation 10.00
loader 800.00 0.00
jcb 800.00 0.00
Dozer 800.00 0.00
grader 600.00 0.00 -
roller 450.00 0.00 -
compressor 250.00 0.00 -
double drum 50.00 0.00 -
tanker 500.00 0.00
truck 0.00 800.00 0.00 Average MP NO.
generator 6,000.00 0.00 Operator -
other 0.00 0.00 Ganger -
Total 0.00 Skilled -
Prod.Rate 1.00 UnSkilled -
Material Labour Equipment Subcont. Prod. Rate Ave. 1.00
0.00 0.00 0.00 0.00
Total Drycost 0.00
No.
11

Equipment Type quantity rate amount


Activities QTY
crane 0.00 1,200.00 0.00
excavator 1,000.00 0.00 installation 11.00
loader 800.00 0.00
jcb 800.00 0.00
Dozer 800.00 0.00
grader 600.00 0.00 -
roller 450.00 0.00 -
compressor 250.00 0.00 -
double drum 50.00 0.00 -
tanker 500.00 0.00
truck 0.00 800.00 0.00 Average MP NO.
generator 6,000.00 0.00 Operator -
other 0.00 0.00 Ganger -
Total 0.00 Skilled -
Prod.Rate 1.00 UnSkilled -
Material Labour Equipment Subcont. Prod. Rate Ave. 1.00
0.00 0.00 0.00 0.00
Total Drycost 0.00
No.
31

Equipment Type quantity rate amount


Activities QTY
crane 0.00 1,200.00 0.00
excavator 1,000.00 0.00 installation 31.00
loader 800.00 0.00
jcb 800.00 0.00
Dozer 800.00 0.00
grader 600.00 0.00 -
roller 450.00 0.00 -
compressor 250.00 0.00 -
double drum 50.00 0.00 -
tanker 500.00 0.00
truck 0.00 800.00 0.00 Average MP NO.
generator 6,000.00 0.00 Operator -
other 0.00 0.00 Ganger -
Total 0.00 Skilled -
Prod.Rate 1.00 UnSkilled -
Material Labour Equipment Subcont. Prod. Rate Ave. 1.00
0.00 0.00 0.00 0.00
Total Drycost 0.00
No.
57
Equipment Type quantity rate amount
Activities QTY
crane 0.00 1,200.00 0.00
excavator 1,000.00 0.00 installation 57.00
loader 800.00 0.00
jcb 800.00 0.00
Dozer 800.00 0.00
grader 600.00 0.00 -
roller 450.00 0.00 -
compressor 250.00 0.00 -
double drum 50.00 0.00 -
tanker 500.00 0.00
truck 0.00 800.00 0.00 Average MP NO.
generator 6,000.00 0.00 Operator -
other 0.00 0.00 Ganger -
Total 0.00 Skilled -
Prod.Rate 1.00 UnSkilled -
Material Labour Equipment Subcont. Prod. Rate Ave. 1.00
0.00 0.00 0.00 0.00
Total Drycost 0.00
No.
45

Equipment Type quantity rate amount


Activities QTY
crane 0.00 1,200.00 0.00
excavator 1,000.00 0.00 installation 45.00
loader 800.00 0.00
jcb 800.00 0.00
Dozer 800.00 0.00
grader 600.00 0.00 -
roller 450.00 0.00 -
compressor 250.00 0.00 -
double drum 50.00 0.00 -
tanker 500.00 0.00
truck 0.00 800.00 0.00 Average MP NO.
generator 6,000.00 0.00 Operator -
other 0.00 0.00 Ganger -
Total 0.00 Skilled -
Prod.Rate 1.00 UnSkilled -
Material Labour Equipment Subcont. Prod. Rate Ave. 1.00
0.00 0.00 0.00 0.00
Total Drycost 0.00
mt.
1,000

Equipment Type quantity rate amount


Activities QTY
crane 0.00 1,200.00 0.00
excavator 1,000.00 0.00 installation 1,000.00
loader 800.00 0.00
jcb 800.00 0.00
Dozer 800.00 0.00
grader 600.00 0.00 -
roller 450.00 0.00 -
compressor 250.00 0.00 -
double drum 50.00 0.00 -
tanker 500.00 0.00
truck 0.00 800.00 0.00 Average MP NO.
generator 6,000.00 0.00 Operator -
other 0.00 0.00 Ganger -
Total 0.00 Skilled -
Prod.Rate 1.00 UnSkilled -
Material Labour Equipment Subcont. Prod. Rate Ave. 1.00
0.00 0.00 0.00 0.00
Total Drycost 0.00
No.
51

Equipment Type quantity rate amount


Activities QTY
crane 0.00 1,200.00 0.00
excavator 1,000.00 0.00 installation 51.00
loader 800.00 0.00
jcb 800.00 0.00
Dozer 800.00 0.00
grader 600.00 0.00 -
roller 450.00 0.00 -
compressor 250.00 0.00 -
double drum 50.00 0.00 -
tanker 500.00 0.00
truck 0.00 800.00 0.00 Average MP NO.
generator 6,000.00 0.00 Operator -
other 0.00 0.00 Ganger -
Total 0.00 Skilled -
Prod.Rate 1.00 UnSkilled -
Material Labour Equipment Subcont. Prod. Rate Ave. 1.00
0.00 0.00 0.00 0.00
Total Drycost 0.00
No.
1,009

Equipment Type quantity rate amount


Activities QTY
crane 0.00 1,200.00 0.00
excavator 1,000.00 0.00 installation 1,009.00
loader 800.00 0.00
jcb 800.00 0.00
Dozer 800.00 0.00
grader 600.00 0.00 -
roller 450.00 0.00 -
compressor 250.00 0.00 -
double drum 50.00 0.00 -
tanker 500.00 0.00
truck 0.00 800.00 0.00 Average MP NO.
generator 6,000.00 0.00 Operator -
other 0.00 0.00 Ganger -
Total 0.00 Skilled -
Prod.Rate 1.00 UnSkilled -
Material Labour Equipment Subcont. Prod. Rate Ave. 1.00
0.00 0.00 0.00 0.00
Total Drycost 0.00
No.
1

Equipment Type quantity rate amount


Activities QTY
crane 0.00 1,200.00 0.00
excavator 1,000.00 0.00 installation 1.00
loader 800.00 0.00
jcb 800.00 0.00
Dozer 800.00 0.00
grader 600.00 0.00 -
roller 450.00 0.00 -
compressor 250.00 0.00 -
double drum 50.00 0.00 -
tanker 500.00 0.00
truck 0.00 800.00 0.00 Average MP NO.
generator 6,000.00 0.00 Operator -
other 0.00 0.00 Ganger -
Total 0.00 Skilled -
Prod.Rate 1.00 UnSkilled -
Material Labour Equipment Subcont. Prod. Rate Ave. 1.00
0.00 0.00 0.00 0.00
Total Drycost 0.00
No.
30

Equipment Type quantity rate amount


Activities QTY
crane 0.00 1,200.00 0.00
excavator 1,000.00 0.00 installation 30.00
loader 800.00 0.00
jcb 800.00 0.00
Dozer 800.00 0.00
grader 600.00 0.00 -
roller 450.00 0.00 -
compressor 250.00 0.00 -
double drum 50.00 0.00 -
tanker 500.00 0.00
truck 0.00 800.00 0.00 Average MP NO.
generator 6,000.00 0.00 Operator -
other 0.00 0.00 Ganger -
Total 0.00 Skilled -
Prod.Rate 1.00 UnSkilled -
Material Labour Equipment Subcont. Prod. Rate Ave. 1.00
0.00 0.00 0.00 0.00
Total Drycost 0.00
No.
30

Equipment Type quantity rate amount


Activities QTY
crane 0.00 1,200.00 0.00
excavator 1,000.00 0.00 installation 30.00
loader 800.00 0.00
jcb 800.00 0.00
Dozer 800.00 0.00
grader 600.00 0.00 -
roller 450.00 0.00 -
compressor 250.00 0.00 -
double drum 50.00 0.00 -
tanker 500.00 0.00
truck 0.00 800.00 0.00 Average MP NO.
generator 6,000.00 0.00 Operator -
other 0.00 0.00 Ganger -
Total 0.00 Skilled -
Prod.Rate 1.00 UnSkilled -
Material Labour Equipment Subcont. Prod. Rate Ave. 1.00
0.00 0.00 0.00 0.00
Total Drycost 0.00
No.
473

Equipment Type quantity rate amount


Activities QTY
crane 0.00 1,200.00 0.00
excavator 1,000.00 0.00 installation 473.00
loader 800.00 0.00
jcb 800.00 0.00
Dozer 800.00 0.00
grader 600.00 0.00 -
roller 450.00 0.00 -
compressor 250.00 0.00 -
double drum 50.00 0.00 -
tanker 500.00 0.00
truck 0.00 800.00 0.00 Average MP NO.
generator 6,000.00 0.00 Operator -
other 0.00 0.00 Ganger -
Total 0.00 Skilled -
Prod.Rate 1.00 UnSkilled -
Material Labour Equipment Subcont. Prod. Rate Ave. 1.00
0.00 0.00 0.00 0.00
Total Drycost 0.00
No.
3

Equipment Type quantity rate amount


Activities QTY
crane 0.00 1,200.00 0.00
excavator 1,000.00 0.00 installation 3.00
loader 800.00 0.00
jcb 800.00 0.00
Dozer 800.00 0.00
grader 600.00 0.00 -
roller 450.00 0.00 -
compressor 250.00 0.00 -
double drum 50.00 0.00 -
tanker 500.00 0.00
truck 0.00 800.00 0.00 Average MP NO.
generator 6,000.00 0.00 Operator -
other 0.00 0.00 Ganger -
Total 0.00 Skilled -
Prod.Rate 1.00 UnSkilled -
Material Labour Equipment Subcont. Prod. Rate Ave. 1.00
0.00 0.00 0.00 0.00
Total Drycost 0.00
No.
4

Equipment Type quantity rate amount


Activities QTY
crane 0.00 1,200.00 0.00
excavator 1,000.00 0.00 installation 4.00
loader 800.00 0.00
jcb 800.00 0.00
Dozer 800.00 0.00
grader 600.00 0.00 -
roller 450.00 0.00 -
compressor 250.00 0.00 -
double drum 50.00 0.00 -
tanker 500.00 0.00
truck 0.00 800.00 0.00 Average MP NO.
generator 6,000.00 0.00 Operator -
other 0.00 0.00 Ganger -
Total 0.00 Skilled -
Prod.Rate 1.00 UnSkilled -
Material Labour Equipment Subcont. Prod. Rate Ave. 1.00
0.00 0.00 0.00 0.00
Total Drycost 0.00
No.
4

Equipment Type quantity rate amount


Activities QTY
crane 0.00 1,200.00 0.00
excavator 1,000.00 0.00 installation 4.00
loader 800.00 0.00
jcb 800.00 0.00
Dozer 800.00 0.00
grader 600.00 0.00 -
roller 450.00 0.00 -
compressor 250.00 0.00 -
double drum 50.00 0.00 -
tanker 500.00 0.00
truck 0.00 800.00 0.00 Average MP NO.
generator 6,000.00 0.00 Operator -
other 0.00 0.00 Ganger -
Total 0.00 Skilled -
Prod.Rate 1.00 UnSkilled -
Material Labour Equipment Subcont. Prod. Rate Ave. 1.00
0.00 0.00 0.00 0.00
Total Drycost 0.00
No.
18
Equipment Type quantity rate amount
Activities QTY
crane 0.00 1,200.00 0.00
excavator 1,000.00 0.00 installation 18.00
loader 800.00 0.00
jcb 800.00 0.00
Dozer 800.00 0.00
grader 600.00 0.00 -
roller 450.00 0.00 -
compressor 250.00 0.00 -
double drum 50.00 0.00 -
tanker 500.00 0.00
truck 0.00 800.00 0.00 Average MP NO.
generator 6,000.00 0.00 Operator -
other 0.00 0.00 Ganger -
Total 0.00 Skilled -
Prod.Rate 1.00 UnSkilled -
Material Labour Equipment Subcont. Prod. Rate Ave. 1.00
0.00 0.00 0.00 0.00
Total Drycost 0.00
No.
4

Equipment Type quantity rate amount


Activities QTY
crane 0.00 1,200.00 0.00
excavator 1,000.00 0.00 installation 4.00
loader 800.00 0.00
jcb 800.00 0.00
Dozer 800.00 0.00
grader 600.00 0.00 -
roller 450.00 0.00 -
compressor 250.00 0.00 -
double drum 50.00 0.00 -
tanker 500.00 0.00
truck 0.00 800.00 0.00 Average MP NO.
generator 6,000.00 0.00 Operator -
other 0.00 0.00 Ganger -
Total 0.00 Skilled -
Prod.Rate 1.00 UnSkilled -
Material Labour Equipment Subcont. Prod. Rate Ave. 1.00
0.00 0.00 0.00 0.00
Total Drycost 0.00
No.
1

Equipment Type quantity rate amount


Activities QTY
crane 0.00 1,200.00 0.00
excavator 1,000.00 0.00 installation 1.00
loader 800.00 0.00
jcb 800.00 0.00
Dozer 800.00 0.00
grader 600.00 0.00 -
roller 450.00 0.00 -
compressor 250.00 0.00 -
double drum 50.00 0.00 -
tanker 500.00 0.00
truck 0.00 800.00 0.00 Average MP NO.
generator 6,000.00 0.00 Operator -
other 0.00 0.00 Ganger -
Total 0.00 Skilled -
Prod.Rate 1.00 UnSkilled -
Material Labour Equipment Subcont. Prod. Rate Ave. 1.00
0.00 0.00 0.00 0.00
Total Drycost 0.00
No.
5

Equipment Type quantity rate amount


Activities QTY
crane 0.00 1,200.00 0.00
excavator 1,000.00 0.00 installation 5.00
loader 800.00 0.00
jcb 800.00 0.00
Dozer 800.00 0.00
grader 600.00 0.00 -
roller 450.00 0.00 -
compressor 250.00 0.00 -
double drum 50.00 0.00 -
tanker 500.00 0.00
truck 0.00 800.00 0.00 Average MP NO.
generator 6,000.00 0.00 Operator -
other 0.00 0.00 Ganger -
Total 0.00 Skilled -
Prod.Rate 1.00 UnSkilled -
Material Labour Equipment Subcont. Prod. Rate Ave. 1.00
0.00 0.00 0.00 0.00
Total Drycost 0.00
No.
1

Equipment Type quantity rate amount


Activities QTY
crane 0.00 1,200.00 0.00
excavator 1,000.00 0.00 installation 1.00
loader 800.00 0.00
jcb 800.00 0.00
Dozer 800.00 0.00
grader 600.00 0.00 -
roller 450.00 0.00 -
compressor 250.00 0.00 -
double drum 50.00 0.00 -
tanker 500.00 0.00
truck 0.00 800.00 0.00 Average MP NO.
generator 6,000.00 0.00 Operator -
other 0.00 0.00 Ganger -
Total 0.00 Skilled -
Prod.Rate 1.00 UnSkilled -
Material Labour Equipment Subcont. Prod. Rate Ave. 1.00
0.00 0.00 0.00 0.00
Total Drycost 0.00
No.
500

Equipment Type quantity rate amount


Activities QTY
crane 0.00 1,200.00 0.00
excavator 1,000.00 0.00 installation 500.00
loader 800.00 0.00
jcb 800.00 0.00
Dozer 800.00 0.00
grader 600.00 0.00 -
roller 450.00 0.00 -
compressor 250.00 0.00 -
double drum 50.00 0.00 -
tanker 500.00 0.00
truck 0.00 800.00 0.00 Average MP NO.
generator 6,000.00 0.00 Operator -
other 0.00 0.00 Ganger -
Total 0.00 Skilled -
Prod.Rate 1.00 UnSkilled -
Material Labour Equipment Subcont. Prod. Rate Ave. 1.00
0.00 0.00 0.00 0.00
Total Drycost 0.00
No.
250

Equipment Type quantity rate amount


Activities QTY
crane 0.00 1,200.00 0.00
excavator 1,000.00 0.00 installation 250.00
loader 800.00 0.00
jcb 800.00 0.00
Dozer 800.00 0.00
grader 600.00 0.00 -
roller 450.00 0.00 -
compressor 250.00 0.00 -
double drum 50.00 0.00 -
tanker 500.00 0.00
truck 0.00 800.00 0.00 Average MP NO.
generator 6,000.00 0.00 Operator -
other 0.00 0.00 Ganger -
Total 0.00 Skilled -
Prod.Rate 1.00 UnSkilled -
Material Labour Equipment Subcont. Prod. Rate Ave. 1.00
0.00 0.00 0.00 0.00
Total Drycost 0.00
No.
1

Equipment Type quantity rate amount


Activities QTY
crane 0.00 1,200.00 0.00
excavator 1,000.00 0.00 installation 1.00
loader 800.00 0.00
jcb 800.00 0.00
Dozer 800.00 0.00
grader 600.00 0.00 -
roller 450.00 0.00 -
compressor 250.00 0.00 -
double drum 50.00 0.00 -
tanker 500.00 0.00
truck 0.00 800.00 0.00 Average MP NO.
generator 6,000.00 0.00 Operator -
other 0.00 0.00 Ganger -
Total 0.00 Skilled -
Prod.Rate 1.00 UnSkilled -
Material Labour Equipment Subcont. Prod. Rate Ave. 1.00
0.00 0.00 0.00 0.00
Total Drycost 0.00
No.

Equipment Type quantity rate amount


Activities QTY
crane 0.00 1,200.00 0.00
excavator 1,000.00 0.00 installation 1.00
loader 800.00 0.00
jcb 800.00 0.00
Dozer 800.00 0.00
grader 600.00 0.00 -
roller 450.00 0.00 -
compressor 250.00 0.00 -
double drum 50.00 0.00 -
tanker 500.00 0.00
truck 0.00 800.00 0.00 Average MP NO.
generator 6,000.00 0.00 Operator -
other 0.00 0.00 Ganger -
Total 0.00 Skilled -
Prod.Rate 1.00 UnSkilled -
Material Labour Equipment Subcont. Prod. Rate Ave. 1.00
0.00 0.00 0.00 0.00
Total Drycost 0.00
No.

Equipment Type quantity rate amount


Activities QTY
Activities QTY
crane 0.00 1,200.00 0.00
excavator 1,000.00 0.00 installation 1.00
loader 800.00 0.00
jcb 800.00 0.00
Dozer 800.00 0.00
grader 600.00 0.00 -
roller 450.00 0.00 -
compressor 250.00 0.00 -
double drum 50.00 0.00 -
tanker 500.00 0.00
truck 0.00 800.00 0.00 Average MP NO.
generator 6,000.00 0.00 Operator -
other 0.00 0.00 Ganger -
Total 0.00 Skilled -
Prod.Rate 1.00 UnSkilled -
Material Labour Equipment Subcont. Prod. Rate Ave. 1.00
0.00 0.00 0.00 0.00
Total Drycost 0.00
No.
1

Equipment Type quantity rate amount


Activities QTY
crane 0.00 1,200.00 0.00
excavator 1,000.00 0.00 installation 1.00
loader 800.00 0.00
jcb 800.00 0.00
Dozer 800.00 0.00
grader 600.00 0.00 -
roller 450.00 0.00 -
compressor 250.00 0.00 -
double drum 50.00 0.00 -
tanker 500.00 0.00
truck 0.00 800.00 0.00 Average MP NO.
generator 6,000.00 0.00 Operator -
other 0.00 0.00 Ganger -
Total 0.00 Skilled -
Prod.Rate 1.00 UnSkilled -
Material Labour Equipment Subcont. Prod. Rate Ave. 1.00
0.00 0.00 0.00 0.00
Total Drycost 0.00
No.

Equipment Type quantity rate amount


Activities QTY
crane 0.00 1,200.00 0.00
excavator 1,000.00 0.00 installation 1.00
loader 800.00 0.00
jcb 800.00 0.00
Dozer 800.00 0.00
grader 600.00 0.00 -
roller 450.00 0.00 -
compressor 250.00 0.00 -
double drum 50.00 0.00 -
tanker 500.00 0.00
truck 0.00 800.00 0.00 Average MP NO.
generator 6,000.00 0.00 Operator -
other 0.00 0.00 Ganger -
Total 0.00 Skilled -
Prod.Rate 1.00 UnSkilled -
Material Labour Equipment Subcont. Prod. Rate Ave. 1.00
0.00 0.00 0.00 0.00
Total Drycost 0.00
No.

27

Equipment Type quantity rate amount


Activities QTY
crane 0.00 1,200.00 0.00
excavator 1,000.00 0.00 installation 27.00
loader 800.00 0.00
jcb 800.00 0.00
Dozer 800.00 0.00
grader 600.00 0.00 -
roller 450.00 0.00 -
compressor 250.00 0.00 -
double drum 50.00 0.00 -
tanker 500.00 0.00
truck 0.00 800.00 0.00 Average MP NO.
generator 6,000.00 0.00 Operator -
other 0.00 0.00 Ganger -
Total 0.00 Skilled -
Prod.Rate 1.00 UnSkilled -
Material Labour Equipment Subcont. Prod. Rate Ave. 1.00
0.00 0.00 0.00 0.00
Total Drycost 0.00
No.
27

Equipment Type quantity rate amount


Activities QTY
crane 0.00 1,200.00 0.00
excavator 1,000.00 0.00 installation 27.00
loader 800.00 0.00
jcb 800.00 0.00
Dozer 800.00 0.00
grader 600.00 0.00 -
roller 450.00 0.00 -
compressor 250.00 0.00 -
double drum 50.00 0.00 -
tanker 500.00 0.00
truck 0.00 800.00 0.00 Average MP NO.
generator 6,000.00 0.00 Operator -
other 0.00 0.00 Ganger -
Total 0.00 Skilled -
Prod.Rate 1.00 UnSkilled -
Material Labour Equipment Subcont. Prod. Rate Ave. 1.00
0.00 0.00 0.00 0.00
Total Drycost 0.00
No.
27

Equipment Type quantity rate amount


Activities QTY
crane 0.00 1,200.00 0.00
excavator 1,000.00 0.00 installation 27.00
loader 800.00 0.00
jcb 800.00 0.00
Dozer 800.00 0.00
grader 600.00 0.00 -
roller 450.00 0.00 -
compressor 250.00 0.00 -
double drum 50.00 0.00 -
tanker 500.00 0.00
truck 0.00 800.00 0.00 Average MP NO.
generator 6,000.00 0.00 Operator -
other 0.00 0.00 Ganger -
Total 0.00 Skilled -
Prod.Rate 1.00 UnSkilled -
Material Labour Equipment Subcont. Prod. Rate Ave. 1.00
0.00 0.00 0.00 0.00
Total Drycost 0.00
No.
27

Equipment Type quantity rate amount


Activities QTY
crane 0.00 1,200.00 0.00
excavator 1,000.00 0.00 installation 27.00
loader 800.00 0.00
jcb 800.00 0.00
Dozer 800.00 0.00
grader 600.00 0.00 -
roller 450.00 0.00 -
compressor 250.00 0.00 -
double drum 50.00 0.00 -
tanker 500.00 0.00
truck 0.00 800.00 0.00 Average MP NO.
generator 6,000.00 0.00 Operator -
other 0.00 0.00 Ganger -
Total 0.00 Skilled -
Prod.Rate 1.00 UnSkilled -
Material Labour Equipment Subcont. Prod. Rate Ave. 1.00
0.00 0.00 0.00 0.00
Total Drycost 0.00
No.
135

Equipment Type quantity rate amount


Activities QTY
crane 0.00 1,200.00 0.00
excavator 1,000.00 0.00 installation 135.00
loader 800.00 0.00
jcb 800.00 0.00
Dozer 800.00 0.00
grader 600.00 0.00 -
roller 450.00 0.00 -
compressor 250.00 0.00 -
double drum 50.00 0.00 -
tanker 500.00 0.00
truck 0.00 800.00 0.00 Average MP NO.
generator 6,000.00 0.00 Operator -
other 0.00 0.00 Ganger -
Total 0.00 Skilled -
Prod.Rate 1.00 UnSkilled -
Material Labour Equipment Subcont. Prod. Rate Ave. 1.00
0.00 0.00 0.00 0.00
Total Drycost 0.00
Manpower Duration Mandays
Unit P. Rate
Operator Ganger S US Days Operator Ganger
m 0 0 0 0 1.00 1.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
Totals 1.00 0.00 0

Manpower Duration Mandays


Unit P. Rate
Operator Ganger S US Days Operator Ganger
m 0 0 0 0 1.00 1.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
Totals 1.00 0.00 0
Manpower Duration Mandays
Unit P. Rate
Operator Ganger S US Days Operator Ganger
m 0 0 0 0 1.00 115.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
Totals 115.00 0.00 0

Manpower Duration Mandays


Unit P. Rate
Operator Ganger S US Days Operator Ganger
m 0 0 0 0 1.00 35.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 3 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
Totals 35.00 0.00 0
Manpower Duration Mandays
Unit P. Rate
Operator Ganger S US Days Operator Ganger
m 0 0 0 0 1.00 115.00 0.00 0
m3 0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
Totals 115.00 0.00 0

Manpower Duration Mandays


Unit P. Rate
Operator Ganger S US Days Operator Ganger
m 0 0 0 0 1.00 60.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
Totals 60.00 0.00 0

Manpower Duration Mandays


Unit P. Rate
Operator Ganger S US Days Operator Ganger
0 0 0 0 1.00 1.00 0.00 0
0 0 1 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
Totals 1.00 0.00 0

Manpower Duration Mandays


Unit P. Rate
Operator Ganger S US Days Operator Ganger
0 0 0 0 1.00 100.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
Totals 100.00 0.00 0

Manpower Duration Mandays


Unit P. Rate
Operator Ganger S US Days Operator Ganger
0 0 0 0 1.00 110.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
Totals 110.00 0.00 0
Manpower Duration Mandays
Unit P. Rate
Operator Ganger S US Days Operator Ganger
0 0 0 0 1.00 125.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
Totals 125.00 0.00 0

Manpower Duration Mandays


Unit P. Rate
Operator Ganger S US Days Operator Ganger
0 0 0 0 1.00 30.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
Totals 30.00 0.00 0

Manpower Duration Mandays


Unit P. Rate
Operator Ganger S US Days Operator Ganger
nr 0 0 0 0 1.00 50.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
Totals 50.00 0.00 0

Manpower Duration Mandays


Unit P. Rate
Operator Ganger S US Days Operator Ganger
nr 0 0.25 1 2 45.00 61.91 0.00 15.477778
0 0.5 1 2 45.00 61.91 0.00 30.955556
0 0.25 1 0 200.00 4.64 0.00 1.1608333
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
Totals 128.47 0.00 47.594167
Manpower Duration Mandays
Unit P. Rate
Operator Ganger S US Days Operator Ganger
nr 0 0 0 0 1.00 277.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 3 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
Totals 277.00 0.00 0

Manpower Duration Mandays


Unit P. Rate
Operator Ganger S US Days Operator Ganger
Lm 0 0 0 0 1.00 122.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 1 0 4.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
Totals 122.00 0.00 0

Manpower Duration Mandays


Unit P. Rate
Operator Ganger S US Days Operator Ganger
Lm 0 0 0 0 1.00 10.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 1 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
Totals 10.00 0.00 0

Manpower Duration Mandays


Unit P. Rate
Operator Ganger S US Days Operator Ganger
Lm 0 0 0 0 1.00 38.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 1 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
Totals 38.00 0.00 0

Manpower Duration Mandays


Unit P. Rate
Operator Ganger S US Days Operator Ganger
Lm 0 0 0 0 1.00 7.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
Totals 7.00 0.00 0
Manpower Duration Mandays
Unit P. Rate
Operator Ganger S US Days Operator Ganger
Lm 0 0 0 0 1.00 621.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
Totals 621.00 0.00 0

Manpower Duration Mandays


Unit P. Rate
Operator Ganger S US Days Operator Ganger
Lm 0 0 0 0 1.00 1242.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 1 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 100.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
Totals 1242.00 0.00 0

Manpower Duration Mandays


Unit P. Rate
Operator Ganger S US Days Operator Ganger
no 0 0 0 0 1.00 41.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
Totals 41.00 0.00 0

Manpower Duration Mandays


Unit P. Rate
Operator Ganger S US Days Operator Ganger
0 0 0 0 1.00 35.00 0.00 0
0 0 1 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
Totals 35.00 0.00 0

Manpower Duration Mandays


Unit P. Rate
Operator Ganger S US Days Operator Ganger
no 0 0 0 0 1.00 66.00 0.00 0
0 0 1 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
Totals 66.00 0.00 0

Manpower Duration Mandays


Unit P. Rate
Operator Ganger S US Days Operator Ganger
nr 0 0 0 0 1.00 58.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
Totals 58.00 0.00 0

Manpower Duration Mandays


Unit P. Rate
Operator Ganger S US Days Operator Ganger
nr 0 0 0 0 1.00 113.00 0.00 0
nr 0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
Totals 113.00 0.00 0
Manpower Duration Mandays
Unit P. Rate
Operator Ganger S US Days Operator Ganger
nr 0 0 0 0 1.00 3.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
Totals 3.00 0.00 0

Manpower Duration Mandays


Unit P. Rate
Operator Ganger S US Days Operator Ganger
nr 0 0 0 0 1.00 2.00 0.00 0
nr 0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
Totals 2.00 0.00 0

Manpower Duration Mandays


Unit P. Rate
Unit P. Rate
Operator Ganger S US Days Operator Ganger
nr 0 0 0 0 1.00 277.00 0.00 0
nr 0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
Totals 277.00 0.00 0

Manpower Duration Mandays


Unit P. Rate
Operator Ganger S US Days Operator Ganger
nr 0 0 0 0 1.00 122.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
Totals 122.00 0.00 0

Manpower Duration Mandays


Unit P. Rate
Operator Ganger S US Days Operator Ganger
nr 0 0 0 0 1.00 10.00 0.00 0
nr 0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
Totals 10.00 0.00 0

Manpower Duration Mandays


Unit P. Rate
Operator Ganger S US Days Operator Ganger
0 0 0 0 1.00 38.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 3 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
Totals 38.00 0.00 0

Manpower Duration Mandays


Unit P. Rate
Operator Ganger S US Days Operator Ganger
no 0 0 0 0 1.00 7.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
Totals 7.00 0.00 0
Manpower Duration Mandays
Unit P. Rate
Operator Ganger S US Days Operator Ganger
no 0 0 0 0 1.00 100.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
Totals 100.00 0.00 0

Manpower Duration Mandays


Unit P. Rate
Operator Ganger S US Days Operator Ganger
no 0 0 0 0 1.00 1.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
Totals 1.00 0.00 0
Manpower Duration Mandays
Unit P. Rate
Operator Ganger S US Days Operator Ganger
no 0 0 0 0 1.00 1.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
Totals 1.00 0.00 0

Manpower Duration Mandays


Unit P. Rate
Operator Ganger S US Days Operator Ganger
no 0 0 0 0 1.00 1.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
Totals 1.00 0.00 0

Manpower Duration Mandays


Unit P. Rate
Operator Ganger S US Days Operator Ganger
no 0 0 0 0 1.00 1.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
Totals 1.00 0.00 0

Manpower Duration Mandays


Unit P. Rate
Operator Ganger S US Days Operator Ganger
no 0 0 0 0 1.00 1.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
Totals 1.00 0.00 0

Manpower Duration Mandays


Unit P. Rate
Operator Ganger S US Days Operator Ganger
no 0 0 0 0 1.00 1.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
Totals 1.00 0.00 0
Manpower Duration Mandays
Unit P. Rate
Operator Ganger S US Days Operator Ganger
no 0 0 0 0 1.00 1.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
Totals 1.00 0.00 0

Manpower Duration Mandays


Unit P. Rate
Operator Ganger S US Days Operator Ganger
no 0 0 0 0 1.00 1.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
Totals 1.00 0.00 0
Manpower Duration Mandays
Unit P. Rate
Operator Ganger S US Days Operator Ganger
no 0 0 0 0 1.00 1.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
Totals 1.00 0.00 0

Manpower Duration Mandays


Unit P. Rate
Operator Ganger S US Days Operator Ganger
no 0 0 0 0 1.00 1.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
Totals 1.00 0.00 0

Manpower Duration Mandays


Unit P. Rate
Operator Ganger S US Days Operator Ganger
no 0 0 0 0 1.00 1.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
Totals 1.00 0.00 0

Manpower Duration Mandays


Unit P. Rate
Operator Ganger S US Days Operator Ganger
no= 0 0 0 0 1.00 1.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
Totals 1.00 0.00 0

Manpower Duration Mandays


Unit P. Rate
Operator Ganger S US Days Operator Ganger
no 0 0 0 0 1.00 1.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
Totals 1.00 0.00 0

Manpower Duration Mandays


Unit P. Rate
Operator Ganger S US Days Operator Ganger
no 0 0 0 0 1.00 1.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
Totals 1.00 0.00 0

Manpower Duration Mandays


Unit P. Rate
Operator Ganger S US Days Operator Ganger
no 0 0 0 0 1.00 1.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
Totals 1.00 0.00 0
Manpower Duration Mandays
Unit P. Rate
Operator Ganger S US Days Operator Ganger
no 0 0 0 0 1.00 1.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
Totals 1.00 0.00 0

Manpower Duration Mandays


Unit P. Rate
Operator Ganger S US Days Operator Ganger
no 0 0 0 0 1.00 1.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
Totals 1.00 0.00 0

Manpower Duration Mandays


Unit P. Rate
Operator Ganger S US Days Operator Ganger
no 0 0 0 0 1.00 1.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
Totals 1.00 0.00 0

Manpower Duration Mandays


Unit P. Rate
Operator Ganger S US Days Operator Ganger
no 0 0 0 0 1.00 1.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
Totals 1.00 0.00 0

Manpower Duration Mandays


Unit P. Rate
Operator Ganger S US Days Operator Ganger
no 0 0 0 0 1.00 1.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
Totals 1.00 0.00 0
Manpower Duration Mandays
Unit P. Rate
Operator Ganger S US Days Operator Ganger
no 0 0 0 0 1.00 1.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
Totals 1.00 0.00 0

Manpower Duration Mandays


Unit P. Rate
Operator Ganger S US Days Operator Ganger
no 0 0 0 0 1.00 1.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
Totals 1.00 0.00 0

Manpower Duration Mandays


Unit P. Rate
Unit P. Rate
Operator Ganger S US Days Operator Ganger
no 0 0 0 0 1.00 1.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
Totals 1.00 0.00 0

Manpower Duration Mandays


Unit P. Rate
Operator Ganger S US Days Operator Ganger
no 0 0 0 0 1.00 1.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
Totals 1.00 0.00 0

Manpower Duration Mandays


Unit P. Rate
Operator Ganger S US Days Operator Ganger
no 0 0 0 0 1.00 1.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
Totals 1.00 0.00 0

Manpower Duration Mandays


Unit P. Rate
Operator Ganger S US Days Operator Ganger
no 0 0 0 0 1.00 1.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
Totals 1.00 0.00 0

Manpower Duration Mandays


Unit P. Rate
Operator Ganger S US Days Operator Ganger
no 0 0 0 0 1.00 11.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
Totals 11.00 0.00 0
Manpower Duration Mandays
Unit P. Rate
Operator Ganger S US Days Operator Ganger
no 0 0 0 0 1.00 1.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
Totals 1.00 0.00 0

Manpower Duration Mandays


Unit P. Rate
Operator Ganger S US Days Operator Ganger
no 0 0 0 0 1.00 1.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
Totals 1.00 0.00 0

Manpower Duration Mandays


Unit P. Rate
Operator Ganger S US Days Operator Ganger
no 0 0 0 0 1.00 1.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
Totals 1.00 0.00 0

Manpower Duration Mandays


Unit P. Rate
Operator Ganger S US Days Operator Ganger
no 0 0 0 0 1.00 1.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
Totals 1.00 0.00 0

Manpower Duration Mandays


Unit P. Rate
Operator Ganger S US Days Operator Ganger
no 0 0 0 0 1.00 1.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
Totals 1.00 0.00 0
Manpower Duration Mandays
Unit P. Rate
Operator Ganger S US Days Operator Ganger
no 0 0 0 0 1.00 1.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
Totals 1.00 0.00 0

Manpower Duration Mandays


Unit P. Rate
Operator Ganger S US Days Operator Ganger
no 0 0 0 0 1.00 1.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
Totals 1.00 0.00 0
Manpower Duration Mandays
Unit P. Rate
Operator Ganger S US Days Operator Ganger
no 0 0 0 0 1.00 1.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
Totals 1.00 0.00 0

Manpower Duration Mandays


Unit P. Rate
Operator Ganger S US Days Operator Ganger
no 0 0 0 0 1.00 1.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
Totals 1.00 0.00 0

Manpower Duration Mandays


Unit P. Rate
Operator Ganger S US Days Operator Ganger
no 0 0 0 0 1.00 1.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
Totals 1.00 0.00 0

Manpower Duration Mandays


Unit P. Rate
Operator Ganger S US Days Operator Ganger
no 0 0 0 0 1.00 11.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
Totals 11.00 0.00 0

Manpower Duration Mandays


Unit P. Rate
Operator Ganger S US Days Operator Ganger
no 0 0 0 0 1.00 1.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
Totals 1.00 0.00 0
Manpower Duration Mandays
Unit P. Rate
Operator Ganger S US Days Operator Ganger
no 0 0 0 0 1.00 11.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
Totals 11.00 0.00 0

Manpower Duration Mandays


Unit P. Rate
Operator Ganger S US Days Operator Ganger
no 0 0 0 0 1.00 1.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
Totals 1.00 0.00 0

Manpower Duration Mandays


Unit P. Rate
Operator Ganger S US Days Operator Ganger
no 0 0 0 0 1.00 1.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
Totals 1.00 0.00 0

Manpower Duration Mandays


Unit P. Rate
Operator Ganger S US Days Operator Ganger
no 0 0 0 0 1.00 42.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
Totals 42.00 0.00 0

Manpower Duration Mandays


Unit P. Rate
Operator Ganger S US Days Operator Ganger
no 0 0 0 0 1.00 1360.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
Totals 1360.00 0.00 0
Manpower Duration Mandays
Unit P. Rate
Operator Ganger S US Days Operator Ganger
no 0 0 0 0 1.00 78.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
Totals 78.00 0.00 0

Manpower Duration Mandays


Unit P. Rate
Operator Ganger S US Days Operator Ganger
no 0 0 0 0 1.00 351.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
Totals 351.00 0.00 0
Manpower Duration Mandays
Unit P. Rate
Operator Ganger S US Days Operator Ganger
no 0 0 0 0 1.00 422.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
Totals 422.00 0.00 0

Manpower Duration Mandays


Unit P. Rate
Operator Ganger S US Days Operator Ganger
no 0 0 0 0 1.00 257.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
Totals 257.00 0.00 0

Manpower Duration Mandays


Unit P. Rate
Operator Ganger S US Days Operator Ganger
no 0 0 0 0 1.00 46.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
Totals 46.00 0.00 0

Manpower Duration Mandays


Unit P. Rate
Operator Ganger S US Days Operator Ganger
no 0 0 0 0 1.00 11.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
Totals 11.00 0.00 0

Manpower Duration Mandays


Unit P. Rate
Operator Ganger S US Days Operator Ganger
no 0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
Totals 0.00 0.00 0
Manpower Duration Mandays
Unit P. Rate
Operator Ganger S US Days Operator Ganger
no 0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
Totals 0.00 0.00 0

Manpower Duration Mandays


Unit P. Rate
Operator Ganger S US Days Operator Ganger
no 0 0 0 0 1.00 149.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
Totals 149.00 0.00 0

Manpower Duration Mandays


Unit P. Rate
Operator Ganger S US Days Operator Ganger
no 0 0 0 0 1.00 2.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
Totals 2.00 0.00 0

Manpower Duration Mandays


Unit P. Rate
Operator Ganger S US Days Operator Ganger
no 0 0 0 0 1.00 18.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
Totals 18.00 0.00 0

Manpower Duration Mandays


Unit P. Rate
Operator Ganger S US Days Operator Ganger
no 0 0 0 0 1.00 10.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
Totals 10.00 0.00 0
Manpower Duration Mandays
Unit P. Rate
Operator Ganger S US Days Operator Ganger
no 0 0 0 0 1.00 11.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
Totals 11.00 0.00 0

Manpower Duration Mandays


Unit P. Rate
Operator Ganger S US Days Operator Ganger
no 0 0 0 0 1.00 31.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
Totals 31.00 0.00 0
Manpower Duration Mandays
Unit P. Rate
Operator Ganger S US Days Operator Ganger
no 0 0 0 0 1.00 57.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
Totals 57.00 0.00 0

Manpower Duration Mandays


Unit P. Rate
Operator Ganger S US Days Operator Ganger
no 0 0 0 0 1.00 45.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
Totals 45.00 0.00 0

Manpower Duration Mandays


Unit P. Rate
Operator Ganger S US Days Operator Ganger
no 0 0 0 0 1.00 1000.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
Totals 1000.00 0.00 0

Manpower Duration Mandays


Unit P. Rate
Operator Ganger S US Days Operator Ganger
no 0 0 0 0 1.00 51.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
Totals 51.00 0.00 0

Manpower Duration Mandays


Unit P. Rate
Operator Ganger S US Days Operator Ganger
no 0 0 0 0 1.00 1009.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
Totals 1009.00 0.00 0
Manpower Duration Mandays
Unit P. Rate
Operator Ganger S US Days Operator Ganger
no 0 0 0 0 1.00 1.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
Totals 1.00 0.00 0

Manpower Duration Mandays


Unit P. Rate
Operator Ganger S US Days Operator Ganger
no 0 0 0 0 1.00 30.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
Totals 30.00 0.00 0

Manpower Duration Mandays


Unit P. Rate
Operator Ganger S US Days Operator Ganger
no 0 0 0 0 1.00 30.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
Totals 30.00 0.00 0

Manpower Duration Mandays


Unit P. Rate
Operator Ganger S US Days Operator Ganger
no 0 0 0 0 1.00 473.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
Totals 473.00 0.00 0

Manpower Duration Mandays


Unit P. Rate
Operator Ganger S US Days Operator Ganger
no 0 0 0 0 1.00 3.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
Totals 3.00 0.00 0
Manpower Duration Mandays
Unit P. Rate
Operator Ganger S US Days Operator Ganger
no 0 0 0 0 1.00 4.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
Totals 4.00 0.00 0

Manpower Duration Mandays


Unit P. Rate
Operator Ganger S US Days Operator Ganger
no 0 0 0 0 1.00 4.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
Totals 4.00 0.00 0
Manpower Duration Mandays
Unit P. Rate
Operator Ganger S US Days Operator Ganger
no 0 0 0 0 1.00 18.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
Totals 18.00 0.00 0

Manpower Duration Mandays


Unit P. Rate
Operator Ganger S US Days Operator Ganger
no 0 0 0 0 1.00 4.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
Totals 4.00 0.00 0

Manpower Duration Mandays


Unit P. Rate
Operator Ganger S US Days Operator Ganger
no 0 0 0 0 1.00 1.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
Totals 1.00 0.00 0

Manpower Duration Mandays


Unit P. Rate
Operator Ganger S US Days Operator Ganger
no 0 0 0 0 1.00 5.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
Totals 5.00 0.00 0

Manpower Duration Mandays


Unit P. Rate
Operator Ganger S US Days Operator Ganger
no 0 0 0 0 1.00 1.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
Totals 1.00 0.00 0
Manpower Duration Mandays
Unit P. Rate
Operator Ganger S US Days Operator Ganger
no 0 0 0 0 1.00 500.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
Totals 500.00 0.00 0

Manpower Duration Mandays


Unit P. Rate
Operator Ganger S US Days Operator Ganger
no 0 0 0 0 1.00 250.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
Totals 250.00 0.00 0

Manpower Duration Mandays


Unit P. Rate
Operator Ganger S US Days Operator Ganger
no 0 0 0 0 1.00 1.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
Totals 1.00 0.00 0

Manpower Duration Mandays


Unit P. Rate
Operator Ganger S US Days Operator Ganger
no 0 0 0 0 1.00 1.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
Totals 1.00 0.00 0

Manpower Duration Mandays


Unit P. Rate
Unit P. Rate
Operator Ganger S US Days Operator Ganger
no 0 0 0 0 1.00 1.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
Totals 1.00 0.00 0

Manpower Duration Mandays


Unit P. Rate
Operator Ganger S US Days Operator Ganger
no 0 0 0 0 1.00 1.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
Totals 1.00 0.00 0

Manpower Duration Mandays


Unit P. Rate
Operator Ganger S US Days Operator Ganger
no 0 0 0 0 1.00 1.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
Totals 1.00 0.00 0

Manpower Duration Mandays


Unit P. Rate
Operator Ganger S US Days Operator Ganger
no 0 0 0 0 1.00 27.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
Totals 27.00 0.00 0

Manpower Duration Mandays


Unit P. Rate
Operator Ganger S US Days Operator Ganger
no 0 0 0 0 1.00 27.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
Totals 27.00 0.00 0

Manpower Duration Mandays


Unit P. Rate
Operator Ganger S US Days Operator Ganger
no 0 0 0 0 1.00 27.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
Totals 27.00 0.00 0

Manpower Duration Mandays


Unit P. Rate
Operator Ganger S US Days Operator Ganger
no 0 0 0 0 1.00 27.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
Totals 27.00 0.00 0
Manpower Duration Mandays
Unit P. Rate
Operator Ganger S US Days Operator Ganger
no 0 0 0 0 1.00 135.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
0 0 0 0 1.00 0.00 0.00 0
Totals 135.00 0.00 0

Duration
Mandays
Operator
Ganger
S
US
Total
Mandays Duration 1
S US Total Mandays
0 0 0 Operator 0
0 0 0 Ganger 0
0 0 0 S 0
0 0 0 US 0
0 0 0 Total 0
0 0 0
0 0 0
0 0 0
0 0 0

Mandays Duration 1
S US Total Mandays
0 0 0 Operator 0
0 0 0 Ganger 0
0 0 0 S 0
0 0 0 US 0
0 0 0 Total 0
0 0 0
0 0 0
0 0 0
0 0 0
Mandays Duration 115
S US Total Mandays
0 0 0 Operator 0
0 0 0 Ganger 0
0 0 0 S 0
0 0 0 US 0
0 0 0 Total 0
0 0 0
0 0 0
0 0 0
0 0 0

Mandays Duration 35
S US Total Mandays
0 0 0 Operator 0
0 0 0 Ganger 0
0 0 0 S 0
0 0 0 US 0
0 0 0 Total 0
0 0 0
0 0 0
0 0 0
0 0 0
Mandays Duration 115
S US Total Mandays
0 0 0 Operator 0
0 0 0 Ganger 0
0 0 0 S 0
0 0 0 US 0
0 0 0 Total 0
0 0 0
0 0 0
0 0 0
0 0 0

Mandays Duration 60
S US Total Mandays
0 0 0 Operator 0
0 0 0 Ganger 0
0 0 0 S 0
0 0 0 US 0
0 0 0 Total 0
0 0 0
0 0 0
0 0 0
0 0 0

Mandays Duration 1
S US Total Mandays
0 0 0 Operator 0
0 0 0 Ganger 0
0 0 0 S 0
0 0 0 US 0
0 0 0 Total 0
0 0 0
0 0 0
0 0 0
0 0 0

Mandays Duration 100


S US Total Mandays
0 0 0 Operator 0
0 0 0 Ganger 0
0 0 0 S 0
0 0 0 US 0
0 0 0 Total 0
0 0 0
0 0 0
0 0 0
0 0 0

Mandays Duration 110


S US Total Mandays
0 0 0 Operator 0
0 0 0 Ganger 0
0 0 0 S 0
0 0 0 US 0
0 0 0 Total 0
0 0 0
0 0 0
0 0 0
0 0 0
Mandays Duration 125
S US Total Mandays
0 0 0 Operator 0
0 0 0 Ganger 0
0 0 0 S 0
0 0 0 US 0
0 0 0 Total 0
0 0 0
0 0 0
0 0 0
0 0 0

Mandays Duration 30
S US Total Mandays
0 0 0 Operator 0
0 0 0 Ganger 0
0 0 0 S 0
0 0 0 US 0
0 0 0 Total 0
0 0 0
0 0 0
0 0 0
0 0 0

Mandays Duration 50
S US Total Mandays
0 0 0 Operator 0
0 0 0 Ganger 0
0 0 0 S 0
0 0 0 US 0
0 0 0 Total 0
0 0 0
0 0 0
0 0 0
0 0 0

Mandays Duration 61.911111


S US Total Mandays
61.911111 123.82222 201.21111 Operator 0
61.911111 123.82222 216.68889 Ganger 47.594167
4.6433333 0 5.8041667 S 128.46556
0 0 0 US 247.64444
0 0 0 Total 423.70417
0 0 0
0 0 0
0 0 0
128.46556 247.64444 423.70417
Mandays Duration 277
S US Total Mandays
0 0 0 Operator 0
0 0 0 Ganger 0
0 0 0 S 0
0 0 0 US 0
0 0 0 Total 0
0 0 0
0 0 0
0 0 0
0 0 0

Mandays Duration 122


S US Total Mandays
0 0 0 Operator 0
0 0 0 Ganger 0
0 0 0 S 0
0 0 0 US 0
0 0 0 Total 0
0 0 0
0 0 0
0 0 0
0 0 0

Mandays Duration 10
S US Total Mandays
0 0 0 Operator 0
0 0 0 Ganger 0
0 0 0 S 0
0 0 0 US 0
0 0 0 Total 0
0 0 0
0 0 0
0 0 0
0 0 0

Mandays Duration 38
S US Total Mandays
0 0 0 Operator 0
0 0 0 Ganger 0
0 0 0 S 0
0 0 0 US 0
0 0 0 Total 0
0 0 0
0 0 0
0 0 0
0 0 0

Mandays Duration 7
S US Total Mandays
0 0 0 Operator 0
0 0 0 Ganger 0
0 0 0 S 0
0 0 0 US 0
0 0 0 Total 0
0 0 0
0 0 0
0 0 0
0 0 0
Mandays Duration 621
S US Total Mandays
0 0 0 Operator 0
0 0 0 Ganger 0
0 0 0 S 0
0 0 0 US 0
0 0 0 Total 0
0 0 0
0 0 0
0 0 0
0 0 0

Mandays Duration 1242


S US Total Mandays
0 0 0 Operator 0
0 0 0 Ganger 0
0 0 0 S 0
0 0 0 US 0
0 0 0 Total 0
0 0 0
0 0 0
0 0 0
0 0 0

Mandays Duration 41
S US Total Mandays
0 0 0 Operator 0
0 0 0 Ganger 0
0 0 0 S 0
0 0 0 US 0
0 0 0 Total 0
0 0 0
0 0 0
0 0 0
0 0 0

Mandays Duration 35
S US Total Mandays
0 0 0 Operator 0
0 0 0 Ganger 0
0 0 0 S 0
0 0 0 US 0
0 0 0 Total 0
0 0 0
0 0 0
0 0 0
0 0 0

Mandays Duration 66
S US Total Mandays
0 0 0 Operator 0
0 0 0 Ganger 0
0 0 0 S 0
0 0 0 US 0
0 0 0 Total 0
0 0 0
0 0 0
0 0 0
0 0 0

Mandays Duration 58
S US Total Mandays
0 0 0 Operator 0
0 0 0 Ganger 0
0 0 0 S 0
0 0 0 US 0
0 0 0 Total 0
0 0 0
0 0 0
0 0 0
0 0 0

Mandays Duration 113


S US Total Mandays
0 0 0 Operator 0
0 0 0 Ganger 0
0 0 0 S 0
0 0 0 US 0
0 0 0 Total 0
0 0 0
0 0 0
0 0 0
0 0 0
Mandays Duration 3
S US Total Mandays
0 0 0 Operator 0
0 0 0 Ganger 0
0 0 0 S 0
0 0 0 US 0
0 0 0 Total 0
0 0 0
0 0 0
0 0 0
0 0 0

Mandays Duration 2
S US Total Mandays
0 0 0 Operator 0
0 0 0 Ganger 0
0 0 0 S 0
0 0 0 US 0
0 0 0 Total 0
0 0 0
0 0 0
0 0 0
0 0 0

Mandays Duration 277


S US Total Mandays
0 0 0 Operator 0
0 0 0 Ganger 0
0 0 0 S 0
0 0 0 US 0
0 0 0 Total 0
0 0 0
0 0 0
0 0 0
0 0 0

Mandays Duration 122


S US Total Mandays
0 0 0 Operator 0
0 0 0 Ganger 0
0 0 0 S 0
0 0 0 US 0
0 0 0 Total 0
0 0 0
0 0 0
0 0 0
0 0 0

Mandays Duration 10
S US Total Mandays
0 0 0 Operator 0
0 0 0 Ganger 0
0 0 0 S 0
0 0 0 US 0
0 0 0 Total 0
0 0 0
0 0 0
0 0 0
0 0 0

Mandays Duration 38
S US Total Mandays
0 0 0 Operator 0
0 0 0 Ganger 0
0 0 0 S 0
0 0 0 US 0
0 0 0 Total 0
0 0 0
0 0 0
0 0 0
0 0 0

Mandays Duration 7
S US Total Mandays
0 0 0 Operator 0
0 0 0 Ganger 0
0 0 0 S 0
0 0 0 US 0
0 0 0 Total 0
0 0 0
0 0 0
0 0 0
0 0 0
Mandays Duration 100
S US Total Mandays
0 0 0 Operator 0
0 0 0 Ganger 0
0 0 0 S 0
0 0 0 US 0
0 0 0 Total 0
0 0 0
0 0 0
0 0 0
0 0 0

Mandays Duration 1
S US Total Mandays
0 0 0 Operator 0
0 0 0 Ganger 0
0 0 0 S 0
0 0 0 US 0
0 0 0 Total 0
0 0 0
0 0 0
0 0 0
0 0 0
Mandays Duration 1
S US Total Mandays
0 0 0 Operator 0
0 0 0 Ganger 0
0 0 0 S 0
0 0 0 US 0
0 0 0 Total 0
0 0 0
0 0 0
0 0 0
0 0 0

Mandays Duration 1
S US Total Mandays
0 0 0 Operator 0
0 0 0 Ganger 0
0 0 0 S 0
0 0 0 US 0
0 0 0 Total 0
0 0 0
0 0 0
0 0 0
0 0 0

Mandays Duration 1
S US Total Mandays
0 0 0 Operator 0
0 0 0 Ganger 0
0 0 0 S 0
0 0 0 US 0
0 0 0 Total 0
0 0 0
0 0 0
0 0 0
0 0 0

Mandays Duration 1
S US Total Mandays
0 0 0 Operator 0
0 0 0 Ganger 0
0 0 0 S 0
0 0 0 US 0
0 0 0 Total 0
0 0 0
0 0 0
0 0 0
0 0 0

Mandays Duration 1
S US Total Mandays
0 0 0 Operator 0
0 0 0 Ganger 0
0 0 0 S 0
0 0 0 US 0
0 0 0 Total 0
0 0 0
0 0 0
0 0 0
0 0 0
Mandays Duration 1
S US Total Mandays
0 0 0 Operator 0
0 0 0 Ganger 0
0 0 0 S 0
0 0 0 US 0
0 0 0 Total 0
0 0 0
0 0 0
0 0 0
0 0 0

Mandays Duration 1
S US Total Mandays
0 0 0 Operator 0
0 0 0 Ganger 0
0 0 0 S 0
0 0 0 US 0
0 0 0 Total 0
0 0 0
0 0 0
0 0 0
0 0 0
Mandays Duration 1
S US Total Mandays
0 0 0 Operator 0
0 0 0 Ganger 0
0 0 0 S 0
0 0 0 US 0
0 0 0 Total 0
0 0 0
0 0 0
0 0 0
0 0 0

Mandays Duration 1
S US Total Mandays
0 0 0 Operator 0
0 0 0 Ganger 0
0 0 0 S 0
0 0 0 US 0
0 0 0 Total 0
0 0 0
0 0 0
0 0 0
0 0 0

Mandays Duration 1
S US Total Mandays
0 0 0 Operator 0
0 0 0 Ganger 0
0 0 0 S 0
0 0 0 US 0
0 0 0 Total 0
0 0 0
0 0 0
0 0 0
0 0 0

Mandays Duration 1
S US Total Mandays
0 0 0 Operator 0
0 0 0 Ganger 0
0 0 0 S 0
0 0 0 US 0
0 0 0 Total 0
0 0 0
0 0 0
0 0 0
0 0 0

Mandays Duration 1
S US Total Mandays
0 0 0 Operator 0
0 0 0 Ganger 0
0 0 0 S 0
0 0 0 US 0
0 0 0 Total 0
0 0 0
0 0 0
0 0 0
0 0 0

Mandays Duration 1
S US Total Mandays
0 0 0 Operator 0
0 0 0 Ganger 0
0 0 0 S 0
0 0 0 US 0
0 0 0 Total 0
0 0 0
0 0 0
0 0 0
0 0 0

Mandays Duration 1
S US Total Mandays
0 0 0 Operator 0
0 0 0 Ganger 0
0 0 0 S 0
0 0 0 US 0
0 0 0 Total 0
0 0 0
0 0 0
0 0 0
0 0 0
Mandays Duration 1
S US Total Mandays
0 0 0 Operator 0
0 0 0 Ganger 0
0 0 0 S 0
0 0 0 US 0
0 0 0 Total 0
0 0 0
0 0 0
0 0 0
0 0 0

Mandays Duration 1
S US Total Mandays
0 0 0 Operator 0
0 0 0 Ganger 0
0 0 0 S 0
0 0 0 US 0
0 0 0 Total 0
0 0 0
0 0 0
0 0 0
0 0 0

Mandays Duration 1
S US Total Mandays
0 0 0 Operator 0
0 0 0 Ganger 0
0 0 0 S 0
0 0 0 US 0
0 0 0 Total 0
0 0 0
0 0 0
0 0 0
0 0 0

Mandays Duration 1
S US Total Mandays
0 0 0 Operator 0
0 0 0 Ganger 0
0 0 0 S 0
0 0 0 US 0
0 0 0 Total 0
0 0 0
0 0 0
0 0 0
0 0 0

Mandays Duration 1
S US Total Mandays
0 0 0 Operator 0
0 0 0 Ganger 0
0 0 0 S 0
0 0 0 US 0
0 0 0 Total 0
0 0 0
0 0 0
0 0 0
0 0 0
Mandays Duration 1
S US Total Mandays
0 0 0 Operator 0
0 0 0 Ganger 0
0 0 0 S 0
0 0 0 US 0
0 0 0 Total 0
0 0 0
0 0 0
0 0 0
0 0 0

Mandays Duration 1
S US Total Mandays
0 0 0 Operator 0
0 0 0 Ganger 0
0 0 0 S 0
0 0 0 US 0
0 0 0 Total 0
0 0 0
0 0 0
0 0 0
0 0 0

Mandays Duration 1
S US Total Mandays
0 0 0 Operator 0
0 0 0 Ganger 0
0 0 0 S 0
0 0 0 US 0
0 0 0 Total 0
0 0 0
0 0 0
0 0 0
0 0 0

Mandays Duration 1
S US Total Mandays
0 0 0 Operator 0
0 0 0 Ganger 0
0 0 0 S 0
0 0 0 US 0
0 0 0 Total 0
0 0 0
0 0 0
0 0 0
0 0 0

Mandays Duration 1
S US Total Mandays
0 0 0 Operator 0
0 0 0 Ganger 0
0 0 0 S 0
0 0 0 US 0
0 0 0 Total 0
0 0 0
0 0 0
0 0 0
0 0 0

Mandays Duration 1
S US Total Mandays
0 0 0 Operator 0
0 0 0 Ganger 0
0 0 0 S 0
0 0 0 US 0
0 0 0 Total 0
0 0 0
0 0 0
0 0 0
0 0 0

Mandays Duration 11
S US Total Mandays
0 0 0 Operator 0
0 0 0 Ganger 0
0 0 0 S 0
0 0 0 US 0
0 0 0 Total 0
0 0 0
0 0 0
0 0 0
0 0 0
Mandays Duration 1
S US Total Mandays
0 0 0 Operator 0
0 0 0 Ganger 0
0 0 0 S 0
0 0 0 US 0
0 0 0 Total 0
0 0 0
0 0 0
0 0 0
0 0 0

Mandays Duration 1
S US Total Mandays
0 0 0 Operator 0
0 0 0 Ganger 0
0 0 0 S 0
0 0 0 US 0
0 0 0 Total 0
0 0 0
0 0 0
0 0 0
0 0 0

Mandays Duration 1
S US Total Mandays
0 0 0 Operator 0
0 0 0 Ganger 0
0 0 0 S 0
0 0 0 US 0
0 0 0 Total 0
0 0 0
0 0 0
0 0 0
0 0 0

Mandays Duration 1
S US Total Mandays
0 0 0 Operator 0
0 0 0 Ganger 0
0 0 0 S 0
0 0 0 US 0
0 0 0 Total 0
0 0 0
0 0 0
0 0 0
0 0 0

Mandays Duration 1
S US Total Mandays
0 0 0 Operator 0
0 0 0 Ganger 0
0 0 0 S 0
0 0 0 US 0
0 0 0 Total 0
0 0 0
0 0 0
0 0 0
0 0 0
Mandays Duration 1
S US Total Mandays
0 0 0 Operator 0
0 0 0 Ganger 0
0 0 0 S 0
0 0 0 US 0
0 0 0 Total 0
0 0 0
0 0 0
0 0 0
0 0 0

Mandays Duration 1
S US Total Mandays
0 0 0 Operator 0
0 0 0 Ganger 0
0 0 0 S 0
0 0 0 US 0
0 0 0 Total 0
0 0 0
0 0 0
0 0 0
0 0 0
Mandays Duration 1
S US Total Mandays
0 0 0 Operator 0
0 0 0 Ganger 0
0 0 0 S 0
0 0 0 US 0
0 0 0 Total 0
0 0 0
0 0 0
0 0 0
0 0 0

Mandays Duration 1
S US Total Mandays
0 0 0 Operator 0
0 0 0 Ganger 0
0 0 0 S 0
0 0 0 US 0
0 0 0 Total 0
0 0 0
0 0 0
0 0 0
0 0 0

Mandays Duration 1
S US Total Mandays
0 0 0 Operator 0
0 0 0 Ganger 0
0 0 0 S 0
0 0 0 US 0
0 0 0 Total 0
0 0 0
0 0 0
0 0 0
0 0 0

Mandays Duration 11
S US Total Mandays
0 0 0 Operator 0
0 0 0 Ganger 0
0 0 0 S 0
0 0 0 US 0
0 0 0 Total 0
0 0 0
0 0 0
0 0 0
0 0 0

Mandays Duration 1
S US Total Mandays
0 0 0 Operator 0
0 0 0 Ganger 0
0 0 0 S 0
0 0 0 US 0
0 0 0 Total 0
0 0 0
0 0 0
0 0 0
0 0 0
Mandays Duration 11
S US Total Mandays
0 0 0 Operator 0
0 0 0 Ganger 0
0 0 0 S 0
0 0 0 US 0
0 0 0 Total 0
0 0 0
0 0 0
0 0 0
0 0 0

Mandays Duration 1
S US Total Mandays
0 0 0 Operator 0
0 0 0 Ganger 0
0 0 0 S 0
0 0 0 US 0
0 0 0 Total 0
0 0 0
0 0 0
0 0 0
0 0 0

Mandays Duration 1
S US Total Mandays
0 0 0 Operator 0
0 0 0 Ganger 0
0 0 0 S 0
0 0 0 US 0
0 0 0 Total 0
0 0 0
0 0 0
0 0 0
0 0 0

Mandays Duration 42
S US Total Mandays
0 0 0 Operator 0
0 0 0 Ganger 0
0 0 0 S 0
0 0 0 US 0
0 0 0 Total 0
0 0 0
0 0 0
0 0 0
0 0 0

Mandays Duration 1360


S US Total Mandays
0 0 0 Operator 0
0 0 0 Ganger 0
0 0 0 S 0
0 0 0 US 0
0 0 0 Total 0
0 0 0
0 0 0
0 0 0
0 0 0
Mandays Duration 78
S US Total Mandays
0 0 0 Operator 0
0 0 0 Ganger 0
0 0 0 S 0
0 0 0 US 0
0 0 0 Total 0
0 0 0
0 0 0
0 0 0
0 0 0

Mandays Duration 351


S US Total Mandays
0 0 0 Operator 0
0 0 0 Ganger 0
0 0 0 S 0
0 0 0 US 0
0 0 0 Total 0
0 0 0
0 0 0
0 0 0
0 0 0
Mandays Duration 422
S US Total Mandays
0 0 0 Operator 0
0 0 0 Ganger 0
0 0 0 S 0
0 0 0 US 0
0 0 0 Total 0
0 0 0
0 0 0
0 0 0
0 0 0

Mandays Duration 257


S US Total Mandays
0 0 0 Operator 0
0 0 0 Ganger 0
0 0 0 S 0
0 0 0 US 0
0 0 0 Total 0
0 0 0
0 0 0
0 0 0
0 0 0

Mandays Duration 46
S US Total Mandays
0 0 0 Operator 0
0 0 0 Ganger 0
0 0 0 S 0
0 0 0 US 0
0 0 0 Total 0
0 0 0
0 0 0
0 0 0
0 0 0

Mandays Duration 11
S US Total Mandays
0 0 0 Operator 0
0 0 0 Ganger 0
0 0 0 S 0
0 0 0 US 0
0 0 0 Total 0
0 0 0
0 0 0
0 0 0
0 0 0

Mandays Duration 0
S US Total Mandays
0 0 0 Operator 0
0 0 0 Ganger 0
0 0 0 S 0
0 0 0 US 0
0 0 0 Total 0
0 0 0
0 0 0
0 0 0
0 0 0
Mandays Duration 0
S US Total Mandays
0 0 0 Operator 0
0 0 0 Ganger 0
0 0 0 S 0
0 0 0 US 0
0 0 0 Total 0
0 0 0
0 0 0
0 0 0
0 0 0

Mandays Duration 149


S US Total Mandays
0 0 0 Operator 0
0 0 0 Ganger 0
0 0 0 S 0
0 0 0 US 0
0 0 0 Total 0
0 0 0
0 0 0
0 0 0
0 0 0

Mandays Duration 2
S US Total Mandays
0 0 0 Operator 0
0 0 0 Ganger 0
0 0 0 S 0
0 0 0 US 0
0 0 0 Total 0
0 0 0
0 0 0
0 0 0
0 0 0

Mandays Duration 18
S US Total Mandays
0 0 0 Operator 0
0 0 0 Ganger 0
0 0 0 S 0
0 0 0 US 0
0 0 0 Total 0
0 0 0
0 0 0
0 0 0
0 0 0

Mandays Duration 10
S US Total Mandays
0 0 0 Operator 0
0 0 0 Ganger 0
0 0 0 S 0
0 0 0 US 0
0 0 0 Total 0
0 0 0
0 0 0
0 0 0
0 0 0
Mandays Duration 11
S US Total Mandays
0 0 0 Operator 0
0 0 0 Ganger 0
0 0 0 S 0
0 0 0 US 0
0 0 0 Total 0
0 0 0
0 0 0
0 0 0
0 0 0

Mandays Duration 31
S US Total Mandays
0 0 0 Operator 0
0 0 0 Ganger 0
0 0 0 S 0
0 0 0 US 0
0 0 0 Total 0
0 0 0
0 0 0
0 0 0
0 0 0
Mandays Duration 57
S US Total Mandays
0 0 0 Operator 0
0 0 0 Ganger 0
0 0 0 S 0
0 0 0 US 0
0 0 0 Total 0
0 0 0
0 0 0
0 0 0
0 0 0

Mandays Duration 45
S US Total Mandays
0 0 0 Operator 0
0 0 0 Ganger 0
0 0 0 S 0
0 0 0 US 0
0 0 0 Total 0
0 0 0
0 0 0
0 0 0
0 0 0

Mandays Duration 1000


S US Total Mandays
0 0 0 Operator 0
0 0 0 Ganger 0
0 0 0 S 0
0 0 0 US 0
0 0 0 Total 0
0 0 0
0 0 0
0 0 0
0 0 0

Mandays Duration 51
S US Total Mandays
0 0 0 Operator 0
0 0 0 Ganger 0
0 0 0 S 0
0 0 0 US 0
0 0 0 Total 0
0 0 0
0 0 0
0 0 0
0 0 0

Mandays Duration 1009


S US Total Mandays
0 0 0 Operator 0
0 0 0 Ganger 0
0 0 0 S 0
0 0 0 US 0
0 0 0 Total 0
0 0 0
0 0 0
0 0 0
0 0 0
Mandays Duration 1
S US Total Mandays
0 0 0 Operator 0
0 0 0 Ganger 0
0 0 0 S 0
0 0 0 US 0
0 0 0 Total 0
0 0 0
0 0 0
0 0 0
0 0 0

Mandays Duration 30
S US Total Mandays
0 0 0 Operator 0
0 0 0 Ganger 0
0 0 0 S 0
0 0 0 US 0
0 0 0 Total 0
0 0 0
0 0 0
0 0 0
0 0 0

Mandays Duration 30
S US Total Mandays
0 0 0 Operator 0
0 0 0 Ganger 0
0 0 0 S 0
0 0 0 US 0
0 0 0 Total 0
0 0 0
0 0 0
0 0 0
0 0 0

Mandays Duration 473


S US Total Mandays
0 0 0 Operator 0
0 0 0 Ganger 0
0 0 0 S 0
0 0 0 US 0
0 0 0 Total 0
0 0 0
0 0 0
0 0 0
0 0 0

Mandays Duration 3
S US Total Mandays
0 0 0 Operator 0
0 0 0 Ganger 0
0 0 0 S 0
0 0 0 US 0
0 0 0 Total 0
0 0 0
0 0 0
0 0 0
0 0 0
Mandays Duration 4
S US Total Mandays
0 0 0 Operator 0
0 0 0 Ganger 0
0 0 0 S 0
0 0 0 US 0
0 0 0 Total 0
0 0 0
0 0 0
0 0 0
0 0 0

Mandays Duration 4
S US Total Mandays
0 0 0 Operator 0
0 0 0 Ganger 0
0 0 0 S 0
0 0 0 US 0
0 0 0 Total 0
0 0 0
0 0 0
0 0 0
0 0 0
Mandays Duration 18
S US Total Mandays
0 0 0 Operator 0
0 0 0 Ganger 0
0 0 0 S 0
0 0 0 US 0
0 0 0 Total 0
0 0 0
0 0 0
0 0 0
0 0 0

Mandays Duration 4
S US Total Mandays
0 0 0 Operator 0
0 0 0 Ganger 0
0 0 0 S 0
0 0 0 US 0
0 0 0 Total 0
0 0 0
0 0 0
0 0 0
0 0 0

Mandays Duration 1
S US Total Mandays
0 0 0 Operator 0
0 0 0 Ganger 0
0 0 0 S 0
0 0 0 US 0
0 0 0 Total 0
0 0 0
0 0 0
0 0 0
0 0 0

Mandays Duration 5
S US Total Mandays
0 0 0 Operator 0
0 0 0 Ganger 0
0 0 0 S 0
0 0 0 US 0
0 0 0 Total 0
0 0 0
0 0 0
0 0 0
0 0 0

Mandays Duration 1
S US Total Mandays
0 0 0 Operator 0
0 0 0 Ganger 0
0 0 0 S 0
0 0 0 US 0
0 0 0 Total 0
0 0 0
0 0 0
0 0 0
0 0 0
Mandays Duration 500
S US Total Mandays
0 0 0 Operator 0
0 0 0 Ganger 0
0 0 0 S 0
0 0 0 US 0
0 0 0 Total 0
0 0 0
0 0 0
0 0 0
0 0 0

Mandays Duration 250


S US Total Mandays
0 0 0 Operator 0
0 0 0 Ganger 0
0 0 0 S 0
0 0 0 US 0
0 0 0 Total 0
0 0 0
0 0 0
0 0 0
0 0 0

Mandays Duration 1
S US Total Mandays
0 0 0 Operator 0
0 0 0 Ganger 0
0 0 0 S 0
0 0 0 US 0
0 0 0 Total 0
0 0 0
0 0 0
0 0 0
0 0 0

Mandays Duration 1
S US Total Mandays
0 0 0 Operator 0
0 0 0 Ganger 0
0 0 0 S 0
0 0 0 US 0
0 0 0 Total 0
0 0 0
0 0 0
0 0 0
0 0 0

Mandays Duration 1
S US Total Mandays
0 0 0 Operator 0
0 0 0 Ganger 0
0 0 0 S 0
0 0 0 US 0
0 0 0 Total 0
0 0 0
0 0 0
0 0 0
0 0 0

Mandays Duration 1
S US Total Mandays
0 0 0 Operator 0
0 0 0 Ganger 0
0 0 0 S 0
0 0 0 US 0
0 0 0 Total 0
0 0 0
0 0 0
0 0 0
0 0 0

Mandays Duration 1
S US Total Mandays
0 0 0 Operator 0
0 0 0 Ganger 0
0 0 0 S 0
0 0 0 US 0
0 0 0 Total 0
0 0 0
0 0 0
0 0 0
0 0 0

Mandays Duration 27
S US Total Mandays
0 0 0 Operator 0
0 0 0 Ganger 0
0 0 0 S 0
0 0 0 US 0
0 0 0 Total 0
0 0 0
0 0 0
0 0 0
0 0 0

Mandays Duration 27
S US Total Mandays
0 0 0 Operator 0
0 0 0 Ganger 0
0 0 0 S 0
0 0 0 US 0
0 0 0 Total 0
0 0 0
0 0 0
0 0 0
0 0 0

Mandays Duration 27
S US Total Mandays
0 0 0 Operator 0
0 0 0 Ganger 0
0 0 0 S 0
0 0 0 US 0
0 0 0 Total 0
0 0 0
0 0 0
0 0 0
0 0 0

Mandays Duration 27
S US Total Mandays
0 0 0 Operator 0
0 0 0 Ganger 0
0 0 0 S 0
0 0 0 US 0
0 0 0 Total 0
0 0 0
0 0 0
0 0 0
0 0 0
Mandays Duration 135
S US Total Mandays
0 0 0 Operator 0
0 0 0 Ganger 0
0 0 0 S 0
0 0 0 US 0
0 0 0 Total 0
0 0 0
0 0 0
0 0 0
0 0 0

10587.911
Mandays
0
47.594167
128.46556
247.64444
423.70417
Earthing System
1 (01) LV. EARTHING

(01) Supply, install, connect and test of earthing system complete as specified and as
shown in the drawings the unit price shall be lump sum including earthing rods,
earthing inspection pits, earthing cables, test links, equalizer bars, excavation and
backfilling and all necessary accessories and ancillary works associated with earthing
installation.
,to give resistance not more than 3 ohm
(02) LC. EARTHING
as above but.to give resistance not more than 0.5 ohm

2 LV Cables
Supply, install, connect and test of low voltage copper cables installed on cable trays /
in trenches complete including UPVC conduites ,fire barrier,cable
trays,taging ,terminls and all necessary accessories and ancillary works as described in
the technical specifications and as shown in the drawings.
(02.01) Multicore PVC/PVC Insulated copper cables:-
(02.01.01)3*95+50+50 mm2
(02.01.01)3*70+35+35 mm2
(02.01.02) 3*50+25+25 mm2
(02.01.03)4*35+25 mm2
(02.01.03)4*25+25 mm2
(02.01.04) 5* 16 mm2
(02.01.05) 5* 10 mm2
(02.01.06) 5*6 mm2
(02.01.07) 5*4 mm2
(02.01.08) 3*16 mm2

3 RACEWAYS, BOXES AND FITTINGS


(01) Lighting Outlets
Supply, install, connect, test and commission of wall or ceiling or outdoor lighting
outlet, complete including conduit, conduit fittings wiring,Cables,cable trays,creoss
section as indicated in drawings and all necessary accessories and ancillary works.
(01.01) Lighting outlets.
(02) Lighting Switches Outlets
Supply, install, connect, test and commission of outlets for lighting
switches, complete including conduits, conduit fittings, wiring and all
necessary accessories and ancillary works.
(02.01) Outlet for one way one gang switch 16 A.
(02.02) Outlet for one way two gang switch 16 A.
(02. 03) Outlet for two way one gang switch 16 A.
(02. 04) Outlet for two way two gang switch 16 A.
(02.05) Outlet for one way three gang switch 16 A.
(03) Socket Outlets
Supply, install, connect, test and commission of socket outlets complete
including ,sockets,conduit, conduit fittings wiring,Cables,cable trays,creoss section as
indicated in drawings and all necessary accessories and ancillary works.
(04.01) Outlet for single phase single socket 16 A.- 220V (2P+E)
(04.02) Outlet for single phase duplex socket 16 A. - 220V (2P+E)
(04.03) Outlet for power socket 20 A. - 220V (2P+E) IP=42
(04.04) Outlet for power socket 20 A. - 220V (2P+E) IP=44(for hand dryer)
(05) Isolator - Outlets
Supply, install, connect, test and commission of isolators outlets, complete including
isolators, conduit, conduit fittings wiring,Cables,cable trays,creoss section as
indicated in drawings and all necessary accessories and ancillary works.
(05.01) Outlet for 220 V, 20 A, disconnect switch with indicaing lamp for water heater
(05.02) Outlet for 220 V, 25 A, disconnect switch
(05.03) Outlet for 220 V, 32 A, disconnect switch
(05.04) Outlet for 220 V, 40 A, disconnect switch
(05.05) Outlet for 380 V, 40 A, disconnect switch for elevator

4 Wiring Devices
(01) Switches
Supply, install, connect, test and commission of switches as
specified and as listed below, complete with all necessary
accessories and ancillary works.
(01.01) One way one gang switch 16 A.
(01.02) One way two gang switch 16 A.
(02. 03) Outlet for two way one gang switch 16 A.
(02. 04) Outlet for two way two gang switch 16 A.
(02.05) Outlet for one way three gang switch 16 A.
(02. 06) Floor box IP=42 with capacity as indicated in drawings

5 Main L.V.P]
(01) Supply, install, connect, test and commission of complete L.V. main distribytion
boards the price include selectvity study, UPVC pipe for incoming
cables,termination,Identifications ,labling,glands,copper luggs, as specified and as
indicating drawings . System shall be lump sum complete in every respect with all
necessary accessories and ancillary works.
(01.01) DB-G1
(01.02) DB-G2
(01.03) DB-G3
(01.04) EDB-G1
(01.05) EDB-G2
(01.06) EDB-G3

6 DISTRIBUTION BOARDS
(01) Supply, install, connect, test and commission of complete L.V. distribution
boards the price include selectvity
study,,termination,Identifications ,labling,glands,copper luggs, as specified and as
indicating drawings . System shall be lump sum complete in every respect with all
necessary accessories and ancillary works.
LP-G1(01.01)
LP-G2(01.02)
LP-G3(01.03)
ELP-G1 (01.04)
ELP-G2(01.05)
ELP-G3 (01.06)
PP-AC-G1(01.07)
PP-AC-G2(01.08)
PP-AC-G3(01.09)
LP-1F1(01.10)
LP-1F2(01.11)
LP-1F3(01.12)
ELP-1F1 (01.13)
ELP-1F2(01.14)
ELP-1F3 (01.15)
PP-AC-1F1(01.16)
PP-AC-1F2(01.17)
PP-AC-1F3(01.18)
LP-2F1(01.19)
LP-2F2(01.20)
LP-2F3(01.21)
ELP-2F1 (01.22)
ELP-2F2(01.23)
ELP-2F3 (01.24)
PP-AC-2F1(01.25)
PP-AC-2F2(01.26)
PP-AC-2F3(01.27)
LP-SD(01.28)
LP-EX(01.29)
LP-UPS-2F1 (01.30)
PP-AC-R1(01.31)
PP-AC-R2(01.32)
PP-G3(01.33)
PP-1F3(01.34)
PP-2F3(01.35)
PP-AC-R3(01.36)

01) Install Only , connect, test and commission of lighting fixtures as specified and as
7 shown in schedule of luminaires complete with lamps, electronic control gear and all
necessary accessories and ancillary works.
(01.01) Lighting Fixture type F1
(01.02) Lighting Fixture type F2
(01.03) Lighting Fixture type F3
(01.04) Lighting Fixture type S1
(01.05) Lighting Fixture type S2
(01.06) Lighting Fixture type S3
(01.07) Lighting Fixture type S4
(01.08) Lighting Fixture type S4-1
(01.09) Lighting Fixture type S5
(01.10) Lighting Fixture type S6
(01.11) Lighting Fixture type C1
(01.12) Lighting Fixture type CH
(01.13) Lighting Fixture type WM1
(01.14) Lighting Fixture type WM2
(01.15) Lighting Fixture type WM3
(01.16) Lighting Fixture type UL2

(01.17) Lighting Fixture type EX1


(01.18) Lighting Fixture type EX2
(01.19) Lighting Fixture flixeble led light

8 (01) IP CCTV System (First Fix Only)


(01)'Supply, install, connect, and test of IP camera outlet complete as specified
including 20mm UPVC conduites,conduit fittings,pull boxes .pull wire and all
necessary accessories and ancillary works required for complete operating system
9 . DATA NETWORK (First Fix Only)
(01)UTP Data/Tel Node Complet with conduites,20mm UPVC conduit fittings,pull
boxes ,pull wire, form each rack to the out location

10 Fire Alarm System


(01-01) Supply, install, connect, test and commission of Main fire alarm panel (6
loop) (MFAP),including auto dillar ,battery,charger, and all necessary accessories
and ancillary works required for complete operative system as specified and as shown
on the drawings.
(02) Detectors, Call-Points and Alarms
Supply, install, connect, test and commission of fire alarm, life safety detection
Devices complete including conduits, conduit fittings, fire resistance cables 750 c-3H,
as specified with all necessary accessories and ancillary works required for complete
operative system.
(02.01) Manual alarm stations by 2x1.5mm2 copper cable
(02.02) Fire alarm Bell 90db-imt 2x2.5mm2 copper cable
(02.03) Smoke detector .by 2x1.5mm2 copper cable
(02.03) Heat detector .by 2x1.5mm2 copper cable
(02.04) Control module unitby 2x1.5mm2 copper cable
(02.05) Monitor module unit by 2x1.5mm2 copper cable
(02.06) Multi detector unit by 2x1.5mm2 copper cable
11 SOUND AND PUBLIC ADDRESS SYSTEM (First Fix Only)
(01) Distribution Network
Supply, install, connect and commission of sound system distribution
network complete as specified and as indicated in the drawing. The unit
shall be complete with all necessary boxes, wiring, conduits, trays, fitting
and all ancillary works.
(01.01)Wall Mounted loud speakers outlet in drama studio (empty pipe)
(01.02) Network, complete including risers, termination boxes, cables and
all necessary accessories and ancillary works.
(01-03) Mic outlet in drama studio (empty conduites by 32 mm pipe)

13 U.P.S
(01)Supply , install and put into operation on line UPS ,<3% THD FOR LINEAR
loads 10 KVA as in specification & drawing . For 15 minuites operation

14 cable trunk
(01)Supply, install, connect, and put into operation 15 cm galvanized cable trunk
(solid type) complete including thread rods,galvanized cover ,supports and all
necesary accessories,devices, and ancillary works required for complete operative
system
(02)as above but 20 cm

15 Acces control system (first Fix Only)


(01) Supply, install, connect, test and commission of complete acces control system
control panel including ,power supply,battery,charger,software,attendat software,
and all necesary accessories and ancillary works required for complete operative
system as specified and as shown on drawings for 1 doors
(02) Supply, install, connect, test and commission of complete acces control system
control panel including ,power supply,battery,charger,software,attendat software,
and all necesary accessories and ancillary works required for complete operative
system as specified and as shown on drawings for 5 doors
(03) Supply, install, connect, test and commission of complete acces control system
control panel including ,power supply,battery,charger,software,attendat software,
and all necesary accessories and ancillary works required for complete operative
system as specified and as shown on drawings for 6 doors
(03) Supply, install, connect, test and commission of complete acces control system
control panel including ,power supply,battery,charger,software,attendat software,
and all necesary accessories and ancillary works required for complete operative
system as specified and as shown on drawings for 7 doors
(05) Supply, install, connect, test and commission of complete acces control system
control panel including ,power supply,battery,charger,software,attendat software,
and all necesary accessories and ancillary works required for complete operative
system as specified and as shown on drawings for 8 doors
(06)Supply, install, connect, test and commission of acces control devices including
cables,wires,conduites,fittings,trunking,pull boxes as specified and indicated in
drawings with all necessary accessories and ancillary works required for complete
operative system.
(02-01) card reader
(02-02) door contact
(02-03)door magnetic lock
(02-04) release switch
(02-05)proximity cards with durable packing
SUPP
Sales Tax Final including Sales
Unit Qty U.P Total U.P
10 % tax

L.S. 1

L.S. 1

Mt. 115
Mt. 35
Mt. 115
Mt. 60
Mt. 20
Mt. 100
Mt. 110
Mt. 125
Mt. 30
Mt. 50

No. 2786

No. 277
No. 122
No. 10
No. 38
No. 7
No. 621
No. 1242
No. 41
No. 35

No. 66
No. 58
No. 113
No. 3
No. 2

No. 277
No. 122
No. 10
No. 38
No. 7
No. 100

No. 1
No. 1
No. 1
No. 1
No. 1
No. 1
No. 1
No. 1
No. 1
No. 1
No. 1
No. 1
No. 1
No. 1
No. 1
No. 1
No. 1
No. 1
No. 1
No. 1
No. 1
No. 1
No. 1
No. 1
No. 1
No. 1
No. 1
No. 1
No. 1
No. 1
No. 1
No. 1
No. 1
No. 1
No. 1
No. 1
No. 1
No. 1
No. 1
No. 1
No. 1
No. 1
No. 1

No. 30
No. 30
No. 473
No. 3
No. 4
No. 4
No. 18
No. 4

LS 1
No. 5

No. 1

Mt. 500

Mt. 250

No. 1

No. 1

No. 1

No. 1

No. 1
No. 27
No. 27
No. 27
No. 27
No. 135
SUPPLIER 1 SUPPLIER 2
Total Sales Tax Total U.P Total Sales Tax Total
Technical Staff

mobile Total
yearly salary medical
DESCRIPTION Net salary Taxes social insurance
increase allowance
food allowance transp. phone annual leave Monthly Daily Rate Hourly Rate
allowance Rate

Project Manager 30,000 5,100 800 3,000 250 400 1,750 38,300 1473.076923 184.13

Construction Manager 18,000 3,060 800 1,800 250 300 1,050 23,460 902.3076923 112.79

Sector Managers 15,000 2,550 800 1,500 250 300 875 19,775 760.5769231 95.07

Technical Office Manager 18,000 3,060 800 1,800 250 300 1,050 23,460 902.3076923 112.79

Technical Office Engineers (Civil,Arch.) 8,500 1,445 800 850 250 100 496 11,591 445.8012821 55.73

Technical Office Engineers (MEP) 8,500 1,445 800 850 250 100 496 11,591 445.8012821 55.73

Site Engineers (Civil,Arch.) 8,500 1,445 800 850 250 100 496 11,591 445.8012821 55.73

Site Engineers (MEP) 8,500 1,445 800 850 250 100 496 11,591 445.8012821 55.73

General Forman 5,500 935 800 550 250 100 321 7,906 304.0705128 38.01

Site Supervisors 5,000 850 800 500 250 100 292 7,292 280.4487179 35.06

Site Supervisors (MEP) 5,500 935 800 550 250 100 321 7,906 304.0705128 38.01

Steel Structure Inspectors 5,000 850 800 500 250 100 292 7,292 280.4487179 35.06

Survey Engineers 8,500 1,445 800 850 250 100 496 11,591 445.8012821 55.73

Surveyors 5,500 935 800 550 250 100 321 7,906 304.0705128 38.01

Surveying Labor 3,500 595 800 350 250 100 204 5,449 209.5833333 26.20

Laboratory Technician 4,000 680 800 400 250 100 233 6,063 233.2051282 29.15

Safety Officer 6,000 1,020 800 600 250 100 350 8,520 327.6923077 40.96

Drafts man 4,500 765 800 450 250 100 263 6,678 256.8269231 32.10

Planning & Cost Control Engineer 8,500 1,445 800 850 250 100 496 11,591 445.8012821 55.73

QTY surveyers eng. 8,500 1,445 800 850 250 100 496 11,591 445.8012821 55.73

Quality Control Engineer (Civil,Arch.) 8,500 1,445 800 850 250 100 496 11,591 445.8012821 55.73

Quality Control Engineer (Elec.) 8,500 1,445 800 850 250 100 496 11,591 445.8012821 55.73

Quality Control Engineer (Mech.) 8,500 1,445 800 850 250 100 496 11,591 445.8012821 55.73
Plumber 3,000 3,000 115.3846154 14.42
Plumber Helper 1,800 1,800 69.23076923 8.65
Electrician 3,000 3,000 115.3846154 14.42
Electrician Helper 1,800 1,800 69.23076923 8.65
Welder 3,500 3,500 134.6153846 16.83
Admin. Staff

mobile
yearly salary medical
DESCRIPTION Net salary Taxes social insurance
increase allowance
food allowance transp. phone annual leave Total Daily Rate Hourly Rate
allowance

Chief Accountant 7,000 1,190 800 700 250 200 408 9,848 378.7820513 47.35

Purchaser 4,000 680 800 400 250 100 233 6,063 233.2051282 29.15

Accountant 4,000 680 800 400 250 100 233 6,063 233.2051282 29.15

Assistant Accountant 2,500 425 800 250 250 100 146 4,221 162.3397436 20.29

Senior storekeeper 6,000 1,020 800 600 250 100 350 8,520 327.6923077 40.96

Storekeeper 4,000 680 800 400 250 100 233 6,063 233.2051282 29.15

Store Laborer 2,000 340 800 200 250 100 117 3,607 138.7179487 17.34

Chief Administrator 6,000 1,020 800 600 250 100 350 8,520 327.6923077 40.96

Personnel Officer 3,000 510 800 300 250 100 175 4,835 185.9615385 23.25

Secretary 3,500 595 800 350 250 100 204 5,449 209.5833333 26.20

Time Keeper 2,500 425 800 250 250 100 146 4,221 162.3397436 20.29

Document Controler 4,000 680 800 400 250 100 233 6,063 233.2051282 29.15

Driver (for P.M) 2,000 340 800 200 250 25 117 3,532 135.8333333 16.98

Drivers for Staff 2,000 340 800 200 250 25 117 3,532 135.8333333 16.98

Guards 2,000 340 800 200 250 25 117 3,532 135.8333333 16.98

Doctor 7,000 1,190 800 700 250 100 408 9,748 374.9358974 46.87

Nurse 4,500 765 800 450 250 25 263 6,603 253.9423077 31.74

Service Boy 1,500 255 800 150 250 25 88 2,918 112.2115385 14.03

Cleaning labor 1,500 255 800 150 250 25 88 2,918 112.2115385 14.03
MONTHLY RENTAL RATES (ON DAILY BASIS) OFFERED BY FLASH TRADING CO.

No. Equipment Brand Model Cap. Day Rate LE


1 Rough Terrain Mobile Crane Coles Husky 680 S 70T 2,242.00
2 Rough Terrain Mobile Crane PPM A 580 50T 1,457.30
3 All Terrain Mobile Crane PPM 380 ATT 40T 1,345.20
4 All Terrain Mobile Crane PPM 380 ATT 40T 1,345.20
5 All Terrain Mobile Crane PPM 380 ATT 40T 1,345.20
6 Rough Terrain Mobile Crane PPM 30.09 30T 1,008.90
7 Rough Terrain Mobile Crane PPM 30.09 30T 1,008.90
8 Truck with crane JAC HFC1083 KR1 7Ton 616.55
9 Truck with crane JAC HFC1083 KR1 7Ton 616.55
10 Truck with crane JAC HFC1083 KR1 7Ton 616.55
11 Skid steer Loader Bob Cat S205 930Kg 392.35
12 Skid steer Loader Bob Cat S205 930Kg 392.35
13 Skid steer Loader Bob Cat S205 930Kg 392.35
14 Skid steer Loader Bob Cat S220 980Kg 448.40
15 Forklift JCB 525B 2.5T 448.40
16 Telehandler JCB 540/170 4T 784.70
17 Telehandler JCB 540/170 4T 784.70
18 Telehandler JCB 540/170 4T 784.70
19 Telehandler JCB 540/170 4T 784.70
20 Compressor Atlas Copco ABE K288 7 Bar 280.25
21 Man Lift Haulotte HA20PX 20 meters 728.65
22 Man Lift Haulotte HA20PX 20 meters 728.65
23 Scissor Lift Haulote H15SDX 15 meters 560.50
24 Scissor Lift Haulote H15SDX 15 meters 560.50
25 Backhoe excavator JCB 2CX 672.60
26 Tower Crane SYM H25-14 10 ton Upon Request
27 Tower Crane Raimondi MR 75 5 ton Upon Request
28 Tower Crane Raimondi ER 240 10 ton Upon Request
29 Tower Crane Raimondi ER 240 12 ton Upon Request
30 Tower Crane Raimondi ER 240 12 ton Upon Request
31 Tower Crane Raimondi ER 240 14 ton Upon Request
32 Tower Crane Raimondi MR 183 8 ton Upon Request
33 Tower Crane Raimondi MR 183 8 ton Upon Request
34 Tower Crane Raimondi MR 120 8 ton Upon Request
35 Tower Crane Potain GTMR 360 8 ton Upon Request
36 Tower Crane Cadillon C36-60 8 ton Upon Request
37 Derrick Crane Comedil CD-1823 6 ton Upon Request
38 Derrick Crane Comedil CD-1823 6 ton Upon Request
39 Passenger & material hoist GJJ/BAODA TD-200 2 ton Upon Request
40 Passenger & material hoist GJJ/BAODA TD-201 2 ton Upon Request
41 Passenger & material hoist GJJ/BAODA TD-202 2 ton Upon Request
42 Passenger & material hoist GJJ/BAODA TD-203 2 ton Upon Request
43 Passenger & material hoist GJJ/BAODA TD-204 2 ton Upon Request
44 Passenger & material hoist GJJ/BAODA TD-205 2 ton Upon Request
45 Passenger & material hoist GJJ/BAODA TD-206 2 ton Upon Request
46 Passenger & material hoist GJJ/BAODA TD-207 2 ton Upon Request
47 Construction hanging cradle BOYU ZLD-63 630 kgs. Upon Request
48 Construction hanging cradle BOYU ZLD-63 630 kgs. Upon Request
49 Construction hanging cradle BOYU ZLD-63 630 kgs. Upon Request
50 Construction hanging cradle BOYU ZLD-63 630 kgs. Upon Request
51 Construction hanging cradle BOYU ZLD-63 630 kgs. Upon Request
52 Construction hanging cradle BOYU ZLD-63 630 kgs. Upon Request
53 Construction hanging cradle BOYU ZLD-63 630 kgs. Upon Request
54 Construction hanging cradle BOYU ZLD-63 630 kgs. Upon Request
55 Construction hanging cradle BOYU ZLD-63 630 kgs. Upon Request
56 Construction hanging cradle BOYU ZLD-63 630 kgs. Upon Request

All our equipment has 3rd party inspections every 6 months.


Our rate is for 8 hours per day. Sales tax is not included.
BY FLASH TRADING CO.

Remarks
Computerized Load Moment Ind.
Computerized Load Moment Ind.
Computerized Load Moment Ind.
Computerized Load Moment Ind.
Computerized Load Moment Ind.
Computerized Load Moment Ind.
Computerized Load Moment Ind.
3.3 Ton Atlas crane behind cab
3.3 Ton Atlas crane behind cab
3.3 Ton Atlas crane behind cab
Bucket or forks
Bucket or forks
Bucket or forks
Bucket or forks

Bucket, forks & other accessories


Bucket, forks & other accessories
Bucket, forks & other accessories
Bucket, forks & other accessories

Rough terrain/silent diesel


Rough terrain/silent diesel
Rough terrain/silent diesel
Rough terrain/silent diesel
Several size buckets
60 meter jib
48 meter jib
70 meter jib
70 meter jib
75 meter jib
75 meter jib
66 meter jib
66 meter jib
60 meter jib
40 meter jib/self erector
41 meter jib/self erector
18 meter luffing jib
19 meter luffing jib
Up to 150 meters height
Up to 150 meters height
Up to 150 meters height
Up to 150 meters height
Up to 150 meters height
Up to 150 meters height
Up to 150 meters height
Up to 150 meters height
Up to 150 meters height
Up to 150 meters height
Up to 150 meters height
Up to 150 meters height
Up to 150 meters height
Up to 150 meters height
Up to 150 meters height
Up to 150 meters height
Up to 150 meters height
Up to 150 meters height
Low
Voltage
MDB-1 1 361583 361583 excl. 397741.3
MDB-2 1 374542 374542 excl. 411996.2
EMDB 1 163875 163875 excl. 180262.5
MV

Supply of
medium
voltage
primary
switchgea
r IP4X, DC
Control
Voltage,
22 KV,
consisting
of (6)
cubicles
as follow:
(2)
1 Incomer, 1 878000 878000 excl. 965800
(1) Riser;
(1)
Coupler;
(2)
Outgoing;
Complete
with
Battery &
Battery
charger;
As per
specificati
on
enclosed.

Spare set 15500 15500 excl. 17050


Supply
Ring Main
Unit
(0+1), SF6
Type,
2 22KV 2 35000 70000 excl. 77000
630A; As
per
specificati
on
enclosed

recomme
nded
2.1 - Alt configurat 2 115000 230000 excl. 253000
ion
(4+0+M)

Supply of
2000KVA
Dry Type
Transfor
mer,
22/0.4KV,
Al/Al
winding,
insulation
class F,
3 2 309000 618000 excl. 679800
forced
cooling is
applied to
boost
power up
to 125%;
As per
specificati
on
enclosed.
4 Cores
multi
mode
4 outdoor MTR 2200 17.05 37510 incl 37510
fiber
optical
cable

4 Core-
fiber OM3
multimod
e low
smoke
4.1 zero MTR 2200 17.05 incl 0
halogen
rated
indoor/ou
tdoor
cable.

8 Cores
Single
mode
5 outdoor MTR 2000 22.73 45460 incl 45460
fiber
optical
cable

Core-fiber
OM3
multimod
e low
smoke
5.1 zero MTR 2000 22.73 incl 0
halogen
rated
indoor/ou
tdoor
cable

Cummins
Power
Generatio
n
Genset
model
C550D5e,
380V, 50
Hz, rated:
(500 KVA Ea 1 773550 773550 incl 773550
prime
power),
(550 kVA
standby
power).

Local
Accessori
es

8 m³ Fuel
Storage
Tank,
Single
1 25500 25500 incl 25500
Wall,
6mm
Above
Ground

Electric
fuel
transfer
2 11000 22000 incl 22000
pump and
Its
Control

Manual
fuel
1 1700 1700 incl 1700
transfer
pump

Fuel level
1 2000 2000 incl 2000
Switch

Battery
Charger 1 5400 5400 incl 5400
24 Volt

Remote
Annunciat 1 7000 7000 incl 7000
or

Phase
Sequence 1 1800 1800 incl 1800
Relay
Audible
and Visual 1 1200 1200 incl 1200
Alarm

Lubricatio
n Oil 1 3100 3100 incl 3100
Heater
Spring
isolators
8 1000 8000 incl 8000
(Local)
Jacket
Water 1 6500 6500 incl 6500
Heater

Molded
Case
Circuit
1 18000 18000 incl 18000
breaker
800A c/w
Shunt trip

Standard
installatio
n works
without
1 29150 29150 incl 29150
any civil
work or
Power
cables

Spare
parts 1 7284 7284 incl 7284
(1000hrs)

Spare
parts 1 14875 14875 incl 14875
(2000hrs)

Lighting
Fixtures

DELTA The Egyption company for trading

TECMAR 49 520 25480 incl


PXF 0 550 0 incl
TECMAR 0 385 0 incl
PXF 1 315 315 incl
ONOK 67 450 30150 incl TRS 67
ONOK 40 460 18400 incl ROVASI 40
ONOK 0 465 0 incl TRS 18
ONOK 18 300 5400 incl 0 0
ONOK 21 805 16905 incl TRS 21
ONOK 19 425 8075 incl

ONOK 27 330 8910 incl


ONOK 0 300 0 incl
PXF 18 595 10710 incl

ARES 55 955 52525 incl

DURALITE 20 225 4500 incl

ARES 4 1855 7420 incl


RZB 7 135 945 incl
TRILUX 8 1590 12720 incl
IDEAL-
13 310 4030 incl
LUX
ARES 15 1115 16725 incl DISANO 15
ARES 4 415 1660 incl IVELA 15
TM 3 400 1200 incl OLYMPIA 3
TM 18 755 13590 incl OLYMPIA 18
ONOK 260 125 32500 incl
ONOK 10 1025 10250 incl
Flexible LED strip with silicon cover
SCREENLUZ 260
4.8W/m
Flexible LED strip with silicon cover
SCREENLUZ 260
14.4W/m

EGY LUX EGY LUX


HM1 20 2395 47900 Incld
HM2 16 2395 38320 Incld
HM3 24 2395 57480 Incld
HM4 16 2395 38320 Incld
HM5 4 2395 9580 Incld
gyption company for trading & import

310 20770 incl


375 15000 incl
320 5760 incl
0 0 0
405 8505 Icld.

1724 25860 Icld.


350 5250 Icld.
265 795 Icld.
585 10530 Icld.

120 31200 Icld.


220 57200 Icld.

You might also like