WORK COMPLETION REPORT

1. Application Number
2. Name of Applicant
3. Plant Address
4. District
5. Pin Code
6. Service Connection Number
7. Plant Capacity

A. Details of the Solar PV Module


1. Model No
2. Serial No.
3. Total capacity (kWp)
4. Make
5. Type of Modules
6. No. of modules
7. Capacity of each module (Wp)
8. No. of Series and Parallel
9. Module Efficiency

B. Details of the Power Conditioning Unit/Inverter


1. Model No.
2. Serial No.
4. Total AC capacity of inverter (kW)

5. Make
6. No. of inverters installed

F. Details of the DC Distribution Box


1. Make/Name of manufacturer
2. Sl. No.
3. No.of dc box
4. Miniature Circuit Breaker (MCB)/Isolator quantity and
capacity
G. Details of the AC Distribution Box
1. Make/Name of manufacturer
2. Sl. No.
3. AC surge protection device
4. MCB/Molded Case Circuit Breaker (MCCB) quantity and
capacity

H. Details of the Earthing


1. Size of the earth wire/flat *
2. Earthing Test Report:
a. Applied volt
b. No. of earth pits
Location Values

Earth pit 1:

Earth pit 2:

Earth pit 3:

I. Pre Commissioning Test Report


a. DC Test report
1. Inverter Nu.
2. String No.
3. Polarity
4. Voc

b. AC Test report
Phase sequence
1. L1‐N volts
2. L2‐N volts
3. L3‐N volts
4. L1‐L2 volts
5. L2‐L3 volts
6. L1‐L3 volts
J. Details of the meter

1. Make
2. Serial No.
3. Manufacturer’s Name
4. Capacity
5. Type/Model
7. Single ph./three ph.

M. G.P.S. Co‐ordinates of the RTSPV System Installation

01 Latitude: Lonititute:
02 Site pic