3.00m 3.20m 3.00m 1.20m 1.75m OFFICE OF THE BUILDING OFFICIAL

C2F2 C2F2 C2F2 C2F2 C2F2


TB TB TB TB APPROVED:
1.60m 1.20m 0.40m

TB TB 1.60m 1.20m 0.40m


TB
VS VS TB TB 2.00m
TB MUNICIPAL ENGINEER
TB
TB B2 TB
TB
C1F1
4.10m TB TB TB TB TB
1.50m C1F1 TB 1.50m
B2
TB TB
1.50m B2 1.50m

TB
TB TB 2.10m
VS VS B2
TB TB
3.20m
3.20m

C2F2 TB C2F2 TB C2F2 TB C2F2 TB C2F2


CASHIER'S BOOTH FOUNDATION PLAN CASHIER'S BOOTH BEAM PLAN
SCALE: 1:30m SCALE: 1:30m
12.29m

COMMERCIAL BUILDING FOUNDATION PLAN VERT. BARS


SCALE: 1:50m
LATERAL
TIES SPACED:
1.50m 1.35m 1.50m 1.70m 1.50m 1.50m 1.20m 1.75m 3@ 0.05M.,
2.85m 3.20m 3.00m 2.95m 3@ 0.10 M.,
REST @ 0.20 M.
TB TB TB TB NGL
RB RB RB RB
TB TB TB TB TB 2.00m
RB RB RB RB RB 2.00m
1.25m
B1 B1 B1 B1
RB RB RB RB
B1 B1 B1 B1 B1 B1 B1 B1 B1 1.50m
0.25m

B1 B1 B1 B1 B1 1.00m
RB RB RB RB RB
4.10m
0.20m
B1 B1 B1 B1 B1 B1 2.60m RSB
MAT BARS
spaced
1.00m 0.40m
B1 B1 B1 B1 B1 @ 0.17m O.C.
RB RB bothways
RB RB
CB CB CB CB CB 1.20m
B2 B2 B2 B2 RB RB RB RB RB 1.20m
RB RB RB RB C1F1 DETAIL
SCALE: 1:20m
COMMERCIAL BUILDING SECOND FLOOR BEAM FRAMING PLAN
SCALE: 1:60m COMMERCIAL BUILDING ROOF BEAM FRAMING PLAN 1.50m
SCALE: 1:70m

0.25m

MAT BARS SPACED


1.50m 0.30m

SCHEDULE OF BEAM 1.50m 2.10m 1.20m @ 0.15m O.C


BOTHWAYS

3.200 / 0.20
BEAM STEEL REINFORCEMENT
FLOOR BEAM DIMENSIONS STIRRUPS 0.300
(mm) REBAR LEFT MIDSPAN RIGHT (10mm dia.)
LEVEL MARK
b h
(mm dia.)
TOP BOTTOM TOP BOTTOM TOP BOTTOM 1.20m 16 15 14 13 12 11 10 9 8 1.20m
VERT. BARS WITH
5@0.05m, 5@0.10m 0.15m O.C., B.W.
GF TB 250 300 16 3 2 2 3 3 2 rest @0.10m O.C TIES SPACED: 5@
0.05M., 5@ 0.10 M.,
5@0.05m, 5@0.10m
SF B1 250 350 16 4 3 3 4 4 3
REST @ 0.20 M.
rest @0.10m O.C 7 3.20
5@0.05m, 5@0.10m
B2 250 350 16 3 2 2 3 3 2 rest @0.10m O.C 6
5@0.05m, 5@0.10m
RB 250 350 16 3 2 2 3 3 2 rest @0.10m O.C 5 0.40m
FFL
TB
L L 4 2.10m NGL

L/2 L/2 3
L/4 L/4 L/4 L/4
2 1.50m
GROUND FFL
TOP BARS TOP BARS
1
BOTTOM BARS BOTTOM BARS

0.900 0.29m
SUPPORT MIDSPAN
C2 F2 DETAIL
STAIR DETAIL 0.200 SCALE: 1:50m
TYPICAL BEAM ELEVATION SCALE: NTS 0.800

CADD BY: CERTIFIED BY: PRC NO. 0139383 PROJECT TITLE : APPROVED BY: SHEET CONTENT: SHEET NO.
TIN 469 - 847 - 220
PROPOSED GASOLINE STATION WITH
NINA HAZEL M. BARTOLO
PTR NO. 2081552
TWO(2) STOREY COMMERCIAL BUILDING
AS SHOWN S-1
DATE JANUARY 13, 2023 ABOVE 3 of 8
CIVIL ENGINEER PLACE BUGASONG, ANTIQUE LOCATION: BAHUYAN, BARBAZA, ANTIQUE PROJECT OWNER