Professional Documents
Culture Documents
TPL to SHARE the Briefing Pack, Facilitator to speak the title and content of BP
Summary of any previous workshops on the job / briefing pack changes etc - (memory jog from
past workshops)
Talk through the schematic, pointing out how the assessed signals are highlighted.
TPL Run through the train frequency data promote any questions/issues/items for discussion,
and include Pattern of movements covered in the data.
TPL Risk banding data to be briefed out Including how the scores are achieved. (H4 cutoff etc.)
Fac talk through VARISPAD Questions and TPL enters text as directed.
TPWS calculator
SFAIRP Statement (Consensus, may have conditions i.e. “Subject to SSC agreement”, can be a majority but
having one member strongly in opposition is usually an indication of an issue that should be addressed.)
SORAT-LX/VariSPAD
Do as per VariSPAD, but replace consequence with Level Crossing Risk Factors (NEED LCM or SUITABLE
REP i.e. LOM or RLCM)
TPWS as required
Driveability
Driveability / Movement authorities & schematics brief & run through individually – brief the hazard pre
cursors to the WS
VIDEO virtual drive through and discussion, using Scheme plan to provide a commentary and invite members
to raise items for discussion.