You are on page 1of 1

MILAHA SHIP MANAGEMENT

TOOL BOX TALK CHECKLIST MSM – OOV – SM - 613

All personnel involved in the work activity must participate in the Toolbox Talk (TBT) and sign below as present.
The TBT objective is to communicate the Activity Task Assessment and capture any specific controls not already identified
to the work party.
Work Location: Work Activity:
Engine Room Daily Routine Maintenance Jobs and General Safety
Date: 01 April 2020 Time: 0600 Hours & 1800 Hours
Permit W/O: RA, LIFTPLAN, COSHH
Or Procedure No.: Or Manual Handling No.:
CHECKLIST / PROMPT (Tick where appropriate)
 Type of operation to be executed  Work Equipment  Hazard substances used/present
 Methods / Procedures to be  Production / operational  Isolation requirement
adapted constraints  Conflicting activities
 PTW Precautions / controls  Human Factor assessment  Environmental considerations
 Safety Equipment location  Crane / lifting requirements  Waste management
 Individual responsibilities for  Confined space entry  Working environmental
controls requirement conditions
 Access / egress  Manual Handling
 Tests / Monitoring  Potential Hazards

OPERATIONS SUMMARY
1. Vessel In field
2. Engine room general safety, All maintenance jobs planned for the day.
3. Draining of FO Service/Settling Tanks and FO Purifier Drip outlet drip sampling to be strictly adhered as per log sheet.
4. Electrical routine jobs.
6. Rough weather precautions.
5. Discussed safety precautions regarding all jobs planned for the day.
EQUIPMENT SUMMARY
1. Engine- PPE, Chemical Handling Equipment
2. Electrical PPE
SAFETY TOPICS DISCUSSED
1. Checks, Isolations and Procedures related to jobs planned during the day.
2. Importance of PPE
3. Chemical handling precautions and MSDS. Using correct tools, inspection of lifting gear before use.
4. Importance of reporting any abnormalities, unsafe acts or conditions observed, suggestions for improvement.
5. SAFETY TOPIC Prevention of Dropped Objects
ATTENDEES
Print Name Signature Print Name Signature
Edwyn Pasvare
Dinesh Dony
Biju
Pritam
TALK CONDUCTED BY  Procedures
Planned By Print Name: Signature: Date:
Vikram Ghorpade 01 April 2020  Risk Assessment
Talk carried Print Name: Signature: Date:  Other
Out by Sanjit / Andry 01 April 2020 Documents

Rev 00 Date: 01-Apr-2018 Page 1 of 1


Master copy available with DPA. Controlled copies are in distribution as per distribution list