Procedure Manual - IMS DOC. NO. : PM/LW/SMT/07
ISSUE/REV NO.-1/0Date : 15-09-2019
ISO 9001:2015, ISO 14001:2015 &
ISO 45001: 2018
1. SUMMARY
1.1 This procedure is established, documented, implemented and maintained to help the
organization for ongoing identification of OH and S hazards, assessment of risk and
determination of necessary controls
1.2 Responsibility and Authority for this procedure is spread across various functions within
decided scope. Senior Management Team is responsible for Implementation
1.3 Note: This procedure has adopted some definitions developed by Locomotive Workshop,
Northern Railway, Charbagh, Lucknow
3. Procedure:
3.1. An effective OH&S management system begins with identification of Hazards in the process
&understanding how an organization can Control the hazards by assessing risks involved.
Identification process shall take into consideration
o Routine and non routine activities,
o Activities of all personnel having access to the work place (including subcontractors and
visitors),
o Infrastructure, Equipments and materials at the work place, whether provided by the
Organization or others,
o Human behavior capabilities and other human factors.
o Identified hazards originating outside the workplace capable of adversely affecting the
health and safety of persons under the control of Locomotive Workshop, Northern
Railway, Charbagh, Lucknow within the workplace,
o Hazards created in the vicinity of the work place by work related activities under the
control of Locomotive Workshop, Northern Railway, Charbagh, Lucknow
Page 1 of 4
LOCOMOTIVE WORKSHOP, NORTHERN RAILWAY,
LUCKNOW
Procedure Manual - IMS DOC. NO. : PM/LW/SMT/07
ISSUE/REV NO.-1/0Date : 15-09-2019
ISO 9001:2015, ISO 14001:2015 &
ISO 45001: 2018
3.4. The risks identified can lead to the hazards some of them can be as listed as
Page 2 of 4
LOCOMOTIVE WORKSHOP, NORTHERN RAILWAY,
LUCKNOW
Procedure Manual - IMS DOC. NO. : PM/LW/SMT/07
ISSUE/REV NO.-1/0Date : 15-09-2019
ISO 9001:2015, ISO 14001:2015 &
ISO 45001: 2018
3.5. Hazards are identified through Consultation, Safety Audit, Injury, Permanent Disability / Fatality,
Minor Injury / First aid, Illness and injury records, Task Analysis / Job Hazard Analysis, Legal
and other Requirements.
3.6. Risk Control is executed during the process as per one of the following guidelines
Elimination: If possible, eliminate hazards altogether, or combat risks at source, e.g. use
a safe substance instead of dangerous one or reduce inventory level of hazardous
substance.
Substitution: If elimination is not possible try to to use substitute material or equipment
Engineering Control: Establish engineering control (Auto/manual) wherever possible to
reduce the risk.
Signage, warning or administrative control: Display signage or warning and
procedures/work instructions at suitable place
Personal protective Equipments: Ensure that PPEs are provided, suitable, used and
maintained.
Pre-employment and Periodical Medical examinations with specific location wise tests are
carried out at Outside facility. Awareness Training for Hygiene and Safety carried out periodically
so as to cover all the Persons in the scope area.
Page 3 of 4
LOCOMOTIVE WORKSHOP, NORTHERN RAILWAY,
LUCKNOW
Procedure Manual - IMS DOC. NO. : PM/LW/SMT/07
ISSUE/REV NO.-1/0Date : 15-09-2019
ISO 9001:2015, ISO 14001:2015 &
ISO 45001: 2018
3.7. Significance of the risks, i.e. Acceptable Risk and Not acceptable Risk is decided based on
criteria of combination of risk severity rating and risk probability rating
Cognizance to Legal Requirements: If any of the controls are required as per legal
requirements identified through legal register e.g. use of PPE or dangerous operation or
factories acts/rules then identify legal requirements as 'Yes' and ensure compliance
through evaluation of compliance.
Cognizance to Emergency: If any one hazards which leads to fire or explosion or toxic
release or combination of these; then identify emergency as 'Yes'. All such identified
emergencies are considered for emergency preparedness and response through onsite
emergency plan.
Risk identified as trivial, tolerable and moderate are considered as acceptable risks. Risk
identified as substantial is considered as not acceptable risks and needs management
program Risk identified as intolerable is consider as not acceptable risk and Work cannot
be started or continued until risk is reduced through Management program
.
3.8. An organization’s policy, objectives and targets, training, communications, operational controls
and monitoring programs are primarily based on knowledge of the significant environmental
aspects, although issues such as applicable legal requirements and other requirements or which
the organization subscribes and the view of interested parties are also taken in to account.
3.9. All risks are then be prioritized for objective target and management program as below
Priority 1: All not acceptable risks.
Priority 2: All other risks.
The results of the most recent Status Review are reviewed as part of the Management
Review process. Based on this review and the Management determines the need to update
the Hazard list and Risk Assessment criteria.
Whenever a new equipment or process is added to the facility, associated risks shall be
identified by the concerned functional head along with SMT and Risk register shall be
updated accordingly.
The newly identified risks are evaluated by the Cross Functional Team and reviewed by the
Steering Committee.
After implementation of corrective and Preventive action the risk assessment shall be carried
out and evaluated risk level will be updated in the Risk Register.
Page 4 of 4