4.2 Rencana Anggaran Biaya


4.2.1 Daftar Harga Satuan Bahan dan Upah Tenaga Kerja

No. JENIS BAHAN SATUAN HARGA DASAR (Rp) KETERANGAN

I. HARGA DASAR BAHAN


1. SEMEN Semen PC Zak 67,000.00 semen tipe I; semen baturaja;1 zak @ 50 kg

Semen PC kg 1,340.00
Floor hardener kg 7,500.00
Semen instan Zak 157,700.00 semen ; 1 Zak @ 40 Kg

Semen Beton Hebel Zak 188,000.00 semen untuk bata hebel ; 1 Zak @ 40 Kg

Semen putih kg 6,000.00 setara kingkong


Cornis Zak 75,000.00 setara A+; 1 zak @ 20 kg
Cornis kg 3,750.00
-
2. PASIR Pasir Beton m3 125,000.00
Pasir Beton kg 89.29 BJ 1400 kg/m3
Pasir Urug m3 95,000.00
Pasir Urug kg 67.86 BJ 1400 kg/m3
-
3. BATU KALI Batu kali m3 385,000.00
Batu koral m3 435,000.00
Batu koral kg 322.22 BJ 1350 kg/m3
Batu split m3 475,000.00
Batu split kg 351.85 BJ 1350 kg/m3
-
4. BATU BATA Batu bata bh 610.00 uk. 8x8x16 cm; batu bata lubang press mesin

Batu bata ringan / hebel bh 12,500.00 uk. 60x20x75 cm ; 1 m3 @111 bh

-
5. TANAH Tanah urug / bahan tanah timbunan m3 60,000.00
Tanah Sirtu m3 80,000.00
-
6. LAIN-LAIN Aspal kg 12,550.00
-
-
-
II. BAHAN PENUTUP ATAP

1. SENG BJLS Seng gelombang uk. 5' kpg 31,500.00 uk. 0,8 m x 1,50 m
Seng gelombang uk. 7' kpg 43,500.00 uk. 0,8 m x 2,1 m
Seng gelombang uk. 10' kpg 62,000.00 uk. 0,8 m x 3,0 m
Seng polos m 28,000.00 lebar 88 cm
-
-
2. ASBES Asbes gelombang 5' kpg 55,000.00 lebar 105 cm
Nok asbes bh 45,000.00 panjang 105 cm; satu pasang
-
-
3. GENTENG KERAMI Keramik warna natural bh 12,300.00 setara Kanmuri; 1m 2 @ 14 bh
Keramik warna special bh 18,700.00 setara Kanmuri; 1m 2 @ 14 bh
Nok keramik warna natural bh 23,800.00 setara Kanmuri; 1m @ 3,9 bh
Nok Keramik warna special bh 36,700.00 setara Kanmuri; 1m @ 3,9 bh
-
4. GENTENG METAL Genteng metal uk. 2x4 (0.25mm) lbr 38,000.00 setara Sakura Merpati roof; 1 m2 @ 1,62 lbr

Genteng metal uk. 2x4 (0.3mm) lbr 46,000.00 setara Sakura Elang roof; 1 m2 @ 1,62 lbr

Genteng metal berpasir 2x5 (0,45mm) lbr 98,000.00 setara Multiroof; 1m2 @ 1,3 lbr

Nok genteng metal bh 23,700.00 setara Sakura ; panjang 80 cm


Nok genteng metal berpasir bh 47,000.00 setara Multiroof; panjang 80 cm
-
5. GENTENG TANAH LGenteng tanah liat bh 1,200.00 1 m2 @ 17,5 bh
Nok genteng tanah liat bh 1,800.00 1 m @ 3,5 bh
-
6. POLYCARBONATE Polycarbonate m2 90,800.00 setara Twinlite; 1 roll @ 5mm x 2,1m x 11,8m

-
7. ATAP ZINCALUME Atap Zincalume (t.0,35 mm) m' 64,000.00 uk.lebar 105 cm
Atap Zincalume warna (t. 0,35 mm) m' 72,000.00 uk.lebar 105 cm
Atap Alkan (t.0,35 mm) m' 62,000.00 uk. Lebar 105 cm
Nok Zincalume 0,30 m' 26,000.00 uk. 300x60
Atap Zincalume warna (t.022mm) lbr 52,000.00 uk. 1600 mm x 740 mm, setara soka

Atap Zincalume warna (t.045mm) m' 97,000.00 setara bluecsoope; uk.lebar 105 cm

-
591

No. JENIS BAHAN SATUAN HARGA DASAR (Rp) KETERANGAN


8. ATAP BITUMEN Atap bitumen motif gelombang lbr 149,500.00 setara onduline; warna merah/ coklat/hitam; uk.
200x95x0,3 cm
Atap bitumen motif genteng lbr 45,500.00 setara onduline; uk. 105x40x0,3 cm
Nok atap bitumen bh 80,000.00 setara onduline;; uk. 90cm x 50 cm

-
9. LAIN-LAIN Aluminium foil m2 46,500.00 setara Ika Sunilate; 1 roll @ 1,23 m x 40 m

Kalsiplank btg 48,000.00 uk. 3m x 20 cm x 8mm


Karpet talang m` 18,000.00 lebar 55 cm
-
-
III BAHAN KAYU

1. MERAWAN, KULIMPapan m3 5,500,000.00 Kayu Klas II


Balok kayu m3 5,800,000.00 Kayu Klas II
-
2. MERANTI Papan m3 4,800,000.00 Kayu klas III
Balok kayu m3 4,300,000.00 Kayu klas III
-
4. RACUK Papan m3 1,400,000.00
Balok kayu m3 1,600,000.00
Papan racuk t.20 cm kpg 35,000.00 uk 2/25
-
3. LAIN-LAIN Gelam 6-8 cm pj. 4m btg 9,000.00
Gelam 8-10 cm pj. 4m btg 12,000.00
Gelam 10-12 cm pj. 4m btg 15,000.00
Bambu dia.6-8/ 600cm btg 38,000.00
-
-
IV BAHAN PENUTUP DINDING/LANTAI

1. KERAMIK PUTIH 20 x 25 kotak 57,000.00 setara asia tile; 1 kotak @ 15 kpg

buah 3,800.00
30 x 30 kotak 50,000.00 setara mulia ; 1 kotak @ 11 kpg

buah 4,545.45
40 x 40 kotak 65,600.00 setara Milan; 1 kotak @ 6 kpg

buah 10,933.33
50x50 kotak 128,000.00 setara Roman; 1 kotak @ 4 kpg
buah 32,000.00
-
2. KERAMIK 20 x 25 kotak 56,000.00 setara Impresso; 1 kotak @ 20 kpg
WARNA/TEKSTUR
bh 2,800.00
20 x 20 (KM/WC) kotak 80,000.00 setara Roman; 1 kotak @ 25 kpg
bh 3,200.00
30 x 30 (tekstur) kotak 141,000.00 setara KIA; 1 kotak @ 11 kpg
bh 12,818.18
30 x 30 kotak 61,200.00 setara KIA Tile; 1 kotak @ 11 kpg

bh 5,563.64
33,5x33,5 (tekstur) kotak 105,000.00 setara Roman; 1 kotak @ 8 kpg

bh 13,125.00
40 x 40 kotak 70,700.00 setara KIA; 1 kotak @ 6 kpg
bh 11,783.33
50x50 kotak 131,000.00 setara Roman; 1 kotak @ 4 kpg

bh 32,750.00
50x50 (tekstur) kotak 131,000.00 setara Roman; 1 kotak @ 4 kpg

bh 32,750.00
30x60 ktk 130,800.00 setara platinum; 1 kotak @ 5 kpg
bh 26,160.00
-
3. GRANITE TILE 60 x 60 kotak 309,600.00 setara Sincere; 1 kotak @ 4 kpg

bh 77,400.00
60 x 60 (tekstur) kotak 533,000.00 setara Indogres; 1 kotak @ 4 kpg

bh 133,250.00
80 x 80 kotak 663,360.00 setara Elegenza; 1 kotak @ 2 kpg

bh 331,680.00
80 x 80 (tekstur) kotak 838,000.00 setara elegenza; 1 kotak @ 2 kpg

bh 419,000.00
Granite Pola uk. 1,2 x 1,2 m ls 2,550,000.00 setara Indecor
Step nosing 30 x 60 bh 92,600.00 setara granito
Step nosing 20 x 60 bh 58,700.00 setara granito
592

No. JENIS BAHAN SATUAN HARGA DASAR (Rp) KETERANGAN


-
4. BATU ALAM Batu candi uk. 10x20 m2 170,000.00
Granit alam m2 1,750,000.00
Andesit bintik bakar uk. 15x30 m2 175,000.00
Andesit bintik bakar uk. 10 x 20 m2 150,000.00
Palimanan uk. 10x20 m2 160,000.00
Palimanan uk. 15x30 m2 180,000.00
Lempeng (kecil) m2 100,000.00
Lempeng (besar) m2 130,000.00
Andesit + bevel m2 195,000.00 uk. 15x30
-
5. LAIN-LAIN Karpet biasa m2 17,500.00 bahan polyester; uk. 30 m x 2 m
Karpet tebal 4 - 4,5mm m2 87,500.00 setara rainbow tipe crown; lebar 3,95 - 4 m
Karpet t. 4- 6 mm m2 237,500.00 setara rainbow tipe carprice; lebar 3,95 - 4 m
Lantai vinyl 3 mm m2 243,240.00 setara Gaimaru; 1ktk@ 3,3m2
Lantai Laminate t=0,8 mm m2 210,332.10 setara krisbow 1 ktk@1,897m2
Lapis foam Lantai laminate m 17,500.00 uk. 1,2 m x 1 m
Plint laminate m 133,000.00 P. 2,4 m ; L. 10 cm
Adaptation laminate m 83,000.00 P. 2,4 m
Wallpaper m2 50,000.00 uk. 1 rol @ 10m x 50 cm

Nat keramik kg 16,500.00 setara AM


Aluminium Composite Panel (ACP) tipe PE m2 195,000.00
untuk dalam setara seven untuk interior ; uk. 1,22 m x 2,44 m
Aluminium Composite Panel (ACP) tipe m2 255,500.00
PVDF untuk luar setara seven untuk eksterior ; uk. 1,22 m x 2,44 m
-
-
V BAHAN CETAK

1. BUIS BETON Buis beton dia. 100cm m 975,000.00 d0=100 cm; d1=120cm
Buis beton dia. 80cm m 875,000.00 d0=80 cm; d1=100cm
Buis beton dia. 60cm m 625,000.00 d0=60 cm; d1=75cm
Buis beton dia.40cm m 450,000.00 d0=40 cm; d1=48cm
Buis beton dia. 30cm m 345,000.00 d0=30 cm; d1=38cm
Buis beton dia. 20cm m 250,000.00 d0=20 cm; d1=25cm
-
2. ROSTER Roster keramik uk.30x30 bh 61,500.00 setara Trisensa
Roster keramik uk. 20x20 bh 45,000.00 setara Trisensa
Roster terawang bh 8,000.00 uk. 10x20
Roster beton bh 22,500.00 uk. 25x25
-
3. GLASS BLOK Glass block uk. 20x20 bh 26,800.00 setara Tidy
-
4. PAGAR BETON Panel beton lebar 50 bh 165,000.00 uk. 50x240
Panel beton lebar 40 bh 137,500.00 uk. 40x240
Kolom beton pracetak m 100,000.00 uk. 16x17
Pagar catur t. 60 bh 20,000.00
-
5. PAVING BLOK Segi enam t. 6 cm bh 2,229.73 1 m2 @ 37 bh; K 200
Persegi panjang t. 6 cm bh 1,875.00 1 m2 @ 44 bh; K200
Segi enam t.8 cm bh 2,500.00 1 m2 @ 37 bh; K 200
Persegi panjang t. 8 cm bh 2,102.27 1 m2 @ 44 bh; K200
Segi enam warna t. 6 cm bh 2,567.57 1 m2 @ 37 bh; K 200
Persegi panjang warna t. 6 cm bh 2,159.09 1 m2 @ 44 bh; K200
Segi enam warna t.8 cm bh 2,837.84 1 m2 @ 37 bh; K 200
Persegi panjang warna t. 8 cm bh 2,386.36 1 m2 @ 44 bh; K200
-
6. KANSTEIN Uk. 60x30x20/12 bh 55,000.00
Uk. 60x30x10/15 bh 52,500.00
Uk.40x20x10/13 bh 32,500.00
Uk. 60x35x18/21 bh 65,000.00 stdr K.250 (LRT)
7. BATACO BETON Bataco uk. 20x40 bh 2,300.00
-
8. JENDELA UPVC Jendela kaca dan kusen UPVC (uk. 1 m x bh 1,500,000.00 dua daun jendela
1,2 m)
Jendela kaca dan kusen UPVC (uk. 0.6 m x bh 995,000.00 satu daun jendela
1,5 m)
-
-
VI BAHAN BESI /BAJA /ALUMINIUM /BAJA RINGAN

1. BESI BETON Besi beton kg 12,000.00 1 batang @ 12 m


Kawat beton kg 20,000.00
Wiremesh kg - uk. 2,1 m x 5,4 m; jarak150mm x150mm (6mm)
@336000

2. BAJA Baja WF, IWF, H kg 14,000.00


Baja Siku, CNP kg 9,750.00
Kawat las kg 35,000.00 setara Niko; 1 ktk @ 2 kg
Besi Pipa medium Ø 2 " - 4mm m' 83,325.00
Besi Pipa medium Ø 3 " - 4mm m' 108,019.50
Besi Pipa medium Ø 4 " -4mm m' 145,894.50
593

No. JENIS BAHAN SATUAN HARGA DASAR (Rp) KETERANGAN


-
3. ALUMINIUM Profil daun pintu kaca m 55,000.00 setara CA; warna silver; panjang 6 m
Profil kusen 3" m 33,500.00 setara CA; warna silver; panjang 6 m
Profil kusen 4" m 47,000.00 setara CA; warna silver; panjang 6 m
Aluminium strip m 33,000.00 setara CA; warna silver; panjang 6 m
-
4. BAJA RINGAN Profil C channel 100.75 btg 128,000.00 Tegangan leleh minimum 550 MPa;p. 6 m

Profil C channel 80.75 btg 92,000.00 Tegangan leleh minimum 550 MPa;p. 6 m

Profil C channel 75.75 btg 82,000.00 Tegangan leleh minimum 550 Mpa;p. 6 m

Profil C channel 75.65 btg 73,000.00 Tegangan leleh minimum 550 Mpa;p. 6 m

Reng R.40.45 btg 40,000.00 Tegangan leleh minimum 550 Mpa;p. 6 m

Screw truss 12x 3/4 bh 165.00


Dynabolt bh 1,500.00 p. 10 mm
Talang Jurai dalam m 39,000.00 panjang 6 m
-
5. PINTU BESI Folding Gate t.0,4 mm m2 430,000.00 min. 7 m2; finish cat standar
Folding Gate t.0,6mm m2 505,000.00 min. 7 m2; finish cat standar
Folding Gate t.0,8mm (jumbo) m2 655,000.00 min. 7 m2; finish cat standar
Rolling door aluminum t.0,8 mm m2 600,000.00 min. 6 m2; panjang + 50 cm
Rolling door besi t.± 0,5 mm m2 550,000.00 min. 6 m2; panjang + 50 cm; finish cat standar
Rolling door galvanum t.± 0,5 mm m2 400,000.00 min. 6 m2; panjang + 50 cm
-
6. PEGANGAN Pegangan tangga stainless kombinasi acylic m' 317,000.00 setara star
TANGGA (3/4", 1" & 2")
STAINLESS
Pegangan tangga stainless (3/4" & 2") m' 673,000.00 setara star
-
-
7. LAIN-LAIN Kawat jaring galvanis lbr 194,400.00 uk. 2,4 m x 3 m
Kawat duri roll 135,000.00 1 rol @ 60m
Pintu KM/WC Aluminium warna - frame bh 2,450,000.00 Aluminium 0,75mm ; coating powder 60 micron;
louver (incl. kusen, lever handle stainless uk. 80cm x 200cm; setara solidoor-starmas
steel, engsel aluminium)
Pintu Aluminium warna - 5 mm ice glass bh 3,750,000.00 Aluminium 0,75mm ; coating powder 60 micron;
(incl. kusen, lever handle stainless steel, uk. 90cm x 215cm; setara solidoor-starmas
engsel aluminium)

Pintu KM/WC Aluminium warna urat kayu bh 3,600,000.00 Aluminium 0,75mm ; coating powder 60 micron;
- frame louver (incl. kusen, lever handle uk. 80cm x 200cm; setara solidoor-starmas
stainless steel, engsel aluminium)
Pintu Aluminium warna urat kayu - 5 mm bh 4,300,000.00 Aluminium 0,75mm ; coating powder 60 micron;
ice glass (incl. kusen, lever handle stainless uk. 90cm x 215cm; setara solidoor-starmas
steel, engsel aluminium)
-
-
VII. BAHAN PIPA

1. PIPA PVC Pipa PVC AW 1/2" btg 23,000.00 setara Wavin; 1 batang @ 4 m
Pipa PVC AW 3/4" btg 30,000.00 setara Wavin; 1 batang @ 4 m
Pipa PVC AW 3" btg 178,000.00 setara Wavin; 1 batang @ 4 m
Pipa PVC AW 4" btg 294,000.00 setara Wavin; 1 batang @ 4 m
Pipa PVC DW 3" btg 96,000.00 setara Wavin; 1 batang @ 4 m
Pipa PVC DW 4" btg 151,000.00 setara Wavin; 1 batang @ 4 m
-
g346 -
2. PIPA GALVANIS Pipa galvanis 1/2" t.1,9-2,3 mm btg 140,000.00 1 btg @ 6m
Pipa galvanis 3/4" t.1,9-2,3 mm btg 190,000.00 1 btg @ 6m
-
3. LAIN-LAIN Lem pipa btl 8,000.00 1 botol @ 60 gram
-
-
-
VIII. BAHAN LANGIT-LANGIT

1. PLYWOOD Plywood 3 mm lbr 45,000.00


Plywood 4 mm lbr 70,000.00
Plywood 6 mm lbr 90,000.00
Plywood 9 mm lbr 130,000.00
Plywood 12 mm lbr 180,000.00
-
2. SOFT BOARD Gypsum 9 mm uk. 1,2 x 2,4 m kpg 75,000.00 setara Jayaboard
-
3. HARD BOARD Calsiboard 3,5mm kpg 69,000.00
Eternit kpg 65,000.00 uk. 1,2 x 2,4 m
-
4. PLAFOND PVC Plafond PVC putih + pasang m2 175,000.00 setara Shunda plafond
Plafond PVC warna + pasang m2 250,000.00 setara Shunda plafond
Ornamen PVC unit 5,000,000.00 setara Shunda plafond; uk. 1,2m x 1,6m

-
5. LIST PLAFOND List plafond 1x4 btg 8,000.00 1 batang @ 3,8 m
594

No. JENIS BAHAN SATUAN HARGA DASAR (Rp) KETERANGAN

List plafond besar btg 17,000.00 1 batang @ 3,8 m


List gypsum kecil btg 13,000.00 1 batang @ 1,7 m
List gypsum sedang btg 17,000.00 1 batang @ 1,7 m
List PVC btg 120,000.00 1 batang @ 4 m
-
6. LAIN-LAIN Skrup gypsum 1" dus 60,000.00 1 kotak @ 1000
Lakban gypsum roll 15,000.00
Paku plywood kg 25,000.00
Hollow galvanis 20x40 m 4,000.00 1 btg @ 4 m
Hollow galvanis 40x40 m 5,375.00 1 btg @ 4 m
-
-
IX. BAHAN FINISHING

1. KAYU Menie kayu kg 46,100.00 setara Nippon Paint


Plamir kayu kg 9,300.00 setara Rj; 1 klg@ 5 kg
Cat dasar kg 31,000.00 setara bodiluc
Cat penutup kg 52,000.00 setara Impra
Teak Oil ltr 57,500.00
Politur ltr 63,000.00 setara ultran
Residu/Ter ltr 4,500.00 setara Bintang bola
Dempul kayu kg 9,300.00 setara Rj; 1 klg@ 5 kg
Vernis ltr 57,500.00 setara impra
-
2. BESI Menie kg 32,900.00 setara Nippon Bodelac ; 1 galon @ 5kg

Cat penutup liter 75,000.00 setara jotun


-
3. TEMBOK Cat tembok eksterior liter 95,950.00 setara Dulux Weather Shield; 1 galon @ 2,5 l

Cat tembok interior kg 22,240.00 setara Vinilex; 1 galon @ 5 kg


Plamir dinding/kayu kg 9,300.00 setara Rj
Cat dasar/sealer interior kg 33,025.10 setara Vinilex
Cat dasar/sealer eksterior liter 48,000.00 setara Dulux
Cat antibocor kg 52,000.00 setara aquaproof; 1 kaleng @ 1 kg

-
4. THINNER Thinner liter 31,800.00 setara Jotun: 1 kaleng @ 1 l

-
5. LAIN-LAIN Kuas 1" bh 10,000.00 setara prima
Kuas 1 1/2" bh 11,500.00 setara prima
Kuas 2" bh 14,000.00 setara prima
Kuas 3" bh 24,900.00 setara ace
Kuas 4" bh 35,900.00 setara ace
Kual roll bh 45,900.00 setara ace
Baki cat bh 16,000.00 NN
Coating batu alam liter 72,500.00 setara AM 152
-
X. BAHAN KACA

1. KACA POLOS Kaca polos 3mm m2 120,000.00 setara Asahimas


Kaca polos 5mm m2 115,000.00 setara Asahimas
Kaca polos 8mm m2 350,000.00 setara Asahimas
Kaca polos 10mm m2 450,000.00 setara Asahimas
Kaca polos 12mm m2 550,000.00 setara Asahimas
-
2. KACA RYBEN/HITAKaca polos 8mm m2 450,000.00 setara Asahimas
Kaca polos 10mm m2 550,000.00 setara Asahimas
-
3. LAIN-LAIN Sunblast polos m2 200,000.00
Sunblast coating m2 325,000.00
Kaca film m2 65,000.00 lebar 120 cm
Kaca patri m2 2,000,000.00 list kuningan
Lem kaca btl 25,000.00
Jendela nako 5mm ryben (8 daun) unit 208,000.00 u. 60x120
-
-
XI BAHAN INSTALASI LISTRIK

1. KABEL LISTRIK NYM 2 x 1,5 m 7,770.00 setara supreme; 1 roll @ 50 m


NYM 2 x 2,5 m 13,600.00 setara supreme; 1 roll @ 50 m
NYM 3 x 2,5 m 13,800.00 setara supreme; 1 roll @ 50 m
NYA 2,5 m 4,700.00 setara Praba; 1 roll @ 50 m
-
2. SAKELAR Saklar tunggal bh 61,600.00 setara Philips
Saklar seri bh 70,400.00 setara Philips
-
3. STOP KONTAK Stop kontak bh 70,400.00 setara Brocco
Stop kontak AC bh 225,350.00 setara Brocco
-
4. LAMPU Downlight 4" bh 87,500.00 setara Philips
Lampu SL bh 45,000.00 setara Philips
595

No. JENIS BAHAN SATUAN HARGA DASAR (Rp) KETERANGAN

Lampu LED bh 45,000.00 setara Panasonic


Lampu T5 p. 60 cm bh 37,500.00
Lampu TL RAM 2 x 28 watt bh 240,000.00 setara Philips; 2 x 28 watt
Lampu Taman t. 1m bh 699,000.00 besi tempa (wrougt iron)
Lampu TL RAM 2 X 18 bh 956,000.00 setara Philips
Lampu TL 1 x 36 bh 455,250.00
Down light PLC 18 W 385,750.00
Down light PLC 8 W 330,200.00
-
5. LAIN-LAIN Pipa listrik btg 10,900.00 setara clipsal; 1 btg @ 3 meter
T dus, L bh 6,600.00
Lakban listrik roll 11,500.00
Klem kabel bks 8,500.00 1 bks @ 50 pcs
Mangkok inbow bh 5,000.00 setara panasonic
Fitting bh 11,900.00
Klem pipa bh 700.00
Fleksibel m 4,000.00
MCB 10A bh 55,100.00 setara schneider
Exchaust Fan 918,225.00

-
-
XII. BAHAN PENGUNCI DAN PENGGANTUNG

1. KUNCI TANAM Kunci tanam stainless bh 279,000.00 setara Dekkson


Kunci tanam biasa bh 159,000.00 setara Hampton
Kunci tanam kecil bh 65,000.00
Kunci bulat (KM/WC) bh 150,000.00 setara Dekkson
Handle pintu stainless steel bh 238,000.00 setara Gradino, Solid
Cylinder kunci bh 175,000.00 setara paloma
-
2. ENGSEL/GRENDEL Engsel 3" stainless steel ktk 60,000.00 setara unikey; 1 ktk @ 2 pcs
Engsel 3" biasa ktk 48,000.00 1 ktk @ 2 pcs (untuk jendela)
Engsel 4" stainless steel ktk 810,000.00 setara unikey; 1 ktk @ 2 pcs (untuk pintu)

Engsel 4" biasa ktk 60,000.00 1 ktk @ 2 pcs (untuk pintu)


Engsel tanam set 1,137,500.00 setara Dekson
Grendel 2" stainless steel bh 23,000.00
Grendel 3" stainless steel bh 30,000.00
Grendel 8 " bh 100,000.00 paloma
Grendel 12 " bh 200,000.00
Grendel tanam bh 220,000.00 setara unikey : 1 ktk @2 pcs
-
3. LAIN-LAIN Gembok bh 140,000.00 setara paloma
Door closer bh 500,000.00 setara Paloma
Door stop bh 130,000.00 setara Paloma
Door holder bh 110,000.00 setara Hampton
Kait angin bh 60,000.00 setara paloma
Spring knip ktk 58,000.00 1 ktk @ 2 pcs hampton
Pull Handle ps 450,000.00 setara Dolomite
Kunci slot stainless steel bh 70,000.00 setara paloma
-
-
XIII. BAHAN SANITAIR

1. CLOSED Closed jongkok bh 478,000.00 setara Toto


Closed duduk bh 1,480,000.00 setara Amstand Newton CCST
Closed duduk bh 2,280,000.00
setara Toto CW 660J/421 Ecoflush
-
2. JET SHOWER Jet shower bh 210,000.00 setara Toto
Jet shower bh 91,500.00 setara Onda
Hand shower bh 490,000.00 setara Toto
-
3. KRAN TEMBOK Kran air 1/2 - 3/4" bh 198,000.00 setara San-Ei
Kran air 1/2 - 3/4" bh 57,500.00 setara Onda
-
4. WASTAFEL Wastafel bh 421,000.00 setara Toto
Siphon stainless bh 273,000.00 setara Amstand
kran wastafel bh 566,100.00 setara Amstand
Stop Kran bh 61,500.00
Selang Flexsibel p.40 cm bh 97,000.00 setara san-ei
-
5. URINOIR Urinoir bh 2,055,000.00 setara Amstand+flexible+flash
Pembatas Urinoir bh 552,000.00 setara Amstand
-
6. BATHUBE Bathube uk. 820x470 bh 3,800,000.00 setara Hubert
-
7. PENAMPUNG AIR Penampung air fiber kap. 250L unit 510,000.00 setara tedmont
Penampung air fiber kap. 550 L unit 926,000.00 setara tedmont
Penampung air fiber kap. 1100 L unit 1,564,000.00 setara tedmont
Penampung air fiber kap. 2000 L unit 2,733,000.00 setara tedmont
596

No. JENIS BAHAN SATUAN HARGA DASAR (Rp) KETERANGAN

Penampung air fiber kap. 3000 L unit 4,183,000.00 setara tedmont


Penampung air stainless kap. 550 L unit 2,370,000.00 setara tedmont
Penampung air stainless kap. 1100 L unit 4,994,000.00 setara tedmont
Penampung air stainless kap. 2000 L unit 8,490,000.00 setara tedmont
-
8. LAIN-LAIN Bak Air fiberglass uk. 1 m3 bh 395,000.00
Bak Air Marble uk. 56x56 cm bh 1,947,500.00
Bak Air Marble uk. 66x66 cm bh 2,137,500.00
Biotank type BT-12 kapasitas 1800 ltr bh 6,825,000.00
Biotank type BF-08 kapasitas 3000 ltr bh 9,030,000.00
Kitchen siknk stainless steel bh 1,361,000.00 Uk. 820 x 470
Waterdrain bh 88,000.00
Floor drain stainless steel bh 284,500.00 setara Onda
Floor drain plastik bh 25,000.00 NN
Sealtape bh 5,000.00
Stop Kran bh 25,000.00
Pintu KM/WC PVC bh 759,810.00 setara muriko
Pelampung 1/2" bh 205,000.00 setara Onda
Pelampung 3/4" bh 249,000.00 setara Onda
-
-
XIV. BAHAN PENGIKAT

1. PAKU Paku bermacam ukuran kg 18,000.00


Beton ktk 20,000.00 1 ktk @ 50 buah
Paku seng kg 28,000.00
Paku atap bitumen bh 1,000.00 p. 70 mm
Skrup fixer bh 700.00 1 kotak @ 100 pcs
-
2. LEM Lem kayu kg 19,375.00 setara lem fox; 1 bungkus @ 800 gram
Lem aica aibon kg 51,580.00
Sealent tube 28,000.00
-
-
XV. LAIN-LAIN

1 Amplas lbr 8,000.00


2 Diamond wheel bh 130,000.00 setara Bosch
3 Tali Ijuk kg 38,000.00
4 Air ltr 66.60
5 Minyak Bekesting ltr 10,700.00
6 Minyak Pelumas ltr 35,000.00
7 Solar ltr 10,130.00
8 Soda api kg 40,000.00
9 Sewa alat las jam 6,700.00
10 Sewa scafolding unit 45,000.00 1 bulan
11 Sewa molen unit/hari 600,000.00
12 Karung goni lbr 9,700.00 uk. 75 cm x 110 cm
13 Plastik m2 3,125.00 1 roll @ 20m x 1,2m
14 Geotekstil m2 22,000.00
-
-
HARGA DASAR UPAH

1 Pekerja OH 95,000.00
2 Tukang OH 125,000.00
3 Kepala Tukang OH 140,000.00
4 Mandor OH 165,000.00
4.3.1 Daftar Harga Satuan Bahan dan Upah Tenaga Kerja

NO. JENIS BARANG / BAHAN / UPAH URAIAN SATUAN HARGA

I. HARGA SATUAN DASAR TENAGA KERJA / UPAH

Pekerja OH 145,000
Kepala Tukang OH 180,000
Mandor OH 185,000
Mekanik alat berat OH 150,000
Operator alat berat OH 165,000
Operator komputer/printer/ploter OH 165,000
Operator pompa OH 165,000
Pembantu driller OH 110,000
Pembantu Juru ukur OH 110,000
Pembantu mekanik alat berat OH 110,000
Pembantu operator alat berat OH 110,000
Sopir OH 150,000
Supir kendaraan < 2 ton (termasuk sedan) OH 150,000
Tukang Aspal OH 175,000
Tukang Batu OH 175,000
Tukang Besi OH 175,000
Tukang Besi Konstruksi OH 175,000
Tukang Cat OH 175,000
Tukang Erection OH 175,000
Tukang Gali OH 175,000
Tukang Kayu OH 175,000
Tukang Khusus Aluminium OH 175,000
Tukang Las Biasa OH 175,000
Tukang Las Konstruksi OH 175,000
Tukang Listrik OH 175,000
Tukang Pipa OH 175,000
Tukang Vibrator OH 175,000

II. HARGA SATUAN DASAR BAHAN / MATERIAL

A. MATERIAL TANAH DAN BATUAN


Abu Batu m³ 150,000
Batu kali m³ 385,000
Bata merah tipis uk. (5 x 11 x 22) cm buah 800
Bata merah tebal uk. (8 x 18 x 16) cm buah 850
Bata merah m³ 325,000
Bata ringan hebel m³ 850,000
Bata ringan 7,5 x 20 x 60 cm m³ 1,350,000
Bata ringan 10 x 20 x 60 cm m³ 1,350,000
Batu alam andesit bakar 20/40 m² 185,000
Batu candi 20/40 m² 175,000
Batu granit kg 7,200
Batu paras m² 175,000
Batu pecah 1/2 m³ 550,000
Batu pecah 2/3 m³ 550,000
Batu pecah 3/5 m³ 550,000
Batu pecah 5/7 m³ 550,000
Batu sikat (pancawarna) zak 175,000
Batu tempel hitam m² 125,000
Batu traso kg 7,000
Koral bulat m³ 435,000
Pasir beton m³ 175,000
NO. JENIS BARANG / BAHAN / UPAH URAIAN SATUAN HARGA

Pasir pasang m³ 105,000


Pasir urug m³ 153,000
Sirtu m³ 95,000
Tanah urug/timbunan m³ 85,000

B. MATERIAL KAYU
Dolken kayu gelam Ø 8-10 cm, pjg 3 m batang 15,000
Dolken kayu gelam Ø 6-8 cm, pjg 3 m batang 10,000
Formika Uk. 244 cm x 122 cm lembar 150,000
Kayu Kelas II m³ 4,300,000
Kayu Kelas III m³ 2,600,000
Kayu Kelas IV m³ 2,500,000
Kayu Bekisting/Perancah m² 2,250,000
List kayu profil m' 22,000
Multiplek tebal 6 mm lembar 78,000
Multiplek tebal 9 mm lembar 140,000
Multiplek tebal 18 mm lembar 375,000
Phenol film 12mm lembar 225,000
Plywood 4 mm lembar 70,000
Plywood 12 mm (120x240) lembar 185,000
Plywood 9 mm (120x240) lembar 150,000
Teakwood 4 mm (90x220) lembar 45,000
Teakwood 9 mm (90x210) lembar 67,000
Tripleks t=4mm, 120x240 cm lembar 70,000

C. MATERIAL BESI DAN BAJA


Baja tulangan polos U-24 atau ulir U-32 kg 19,000
Baja (ulir) U-39 kg 19,000
Baja (ulir) U-48 kg 19,000
Baja Tahan Karat ( Stainless Steel ) kg 112,000
Baja Teralis kg 15,000
Baja canai dingin profil C.75 kg 16,750
Tegangan leleh minimum 550
Baja Ringan Profil C. 100. 75 batang 135,000
MPa;p. 6 m
Tegangan leleh minimum 550
Baja Ringan Profil C. 80.75 batang 110,000
MPa;p. 6 m
Tegangan leleh minimum 550
Baja Ringan Profil C. 75.75 batang 98,000
MPa;p. 6 m
Tegangan leleh minimum 550
Baja Ringan Profil C. 75.65 batang 88,000
MPa;p. 6 m
Besi angkur/mur/baut kg 18,000
Besi hollow 50.50.3 kg 14,000
Besi hollow 40.40.2 kg 11,000
Baut Bh 175
Tegangan leleh minimum 550
Reng Baja Ringan t. 45 mm batang 45,000
MPa;p. 6 m
Tegangan leleh minimum 550
Reng Baja Ringan t. 60 mm batang 95,000
MPa;p. 6 m
Rolling / Besi Lis Kaca (1 x 1) cm m' 30,000
Besi plat kg 10,000
Besi profil kg 14,000
Besi siku kg 10,000
Besi strip kg 9,000
Besi squaretube m' 15,000
Dynabolt buah 1,500
uk. 2,1 m x 5,4 m; jarak150mm
Jaring Kawat Baja dilas kg 12,500
x150mm (6mm) @395.000
Kawat beton kg 20,000
Kawat duri 1 roll, p:15 m @135.000 m' 9,000
Kawat galvanis Ø 3 mm kg 16,000
Kawat galvanis Ø 4 mm kg 16,000
Kawat galvanis Ø 5 mm kg 16,000
Kawat las listrik kg 35,000
Kawat nyamuk m2 25,000
NO. JENIS BARANG / BAHAN / UPAH URAIAN SATUAN HARGA

Kawat nyamuk nylon m2 21,000


Paku kg 28,000
Paku hak panjang 15cm kg 20,000
Paku pancing 6x23 kg 20,000
Paku sekrup kg 55,000
Saringan pasir m' 18,000
Screw truss buah 175
Sekrup kait buah 1,200
Talang jurai M' 27,000

D. MATERIAL PAVING
Kanstin K-200, 10x20x50 cm buah 32,000
Paving block 6 cm abu-abu K-200 m² 82,000
Paving block 6 cm warna K-200 m² 90,000
Paving block 8 cm abu-abu K-200 m² 105,000
Paving block 8 cm warna K-200 m² 115,000

E. MATERIAL DRAINASE
Buis beton Ø 20 cm d0=20 cm; d1=25cm; p=100 cm buah 250,000
Buis beton Ø 30 cm d0=30 cm; d1=38cm buah 335,000
Buis beton Ø 40 cm d0=40 cm; d1=48cm buah 425,000
Buis beton Ø 60 cm d0=60 cm; d1=75cm buah 600,000
Buis beton Ø 80 cm d0=80 cm; d1=100cm buah 850,000
Buis beton Ø 100 cm d0=100 cm; d1=120cm buah 950,000
Penutup U - Ditch 100 HD tebal 12 cm, panjang 0,6 m unit 825,000
Penutup U - Ditch 100 LD tebal 12 cm, panjang 0,6 m unit 725,000
Penutup U - Ditch 120, panjang 0,6 m unit 1,000,000
Penutup U - Ditch 20, panjang 0,6 m unit 55,000
Penutup U - Ditch 30, panjang 0,6 m unit 145,000
Penutup U - Ditch 40, panjang 0,6 m unit 215,000
Penutup U - Ditch 50, panjang 0,6 m unit 275,000
Penutup U - Ditch 60, panjang 0,6 m unit 330,000
Penutup U - Ditch 80 HD tebal 10 cm, panjang 0,6 m unit 650,000
Penutup U - Ditch 80 LD tebal 10 cm, panjang 0,6 m unit 380,000
U - Ditch - 100, panjang 1,2 m unit 2,785,000
U - Ditch - 120, panjang 1,2 m unit 3,500,000
U - Ditch - 140, panjang 1,2 m unit 4,400,000
U - Ditch - 20, panjang 1,2 m unit 390,000
U - Ditch - 30, panjang 1,2 m unit 660,000
U - Ditch - 40, panjang 1,2 m unit 1,000,000
U - Ditch - 50, panjang 1,2 m unit 1,050,000
U - Ditch - 60, panjang 1,2 m unit 1,200,000
U - Ditch - 80, panjang 1,2 m unit 1,950,000

F. MATERIAL PRECAST
Kolom beton pracetak 320 x 17 x 17 cm btg 370,000
Kolom beton pracetak 280 x 17 x 17 cm btg 305,000
Panel beton pracetak 5x50x240 cm buah 140,000
Panel beton pracetak 5x40x240 cm buah 120,000

G. MATERIAL PENUTUP ATAP


Alumunium gelombang tebal 0,55 lembar 100,000
Asbes gelombang besar 5mm (180x92 cm) lembar 98,000
Asbes gelombang besar 5mm (200x92 cm) lembar 101,000
Asbes gelombang besar 5mm (225x92 cm) lembar 110,000
Asbes gelombang besar 5mm (250x92 cm) lembar 112,000
NO. JENIS BARANG / BAHAN / UPAH URAIAN SATUAN HARGA

Asbes gelombang besar 6mm (180x108 cm) lembar 90,000


Asbes gelombang besar 6mm (210x108 cm) lembar 90,000
Asbes gelombang besar 6mm (240x108 cm) lembar 98,000
Asbes gelombang besar 6mm (270x108 cm) lembar 106,000
Asbes gelombang besar 6mm (300x108 cm) lembar 110,000
Asbes gelombang kecil 4mm (150x105 cm) lembar 52,000
Asbes gelombang kecil 4mm (180x105 cm) lembar 56,000
Asbes gelombang kecil 4mm (210x105 cm) lembar 66,000
Asbes gelombang kecil 4mm (240x105 cm) lembar 78,000
Asbes gelombang kecil 4mm (270x105 cm) lembar 85,000
Asbes gelombang kecil 4mm (300x105 cm) lembar 92,000
Atap Bitumen bergelombang uk. 200 x 95 x 0,30 cm warna merah/coklat/hitam lembar 168,000
Genteng Bitumen bergelombang uk. 200 x 97 x 0,30 cmwarna merah/coklat/hitam lembar 165,000
Genteng Bitumen bergelombang uk. 106 x 40 x 0,30 cmwarna merah/coklat/hitam lembar 54,000
Bubung genteng kodok buah 8,000
Bubung genteng palentong buah 12,500
Bubung genteng palentong super buah 13,500
Bubungan asbes besar buah 11,000
Bubungan asbes kecil buah 52,000
Bubungan beton press buah 6,800
Genteng aspal buah 26,000
Genteng bitumen lapis aspal lembar 172,500
Genteng beton buah 7,250
Genteng keramik setara kanmuri, 14 pcs @ 1m2 buah 11,200
Genteng kodok buah 3,350
Genteng kodok glazuur buah 5,400
Genteng metal setara Multiroof; 1m2 @ 1,3 lbr lembar 99,000
Genteng metal berpasir setara Multiroof; 1m2 @ 1,3 lbr lembar 110,000
Genteng palentong buah 3,200
Genteng palentong super buah 4,800
Listplang papan kalsiboard buah 65,000
Listplang tekstur kayu buah 58,000
Nok bitumen uk. 90 x 50 cm lembar 80,000
Nok genteng aspal buah 9,250
Nok genteng beton buah 15,500
Nok genteng metal buah 27,000
Nok genteng metal berpasir buah 45,000
Nok paten 0,92 m lembar 13,500
Nok paten 1,05 m lembar 17,500
Nok paten 1,08 m lembar 21,000
Nok standar 40x18 buah 29,500
Nok stel gelombang 0,92 m lembar 30,000
Nok stel gelombang 1,05 m lembar 36,000
Nok stel gelombang 1,08 m lembar 43,000
Nok stel rata 0,92 m lembar 26,000
Nok stel rata 1,05 m lembar 40,000
Roof light fiberglass lembar 130,000
Seng gelombang 3"-5" lembar 95,000
Seng gelombang bjls 28 lembar 114,000
Seng gelombang bljs 30 lembar 85,500
Seng gelombang uk. 0.9 x 1.8 t=0.02 lembar 102,000
Seng plat 3" x 6" bjls 28 lembar 90,000
Seng plat bjls 28 m 50,000
Seng plat bjls 30 m 63,000
Sirap kayu buah 5,700
NO. JENIS BARANG / BAHAN / UPAH URAIAN SATUAN HARGA

H. MATERIAL PLAFOND
Akustik ukuran 30 cm x 30 cm lembar 10,000
Akustik ukuran 30 cm x 60 cm lembar 14,000
Akustik Ukuran 60 cm x 120 cm lembar 62,000
Asbes 1,00 x 1,00 m lembar 22,000
Bahan plafond PVC m2 85,000
Kalsiborad (120 cm x 240 cm x 5 mm) lembar 75,000
Kalsiboard (120 cm x 240 cm x 3,5 mm) lembar 55,000
Gypsum Board (120 cm x 240 cm x 12 mm) lembar 95,000
Gypsum Board (120 cm x 240 cm x 9 mm) lembar 75,000
List gypsum 1 batang @ 1,7 m m' 10,000
Listplank GRC (20 cm x 244 cm x 9 mm ) m2 75,000
List Profil plafond PVC M' 20,000
Pelat asbes tebal 3,5 mm lembar 41,000
Pelat asbes tebal 4 mm lembar 67,000

I. MATERIALPENUTUP LANTAI DAN DINDING


Bahan Teraso Cor m3 11,500,000
Batako ukuran 20 x 40 x 10 cm buah 2,800
Bata Pelapis / Bata Ekspose buah 3,200
Floor Hardener Kg 7,250
Granit tile unpolish m2 252,000
Gymfloor m2 335,000
Internal Cove ( 5 x 5 x 20 ) cm Bh 9,200
Karpet tbl 4 - 4,5 mm m2 84,000
Keramik dinding 10 x 20 cm buah 1,650
Keramik dinding 20 x 20 cm buah 3,350
Keramik dinding 20 x 25 cm buah 4,300
Keramik dinding 25 x 25 cm buah 4,800
Keramik lantai 20 x 20 cm setara Roman; 1 kotak @ 25 kpg doos 78,000
Keramik lantai 30 x 30 cm setara KIA; 1 doos @ 11 kpg doos 130,000
Keramik lantai 33 x 33 cm setara Roman; 1 kotak @ 8 kpg doos 98,000
Keramik lantai 40 x 40 cm setara KIA; 1 kotak @ 6 kpg doos 82,000
Keramik uk. 10x33 cm, variasi / Border Bh 3,800
Marmer m2 1,650,000
Keramik Mozaik uk. 30 cm x 30 cm Bh 11,800
Parquet m2 335,000
Plamir Kg 18,000
Plint Ubin PC 10 x 30 cm Bh 1,400
Plint Ubin PC 10 x 40 cm Bh 1,600
Plint Ubin PC 15 x 20 cm Bh 1,250
Plint Ubin PC Warna 10 x 20 cm Bh 2,500
Plint Ubin PC Warna 10 x 30 cm Bh 9,000
Plint Ubin PC Warna 10 x 40 cm Bh 3,500
Plint Ubin Teralux Kerang 10 x 30 cm Bh 3,250
Plint Ubin Teralux Kerang 10 x 40 cm Bh 3,500
Plint Ubin Teralux Marmer 10 x 30 cm Bh 26,000
Plint Ubin Teralux Marmer 10 x 40 cm Bh 36,000
Plint Ubin Teralux Marmer 10 x 60 cm Bh 55,000
Plint Ubin Teraso 10 x 20 cm Bh 2,550
Plint Ubin Teraso 10 x 30 cm Bh 3,300
Plint granit 10 x 30 cm buah 8,200
Plint granit 10 x 40 cm buah 14,800
Plint granit 10 x 60 cm buah 13,000
Plint keramik 10 x 20 cm buah 3,600
Plint keramik 10 x 30 cm buah 3,900
NO. JENIS BARANG / BAHAN / UPAH URAIAN SATUAN HARGA

Plint keramik 10 x 40 cm buah 5,100


Plint keramik 5 x 20 cm buah 4,750
Porselen ( 11 x 11 ) cm buah 4,650
Thinner / Terpentin Ltr 27,500
Ubin Granit 30 x 30 cm Bh 24,500
Ubin Granit 40 x 40 cm Bh 59,500
Ubin Granit 60 x 60 cm Bh 78,000
Ubin Keramik Artistik 10 x 10 cm Bh 4,250
Ubin Keramik Artistik 10 x 20 cm Bh 8,200
Ubin Keramik Artistik 5 x 20 cm Bh 8,200
Ubin Keramik Setara granit 30 x 60 Doos 11,500
Ubin Keramik Setara granit 60 x 60 Doos 175,000
Ubin Keramik Setara Granit 60x120 Doos 1,200,000
Ubin PC Abu-abu 40 x 40 cm Bh 6,400
Ubin PC Abu-abu uk. 20x20 cm Bh 8,200
Ubin PC Abu-abu uk. 30x30 cm Bh 4,800
Ubin Tahan Asam M3 115,000
Ubin Teralux Kerang 30 x 30 cm Bh 12,250
Ubin Teralux Kerang 40 x 40 cm Bh 10,250
Ubin Teralux Marmer 30 x 30 cm Bh 31,000
Ubin Teralux Marmer 40 x 40 cm Bh 59,000
Ubin Teralux Marmer 60 x 60 cm Bh 125,000
Ubin Teraso 30 x 30 cm Bh 6,000
Ubin Teraso 40 x 40 cm Bh 8,300
Ubin Wafel Crame uk. 20 x 20 Bh 8,000
Ubin Warna 20 x 20 cm Bh 3,400
Ubin Warna 30 x 30 cm Bh 4,800
Ubin Warna 40 x 40 cm Bh 5,900
Underlyer / rubber corrugated M2 78,000
Urinoir setara. American standar Bh 2,500,000
Vernis Ltr 32,000
Vinyl uk. 30 cm x 30 cm Bh 28,000
Vinyl Wall Covering lebar 50 cm M' 62,000
Wall Paper m2 63,000
Wall plasing metal m' 120,000
Wastafel Bh 750,000
Water Drain & Aksesoris Set 92,000
Web Capsul 6,2 M' 2,000
Wood Filler Kg 28,000
Wood Stain Kg 62,000

J. MATERIAL PEREKAT
Compound gypsum kg 15,500
Compound hardboard kg 84,000
Flexible waterproofing kg 30,000
Kassa m' 750
Kapur m3 1,750,000
Lem Serbaguna kg 92,000
Lem kayu kg 33,000
Lem silikon kg 25,000
Lem vinyl kg 30,000
Mortar siap pakai/perekat bata ringan kg 3,500
Paper tape hardboard m' 1,000
Pengisi khusus rongga nat kg 16,000
Perekat khusus penutup dinding kg 6,300
Perekat khusus penutup lantai kg 6,300
Perekat untuk wallpaper kg 180,000
NO. JENIS BARANG / BAHAN / UPAH URAIAN SATUAN HARGA

Semen Portland kg 1,700


Semen 40 Kg zak 55,000
Semen 50 Kg zak 85,000
Semen merah kg 90,000
Semen nat kg 14,000
Semen putih 40 Kg zak 90,000
Semen putih 50 Kg zak 115,000
Semen warna kg 5,500
Waterproofing kg 55,000
Strorox - 100 kg 95,000

K. MATERIAL CAT
Amplas lembar 8,000
Cat anti karat kg 45,000
Cat dasar (cat besi) kg 60,000
Cat coating liter 64,000
Cat dasar tembok (sealer) kg 43,000
Cat dasar (cat kayu) kg 30,000
Cat genteng kg 40,000
Cat penutup (cat besi) kg 54,000
Cat penutup (cat kayu) kg 54,000
Cat penutup (cat tembok) untuk interior (dalam) kg 28,000
Cat penutup (cat tembok) untuk eksterior (luar) kg 97,000
Cat penutup (cat plafond) Biasa kg 24,000
Cat pelapis anti bocor kg 51,000
Dempul kg 34,000
Dempul kayu kg 10,000
Kalkarium kg 11,500
Kuas 1" buah 10,000
Kuas 2" buah 20,000
Kuas 3" buah 30,000
Kuas 4" buah 40,000
Meni besi kg 34,000
Meni kayu kg 24,000
Pengencer cat kayu/besi kg 28,000
Plamir kayu kg 18,000
Plamir tembok kg 18,000
Politur liter 43,000
Politur jadi liter 62,000
Politur melamic kg 47,000
Sanding kg 68,000
Vernis liter 32,000

L. MATERIAL KUNCI DAN ENGSEL


1 set kunci pintu (bulat) buah 185,000
1 set kunci pintu (handle) buah 285,000
Door closer buah 500,000
Door holder buah 115,000
Door stop buah 105,000
Engsel angin buah 21,000
Engsel jendela buah 30,000
Engsel kupu-kupu buah 26,000
Engsel lengan jendela buah 18,000
Engsel pintu (tebal) buah 47,000
Engsel pintu (biasa) buah 30,000
Grendel Biasa buah 18,000
Grendel Tanam buah 120,000
NO. JENIS BARANG / BAHAN / UPAH URAIAN SATUAN HARGA

Kait angin buah 22,000


Kunci lemari buah 16,000
Kunci slot buah 52,000
Kunci silinder buah 175,000
Kunci tanam antik buah 180,000
Kunci tanam biasa buah 155,000
Kunci tanam stanless/cylinder kunci buah 175,000
Kunci tanam kamar mandi buah 135,000
Pegangan Pintu Biasa buah 265,000
Pegangan Pintu Stainless buah 425,000
Rel pintu dorong set 650,000
Spring knip buah 26,000

M. MATERIAL KACA
Jendela nako m2 275,000
Kaca buram 12 mm m2 1,200,000
Kaca cermin 5 mm m2 220,000
Kaca cermin 6 mm m2 340,000
Kaca cermin 8 mm m2 920,000
Kaca gravire 5 mm m2 750,000
Kaca gravire putih 5 mm m2 850,000
Kaca lukis alur 5 mm m2 780,000
Kaca patri 5 mm m2 1,850,000
Kaca polos 3 mm m2 110,000
Kaca polos 5 mm m2 150,000
Kaca polos 8 mm m2 350,000
Kaca polos 12 mm m2 525,000
Kaca tanpa tripel 5 mm m2 2,650,000
Kaca triple 5 mm m2 3,250,000
Kaca triple platinum 5 mm m2 3,400,000
Kaca wireglass 5 mm m2 175,000
Profil kaca m¹ 15,000
Kaca Ray Band 3mm m2 625,000
Kaca Ray Band 5mm m2 825,000

N. MATERIAL SANITAIR
Batchcuip buah 6,500,000
Bak cuci piring stainless steel buah 350,000
Bak fiberglass 70 x 70 x 66 cm buah 655,000
Bak reservoir fibreglass (kapasitas 1000 liter) buah 1,320,000
Floor drain stainless steel buah 350,000
Floor drain plastik buah 35,000
Kloset duduk/monoblok buah 5,200,000
Kloset jongkok porselen buah 240,000
Kloset jongkok teraso buah 105,000
Kran air buah 47,000
Tempat sabun gantung buah 95,000
Tempat sabun tanam buah 40,000
Urinoir buah 2,500,000
Wastafel buah 750,000
Water drain + asesories set 265,000

O. MATERIAL MINYAK
Bensin liter 7,600
Minyak bekisting liter 11,000
Minyak Pelumas liter 35,000
Minyak tanah liter 13,000
NO. JENIS BARANG / BAHAN / UPAH URAIAN SATUAN HARGA

Residu liter 5,000


Solar liter 10,130
Teak oil liter 55,000
Thinner liter 24,000
Thinner A liter 31,000

P. MATERIAL PINTU ALUMINIUM DAN BESI


Aluminium strip m¹ 38,500
C channel galvanis lebar 40 mm m' 11,500
C channel galvanis lebar 75 mm m' 19,500
Hollow galvanis 20x40x0,25 mm m' 4,500
Hollow galvanis 40x40x0,25 mm m' 6,250
Kusen aluminium 3" putih m¹ 130,000
Kusen aluminium 4" putih m¹ 150,000
Pengelasan cm -
Pintu aluminium m' 200,000
Pintu aluminium warna lengkap (kusen, kunci engsel setara dekson) - ice glass bh 3,500,000
Pintu lipat (folding door) aluminium min 7 m² ; finish cat standar m2 685,000
Pintu lipat besi m2 585,000
Pintu lipat bahan PVC m2 550,000
Plat siku aluminium 25.25.3 mm m' 58,000
Profil aluminium m¹ 150,000
Profil aluminium "T" m¹ 135,000
Profil kaca m' 7,500
Rolling door aluminium min. 6 m²; panjang + 50 cm m2 685,000
Rolling door besi min. 6 m²; panjang + 50 cm m2 585,000
Skrup fixer buah 950
Sunscreen aluminium m2 425,000
Talang galvalum lebar 50 cm tebal 0,4 mm m' 82,000

Q. MATERIAL PAGAR BRC


Pagar BRC uk. 90 cm x 240 cm lembar 230,000
Pagar BRC uk. 120 cm x 240 cm lembar 305,000
Pagar BRC uk. 150 cm x 240 cm lembar 335,000
Tiang BRC lengkap P 90 Ø 1,5" batang 200,000
Tiang BRC lengkap P 120 Ø 1,5" batang 255,000
Tiang BRC lengkap P 150 Ø 1,5" batang 280,000

R. MATERIAL PERALATAN
Alat bantu set 60,000
Sewa alat las jam 35,000
Sewa crane sewa per hari unit 650,000
Sewa pipe suport sewa per bulan unit 12,800
Sewa scaffolding : sewa per bulan unit 45,000

S. MATERIAL LISTRIK
Box Panel 40 x 50 x 20 cm buah 475,000
Box Panel 30 x 40 x 20 cm buah 350,000
Box Panel 50 x 60 x 20 cm buah 750,000
Box panel 68 x 80 x 30 cm buah 1,200,000
Exhaust fan buah 500,000
Inbow dus buah 7,000
Isolasi buah 10,500
Kabel NYA 1 x 1.5 setara supreme; 1 roll @ 100 m m¹ 3,750
Kabel NYA 1 x 2.5 setara supreme; 1 roll @ 100 m m¹ 5,200
Kabel NYM 2 x 1.5 setara supreme; 1 roll @ 50 m m¹ 8,500
Kabel NYM 2 x 2,5 setara supreme; 1 roll @ 50 m m¹ 13,000
NO. JENIS BARANG / BAHAN / UPAH URAIAN SATUAN HARGA

Kabel NYM 3 x 1.5 setara supreme; 1 roll @ 50 m m¹ 13,250


Kabel NYM 3 x 2.5 setara supreme; 1 roll @ 50 m m¹ 25,000
Kabel NYY 2 x 2.5 mm² setara supreme m¹ 30,000
Kabel NYY 3 x 2,5 mm² setara supreme m¹ 33,000
Kabel NYY 4 x 2,5 mm² setara supreme m¹ 41,500
Kawat Las UK.32 dos 155,000
Lampu Hias Selang m¹ 25,000
Lampu pijar 5 W / 220 V buah 7,500
Lampu SL 32 watt buah 120,000
Lampu SL 42 watt buah 185,000
Lampu SL 65 watt buah 275,000
Lampu TL 40 W / 220 V buah 28,000
MCB 10 A 1 PHASE setara schneider buah 50,000
MCB 10 A 3 PHASE setara schneider buah 235,000
MCB 25 A 1 PHASE setara schneider buah 57,000
MCB 25 A 3 PHASE setara schneider buah 250,000
MCB 32 A 1 PHASE setara schneider buah 58,000
MCB 32 A 3 PHASE setara schneider buah 280,000
MCB 40 A 1 PHASE setara schneider buah 67,000
MCB 40 A 3 PHASE setara schneider buah 285,000
MCB 6 A 1 PHASE setara schneider buah 48,000
Pengetesan dan penyalaan titik 10,000
Pipa flexibel buah 18,000
Pipa indoor galvanis Ø 2" Medium 1 batang @ 6 m batang 710,000
Pipa Konduit PVC HI "EGA" Dia. 20mm m' 4,000
Pipa Subduct HDPE 40 mm x 34 mm2 buah 17,000
Saklar Ganda buah 112,000
Saklar Tunggal buah 95,000
Stop Kontak buah 140,800
Stop Kontak AC buah 65,000
T-Dus PVC HI "EGA" Dia. 20mm buah 6,000

T. MATERIAL LAIN-LAIN
Additive liter 30,000
Air liter 36
Alang - alang ikat 6,000
Aluminium foil 1 roll @ 1,20 m x 50 m roll 650,000
Aluminium Composite Panel (ACP) m2 425,000
Aspal curah kg 12,550
Batako (ukuran 40x20x10) buah 2,800
Batako (ukuran 40x20x12) buah 2,800
Batako (ukuran 40x20x15) buah 2,800
Batako (ukuran 40x20x20) buah 2,800
Bambu dia. 6 - 8 /600 cm Btg 35,000
Dinabolt dia 12mm (10-15cm) buah 13,500
Formica uk. 122 cm x 244 cm lembar 150,000
Formtie/penjaga jarak bekesting/spacer buah 10,000
Gebalan Rumput m2 15,000
Geotekstil m2 22,000
Glass Block buah 24,000
Hebel Block (ukuran 60x20x10 cm) buah 12,500
Hebel Block (ukuran 60x20x15 cm) buah 12,500
Hebel Block (ukuran 60x20x20 cm) buah 12,500
Ijuk m3 45,000
Jendela nako (rangka + kaca 5 mm) m2 325,000
Kalsiplank btg 47,000
Kapur m3 1,750,000
NO. JENIS BARANG / BAHAN / UPAH URAIAN SATUAN HARGA

Kapur Kg 6,000
Karung goni buah 10,000
Karung plastik buah 5,000
Lapisan galvanis kg 10,000
Lapisan coating primer membran bitumen pelapis anti bocor sistem bakar kg 42,000
Membran bitumen pelapis anti bocor sistem baakar 1 roll @ 1 m x 10 m, t. 3 mm roll 750,000
Nako per daun buah 10,500
Penampung / tangki air 900 ml bahan fiber buah 1,250,000
Penampung / tangki air 1200 ml bahan fiber buah 1,350,000
Penampung / tangki air 1100 ml bahan stainless buah 4,450,000
Pintu KM/WC bahan PVC bh 750,000
Pintu lipat (folding door) bahan plastik/PVC m2 275,000
Pipa HDPE 40/33 mm m¹ 12,000
Pipa screen pvc Ø 4" m¹ 115,000
Pipa tanah Ø 15 cm 1 btg @ 6 m btg 700,000
Pipa tanah Ø 20 cm 1 btg @ 6 m btg 1,075,000
Pipa tanah Ø 30 cm 1 btg @ 6 m btg 2,650,000
Plastic aerator buah 25,000
Plastik cor 1 roll @ 20m x 1,2m m2 3,250
Ramset/dina bolt buah 4,500
Rooster tanah uk. 10x20 buah 3,350
Rooster beton uk. 20x20 buah 7,700
Rooster keramik lukis uk. 20x20 buah 38,000
Sabun Kg 18,000
Seal tape buah 3,500
Sealant tube 40,000
Sealant kaca kg 85,000
Soda api kg 40,000
Sesek bambu (2x1,5m) 1 lembar @ 2 m x 3 m lembar 175,000
Shower bidet kloset / jet shower bh 210,000
Shower mandi set bh 798,000
Skrup fixer buah 1,650
Tali ijuk kg 35,000
Venetian blinds dan vertical blinds (tirai) m2 38,000
Wallpaper lebar 100 cm 1 roll @ 1 m x 15 m m 67,000
Wallpaper lebar 50cm 1 roll @ 0,5 m x 10 m m 48,000
Assesoris PVC m¹ 5,000
Pipa PVC tipe AW Ø 1/2" panjang 4 m batang 24,000
Pipa PVC tipe AW Ø 3/4" panjang 4 m batang 32,000
Pipa PVC tipe AW Ø 1" panjang 4 m batang 42,000
Pipa PVC tipe AW Ø 1 1/2" panjang 4 m batang 72,000
Pipa PVC tipe AW Ø 2" panjang 4 m batang 95,000
Pipa PVC tipe AW Ø 21/2" panjang 4 m batang 135,000
Pipa PVC tipe AW Ø 3" panjang 4 m batang 185,000
Pipa PVC tipe AW Ø 4" panjang 4 m batang 320,000
Pipa PVC tipe D Ø 1 1/4" panjang 4 m batang 40,000
Pipa PVC tipe D Ø 1 1/2" panjang 4 m batang 46,000
Pipa PVC tipe D Ø 2" panjang 4 m batang 59,000
Pipa PVC tipe D Ø 2 1/2" panjang 4 m batang 79,000
Pipa PVC tipe D Ø 3" panjang 4 m batang 105,000
Pipa PVC tipe D Ø 4" panjang 4 m batang 166,000
Pipa PVC tipe D Ø 5" panjang 4 m batang 256,000
Pipa PVC tipe D Ø 6" panjang 4 m batang 338,000
Pipa PVC tipe D Ø 8" panjang 4 m batang 594,000
NO. JENIS BARANG / BAHAN / UPAH URAIAN SATUAN HARGA

Pipa PVC tipe D Ø 10" panjang 4 m batang 979,000


Pipa PVC tipe D Ø 12" panjang 4 m batang 1,374,000
PVC waterstop lebar 150 mm m' 65,000
PVC waterstop lebar 200 mm m' 90,000
PVC waterstop lebar 320 mm m' 150,000

B. MATERIAL PIPA GALVANIS


Assesoris galvanis m¹ 6,000
Pipa galvanis medium Ø 1/2" panjang 6 m batang 185,000
Pipa galvanis medium Ø 3/4" panjang 6 m batang 225,000
Pipa galvanis medium Ø 1" panjang 6 m batang 340,000
Pipa galvanis medium Ø 1 1/2" panjang 6 m batang 525,000
Pipa galvanis medium Ø 2" panjang 6 m batang 710,000
Pipa galvanis medium Ø 3" panjang 6 m batang 1,150,000
Pipa galvanis medium Ø 4" panjang 6 m batang 1,675,000
Pipa galvanis medium Ø 6" panjang 6 m batang 2,300,000
Pipa galvanis medium Ø 8" panjang 6 m batang 3,750,000
4.3.2 DAFTAR HARGA SATUAN PEKERJAAN

No. Mata Harga Satuan


DIVISI Satuan
Pembayaran Uraian Pekerjaan (Rp)

a b c d e

4.3.2.1 PEKERJAAN PERSIAPAN


2.2.1.1 Pembuatan 1 m2 pagar sementara dari seng gelombang tinggi 2 meter m² 521,197.25
2.2.1.2 Pengukuran dan pemasangan 1 m' Bouwplank m' 95,133.75
2.2.1.3 Pembuatan 1 m2 kantor sementara lantai plesteran m² 2,010,372.50
2.2.1.4 Pembuatan 1 m2 gudang semen dan peralatan m² 1,515,872.50
2.2.1.5 Pembersihan 1 m2 lapangan dan perataan m² 27,312.50

4.3.2.2 PEKERJAAN TANAH


2.3.1.1 Penggalian tanah biasa sedalam 1 m m³ 130,381.25
2.3.1.2 Pengurugan kembali 1 m³ galian tanah m³ 94,012.50
2.3.1.3 Pengurugan 1 m³ dengan pasir urug m³ 263,292.50
2.3.1.4 Pengurugan 1 m³ dengan tanah timbunan m³ 164,306.25

4.3.2.3 PEKERJAAN PONDASI


3.2.1.1 Pemasangan 1 m³ pondasi batu Kali 1PC:3PP m³ 1,417,317.50
3.2.1.1.a Pemasangan 1 m³ pondasi batu bata (8x8x16) cm campuran 1PC:3PP m³ 1,607,836.45
3.2.1.2 Pemasangan 1 m³ pondasi batu Kali 1PC:4PP m³ 1,345,298.75
3.2.1.2.a Pemasangan 1 m³ pondasi batu bata (8x8x16) cm campuran 1PC:4PP m³ 1,544,482.03
3.2.1.3 Pemasangan 1 m³ pondasi batu Kali 1PC:5PP m³ 1,295,411.75
3.2.1.4 Pemasangan 1 m³ pondasi batu Kali 1PC:6PP m³ 1,260,319.50
3.2.1.5 Pemasangan 1 m³ pondasi batu Kali 1PC:8PP m³ 1,212,266.75
3.2.1.6 Pemasangan 1 m³ pondasi batu Kali 1KP:1SM:2 PP m³ 1,347,356.10
3.2.1.7 Pemasangan 1 m³ pondasi batu Kali 1PC:3KP:10 PP m³ 1,438,345.25
3.2.1.8 Pemasangan 1 m³ pondasi batu Kali 1/4PC:1KP:4 PP m³ 1,370,788.50
3.2.1.9 Pemasangan 1 m³ batu kosong (aanstamping) m³ 827,265.15
3.2.1.10 Pemasangan 1 m³ pondasi siklop 60% beton m³ 4,386,583.00
3.2.1.11 Pemasangan 1 m³ pondasi sumuran Ø 100cm m³ 1,535,002.75

4.3.2.4 PEKERJAAN BETON


4.1.1.1 Pembuatan 1 m3 beton mutu f'c 31,2 MPa (K350) m³ 1,899,337.02
4.1.1.2 Pembesian 1 kg dengan besi polos atau ulir kg 26,093.50
4.1.1.3 Pemasangan 1 m2 bekisting untuk pondasi m² 264,373.50
4.1.1.4 Pemasangan 1 m2 bekisting untuk sloof m² 277,311.00
4.1.1.5 Pemasangan 1 m2 bekisting untuk kolom m² 445,849.25
4.1.1.6 Pemasangan 1 m2 bekisting untuk balok m² 454,474.25
4.1.1.7 Pemasangan 1 m2 bekisting untuk lantai m² 514,849.25
4.1.1.8 Pemasangan 1 m2 bekisting untuk tangga m² 431,416.75

4.3.2.5 PEKERJAAN BESI & ALUMUNIUM


4.2.1.1 Pemasangan 1 m2 pintu kaca rangka alluminium m² 1,097,335.75

4.3.2.6 PEKERJAAN DINDING PASANGAN


4.4.1.3 Pemasangan 1 m² dinding bata merah 1 batu camp. 1PC:4PP m² 342,757.50

4.3.2.7 PEKERJAAN PLESTERAN


4.4.2.1 Pemasangan 1 m² plesteran 1PC:4PP tebal 20 mm m² 135,900.10
4.4.2.2 Pemasangan 1 m² acian m² 64,026.25

4.3.2.8 PEKERJAAN PENUTUP LANTAI & PENUTUP DINDING


4.4.3.34.a Pemasangan 1 m2 lantai keramik 40x40 m² 325,476.45
4.4.3.35 Pemasangan 1 m2 lantai keramik 30x30 m² 393,300.00
4.4.3.36 Pemasangan 1 m2 lantai keramik 20x20 m² 332,051.00

4.3.2.9 PEKERJAAN PLAFOND


4.5.1.1 Pemasangan 1 m² langit-langit gypsum board tebal 9 mm m² 67,188.75

4.3.2.10 PEKERJAAN KUNCI & KACA


4.6.2.2.a Pemasangan 1 buah kunci tanam stainless buah 803,706.25
4.6.2.5 Pemasangan 1 buah engsel pintu buah 91,545.75

4.3.2.11 PEKERJAAN PENGECATAN


4.7.1.10 Pengecatan 1 m2 plafond m² 32,147.10
4.7.1.10.b Pengecatan 1 m2 tembok baru m² 53,974.10
No. Mata Harga Satuan
DIVISI Satuan
Pembayaran Uraian Pekerjaan (Rp)

a b c d e

4.3.2.12 PEKERJAAN SANITASI GEDUNG


5.1.1.1 Pemasangan 1 buah closet duduk/monoblock buah 7,146,560.00
5.1.1.2 Pemasangan 1 buah closet jongkok porslen buah 822,652.50
5.1.1.3 Pemasangan 1 buah urinoir buah 4,149,775.00
5.1.1.4 Pemasangan 1 buah wastafel buah 1,687,165.00
5.1.1.5 Pemasangan 1 buah bak cuci piring stainles steel buah 782,028.75
5.1.1.6 Pemasangan 1 buah floor drain stainless steel buah 427,426.25
5.1.1.7 Pemasangan 1 buah kran Ø 3/4" atau 1/2" buah 146,078.75
5.1.1.8 Pemasangan 1 m pipa PVC tipe AW Ø 1/2" m' 21,646.59
5.1.1.9 Pemasangan 1 m pipa PVC tipe AW Ø 3/4" m' 28,870.75
5.1.1.10 Pemasangan 1 m pipa PVC tipe AW Ø 11/2" m' 45,587.44
5.1.1.11 Pemasangan 1 m pipa PVC tipe AW Ø 2" m' 56,994.00
5.1.1.12 Pemasangan 1 m pipa PVC tipe AW Ø 4" m' 114,661.47
5.1.1.13 Pemasangan 1 buah Penyekatan urinoir buah 1,829,630.00
5.1.1.14 Pemasangan 1 buah Pompa Air buah 1,755,000.00
5.1.1.15 Pemasangan 1 unit Septi tank unit 4,784,677.00
5.1.1.16 Pemasangan 1 buah Jet Washer 1/2" - 3/4" (ex Toto) m 412,940.00
5.1.1.17 Pemasangan 1 m2 Water proofing lantai KM/Wc m² 62,469.15

Taksir PEKERJAAN LAIN - LAIN


Taksir 1 Pemasangan titik nyala stop kontak titik 592,227.00
Taksir 2 Pemasangan titik nyala saklar titik 592,227.00
Taksir 3 Pemasangan titik nyala lampu titik 385,227.00
Taksir 4 Pemasangan 1 buah stop kontak buah 193,619.75
Taksir 5 Pemasangan 1 buah saklar tunggal buah 133,109.05
Taksir 6 Pemasangan 1 buah saklar ganda buah 160,499.75
Taksir 7 Pemasangan 1 buah exhaust fan buah 598,258.75
Taksir 9 Pemasangan 1 bh pintu KM/WC aluminium warna lengkap (kusen, kunci engsel buah 4,146,689.55
Taksir 14 setara dekson) - ice box
1 unit pemasangan glasspanel 1 unit 32,200,300
4.3.3 DAFTAR HARGA SATUAN PEKERJAAN
I. HARGA SATUAN PEKERJAAN PERSIAPAN

1.1 Pembuatan 1 m2 pagar sementara dari seng gelombang tinggi 2 meter


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.200 145,000.00 29,000.00
Tukang Kayu L.02 OH 0.400 175,000.00 70,000.00
Kepala Tukang L.03 OH 0.020 180,000.00 3,600.00
Mandor L.04 OH 0.020 185,000.00 3,700.00
JUMLAH TENAGA KERJA 106,300.00
B BAHAN
Dolken Kayu ɸ 8-10/400 cm Batang 1.250 15,000.00 18,750.00
Semen Portland Kg 2.500 1,700.00 4,250.00
Seng Gelombang Lbr 1.200 102,000.00 122,400.00
Pasir Beton m3 0.005 160,000.00 800.00
Koral Beton m3 0.009 435,000.00 3,915.00
Kayu 5/7 m3 0.072 2,500,000.00 180,000.00
Paku Biasa 2" - 5" Kg 0.060 25,000.00 1,500.00
Meni Besi Liter 0.450 34,000.00 15,300.00

JUMLAH TENAGA BAHAN 346,915.00


C. PERALATAN
-
JUMLAH TENAGA ALAT -

D. Jumlah (A+B+C) 453,215.00


### E. Overhead & Profit 15% x D 67,982.25
F. Harga Satuan Pekerjaan (D+E) 521,197.25

1.2 Pengukuran dan Pemasangan 1 m' Bouwplank


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.100 145,000.00 14,500.00
Tukang Kayu L.02 OH 0.100 175,000.00 17,500.00
Kepala Tukang L.03 OH 0.010 180,000.00 1,800.00
Mandor L.04 OH 0.005 185,000.00 925.00
JUMLAH TENAGA KERJA 34,725.00
B BAHAN
Kayu Balok 5/7 m3 0.012 2,500,000.00 30,000.00
Paku 2" - 3" Kg 0.020 25,000.00 500.00
Kayu Papan 3/20 m3 0.007 2,500,000.00 17,500.00

### JUMLAH TENAGA BAHAN 48,000.00


C. PERALATAN
-
JUMLAH TENAGA ALAT -

D. Jumlah (A+B+C) 82,725.00


E. Overhead & Profit 15% x D 12,408.75
F. Harga Satuan Pekerjaan (D+E) 95,133.75

1.3 Pembuatan 1 m2 kantor sementara lantai plesteran


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 2.000 145,000.00 290,000.00
Tukang Kayu L.02 OH 2.000 175,000.00 350,000.00
Tukang Batu L.03 OH 1.000 175,000.00 175,000.00
Kepala Tukang L.04 OH 0.300 180,000.00 54,000.00
Mandor L.05 OH 0.050 185,000.00 9,250.00
JUMLAH TENAGA KERJA 878,250.00
B BAHAN
Dolken Kayu ɸ 8-10/400 cm Batang 1.250 15,000.00 18,750.00
Kayu m3 0.180 2,500,000.00 450,000.00
Paku Biasa Kg 0.080 25,000.00 2,000.00
Besi Strip Kg 1.100 9,000.00 9,900.00
Semen Portland Kg 35.000 1,700.00 59,500.00
Pasir Pasang m3 0.150 105,000.00 15,750.00
Pasir Beton m3 0.100 160,000.00 16,000.00
Koral Beton m3 0.150 435,000.00 65,250.00
Bata Merah Bh 30.000 800.00 24,000.00
Seng Plat Lbr 0.250 90,000.00 22,500.00
Jendela Naco Bh 0.200 750,000.00 150,000.00
Kaca Polos m2 0.080 110,000.00 8,800.00
Kunci Tanam Bh 0.150 155,000.00 23,250.00
Plywood 4mm Lbr 0.060 70,000.00 4,200.00
JUMLAH TENAGA BAHAN 869,900.00
C. PERALATAN
-
### JUMLAH TENAGA ALAT -

D. Jumlah (A+B+C) 1,748,150.00


E. Overhead & Profit 15% x D 262,222.50
F. Harga Satuan Pekerjaan (D+E) 2,010,372.50

1.4 Pembuatan 1 m2 gudang semen dan peralatan


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja (L01) OH 1.000 145,000.00 145,000.00
Tukang Kayu (L02) OH 2.000 175,000.00 350,000.00
Kepala Tukang (L03) OH 0.200 180,000.00 36,000.00
Mandor (L04) OH 0.050 185,000.00 9,250.00
JUMLAH TENAGA KERJA 540,250.00
B BAHAN
Dolken Kayu ɸ 8-10/400 cm Batang 1.700 15,000.00 25,500.00
Kayu m3 0.210 2,500,000.00 525,000.00
Paku Biasa Kg 0.300 25,000.00 7,500.00
Semen Portland Kg 10.500 1,700.00 17,850.00
Pasir Beton m3 0.030 160,000.00 4,800.00
Koral Beton m3 0.050 435,000.00 21,750.00
Seng Gelombang Lbr 1.500 102,000.00 153,000.00
Seng Plat Lbr 0.250 90,000.00 22,500.00

JUMLAH TENAGA BAHAN 777,900.00


C. PERALATAN
-
JUMLAH TENAGA ALAT -

D. Jumlah (A+B+C) 1,318,150.00


E. Overhead & Profit 15% x D 197,722.50
F. Harga Satuan Pekerjaan (D+E) 1,515,872.50

1.5 Pembersihan 1 m2 lapangan dan perataan


### No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.100 145,000.00 14,500.00
Mandor L.04 OH 0.050 185,000.00 9,250.00
JUMLAH TENAGA KERJA 23,750.00
B BAHAN

JUMLAH TENAGA BAHAN -


C. PERALATAN
-
JUMLAH TENAGA ALAT -

D. Jumlah (A+B+C) 23,750.00


E. Overhead & Profit 15% x D 3,562.50
F. Harga Satuan Pekerjaan (D+E) 27,312.50

###
II. HARGA SATUAN PEKERJAAN TANAH

1.1 Penggalian 1 m3 tanah biasa sedalam 1 m


### No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.750 145,000.00 108,750.00
Mandor L.04 OH 0.025 185,000.00 4,625.00
JUMLAH TENAGA KERJA 113,375.00
B BAHAN

JUMLAH TENAGA BAHAN -


C. PERALATAN
-
JUMLAH TENAGA ALAT -

D. Jumlah (A+B+C) 113,375.00


E. Overhead & Profit 15% x D 17,006.25
F. Harga Satuan Pekerjaan (D+E) 130,381.25

1.2 Pengurugan kembali 1 m³ galian tanah


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.500 145,000.00 72,500.00
Mandor L.04 OH 0.050 185,000.00 9,250.00
### JUMLAH TENAGA KERJA 81,750.00
B BAHAN

JUMLAH TENAGA BAHAN -


C. PERALATAN
-
JUMLAH TENAGA ALAT -

D. Jumlah (A+B+C) 81,750.00


E. Overhead & Profit 15% x D 12,262.50
F. Harga Satuan Pekerjaan (D+E) 94,012.50

1.3 Pengurugan 1 m³ dengan pasir urug


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.300 145,000.00 43,500.00
Mandor L.04 OH 0.010 185,000.00 1,850.00
JUMLAH TENAGA KERJA 45,350.00
B BAHAN
Pasir Urug 0 M3 1.200 153,000.00 183,600.00
JUMLAH TENAGA BAHAN 183,600.00
C. PERALATAN
-
JUMLAH TENAGA ALAT -

D. Jumlah (A+B+C) 228,950.00


E. Overhead & Profit 15% x D 34,342.50
F. Harga Satuan Pekerjaan (D+E) 263,292.50

1.4 Pengurugan 1 m³ dengan tanah timbunan


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.250 145,000.00 36,250.00
Mandor L.04 OH 0.025 185,000.00 4,625.00
JUMLAH TENAGA KERJA 40,875.00
B BAHAN
Tanah Timbunan 0 m3 1.200 85,000.00 102,000.00
JUMLAH TENAGA BAHAN 102,000.00
C. PERALATAN
-
JUMLAH TENAGA ALAT -

D. Jumlah (A+B+C) 142,875.00


E. Overhead & Profit 15% x D 21,431.25
F. Harga Satuan Pekerjaan (D+E) 164,306.25
III. HARGA SATUAN PEKERJAAN PONDASI

3.1 Pemasangan Tiang Pancang


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.300 145,000.00 43,500.00
Mandor L.03 OH 0.030 185,000.00 5,550.00
JUMLAH TENAGA KERJA 49,050.00
B BAHAN
Tiang Pancang m 1.000 780,000.00 780,000.00
Kawat Las kg 2.000 45,000.00 90,000.00
JUMLAH TENAGA BAHAN 870,000.00
C. PERALATAN
Crane Jam 0.192 650,000.00 124,800.00
Drop Hammer Jam 0.017 600,000.00 10,200.00
JUMLAH TENAGA ALAT 135,000.00

D. Jumlah (A+B+C) 1,054,050.00


E. Overhead & Profit 15% x D 158,107.50
F. Harga Satuan Pekerjaan (D+E) 1,212,157.50

IV. HARGA SATUAN PEKERJAAN BETON

4.1 Pembuatan 1 m3 beton mutu f'c 31,2 MPa (K350)


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 2.100 145,000.00 304,500.00
Tukang Batu L.02 OH 0.350 175,000.00 61,250.00
Kepala Tukang L.03 OH 0.035 180,000.00 6,300.00
Mandor L.04 OH 0.105 185,000.00 19,425.00
JUMLAH TENAGA KERJA 391,475.00
B BAHAN
Semen Portland Kg 448.000 1,700.00 761,600.00
Pasir Beton Kg 0.476 175,000.00 83,375.00
Kerikil (Maks 30mm) Kg 0.741 550,000.00 407,407.41
Air Liter 215.000 36.00 7,740.00
JUMLAH TENAGA BAHAN 1,260,122.41
C. PERALATAN
-
JUMLAH TENAGA ALAT -

D. Jumlah (A+B+C) 1,651,597.41


E. Overhead & Profit 15% x D 247,739.61
F. Harga Satuan Pekerjaan (D+E) 1,899,337.02

4.2 Pembesian 1 kg dengan besi polos atau ulir


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.070 145,000.00 10,150.00
Tukang Besi L.02 OH 0.070 175,000.00 12,250.00
Kepala Tukang L.03 OH 0.007 180,000.00 1,260.00
Mandor L.04 OH 0.004 185,000.00 740.00
JUMLAH TENAGA KERJA 24,400.00
B BAHAN
Besi Beton (polos/ulir) Kg 10.500 19,000.00 199,500.00
Kawat Beton Kg 0.150 20,000.00 3,000.00
JUMLAH TENAGA BAHAN 202,500.00
C. PERALATAN
-
JUMLAH TENAGA ALAT -

D. Jumlah (A+B+C) 226,900.00


E. Overhead & Profit 15% x D 34,035.00
F. Harga Satuan Pekerjaan (D+E) 260,935.00
1kg 26,093.50

4.3 Pemasangan 1 m2 bekisting untuk pondasi


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.520 145,000.00 75,400.00
Tukang Kayu L.02 OH 0.260 175,000.00 45,500.00
Kepala Tukang L.03 OH 0.026 180,000.00 4,680.00
Mandor L.04 OH 0.026 185,000.00 4,810.00
JUMLAH TENAGA KERJA 130,390.00
B BAHAN
Kayu 0 m3 0.040 2,250,000.00 90,000.00
Paku 5 - 10 cm 0 Kg 0.300 28,000.00 8,400.00
Minyak Bekisting 0 Liter 0.100 11,000.00 1,100.00
JUMLAH TENAGA BAHAN 99,500.00
C. PERALATAN
-
JUMLAH TENAGA ALAT -

D. Jumlah (A+B+C) 229,890.00


E. Overhead & Profit 15% x D 34,483.50
F. Harga Satuan Pekerjaan (D+E) 264,373.50

4.4 Pemasangan 1 m2 bekisting untuk sloof


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.520 145,000.00 75,400.00
Tukang Kayu L.02 OH 0.260 175,000.00 45,500.00
Kepala Tukang L.03 OH 0.026 180,000.00 4,680.00
Mandor L.04 OH 0.026 185,000.00 4,810.00
JUMLAH TENAGA KERJA 130,390.00
B BAHAN
Kayu 0 m3 0.045 2,250,000.00 101,250.00
Paku 5 - 10 cm 0 Kg 0.300 28,000.00 8,400.00
Minyak Bekisting 0 Liter 0.100 11,000.00 1,100.00
JUMLAH TENAGA BAHAN 110,750.00
C. PERALATAN
-
JUMLAH TENAGA ALAT -

D. Jumlah (A+B+C) 241,140.00


E. Overhead & Profit 15% x D 36,171.00
F. Harga Satuan Pekerjaan (D+E) 277,311.00

4.5 Pemasangan 1 m2 bekisting untuk kolom


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.660 145,000.00 95,700.00
Tukang Kayu L.02 OH 0.330 175,000.00 57,750.00
Kepala Tukang L.03 OH 0.033 180,000.00 5,940.00
Mandor L.04 OH 0.033 185,000.00 6,105.00
JUMLAH TENAGA KERJA 165,495.00
B BAHAN
Kayu m3 0.040 2,250,000.00 90,000.00
Paku 5 - 12 cm Kg 0.400 25,000.00 10,000.00
Minyak Bekisting Liter 0.200 11,000.00 2,200.00
Balok Kayu m3 0.015 2,500,000.00 37,500.00
Plywood tebal 9mm Lbr 0.350 150,000.00 52,500.00
Dolken Kayu ɸ 8-10cm -panj 4m Batang 2.000 15,000.00 30,000.00
JUMLAH TENAGA BAHAN 222,200.00
C. PERALATAN
-
JUMLAH TENAGA ALAT -

D. Jumlah (A+B+C) 387,695.00


E. Overhead & Profit 15% x D 58,154.25
F. Harga Satuan Pekerjaan (D+E) 445,849.25

4.6 Pemasangan 1 m2 bekisting untuk balok


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.660 145,000.00 95,700.00
Tukang Kayu L.02 OH 0.330 175,000.00 57,750.00
Kepala Tukang L.03 OH 0.033 180,000.00 5,940.00
Mandor L.04 OH 0.033 185,000.00 6,105.00
JUMLAH TENAGA KERJA 165,495.00
B BAHAN
Kayu m3 0.040 2,250,000.00 90,000.00
Paku 5 - 12 cm Kg 0.400 25,000.00 10,000.00
Minyak Bekisting Liter 0.200 11,000.00 2,200.00
Balok Kayu m3 0.018 2,500,000.00 45,000.00
Plywood tebal 9mm Lbr 0.350 150,000.00 52,500.00
Dolken Kayu g ɸ 8-10cm -panj 4m Batang 2.000 15,000.00 30,000.00
JUMLAH TENAGA BAHAN 229,700.00
C. PERALATAN
-
JUMLAH TENAGA ALAT -

D. Jumlah (A+B+C) 395,195.00


E. Overhead & Profit 15% x D 59,279.25
F. Harga Satuan Pekerjaan (D+E) 454,474.25

4.7 Pemasangan 1 m2 bekisting untuk lantai


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.660 145,000.00 95,700.00
Tukang Kayu L.02 OH 0.330 175,000.00 57,750.00
Kepala Tukang L.03 OH 0.033 180,000.00 5,940.00
Mandor L.04 OH 0.033 185,000.00 6,105.00
JUMLAH TENAGA KERJA 165,495.00
B BAHAN
Kayu m3 0.040 2,250,000.00 90,000.00
Paku 5 - 12 cm Kg 0.400 25,000.00 10,000.00
Minyak Bekisting Liter 0.200 11,000.00 2,200.00
Balok Kayu m3 0.015 2,500,000.00 37,500.00
Plywood tebal 9mm Lbr 0.350 150,000.00 52,500.00
Dolken Kayu galam ɸ 8-10cm -panj Batang 6.000 15,000.00 90,000.00
JUMLAH TENAGA BAHAN 282,200.00
C. PERALATAN
-
JUMLAH TENAGA ALAT -

D. Jumlah (A+B+C) 447,695.00


E. Overhead & Profit 15% x D 67,154.25
F. Harga Satuan Pekerjaan (D+E) 514,849.25

4.8 Pemasangan 1 m2 bekisting untuk tangga


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.660 145,000.00 95,700.00
Tukang Kayu L.02 OH 0.330 175,000.00 57,750.00
Kepala Tukang L.03 OH 0.033 180,000.00 5,940.00
Mandor L.04 OH 0.033 185,000.00 6,105.00
JUMLAH TENAGA KERJA 165,495.00
B BAHAN
Kayu 0 m3 0.030 2,600,000.00 78,000.00
Paku 5 - 12 cm 0 Kg 0.400 25,000.00 10,000.00
Minyak Bekisting 0 Liter 0.150 11,000.00 1,650.00
Balok Kayu 0 m3 0.015 2,500,000.00 37,500.00
Plywood tebal 9mm 0 Lbr 0.350 150,000.00 52,500.00
Dolken Kayu ɸ 8-10cm -p 0 Batang 2.000 15,000.00 30,000.00
JUMLAH TENAGA BAHAN 209,650.00
C. PERALATAN
-
JUMLAH TENAGA ALAT -

D. Jumlah (A+B+C) 375,145.00


E. Overhead & Profit 15% x D 56,271.75
F. Harga Satuan Pekerjaan (D+E) 431,416.75

V. HARGA SATUAN PEKERJAAN BESI & ALUMUNIUM

5.1 Pemasangan 1 m2 pintu kaca rangka alluminium


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.085 145,000.00 12,325.00
Tukang Khusus Aluminium L.03 OH 0.085 175,000.00 14,875.00
Kepala Tukang L.03 OH 0.009 180,000.00 1,530.00
Mandor L.04 OH 0.005 185,000.00 925.00
JUMLAH TENAGA KERJA 29,655.00
B BAHAN
Pintu Alluminium m 4.400 200,000.00 880,000.00
Profil Kaca m 4.500 7,500.00 33,750.00
Sealant Tube 0.270 40,000.00 10,800.00
JUMLAH TENAGA BAHAN 924,550.00
C. PERALATAN
-
JUMLAH TENAGA ALAT -

D. Jumlah (A+B+C) 954,205.00


E. Overhead & Profit 15% x D 143,130.75
F. Harga Satuan Pekerjaan (D+E) 1,097,335.75

VI. HARGA SATUAN PEKERJAAN DINDING PASANGAN

6.1 Pemasangan 1 m² dinding bata merah 1 batu camp. 1PC:4PP


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.600 145,000.00 87,000.00
Tukang Batu L.02 OH 0.200 175,000.00 35,000.00
Kepala Tukang L.03 OH 0.020 180,000.00 3,600.00
Mandor L.04 OH 0.030 185,000.00 5,550.00
JUMLAH TENAGA KERJA 131,150.00
B BAHAN
Bata Merah buah 140.000 800.00 112,000.00
Semen Portland Kg 26.550 1,700.00 45,135.00
Pasir Pasang m3 0.093 105,000.00 9,765.00
JUMLAH TENAGA BAHAN 166,900.00
C. PERALATAN
-
JUMLAH TENAGA ALAT -

D. Jumlah (A+B+C) 298,050.00


E. Overhead & Profit 15% x D 44,707.50
F. Harga Satuan Pekerjaan (D+E) 342,757.50

VII. HARGA SATUAN PEKERJAAN PLESTERAN

7.1 Pemasangan 1 m² plesteran 1PC:4PP tebal 20 mm


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja (L.01) OH 0.400 145,000.00 58,000.00
Tukang Batu (L.03) OH 0.200 175,000.00 35,000.00
Kepala Tukang (L.03) OH 0.020 180,000.00 3,600.00
Mandor (L.04) OH 0.022 185,000.00 4,070.00
JUMLAH TENAGA KERJA 100,670.00
B BAHAN
Semen portland 0 Kg 8.320 1,700.00 14,144.00
Pasir pasang 0 m3 0.032 105,000.00 3,360.00
JUMLAH TENAGA BAHAN 17,504.00
C. PERALATAN
-
JUMLAH TENAGA ALAT -

D. Jumlah (A+B+C) 118,174.00


E. Overhead & Profit 15% x D 17,726.10
F. Harga Satuan Pekerjaan (D+E) 135,900.10

7.2 Pemasangan 1 m² acian


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.200 145,000.00 29,000.00
Tukang Batu L.03 OH 0.100 175,000.00 17,500.00
Kepala Tukang L.03 OH 0.010 180,000.00 1,800.00
Mandor L.04 OH 0.010 185,000.00 1,850.00
JUMLAH TENAGA KERJA 50,150.00
B BAHAN
Semen portland Kg 3.250 1,700.00 5,525.00
JUMLAH TENAGA BAHAN 5,525.00
C. PERALATAN
-
JUMLAH TENAGA ALAT -

D. Jumlah (A+B+C) 55,675.00


E. Overhead & Profit 15% x D 8,351.25
F. Harga Satuan Pekerjaan (D+E) 64,026.25

VIII. HARGA SATUAN PEKERJAAN PENUTUP LANTAI & PENUTUP DINDING

8.1 Pemasangan 1 m2 lantai keramik 40x40


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.700 145,000.00 101,500.00
Tukang Batu L.02 OH 0.350 175,000.00 61,250.00
Kepala tukang L.03 OH 0.035 180,000.00 6,300.00
Mandor L.04 OH 0.035 185,000.00 6,475.00
JUMLAH TENAGA KERJA 175,525.00
B BAHAN
Ubin keramik uk. 40x40 c 0 Dooz 1.050 82,000.00 86,100.00
Semen Portland 0 Kg 8.190 1,700.00 13,923.00
Pasir pasang 0 M3 0.045 105,000.00 4,725.00
Semen warna 0 Kg 0.500 5,500.00 2,750.00
JUMLAH TENAGA BAHAN 107,498.00
C. PERALATAN
-
JUMLAH TENAGA ALAT -

D. Jumlah (A+B+C) 283,023.00


E. Overhead & Profit 15% x D 42,453.45
F. Harga Satuan Pekerjaan (D+E) 325,476.45

8.2 Pemasangan 1 m2 lantai keramik 30X30


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.700 145,000.00 101,500.00
Tukang Batu L.02 OH 0.350 175,000.00 61,250.00
Kepala tukang L.03 OH 0.035 180,000.00 6,300.00
Mandor L.04 OH 0.035 185,000.00 6,475.00
JUMLAH TENAGA KERJA 175,525.00
B BAHAN
Ubin keramik kk. 30 x 30 cm Doos 1.050 130,000.00 136,500.00
Semen Portland Kg 10.000 1,700.00 17,000.00
Pasir pasang M3 0.045 105,000.00 4,725.00
Semen warna Kg 1.500 5,500.00 8,250.00
JUMLAH TENAGA BAHAN 166,475.00
C. PERALATAN
-
JUMLAH TENAGA ALAT -

D. Jumlah (A+B+C) 342,000.00


E. Overhead & Profit 15% x D 51,300.00
F. Harga Satuan Pekerjaan (D+E) 393,300.00

8.3 Pemasangan 1 m2 lantai keramik 20X20


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.700 145,000.00 101,500.00
Tukang Batu L.02 OH 0.350 175,000.00 61,250.00
Kepala tukang L.03 OH 0.035 180,000.00 6,300.00
Mandor L.04 OH 0.035 185,000.00 6,475.00
JUMLAH TENAGA KERJA 175,525.00
B BAHAN
Ubin keramik uk. 20 x 20 cm Doos 1.050 78,000.00 81,900.00
Semen Portland Kg 10.400 1,700.00 17,680.00
Pasir pasang M3 0.045 105,000.00 4,725.00
Semen warna Kg 1.620 5,500.00 8,910.00
JUMLAH TENAGA BAHAN 113,215.00
C. PERALATAN
-
JUMLAH TENAGA ALAT -

D. Jumlah (A+B+C) 288,740.00


E. Overhead & Profit 15% x D 43,311.00
F. Harga Satuan Pekerjaan (D+E) 332,051.00

IX. HARGA SATUAN PEKERJAAN PLAFOND

9.1 Pemasangan 1 m² langit-langit gypsum board tebal 9 mm


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.100 145,000.00 14,500.00
Tukang Kayu L.02 OH 0.050 175,000.00 8,750.00
Kepala tukang L.03 OH 0.005 180,000.00 900.00
Mandor L.04 OH 0.005 185,000.00 925.00
JUMLAH TENAGA KERJA 25,075.00
B BAHAN
Gypsum board Lembar 0.364 75,000.00 27,300.00
Paku skrup kg 0.110 55,000.00 6,050.00
JUMLAH TENAGA BAHAN 33,350.00
C. PERALATAN
-
JUMLAH TENAGA ALAT -

D. Jumlah (A+B+C) 58,425.00


E. Overhead & Profit 15% x D 8,763.75
F. Harga Satuan Pekerjaan (D+E) 67,188.75

X. HARGA SATUAN PEKERJAAN KUNCI & KACA

10.1 Pemasangan 1 buah kunci tanam stainless


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja (L.01) OH 0.010 145,000.00 1,450.00
Tukang Kayu (L.02) OH 0.500 175,000.00 87,500.00
Kepala tukang (L.03) OH 0.050 180,000.00 9,000.00
Mandor (L.04) OH 0.005 185,000.00 925.00
JUMLAH TENAGA KERJA 98,875.00
B BAHAN
Handle pintu 0 Bh 1.000 425,000.00 425,000.00
Isi silinder kunci 0 Bh 1.000 175,000.00 175,000.00
JUMLAH TENAGA BAHAN 600,000.00
C. PERALATAN
-
JUMLAH TENAGA ALAT -

D. Jumlah (A+B+C) 698,875.00


E. Overhead & Profit 15% x D 104,831.25
F. Harga Satuan Pekerjaan (D+E) 803,706.25

10.2 Pemasangan 1 buah engsel pintu


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja (L.01) OH 0.015 145,000.00 2,175.00
Tukang Kayu (L.02) OH 0.150 175,000.00 26,250.00
Kepala tukang (L.03) OH 0.015 180,000.00 2,700.00
Mandor (L.04) OH 0.008 185,000.00 1,480.00
JUMLAH TENAGA KERJA 32,605.00
B BAHAN
Engsel Pintu Bh 1.000 47,000.00 47,000.00
JUMLAH TENAGA BAHAN 47,000.00
C. PERALATAN
-
JUMLAH TENAGA ALAT -

D. Jumlah (A+B+C) 79,605.00


E. Overhead & Profit 15% x D 11,940.75
F. Harga Satuan Pekerjaan (D+E) 91,545.75

XI. HARGA SATUAN PEKERJAAN PENGECATAN

11.1 Pengecatan 1 m2 plafond


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja (L.01) OH 0.020 145,000.00 2,900.00
Tukang Cat (L.02) OH 0.063 175,000.00 11,025.00
Kepala Tukang (L.03) OH 0.006 180,000.00 1,134.00
Mandor (L.04) OH 0.003 185,000.00 555.00
JUMLAH TENAGA KERJA 15,614.00
B BAHAN
Plamur Kg 0.100 18,000.00 1,800.00
Cat dasar Kg 0.100 43,000.00 4,300.00
Cat penutup Kg 0.260 24,000.00 6,240.00
JUMLAH TENAGA BAHAN 12,340.00
C. PERALATAN
-
JUMLAH TENAGA ALAT -

D. Jumlah (A+B+C) 27,954.00


E. Overhead & Profit 15% x D 4,193.10
F. Harga Satuan Pekerjaan (D+E) 32,147.10

11.2 Pengecatan 1 m2 Tembok baru


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja (L.01) OH 0.020 145,000.00 2,900.00
Tukang Cat (L.02) OH 0.063 175,000.00 11,025.00
Kepala Tukang (L.03) OH 0.006 180,000.00 1,134.00
Mandor (L.04) OH 0.003 185,000.00 555.00
JUMLAH TENAGA KERJA 15,614.00
B BAHAN
Plamuur Kg 0.100 18,000.00 1,800.00
Cat dasar tembok (sealer) Kg 0.100 43,000.00 4,300.00

Cat penutup (cat tembok) Kg 0.260 97,000.00 25,220.00


untuk eksterior (luar)
JUMLAH TENAGA BAHAN 31,320.00
C. PERALATAN
-
JUMLAH TENAGA ALAT -

D. Jumlah (A+B+C) 46,934.00


E. Overhead & Profit 15% x D 7,040.10
F. Harga Satuan Pekerjaan (D+E) 53,974.10

XII. HARGA SATUAN PEKERJAAN SANITASI GEDUNG

12.1 Pemasangan 1 buah closet duduk/monoblock


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja (L.01) OH 3.300 145,000.00 478,500.00
Tukang Batu (L.02) OH 1.100 175,000.00 192,500.00
Kepala Tukang (L.03) OH 0.010 180,000.00 1,800.00
Mandor (L.04) OH 0.160 185,000.00 29,600.00
JUMLAH TENAGA KERJA 702,400.00
B BAHAN
Closet duduk Unit 1.000 5,200,000.00 5,200,000.00
Perlengkapan Ls 6% x closet 312,000.00 312,000.00
JUMLAH TENAGA BAHAN 5,512,000.00
C. PERALATAN
-
JUMLAH TENAGA ALAT -

D. Jumlah (A+B+C) 6,214,400.00


E. Overhead & Profit 15% x D 932,160.00
F. Harga Satuan Pekerjaan (D+E) 7,146,560.00

12.2 Pemasangan 1 buah closet jongkok porslen


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja (L.01) OH 1.000 145,000.00 145,000.00
Tukang Batu (L.02) OH 1.500 175,000.00 262,500.00
Kepala Tukang (L.03) OH 0.150 180,000.00 27,000.00
Mandor (L.04) OH 0.160 185,000.00 29,600.00
JUMLAH TENAGA KERJA 464,100.00
B BAHAN
Closet jongkok Unit 1.000 240,000.00 240,000.00
Semen Portland Kg 6.000 1,700.00 10,200.00
Pasir pasang M3 0.010 105,000.00 1,050.00
JUMLAH TENAGA BAHAN 251,250.00
C. PERALATAN
-
JUMLAH TENAGA ALAT -

D. Jumlah (A+B+C) 715,350.00


E. Overhead & Profit 15% x D 107,302.50
F. Harga Satuan Pekerjaan (D+E) 822,652.50

12.3 Pemasangan 1 buah urinoir


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja (L.01) OH 1.000 145,000.00 145,000.00
Tukang Batu (L.02) OH 1.000 175,000.00 175,000.00
Kepala Tukang (L.03) OH 0.100 180,000.00 18,000.00
Mandor (L.04) OH 0.050 185,000.00 9,250.00
JUMLAH TENAGA KERJA 347,250.00
B BAHAN
Urinoir Unit 1.000 2,500,000.00 2,500,000.00
Semen Portland Kg 6.000 1,700.00 10,200.00
Pasir pasang M3 0.010 105,000.00 1,050.00
Perlengkapan % 30.000 2,500,000.00 750,000.00
JUMLAH TENAGA BAHAN 3,261,250.00
C. PERALATAN
-
JUMLAH TENAGA ALAT -

D. Jumlah (A+B+C) 3,608,500.00


E. Overhead & Profit 15% x D 541,275.00
F. Harga Satuan Pekerjaan (D+E) 4,149,775.00

12.4 Pemasangan 1 buah wastafel


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja (L.01) OH 1.200 145,000.00 174,000.00
Tukang Batu (L.02) OH 1.450 175,000.00 253,750.00
Kepala Tukang (L.03) OH 0.150 180,000.00 27,000.00
Mandor (L.04) OH 0.060 185,000.00 11,100.00
JUMLAH TENAGA KERJA 465,850.00
B BAHAN
Wastafel 0 Unit 1.200 750,000.00 900,000.00
Semen Portland 0 Kg 6.000 1,700.00 10,200.00
Pasir pasang 0 M3 0.010 105,000.00 1,050.00
Perlengkapan 0 % 12.000 750,000.00 90,000.00
JUMLAH TENAGA BAHAN 1,001,250.00
C. PERALATAN
-
JUMLAH TENAGA ALAT -

D. Jumlah (A+B+C) 1,467,100.00


E. Overhead & Profit 15% x D 220,065.00
F. Harga Satuan Pekerjaan (D+E) 1,687,165.00

12.5 Pemasangan 1 buah bak cuci piring stainles steel


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja (L.01) OH 0.030 145,000.00 4,350.00
Tukang Batu (L.02) OH 0.300 175,000.00 52,500.00
Kepala Tukang (L.03) OH 0.030 180,000.00 5,400.00
Mandor (L.04) OH 0.015 185,000.00 2,775.00
JUMLAH TENAGA KERJA 65,025.00
B BAHAN
Bak cuci piring Unit 1.000 350,000.00 350,000.00
Waterdrain Bh 1.000 265,000.00 265,000.00
JUMLAH TENAGA BAHAN 615,000.00
C. PERALATAN
-
JUMLAH TENAGA ALAT -

D. Jumlah (A+B+C) 680,025.00


E. Overhead & Profit 15% x D 102,003.75
F. Harga Satuan Pekerjaan (D+E) 782,028.75

12.6 Pemasangan 1 buah floor drain stainless steel


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja (L.01) OH 0.010 145,000.00 1,450.00
Tukang Batu (L.02) OH 0.100 175,000.00 17,500.00
Kepala Tukang (L.03) OH 0.010 180,000.00 1,800.00
Mandor (L.04) OH 0.005 185,000.00 925.00
JUMLAH TENAGA KERJA 21,675.00
B BAHAN
Floor drain stainless Unit 1.000 350,000.00 350,000.00
JUMLAH TENAGA BAHAN 350,000.00
C. PERALATAN
-
JUMLAH TENAGA ALAT -

D. Jumlah (A+B+C) 371,675.00


E. Overhead & Profit 15% x D 55,751.25
F. Harga Satuan Pekerjaan (D+E) 427,426.25

12.7 Pemasangan 1 buah kran Ø 3/4" atau 1/2"


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja (L.01) OH 0.010 145,000.00 1,450.00
Tukang Batu (L.02) OH 0.400 175,000.00 70,000.00
Kepala Tukang (L.03) OH 0.040 180,000.00 7,200.00
Mandor (L.04) OH 0.005 185,000.00 925.00
JUMLAH TENAGA KERJA 79,575.00
B BAHAN
Kran air M 1.000 47,000.00 47,000.00
Sealtape Buah 0.025 18,000.00 450.00
JUMLAH TENAGA BAHAN 47,450.00
C. PERALATAN
-
JUMLAH TENAGA ALAT -

D. Jumlah (A+B+C) 127,025.00


E. Overhead & Profit 15% x D 19,053.75
F. Harga Satuan Pekerjaan (D+E) 146,078.75

12.8 Pemasangan 1 m pipa PVC tipe AW Ø 1/2"


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja (L.01) OH 0.036 145,000.00 5,220.00
Tukang Batu (L.02) OH 0.060 175,000.00 10,500.00
Kepala Tukang (L.03) OH 0.006 180,000.00 1,080.00
Mandor (L.04) OH 0.002 185,000.00 370.00
JUMLAH TENAGA KERJA 17,170.00
B BAHAN
Pipa PVC 1/2” M 1.200 1,250.00 1,500.00
Perlengkapan % 35.000 437.50 153.13
JUMLAH TENAGA BAHAN 1,653.13
C. PERALATAN
-
JUMLAH TENAGA ALAT -

D. Jumlah (A+B+C) 18,823.13


E. Overhead & Profit 15% x D 2,823.47
F. Harga Satuan Pekerjaan (D+E) 21,646.59

12.9 Pemasangan 1 m pipa PVC tipe AW Ø 3/4"


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja (L.01) OH 0.036 145,000.00 5,220.00
Tukang Batu (L.02) OH 0.060 175,000.00 10,500.00
Kepala Tukang (L.03) OH 0.006 180,000.00 1,080.00
Mandor (L.04) OH 0.002 185,000.00 370.00
JUMLAH TENAGA KERJA 17,170.00
B BAHAN
Pipa PVC 3/4” 0 M 1.200 6,000.00 7,200.00
Perlengkapan 0 % 35.000 2,100.00 735.00
JUMLAH TENAGA BAHAN 7,935.00
C. PERALATAN
-
JUMLAH TENAGA ALAT -

D. Jumlah (A+B+C) 25,105.00


E. Overhead & Profit 15% x D 3,765.75
F. Harga Satuan Pekerjaan (D+E) 28,870.75

12.10 Pemasangan 1 m pipa PVC tipe AW Ø 11/2"


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja (L.01) OH 0.054 145,000.00 7,830.00
Tukang Batu (L.02) OH 0.090 175,000.00 15,750.00
Kepala Tukang (L.03) OH 0.009 180,000.00 1,620.00
Mandor (L.04) OH 0.003 185,000.00 555.00
JUMLAH TENAGA KERJA 25,755.00
B BAHAN
Pipa PVC 11/2” 0 M 1.200 10,500.00 12,600.00
Perlengkapan 0 % 35.000 3,675.00 1,286.25
JUMLAH TENAGA BAHAN 13,886.25
C. PERALATAN
-
JUMLAH TENAGA ALAT -

D. Jumlah (A+B+C) 39,641.25


E. Overhead & Profit 15% x D 5,946.19
F. Harga Satuan Pekerjaan (D+E) 45,587.44

12.11 Pemasangan 1 m pipa PVC tipe AW Ø 2"


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja (L.01) OH 0.054 145,000.00 7,830.00
Tukang Batu (L.02) OH 0.090 175,000.00 15,750.00
Kepala Tukang (L.03) OH 0.009 180,000.00 1,620.00
Mandor (L.04) OH 0.003 185,000.00 555.00
JUMLAH TENAGA KERJA 25,755.00
B BAHAN
Pipa PVC 2” M 1.200 18,000.00 21,600.00
Perlengkapan % 35.000 6,300.00 2,205.00
JUMLAH TENAGA BAHAN 23,805.00
C. PERALATAN
-
JUMLAH TENAGA ALAT -

D. Jumlah (A+B+C) 49,560.00


E. Overhead & Profit 15% x D 7,434.00
F. Harga Satuan Pekerjaan (D+E) 56,994.00

12.12 Pemasangan 1 m pipa PVC tipe AW Ø 4"


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja (L.01) OH 0.081 145,000.00 11,745.00
Tukang Batu (L.02) OH 0.135 175,000.00 23,625.00
Kepala Tukang (L.03) OH 0.014 180,000.00 2,430.00
Mandor (L.04) OH 0.004 185,000.00 740.00
JUMLAH TENAGA KERJA 38,540.00
B BAHAN
Pipa PVC 4” 0 M 1.200 46,250.00 55,500.00
Perlengkapan 0 % 35.000 16,187.50 5,665.62
JUMLAH TENAGA BAHAN 61,165.63
C. PERALATAN
-
JUMLAH TENAGA ALAT -

D. Jumlah (A+B+C) 99,705.63


E. Overhead & Profit 15% x D 14,955.84
F. Harga Satuan Pekerjaan (D+E) 114,661.47

12.13 Pemasangan 1 buah Septitank dan Peresapan


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.380 145,000.00 55,100.00
Tukang batu L.02 OH 0.190 175,000.00 33,250.00
Kepala Tukang L.03 OH 0.019 180,000.00 3,420.00
Mandor L.04 OH 0.019 185,000.00 3,515.00
JUMLAH TENAGA KERJA 95,285.00
B BAHAN
Galian Tanah bh 10.500 130,381.25 1,369,003.13
Urugan Kembali m3 2.625 94,012.50 246,782.81
Batu Bata m2 8.400 800.00 6,720.00
Plesteran m3 13.500 135,900.10 1,834,651.35
Pelat Beton m3 0.200 2,750,000.00 550,000.00
JUMLAH TENAGA BAHAN 4,007,157.29
C. PERALATAN
-
JUMLAH TENAGA ALAT -

D. Jumlah (A+B+C) 4,102,442.29


E. Overhead & Profit 15% x D 615,366.34
F. Harga Satuan Pekerjaan (D+E) 4,784,677.00

12.14 Pemasangan 1 buah Jet Washer 1/2" - 3/4" (ex Toto)


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.010 145,000.00 1,450.00
Tukang batu L.02 OH 0.100 175,000.00 17,500.00
Kepala Tukang L.03 OH 0.040 180,000.00 7,200.00
Mandor L.04 OH 0.005 185,000.00 925.00
JUMLAH TENAGA KERJA 27,075.00
B BAHAN
Jet Washer unit 1.000 1.00 300,000.00
Sealtape bh 0.025 0.03 7,000.00
JUMLAH TENAGA BAHAN 307,000.00
C. PERALATAN
-
JUMLAH TENAGA ALAT -

D. Jumlah (A+B+C) 334,075.00


E. Overhead & Profit 15% x D 78,865.00
F. Harga Satuan Pekerjaan (D+E) 412,940.00

12.15 Pelapisan anti bocor 1 m2 (2 lapis )


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.028 145,000.00 4,060.00
Tukang cat L.02 OH 0.042 175,000.00 7,350.00
Kepala tukang L.03 OH 0.0042 180,000.00 756.00
Mandor L.04 OH 0.003 185,000.00 555.00
JUMLAH TENAGA KERJA 12,721.00
B BAHAN
Pelapis anti bocor kg 0.800 52,000.00 41,600.00
JUMLAH TENAGA BAHAN 41,600.00
C. PERALATAN
-
JUMLAH TENAGA ALAT -

D. Jumlah (A+B+C) 54,321.00


E. Overhead & Profit 15% x D 8,148.15
F. Harga Satuan Pekerjaan (D+E) 62,469.15

XIII. HARGA SATUAN PEKERJAAN LAIN-LAIN

13.1 Pemasangan titik nyala stop kontak


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.000 - -
Tukang Listrik L.02 OH 0.135 175,000.00 23,625.00
Kepala Tukang L.03 OH 0.014 180,000.00 2,430.00
Mandor L.04 OH 0.005 185,000.00 925.00
JUMLAH TENAGA KERJA 26,980.00
B BAHAN
Kabel NYM 3 x 2,5 mm2 M' 15.000 25,000.00 375,000.00
Pipa Konduit PVC HI "EGA" Dia. 20 M' 12.000 4,000.00 48,000.00
T-Dus PVC HI "EGA" Dia. 20mm Bh 1.000 65,000.00 65,000.00
JUMLAH TENAGA BAHAN 488,000.00
C. PERALATAN
-
JUMLAH TENAGA ALAT -

D. Jumlah (A+B+C) 514,980.00


E. Overhead & Profit 15% x D 77,247.00
F. Harga Satuan Pekerjaan (D+E) 592,227.00

13.2 Pemasangan titik nyala saklar


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH
Tukang Listrik L.02 OH 0.135 175,000.00 23,625.00
Kepala Tukang L.03 OH 0.014 180,000.00 2,430.00
Mandor L.04 OH 0.005 185,000.00 925.00
JUMLAH TENAGA KERJA 26,980.00
B BAHAN
Kabel NYM 3 x 2,5 mm2 M' 15.000 25,000.00 375,000.00
Pipa Konduit PVC HI "EGA" Dia. 20 M' 12.000 4,000.00 48,000.00
T-Dus PVC HI "EGA" Dia. 20mm Bh 1.000 65,000.00 65,000.00
JUMLAH TENAGA BAHAN 488,000.00
C. PERALATAN
-
JUMLAH TENAGA ALAT -

D. Jumlah (A+B+C) 514,980.00


E. Overhead & Profit 15% x D 77,247.00
F. Harga Satuan Pekerjaan (D+E) 592,227.00
13.3 Pemasangan titik nyala lampu
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH
Tukang Listrik L.02 OH 0.135 175,000.00 23,625.00
Kepala Tukang L.03 OH 0.014 180,000.00 2,430.00
Mandor L.04 OH 0.005 185,000.00 925.00
JUMLAH TENAGA KERJA 26,980.00
B BAHAN
Kabel NYM 2 x 2,5 mm2 M' 15.000 13,000.00 195,000.00
Pipa Konduit PVC HI "EGA" Dia. 20 M' 12.000 4,000.00 48,000.00
T-Dus PVC HI "EGA" Dia. 20mm Bh 1.000 65,000.00 65,000.00
JUMLAH TENAGA BAHAN 308,000.00
C. PERALATAN
-
JUMLAH TENAGA ALAT -

D. Jumlah (A+B+C) 334,980.00


E. Overhead & Profit 15% x D 50,247.00
F. Harga Satuan Pekerjaan (D+E) 385,227.00

13.4 Pemasangan 1 buah stop kontak


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH
Tukang Listrik L.02 OH 0.100 175,000.00 17,500.00
Kepala Tukang L.03 OH 0.010 180,000.00 1,800.00
Mandor L.04 OH 0.005 185,000.00 925.00
JUMLAH TENAGA KERJA 20,225.00
B BAHAN
Stop Kontak Bh 1.000 140,800.00 140,800.00
Inbow dus Bh 1.000 7,000.00 7,000.00
Semen Portland Kg 0.200 1,700.00 340.00
JUMLAH TENAGA BAHAN 148,140.00
C. PERALATAN
-
JUMLAH TENAGA ALAT -

D. Jumlah (A+B+C) 168,365.00


E. Overhead & Profit 15% x D 25,254.75
F. Harga Satuan Pekerjaan (D+E) 193,619.75

13.5 Pemasangan 1 buah saklar tunggal


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH
Tukang Listrik L.02 OH 0.100 175,000.00 17,500.00
Kepala Tukang L.03 OH 0.010 180,000.00 1,800.00
Mandor L.04 OH 0.005 185,000.00 925.00
JUMLAH TENAGA KERJA 20,225.00
B BAHAN
Saklar Tunggal Bh 1.000 95,000.00 95,000.00
Inbow dus Bh 1.000 7,000.00 420.00
Semen Portland Kg 0.200 1,700.00 102.00
JUMLAH TENAGA BAHAN 95,522.00
C. PERALATAN
-
JUMLAH TENAGA ALAT -

D. Jumlah (A+B+C) 115,747.00


E. Overhead & Profit 15% x D 17,362.05
F. Harga Satuan Pekerjaan (D+E) 133,109.05

13.6 Pemasangan 1 buah saklar ganda


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH
Tukang Listrik L.02 OH 0.100 175,000.00 17,500.00
Kepala Tukang L.03 OH 0.010 180,000.00 1,800.00
Mandor L.04 OH 0.005 185,000.00 925.00
JUMLAH TENAGA KERJA 20,225.00
B BAHAN
Saklar Ganda Bh 1.000 112,000.00 112,000.00
Inbow dus Bh 1.000 7,000.00 7,000.00
Semen Portland Kg 0.200 1,700.00 340.00
JUMLAH TENAGA BAHAN 119,340.00
C. PERALATAN
-
JUMLAH TENAGA ALAT -

D. Jumlah (A+B+C) 139,565.00


E. Overhead & Profit 15% x D 20,934.75
F. Harga Satuan Pekerjaan (D+E) 160,499.75

13.7 Pemasangan 1 buah exhaust fan


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH
Tukang Listrik L.02 OH 0.100 175,000.00 17,500.00
Kepala Tukang L.03 OH 0.010 180,000.00 1,800.00
Mandor L.04 OH 0.005 185,000.00 925.00
JUMLAH TENAGA KERJA 20,225.00
B BAHAN
Exhaust fan Bh 1.000 500,000.00 500,000.00
JUMLAH TENAGA BAHAN 500,000.00
C. PERALATAN
-
JUMLAH TENAGA ALAT -

D. Jumlah (A+B+C) 520,225.00


E. Overhead & Profit 15% x D 78,033.75
F. Harga Satuan Pekerjaan (D+E) 598,258.75

13.8 Pemasangan 1 bh pintu KM/WC aluminium warna lengkap kunci engsel setara dekson)
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.050 145,000.00 7,250.00
Tukang L.02 OH 0.500 175,000.00 87,500.00
Kepala Tukang L.03 OH 0.050 180,000.00 9,000.00
Mandor L.04 OH 0.003 185,000.00 555.00
JUMLAH TENAGA KERJA 104,305.00
B BAHAN
Pintu aluminium warna lengkap bh 1.000 3,500,000.00 3,500,000.00
Sealent tube 0.432 3,500.00 1,512.00
JUMLAH TENAGA BAHAN 3,501,512.00
C. PERALATAN
-
JUMLAH TENAGA ALAT -

D. Jumlah (A+B+C) 3,605,817.00


E. Overhead & Profit 15% x D 540,872.55
F. Harga Satuan Pekerjaan (D+E) 4,146,689.55

12.2 Pemotongan 1 buah Tiang Pancang


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja (L.01) OH 1.000 145,000.00 145,000.00
Mandor (L.04) OH 1.000 185,000.00 185,000.00
JUMLAH TENAGA KERJA 330,000.00
B BAHAN

JUMLAH TENAGA BAHAN


C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C) 330,000.00


E. Overhead & Profit 15% x D 49,500.00
F. Harga Satuan Pekerjaan (D+E) 379,500.00
602

4.3.4. PERHITUNGAN VOLUME PEKERJAAN

NO URAIAN PEKERJAAN DAN GAMBAR SKET URAIAN PERHITUNGAN KUANTITAS

I PEKERJAAN PERSIAPAN
1.1 Pekerjaan Pembersihan
Panjang = 34.00 m
Lebar = 23.50 m
Volume = 799.00 m2

1.2 Pemasangan Bouwplank


Panjang = 33.00 m
Lebar = 22.50 m
Volume = 111.00 m'

1.3 Pemagaran Proyek


Panjang = 35.00 m
Lebar = 24.50 m
Volume = 119.00 m'

1.4 Pembuatan Kantor Sementara


Panjang = 7.00 m
Lebar = 5.00 m
Volume = 35.00 m2

1.5 Pembuatan Gudang alat dan Bahan


Panjang = 7.00 m
Lebar = 5.00 m
Volume = 35.00 m2

II PEKERJAAN TANAH DAN PASIR


2.1 Pek. Galian Tanah Untuk Pile Cap
Panjang = 2.20 m
Lebar = 2.20 m
Tinggi = 0.50 m
Jumlah = 35.00 bh
Volume = 84.70 m3

2.2 Pek. Urugan pasir bawah pile cap


Panjang = 2.20 m
Lebar = 2.20 m
Tinggi = 0.15 m
Jumlah = 35.00 bh
Volume = ( Panjang x Lebar x Tinggi ) 25.41 m3
=

2.3 Pek. Urugan tanah kembali pile cap


Volume Galian Pile Cap = 84.70 m3
Volume = (1/3 x Volume Galian ) 28.23 m3
=

2.4 Pek. Galian Sloof


Panjang Total = 298.50 m
Lebar = 0.30 m
Tinggi = 0.60 m
Volume = ( Panjang x Lebar x Tinggi ) 53.73 m3

2.5 Pek. Urugan Pasir bawah sloof


Panjang Total = 298.50 m
Lebar = 0.30 m
Tinggi = 0.80 m
Volume = ( Panjang x Lebar x Tinggi )
= 71.64 m3

2.6 Pemadatan Tanah Lantai


Panjang = 68.00 m
Lebar = 16.00 m
Kedalaman = 0.50 m
Volume = Luas Lantai x Tinggi
= 544.00 m3
603

III PEKERJAAN STRUKTUR BAWAH


3.1 Pemasangan Tiang Pancang Square Pile 30 x 30
cm Kedalaman = 16.00 m
Jumlah Tiang = 4.00 bh
Jumlah Titik = 35.00 bh
Jumlah = 2,240.00 m 2240.00 m

24

3.2 Pemotongan Tiang Pancang


Jumlah Tiang = 4.00 bh
Jumlah Titik = 35.00 bh
Jumlah = 140.00 bh 140.00 bh
3.3 Pekerjaan Pile Cap
- Cor Lantai Kerja Pile Cap
Panjang = 1.80 m
Lebar = 1.80 m
Tinggi = 0.50 m
Jlh. Lantai Kerja = 35.00 bh
Jumlah = 56.70 m3 56.70 m3

- Pekerjaan Pembesian Pile Cap


Arah X D22-100 mm
Jumlah Titik Tiang Pancang = 35.00 bh
Panjang Pile Cap = 1.80 m Tebal Selimut beton 75 mm
Tinggi Pile Cap = 0.50 m Tebal Selimut beton 75 mm
Jarak Tulangan = 0.10 m
Panjang Tulangan = 4.70
Panjang Total = 79.90
Berat D22 = 2.98 kg/m
Jumlah Tulangan = 17.00 bh
Berat Tulangan = 8,333.57 kg 8333.57 kg

Arah Y D22-100 mm
Jumlah Titik Tiang Pancang = 35.00 bh
Panjang Pile Cap = 1.80 m Tebal Selimut beton 75 mm
Tinggi Pile Cap = 0.50 m Tebal Selimut beton 75 mm
Jarak Tulangan = 0.10 m
Panjang Tulangan = 4.70
Panjang Total = 79.90
Berat D22 = 2.98 kg/m
Jumlah Tulangan = 17.00 bh
Berat Tulangan = 8,333.57 kg 8333.57 kg
Total Berat Tulangan = 16667.1 kg

- Bekisting Pilecap
Jumlah = 35.00 bh
Panjang = 1.80 m
Lebar = 1.80 m tebal papan bekisting 4 cm
Tinggi = 0.50 m
Luas = (2 x (p x l)) x t x jumlah
= 126.00
Total Bekisting Pile Cap 126.00 m2

- Beton Pile Cap


Panjang = 1.80 m
Lebar = 1.80 m
Tinggi = 0.50 m
Jlh. Pile Cap = 35.00 bh
Jumlah = 56.70 m3 56.70 m3

3.4 Pekerjaan Sloof


- Cor Lantai Kerja Sloof
Panjang = 298.50 m
Lebar = 0.30 m
Tinggi = 0.60 m
Jumlah = 53.73 m3 53.73 m3

Pekerjaan Pembesian Sloof


Sloof Memanjang Ukuran 30/60 Panjang 5.5 m
TUMPUAN
Panjang Sloof = 5.50 m
Banyak Tulangan = 2.00 bh
Jumlah Sloof = 10.00 bh
Berat D22 = 2.98 kg/m
Berat Total = 327.80 kg

LAPANGAN
Panjang Sloof = 5.50 m
Banyak Tulangan = 3.00 bh
Jumlah Sloof = 10.00 bh
Berat D22 = 2.98 kg/m
Berat Total = 491.70 kg
Total = 819.50 kg

Sengkang Ø10-250 5.5 M


Panjang Tulangan = 1.41 m
Banyak Sengkang = 26.00 bh
Jumlah Sloof = 10.00 bh
Berat Ø10 = 0.62 kg/m
Berat sengkang = 226.19 kg
Berat Total Tulangan = 1045.69 kg
604

Sloof Memanjang
Ukuran 30/60 Panjang 5 M
TUMPUAN
Panjang Sloof = 5.00 m
Banyak Tulangan = 2.00 bh
Jumlah Sloof = 20.00 bh
Berat D22 = 2.98 kg/m
Berat Total = 596.00 kg

LAPANGAN
Panjang Sloof = 5.00 m
Banyak Tulangan = 3.00 bh
Jumlah Sloof = 20.00 bh
Berat D22 = 2.98 kg/m
Berat Total = 894.00 kg
Total = 1,490.00 kg

Sengkang Ø13-215 5 M
Panjang Tulangan = 1.41 m
Banyak Sengkang = 24.00 bh
Jumlah Sloof = 20.00 bh
Berat Ø13 = 1.04 kg/m
Berat sengkang = 703.87 kg
Berat Total Tulangan = 2193.87 kg

Sloof Melintang
Ukuran 30/60 Panjang 2.25 M
TUMPUAN
Panjang Sloof = 2.25 m
Banyak Tulangan = 2.00 bh
Jumlah Sloof = 14.00 bh
Berat D22 = 2.98 kg/m
Berat Total = 187.74 kg

LAPANGAN
Panjang Sloof = 2.25 m
Banyak Tulangan = 5.00 bh
Jumlah Sloof = 14.00 bh
Berat D22 = 2.98 kg/m
Berat Total = 469.35 kg
Total = 657.09 kg

Sengkang Ø13-215 2.25 M


Panjang Tulangan = 1.41 m
Banyak Sengkang = 9.00 bh
Jumlah Sloof = 14.00 bh
Berat Ø13 = 1.04 kg/m
Berat sengkang = 184.77 kg
Berat Total Tulangan = 841.86 kg

Sloof Melintang
Ukuran 30/60 Panjang 8 M
TUMPUAN
Panjang Sloof = 8.00 m
Banyak Tulangan = 2.00 bh
Jumlah Sloof = 14.00 bh
Berat D22 = 2.98 kg/m
Berat Total = 667.52 kg

LAPANGAN
Panjang Sloof = 8.00 m
Banyak Tulangan = 2.00 bh
Jumlah Sloof = 14.00 bh
Berat D22 = 2.98 kg/m
Berat Total = 667.52 kg
Total = 1,335.04 kg

Sengkang Ø13-215 8 M
Panjang Tulangan = 1.41 m
Banyak Sengkang = 32.00 bh
Jumlah Sloof = 14.00 bh
Berat Ø13 = 1.04 kg/m
Berat sengkang = 656.95 kg
Berat Total Tulangan = 1991.99 kg
Berat Total Tulangan Sloof 6073.41
Bekisting Sloof
Sloof 30/60 PANJANG 8 M
Panjang = 8.00 m
Tinggi = 0.60 m
Jumlah = 14.00 bh
Lebar = 0.30 m
Luas = nggi x 2) x Panjang x Jumlah
= 134.40
PANJANG 5,5 M
Panjang = 6.50 m
Tinggi = 0.60 m
Jumlah = 10.00 bh
Lebar = 0.30 m
Luas = nggi x 2) x Panjang x Jumlah
= 78.00
PANJANG 5 M
Panjang = 3.00 m
Tinggi = 0.60 m
Jumlah = 20.00 bh
Lebar = 0.30 m
Luas = nggi x 2) x Panjang x Jumlah
= 72.00
PANJANG 2.25 M
Panjang = 3.00 m
Tinggi = 0.60 m
Jumlah = 14.00 bh
Lebar = 0.30 m
Luas = nggi x 2) x Panjang x Jumlah
= 50.40
Total Bekisting Sloof 262.80 m2

Beton Sloof
Sloof 30/60 PANJANG 8 M
Panjang = 8.00 m
Tinggi = 0.60 m
Lebar = 0.30 m
Jumlah = 14.00 bh
Volume = 20.16 m3
PANJANG 5,5 M
Panjang = 5.50 m
Tinggi = 0.60 m
Lebar = 0.30 m
Jumlah = 10.00 bh
Volume = 9.90 m3
PANJANG 5 M
Panjang = 5.00 m
Tinggi = 0.60 m
Lebar = 0.30 m
605

Jumlah = 20.00 bh
Volume = 18.00 m3
PANJANG 2.25 M
Panjang = 2.25 m
Tinggi = 0.60 m
Lebar = 0.30 m
Jumlah = 14.00 bh
Volume = 5.67 m3

Total Beton Sloof = 43.83 m3


606

III PEKERJAAN STRUKTUR ATAS


LANTAI 1
4.1 Pekerjaan Pelat
Penulangan Pelat Lantai 1 Panel 1
Jumlah Panel = 4.00 bh
Lx = 2.25 m
Ly = 5.50 m
Diameter Tulangan = 0.01 m
Jarak Lapangan x = 0.15 m Tulangan Ø10-150 mm
Jarak Lapangan y = 0.15 m Tulangan Ø10-150 mm
Jarak Tumpuan x = 0.15 m Tulangan Ø10-150 mm
Jarak Tumpuan y = 0.15 m Tulangan Ø10-150 mm
Jumlah Tulangan Lapangan x = 37.00 bh
Panjang Tulangan Lapangan x = 1.13 m
Panjang Total tulangan Lapangan x = 41.63 m

1 Jumlah Tulangan Lapangan y


Panjang Tulangan Lapangan y
=
=
15.00
2.75
bh
m
Panjang Total tulangan Lapangan y = 41.25 m
Jumlah Tulangan Tumpuan x = 15.00 bh
Panjang Tulangan Tumpuan x = 1.13 m
Panjang Total tulangan Tumpuan x = 16.88 m
Jumlah Tulangan Tumpuan y = 15.00 bh
Panjang Tulangan Tumpuan y = 2.75 m
Panjang Total tulangan Tumpuan y = 41.25 m
Panjang Total tulangan Pelat = 141.00 m
Berat Tulangan Ø10 = 0.62 kg/m
Berat Total Tulangan = 347.99 kg
Berat Total Tulangan Panel 1 = 347.99 kg

Panel 2
Jumlah Panel = 8.00 bh
Lx = 2.25 m
Ly = 5.00 m
Diameter Tulangan = 0.01 m
Jarak Lapangan x = 0.25 m Tulangan Ø10-250 mm
Jarak Lapangan y = 0.25 m Tulangan Ø10-250 mm
Jarak Tumpuan x = 0.25 m Tulangan Ø10-250 mm
Jarak Tumpuan y = 0.25 m Tulangan Ø10-250 mm
Jumlah Tulangan Lapangan x = 20.00 bh
Panjang Tulangan Lapangan x = 1.13 m
Panjang Total tulangan Lapangan x = 22.50 m

2
Jumlah Tulangan Lapangan y = 9.00 bh
Panjang Tulangan Lapangan y = 2.50 m
Panjang Total tulangan Lapangan y = 22.50 m
Jumlah Tulangan Tumpuan x = 20.00 bh
Panjang Tulangan Tumpuan x = 1.13 m
Panjang Total tulangan Tumpuan x = 22.50 m
Jumlah Tulangan Tumpuan y = 9.00 bh
Panjang Tulangan Tumpuan y = 2.50 m
Panjang Total tulangan Tumpuan y = 22.50 m
Panjang Total tulangan Pelat = 90.00 m
Berat Tulangan Ø10 = 0.62 kg/m
Berat Total Tulangan = 444.24 kg
Berat Total Tulangan Panel 2 = 444.24 kg

Panel 3
Jumlah Panel = 6.00 bh
Lx = 4.00 m
Ly = 5.50 m
Diameter Tulangan = 0.01 m
Jarak Lapangan x = 0.23 m Tulangan Ø10-225 mm
Jarak Lapangan y = 0.23 m Tulangan Ø10-225 mm
Jarak Tumpuan x = 0.23 m Tulangan Ø10-225 mm
Jarak Tumpuan y = 0.23 m Tulangan Ø10-225 mm
Jumlah Tulangan Lapangan x = 25.00 bh
Panjang Tulangan Lapangan x = 2.00 m
Panjang Total tulangan Lapangan x = 50.00 m
Jumlah Tulangan Lapangan y = 18.00 bh
Panjang Tulangan Lapangan y = 2.75 m
3 Panjang Total tulangan Lapangan y
Jumlah Tulangan Tumpuan x
=
=
49.50
25.00
m
bh
Panjang Tulangan Tumpuan x = 2.00 m
Panjang Total tulangan Tumpuan x = 50.00 m
Jumlah Tulangan Tumpuan y = 18.00 bh
Panjang Tulangan Tumpuan y = 2.75 m
Panjang Total tulangan Tumpuan y = 49.50 m
Panjang Total tulangan Pelat = 199.00 m
Berat Tulangan Ø10 = 0.62 kg/m
Berat Total Tulangan = 736.70 kg
Berat Total Tulangan Panel 3 = 736.70 kg

Panel 4
Jumlah Panel = 16.00 bh
Lx = 4.00 m
Ly = 5.00 m
Diameter Tulangan = 0.01 m
Jarak Lapangan x = 0.25 m Tulangan Ø10-250 mm
Jarak Lapangan y = 0.25 m Tulangan Ø10-250 mm
Jarak Tumpuan x = 0.25 m Tulangan Ø10-250 mm
Jarak Tumpuan y = 0.25 m Tulangan Ø10-250 mm
Jumlah Tulangan Lapangan x = 20.00 bh
Panjang Tulangan Lapangan x = 2.00 m
Panjang Total tulangan Lapangan x = 40.00 m
Jumlah Tulangan Lapangan y = 16.00 bh
Panjang Tulangan Lapangan y = 2.50 m

4
607

4 Panjang Total tulangan Lapangan y


Jumlah Tulangan Tumpuan x
=
=
40.00
20.00
m
bh
Panjang Tulangan Tumpuan x = 2.00 m
Panjang Total tulangan Tumpuan x = 40.00 m
Jumlah Tulangan Tumpuan y = 16.00 bh
Panjang Tulangan Tumpuan y = 2.50 m
Panjang Total tulangan Tumpuan y = 40.00 m
Panjang Total tulangan Pelat = 160.00 m
Berat Tulangan Ø10 = 0.62 kg/m
Berat Total Tulangan = 1,579.52 kg
Berat Total Tulangan Panel 4 = 1579.52 kg

Panel 5
Jumlah Panel = 4.00 bh
Lx = 1.80 m
Ly = 4.50 m
Diameter Tulangan = 0.01 m
Jarak Lapangan x = 0.25 m Tulangan Ø10-250 mm
Jarak Lapangan y = 0.25 m Tulangan Ø10-250 mm
Jarak Tumpuan x = 0.25 m Tulangan Ø10-250 mm
Jarak Tumpuan y = 0.25 m Tulangan Ø10-250 mm
Jumlah Tulangan Lapangan x = 18.00 bh
Panjang Tulangan Lapangan x = 0.90 m
Panjang Total tulangan Lapangan x = 16.20 m

5 Jumlah Tulangan Lapangan y


Panjang Tulangan Lapangan y
=
=
8.00
2.25
bh
m
Panjang Total tulangan Lapangan y = 18.00 m
Jumlah Tulangan Tumpuan x = 18.00 bh
Panjang Tulangan Tumpuan x = 0.90 m
Panjang Total tulangan Tumpuan x = 16.20 m
Jumlah Tulangan Tumpuan y = 8.00 bh
Panjang Tulangan Tumpuan y = 2.25 m
Panjang Total tulangan Tumpuan y = 18.00 m
Panjang Total tulangan Pelat = 68.40 m
Berat Tulangan Ø10 = 0.62 kg/m
Berat Total Tulangan = 168.81 kg
Berat Total Tulangan Panel 5 = 168.81 kg

Berat Total Pembesian Pelat Lantai 1 3277.26 kg


Beton Pelat Lantai
Tebal Pelat 0.15 m
Luas 635.50
Volume 95.33
Total Beton Pelat Lantai 1 95.33 m

4.2 Pekerjaan Kolom


Pekerjaan Pembesian Kolom
Ukuran 40/40Tinggi 4.45 M
Tinggi Kolom = 4.45 m Tinggi Balok Induk 60 cm
Jumlah Kolom = 35.00 bh
Berat D19 = 2.22 kg/m
Banyak Tulangan = 8.00 bh
Berat Total = 2,766.12 kg

Sengkang Ø10-110
Panjang Tulangan = 0.96 m
Banyak Sengkang = 41.00 bh
Jumlah Kolom = 35.00 bh
Berat Ø10 = 0.62 kg/m
Berat sengkang = 849.98 kg
Berat Total Pembesian Kolom 3616.10 kg

Pekerjaan Bekisting Kolom

Kolom 40/40
Tinggi Kolom = 4.45 m
Tinggi Balok Lantai = 0.60 m
Tinggi Kolom Bersih = 3.85 m
Lebar = 0.40 m Tebal papan bekisting 4 cm
Panjang = 0.40 m
Jumlah = 35.00 bh
Luas = ng ) + ( 2 x Tinggi x Lebar )
= 215.60 m2
Total Bekisting Kolom Lt.Dasar 215.60 m2
608

Pekerjaan Beton Kolom


Panjang = 0.40 m
Lebar = 0.40 m
Tinggi = 3.85 m
Jumlah = 35.00 bh
Volume = ( Panjang x Lebar x Tinggi )
Volume = 21.56 m3

Total Beton Kolom 21.56 m3


Total Beton Kolom Lt.Dasar 21.56 m3

4.3 Pekerjaan Tangga


Pekerjaan Pembesian Tangga potongan A Anak Tangga
Tulangan Anak Tangga = 0.02 m
Tulangan Sengkang = 0.01 m
Optride = 0.17 m 0.25 m3
Antride = 0.30 m
Jumlah Anak Tangga = 20.00 bh
Lebar tangga = 1.50 m
Tebal Pelat Tangga = 0.15 m
Selimut Beton = 0.02 m
Panjang Sengkang = 0.77 m
Jarak Sengkang = 0.15 m
Jumlah Sengkang = 39.00 bh
Panjang Total Tulangan Utama = 30.00 m
Panjang Total Sengkang = 30.01 m
Berat Ø16 = 1.58 kg/m
Berat Ø10 = 0.62 kg/m
Total Berat Sengkang = 47.42 kg
Total Berat Tulangan Utama = 18.60 kg
Total Berat = 66.02 kg
Berat Tulangan Anak Tangga = 66.02 kg

Pekerjaan Pembesian Tangga potongan B


Anak Tangga
Tulangan Anak Tangga = 0.02 m
Tulangan Sengkang = 0.01 m
Optride = 0.17 m
Antride = 0.30 m
Jumlah Anak Tangga = 20.00 bh
Lebar tangga = 1.50 m
Tebal Pelat Tangga = 0.15 m
Selimut Beton = 0.02 m
Panjang Sengkang = 0.77 m
Jarak Sengkang = 0.15 m
Jumlah Sengkang = 39.00 bh
Panjang Total Tulangan Utama = 30.00 m
Panjang Total Sengkang = 30.01 m
Berat Ø16 = 1.58 kg/m
Berat Ø10 = 0.62 kg/m
Total Berat Sengkang = 47.42 kg
Total Berat Tulangan Utama = 18.60 kg
Total Berat = 66.02 kg
Berat Tulangan Anak Tangga = 66.02 kg

Pelat Tangga
Panjang = 1.50 m
Lebar = 1.12 m
Tebal = 0.15 m
Jumlah = 2.00 bh
Jumlah Tulangan Bagi = 11.20 bh Tulangan Bagi Ø10-155
Jumlah Tulangan Utama = 13.64 bh Tulangan Utama D16-110
- Berat Ø10 = 0.62 kg/m
Berat Ø16 = 1.58 kg/m
Total 1 Lapis = 80.19 kg
Total 2 Lapis = 160.38 kg
Berat Tulangan Pelat Tangga = 160.38 kg

Bordes
Panjang = 2.25 m
Lebar = 2.34 m
Jumlah bordes = 3.00 bh
Tebal = 0.10 m
Jumlah Tulangan Utama = 14.62 bh Tulangan Utama D16-215
Jumlah Tulangan Bagi = 20.45 bh Tulangan Bagi Ø16-110
Total Berat = 82.61 kg
Berat Tulangan Bordes = 82.61 kg

Balok Bordes
Panjang = 4.40 m
Lebar Balok = 0.30 m
Tebal Balok = 0.12 m
Berat D16 = 1.58 kg/m
Jumlah Tulangan = 2.00 bh Tulangan 2D10
Total Berat = 13.90 kg
Berat Tulangan Balok Bordes = 13.90 kg

- Berat Ø10 = 0.62 kg/m


Panjang = 0.57 m
Jumlah Sengkang = 28.00 bh Sengkang Ø10-160
Total Berat = 9.85 kg
Berat Tulangan Sengkang Balok Bordes = 9.85 kg

Total Berat Tulangan Tangga = 398.78 kg

Bekisting Tangga
Anak Tangga
Lebar = 1.12 m
Optrede = 0.17 m
Jumlah = 20.00 bh
Luas = 3.81 m2 3.81 m2
609

Pelat Tangga
Cetakan Bawah
Lebar = 2.25 m
Panjang = 2.34 m
Jumlah = 2.00 bh
Luas = 10.53 m2 10.53 m2

Cetakan Samping
Panjang = 2.15 m
Tinggi = 0.17 m
Jumlah = 2.00 bh
Luas = 1.46 m2 1.46 m2

Bordes
Panjang = 2.25 m
Lebar = 2.34 m
Tinggi = 0.20 m
Luas = 5.27 m2 5.27 m2

Balok Bordes
Panjang = 4.40 m
Tebal = 0.10 m
Lebar = 0.30 m
Luas = 2.20 m2 2.20 m2

Total Bekisting Tangga = 23.27 m2

Beton Tangga
Anak Tangga
Lebar = 1.12 m
Optrede = 0.17 m
- Antrade = 0.30 m
Jumlah = 20.00 bh
Volume = (Lebar x Optrede x Antrede) 1.14 m3

Pelat Tangga
Lebar = 1.12 m
Tinggi = 0.20 m
Panjang = 2.15 m
Jumlah = 2.00 bh
Volume = ng x Tinggi x Lebar x Jumlah 0.96 m3

Bordes
Panjang = 2.25 m
Lebar = 2.34 m
Tinggi = 0.20 m
Jumlah = 3.00 bh
Volume = ng x Lebar x Tinggi x Jumlah 3.16 m3

Balok Bordes
Panjang = 4.40 m
Tebal = 0.15 m
Lebar = 0.30 m 0.66 m3
Volume = Panjang x Lebar x Tinggi

Total Beton Tangga 5.92 m3

LANTAI 2
4.4 Pekerjaan Balok Lantai 2
Pekerjaan Pembesian Balok Induk
Balok Memanjang
Ukuran 30/60 Panjang 5.5 M
TUMPUAN
Panjang Balok = 5.50 m
Banyak Tulangan = 2.00 bh
Jumlah Balok = 14.00 bh
Berat D22 = 2.98 kg/m
Berat Total = 458.92 kg

LAPANGAN
Panjang Balok = 5.50 m
Banyak Tulangan = 3.00 bh
Jumlah Balok = 14.00 bh
Berat D22 = 2.98 kg/m
Berat Total = 688.38 kg
Total = 1,147.30 kg

Sengkang Ø10-250 5.5 M


Panjang Tulangan = 1.48 m
Banyak Sengkang = 23.00 bh
Jumlah Balok = 14.00 bh
Berat Ø10 = 0.62 kg/m
Berat sengkang = 294.04 kg
Berat Total Tulangan = 1441.34 m2

Balok Memanjang
Ukuran 30/60 Panjang 5 M
TUMPUAN
Panjang Balok = 5.00 m
Banyak Tulangan = 2.00 bh
Jumlah Balok = 28.00 bh
Berat D22 = 2.98 kg/m
Berat Total = 834.40 kg

LAPANGAN
Panjang Balok = 5.00 m
Banyak Tulangan = 3.00 bh
Jumlah Balok = 28.00 bh
Berat D22 = 2.98 kg/m
Berat Total = 1,251.60 kg
Total = 2,086.00 kg

Sengkang Ø10-250 5.5 M


Panjang Tulangan = 1.48 m
Banyak Sengkang = 21.00 bh
Jumlah Balok = 28.00 bh
Berat Ø10 = 0.62 kg/m
Berat sengkang = 536.94 kg
Berat Total Tulangan = 2622.94 m2
610

Balok Melintang
Ukuran 30/60 Panjang 8 M
TUMPUAN
Panjang Balok = 8.00 m
Banyak Tulangan = 2.00 bh
Jumlah Balok = 14.00 bh
Berat D22 = 2.98 kg/m
Berat Total = 667.52 kg

LAPANGAN
Panjang Balok = 8.00 m
Banyak Tulangan = 5.00 bh
Jumlah Balok = 14.00 bh
Berat D22 = 2.98 kg/m
Berat Total = 1,668.80 kg
Total = 2,336.32 kg

Sengkang Ø10-250 8 M
Panjang Tulangan = 1.48 m
Banyak Sengkang = 34.00 bh
Jumlah Balok = 14.00 bh
Berat D10 = 0.62 kg/m
Berat sengkang = 434.66 kg
Berat Total Tulangan = 2770.98
Balok Melintang Ukuran 30/60 Panjang 2.25 M
TUMPUAN
Panjang Balok = 2.25 m
Banyak Tulangan = 2.00 bh
Jumlah Balok = 14.00 bh
Berat D22 = 2.98 kg/m
Berat Total = 187.74 kg

LAPANGAN
Panjang Balok = 2.25 m
Banyak Tulangan = 5.00 bh
Jumlah Balok = 14.00 bh
Berat D22 = 2.98 kg/m
Berat Total = 469.35 kg
Total = 657.09 kg

Sengkang Ø10-250 2.25 M


Panjang Tulangan = 1.48 m
Banyak Sengkang = 10.00 bh
Jumlah Balok = 14.00 bh
Berat D10 = 0.62 kg/m
Berat sengkang = 127.84 kg
Berat Total Tulangan = 784.93
Berat Total Pembesian Balok Induk Lantai 1 = 7620.2 m3

Pekerjaan Pembesian Balok Anak


Balok Memanjang
Ukuran 250/350 Panjang 5.5 M
TUMPUAN
Panjang Balok = 5.50 m
Banyak Tulangan = 2.00 bh
Jumlah Balok = 4.00 bh
Berat D16 = 1.58 kg/m
Berat Total = 69.52 kg

LAPANGAN
Panjang Balok = 5.50 m
Banyak Tulangan = 2.00 bh
Jumlah Balok = 4.00 bh
Berat D16 = 1.58 kg/m
Berat Total = 69.52 kg
Total = 139.04 kg

Sengkang Ø10-150 5.5 M


Panjang Tulangan = 1.03 m
Banyak Sengkang = 4.00 bh
Berat Ø10 = 0.62 kg/m
Berat sengkang = 10.17 kg
Berat Total Tulangan = 149.21 kg

Balok Memanjang
Ukuran 250/350 Panjang 5 M
TUMPUAN
Panjang Balok = 5.00 m
Banyak Tulangan = 2.00 bh
Jumlah Balok = 8.00 bh
Berat D16 = 1.58 kg/m
Berat Total = 126.40 kg

LAPANGAN
Panjang Balok = 5.00 m
Banyak Tulangan = 2.00 bh
Jumlah Balok = 8.00 bh
Berat D16 = 1.58 kg/m
Berat Total = 126.40 kg
Total = 252.80 kg

Sengkang Ø10-150 5 M
Panjang Tulangan = 1.03 m
Banyak Sengkang = 5.00 bh
Berat Ø10 = 0.62 kg/m
Berat sengkang = 25.42 kg
Berat Total Tulangan = 278.22 kg
Berat Total Pembesian Balok Anak Lantai 2 427.43 kg

Berat Total Pembesian Balok Lantai 2 8047.6 kg


Bekisting Balok Panjang = 8.00 m
Bekisting Balok Induk Jumlah balok = 14.00 bh
Balok Induk 30/60 Lebar = 0.30 m Tebal papan bekisting 4 cm
Tinggi = 0.50 m dikurangi tebal plat 10 cm
Luas =x 0,30 m)+ 2 x (8 m x 0,5 m))
= 145.60 m²

Total Bekisting Balok Induk = 145.60 m2

Bekisting Balok Panjang = 5.50 m


Bekisting Balok Induk Jumlah balok = 14.00 bh
Balok Induk 30/60 Lebar = 0.30 m Tebal papan bekisting 4 cm
Tinggi = 0.50 m dikurangi tebal plat 10 cm
Luas =
= 100.10 m²

Total Bekisting Balok Induk = 100.10 m2

Bekisting Balok Panjang = 5.00 m


Bekisting Balok Induk Jumlah balok = 28.00 bh
Balok Induk 30/60 Lebar = 0.30 m Tebal papan bekisting 4 cm
611

Tinggi = 0.50 m dikurangi tebal plat 10 cm


Luas =
= 182.00 m²

Total Bekisting Balok Induk = 182.00 m2

Bekisting Balok Panjang = 2.25 m


Bekisting Balok Induk Jumlah balok = 14.00 bh
Balok Induk 30/60 Lebar = 0.30 m Tebal papan bekisting 4 cm
Tinggi = 0.50 m dikurangi tebal plat 10 cm
Luas = 30 m)+ 2 x (2,25 m x 0,5 m))
= 40.95 m²

Total Bekisting Balok Induk = 40.95 m2

Bekisting Balok Anak


Bekisting Balok Anak
Balok Anak 25/35 PANJANG 5.5 M
Panjang = 5.50 m
Jumlah balok = 4.00 bh
Lebar = 0.25 m Tebal papan bekisting 4 cm
Tinggi = 0.25 m dikurangi tebal plat 10 cm

Luas =,25 m)+ 2 x (5,5 m x 0,25 m))

= 16.50 m²

Total Bekisting Balok Anak = 16.50 m2

Bekisting Balok Anak


Balok Anak 25/35 PANJANG 5 M
Panjang = 5.00 m
Jumlah balok = 8.00 bh
Lebar = 0.25 m Tebal papan bekisting 4 cm
Tinggi = 0.25 m dikurangi tebal plat 10 cm
Luas = 0,28 m)+ 2 x (5 m x 0,25 m))
= 30.00 m²

Total Bekisting Balok Anak = 30.00 m2

Total Bekisting Balok = 515.15 m2

Beton Balok
Beton Balok Induk
Balok Induk 30/60 PANJANG 8 M
Panjang = 8.00 m
Jumlah balok = 14.00 bh
Lebar = 0.30 m Tebal papan bekisting 4 cm
Tinggi = 0.50 m dikurangi tebal plat 10 cm
Luas = ( Panjang x Lebar x Tinggi )
= 16.80 m²
Total Beton Balok Induk = 16.80 m²
612

Beton Balok
Beton Balok Induk
Balok Induk 30/55 PANJANG 5,5 M
Panjang = 5.50 m
Jumlah balok = 28.00 bh
Lebar = 0.30 m Tebal papan bekisting 4 cm
Tinggi = 0.50 m dikurangi tebal plat 10 cm
Luas = ( Panjang x Lebar x Tinggi )
= 23.10 m²
Total Beton Balok Induk = 23.10 m²

Beton Balok
Beton Balok Induk
Balok Induk 30/60 PANJANG 5 M
Panjang = 5.00 m
Jumlah balok = 10.00 bh
Lebar = 0.30 m Tebal papan bekisting 4 cm
Tinggi = 0.45 m dikurangi tebal plat 10 cm
Luas = ( Panjang x Lebar x Tinggi )
= 6.75 m²
Total Beton Balok Induk = 6.75 m²

Beton Balok
Beton Balok Induk
Balok Induk 30/60 PANJANG 5 M
Panjang = 2.25 m
Jumlah balok = 14.00 bh
Lebar = 0.30 m Tebal papan bekisting 4 cm
Tinggi = 0.50 m dikurangi tebal plat 10 cm
Luas = ( Panjang x Lebar x Tinggi )
= 4.73 m²
Total Beton Balok Induk = 4.73 m²

Beton Balok Anak


Balok Anak 25/35 PANJANG 5.5 M
Panjang = 5.50 m
Jumlah balok = 4.00 bh
Lebar = 0.25 m Tebal papan bekisting 4 cm
Tinggi = 0.25 m dikurangi tebal plat 10 cm
Luas = ( Panjang x Lebar x Tinggi )
= 1.37 m²

PANJANG 5 M
Panjang = 5.00 m
Jumlah balok = 8.00 bh
Lebar = 0.28 m Tebal papan bekisting 4 cm
Tinggi = 0.25 m dikurangi tebal plat 10 cm
Luas = ( Panjang x Lebar x Tinggi )
= 2.75 m² 2.75 m²

Total Beton Balok Lantai 1 = 54.13 m²

4.5 Pekerjaan Pelat


Penulangan Pelat Lantai 2 Panel 1
Jumlah Panel = 4.00 bh
Lx = 2.25 m
Ly = 5.50 m
Diameter Tulangan = 0.01 m
Jarak Lapangan x = 0.15 m Tulangan Ø10-150 mm
Jarak Lapangan y = 0.15 m Tulangan Ø10-150 mm
Jarak Tumpuan x = 0.15 m Tulangan Ø10-150 mm
Jarak Tumpuan y = 0.15 m Tulangan Ø10-150 mm
Jumlah Tulangan Lapangan x = 37.00 bh
Panjang Tulangan Lapangan x = 1.13 m
Panjang Total tulangan Lapangan x = 41.63 m

1
Jumlah Tulangan Lapangan y = 15.00 bh
Panjang Tulangan Lapangan y = 2.75 m
Panjang Total tulangan Lapangan y = 41.25 m
Jumlah Tulangan Tumpuan x = 15.00 bh
Panjang Tulangan Tumpuan x = 1.13 m
Panjang Total tulangan Tumpuan x = 16.88 m
Jumlah Tulangan Tumpuan y = 15.00 bh
Panjang Tulangan Tumpuan y = 2.75 m
Panjang Total tulangan Tumpuan y = 41.25 m
Panjang Total tulangan Pelat = 141.00 m
Berat Tulangan Ø10 = 0.62 kg/m
Berat Total Tulangan = 347.99 kg
Berat Total Tulangan Panel 1 = 347.99 kg

- Panel 2
Jumlah Panel = 8.00 bh
Lx = 2.25 m
Ly = 5.00 m
Diameter Tulangan = 0.01 m
Jarak Lapangan x = 0.25 m Tulangan Ø10-250 mm
Jarak Lapangan y = 0.25 m Tulangan Ø10-250 mm
Jarak Tumpuan x = 0.25 m Tulangan Ø10-250 mm
Jarak Tumpuan y = 0.25 m Tulangan Ø10-250 mm
Jumlah Tulangan Lapangan x = 20.00 bh
Panjang Tulangan Lapangan x = 1.13 m

2 Panjang Total tulangan Lapangan x


Jumlah Tulangan Lapangan y
=
=
22.50
9.00
m
bh
Panjang Tulangan Lapangan y = 2.50 m
Panjang Total tulangan Lapangan y = 22.50 m
Jumlah Tulangan Tumpuan x = 20.00 bh
Panjang Tulangan Tumpuan x = 1.13 m
Panjang Total tulangan Tumpuan x = 22.50 m
Jumlah Tulangan Tumpuan y = 9.00 bh
Panjang Tulangan Tumpuan y = 2.50 m
Panjang Total tulangan Tumpuan y = 22.50 m
Panjang Total tulangan Pelat = 90.00 m
Berat Tulangan Ø10 = 0.62 kg/m
Berat Total Tulangan = 444.24 kg
Berat Total Tulangan Panel 2 = 444.24 kg
613

Panel 3
Jumlah Panel = 6.00 bh
Lx = 4.00 m
- Ly = 5.50 m
Diameter Tulangan = 0.01 m
Jarak Lapangan x = 0.23 m Tulangan Ø10-225 mm
Jarak Lapangan y = 0.23 m Tulangan Ø10-225 mm
Jarak Tumpuan x = 0.23 m Tulangan Ø10-225 mm
Jarak Tumpuan y = 0.23 m Tulangan Ø10-225 mm
Jumlah Tulangan Lapangan x = 25.00 bh
Panjang Tulangan Lapangan x = 2.00 m
Panjang Total tulangan Lapangan x = 50.00 m
Jumlah Tulangan Lapangan y = 18.00 bh

3 Panjang Tulangan Lapangan y


Panjang Total tulangan Lapangan y
=
=
2.75
49.50
m
m
Jumlah Tulangan Tumpuan x = 25.00 bh
Panjang Tulangan Tumpuan x = 2.00 m
Panjang Total tulangan Tumpuan x = 50.00 m
Jumlah Tulangan Tumpuan y = 18.00 bh
Panjang Tulangan Tumpuan y = 2.75 m
Panjang Total tulangan Tumpuan y = 49.50 m
Panjang Total tulangan Pelat = 199.00 m
Berat Tulangan Ø10 = 0.62 kg/m
Berat Total Tulangan = 736.70 kg
Berat Total Tulangan Panel 3 = 736.70 kg

Panel 4
Jumlah Panel = 16.00 bh
Lx = 4.00 m
Ly = 5.00 m
Diameter Tulangan = 0.01 m
Jarak Lapangan x = 0.25 m Tulangan Ø10-250 mm
Jarak Lapangan y = 0.25 m Tulangan Ø10-250 mm
Jarak Tumpuan x = 0.25 m Tulangan Ø10-250 mm
Jarak Tumpuan y = 0.25 m Tulangan Ø10-250 mm
Jumlah Tulangan Lapangan x = 20.00 bh
Panjang Tulangan Lapangan x = 2.00 m
Panjang Total tulangan Lapangan x = 40.00 m
Jumlah Tulangan Lapangan y = 16.00 bh
Panjang Tulangan Lapangan y = 2.50 m
Panjang Total tulangan Lapangan y = 40.00 m
Jumlah Tulangan Tumpuan x = 20.00 bh

4
Panjang Tulangan Tumpuan x = 2.00 m
Panjang Total tulangan Tumpuan x = 40.00 m
Jumlah Tulangan Tumpuan y = 16.00 bh
Panjang Tulangan Tumpuan y = 2.50 m
Panjang Total tulangan Tumpuan y = 40.00 m
Panjang Total tulangan Pelat = 160.00 m
Berat Tulangan Ø10 = 0.62 kg/m
Berat Total Tulangan = 1,579.52 kg
Berat Total Tulangan Panel 4 = 1579.52 kg

Panel 5
Jumlah Panel = 4.00 bh
Lx = 1.80 m
Ly = 4.50 m
Diameter Tulangan = 0.01 m
Jarak Lapangan x = 0.25 m Tulangan Ø10-250 mm
Jarak Lapangan y = 0.25 m Tulangan Ø10-250 mm
Jarak Tumpuan x = 0.25 m Tulangan Ø10-250 mm
Jarak Tumpuan y = 0.25 m Tulangan Ø10-250 mm
Jumlah Tulangan Lapangan x = 18.00 bh
Panjang Tulangan Lapangan x = 0.90 m
Panjang Total tulangan Lapangan x = 16.20 m
Jumlah Tulangan Lapangan y = 8.00 bh

5 Panjang Tulangan Lapangan y


Panjang Total tulangan Lapangan y
=
=
2.25
18.00
m
m
Jumlah Tulangan Tumpuan x = 18.00 bh
Panjang Tulangan Tumpuan x = 0.90 m
Panjang Total tulangan Tumpuan x = 16.20 m
Jumlah Tulangan Tumpuan y = 8.00 bh
Panjang Tulangan Tumpuan y = 2.25 m
Panjang Total tulangan Tumpuan y = 18.00 m
Panjang Total tulangan Pelat = 68.40 m
Berat Tulangan Ø10 = 0.62 kg/m
Berat Total Tulangan = 168.81 kg
Berat Total Tulangan Panel 5 = 168.81 kg

Berat Total Pembesian Pelat Lantai 2 3277.26 kg

Beton Pelat Lantai Tebal Pelat 0.15 m


614

Luas 635.50
Volume 95.33
Total Beton Pelat Lantai 2 95.33 m

4.6 Pekerjaan Kolom


Pekerjaan Pembesian Kolom Ukuran 40/40 Tinggi 4.4 M
Tinggi Kolom = 4.40 m Tinggi Balok Induk 60 cm
Jumlah Kolom = 35.00 bh
Berat D19 = 2.22 kg/m
Banyak Tulangan = 8.00 bh
Berat Total = 2,735.04 kg

Sengkang Ø10-150
Panjang Tulangan = 0.93 m
Banyak Sengkang = 40.00 bh
Jumlah Kolom = 35.00 bh
Berat Ø10 = 0.62 kg/m
Berat sengkang = 803.33 kg

Berat Total Pembesian Kolom 3538.37 kg


Berat Total Pembesian Kolom Lt. 2 3538.37 kg

Bekisting Kolom Kolom 30/30


Tinggi Kolom = 4.40 m
Tinggi Balok Lantai = 0.60 m
Tinggi Kolom Bersih = 3.80 m
Lebar = 0.40 m Tebal papan bekisting 4 cm
Panjang = 0.40 m
Jumlah = 35.00 bh
Luas = ng ) + ( 2 x Tinggi x Lebar )
= 212.80 m2
Total Bekisting Kolom 212.80 m2
Total Bekisting Kolom Lt 2 212.80 m2

Beton Kolom Panjang = 0.40 m


Beton Kolom 30/30 Lebar = 0.40 m
Tinggi = 3.80 m
Jumlah = 35.00 bh
Volume = ( Panjang x Lebar x Tinggi )
Volume = 21.28 m3

Total Beton Kolom 21.28 m3


Total Beton Kolom Lt. 2 21.28 m3

4.7 Pekerjaan Tangga


Pekerjaan Pembesian Tangga potongan A Anak Tangga
Tulangan Anak Tangga = 0.02 m
Tulangan Sengkang = 0.01 m
Optride = 0.17 m 0.25 m3
Antride = 0.30 m
Jumlah Anak Tangga = 20.00 bh
Lebar tangga = 1.50 m
Tebal Pelat Tangga = 0.15 m
Selimut Beton = 0.02 m
Panjang Sengkang = 0.77 m
Jarak Sengkang = 0.15 m
Jumlah Sengkang = 39.00 bh
Panjang Total Tulangan Utama = 30.00 m
Panjang Total Sengkang = 30.01 m
Berat Ø16 = 1.58 kg/m
Berat Ø10 = 0.62 kg/m
Total Berat Sengkang = 47.42 kg
Total Berat Tulangan Utama = 18.60 kg
Total Berat = 66.02 kg
Berat Tulangan Anak Tangga = 66.02 kg

Pekerjaan Pembesian Tangga potongan B


Anak Tangga
Tulangan Anak Tangga = 0.02 m
Tulangan Sengkang = 0.01 m
Optride = 0.17 m
Antride = 0.30 m
Jumlah Anak Tangga = 20.00 bh
Lebar tangga = 1.50 m
Tebal Pelat Tangga = 0.15 m
Selimut Beton = 0.02 m
Panjang Sengkang = 0.77 m
Jarak Sengkang = 0.15 m
Jumlah Sengkang = 39.00 bh
Panjang Total Tulangan Utama = 30.00 m
Panjang Total Sengkang = 30.01 m
Berat Ø16 = 1.58 kg/m
Berat Ø10 = 0.62 kg/m
Total Berat Sengkang = 47.42 kg
Total Berat Tulangan Utama = 18.60 kg
Total Berat = 66.02 kg
Berat Tulangan Anak Tangga = 66.02 kg

Pelat Tangga
Panjang = 1.50 m
Lebar = 1.12 m
Tebal = 0.15 m
Jumlah = 2.00 bh
Jumlah Tulangan Bagi = 11.20 bh Tulangan Bagi Ø10-155
Jumlah Tulangan Utama = 13.64 bh Tulangan Utama D16-110
- Berat Ø10 = 0.62 kg/m
Berat Ø16 = 1.58 kg/m
Total 1 Lapis = 80.19 kg
Total 2 Lapis = 160.38 kg
Berat Tulangan Pelat Tangga = 160.38 kg

Bordes
Panjang = 2.25 m
Lebar = 2.34 m
Jumlah bordes = 3.00 bh
615

Tebal = 0.10 m
Jumlah Tulangan Utama = 14.62 bh Tulangan Utama D16-215
Jumlah Tulangan Bagi = 20.45 bh Tulangan Bagi Ø16-110
Total Berat = 82.61 kg
Berat Tulangan Bordes = 82.61 kg

Balok Bordes
Panjang = 4.40 m
Lebar Balok = 0.30 m
Tebal Balok = 0.12 m
Berat D16 = 1.58 kg/m
Jumlah Tulangan = 2.00 bh Tulangan 2D10
Total Berat = 13.90 kg
Berat Tulangan Balok Bordes = 13.90 kg

- Berat Ø10 = 0.62 kg/m


Panjang = 0.57 m
Jumlah Sengkang = 28.00 bh Sengkang Ø10-160
Total Berat = 9.85 kg
Berat Tulangan Sengkang Balok Bordes = 9.85 kg

Total Berat Tulangan Tangga = 398.78 kg

Bekisting Tangga
Anak Tangga
Lebar = 1.12 m
Optrede = 0.17 m
Jumlah = 20.00 bh
Luas = 3.81 m2 3.81 m2

Pelat Tangga
Cetakan Bawah
Lebar = 2.25 m
Panjang = 2.34 m
Jumlah = 2.00 bh
Luas = 10.53 m2 10.53 m2

Cetakan Samping
Panjang = 2.15 m
Tinggi = 0.17 m
Jumlah = 2.00 bh
Luas = 1.46 m2 1.46 m2

Bordes
Panjang = 2.25 m
Lebar = 2.34 m
Tinggi = 0.20 m
Luas = 5.27 m2 5.27 m2

Balok Bordes
Panjang = 4.40 m
Tebal = 0.10 m
Lebar = 0.30 m
Luas = 2.20 m2 2.20 m2

Total Bekisting Tangga = 23.27 m2

Beton Tangga
Anak Tangga
Lebar = 1.12 m
Optrede = 0.17 m
- Antrade = 0.30 m
Jumlah = 20.00 bh
Volume = (Lebar x Optrede x Antrede) 1.14 m3

Pelat Tangga
Lebar = 1.12 m
Tinggi = 0.20 m
Panjang = 2.15 m
Jumlah = 2.00 bh
Volume = ng x Tinggi x Lebar x Jumlah 0.96 m3

Bordes
Panjang = 2.25 m
Lebar = 2.34 m
Tinggi = 0.20 m
Jumlah = 3.00 bh
Volume = ng x Lebar x Tinggi x Jumlah 3.16 m3

Balok Bordes
Panjang = 4.40 m
Tebal = 0.15 m
Lebar = 0.30 m 0.66 m3
Volume = Panjang x Lebar x Tinggi

Total Beton Tangga 5.92 m3


616

LANTAI 3
4.8 Pekerjaan Balok Lantai 3
Pekerjaan Pembesian Balok Induk
Balok Memanjang
Ukuran 30/60 Panjang 5.5 M
TUMPUAN
Panjang Balok = 5.50 m
Banyak Tulangan = 2.00 bh
Jumlah Balok = 14.00 bh
Berat D22 = 2.98 kg/m
Berat Total = 458.92 kg

LAPANGAN
Panjang Balok = 5.50 m
Banyak Tulangan = 3.00 bh
Jumlah Balok = 14.00 bh
Berat D22 = 2.98 kg/m
Berat Total = 688.38 kg
Total = 1,147.30 kg

Sengkang Ø10-250 5.5 M


Panjang Tulangan = 1.48 m
Banyak Sengkang = 23.00 bh
Jumlah Balok = 14.00 bh
Berat Ø10 = 0.62 kg/m
Berat sengkang = 294.04 kg
Berat Total Tulangan = 1441.34 m2

Balok Memanjang
Ukuran 30/60 Panjang 5 M
TUMPUAN
Panjang Balok = 5.00 m
Banyak Tulangan = 2.00 bh
Jumlah Balok = 28.00 bh
Berat D22 = 2.98 kg/m
Berat Total = 834.40 kg

LAPANGAN
Panjang Balok = 5.00 m
Banyak Tulangan = 3.00 bh
Jumlah Balok = 28.00 bh
Berat D22 = 2.98 kg/m
Berat Total = 1,251.60 kg
Total = 2,086.00 kg

Sengkang Ø10-250 5.5 M


Panjang Tulangan = 1.48 m
Banyak Sengkang = 21.00 bh
Jumlah Balok = 28.00 bh
Berat Ø10 = 0.62 kg/m
Berat sengkang = 536.94 kg
Berat Total Tulangan = 2622.94 m2
Balok Melintang
Ukuran 30/60 Panjang 8 M
TUMPUAN
Panjang Balok = 8.00 m
Banyak Tulangan = 2.00 bh
Jumlah Balok = 14.00 bh
Berat D22 = 2.98 kg/m
Berat Total = 667.52 kg

LAPANGAN
Panjang Balok = 8.00 m
Banyak Tulangan = 5.00 bh
Jumlah Balok = 14.00 bh
Berat D22 = 2.98 kg/m
Berat Total = 1,668.80 kg
Total = 2,336.32 kg

Sengkang Ø10-250 8 M
Panjang Tulangan = 1.48 m
Banyak Sengkang = 34.00 bh
Jumlah Balok = 14.00 bh
Berat D10 = 0.62 kg/m
Berat sengkang = 434.66 kg
Berat Total Tulangan = 2770.98
Balok Melintang Ukuran 30/60 Panjang 2.25 M
TUMPUAN
Panjang Balok = 2.25 m
Banyak Tulangan = 2.00 bh
Jumlah Balok = 14.00 bh
Berat D22 = 2.98 kg/m
Berat Total = 187.74 kg

LAPANGAN
Panjang Balok = 2.25 m
Banyak Tulangan = 5.00 bh
Jumlah Balok = 14.00 bh
Berat D22 = 2.98 kg/m
Berat Total = 469.35 kg
Total = 657.09 kg

Sengkang Ø10-250 2.25 M


Panjang Tulangan = 1.48 m
Banyak Sengkang = 10.00 bh
Jumlah Balok = 14.00 bh
Berat D10 = 0.62 kg/m
Berat sengkang = 127.84 kg
Berat Total Tulangan = 784.93
Berat Total Pembesian Balok Induk Lantai 1 = 7620.2 m3

Pekerjaan Pembesian Balok Anak


Balok Memanjang
Ukuran 250/350 Panjang 5.5 M
617

TUMPUAN
Panjang Balok = 5.50 m
Banyak Tulangan = 2.00 bh
Jumlah Balok = 4.00 bh
Berat D16 = 1.58 kg/m
Berat Total = 69.52 kg

LAPANGAN
Panjang Balok = 5.50 m
Banyak Tulangan = 2.00 bh
Jumlah Balok = 4.00 bh
Berat D16 = 1.58 kg/m
Berat Total = 69.52 kg
Total = 139.04 kg

Sengkang Ø10-150 5.5 M


Panjang Tulangan = 1.03 m
Banyak Sengkang = 4.00 bh
Berat Ø10 = 0.62 kg/m
Berat sengkang = 10.17 kg
Berat Total Tulangan = 149.21 kg

Balok Memanjang
Ukuran 250/350 Panjang 5 M
TUMPUAN
Panjang Balok = 5.00 m
Banyak Tulangan = 2.00 bh
Jumlah Balok = 8.00 bh
Berat D16 = 1.58 kg/m
Berat Total = 126.40 kg

LAPANGAN
Panjang Balok = 5.00 m
Banyak Tulangan = 2.00 bh
Jumlah Balok = 8.00 bh
Berat D16 = 1.58 kg/m
Berat Total = 126.40 kg
Total = 252.80 kg

Sengkang Ø10-150 5 M
Panjang Tulangan = 1.03 m
Banyak Sengkang = 5.00 bh
Berat Ø10 = 0.62 kg/m
Berat sengkang = 25.42 kg
Berat Total Tulangan = 278.22 kg
Berat Total Pembesian Balok Anak Lantai 2 427.43 kg

Berat Total Pembesian Balok Lantai 2 8047.6 kg


Bekisting Balok Panjang = 8.00 m
Bekisting Balok Induk Jumlah balok = 14.00 bh
Balok Induk 30/60 Lebar = 0.30 m Tebal papan bekisting 4 cm
Tinggi = 0.50 m dikurangi tebal plat 10 cm
Luas =x 0,30 m)+ 2 x (8 m x 0,5 m))
= 145.60 m²

Total Bekisting Balok Induk = 145.60 m2

Bekisting Balok Panjang = 5.50 m


Bekisting Balok Induk Jumlah balok = 14.00 bh
Balok Induk 30/60 Lebar = 0.30 m Tebal papan bekisting 4 cm
Tinggi = 0.50 m dikurangi tebal plat 10 cm
Luas =
= 100.10 m²

Total Bekisting Balok Induk = 100.10 m2

Bekisting Balok Panjang = 5.00 m


Bekisting Balok Induk Jumlah balok = 28.00 bh
Balok Induk 30/60 Lebar = 0.30 m Tebal papan bekisting 4 cm
Tinggi = 0.50 m dikurangi tebal plat 10 cm
Luas =
= 182.00 m²

Total Bekisting Balok Induk = 182.00 m2

Bekisting Balok Panjang = 2.25 m


Bekisting Balok Induk Jumlah balok = 14.00 bh
Balok Induk 30/60 Lebar = 0.30 m Tebal papan bekisting 4 cm
Tinggi = 0.50 m dikurangi tebal plat 10 cm
Luas = 30 m)+ 2 x (2,25 m x 0,5 m))
= 40.95 m²

Total Bekisting Balok Induk = 40.95 m2

Bekisting Balok Anak


Bekisting Balok Anak
Balok Anak 25/35 PANJANG 5.5 M
618

Panjang = 5.50 m
Jumlah balok = 4.00 bh
Lebar = 0.25 m Tebal papan bekisting 4 cm
Tinggi = 0.25 m dikurangi tebal plat 10 cm
Luas =,25 m)+ 2 x (5,5 m x 0,25 m))
= 16.50 m²

Total Bekisting Balok Anak = 16.50 m2

Bekisting Balok Anak


Balok Anak 25/35 PANJANG 5 M
Panjang = 5.00 m
Jumlah balok = 8.00 bh
Lebar = 0.25 m Tebal papan bekisting 4 cm
Tinggi = 0.25 m dikurangi tebal plat 10 cm
Luas = 0,28 m)+ 2 x (5 m x 0,25 m))
= 30.00 m²

Total Bekisting Balok Anak = 30.00 m2

Total Bekisting Balok = 515.15 m2

Beton Balok
Beton Balok Induk
Balok Induk 30/60 PANJANG 8 M
Panjang = 8.00 m
Jumlah balok = 14.00 bh
Lebar = 0.30 m Tebal papan bekisting 4 cm
Tinggi = 0.50 m dikurangi tebal plat 10 cm
Luas = ( Panjang x Lebar x Tinggi )
= 16.80 m²
Total Beton Balok Induk = 16.80 m²

Beton Balok
Beton Balok Induk
Balok Induk 30/55 PANJANG 5,5 M
Panjang = 5.50 m
Jumlah balok = 28.00 bh
Lebar = 0.30 m Tebal papan bekisting 4 cm
Tinggi = 0.50 m dikurangi tebal plat 10 cm
Luas = ( Panjang x Lebar x Tinggi )
= 23.10 m²
Total Beton Balok Induk = 23.10 m²

Beton Balok
Beton Balok Induk
Balok Induk 30/60 PANJANG 5 M
Panjang = 5.00 m
Jumlah balok = 10.00 bh
Lebar = 0.30 m Tebal papan bekisting 4 cm
Tinggi = 0.45 m dikurangi tebal plat 10 cm
Luas = ( Panjang x Lebar x Tinggi )
= 6.75 m²
Total Beton Balok Induk = 6.75 m²

Beton Balok
Beton Balok Induk
Balok Induk 30/60 PANJANG 5 M
Panjang = 2.25 m
Jumlah balok = 14.00 bh
Lebar = 0.30 m Tebal papan bekisting 4 cm
Tinggi = 0.50 m dikurangi tebal plat 10 cm
Luas = ( Panjang x Lebar x Tinggi )
= 4.73 m²
Total Beton Balok Induk = 4.73 m²

Beton Balok Anak


Balok Anak 25/35 PANJANG 5.5 M
Panjang = 5.50 m
Jumlah balok = 4.00 bh
Lebar = 0.25 m Tebal papan bekisting 4 cm
Tinggi = 0.25 m dikurangi tebal plat 10 cm
Luas = ( Panjang x Lebar x Tinggi )
= 1.37 m²

PANJANG 5 M
Panjang = 5.00 m
Jumlah balok = 8.00 bh
Lebar = 0.28 m Tebal papan bekisting 4 cm
Tinggi = 0.25 m dikurangi tebal plat 10 cm
Luas = ( Panjang x Lebar x Tinggi )
= 2.75 m² 2.75 m²

Total Beton Balok Lantai 3 = 54.13 m²


619

4.9 Pekerjaan Pelat


Penulangan Pelat Lantai 3 Panel 1
Jumlah Panel = 4.00 bh
Lx = 2.25 m
Ly = 5.50 m
Diameter Tulangan = 0.01 m
Jarak Lapangan x = 0.15 m Tulangan Ø10-150 mm
Jarak Lapangan y = 0.15 m Tulangan Ø10-150 mm
Jarak Tumpuan x = 0.15 m Tulangan Ø10-150 mm
Jarak Tumpuan y = 0.15 m Tulangan Ø10-150 mm
Jumlah Tulangan Lapangan x = 37.00 bh
Panjang Tulangan Lapangan x = 1.13 m
Panjang Total tulangan Lapangan x = 41.63 m

1
Jumlah Tulangan Lapangan y = 15.00 bh
Panjang Tulangan Lapangan y = 2.75 m
Panjang Total tulangan Lapangan y = 41.25 m
Jumlah Tulangan Tumpuan x = 15.00 bh
Panjang Tulangan Tumpuan x = 1.13 m
Panjang Total tulangan Tumpuan x = 16.88 m
Jumlah Tulangan Tumpuan y = 15.00 bh
Panjang Tulangan Tumpuan y = 2.75 m
Panjang Total tulangan Tumpuan y = 41.25 m
Panjang Total tulangan Pelat = 141.00 m
Berat Tulangan Ø10 = 0.62 kg/m
Berat Total Tulangan = 347.99 kg
Berat Total Tulangan Panel 1 = 347.99 kg

- Panel 2
Jumlah Panel = 8.00 bh
Lx = 2.25 m
Ly = 5.00 m
Diameter Tulangan = 0.01 m
Jarak Lapangan x = 0.25 m Tulangan Ø10-250 mm
Jarak Lapangan y = 0.25 m Tulangan Ø10-250 mm
Jarak Tumpuan x = 0.25 m Tulangan Ø10-250 mm
Jarak Tumpuan y = 0.25 m Tulangan Ø10-250 mm
Jumlah Tulangan Lapangan x = 20.00 bh
Panjang Tulangan Lapangan x = 1.13 m

2 Panjang Total tulangan Lapangan x


Jumlah Tulangan Lapangan y
=
=
22.50
9.00
m
bh
Panjang Tulangan Lapangan y = 2.50 m
Panjang Total tulangan Lapangan y = 22.50 m
Jumlah Tulangan Tumpuan x = 20.00 bh
Panjang Tulangan Tumpuan x = 1.13 m
Panjang Total tulangan Tumpuan x = 22.50 m
Jumlah Tulangan Tumpuan y = 9.00 bh
Panjang Tulangan Tumpuan y = 2.50 m
Panjang Total tulangan Tumpuan y = 22.50 m
Panjang Total tulangan Pelat = 90.00 m
Berat Tulangan Ø10 = 0.62 kg/m
Berat Total Tulangan = 444.24 kg
Berat Total Tulangan Panel 2 = 444.24 kg

Panel 3
Jumlah Panel = 6.00 bh
Lx = 4.00 m
- Ly = 5.50 m
Diameter Tulangan = 0.01 m
Jarak Lapangan x = 0.23 m Tulangan Ø10-225 mm
Jarak Lapangan y = 0.23 m Tulangan Ø10-225 mm
Jarak Tumpuan x = 0.23 m Tulangan Ø10-225 mm
Jarak Tumpuan y = 0.23 m Tulangan Ø10-225 mm
Jumlah Tulangan Lapangan x = 25.00 bh
Panjang Tulangan Lapangan x = 2.00 m
Panjang Total tulangan Lapangan x = 50.00 m
Jumlah Tulangan Lapangan y = 18.00 bh

3 Panjang Tulangan Lapangan y


Panjang Total tulangan Lapangan y
=
=
2.75
49.50
m
m
Jumlah Tulangan Tumpuan x = 25.00 bh
Panjang Tulangan Tumpuan x = 2.00 m
Panjang Total tulangan Tumpuan x = 50.00 m
Jumlah Tulangan Tumpuan y = 18.00 bh
Panjang Tulangan Tumpuan y = 2.75 m
Panjang Total tulangan Tumpuan y = 49.50 m
Panjang Total tulangan Pelat = 199.00 m
Berat Tulangan Ø10 = 0.62 kg/m
Berat Total Tulangan = 736.70 kg
Berat Total Tulangan Panel 3 = 736.70 kg

Panel 4
Jumlah Panel = 16.00 bh
Lx = 4.00 m
Ly = 5.00 m
Diameter Tulangan = 0.01 m
Jarak Lapangan x = 0.25 m Tulangan Ø10-250 mm
Jarak Lapangan y = 0.25 m Tulangan Ø10-250 mm
Jarak Tumpuan x = 0.25 m Tulangan Ø10-250 mm
Jarak Tumpuan y = 0.25 m Tulangan Ø10-250 mm
Jumlah Tulangan Lapangan x = 20.00 bh
Panjang Tulangan Lapangan x = 2.00 m
Panjang Total tulangan Lapangan x = 40.00 m
Jumlah Tulangan Lapangan y = 16.00 bh
Panjang Tulangan Lapangan y = 2.50 m

4 Panjang Total tulangan Lapangan y


Jumlah Tulangan Tumpuan x
=
=
40.00
20.00
m
bh
Panjang Tulangan Tumpuan x = 2.00 m
Panjang Total tulangan Tumpuan x = 40.00 m
Jumlah Tulangan Tumpuan y = 16.00 bh
Panjang Tulangan Tumpuan y = 2.50 m
Panjang Total tulangan Tumpuan y = 40.00 m
Panjang Total tulangan Pelat = 160.00 m
Berat Tulangan Ø10 = 0.62 kg/m
Berat Total Tulangan = 1,579.52 kg
620

Berat Total Tulangan Panel 4 = 1579.52 kg

Panel 5
Jumlah Panel = 4.00 bh
Lx = 1.80 m
Ly = 4.50 m
Diameter Tulangan = 0.01 m
Jarak Lapangan x = 0.25 m Tulangan Ø10-250 mm
Jarak Lapangan y = 0.25 m Tulangan Ø10-250 mm
Jarak Tumpuan x = 0.25 m Tulangan Ø10-250 mm
Jarak Tumpuan y = 0.25 m Tulangan Ø10-250 mm
Jumlah Tulangan Lapangan x = 18.00 bh
Panjang Tulangan Lapangan x = 0.90 m
Panjang Total tulangan Lapangan x = 16.20 m
Jumlah Tulangan Lapangan y = 8.00 bh

5 Panjang Tulangan Lapangan y


Panjang Total tulangan Lapangan y
=
=
2.25
18.00
m
m
Jumlah Tulangan Tumpuan x = 18.00 bh
Panjang Tulangan Tumpuan x = 0.90 m
Panjang Total tulangan Tumpuan x = 16.20 m
Jumlah Tulangan Tumpuan y = 8.00 bh
Panjang Tulangan Tumpuan y = 2.25 m
Panjang Total tulangan Tumpuan y = 18.00 m
Panjang Total tulangan Pelat = 68.40 m
Berat Tulangan Ø10 = 0.62 kg/m
Berat Total Tulangan = 168.81 kg
Berat Total Tulangan Panel 5 = 168.81 kg

Berat Total Pembesian Pelat Lantai 2 3277.26 kg

Beton Pelat Lantai Tebal Pelat 0.15 m


Luas 635.50
Volume 95.33
Total Beton Pelat Lantai 2 95.33 m

4.10 Pekerjaan Kolom


Pekerjaan Pembesian Kolom Ukuran 40/40 Tinggi 4.4 M
Tinggi Kolom = 4.40 m Tinggi Balok Induk 60 cm
Jumlah Kolom = 35.00 bh
5D25 Berat D19 = 2.22 kg/m
Banyak Tulangan = 8.00 bh
Berat Total = 2,735.04 kg

Sengkang Ø10-150
Panjang Tulangan = 0.93 m
300

Banyak Sengkang = 40.00 bh


Jumlah Kolom = 35.00 bh
Berat Ø10 = 0.62 kg/m
Berat sengkang = 803.33 kg
300 Berat Total Pembesian Kolom 3538.37 kg
Berat Total Pembesian Kolom Lt.3 3538.37 kg

Bekisting Kolom Kolom 30/30


Tinggi Kolom = 4.40 m
Tinggi Balok Lantai = 0.60 m
Tinggi Kolom Bersih = 3.80 m
Lebar = 0.40 m Tebal papan bekisting 4 cm
Panjang = 0.40 m
Jumlah = 35.00 bh
Luas = ng ) + ( 2 x Tinggi x Lebar )
= 212.80 m2
Total Bekisting Kolom 212.80 m2
Total Bekisting Kolom Lt 2 212.80 m2

Beton Kolom
Beton Kolom 40/40 Panjang = 0.40 m
Lebar = 0.40 m
Tinggi = 3.80 m
Jumlah = 35.00 bh
Volume = ( Panjang x Lebar x Tinggi )
Volume = 21.28 m3

Total Beton Kolom 21.28 m3


Total Beton Kolom Lt.3 21.28 m3

Lantai Atap
621

4.11 Pekerjaan Ring Balok Lantai Atap


Pekerjaan Pembesian Balok
Pekerjaan Pembesian Ring Balok
Balok Memanjang Ukuran 30/55 Panjang 5.5 M
TUMPUAN
Panjang Balok = 5.50 m
Banyak Tulangan = 3.00 bh
Jumlah Balok = 14.00 bh
Berat D19 = 2.22 kg/m
Berat Total = 512.82 kg

LAPANGAN
Panjang Balok = 5.50 m
Banyak Tulangan = 4.00 bh
Jumlah Balok = 14.00 bh
Berat D19 = 2.22 kg/m
Berat Total = 683.76 kg
Total = 1,196.58 kg

Sengkang Ø10-250 5.5 M


Panjang Tulangan = 0.98 m
Banyak Sengkang = 34.00 bh
Jumlah Balok = 14.00 bh
Berat Ø10 = 0.62 kg/m
Berat sengkang = 287.82 kg
Berat Total Tulangan = 1484.4 m2

Balok Memanjang Ukuran 30/55 Panjang 5 M


TUMPUAN
Panjang Balok = 5.00 m
Banyak Tulangan = 3.00 bh
Jumlah Balok = 28.00 bh
Berat D19 = 2.22 kg/m
Berat Total = 932.40 kg

LAPANGAN
Panjang Balok = 5.00 m
Banyak Tulangan = 4.00 bh
Jumlah Balok = 28.00 bh
Berat D19 = 2.22 kg/m
Berat Total = 1,243.20 kg
Total = 2,175.60 kg

Sengkang Ø10-250 5 M
Panjang Tulangan = 0.98 m
Banyak Sengkang = 31.00 bh
Jumlah Balok = 28.00 bh
Berat Ø10 = 0.62 kg/m
Berat sengkang = 524.84 kg
Berat Total Tulangan = 2700.4 m2

Balok Melintang
Ukuran 30/55 Panjang 8 M
TUMPUAN
Panjang Balok = 8.00 m
Banyak Tulangan = 4.00 bh
Jumlah Balok = 14.00 bh
Berat D19 = 2.22 kg/m
Berat Total = 994.56 kg

LAPANGAN
Panjang Balok = 8.00 m
Banyak Tulangan = 6.00 bh
Jumlah Balok = 14.00 bh
Berat D19 = 2.22 kg/m
Berat Total = 1,491.84 kg
Total = 2,486.40 kg

Sengkang Ø10-250 8 M
Panjang Tulangan = 0.98 m
Banyak Sengkang = 49.00 bh
Jumlah Balok = 14.00 bh
Berat Ø10 = 0.62 kg/m
Berat sengkang = 414.80 kg
Berat Total Tulangan = 2901.20

Balok Melintang
Ukuran 30/55 Panjang 2.25 M
TUMPUAN
Panjang Balok = 2.25 m
Banyak Tulangan = 4.00 bh
Jumlah Balok = 14.00 bh
Berat D19 = 2.98 kg/m
Berat Total = 375.48 kg

LAPANGAN
Panjang Balok = 2.25 m
Banyak Tulangan = 6.00 bh
Jumlah Balok = 14.00 bh
Berat D19 = 2.22 kg/m
Berat Total = 419.58 kg
Total = 795.06 kg

Sengkang Ø10-250 2.25 M


Panjang Tulangan = 0.98 m
Banyak Sengkang = 14.00 bh
Jumlah Balok = 34.00 bh
Berat Ø10 = 0.62 kg/m
Berat sengkang = 287.82 kg
Berat Total Tulangan = 1082.88

Berat Total Pembesian Ring Balok Lantai Atap = 8168.92 kg

Pekerjaan Pembesian Balok Anak


Balok Memanjang
Ukuran 250/350 Panjang 5.5 M
TUMPUAN
Panjang Balok = 5.50 m
Banyak Tulangan = 2.00 bh
Jumlah Balok = 4.00 bh
Berat D16 = 1.58 kg/m
Berat Total = 69.52 kg

LAPANGAN
Panjang Balok = 5.50 m
Banyak Tulangan = 2.00 bh
Jumlah Balok = 4.00 bh
Berat D16 = 1.58 kg/m
Berat Total = 69.52 kg
Total = 139.04 kg
622

Sengkang Ø10-150 5.5 M


Panjang Tulangan = 1.03 m
Banyak Sengkang = 4.00 bh
Berat Ø10 = 0.62 kg/m
Berat sengkang = 10.17 kg
Berat Total Tulangan = 149.21 kg

Balok Memanjang
623

Ukuran 250/350 Panjang 5 M


TUMPUAN
Panjang Balok = 5.00 m
Banyak Tulangan = 2.00 bh
Jumlah Balok = 8.00 bh
Berat D16 = 1.58 kg/m
Berat Total = 126.40 kg

LAPANGAN
Panjang Balok = 5.00 m
Banyak Tulangan = 2.00 bh
Jumlah Balok = 8.00 bh
Berat D16 = 1.58 kg/m
Berat Total = 126.40 kg
Total = 252.80 kg

Sengkang Ø10-150 5 M
Panjang Tulangan = 1.03 m
Banyak Sengkang = 5.00 bh
Berat Ø10 = 0.62 kg/m
Berat sengkang = 25.42 kg
Berat Total Tulangan = 278.22 kg
Berat Total Pembesian Balok Anak Lantai Atap 427.43 kg

Berat Total Pembesian Balok Lantai Atap 8596.3 kg


Bekisting Balok PANJANG 8 M
Bekisting Ring Balok Panjang = 8.00 m
Balok Induk 30/55 Jumlah balok = 14.00 bh
Lebar = 0.30 m Tebal papan bekisting 4 cm
Tinggi = 0.45 m dikurangi tebal plat 10 cm
Luas = 0,30 m)+ 2 x (8 m x 0,45 m))
= 134.40 m²
Total Bekisting Balok Induk = 134.40 m2

Bekisting Balok PANJANG 5,5 M


Bekisting Ring Balok Panjang = 5.50 m
Balok Induk 30/55 Jumlah balok = 14.00 bh
Lebar = 0.30 m Tebal papan bekisting 4 cm
Tinggi = 0.45 m dikurangi tebal plat 10 cm
Luas =
= 92.40 m²
Total Bekisting Balok Induk = 92.40 m2

Bekisting Balok PANJANG 5 M


Bekisting Ring Balok Panjang = 5.00 m
Balok Induk 30/55 Jumlah balok = 28.00 bh
Lebar = 0.30 m Tebal papan bekisting 4 cm
Tinggi = 0.45 m dikurangi tebal plat 10 cm
Luas = 0,30 m)+ 2 x (5 m x 0,45 m))
= 168.00 m²
Total Bekisting Balok Induk = 168.00 m2

Bekisting Balok PANJANG 2.25 M


Bekisting Ring Balok Panjang = 2.25 m
Balok Induk 30/55 Jumlah balok = 14.00 bh
Lebar = 0.30 m Tebal papan bekisting 4 cm
Tinggi = 0.45 m dikurangi tebal plat 10 cm
Luas = 0 m)+ 2 x (2.25 m x 0,45 m))
= 37.80 m²
Total Bekisting Balok Induk = 37.80 m2
Bekisting Balok Anak PANJANG 5.5M
Balok Anak 25/35 Panjang = 5.50 m
Jumlah balok = 4.00 bh
Lebar = 0.25 m Tebal papan bekisting 4 cm
Tinggi = 0.25 m dikurangi tebal plat 10 cm
Luas =,25 m)+ 2 x (5.5 m x 0,25 m))
= 16.50 m²
Total Bekisting Balok Anak = 16.50 m2
624

Bekisting Balok Anak PANJANG 5 M


Balok Anak 25/35 Panjang = 5.00 m
Jumlah balok = 8.00 bh
Lebar = 0.25 m Tebal papan bekisting 4 cm
Tinggi = 0.25 m dikurangi tebal plat 10 cm
Luas = 0,25 m)+ 2 x (5 m x 0,25 m))

Total Bekisting Balok Anak = 30.00 m² 30.00

Total Bekisting Balok = 479.10 m2


Beton Balok
Ring Balok 30/55 PANJANG 8 M
Panjang = 8.00 m
Jumlah balok = 14.00 bh
Lebar = 0.30 m Tebal papan bekisting 4 cm
Tinggi = 0.45 m dikurangi tebal plat 10 cm
Luas = ( Panjang x Lebar x Tinggi )
= 15.12 m²
Total Beton Balok Induk = 15.12 m²
Beton Balok
BetonRing Balok
Ring Balok 30/55 PANJANG 5,5 M
Panjang = 5.50 m
Jumlah balok = 14.00 bh
Lebar = 0.30 m Tebal papan bekisting 4 cm
Tinggi = 0.45 m dikurangi tebal plat 10 cm
Luas = ( Panjang x Lebar x Tinggi )
= 10.40 m²
Total Beton Balok Induk = 10.40 m²
Beton Balok
BetonRing Balok
Ring Balok 30/55 PANJANG 5 M
Panjang = 5.00 m
Jumlah balok = 28.00 bh
Lebar = 0.30 m Tebal papan bekisting 4 cm
Tinggi = 0.45 m dikurangi tebal plat 10 cm
Luas = ( Panjang x Lebar x Tinggi )
= 18.90 m²
Total Beton Balok Induk = 18.90 m²
Beton Balok
BetonRing Balok
Ring Balok 30/55 PANJANG 2.25 M
Panjang = 2.25 m
Jumlah balok = 14.00 bh
Lebar = 0.30 m Tebal papan bekisting 4 cm
Tinggi = 0.45 m dikurangi tebal plat 10 cm
Luas = ( Panjang x Lebar x Tinggi )
= 4.25 m²
Total Beton Balok Induk = 4.25 m²
Beton Balok Anak
Balok Anak 25/35 PANJANG 5.5M
Panjang = 5.50 m
Jumlah balok = 4.00 bh
Lebar = 0.25 m Tebal papan bekisting 4 cm
Tinggi = 0.25 m dikurangi tebal plat 10 cm
Luas = ( Panjang x Lebar x Tinggi )
= 1.37 m²

PANJANG 5 M
Panjang = 5.00 m
Jumlah balok = 8.00 bh
Lebar = 0.25 m Tebal papan bekisting 4 cm
Tinggi = 0.25 m dikurangi tebal plat 10 cm
Luas = ( Panjang x Lebar x Tinggi )
= 2.50 m²
Total Beton Balok Anak = 3.87 m²
625

Total Beton Balok Lantai Atap = 52.54 m²


4.12 Pekerjaan Pelat
Panel 1
Jumlah Panel = 4.00 bh
Lx = 2.25 m
Ly = 5.50 m
Diameter Tulangan = 0.01 m
Jarak Lapangan x = 0.15 m Tulangan Ø10-150 mm
Jarak Lapangan y = 0.15 m Tulangan Ø10-150 mm
Jarak Tumpuan x = 0.15 m Tulangan Ø10-150 mm
Jarak Tumpuan y = 0.15 m Tulangan Ø10-150 mm
Jumlah Tulangan Lapangan x = 37.00 bh
Panjang Tulangan Lapangan x = 1.13 m
Panjang Total tulangan Lapangan x = 41.63 m
1 Jumlah Tulangan Lapangan y
Panjang Tulangan Lapangan y
=
=
15.00
2.75
bh
m
Panjang Total tulangan Lapangan y = 41.25 m
Jumlah Tulangan Tumpuan x = 15.00 bh
Panjang Tulangan Tumpuan x = 1.13 m
Panjang Total tulangan Tumpuan x = 16.88 m
Jumlah Tulangan Tumpuan y = 15.00 bh
Panjang Tulangan Tumpuan y = 2.75 m
Panjang Total tulangan Tumpuan y = 41.25 m
Panjang Total tulangan Pelat = 141.00 m
Berat Tulangan Ø10 = 0.62 kg/m
Berat Total Tulangan = 347.99 kg
Berat Total Tulangan Panel 1 = 347.99 kg

Panel 2
Jumlah Panel = 8.00 bh
Lx = 2.25 m
Ly = 5.00 m
Diameter Tulangan = 0.01 m
Jarak Lapangan x = 0.25 m Tulangan Ø10-250 mm
Jarak Lapangan y = 0.25 m Tulangan Ø10-250 mm
Jarak Tumpuan x = 0.25 m Tulangan Ø10-250 mm
Jarak Tumpuan y = 0.25 m Tulangan Ø10-250 mm
Jumlah Tulangan Lapangan x = 20.00 bh
Panjang Tulangan Lapangan x = 1.13 m
Panjang Total tulangan Lapangan x = 22.50 m
Jumlah Tulangan Lapangan y = 9.00 bh
2 Panjang Tulangan Lapangan y
Panjang Total tulangan Lapangan y
=
=
2.50
22.50
m
m
Jumlah Tulangan Tumpuan x = 20.00 bh
Panjang Tulangan Tumpuan x = 1.13 m
Panjang Total tulangan Tumpuan x = 22.50 m
Jumlah Tulangan Tumpuan y = 9.00 bh
Panjang Tulangan Tumpuan y = 2.50 m
Panjang Total tulangan Tumpuan y = 22.50 m
Panjang Total tulangan Pelat = 90.00 m
Berat Tulangan Ø10 = 0.62 kg/m
Berat Total Tulangan = 444.24 kg
Berat Total Tulangan Panel 2 = 444.24 kg

Panel 3
Jumlah Panel = 6.00 bh
Lx = 4.00 m
Ly = 5.50 m
Diameter Tulangan = 0.01 m
Jarak Lapangan x = 0.23 m Tulangan Ø10-225 mm
Jarak Lapangan y = 0.23 m Tulangan Ø10-225 mm
Jarak Tumpuan x = 0.23 m Tulangan Ø10-225 mm
Jarak Tumpuan y = 0.23 m Tulangan Ø10-225 mm
Jumlah Tulangan Lapangan x = 25.00 bh
Panjang Tulangan Lapangan x = 2.00 m
Panjang Total tulangan Lapangan x = 50.00 m
Jumlah Tulangan Lapangan y = 18.00 bh

3 Panjang Tulangan Lapangan y


Panjang Total tulangan Lapangan y
=
=
2.75
49.50
m
m
Jumlah Tulangan Tumpuan x = 25.00 bh
Panjang Tulangan Tumpuan x = 2.00 m
Panjang Total tulangan Tumpuan x = 50.00 m
Jumlah Tulangan Tumpuan y = 18.00 bh
Panjang Tulangan Tumpuan y = 2.75 m
Panjang Total tulangan Tumpuan y = 49.50 m
Panjang Total tulangan Pelat = 199.00 m
Berat Tulangan Ø10 = 0.62 kg/m
Berat Total Tulangan = 736.70 kg
Berat Total Tulangan Panel 3 = 736.70 kg

Panel 4
Jumlah Panel = 16.00 bh
Lx = 4.00 m
Ly = 5.00 m
Diameter Tulangan = 0.01 m
Jarak Lapangan x = 0.25 m Tulangan Ø10-250 mm
Jarak Lapangan y = 0.25 m Tulangan Ø10-250 mm
Jarak Tumpuan x = 0.25 m Tulangan Ø10-250 mm
Jarak Tumpuan y = 0.25 m Tulangan Ø10-250 mm
Jumlah Tulangan Lapangan x = 20.00 bh
Panjang Tulangan Lapangan x = 2.00 m
Panjang Total tulangan Lapangan x = 40.00 m
Jumlah Tulangan Lapangan y = 16.00 bh
Panjang Tulangan Lapangan y = 2.50 m
Panjang Total tulangan Lapangan y = 40.00 m
Jumlah Tulangan Tumpuan x = 20.00 bh
Panjang Tulangan Tumpuan x = 2.00 m
Panjang Total tulangan Tumpuan x = 40.00 m
Jumlah Tulangan Tumpuan y = 16.00 bh
Panjang Tulangan Tumpuan y = 2.50 m

4 Panjang Total tulangan Tumpuan y


Panjang Total tulangan Pelat
=
=
40.00
160.00
m
m
626

4
Berat Tulangan Ø10 = 0.62 kg/m
Berat Total Tulangan = 1,579.52 kg
Berat Total Tulangan Panel 4 = 1579.52 kg

Panel 5
Jumlah Panel = 4.00 bh
Lx = 1.80 m
Ly = 4.50 m
Diameter Tulangan = 0.01 m
Jarak Lapangan x = 0.25 m Tulangan Ø10-250 mm
Jarak Lapangan y = 0.25 m Tulangan Ø10-250 mm
Jarak Tumpuan x = 0.25 m Tulangan Ø10-250 mm
Jarak Tumpuan y = 0.25 m Tulangan Ø10-250 mm
Jumlah Tulangan Lapangan x = 18.00 bh
Panjang Tulangan Lapangan x = 0.90 m
Panjang Total tulangan Lapangan x = 16.20 m

5 Jumlah Tulangan Lapangan y


Panjang Tulangan Lapangan y
=
=
8.00
2.25
bh
m
Panjang Total tulangan Lapangan y = 18.00 m
Jumlah Tulangan Tumpuan x = 18.00 bh
Panjang Tulangan Tumpuan x = 0.90 m
Panjang Total tulangan Tumpuan x = 16.20 m
Jumlah Tulangan Tumpuan y = 8.00 bh
Panjang Tulangan Tumpuan y = 2.25 m
Panjang Total tulangan Tumpuan y = 18.00 m
Panjang Total tulangan Pelat = 68.40 m
Berat Tulangan Ø10 = 0.62 kg/m
Berat Total Tulangan = 168.81 kg
Berat Total Tulangan Panel 5 = 168.81 kg

Berat Total Pembesian Pelat Lantai Atap 3277.3 kg

Beton Plat
Tebal Pelat 0.15 m
Luas 635.50
Volume 95.33
Total Beton Pelat Lantai 2 95.33 kg

V PEKERJAAN ARSITEKTUR
5.1 PEKERJAAN DINDING
- LANTAI 1
Pasangan dinding bata Panjang = 495.50 m
Tinggi 3.75 m
Luasan 1,858.13 m2 1858.13 m2

- LANTAI 2
Pasangan dinding bata Panjang = 495.50 m
Tinggi 3.60 m
Luasan 1,783.80 m2 1783.80 m2

- LANTAI 3
Pasangan dinding bata Panjang = 495.50 m
Tinggi 3.60 m
Luasan 1,783.80 m2 1783.80 m2

Total Pas. Batu Bata 5425.73 m2

5.2 PEKERJAAN PLESTERAN & ACIAN


- LANTAI 1
Pasangan dinding bata 8m Panjang = 495.50 m
Tinggi = 3.75 m
Luasan = 1,858.13 m2
Plesteran dinding ad. 1 : 4 Luasan 2 sisi = 3,716.25 m2 3716.25 m2
Acian Luasan 2 sisi = 3,716.25 m3 3716.25 m2
- LANTAI 2
Pasangan dinding bata Panjang = 495.50 m
Tinggi = 3.60 m
Luasan = 1,783.80 m2
Plesteran dinding ad. 1 : 4 Luasan 2 sisi = 3,567.60 m2 3567.60 m2
Acian Luasan 2 sisi = 3,567.60 m3 3567.60 m2
- LANTAI 3
Pasangan dinding bata Panjang = 495.50 m
Tinggi = 3.60 m
Luasan = 1,783.80 m2
Plesteran dinding ad. 1 : 4 Luasan 2 sisi = 3,567.60 m2 3567.60 m2
Acian Luasan 2 sisi = 3,567.60 m3 3567.60 m2
Total Plesteran = 10851.45 m2
Total Acian = 10851.45 m2
627

5.3 PEKERJAAN KUSEN PINTU DAN JENDELA


1 Lantai 1
- Pekerjaan Pintu P1 Jumlah Pintu = 10.00 bh
Lebar = 0.90 m
Tinggi = 2.00 m
Luas = 18.00 m2 18.00 m2
- Pekerjaan Pintu P2 Jumlah Pintu = 3.00 bh
Lebar = 0.80 m
Tinggi = 2.00 m
Luas = 4.80 m2 4.80 m2
- Pintu KM/WC/P3 Jumlah Pintu = 6.00 bh 6.00 bh

2 Lantai 2
- Pekerjaan Pintu P1 Jumlah Pintu = 10.00 bh
Lebar = 0.90 m
Tinggi = 2.00 m
Luas = 18.00 m2 18.00 m2
- Pekerjaan Pintu P2 Jumlah Pintu = 3.00 bh
Lebar = 0.80 m
Tinggi = 2.00 m
Luas = 4.80 m2 4.80 m2
- Pintu KM/WC/P3 Jumlah Pintu = 5.00 bh 5.00 bh

3 Lantai 3
- Pekerjaan Pintu P1 Jumlah Pintu = 2.00 bh
Lebar = 0.90 m
Tinggi = 2.00 m
Luas = 3.60 m2 3.60 m2
- Pekerjaan Pintu P2 Jumlah Pintu = 2.00 bh
Lebar = 0.80 m
Tinggi = 2.00 m
Luas = 3.20 m2 3.20 m2
- Pintu KM/WC/P3 Jumlah Pintu = 4.00 bh 4.00 bh

5.4 PEKERJAAN KUNCI


Lantai 1
Kunci tanam stainless steel 19.00 bh 19.00 bh
Engsel pintu biasa 38.00 bh 38.00 bh
Lantai 2
Kunci tanam stainless steel 18.00 bh 18.00 bh
Engsel pintu biasa 36.00 bh 36.00 bh
Lantai 3
Kunci tanam stainless steel 8.00 bh 8.00 bh
Engsel pintu biasa 16.00 bh 16.00 bh

5.5 PEKERJAAN PASANGAN KERAMIK

1 Pas. Keramik Lantai 1


Keramik 40 x 40 Luas = 544.76 m2
Keramik 20 x 20 Luas = 69.16 m2

2 Pas. Keramik Lantai 2


Keramik 40 x 40 Luas = 544.76 m2
Keramik 20 x 20 Luas = 69.16 m2

3 Pas. Keramik Lantai 3


Keramik 40 x 40 Luas = 538.76 m2
Keramik 20 x 20 Luas = 75.16 m2

Total Pasangan Keramik = 1841.75 m2

4 Spesi 1 : 2 Luas Lantai = 1,841.75 m 2

Tebal = 0.02 m
Volume = 36.83 m3

5.6 PEKERJAAN PLAFOND


1 Lantai 1
Plafond gypsum 9 mm = 607.11 m2

2 Lantai 2
Plafond gypsum 9 mm = 607.11 m2

3 Lantai 3
Plafond gypsum 9 mm = 610.03 m2

Total Pasangan Plafond gypsum = 1824.25 m2

5.7 PEKERJAAN PENGECATAN


1 LANTAI 1
Pekerjaan Cat Tembok Panjang = 495.50 m
Tinggi = 3.85 m
Luas total = 3,815.35 m2 3815.35 m2

Pekerjaan Pengecatan Plafond Luas plafond = 607.11 m 2


607.11 m2

1 LANTAI 2
Pekerjaan Cat Tembok Panjang = 495.50 m
Tinggi = 3.70 m
Luas total = 3,666.70 m2 3666.70 m2

Pekerjaan Pengecatan Plafond Luas plafond = 607.11 m2 607.11 m2

1 LANTAI 3
Pekerjaan Cat Tembok Panjang = 495.50 m
Tinggi = 3.70 m
Luas total = 3,666.70 m2 3666.70 m2

Pekerjaan Pengecatan Plafond Luas plafond = 610.03 m 2


610.03 m2
628

VI PEKERJAAN MEKANIKAL ELEKTRIKAL PLAMBING (MEP)


6.1 Pekerjaan Sanitasi
Lantai 1
- Pasangan Kloset Duduk + Acc = 5.00 bh
- Pasangan Kloset Jongkok + Acc = 7.00 bh
- Pasangan Urinoir + Acc = 5.00 bh
- Pasangan Washtafel + Acc = 10.00 bh
- Pasangan Jetwasher = 5.00 bh
- Pasangan Penyekatan Urinoir = 4.00 bh
- Pasangan Floor Drain Stainless Steel = 13.00 bh
- Pasangan Kran Air = 2.00 bh
- Pasangan Kitchen Zink = 1.00 bh
- Pasangan Pipa PVC 1/2" = 1,792.00 m
- Pasangan Pipa PVC 3/4" = 1,543.00 m
- Pasangan Pipa PVC 1 1/2" = 742.00 m
- Pasangan Pipa PVC 2" = 1,741.00 m
- Pasangan Pipa PVC 4" = 1,421.00 m
- Septictank = 3.00 unit
- Pompa air = 1.00 bh
- Water profing lantai KM/Wc = 72.00 m²

Lantai 2
- Pasangan Kloset Duduk + Acc = 22.00 bh
- Pasangan Washtafel + Acc = 22.00 bh
- Pasangan Jetwasher = 22.00 bh
- Pasangan Floor Drain Stainless Steel = 22.00 bh
- Pasangan Kran Air = 22.00 bh
- Pasangan Kitchen Zink = 1.00 bh
- Pasangan Pipa PVC 1/2" = 4,782.00 m
- Pasangan Pipa PVC 3/4" = 3,278.00 m
- Pasangan Pipa PVC 1 1/2" = 853.00 m
- Pasangan Pipa PVC 2" = 3,246.00 m
- Pasangan Pipa PVC 4" = 2,353.00 m
- Pompa air = 2.00 bh
- Shower = 22.00 bh
- Water profing lantai KM/Wc = 69.16 m²

Lantai 3
- Pasangan Kloset Duduk + Acc = 19.00 bh
- Pasangan Washtafel + Acc = 19.00 bh
- Pasangan Jetwasher = 19.00 bh
- Pasangan Floor Drain Stainless Steel = 19.00 bh
- Pasangan Kran Air = 19.00 bh
- Pasangan Pipa PVC 1/2" = 4,328.00 m
- Pasangan Pipa PVC 3/4" = 1,532.00 m
- Pasangan Pipa PVC 1 1/2" = 765.00 m
- Pasangan Pipa PVC 2" = 2,841.00 m
- Pasangan Pipa PVC 4" = 1,945.00 m
- Pompa air = 2.00 bh
- Shower = 19.00 bh
- Water profing lantai KM/Wc = 75.16 m²

6.2 PEKERJAAN LISTRIK


1 Lantai 1
Instalasi titik lampu = 150.00 bh 150.00 bh
Instalasi Stop Kontak = 87.00 bh 87.00 bh
Instalasi Stop Exchaust Fan = 7.00 bh 7.00 bh
Instalasi Stop Kontak AC = 31.00 bh 31.00 bh
Lampu TL RM 2 x 18 = 108.00 bh 108.00 bh
Lampu TL 1 x 36 = 47.00 bh 47.00 bh
Down light PLC 18 W = 110.00 bh 110.00 bh
Down light PLC 8 W = 43.00 bh 43.00 bh
Exchaust Fan = 7.00 bh 7.00 bh
Saklar Ganda = 35.00 bh 35.00 bh
Stop Kontak = 75.00 bh 75.00 bh
Stop Kontak AC = 31.00 bh 31.00 bh
Box Panel 1 = 2.00 bh 2.00 bh

2 Lantai 2
Instalasi titik lampu = 177.00 bh 177.00 bh
Instalasi Stop Kontak = 154.00 bh 154.00 bh
Instalasi Stop Exchaust Fan = 8.00 bh 8.00 bh
Instalasi Stop Kontak AC = 48.00 bh 48.00 bh
Lampu TL RM 2 x 18 = 192.00 bh 192.00 bh
Lampu TL 1 x 36 = 96.00 bh 96.00 bh
Down light PLC 18 W = 118.00 bh 118.00 bh
Down light PLC 8 W = 59.00 bh 59.00 bh
Exchaust Fan = 8.00 bh 8.00 bh
Saklar Tunggal = 28.00 bh 28.00 bh
Saklar Ganda = 66.00 bh 66.00 bh
Stop Kontak = 132.00 bh 132.00 bh
Stop Kontak AC = 48.00 bh 48.00 bh
Box Panel 2 = 2.00 bh 2.00 bh

3 Lantai 3
Instalasi titik lampu = 171.00 bh 171.00 bh
Instalasi Stop Kontak = 143.00 bh 143.00 bh
Instalasi Stop Exchaust Fan = 4.00 bh 4.00 bh
Instalasi Stop Kontak AC = 41.00 bh 41.00 bh
Lampu TL RM 2 x 18 = 172.00 bh 172.00 bh
Lampu TL 1 x 36 = 86.00 bh 86.00 bh
Down light PLC 18 W = 123.00 bh 123.00 bh
Down light PLC 8 W = 43.00 bh 43.00 bh
Exchaust Fan = 4.00 bh 4.00 bh
Saklar Tunggal = 27.00 bh 27.00 bh
Saklar Ganda = 34.00 bh 34.00 bh
Stop Kontak = 114.00 bh 114.00 bh
Stop Kontak AC = 41.00 bh 41.00 bh
Box Panel 2 = 2.00 bh 2.00 bh

XVII PEMBERSIHAN AKHIR


1 Pembersihan akhir Panjang = 35.00 m
Lebar = 24.00 m
Luas Pembersihan = 840.00 m² 840.00 m2
4.3.5. Rencana Anggaran Biaya K3

PEKERJAAN : K3
TAHUN 2021
LOKASI Pembangunan Gedung Rawat Inap RSUD PALI

Harga Satuan Jumlah Harga


NO. JENIS PEKERJAAN Volume Waktu Satuan Keterangan
(Rp,) (Rp,)

I PEKERJAAN K3
1 Penyiapan RK3K terdiri atas :
1 Pembuatan Manual, Prosedur, intruksi kerja dan 1 1 Set Rp. 2,000,000.00 Rp. 2,000,000.00
2 Pembuatan kartu identitas Pekerja (KIP) 75 1 Org Rp. 7,000.00 Rp. 525,000.00
Sosialisasi dan
2 promosi K3 terdiri atas :
1 Perilaku Berbasis Keselamatan (Budaya K3) 75 1 Org Rp. 7,500.00 Rp. 562,500.00
2 P3K 3 1 Org Rp. 1,750,000.00 Rp. 5,250,000.00
3 Simulasi K3 75 1 Org Rp. 7,500.00 Rp. 562,500.00
4 Spanduk (banner) 4 1 Lb Rp. 150,000.00 Rp. 600,000.00
5 Poster; 8 1 Lb Rp. 50,000.00 Rp. 400,000.00
6 Papan Informasi K3. 5 1 Bh Rp. 500,000.00 Rp. 2,500,000.00
3 Alat Pelindung Diri terdiri atas:
1 Topi Pelindung (Safety Helmet) 75 1 Bh Rp. 75,000.00 Rp. 5,625,000.00 staf & tamu
2 Pelindung Mata (Goggles, Spectacles); 40 1 Psg Rp. 25,000.00 Rp. 1,000,000.00
3 Tameng Muka (Face Shield); 20 1 Bh Rp. 75,000.00 Rp. 1,500,000.00
4 Pelindung Pernafasan Dan Mulut (Masker); 150 1 Bh Rp. 5,000.00 Rp. 750,000.00
5 Sarung Tangan (Safety Gloves); 75 1 Psg Rp. 5,000.00 Rp. 375,000.00
6 Sepatu Keselamatan (Safety Shoes); untuk Staf 10 1 Psg Rp. 650,000.00 Rp. 6,500,000.00
7 Sepatu Keselamatan (Rubber Safety Shoes_and toe cap) 45 1 Psg Rp. 145,000.00 Rp. 6,525,000.00
8 Penunjang Seluruh Tubuh (Full Body Harness); 15 1 Bh Rp. 750,000.00 Rp. 11,250,000.000
9 Rompi Keselamatan (Safety Vest); 50 1 Bh Rp. 65,000.00 Rp. 3,250,000.00
10 Celemek (Apron/Coveralls); 20 1 Bh Rp. 40,000.00 Rp. 800,000.00
4 Asuransi Dan Perijinan terdiri atas :
Surat Ijin Pengesahan Panitia Pembina Keselamatan Dan Kesehatan
1 1 1 Ls Rp. 500,000.00 Rp. 500,000.00
Kerja (P2K3);
5 Rambu- Rambu terdiri atas :
1 Rambu Petunjuk; 4 1 Bh Rp. 75,000.00 Rp. 300,000.00 sesuai kebutuhan
2 Rambu Peringatan; 4 1 Bh Rp. 75,000.00 Rp. 300,000.00 sesuai kebutuhan
3 Rambu Kewajiban; 4 1 Bh Rp. 75,000.00 Rp. 300,000.00 sesuai kebutuhan
4 Rambu Informasi; 10 1 Bh Rp. 75,000.00 Rp. 750,000.00 sesuai kebutuhan
6 Lain- Lain Terkait Pengendalian Risiko K3
1 Alat Pemadam Api Ringan (APAR); 10Kg 3 1 Bh Rp. 550,000.00 Rp. 1,650,000.00
2 Bendera K3; 1 1 Bh Rp. 50,000.00 Rp. 50,000.00
3 Pelaporan dan Penyelidikan Insiden. 1 1 Ls Rp. 500,000.00 Rp. 500,000.00

JUMLAH TOTAL PEKERJAAN K3 Rp. 54,325,000.0


630

4.3.6. Rencana Anggaran Biaya

Kuantitas
No Uraian Pekerjaan Satuan Harga satuan (Rp) Jumlah harga (Rp)
Pekerjaan
I PEKERJAAN PERSIAPAN
1.1 Pekerjaan Pembersihan 799.00 m² 27,312.50 21,822,687.50
1.2 Pemasangan Bouwplank 111.00 m² 95,133.75 10,559,846.25
1.3 Pemagaran Proyek 119.00 m 521,197.25 62,022,472.75
1.4 Pembuatan Kantor Sementara 35.00 m² 2,010,372.50 70,363,037.50
1.5 Pembuatan Gudang Alat dan Bahan 35.00 m² 1,515,872.50 53,055,537.50
1.6 Mobilisasi Alat Pancang 1.00 Ls 40,000,000.00 40,000,000.00
Total Harga Pekerjaan Persiapan 257,823,581.50

II PEKERJAAN TANAH DAN PASIR


2.1 Pekerjaan Galian Tanah untuk Pile Cap 84.70 m³ 130,381.25 11,043,291.88
2.2 Pekerjaan Urugan pasir bawah pile cap 25.41 m³ 263,292.50 6,690,262.43
2.3 Pekerjaan Urugan tanah kembali pile cap 28.23 m³ 94,012.50 2,654,286.25
2.4 Pekerjaan Galian Sloof 53.73 m³ 130,381.25 7,005,384.56
2.5 Pekerjaan Urugan Pasir bawah sloof 71.64 m³ 263,292.50 18,862,274.70
2.6 Timbunan Tanah Peninggian Lantai 544.00 m³ 164,306.25 89,382,600.00
Total Harga Pekerjaan Tanah dan Pasir 135,638,099.81

III PEKERJAAN STRUKTUR BAWAH


3.1 Pemasangan Tiang Pancang Square Pile 30 x 30 cm 2,240.00 m' 1,212,157.50 2,715,232,800.00
3.2 Pemotongan Tiang Pancang 140.00 bh 379,500.00 53,130,000.00
3.3 Pekerjaan Pile Cap
- Pekerjaan Cor Lantai Kerja Pile Cap 56.70 m³ 1,899,337.02 107,692,408.95
- Pekerjaan Pembesian Pile Cap 16,667.14 Kg 26,093.50 434,904,017.59
- Pekerjaan Bekisting Pile Cap 126.00 m² 264,373.50 33,311,061.00
- Pekerjaan Beton Pile Cap (f'c 45 MPa) 56.70 m³ 1,899,337.02 107,692,408.95
3.4 Pekerjaan Sloof
- Pekerjaan Cor Lantai Kerja Sloof 53.73 m³ 1,899,337.02 102,051,378.01
- Pekerjaan Pembesian Sloof 6,073.41 Kg 26,093.50 158,476,466.43
- Pekerjaan Bekisting Sloof 262.80 m² 277,311.00 72,877,330.80
- Pekerjaan Beton Sloof (f'c 30 Mpa) 43.83 m³ 1,899,337.02 83,247,941.52
Total Harga Pekerjaan Pondasi 3,868,615,813.25

IV PEKERJAAN STRUKTUR ATAS


LANTAI 1
4.1 Pekerjaan Pelat
- Pekerjaan Pembesian Pelat Lantai 1 3,277.26 Kg 26,093.50 85,515,110.75
- Pekerjaan Beton Pelat Lantai 1 (f'c 30 Mpa) 95.33 m³ 1,899,337.02 181,054,301.29
4.2 Pekerjaan Kolom
- Pekerjaan Pembesian Kolom 3,616.10 Kg 26,093.50 94,356,684.48
- Pekerjaan Bekisting Kolom 215.60 m² 445,849 96,125,098.30
- Pekerjaan Beton Kolom (f'c 30 Mpa) 21.56 m³ 1,899,337.02 40,949,706.12
4.3 Pekerjaan Tangga
- Pekerjaan Pembesian Tangga 398.78 Kg 26,093.50 10,405,549.82
- Pekerjaan Bekisting Tangga 23.27 m² 431,416.75 10,036,910.69
- Pekerjaan Beton Tangga (f'c 30 Mpa) 5.92 m³ 1,899,337.02 11,252,812.10

LANTAI 2
4.4 Pekerjaan Balok
- Pekerjaan Pembesian Balok 8,047.62 Kg 26,093.50 209,990,591.26
- Pekerjaan Bekisting Balok 515.15 m² 454,474 234,122,409.89
- Pekerjaan Beton Balok ( f'c 30 Mpa) 54.13 m³ 1,899,337.02 102,801,616.13
4.5 Pekerjaan Pelat
- Pekerjaan Pembesian Pelat Lantai 3,277.26 Kg 26,093.50 85,515,110.75
- Pekerjaan Bekisting Pelat 515.15 m² 514,849 265,224,591.14
- Pekerjaan Beton Pelat Lantai (f'c 30 Mpa) 95.33 m³ 1,899,337.02 181,054,301.29
4.6 Pekerjaan Kolom
- Pekerjaan Pembesian Kolom 3,538.37 Kg 26,093.50 92,328,561.97
- Pekerjaan Bekisting Kolom 212.80 m² 445,849 94,876,720.40
- Pekerjaan Beton Kolom (f'c 30 Mpa) 21.28 m³ 1,899,337.02 40,417,891.75
4.7 Pekerjaan Tangga
- Pekerjaan Pembesian Tangga 398.78 Kg 26,093.50 10,405,549.82
- Pekerjaan Bekisting Tangga 23.27 m² 431,417 10,036,910.69
- Pekerjaan Beton Tangga (f'c 30 Mpa) 5.92 m³ 1,899,337.02 11,252,812.10

LANTAI 3
4.8 Pekerjaan Balok
- Pekerjaan Pembesian Balok 8,047.62 Kg 26,093.50 209,990,591.26
- Pekerjaan Bekisting Balok 515.15 m² 454,474 234,122,409.89
- Pekerjaan Beton Balok ( f'c 30 Mpa) 54.13 m³ 1,899,337.02 102,801,616.13
4.9 Pekerjaan Pelat
- Pekerjaan Pembesian Pelat Lantai 3,277.26 Kg 26,093.50 85,515,110.75
- Pekerjaan Bekisting Pelat 515.15 m² 514,849 265,224,591.14
- Pekerjaan Beton Pelat Lantai (f'c 30 Mpa) 95.33 m³ 1,899,337.02 181,054,301.29
4.10 Pekerjaan Kolom
- Pekerjaan Pembesian Kolom 3,538.37 Kg 26,093.50 92,328,561.97
- Pekerjaan Bekisting Kolom 212.80 m² 445,849 94,876,720.40
- Pekerjaan Beton Kolom (f'c 30 Mpa) 21.28 m³ 1,899,337.02 40,417,891.75
631

LANTAI ATAP
4.11 Pekerjaan Ring Balok
- Pekerjaan Pembesian Ring Balok 8,596.35 Kg 26,093.50 224,308,767.92
- Pekerjaan Bekisting Balok 479.10 m² 454,474 217,738,613
- Pekerjaan Beton Balok ( f'c 30 Mpa) 52.54 m³ 1,899,337.02 99,795,915.30
4.12 Pekerjaan Pelat Dak
- Pekerjaan Pembesian Pelat Lantai 3,277.26 Kg 26,093.50 85,515,110.75
- Pekerjaan Bekisting Pelat Lantai 479.10 m³ 514,849.25 246,664,275.68
- Pekerjaan Beton Pelat Lantai (f'c 30 Mpa) 95.33 m³ 1,899,337.02 181,054,301.29

Total Harga Pekerjaan Struktur Atas 4,229,132,019.40

V PEKERJAAN ARSITEKTUR
5.1 PEKERJAAN DINDING
- LANTAI 1
Pekerjaan Pasangan Dinding Bata Ad. 1:4 1,858.13 m² 342,757.50 636,886,279.69
- LANTAI 2
Pekerjaan Pasangan Dinding Bata Ad. 1:4 1,783.80 m² 342,757.50 611,410,828.50
- LANTAI 3
Pekerjaan Pasangan Dinding Bata Ad. 1:4 1,783.80 m² 342,757.50 611,410,828.50
Total Harga Pekerjaan Dinding 1,859,707,936.69

5.2 PEKERJAAN PLESTERAN & ACIAN DINDING


- LANTAI 1
Pekerjaan Plesteran Pasangan Batu Bata Ad. 1:4 3,716.25 m² 135,900.10 505,038,746.63
- LANTAI 2
Pekerjaan Plesteran Pasangan Batu Bata Ad. 1:4 3,567.60 m² 135,900.10 484,837,196.76
- LANTAI 3
Pekerjaan Plesteran Pasangan Batu Bata Ad. 1:4 3,567.60 m² 135,900.10 484,837,196.76
Total Harga Pekerjaan Plesteran Dinding 1,474,713,140.15

- LANTAI 1
Pekerjaan Acian 3,716.25 m² 64,026.25 237,937,551.56
- LANTAI 2
Pekerjaan Acian 3,567.60 m² 64,026.25 228,420,049.50
- LANTAI 3
Pekerjaan Acian 3,567.60 m² 64,026.25 228,420,049.50
Total Harga Pekerjaan Acian Dinding 694,777,650.56
5.3 PEKERJAAN KUSEN & PINTU
- LANTAI DASAR
Pekerjaan Pintu P1 18.00 m² 1,097,335.75 19,752,043.50
Pekerjaan Pintu P2 4.80 m² 1,097,335.75 5,267,211.60
Pintu KM/WC/P3 6.00 m² 4,146,689.55 24,880,137.30
Total Jumlah Harga 49,899,392.40

- LANTAI 2
Pekerjaan Pintu P1 18.00 m² 1,097,335.75 19,752,043.50
Pekerjaan Pintu P2 4.80 m² 1,097,335.75 5,267,211.60
Pintu KM/WC/P3 5.00 m² 4,146,689.55 20,733,447.75
Total Jumlah Harga 45,752,702.85

- LANTAI 3
Pekerjaan Pintu P1 3.60 m² 1,097,335.75 3,950,408.70
Pekerjaan Pintu P2 3.20 m² 1,097,335.75 3,511,474.40
Pintu KM/WC/P3 4.00 m² 4,146,689.55 16,586,758.20
Total Jumlah Harga 24,048,641.30
Total Harga Pekerjaan Kusen Pintu & Jendela 119,700,736.55

5.4 PEKERJAAN KUNCI


LANTAI 1
1 Kunci Tanam Stainless Steel 19.00 Bh 803,706.25 15,270,418.75
2 Engsel Pintu 38.00 Bh 91,545.75 3,478,738.50
Total Jumlah Harga 18,749,157.25

LANTAI 2
1 Kunci Tanam Stainless Steel 18.00 Bh 803,706.25 14,466,712.50
2 Engsel Pintu 36.00 Bh 91,545.75 3,295,647.00
Total Jumlah Harga 17,762,359.50

LANTAI 3
1 Kunci Tanam Stainless Steel 8.00 Bh 803,706.25 6,429,650.00
2 Engsel Pintu 16.00 Bh 91,545.75 1,464,732.00
Total Jumlah Harga 7,894,382.00
Total Harga Pekerjaan Kunci 44,405,898.75

5.5 PEKERJAAN PASANGAN KERAMIK


LANTAI 1
1 Pekerjaan Pasangan Keramik 40 x 40 544.76 m² 325,476.45 177,304,923.52
2 Pekerjaan Pasangan Keramik 20 x 20 69.16 m² 332,051.00 22,964,647.16
Total Jumlah Harga 200,269,570.68

LANTAI 2
1 Pekerjaan Pasangan Keramik 40 x 40 544.76 m² 325,476.45 177,304,923.52
2 Pekerjaan Pasangan Keramik 20 x 20 69.16 m' 332,051.00 22,964,647.16
Total Jumlah Harga 200,269,570.68
632

LANTAI 3
1 Pekerjaan Pasangan Keramik 40 x 40 538.76 m² 325,476.45 175,352,064.82
2 Pekerjaan Pasangan Keramik 20 x 20 75.16 m' 332,051.00 24,956,953.16
Total Jumlah Harga 200,309,017.98

Total Harga Pekerjaan Pasangan Keramik 600,848,159.34

5.6 PEKERJAAN PLAFOND


- LANTAI 1
Pemasangan 1 M2 Langit - Langit gypsum board + rangka besi hollow 607.11 m2 67,188.75 40,791,029.20
Total Jumlah Harga 40,791,029.20

- LANTAI 2
Pemasangan 1 M2 Langit - Langit gypsum board + rangka besi hollow 607.11 m2 67,188.75 40,791,029.20
Total Jumlah Harga 40,791,029.20

- LANTAI 3
Pemasangan 1 M2 Langit - Langit gypsum board + rangka besi hollow 610.03 m2 67,188.75 40,986,817.22
Total Jumlah Harga 40,986,817.22
Total Harga Pekerjaan Plafond 122,568,875.62

5.7 PEKERJAAN PENGECATAN


LANTAI 1
1 Pekerjaan Pengecatan Dinding 3,815.35 m² 53,974.10 205,930,082.44
2 Pekerjaan Pengecatan Plafond 607.11 m² 32,147.10 19,516,858.03
Total Jumlah Harga 225,446,940.46

LANTAI 2
1 Pekerjaan Pengecatan Dinding 3,666.70 m² 53,974.10 197,906,832.47
2 Pekerjaan Pengecatan Plafond 607.11 m² 32,147.10 19,516,858.03
Total Jumlah Harga 217,423,690.50

LANTAI 3
1 Pekerjaan Pengecatan Dinding 3,666.70 m² 53,974.10 197,906,832.47
2 Pekerjaan Pengecatan Plafond 610.03 m² 32,147.10 19,610,534.68
Total Jumlah Harga 217,517,367.15

Total Harga Pekerjaan Pengecatan 660,387,998.11

VI PEKERJAAN MEP
6.1 PEKERJAAN SANITASI
LANTAI 1
1 Pasangan Kloset Duduk + Acc 5 bh 7,146,560.00 35,732,800.00
2 Pasangan Kloset Jongkok + Acc 7 bh 822,652.50 5,758,567.50
3 Pasangan Urinoir + Acc 5 bh 4,149,775.00 20,748,875.00
4 Pasangan Washtafel + Acc 10 bh 1,687,165.00 16,871,650.00
5 Pasangan Jetwasher 5 bh 412,940.00 2,064,700.00
6 Pasangan Penyekatan Urinoir 4 bh 1,829,630.00 7,318,520.00
7 Pasangan Floor Drain Stainless Steel 13 bh 427,426.25 5,556,541.25
8 Pasangan Kran Air 2 bh 146,078.75 292,157.50
9 Pasangan Kitchen Zink 1 bh 782,028.75 782,028.75
10 Pasangan Pipa PVC 1/2" 1,792 m 21,646.59 38,790,696.00
11 Pasangan Pipa PVC 3/4" 1,543 m 28,870.75 44,547,567.25
12 Pasangan Pipa PVC 1 1/2" 742 m 45,587.44 33,825,878.63
13 Pasangan Pipa PVC 2" 1,741 m 56,994.00 99,226,554.00
14 Pasangan Pipa PVC 4" 1,421 m 114,661.47 162,933,947.09
15 Septictank 3 unit 4,784,677.00 14,354,031.00
16 Pompa air 1 bh 1,755,000.00 1,755,000.00
17 Water proofing lantai KM/Wc 72 m² 62,469.15 4,497,778.80
Total Jumlah Harga 495,057,292.77
LANTAI 2
1 Pasangan Kloset Duduk + Acc 22 bh 7,146,560.00 157,224,320.00
2 Pasangan Washtafel + Acc 22 bh 1,687,165.00 37,117,630.00
3 Pasangan Jetwasher 22 bh 412,940.00 9,084,680.00
4 Pasangan Floor Drain Stainless Steel 22 bh 427,426.25 9,403,377.50
5 Pasangan Kran Air 22 bh 146,078.75 3,213,732.50
6 Pasangan Kitchen Zink 1 bh 782,028.75 782,028.75
7 Pasangan Pipa PVC 1/2" 4,782 m 21,646.59 103,514,011.31
8 Pasangan Pipa PVC 3/4" 3,278 m 28,870.75 94,638,318.50
9 Pasangan Pipa PVC 1 1/2" 853 m 45,587.44 38,886,084.19
10 Pasangan Pipa PVC 2" 3,246 m 56,994.00 185,002,524.00
11 Pasangan Pipa PVC 4" 2,353 m 114,661.47 269,798,435.97
12 Pompa air 2 bh 1,755,000.00 3,510,000.00
13 Shower 22 bh 85,000.00 1,870,000.00
14 Water profing lantai KM/Wc 69 m² 62,469.15 4,320,366.41
Total Jumlah Harga 918,365,509.13
633

LANTAI 3
1 Pasangan Kloset Duduk + Acc 19 bh 7,146,560.00 135,784,640.00
2 Pasangan Washtafel + Acc 19 bh 1,687,165.00 32,056,135.00
3 Pasangan Jetwasher 19 bh 412,940.00 7,845,860.00
4 Pasangan Floor Drain Stainless Steel 19 bh 427,426.25 8,121,098.75
5 Pasangan Kran Air 19 bh 146,078.75 2,775,496.25
6 Pasangan Pipa PVC 1/2" 4,328 m 21,646.59 93,686,457.75
7 Pasangan Pipa PVC 3/4" 1,532 m 28,870.75 44,229,989.00
8 Pasangan Pipa PVC 1 1/2" 765 m 45,587.44 34,874,389.69
9 Pasangan Pipa PVC 2" 2,841 m 56,994.00 161,919,954.00
10 Pasangan Pipa PVC 4" 1,945 m 114,661.47 223,016,556.72
11 Pompa air 2 bh 1,755,000.00 3,510,000.00
13 Shower 19 bh 85,000.00 1,615,000.00
12 Water profing lantai KM/Wc 75 m² 62,469.15 4,695,181.31
Total Jumlah Harga 754,130,758.47

Total Harga Pekerjaan Sanitasi 2,167,553,560.37

6.2 PEKERJAAN LISTRIK


LANTAI 1
1 Instalasi Titik Lampu 150 titik 385,227.00 57,784,050.00
2 Instalasi Stop Kontak 87 titik 592,227.00 51,523,749.00
3 Instalasi Exchaust Fan 7 titik 598,258.75 4,187,811.25
4 Instalasi Stop Kontak AC 31 titik 688,094.00 21,330,914.00
5 Lampu TL RM 2 x 18 108 Bh 956,000.00 103,248,000.00
6 Lampu TL 1 x 36 47 Bh 455,250.00 21,396,750.00
7 Down light PLC 18 W 110 Bh 385,750.00 42,432,500.00
8 Down light PLC 8 W 43 Bh 330,200.00 14,198,600.00
9 Exchaust Fan 7 Bh 918,225.00 6,427,575.00
10 Saklar Ganda 35 Bh 112,000.00 3,920,000.00
11 Stop Kontak 75 Bh 17,000.00 1,275,000.00
12 Stop Kontak AC 31 Bh 225,350.00 6,985,850.00
13 Box Panel 1 2 Bh 32,200,300.00 64,400,600.00
Total Jumlah Harga 399,111,399.25

LANTAI 2
1 Instalasi Titk Lampu 177 titik 385,227.00 68,185,179.00
2 Instalasi Stop Kontak 154 titik 592,227.00 91,202,958.00
3 Instalasi Exchaust Fan 8 titik 598,258.75 4,786,070.00
4 Instalasi Stop Kontak AC 48 titik 688,094.00 33,028,512.00
5 Lampu TL RM 2 x 18 192 Bh 956,000.00 183,552,000.00
6 Lampu TL 1 x 36 96 Bh 455,250.00 43,704,000.00
7 Down light PLC 18 W 118 Bh 455,250.00 53,719,500.00
8 Down light PLC 8 W 59 Bh 385,750.00 22,759,250.00
9 Exchaust Fan 8 Bh 330,200.00 2,641,600.00
10 Saklar Tunggal 28 Bh 4,000.00 112,000.00
11 Saklar Ganda 66 Bh 112,000.00 7,392,000.00
12 Stop Kontak 132 Bh 17,000.00 2,244,000.00
13 Stop Kontank AC 48 Bh 225,350.00 10,816,800.00
14 Box Panel 1 2 Bh 32,200,300.00 64,400,600.00
Total Jumlah Harga 588,544,469.00

LANTAI 3
1 Instalasi Titk Lampu 171 titik 385,227.00 65,873,817.00
2 Instalasi Stop Kontak 143 titik 592,227.00 84,688,461.00
3 Instalasi Exchaust Fan 4 titik 598,258.75 2,393,035.00
4 Instalasi Stop Kontak AC 41 titik 688,094.00 28,211,854.00
5 Lampu TL RM 2 x 18 172 Bh 956,000.00 164,432,000.00
6 Lampu TL 1 x 36 86 Bh 455,250.00 39,151,500.00
7 Down light PLC 18 W 123 Bh 455,250.00 55,995,750.00
8 Down light PLC 8 W 43 Bh 385,750.00 16,587,250.00
9 Exchaust Fan 4 Bh 330,200.00 1,320,800.00
10 Saklar Tunggal 27 Bh 4,000.00 108,000.00
11 Saklar Ganda 34 Bh 112,000.00 3,808,000.00
12 Stop Kontak 114 Bh 17,000.00 1,938,000.00
13 Stop Kontak AC 41 Bh 225,350.00 9,239,350.00
14 Box Panel 1 2 Bh 32,200,300.00 64,400,600.00
` Total Jumlah Harga 538,148,417.00

Total Harga Pekerjaan Listrik 1,525,804,285.25

VII PEKERJAAN LAIN-LAIN


7.1 PEKERJAAN AKHIR
1 Pekerjaan Pembersihan Akhir 840.00 m² 27,312.50 22,942,500.00
Total Harga Pekerjaan Akhir 22,942,500.00
VIII PEKERJAAN KESELAMATAN DAN KESEHATAN KERJA
1 Keselamatan dan Kesehatan Kerja (K3) 54,325,000.00
634

4.3.7 Rekapitulasi Biaya

NO URAIAN PEKERJAAN HARGA


I PEKERJAAN PERSIAPAN Rp 257,823,582
II PEKERJAAN TANAH DAN PASIR Rp 135,638,100
III PEKERJAAN STRUKTUR BAWAH Rp 3,868,615,813
IV PEKERJAAN STRUKTUR ATAS Rp 4,229,132,019
V PEKERJAAN ARSITEKTUR Rp 5,577,110,396
VI PEKERJAAN MEP Rp 3,693,357,846
VII PEKERJAAN LAIN-LAIN Rp 22,942,500
VIII PEKERJAAN KESELAMATAN DAN KESEHATAN KRp 54,325,000
TOTAL Rp 17,838,945,255
PPN 11% Rp 1,962,283,978
PPH 3% Rp 535,168,358
TOTAL SELURUH Rp 20,336,397,591
PEMBULATAN Rp 23,277,126,700
621

4.2.6 Perhitungan Durasi Kerja

No Uraian Pekerjaan Koefisien Volume Rencana Kapasitas Pekerja / Hari Durasi


a b c d e = 1/b f=dxe g = c /f
I PEKERJAAN PERSIAPAN
1.1 Pekerjaan Pembersihan 0.100 oh 799.00 m² 50.00 oh 10.00 m² 500.00 m²/hr 1.60 ~ 2 hari
1.2 Pemasangan Bouwplank 0.100 oh 111.00 m² 15.00 oh 10.00 m² 150.00 m²/hr 0.74 ~ 1 hari
1.3 Pemagaran Proyek 0.200 oh 119.00 m 15.00 oh 5.00 m 75.00 m/hr 1.59 ~ 2 hari
1.4 Pembuatan Kantor Sementara 2.000 oh 35.00 m² 10.00 oh 0.50 m² 5.00 m²/hr 7.00 ~ 7 hari
1.5 Pembuatan Gudang Alat dan Bahan 1.000 oh 35.00 m² 10.00 oh 1.00 m² 10.00 m²/hr 3.50 ~ 4 hari
1.6 Mobilisasi Alat Pancang ls oh 1.00 Ls 1.00 oh Ls 3.00 ~ 3 hari

II PEKERJAAN TANAH DAN PASIR


2.1 Pekerjaan Galian Tanah untuk Pile Cap 0.750 oh 84.70 m³ 50.00 oh 1.33 m³ 66.67 m³/hr 1.27 ~ 2 hari
2.2 Pekerjaan Urugan pasir bawah pile cap 0.500 oh 25.41 m³ 4.00 oh 2.00 m³ 8.00 m³/hr 3.18 ~ 4 hari
2.3 Pekerjaan Urugan tanah kembali pile cap 0.300 oh 28.23 m³ 8.00 oh 3.33 m³ 26.67 m³/hr 1.06 ~ 2 hari
2.4 Pekerjaan Galian Sloof 0.750 oh 53.73 m³ 17.00 oh 1.33 m³ 22.67 m³/hr 2.37 ~ 3 hari
2.5 Pekerjaan Urugan Pasir bawah sloof 0.500 oh 71.64 m³ 6.00 oh 2.00 m³ 12.00 m³/hr 5.97 ~ 6 hari
2.6 Pekerjaan Urugan tanah kembali sloof 0.500 oh #NAME? m³ 8.00 oh 2.00 m³ 16.00 m³/hr #NAME? ~ #NAME? hari
2.7 Timbunan Tanah Peninggian Lantai 0.250 oh 544.00 m³ 50.00 oh 4.00 m³ 200.00 m³/hr 2.72 ~ 3 hari

III PEKERJAAN STRUKTUR BAWAH


3.1 Pemasangan Tiang Pancang Square Pile 30 x 30 cm 0.300 oh 2,240.00 m' 75.00 oh 3.33 m' 250.00 m'/hr 8.96 ~ 9 hari

3.2 Pekerjaan Pile Cap


Pekerjaan Lantai Kerja Pile Cap 2.100 oh 56.70 m³ 120.00 oh 0.48 m³ 57.14 m³/hr 0.99 1 hari
Pekerjaan Pembesian Pile Cap 0.070 oh 16,667.14 Kg 382.00 oh 14.29 Kg 5,457.14 Kg/hr 3.05 ~ 4 hari
Pekerjaan Bekisting Pile Cap 0.520 oh 126.00 m² 102.00 oh 1.92 m² 196.15 m²/hr 0.64 ~ 1 hari
Pekerjaan Beton Pile Cap 2.100 oh 56.70 m³ 210.00 oh 0.48 m³ 100.00 m³/hr 0.57 ~ 1 hari
Pekerjaan Pembongkaran Bekisting Pile Cap 0.250 oh 126.00 m² 50.00 oh 4.00 m² 200.00 m²/hr 0.63 ~ 1 hari

3.3 Pekerjaan Sloof


Pekerjaan Lantai Kerja Sloof 2.100 oh 53.73 m³ 70.00 oh 0.48 m³ 33.33 m³/hr 1.61 2 hari
Pekerjaan Pembesian Sloof 0.070 oh 6,073.41 Kg 72.00 oh 14.29 Kg 1,028.57 Kg/hr 5.90 ~ 6 hari
Pekerjaan Bekisting Sloof 0.520 oh 262.80 m² 35.00 oh 1.92 m² 67.31 m²/hr 3.90 ~ 4 hari
Pekerjaan Beton Sloof 2.100 oh 43.83 m³ 24.00 oh 0.48 m³ 11.43 m³/hr 3.84 ~ 4 hari
Pekerjaan Pembongkaran Bekisting Sloof 0.250 oh 262.80 m² 35.00 oh 4.00 m² 140.00 m²/hr 1.88 ~ 2 hari

IV PEKERJAAN STRUKTUR ATAS


LANTAI 1
4.1 Pekerjaan Pelat
Pekerjaan Pembesian Pelat Lantai 1 0.070 oh 3,277.26 Kg 90.00 oh 14.29 Kg 1,285.71 Kg/hr 2.55 ~ 3 hari
Pekerjaan Beton Pelat Lantai 1 2.100 oh 95.33 m³ 90.00 oh 0.48 m³ 42.86 m³/hr 2.22 ~ 3 hari

4.2 Pekerjaan Kolom


Pekerjaan Pembesian Kolom 0.070 oh 3,616.10 Kg 90.00 oh 14.29 Kg 1,285.71 Kg/hr 2.81 ~ 3 hari
Pekerjaan Bekisting Kolom 0.660 oh 215.60 m² 26.00 oh 1.52 m² 39.39 m²/hr 5.47 ~ 6 hari
Pekerjaan Beton Kolom 2.100 oh 21.56 m³ 20.00 oh 0.48 m³ 9.52 m³/hr 2.26 ~ 3 hari
Pekerjaan Pembongkaran Bekisting Kolom 0.250 oh #NAME? m² 20.00 oh 4.00 m² 80.00 m²/hr #NAME? ~ #NAME? hari

4.3 Pekerjaan Tangga


Pekerjaan Pembesian Tangga 0.070 oh 398.78 Kg 12.00 oh 14.29 Kg 171.43 Kg/hr 2.33 ~ 3 hari
Pekerjaan Bekisting Tangga 0.660 oh 23.27 m² 10.00 oh 1.52 m² 15.15 m²/hr 1.54 ~ 2 hari
Pekerjaan Beton Tangga 2.100 oh 5.92 m³ 50.00 oh 0.48 m³ 23.81 m³/hr 0.25 ~ 1 hari
Pekerjaan Pembongkaran Bekisting Tangga 0.250 oh #NAME? m² 7.00 oh 4.00 m² 28.00 m²/hr #NAME? ~ #NAME? hari

LANTAI 2
4.4 Pekerjaan Balok
Pekerjaan Pembesian Balok 0.070 oh 8,047.62 Kg 250.00 oh 14.29 Kg 3,571.43 Kg/hr 2.25 ~ 3 hari
Pekerjaan Bekisting Balok 0.660 oh 515.15 m² 150.00 oh 1.52 m² 227.27 m²/hr 2.27 ~ 3 hari
Pekerjaan Beton Balok 2.100 oh 54.13 m³ 50.00 oh 0.48 m³ 23.81 m³/hr 2.27 ~ 3 hari
Pekerjaan Pembongkaran Bekisting Balok 0.250 oh #NAME? m³ 50.00 oh 4.00 m³ 200.00 m³/hr #NAME? ~ #NAME? hari

4.5 Pekerjaan Pelat


Pekerjaan Pembesian Pelat Lantai 0.070 oh 3,277.26 Kg 90.00 oh 14.29 Kg 1,285.71 Kg/hr 2.55 ~ 3 hari
Pekerjaan Bekisting Pelat 0.660 oh 515.15 m² 75.00 oh 1.52 m² 113.64 m²/hr 4.53 ~ 5 hari
Pekerjaan Beton Pelat Lantai 2.100 oh 95.33 m³ 90.00 oh 0.48 m³ 42.86 m³/hr 2.22 ~ 3 hari
Pekerjaan Pembongkaran Bekisting Pelat Lantai 0.250 oh #NAME? m³ 58.00 oh 4.00 m³ 232.00 m³/hr #NAME? ~ #NAME? hari

4.6 Pekerjaan Kolom


Pekerjaan Pembesian Kolom 0.070 oh 3,538.37 Kg 90.00 oh 14.29 Kg 1,285.71 Kg/hr 2.75 ~ 3 hari
Pekerjaan Bekisting Kolom 0.660 oh 212.80 m² 26.00 oh 1.52 m² 39.39 m²/hr 5.40 ~ 6 hari
Pekerjaan Beton Kolom 2.100 oh 21.28 m³ 20.00 oh 0.48 m³ 9.52 m³/hr 2.23 ~ 3 hari
Pekerjaan Pembongkaran Bekisting Kolom 0.250 oh #NAME? m³ 20.00 oh 4.00 m³ 80.00 m³/hr #NAME? ~ #NAME? hari

4.7 Pekerjaan Tangga


Pekerjaan Pembesian Tangga 0.070 oh 398.78 Kg 12.00 oh 14.29 Kg 171.43 Kg/hr 2.33 ~ 3 hari
Pekerjaan Bekisting Tangga 0.660 oh 23.27 m² 10.00 oh 1.52 m² 15.15 m²/hr 1.54 ~ 2 hari
Pekerjaan Beton Tangga 2.100 oh 5.92 m³ 50.00 oh 0.48 m³ 23.81 m³/hr 0.25 ~ 1 hari
Pekerjaan Pembongkaran Bekisting Tangga 0.250 oh #NAME? m³ 7.00 oh 4.00 m³ 28.00 m³/hr #NAME? ~ #NAME? hari

LANTAI 3
4.8 Pekerjaan Balok
Pekerjaan Pembesian Balok 0.070 oh 8,047.62 Kg 250.00 oh 14.29 Kg 3,571.43 Kg/hr 2.25 ~ 3 hari
Pekerjaan Bekisting Balok 0.660 oh 515.15 m² 150.00 oh 1.52 m² 227.27 m²/hr 2.27 ~ 3 hari
Pekerjaan Beton Balok 2.100 oh 54.13 m³ 50.00 oh 0.48 m³ 23.81 m³/hr 2.27 ~ 3 hari
Pekerjaan Pembongkaran Bekisting Balok 0.250 oh 515.15 m³ 50.00 oh 4.00 m³ 200.00 m³/hr 2.58 ~ 3 hari

4.9 Pekerjaan Pelat


Pekerjaan Pembesian Pelat Lantai 0.070 oh 3,277.26 Kg 90.00 oh 14.29 Kg 1,285.71 Kg/hr 2.55 ~ 3 hari
Pekerjaan Bekisting Pelat 0.660 oh 515.15 m² 75.00 oh 1.52 m² 113.64 m²/hr 4.53 ~ 5 hari
Pekerjaan Beton Pelat Lantai 2.100 oh 95.33 m³ 90.00 oh 0.48 m³ 42.86 m³/hr 2.22 ~ 3 hari
Pekerjaan Pembongkaran Bekisting Pelat Lantai 0.250 oh 515.15 m³ 58.00 oh 4.00 m³ 232.00 m³/hr 2.22 ~ 3 hari

4.10 Pekerjaan Kolom


Pekerjaan Pembesian Kolom 0.070 oh 3,538.37 Kg 90.00 oh 14.29 Kg 1,285.71 Kg/hr 2.75 ~ 3 hari
Pekerjaan Bekisting Kolom 0.660 oh 212.80 m² 26.00 oh 1.52 m² 39.39 m²/hr 5.40 ~ 6 hari
Pekerjaan Beton Kolom 2.100 oh 21.28 m³ 20.00 oh 0.48 m³ 9.52 m³/hr 2.23 ~ 3 hari
622

Pekerjaan Pembongkaran Bekisting Kolom 0.250 oh #NAME? m³ 20.00 oh 4.00 m³ 80.00 m³/hr #NAME? ~ #NAME? hari

LANTAI ATAP
4.11 Pekerjaan Balok
Pekerjaan Pembesian Balok 0.070 oh 8,596.35 Kg 250.00 oh 14.29 Kg 3,571.43 Kg/hr 2.41 ~ 3 hari
Pekerjaan Bekisting Balok 0.660 oh 479.10 m² 150.00 oh 1.52 m² 227.27 m²/hr 2.11 ~ 3 hari
Pekerjaan Beton Balok 2.100 oh 52.54 m³ 50.00 oh 0.48 m³ 23.81 m³/hr 2.21 ~ 3 hari
Pekerjaan Pembongkaran Bekisting Balok 0.250 oh 479.10 m³ 50.00 oh 4.00 m³ 200.00 m³/hr 2.40 ~ 3 hari

4.12 Pekerjaan Pelat Atap


Pekerjaan Pembesian Pelat Lantai 0.070 oh 3,277.26 Kg 90.00 oh 14.29 Kg 1,285.71 Kg/hr 2.55 ~ 3 hari
Pekerjaan Bekisting Pelat Lantai 0.660 oh 479.10 m² 75.00 oh 1.52 m² 113.64 m²/hr 4.22 ~ 5 hari
Pekerjaan Beton Pelat Lantai 2.100 oh 95.33 m³ 90.00 oh 0.48 m³ 42.86 m³/hr 2.22 ~ 3 hari
Pekerjaan Pembongkaran Bekisting Pelat Lantai 0.250 oh 479.10 m³ 58.00 oh 4.00 m³ 232.00 m³/hr 2.07 ~ 3 hari

V PEKERJAAN ARSITEKTUR
5.1 PEKERJAAN DINDING
- LANTAI 1
Pekerjaan Pasangan Dinding Bata Ad. 1:4 0.600 oh 1,858.13 m² 112.00 oh 1.67 m² 186.67 m²/hr 9.95 ~ 10 hari
- LANTAI 2
Pekerjaan Pasangan Dinding Bata Ad. 1:4 0.600 oh 1,783.80 m² 112.00 oh 1.67 m² 186.67 m²/hr 9.56 ~ 10 hari
- LANTAI 3
Pekerjaan Pasangan Dinding Bata Ad. 1:4 0.600 oh 1,783.80 m² 112.00 oh 1.67 m² 186.67 m²/hr 9.56 ~ 10 hari

5.2 PEKERJAAN PLESTERAN & ACIAN DINDING


- LANTAI 1
Pekerjaan Plesteran Pasangan Batu Bata Ad. 1:4 0.400 oh 3,716.25 m² 96.00 oh 2.50 m² 240.00 m²/hr 15.48 ~ 16 hari
- LANTAI 2
Pekerjaan Plesteran Pasangan Batu Bata Ad. 1:4 0.400 oh 3,567.60 m² 96.00 oh 2.50 m² 240.00 m²/hr 14.87 ~ 15 hari
- LANTAI 3
Pekerjaan Plesteran Pasangan Batu Bata Ad. 1:4 0.400 oh 3,567.60 m² 96.00 oh 2.50 m² 240.00 m²/hr 14.87 ~ 15 hari
- LANTAI 1
Pekerjaan Acian 0.200 oh 3,716.25 m² 96.00 oh 5.00 m² 480.00 m²/hr 7.74 ~ 8 hari
- LANTAI 2
Pekerjaan Acian 0.200 oh 3,567.60 m² 96.00 oh 5.00 m² 480.00 m²/hr 7.43 ~ 8 hari
- LANTAI 3
Pekerjaan Acian 0.200 oh 3,567.60 m² 96.00 oh 5.00 m² 480.00 m²/hr 7.43 ~ 8 hari

5.3 PEKERJAAN KUSEN, PINTU & JENDELA


- LANTAI 1
Pekerjaan Pintu P1 0.085 oh 18.00 m² 2.00 oh 11.76 m² 23.53 m²/hr 0.77 ~
Pekerjaan Pintu P2 0.085 oh 4.80 m² 2.00 oh 11.76 m² 23.53 m²/hr 0.20 ~ 2 hari
Pintu KM/WC/P3 0.050 oh 6.00 bh 1.00 oh 20.00 bh 20.00 bh/hr 0.30 ~

- LANTAI 2
Pekerjaan Pintu P1 0.085 oh 18.00 m² 2.00 oh 11.76 m² 23.53 m²/hr 0.77 ~
Pekerjaan Pintu P2 0.085 oh 4.80 m² 2.00 oh 11.76 m² 23.53 m²/hr 0.20 ~ 2 hari
Pintu KM/WC/P3 0.050 oh 5.00 bh 1.00 oh 20.00 bh 20.00 bh/hr 0.25 ~

- LANTAI 3
Pekerjaan Pintu P1 0.085 oh 3.60 m² 2.00 oh 11.76 m² 23.53 m²/hr 0.15 ~
Pekerjaan Pintu P2 0.085 oh 3.20 m² 2.00 oh 11.76 m² 23.53 m²/hr 0.14 ~ 1 hari
Pintu KM/WC/P3 0.050 oh 4.00 bh 1.00 oh 20.00 bh 20.00 bh/hr 0.20 ~

- LANTAI 1
Kunci Tanam Stainless Steel 0.010 oh 19.00 Bh 2.00 oh 100.00 Bh 200.00 Bh/hr 0.10 ~ 1 hari
Engsel Pintu 0.015 oh 38.00 Bh 4.00 oh 66.67 Bh 266.67 Bh/hr 0.14 ~
- LANTAI 2
Kunci Tanam Stainless Steel 0.010 oh 18.00 Bh 2.00 oh 100.00 Bh 200.00 Bh/hr 0.09 ~ 1 hari
Engsel Pintu 0.015 oh 36.00 Bh 4.00 oh 66.67 Bh 266.67 Bh/hr 0.13 ~
- LANTAI 3
Kunci Tanam Stainless Steel 0.010 oh 8.00 Bh 2.00 oh 100.00 Bh 200.00 Bh/hr 0.04 ~ 1 hari
Engsel Pintu 0.015 oh 16.00 Bh 4.00 oh 66.67 Bh 266.67 Bh/hr 0.06 ~

5.5 PEKERJAAN PASANGAN KERAMIK


- LANTAI 1
Pekerjaan Pasangan Keramik 40 x 40 0.700 oh 544.76 m² 42.00 oh 1.43 m² 60.00 m²/hr 9.08 ~ 10 hari
Pekerjaan Pasangan Keramik 20 x 20 0.700 oh 69.16 m² 14.00 oh 1.43 m² 20.00 m²/hr 3.46 ~ 4 hari
- LANTAI 2
Pekerjaan Pasangan Keramik 40 x 40 0.700 oh 544.76 m² 42.00 oh 1.43 m² 60.00 m²/hr 9.08 ~ 10 hari
Pekerjaan Pasangan Keramik 20 x 20 0.700 oh 69.16 m² 14.00 oh 1.43 m' 20.00 m²/hr 3.46 ~ 4 hari
- LANTAI 3
Pekerjaan Pasangan Keramik 40 x 40 0.700 oh 538.76 m² 42.00 oh 1.43 m² 60.00 m²/hr 8.98 ~ 9 hari
Pekerjaan Pasangan Keramik 20 x 20 0.700 oh 75.16 m² 12.00 oh 1.43 m' 17.14 m²/hr 4.38 ~ 5 hari

5.6 PEKERJAAN PLAFOND


- LANTAI 1
Pemasangan 1 M2 Langit - Langit gypsum board + rangka besi0.100
hollow oh 607.11 m2 23.00 oh 10.00 m2 230.00 m²/hr 2.64 ~ 3 hari

- LANTAI 2
Pemasangan 1 M2 Langit - Langit gypsum board + rangka besi0.100
hollow oh 607.11 m2 23.00 oh 10.00 m2 230.00 m²/hr 2.64 ~ 3 hari

- LANTAI 3
Pemasangan 1 M2 Langit - Langit gypsum board + rangka besi0.100
hollow oh 610.03 m2 23.00 oh 10.00 m2 230.00 m²/hr 2.65 ~ 3 hari

5.7 PEKERJAAN PENGECATAN


- LANTAI 1
Pekerjaan Pengecatan Dinding 0.020 oh 3,815.35 m² 50.00 oh 50.00 m² 2,500.00 m²/hr 1.53 ~ 2 hari
Pekerjaan Pengecatan Plafond 0.020 oh 607.11 m² 25.00 oh 50.00 m² 1,250.00 m²/hr 0.49 ~ 1 hari
- LANTAI 2
Pekerjaan Pengecatan Dinding 0.020 oh 3,666.70 m² 50.00 oh 50.00 m² 2,500.00 m²/hr 1.47 ~ 2 hari
Pekerjaan Pengecatan Plafond 0.020 oh 607.11 m² 25.00 oh 50.00 m² 1,250.00 m²/hr 0.49 ~ 1 hari
- LANTAI 3
Pekerjaan Pengecatan Dinding 0.020 oh 3,666.70 m² 50.00 oh 50.00 m² 2,500.00 m²/hr 1.47 ~ 2 hari
Pekerjaan Pengecatan Plafond 0.020 oh 610.03 m² 25.00 oh 50.00 m² 1,250.00 m²/hr 0.49 ~ 1 hari

VI PEKERJAAN MEP
6.1 PEKERJAAN SANITASI
6.1.1 LANTAI 1
623

Pasangan Kloset Duduk + Acc 3.300 oh 5 Bh 16 oh 0.30 Bh 4.85 Bh/hr 1.03 ~


Pasangan Kloset Jongkok + Acc 1.000 oh 7 Bh 16 oh 1.00 Bh 16.00 Bh/hr 0.44 ~
Pasangan Urinoir + Acc 1.000 oh 5 Bh 22 oh 1.00 Bh 22.00 Bh/hr 0.23 ~
Pasangan Washtafel + Acc 1.200 oh 10 Bh 22 oh 0.83 Bh 18.33 Bh/hr 0.55 ~
Pasangan Jetwasher 0.010 oh 5 Bh 22 oh 100.00 Bh 2,200.00 Bh/hr 0.00 ~
Pasangan Penyekatan Urinoir 1.000 oh 4 Bh 22 oh 1.00 Bh 22.00 Bh/hr 0.18 ~
Pasangan Floor Drain Stainless Steel 0.010 oh 13 Bh 22 oh 100.00 Bh 2,200.00 Bh/hr 0.01 ~
Pasangan Kran Air Standar 0.010 oh 2 Bh 5 oh 100.00 Bh 500.00 Bh/hr 0.00 ~
Pasangan Kitchen Zink 0.030 oh 1 Bh 5 oh 33.33 Bh 166.67 Bh/hr 0.01 ~ 59 hari
Pasangan Pipa PVC 1/2" 0.036 oh 1,792 m' 5 oh 27.78 m' 138.89 m'/hr 12.90 ~
Pasangan Pipa PVC 3/4" 0.036 oh 1,543 m' 5 oh 27.78 m' 138.89 m'/hr 11.11 ~
Pasangan Pipa PVC 1 1/2" 0.054 oh 742 m' 5 oh 18.52 m' 92.59 m'/hr 8.01 ~
Pasangan Pipa PVC 2" 0.054 oh 1,741 m' 10 oh 18.52 m' 185.19 m'/hr 9.40 ~
Pasangan Pipa PVC 4" 0.081 oh 1,421 m' 8 oh 12.35 m' 98.77 m'/hr 14.39 ~
Septictank 0.380 oh 2 Bh 3 oh 2.63 Bh 7.89 Bh/hr 0.25 ~
pompa air 0.010 oh 1 Bh 2 oh 100.00 Bh 200.00 Bh/hr 0.01 ~
water profing lantai KM/Wc 0.028 oh 72 m2 30 oh 35.71 m2 1,071.43 m²/hr 0.07 ~

6.1.2 LANTAI 2
Pasangan Kloset Duduk + Acc 3.300 oh 22 Bh 17 oh 0.30 Bh 5.15 Bh/hr 4.27 ~
Pasangan Washtafel + Acc 1.200 oh 22 Bh 23 oh 0.83 Bh 19.17 Bh/hr 1.15 ~
Pasangan Jetwasher 0.010 oh 22 Bh 23 oh 100.00 Bh 2,300.00 Bh/hr 0.01 ~
Pasangan Floor Drain Stainless Steel 0.010 oh 22 Bh 23 oh 100.00 Bh 2,300.00 Bh/hr 0.01 ~
Pasangan Kran Air Standar 0.010 oh 22 Bh 5 oh 100.00 Bh 500.00 Bh/hr 0.04 ~
Pasangan Kitchen Zink 0.030 oh 1 Bh 5 oh 33.33 Bh 166.67 Bh/hr 0.01 ~ 122 hari
Pasangan Pipa PVC 1/2" 0.036 oh 4,782 m' 5 oh 27.78 m' 138.89 m'/hr 34.43 ~
Pasangan Pipa PVC 3/4" 0.036 oh 3,278 m' 5 oh 27.78 m' 138.89 m'/hr 23.60 ~
Pasangan Pipa PVC 1 1/2" 0.054 oh 853 m' 5 oh 18.52 m' 92.59 m'/hr 9.21 ~
Pasangan Pipa PVC 2" 0.054 oh 3,246 m' 10 oh 18.52 m' 185.19 m'/hr 17.53 ~
Pasangan Pipa PVC 4" 0.081 oh 2,353 m' 8 oh 12.35 m' 98.77 m'/hr 23.82 ~
pompa air 0.010 oh 2 Bh 2 oh 100.00 Bh 200.00 Bh/hr 0.01 ~
Shower 1.000 oh 22 Bh 3 oh 1.00 Bh 3.00 Bh/hr 7.33 ~
water profing lantai KM/Wc 0.028 oh 69 m2 30 oh 35.71 m2 1,071.43 m²/hr 0.06 ~

6.1.3 LANTAI 3
Pasangan Kloset Duduk + Acc 3.300 oh 19 Bh 17 oh 0.30 Bh 5.15 Bh/hr 3.69 ~
Pasangan Washtafel + Acc 1.200 oh 19 Bh 23 oh 0.83 Bh 19.17 Bh/hr 0.99 ~
Pasangan Jetwasher 0.010 oh 19 Bh 23 oh 100.00 Bh 2,300.00 Bh/hr 0.01 ~
Pasangan Floor Drain Stainless Steel 0.010 oh 19 Bh 23 oh 100.00 Bh 2,300.00 Bh/hr 0.01 ~
Pasangan Kran Air Standar 0.010 oh 19 Bh 5 oh 100.00 Bh 500.00 Bh/hr 0.04 ~ 89 hari
Pasangan Pipa PVC 1/2" 0.036 oh 4,328 m' 6 oh 27.78 m' 166.67 m'/hr 25.97 ~
Pasangan Pipa PVC 3/4" 0.036 oh 1,532 m' 6 oh 27.78 m' 166.67 m'/hr 9.19 ~
Pasangan Pipa PVC 1 1/2" 0.054 oh 765 m' 6 oh 18.52 m' 111.11 m'/hr 6.89 ~
Pasangan Pipa PVC 2" 0.054 oh 2,841 m' 10 oh 18.52 m' 185.19 m'/hr 15.34 ~
Pasangan Pipa PVC 4" 0.081 oh 1,945 m' 8 oh 12.35 m' 98.77 m'/hr 19.69 ~
pompa air 0.010 oh 2 Bh 2 oh 100.00 Bh 200.00 Bh/hr 0.01 ~
Shower 1.000 oh 19 Bh 3 oh 1.00 Bh 3.00 Bh/hr 6.33 ~
water profing lantai KM/Wc 0.028 oh 75 m2 30 oh 35.71 m2 1,071.43 m²/hr 0.07 ~

6.2 PEKERJAAN LISTRIK


6.2.1 LANTAI 1
Instalasi Titk Lampu 0.135 oh 150.00 titik 15 oh 7.41 titik 111.11 titik/hr 1.35 ~
Instalasi Stop Kontak 0.135 oh 87.00 titik 30 oh 7.41 titik 222.22 titik/hr 0.39 ~
Instalasi Exchaust Fan 0.100 oh 7.00 titik 10 oh 10.00 titik 100.00 titik/hr 0.07 ~
Instalasi Stop Kontak AC 0.135 oh 31.00 titik 10 oh 7.41 titik 74.07 titik/hr 0.42 ~
Lampu TL RM 2 x 18 1.000 oh 108.00 Bh 22 oh 1.00 Bh 22.00 Bh/hr 4.91 ~
Lampu TL 1 x 36 1.000 oh 47.00 Bh 30 oh 1.00 Bh 30.00 Bh/hr 1.57 ~
Down light PLC 18 W 1.000 oh 110.00 Bh 30 oh 1.00 Bh 30.00 Bh/hr 3.67 ~ 20 hari
Down light PLC 8 W 1.000 oh 43.00 Bh 30 oh 1.00 Bh 30.00 Bh/hr 1.43 ~
Exchaust Fan 1.000 oh 7.00 Bh 30 oh 1.00 Bh 30.00 Bh/hr 0.23 ~
Saklar Ganda 1.000 oh 35.00 Bh 30 oh 1.00 Bh 30.00 Bh/hr 1.17 ~
Stop Kontak 1.000 oh 75.00 Bh 30 oh 1.00 Bh 30.00 Bh/hr 2.50 ~
Stop Kontak AC 1.000 oh 31.00 Bh 30 oh 1.00 Bh 30.00 Bh/hr 1.03 ~
Box Panel 1 1.000 oh 2.00 Bh 5 oh 1.00 Bh 5.00 Bh/hr 0.40 ~

6.2.2 LANTAI 2
Instalasi Titk Lampu 0.135 oh 177.00 titik 15 oh 7.41 titik 111.11 titik/hr 1.59 ~
Instalasi Stop Kontak 0.135 oh 154.00 titik 30 oh 7.41 titik 222.22 titik/hr 0.69 ~
Instalasi Exchaust Fan 0.100 oh 8.00 titik 10 oh 10.00 titik 100.00 titik/hr 0.08 ~
Instalasi Stop Kontak AC 0.135 oh 48.00 titik 10 oh 7.41 titik 74.07 titik/hr 0.65 ~
Lampu TL RM 2 x 18 1.000 oh 192.00 Bh 22 oh 1.00 Bh 22.00 Bh/hr 8.73 ~
Lampu TL 1 x 36 1.000 oh 96.00 Bh 30 oh 1.00 Bh 30.00 Bh/hr 3.20 ~
Down light PLC 18 W 1.000 oh 118.00 Bh 30 oh 1.00 Bh 30.00 Bh/hr 3.93 ~ 33 hari
Down light PLC 8 W 1.000 oh 59.00 Bh 30 oh 1.00 Bh 30.00 Bh/hr 1.97 ~
Exchaust Fan 1.000 oh 8.00 Bh 30 oh 1.00 Bh 30.00 Bh/hr 0.27 ~
Saklar Tunggal 1.000 oh 28.00 Bh 10 oh 1.00 Bh 10.00 Bh/hr 2.80 ~
Saklar Ganda 1.000 oh 66.00 Bh 30 oh 1.00 Bh 30.00 Bh/hr 2.20 ~
Stop Kontak 1.000 oh 132.00 Bh 30 oh 1.00 Bh 30.00 Bh/hr 4.40 ~
Stop Kontak AC 1.000 oh 48.00 Bh 30 oh 1.00 Bh 30.00 Bh/hr 1.60 ~
Box Panel 1 1.000 oh 2.00 Bh 5 oh 1.00 Bh 5.00 Bh/hr 0.40 ~

6.2.3 LANTAI 3
Instalasi Titk Lampu 0.135 oh 171.00 titik 15 oh 7.41 titik 111.11 titik/hr 1.54 ~
Instalasi Stop Kontak 0.135 oh 143.00 titik 30 oh 7.41 titik 222.22 titik/hr 0.64 ~
Instalasi Exchaust Fan 0.100 oh 4.00 titik 10 oh 10.00 titik 100.00 titik/hr 0.04 ~
Instalasi Stop Kontak AC 0.135 oh 41.00 titik 10 oh 7.41 titik 74.07 titik/hr 0.55 ~
Lampu TL RM 2 x 18 1.000 oh 172.00 Bh 22 oh 1.00 Bh 22.00 Bh/hr 7.82 ~
Lampu TL 1 x 36 1.000 oh 86.00 Bh 30 oh 1.00 Bh 30.00 Bh/hr 2.87 ~
Down light PLC 18 W 1.000 oh 123.00 Bh 30 oh 1.00 Bh 30.00 Bh/hr 4.10 ~
Down light PLC 8 W 1.000 oh 43.00 Bh 30 oh 1.00 Bh 30.00 Bh/hr 1.43 ~ 31 hari
Exchaust Fan 1.000 oh 4.00 Bh 30 oh 1.00 Bh 30.00 Bh/hr 0.13 ~
Saklar Tunggal 1.000 oh 27.00 Bh 10 oh 1.00 Bh 10.00 Bh/hr 2.70 ~
Saklar Ganda 1.000 oh 34.00 Bh 10 oh 1.00 Bh 10.00 Bh/hr 3.40 ~
Stop Kontak 1.000 oh 114.00 Bh 30 oh 1.00 Bh 30.00 Bh/hr 3.80 ~
Stop Kontak AC 1.000 oh 41.00 Bh 30 oh 1.00 Bh 30.00 Bh/hr 1.37 ~
Box Panel 1 1.000 oh 2.00 Bh 5 oh 1.00 Bh 5.00 Bh/hr 0.40 ~
4.2.6 Barchart dan Kurva S

DURASI BULAN KE 1 BULAN KE 2


NO URAIAN PEKERJAAN BIAYA (Rp) BOBOT (%)
(HARI) 1 2 3 4 1 2 3 4 1 2
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68
I PEKERJAAN PERSIAPAN
1.1 Pekerjaan Pembersihan 10 Rp 21,822,688 0.122 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01
1.2 Pemasangan Bouwplank 8 Rp 10,559,846 0.059 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01
1.3 Pemagaran Proyek 14 Rp 62,022,473 0.348 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02
1.4 Pembuatan Kantor Sementara 8 Rp 70,363,038 0.394 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05
1.5 Pembuatan Gudang Alat dan Bahan 8 Rp 53,055,538 0.297 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04
1.6 Mobilisasi Alat Pancang 11 Rp 40,000,000 0.224 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02

II PEKERJAAN TANAH DAN PASIR


2.1 Pekerjaan Galian Tanah untuk Pile Cap 27 Rp 11,043,292 0.062 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
2.2 Pekerjaan Urugan pasir bawah pile cap 22 Rp 6,690,262 0.038 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
2.3 Pekerjaan Urugan tanah kembali pile cap 4 Rp 2,654,286 0.015 0.00 0.00 0.00 0.00
2.4 Pekerjaan Galian Sloof 15 Rp 7,005,385 0.039 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
2.5 Pekerjaan Urugan Pasir bawah sloof 13 Rp 18,862,275 0.106 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01
2.7 Timbunan Tanah Peninggian Lantai 6 Rp 89,382,600 0.501 0.08 0.08 0.08 0.08

III PEKERJAAN STRUKTUR BAWAH


3.1 Pemasangan Tiang Pancang Square Pile 35 x 35 cm 33 Rp 2,715,232,800 15.221 0.46 0.46 0.46 0.46 0.46 0.46 0.46 0.46 0.46 0.46 0.46 0.46 0.46 0.46 0.46 0.46 0.46 0.46 0.46 0.46 0.46 0.46 0.46 0.46 0.46 0.46 0.46 0.46 0.46 0.46 0.46 0.46 0.46
3.2 Pemotongan Tiang Pancang 24 Rp 53,130,000 0.298 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01
3.3 Pekerjaan Lantai Kerja Pile Cap 20 Rp 107,692,409 0.604 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03
3.4 Pekerjaan Pembesian Pile Cap 23 Rp 434,904,018 2.438 0.11 0.11 0.11 0.11 0.11 0.11 0.11 0.11 0.11 0.11 0.11 0.11 0.11 0.11 0.11 0.11 0.11 0.11 0.11 0.11 0.11 0.11 0.11
3.5 Pekerjaan Bekisting Pile Cap 20 Rp 33,311,061 0.187 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01
3.6 Pekerjaan Beton Pile Cap 15 Rp 107,692,409 0.604 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04
3.7 Pekerjaan Lantai Kerja Sloof 13 Rp 102,051,378 0.572 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04
3.8 Pekerjaan Pembesian Sloof 23 Rp 158,476,466 0.888 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04
3.9 Pekerjaan Bekisting Sloof 19 Rp 72,877,331 0.409 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02
3.10 Pekerjaan Beton Sloof 11 Rp 83,247,942 0.467 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04

IV PEKERJAAN STRUKTUR ATAS


4.1 LANTAI 1
4.1.1 Pekerjaan Pembesian Pelat Lantai 10 Rp 85,515,111 0.479 0.05 0.05
4.1.2 Pekerjaan Beton Pelat Lantai 9 Rp 181,054,301 1.015
4.1.3 Pekerjaan Pembesian Kolom 16 Rp 94,356,684 0.529 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03
4.1.4 Pekerjaan Bekisting Kolom 14 Rp 96,125,098 0.539 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04
4.1.5 Pekerjaan Beton Kolom 10 Rp 40,949,706 0.230 0.02 0.02 0.02 0.02
4.1.7 Pekerjaan Pembesian Tangga 5 Rp 10,405,550 0.058
4.1.8 Pekerjaan Bekisting Tangga 2 Rp 10,036,911 0.056
4.1.9 Pekerjaan Beton Tangga 3 Rp 11,252,812 0.063

4.2 LANTAI 2
4.2.1 Pekerjaan Pembesian Balok 19 Rp 209,990,591 1.177
4.2.2 Pekerjaan Bekisting Balok 21 Rp 234,122,410 1.312
4.2.3 Pekerjaan Beton Balok 13 Rp 102,801,616 0.576
4.2.5 Pekerjaan Pembesian Pelat Lantai 16 Rp 85,515,111 0.479
4.2.6 Pekerjaan Bekisting Pelat 22 Rp 265,224,591 1.487
4.2.7 Pekerjaan Beton Pelat Lantai 13 Rp 181,054,301 1.015
4.2.9 Pekerjaan Pembesian Kolom 16 Rp 92,328,562 0.518
4.2.10 Pekerjaan Bekisting Kolom 14 Rp 94,876,720 0.532
4.2.11 Pekerjaan Beton Kolom 12 Rp 40,417,892 0.227
4.2.13 Pekerjaan Pembesian Tangga 5 Rp 10,405,550 0.058
4.2.14 Pekerjaan Bekisting Tangga 3 Rp 10,036,911 0.056
4.2.15 Pekerjaan Beton Tangga 2 Rp 11,252,812 0.063

4.3 LANTAI 3
4.3.1 Pekerjaan Pembesian Balok 19 Rp 209,990,591 1.177
4.3.2 Pekerjaan Bekisting Balok 21 Rp 234,122,410 1.312
4.3.3 Pekerjaan Beton Balok 13 Rp 102,801,616 0.576
4.3.5 Pekerjaan Pembesian Pelat Lantai 16 Rp 85,515,111 0.479
4.3.6 Pekerjaan Bekisting Pelat 22 Rp 265,224,591 1.487
4.3.7 Pekerjaan Beton Pelat Lantai 13 Rp 181,054,301 1.015
4.3.9 Pekerjaan Pembesian Kolom 16 Rp 92,328,562 0.518
4.3.10 Pekerjaan Bekisting Kolom 14 Rp 94,876,720 0.532
4.3.11 Pekerjaan Beton Kolom 12 Rp 40,417,892 0.227

4.4 LANTAI ATAP


4.4.1 Pekerjaan Pembesian Balok 18 Rp 224,308,768 1.257
4.4.2 Pekerjaan Bekisting Balok 17 Rp 217,738,613 1.221
4.4.3 Pekerjaan Beton Balok 12 Rp 99,795,915 0.559
4.4.5 Pekerjaan Pembesian Pelat Lantai 14 Rp 85,515,111 0.479
4.4.6 Pekerjaan Bekisting Pelat Lantai 17 Rp 246,664,276 1.383
4.4.7 Pekerjaan Beton Pelat Lantai 12 Rp 181,054,301 1.015

V PEKERJAAN ARSITEKTUR
5.1 PEKERJAAN DINDING
5.1.1 Lantai 1 22 Rp 636,886,280 3.570
5.1.2 Lantai 2 26 Rp 611,410,829 3.427
5.1.3 Lantai 3 18 Rp 611,410,829 3.427

5.2 PEKERJAAN PLESTERAN & ACIAN DINDING


5.1.1 Lantai 1 (Plesteran) 17 Rp 505,038,747 2.831
5.1.2 Lantai 2 (Plesteran) 18 Rp 484,837,197 2.718
5.1.3 Lantai 3 (Plesteran) 17 Rp 484,837,197 2.718
5.1.4 Lantai 1 (Acian) 14 Rp 237,937,552 1.334
5.1.5 Lantai 2 (Acian) 15 Rp 228,420,050 1.280
5.1.6 Lantai 3 (Acian) 14 Rp 228,420,050 1.280

5.3 PEKERJAAN KUSEN, PINTU & KUNCI


5.3.1 Lantai 1 12 Rp 68,648,550 0.385
5.3.2 Lantai 2 15 Rp 63,515,062 0.356
5.3.4 Lantai 3 13 Rp 31,943,023 0.179

5.4 PEKERJAAN PASANGAN KERAMIK


5.4.1 Lantai 1 15 Rp 200,269,571 1.123
5.4.2 Lantai 2 15 Rp 200,269,571 1.123
5.4.3 Lantai 3 12 Rp 200,309,018 1.123

5.5 PEKERJAAN PLAFOND


5.5.1 Lantai 1 10 Rp 40,791,029 0.229
5.5.2 Lantai 2 7 Rp 40,791,029 0.229
5.5.3 Lantai 3 10 Rp 40,986,817 0.230

5.6 PEKERJAAN PENGECATAN


5.6.1 Lantai 1 15 Rp 225,446,940 1.264
5.6.2 Lantai 2 11 Rp 217,423,690 1.219
5.6.3 Lantai 3 17 Rp 217,517,367 1.219

VI PEKERJAAN MEP
6.1 PEKERJAAN SANITASI
6.1.1 Lantai 1 20 Rp 495,057,293 2.775 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14
6.1.2 Lantai 2 36 Rp 918,365,509 5.148
6.1.3 Lantai 3 20 Rp 754,130,758 4.227
6.2 PEKERJAAN LISTRIK
6.2.1 Lantai 1 14 Rp 399,111,399 2.237
6.2.2 Lantai 2 20 Rp 588,544,469 3.299
6.2.3 Lantai 3 17 Rp 538,148,417 3.017

VII PEKERJAAN LAIN-LAIN


7.1 PEKERJAAN AKHIR
Pekerjaan Pembersihan Akhir 8 Rp 22,942,500 0.129
VIII PEKERJAAN KESELAMATAN DAN KESEHATAN KERJA
8.1 PEKERJAAN K3
Pekerjaan Keselamatan dan Kesehatan Kerja (K3) 224 Rp 54,325,000 0.305 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
TOTAL Rp 17,838,945,255 100
RENCANA KEMAJUAN PEKERJAAN 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.2 0.2 0.2 0.1 0.1 0.6 0.6 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.7 0.7 0.7 0.3 0.3 0.3 0.3 0.3 0.2 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.2 0.3 0.3 0.2 0.2 0.3 0.3 0.4 0.4
KUMULATIF RENCANA KEMAJUAN PEKERJAAN 0 0.1 0.1 0.2 0.2 0.3 0.4 0.4 0.6 0.7 0.9 1.0 1.2 1.7 2.3 2.8 3.3 3.8 4.2 4.7 5.2 5.6 6.1 6.6 7.1 7.6 8.1 8.6 9.1 9.6 10.1 10.6 11.2 11.8 12.4 13.0 13.5 14.1 14.7 15.3 15.8 16.4 17.0 17.7 18.5 19.2 19.5 19.7 20.0 20.3 20.6 20.9 21.2 21.5 21.8 22.0 22.3 22.6 22.9 23.2 23.4 23.7 24.0 24.2 24.4 24.7 25.1 25.4 25.8
BULAN KE 3 BULAN KE 4 BULAN KE 5 BULAN KE 6
2 3 4 1 2 3 4 1 2 3 4 1 2
69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125 126 127 128 129 130 131 132 133 134 135 136 137 138 139 140 141 142 143 144 145 146 147 148 149 150 151 152 153 154 155

0.08 0.08

0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05


0.11 0.11 0.11 0.11 0.11 0.11 0.11 0.11 0.11
0.03 0.03 0.03 0.03 0.03
0.04 0.04 0.04 0.04 0.04 0.04
0.02 0.02 0.02 0.02 0.02 0.02
0.01 0.01 0.01 0.01 0.01
0.03 0.03
0.02 0.02 0.02

0.06 0.06 0.06 0.06 0.06 0.06 0.06 0.06 0.06 0.06 0.06 0.06 0.06 0.06 0.06 0.06 0.06 0.06 0.06
0.06 0.06 0.06 0.06 0.06 0.06 0.06 0.06 0.06 0.06 0.06 0.06 0.06 0.06 0.06 0.06 0.06 0.06 0.06 0.06 0.06
0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04
0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03
0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07
0.08 0.08 0.08 0.08 0.08 0.08 0.08 0.08 0.08 0.08 0.08 0.08 0.08
0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03
0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04
0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02
0.01 0.01 0.01 0.01 0.01
0.02 0.02 0.02
0.03 0.03

0.06 0.06 0.06 0.06 0.06 0.06 0.06 0.06 0.06 0.06 0.06 0.06 0.06 0.06 0.06 0.06 0.06 0.06 0.06
0.06 0.06 0.06 0.06 0.06 0.06 0.06 0.06 0.06 0.06 0.06 0.06 0.06 0.06 0.06 0.06 0.06 0.06 0.06 0.06 0.06
0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04
0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03
0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07
0.08 0.08 0.08 0.08 0.08 0.08 0.08 0.08 0.08 0.08 0.08 0.08 0.08
0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03
0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04
0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02

0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07
0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07
0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05
0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03
0.08 0.08 0.08 0.08 0.08 0.08 0.08 0.08 0.08 0.08 0.08 0.08 0.08 0.08 0.08 0.08 0.08
0.08 0.08 0.08 0.08 0.08 0.08 0.08 0.08 0.08 0.08 0.08 0.08

0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16
0.13 0.13 0.13 0.13 0.13 0.13 0.13 0.13 0.13 0.13 0.13 0.13 0.13 0.13 0.13 0.13 0.13 0.13 0.13 0.13 0.13 0.13 0.13 0.13

0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17
0.15 0.15 0.15 0.15 0.15 0.15 0.15 0.15 0.15 0.15 0.15 0.15 0.15 0.15 0.15

0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10

0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03
0.02 0.02 0.02

0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07

0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02
0.03 0.03 0.03 0.03 0.03 0.03 0.03

0.08 0.08 0.08 0.08 0.08 0.08 0.08 0.08 0.08 0.08 0.08 0.08 0.08 0.08 0.08

0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14
0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14

0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16
0.16 0.16 0.16 0.16 0.16 0.16 0.16

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.4 0.4 0.5 0.5 0.5 0.5 0.5 0.5 0.4 0.5 0.5 0.4 0.2 0.2 0.5 0.5 0.5 0.5 0.6 0.6 0.8 0.8 0.8 0.7 0.6 0.9 0.9 0.7 0.7 0.8 0.8 0.8 0.9 0.9 0.8 0.8 0.6 0.7 0.7 0.5 0.5 0.6 0.6 0.6 0.6 0.6 0.5 0.5 0.5 0.5 0.3 0.4 0.5 0.5 0.5 0.5 0.6 0.5 0.5 0.5 0.6 0.6 0.6 0.7 0.7 0.7 0.7 0.7 0.5 0.5 0.4 0.4 0.46 0.46 0.46 0.46 0.46 0.46 0.46 0.43 0.59 0.59 0.59 0.59 0.62 0.62 0.62
26.2 26.5 27.0 27.6 28.1 28.6 29.1 29.6 30.0 30.5 31.0 31.3 31.6 31.8 32.3 32.8 33.3 33.8 34.4 34.9 35.7 36.5 37.2 37.9 38.5 39.4 40.3 41.0 41.7 42.6 43.4 44.2 45.1 45.9 46.7 47.6 48.2 48.9 49.6 50.1 50.6 51.2 51.7 52.3 52.9 53.5 54.0 54.5 55.0 55.5 55.8 56.2 56.8 57.3 57.9 58.4 59.0 59.5 60 61 61 62 62 63 63.8 64.4 65.1 65.7 66.3 66.8 67.2 68 68.0 68.5 69.0 69.4 69.9 70.3 70.8 71.2 71.8 72.4 73.0 73.6 74.2 74.8 75.4
BULAN KE 6 BULAN KE 7 BULAN KE 8
3 4 1 2 3 4 1 2 3 4
156 157 158 159 160 161 162 163 164 165 166 167 168 169 170 171 172 173 174 175 176 177 178 179 180 181 182 183 184 185 186 187 188 189 190 191 192 193 194 195 196 197 198 199 200 201 202 203 204 205 206 207 208 209 210 211 212 213 214 215 216 217 218 219 220 221 222 223 224
100%

50%

0.13 0.13
0.19 0.19 0.19 0.19 0.19 0.19 0.19 0.19 0.19 0.19 0.19 0.19 0.19 0.19 0.19 0.19 0.19 0.19

0.15 0.15 0.15


0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16

0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.09
0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.09

0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02
0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01

0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07
0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.09

0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02

0.11 0.11 0.11 0.11 0.11 0.11 0.11 0.11 0.11 0.11 0.11
0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07

0.14
0.21 0.21 0.21 0.21 0.21 0.21 0.21 0.21 0.21 0.21 0.21 0.21 0.21 0.21 0.21 0.21 0.21 0.21 0.21 0.21

0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16
0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18

0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0%

0.70 0.56 0.43 0.28 0.28 0.35 0.35 0.35 0.35 0.46 0.46 0.46 0.44 0.48 0.48 0.40 0.40 0.40 0.40 0.59 0.40 0.40 0.40 0.40 0.56 0.56 0.56 0.56 0.74 0.74 0.74 0.75 0.75 0.54 0.54 0.63 0.63 0.44 0.44 0.44 0.47 0.31 0.31 0.40 0.39 0.21 0.21 0.21 0.21 0.12 0.17 0.17 0.17 0.17 0.17 0.07 0.07 0.07 0.07 0.07 0.07 0.09 0.09 0.09 0.09 0.09 0.09 0.02 0.02
76.1 76.7 77.1 77.4 77.7 78.0 78.4 78.7 79.1 79.5 80.0 80.5 80.9 81.4 81.9 82.3 82.7 83.1 83.5 84.1 84.5 84.9 85.3 85.7 86.2 86.8 87.4 87.9 88.7 89.4 90.1 90.9 91.6 92.2 92.7 93.4 94.0 94.4 94.9 95.3 95.8 96.1 96.4 96.8 97.2 97.4 97.6 97.8 98.0 98.2 98.3 98.5 98.7 98.8 99.0 99.1 99.1 99.2 99.3 99.4 99.4 99.5 99.6 99.7 99.8 99.9 99.97 99.98 100.00
DURASI
URAIAN PEKERJAAN BIAYA (Rp) BOBOT (%)
(HARI)
PEKERJAAN PERSIAPAN
1.1 Pekerjaan Pembersihan #REF! Rp 21,822,688 #NAME?
1.2 Pemasangan Bouwplank #REF! Rp 10,559,846 #NAME?
1.3 Pemagaran Proyek #REF! Rp 62,022,473 #NAME?
1.4 Pembuatan Kantor Sementara #REF! Rp 70,363,038 #NAME?
1.5 Pembuatan Gudang Alat dan Bahan #REF! Rp 53,055,538 #NAME?
1.6 Mobilisasi Alat Pancang #REF! Rp 40,000,000 #NAME?

PEKERJAAN TANAH DAN PASIR


2.1 Pekerjaan Galian Tanah untuk Pile Cap #REF! Rp 11,043,292 #NAME?
2.2 Pekerjaan Urugan pasir bawah pile cap #REF! Rp 6,690,262 #NAME?
2.3 Pekerjaan Urugan tanah kembali pile cap #REF! Rp 2,654,286 #NAME?
2.4 Pekerjaan Galian Sloof #REF! Rp 7,005,385 #NAME?
2.5 Pekerjaan Urugan Pasir bawah sloof #REF! Rp 18,862,275 #NAME?
2.6 Pekerjaan Urugan tanah kembali sloof #REF! #NAME? #NAME?
2.7 Timbunan Tanah Peninggian Lantai #REF! Rp 89,382,600 #NAME?

PEKERJAAN STRUKTUR BAWAH


3.1 Pemasangan Tiang Pancang Square Pile 25 x 25 cm #REF! Rp 2,715,232,800 #NAME?
3.2 Pekerjaan Lantai Kerja Pile Cap #REF! Rp 107,692,409 #NAME?
3.3 Pekerjaan Pembesian Pile Cap #REF! Rp 434,904,018 #NAME?
3.4 Pekerjaan Bekisting Pile Cap #REF! Rp 33,311,061 #NAME?
3.5 Pekerjaan Beton Pile Cap #REF! Rp 107,692,409 #NAME?
3.6 Pekerjaan Pembongkaran Bekisting Pile Cap #REF! #NAME? #NAME?
3.7 Pekerjaan Lantai Kerja Sloof #REF! Rp 102,051,378 #NAME?
3.8 Pekerjaan Pembesian Sloof #REF! Rp 158,476,466 #NAME?
3.9 Pekerjaan Bekisting Sloof #REF! Rp 72,877,331 #NAME?
3.10 Pekerjaan Beton Sloof #REF! Rp 83,247,942 #NAME?
3.11 Pekerjaan Pembongkaran Bekisting Sloof #REF! #NAME? #NAME?

PEKERJAAN STRUKTUR ATAS


4.1 LANTAI 1
4.1.1 Pekerjaan Pembesian Pelat Lantai 1 #REF! #NAME? #NAME?
4.1.2 Pekerjaan Beton Pelat Lantai 1 #REF! Rp 181,054,301 #NAME?
4.1.3 Pekerjaan Pembesian Kolom #REF! Rp 94,356,684 #NAME?
4.1.4 Pekerjaan Bekisting Kolom #REF! Rp 96,125,098 #NAME?
4.1.5 Pekerjaan Beton Kolom #REF! Rp 40,949,706 #NAME?
4.1.6 Pekerjaan Pembongkaran Bekisting Kolom #REF! #NAME? #NAME?
4.1.7 Pekerjaan Pembesian Tangga #REF! Rp 10,405,550 #NAME?
4.1.8 Pekerjaan Bekisting Tangga #REF! Rp 10,036,911 #NAME?
4.1.9 Pekerjaan Beton Tangga #REF! Rp 11,252,812 #NAME?
4.1.10 Pekerjaan Pembongkaran Bekisting Tangga #REF! #NAME? #NAME?

4.2 LANTAI 2
4.2.1 Pekerjaan Pembesian Balok #REF! Rp 209,990,591 #NAME?
4.2.2 Pekerjaan Bekisting Balok #REF! Rp 234,122,410 #NAME?
4.2.3 Pekerjaan Beton Balok #REF! Rp 102,801,616 #NAME?
4.2.4 Pekerjaan Pembongkaran Bekisting Balok #REF! #NAME? #NAME?
4.2.5 Pekerjaan Pembesian Pelat Lantai #REF! Rp 85,515,111 #NAME?
4.2.6 Pekerjaan Bekisting Pelat #REF! Rp 265,224,591 #NAME?
4.2.7 Pekerjaan Beton Pelat Lantai #REF! Rp 181,054,301 #NAME?
4.2.8 Pekerjaan Pembongkaran Bekisting Pelat Lantai #REF! #NAME? #NAME?
4.2.9 Pekerjaan Pembesian Kolom #REF! Rp 92,328,562 #NAME?
4.2.10 Pekerjaan Beton Pelat Lantai 1 #REF! Rp 94,876,720 #NAME?
4.2.11 Pekerjaan Beton Kolom #REF! Rp 40,417,892 #NAME?
4.2.12 Pekerjaan Pembongkaran Bekisting Kolom #REF! #NAME? #NAME?
4.2.13 Pekerjaan Pembesian Tangga #REF! Rp 10,405,550 #NAME?
4.2.14 Pekerjaan Bekisting Tangga #REF! Rp 10,036,911 #NAME?
4.2.15 Pekerjaan Beton Tangga #REF! Rp 11,252,812 #NAME?
4.2.16 Pekerjaan Pembongkaran Bekisting Tangga #REF! #NAME? #NAME?

4.3 LANTAI 3
4.3.1 Pekerjaan Pembesian Balok #REF! Rp 209,990,591 #NAME?
4.3.2 Pekerjaan Bekisting Balok #REF! Rp 234,122,410 #NAME?
4.3.3 Pekerjaan Beton Balok #REF! Rp 102,801,616 #NAME?
4.3.4 Pekerjaan Pembongkaran Bekisting Balok #REF! #NAME? #NAME?
4.3.5 Pekerjaan Pembesian Pelat Lantai #REF! Rp 85,515,111 #NAME?
4.3.6 Pekerjaan Bekisting Pelat #REF! Rp 265,224,591 #NAME?
4.3.7 Pekerjaan Beton Pelat Lantai #REF! Rp 181,054,301 #NAME?
4.3.8 Pekerjaan Pembongkaran Bekisting Pelat Lantai #REF! #NAME? #NAME?
4.3.9 Pekerjaan Pembesian Kolom #REF! Rp 92,328,562 #NAME?
4.3.10 Pekerjaan Pembesian Kolom #REF! Rp 94,876,720 #NAME?
4.3.11 Pekerjaan Beton Kolom #REF! Rp 40,417,892 #NAME?
4.3.12 Pekerjaan Pembongkaran Bekisting Kolom #REF! #NAME? #NAME?

4.4 LANTAI ATAP


4.4.1 Pekerjaan Pembesian Balok #REF! Rp 224,308,768 #NAME?
4.4.2 Pekerjaan Bekisting Balok #REF! Rp 217,738,613 #NAME?
4.4.3 Pekerjaan Beron Balok #REF! Rp 99,795,915 #NAME?
4.4.4 Pembongkarang Bekisting Balok #REF! #NAME? #NAME?
4.4.5 Pekerjaan Pembesian Pelat Lantai #REF! Rp 85,515,111 #NAME?
4.4.6 Pekerjaan Bekisting Pelat Lantai #REF! Rp 246,664,276 #NAME?
4.4.7 Pekerjaan Beton Pelat Lantai #REF! Rp 181,054,301 #NAME?
4.4.8 Pekerjaan Pembongkaran Bekisting Pelat Lantai #REF! #NAME? #NAME?

PEKERJAAN ARSITEKTUR
5.1 PEKERJAAN DINDING
5.1.1 LANTAI 1 #REF! Rp 636,886,280 #NAME?
5.1.2 LANTAI 2 #REF! Rp 611,410,829 #NAME?
5.1.3 LANTAI 3 #REF! Rp 611,410,829 #NAME?

5.2 PEKERJAAN PLESTERAN DINDING


5.1.1 LANTAI 1 #REF! Rp 505,038,747 #NAME?
5.1.2 LANTAI 2 #REF! Rp 505,038,747 #NAME?
5.1.3 LANTAI 3 #REF! Rp 484,837,197 #NAME?

5.3 PEKERJAAN KUSEN, PINTU, KUNCI & JENDELA


5.3.1 LANTAI 1 #REF! Rp 49,899,392 #NAME?
5.3.2 LANTAI 2 #REF! Rp 45,752,703 #NAME?
5.3.4 LANTAI 3 #REF! Rp 24,048,641 #NAME?

5.5 PEKERJAAN PASANGAN KERAMIK


5.5.1 LANTAI 1 #REF! Rp 200,269,571 #NAME?
5.5.2 LANTAI 2 #REF! Rp 200,269,571 #NAME?
5.5.3 LANTAI 3 #REF! Rp 200,309,018 #NAME?

5.6 PEKERJAAN PLAFOND


5.6.1 LANTAI 1 #REF! Rp 40,791,029 #NAME?
5.6.2 LANTAI 2 #REF! Rp 40,791,029 #NAME?
5.6.3 LANTAI 3 #REF! Rp 40,986,817 #NAME?

5.7 PEKERJAAN PENGECATAN


5.7.1 LANTAI 1 #REF! Rp 225,446,940 #NAME?
5.7.2 LANTAI 2 #REF! Rp 217,423,690 #NAME?
5.7.3 LANTAI 3 #REF! Rp 217,517,367 #NAME?

PEKERJAAN MEP
6.1 PEKERJAAN SANITASI
6.1.1 LANTAI 1 #REF! Rp 495,057,293 #NAME?
6.1.2 LANTAI 2 #REF! Rp 918,365,509 #NAME?
6.1.3 LANTAI 3 #REF! Rp 754,130,758 #NAME?
6.2 PEKERJAAN LISTRIK
6.2.1 LANTAI 1 #REF! Rp 399,111,399 #NAME?
6.2.2 LANTAI 2 #REF! Rp 588,544,469 #NAME?
6.2.3 LANTAI 3 #REF! Rp 538,148,417 #NAME?

PEKERJAAN LAIN-LAIN
7.1 PEKERJAAN AKHIR
Pekerjaan Pembersihan Akhir #REF! Rp 22,942,500 #NAME?
TOTAL #NAME? #NAME?
DURASI
NO URAIAN PEKERJAAN HARGA
(MINGGU)
I PEKERJAAN PERSIAPAN 1 Rp
II PEKERJAAN TANAH DAN PASIR 4 Rp
III PEKERJAAN STRUKTUR BAWAH 6 Rp
IV PEKERJAAN STRUKTUR ATAS 10 Rp
V PEKERJAAN ARSITEKTUR 7 Rp
VI PEKERJAAN MEP 10 Rp
VII PEKERJAAN LAIN-LAIN 2 Rp
TOTAL Rp
RENCANA KEMAJUAN PEKERJAAN
KUMULATIF RENCANA KEMAJUAN PEKERJAAN
HARGA
257,823,582
135,638,100
3,868,615,813
4,229,132,019
4,882,332,745
3,693,357,846
22,942,500
17,089,842,605
REKAPITULASI BIAYA
RAB PEMBANGUNAN GEDUNG KULIAH FAKULTAS EKONOMI UIN RADEN FATAH
KAMPUS B JAKABARING PALEMBANG SUMATERA SELATAN

DURASI DURASI
NO URAIAN PEKERJAAN HARG
(HARI) (MINGGU)
I PEKERJAAN PERSIAPAN #REF! 4 Rp
II PEKERJAAN TANAH DAN PASIR #REF! 3 Rp
III PEKERJAAN PONDASI #REF! 3 Rp
IV PEKERJAAN BEKISTING #REF! 18 Rp
V PEKERJAAN BAJA DAN TULANGAN #REF! 26 Rp
VI PEKERJAAN BETON #REF! 12 Rp
VII PEKERJAAN PEMBONGKARAN BEKISTING #REF! 9 Rp
VIII PEKERJAAN DINDING #REF! 8 Rp
IX PEKERJAAN PLESTERAN DINDING #REF! 12 Rp
X PEKERJAAN KUSEN, PINTU & JENDELA #REF! 9 Rp
XI PEKERJAAN KUNCI #REF! 2 Rp
XII PEKERJAAN PASANGAN KERAMIK #REF! 9 Rp
XIII PEKERJAAN SANITASI #REF! 5 Rp
XIV PEKERJAAN LISTRIK #REF! 6 Rp
XV PEKERJAAN PLAFOND #REF! 3 Rp
XVI PEKERJAAN PENGECATAN #REF! 6 Rp
XVII PEKERJAAN AKHIR #REF! 3 Rp
TOTAL Rp
UIN RADEN FATAH
ELATAN

HARGA
257,823,582
135,638,100
3,868,615,813
4,229,132,019
3,868,615,813
11,252,812
4,229,132,019
1,859,707,937
1,474,713,140
119,700,737
44,405,899
600,848,159
2,167,553,560
1,525,804,285
122,568,876
660,387,998
22,942,500
25,198,843,250