Professional Documents
Culture Documents
DAFTAR UPAH
HARGA
NO. JENIS UPAH / BAHAN SATUAN KETERANGAN
(Rp)
A UPAH / OH
1 Pekerja 1 Oh 100,000.00
2 Tukang 1 Oh 145,000.00
3 Kepala tukang 1 Oh 160,000.00
4 Mandor 1 Oh 160,000.00
B UPAH / JAM
1 Pekerja 1 Jam 14,285.71
2 Tukang 1 Jam 20,000.00
3 Kepala tukang 1 Jam 22,142.86
4 Mandor 1 Jam 22,142.86
HARGA
NO. JENIS UPAH / BAHAN SATUAN KETERANGAN
(Rp)
A BAHAN GALIAN/ALAM
1 Batu Bata 1 Bh 550.00
2 Kerikil Sungai 1 Kg 97.22
3 Pasir Beton 1 Kg 53.57
4 Pasir cor 1 M3 178,000.00
5 Pasir Urug / Pasir Pasang 1 M3 98,500.00
6 Semen (50 Kg) 1 Kg 1,280.00
7 Semen Warna 1 Kg 12,000.00
B BESI
1 Besi Tulang Beton Polos 1 Kg 11,800.00
2 Pagar BRC 240 Uk. 8 mm (lengkap/terpasang) 1 M' 397,000.00
3 Tiang Besi Pagar BRC 120 HD Tinggi Tiang 150 1 M' 155,000.00
4 Kawat Beton 1 Kg 21,500.00
5 Paku Biasa 1 Kg 23,000.00
C CAT / MINYAK
1 Cat Air (biasa) 1 Kg 13,000.00
2 Cat Menie Kayu 1 Kg 33,500.00
3 Cat Minyak 1 Kg 60,000.00
4 Minyak bekisting 1 Ltr 23,000.00
5 Plamir 1 Kg 20,000.00
6 Soda Api 1 Kg 10,000.00
7 Kuas 2" 1 Bh 12,750.00
8 Lem Kayu 1 Kg 24,000.00
9 Ampelas 1 Lbr 5,000.00
10 Tinner 1 Kg 24,000.00