PROYEK : RENOVASI RUMAH TINGGAL

LOKASI : BEDALI
NAMA PEMILIK PROYEK : BPK SLAMET
TAHUN : 2019
LAPORAN PENGELUARAN MATERIAL BULAN NOVEMBER 2019

NAMA TOKO BAHAN


No BANGUNAN Hari Tanggal Nama Barang Qty Sat Harga Jumlah JUMLAH TOTAL

MINGGU KE 1
1 UD. MAKMUR JAYA Senin 18-Nov-19 Kayu 4/6 MO 3 Btng 63,333.33 190,000.00
Engsel T 3 Bh 15,000.00 45,000.00
JUMLAH 235,000.00
UD. MAKMUR JAYA Kayu 4/6 Duren 3 Btng 53,333.33 160,000.00
Engsel T 3 Bh 15,000.00 45,000.00
JUMLAH 205,000.00
UD. MAKMUR JAYA Paku Sica 1 Pack 25,000.00 25,000.00
JUMLAH 25,000.00
UD. MAKMUR JAYA Paku Payung 11 Kg 4,545.45 50,000.00
Kawat 3 Rol 10,000.00 30,000.00
Catut 1 Bh 15,000.00 15,000.00
JUMLAH 95,000.00
2 UD. MAKMUR JAYA Selasa 19-Nov-19 Doran 1 Bh 12,000.00 12,000.00
Sekrop Burik 1 Bh 65,000.00 65,000.00
Selang Timbang 10 m 3,000.00 30,000.00
Paku Reng 1 kg 21,000.00 21,000.00
Paku Reng 1 Kg 20,000.00 20,000.00
JUMLAH 148,000.00
3 UD. MAKMUR JAYA Rabu 20-Nov-19 Kran 1 Bh 15,000.00 15,000.00
Sock 1/2" 6 Bh 3,000.00 18,000.00
Tba 1 Bh 4,000.00 4,000.00
Lem cair 1 Bh 11,000.00 11,000.00
SOL 1 Bh 6,000.00 6,000.00
JUMLAH 54,000.00
PROYEK : RENOVASI RUMAH TINGGAL
LOKASI : BEDALI
NAMA PEMILIK PROYEK : BPK SLAMET
TAHUN : 2019
LAPORAN PENGELUARAN MATERIAL BULAN NOVEMBER 2019

NAMA TOKO BAHAN


No BANGUNAN Hari Tanggal Nama Barang Qty Sat Harga Jumlah JUMLAH TOTAL

MINGGU KE 1
4 UD. MAKMUR JAYA Kamis 21-Nov-19 Pasir Lumajang 2 Pick up 290,000.00 580,000.00
Semen Gresik 20 40 kg Zak 50,000.00 1,000,000.00
Koral 1 Pick up 260,000.00 260,000.00
JUMLAH 1,840,000.00
Bendrat 5 Kg 22,000.00 110,000.00
Pleser 6-8 baja 1 Bh 20,000.00 20,000.00
Pleser 8-10 baja 1 Bh 25,000.00 25,000.00
Pensil 1 Bh 2,000.00 2,000.00
JUMLAH 157,000.00
UD. AMIRUDDIN JAYA Drum 120 Lt 1 Bh 175,000.00 175,000.00
JUMLAH 175,000.00
5 UD. MAKMUR JAYA Jumat 22-Nov-19 Pasir Lumajang 2 Pick up 290,000.00 580,000.00
Koral 1 Pick up 250,000.00 250,000.00
Semen Gresik 1 zak 35,000.00 35,000.00
JUMLAH 865,000.00
Resibon 1 Bh 5,000.00 5,000.00
Resibon Tel 1 Bh 14,000.00 14,000.00
JUMLAH 19,000.00
TOTAL MATERIAL MINGGU KE 1 ( 15 NOV - 23 NOV 2019 ) 3,818,000.00
PROYEK : RENOVASI RUMAH TINGGAL
LOKASI : BEDALI
NAMA PEMILIK PROYEK : BPK SLAMET
TAHUN : 2019
LAPORAN PENGELUARAN MATERIAL BULAN NOVEMBER 2019

NAMA TOKO BAHAN


No BANGUNAN Hari Tanggal Nama Barang Qty Sat Harga Jumlah JUMLAH TOTAL

MINGGU KE 2
6 UD. MAKMUR JAYA Senin 25-Nov-19 Pasir Lumajang 1 Pick up 290,000.00 290,000.00
Koral 1 Pick up 250,000.00 250,000.00
Semen Gresik 10 zak 50,000.00 500,000.00
Papan Randu 20 Lbr 12,000.00 240,000.00
Paku Reng 1 Kg 21,000.00 21,000.00
JUMLAH 1,301,000.00
Paku Usuk 1 Kg 20,000.00 20,000.00
JUMLAH 20,000.00

7 UD. MAKMUR JAYA Selasa 26-Nov-19 Bata merah 1000 Bj 520.00 520,000.00
Pasir Pasang 1 Pick up 140,000.00 140,000.00
Semen Gresik 10 Zak 50,000.00 500,000.00
JUMLAH 1,160,000.00
26-Nov-19 Benang 1 rol 5,000.00 5,000.00
Paku Usuk 1 Kg 20,000.00 20,000.00
Paku Reng 1 Kg 21,000.00 21,000.00
JUMLAH 46,000.00
8 UD. MAKMUR JAYA Rabu 28-Nov-19 Bata merah 2000 Bj 520.00 1,040,000.00
Pasir Pasang 1 Pick up 140,000.00 140,000.00
Flyas 20 Zak 10,000.00 200,000.00
K. Ayakan 1 m 19,000.00 19,000.00
JUMLAH 1,399,000.00
9 UD. MAKMUR JAYA Sabtu 30-Nov-19 Pasir Pasang 1 Pick up 140,000.00 140,000.00
Pasir Pasang 1 Pick up 140,000.00 140,000.00
Semen Gresik 5 Zak 50,000.00 250,000.00
JUMLAH 530,000.00
TOTAL MATERIAL MINGGU KE 2 ( 25 NOV - 30 NOV 2019 ) 4,456,000.00
BULAN NOVEMBER MATERIAL JUMLAH TOTAL 1 + 2 8,274,000.00
PROYEK : RENOVASI RUMAH TINGGAL
LOKASI : BEDALI
NAMA PEMILIK PROYEK : BPK SLAMET
TAHUN : 2019
LAPORAN PENGELUARAN MATERIAL BULAN DESEMBER 2019

NAMA TOKO BAHAN


No BANGUNAN Hari Tanggal Nama Barang Qty Sat Harga Jumlah JUMLAH TOTAL

MINGGU KE 3
1 UD. MAKMUR JAYA Selasa 03-Dec-19 Pasir Cor Lumajang 1 Pick up 290,000.00 290,000.00
Koral 1 Pick Up 260,000.00 260,000.00
Semen Gresik 10 Bh 50,000.00 500,000.00
Bata 2000 Bh 520.00 1,040,000.00
JUMLAH 2,090,000.00

2 UD. MAKMUR JAYA Rabu 04-Dec-19 Pasir Pasang 1 Pick up 140,000.00 140,000.00
Besi 10 Sni 10 ljr 60,000.00 600,000.00
Bendrat 5 Kg 22,000.00 110,000.00
Paku 2" 2 kg 21,000.00 42,000.00
Papan 20 Lbr 12,000.00 240,000.00
Begel 9x9 100 Bj 1,400.00 140,000.00
Begel 9x12 100 Bj 2,200.00 220,000.00
JUMLAH 1,492,000.00
3 UD. MAKMUR JAYA Kamis 05-Dec-19 Paku Usuk 2 Kg 20,000.00 40,000.00
JUMLAH 40,000.00
4 UD. MAKMUR JAYA Jumat 06-Dec-19 Begel 9x25 8 Kg 20,000.00 160,000.00
JUMLAH 160,000.00
TOTAL MATERIAL MINGGU KE 3 ( 2 DES - 7 DES 2019 ) 3,782,000.00
PROYEK : RENOVASI RUMAH TINGGAL
LOKASI : BEDALI
NAMA PEMILIK PROYEK : BPK SLAMET
TAHUN : 2019
LAPORAN PENGELUARAN MATERIAL BULAN DESEMBER 2019

NAMA TOKO BAHAN


No BANGUNAN Hari Tanggal Nama Barang Qty Sat Harga Jumlah JUMLAH TOTAL

MINGGU KE 4
5 UD. MAKMUR JAYA Senin 09-Dec-19 Kranongsa 1 Bh 85,000.00 85,000.00
Cetok 1 Bh 25,000.00 25,000.00
Timba 6 Bh 7,500.00 45,000.00
Sekrop 1 Bh 50,000.00 50,000.00
Gembok 1 Bh 30,000.00 30,000.00
JUMLAH 235,000.00
Senin 09-Dec-19 Pasir Lumajang 1 Pick up 580,000.00 580,000.00
Semen Gresik 20 Zak 50,000.00 1,000,000.00
JUMLAH 1,580,000.00
6 UD. MAKMUR JAYA Selasa 10-Dec-19 Ban Artco besar Komplit 1 Bh 200,000.00 200,000.00
JUMLAH 200,000.00
Selasa 10-Dec-19 Papan Randu 20 Lbr 12,000.00 240,000.00
Pasir Pasang 1 Pick up 140,000.00 140,000.00
JUMLAH 380,000.00
7 UD. MAKMUR JAYA Rabu 11-Dec-19 Kikir 1 Bh 15,000.00 15,000.00
Matabor Beton 10 mm 1 Bh 22,500.00 22,500.00
Paku Reng 2 Kg 21,000.00 42,000.00
Paku Usuk 2 Kg 20,000.00 40,000.00
JUMLAH 119,500.00
Rabu 11-Dec-19 Koral 1 Pick up 260,000.00 260,000.00
JUMLAH 260,000.00
7 UD. MAKMUR JAYA Sabtu 14-Dec-19 Kayu 4x6 Basia ( 2 Ikat ) 2 Ikt 200,000.00 400,000.00
Triplek 9mm 2 Lbr 115,000.00 230,000.00
PVC 2 1/2" D 2 Bh 80,000.00 160,000.00
JUMLAH 790,000.00
Sabtu 14-Dec-19 Paku Usuk 3 Kg 30,000.00 90,000.00
Paku reng 2 Kg 20,000.00 40,000.00
JUMLAH 130,000.00
PROYEK : RENOVASI RUMAH TINGGAL
LOKASI : BEDALI
NAMA PEMILIK PROYEK : BPK SLAMET
TAHUN : 2019
LAPORAN PENGELUARAN MATERIAL BULAN DESEMBER 2019

NAMA TOKO BAHAN


No BANGUNAN Hari Tanggal Nama Barang Qty Sat Harga Jumlah JUMLAH TOTAL

TOTAL MATERIAL MINGGU KE 4 ( 9 DES - 14 DES 2019 ) 3,694,500.00


PROYEK : RENOVASI RUMAH TINGGAL
LOKASI : BEDALI
NAMA PEMILIK PROYEK : BPK SLAMET
TAHUN : 2019
LAPORAN PENGELUARAN MATERIAL BULAN DESEMBER 2019

NAMA TOKO BAHAN


No BANGUNAN Hari Tanggal Nama Barang Qty Sat Harga Jumlah JUMLAH TOTAL

MINGGU KE 5
5 UD. MAKMUR JAYA Selasa 17-Dec-19 Pasing Pasang 1 Pick up 140,000.00 140,000.00
Bata Merah 2000 Bh 520.00 1,040,000.00
4/6 Basia 3 Pak 200,000.00 600,000.00
Triplek 9mm 9 Lbr 115,000.00 1,035,000.00
Bambu 4m 20 Bh 10,000.00 200,000.00
JUMLAH 3,015,000.00

BULAN DESEMBER MATERIAL JUMLAH TOTAL 17,968,000.00