HARGA
No. URAIAN SATUAN
(Rp.)
BAHAN
1 Broti papan kayu Simalambuo M3 3,400,000.00
2 Kayu sembarang M3 2,100,000.00
3 Tripleks Uk.4mm Lbr 50,000.00
4 Besi beton Kg 6,900.00
5 Besi WF Kg 7,800.00
6 Besi siku Kg 7,500.00
7 Kawat beton Kg 13,000.00
8 Paku biasa Uk.1" s/d 4" Kg 13,400.00
9 Baut @ 3/4 - 8 " Bangunan Bh 5,400.00
10 Keramik 20x 20cm Ktk 45,000.00
11 Keramik 20x 25cm Ktk 47,000.00
12 Kran air Bh 23,000.00
13 Kaca nako bening tbl 5mm 4 daun + Kerangka Set 120,000.00
14 Engsel Besar 4 " Psng 10,000.00
15 Grendel Besar Bh 14,000.00
16 Grendel kecil Bh 9,000.00
17 Paku Kg 11,000.00
18 Cat Tembok Vinileks Kg 8,700.00
19 Cat Plapond Vinileks Kg 8,700.00
20 Cat menie Kg 17,000.00
21 Cat Minyak Kg 25,000.00
22 Thiner Ltr 15,000.00
23 Bataco 12 x 20 x 30 cm + cetak (Padat) Bh 3,500.00
24 Rangka Atap Material Baja ringan 3 Kelas Rabung 1 M2 140,000.00
25 Rangka Atap Material Baja ringan 3 Kelas Rabung 3 M2 150,000.00
26 Rangka Atap Material Baja ringan 3 Kelas Rabung 5 M2 165,000.00
27 Bola lampu pijar 40 Watt + Fiting Unit 15,000.00
28 Bola TL 1 X 20 Watt Unit 40,000.00
29 Saklar Tunggal Bh 12,000.00
30 Saklar Doubel Bh 15,000.00
31 Stop Kontak Bh 12,000.00
32 Skring Lampu 2 Group Set 45,000.00
33 Pasir Pasang M3 43,000.00
34 Pasir Urug M3 30,000.00
35 Kerikil Cor M3 67,000.00
36 Batu Pecah Uk 15- 20 cm M3 58,000.00
37 Tanah Timbun M3 22,000.00
38 Semen PC 50 Kg tipe 1 Zak 40,000.00
39 Batu Bata Bh 800.00
40 Semen Putih Zak 85,000.00
41 Sirtu M3 48,000.00
UPAH
1 Pekerja Hari 35,000.00
2 Mandor Hari 45,000.00
3 Tukang Hari 50,000.00
4 Kepala Tukang Hari 52,000.00
20.5
20
107
DAFTAR ANALISA
A. PEKERJAAN PERSIAPAN
B. PEKERJAAN PONDASI
C. PEKERJAAN BETON
Anl.G.41 1 M3 COR 1 : 2 : 3
0.8200 M3 Agregat Kasar (Kerikil) Rp. 67,000.00 Rp. 54,940.00
6.8000 Zak Semen Andalas @ 40 Kg Rp. 40,000.00 Rp. 272,000.00
0.5400 M3 Pasir Pasang Rp. 43,000.00 Rp. 23,220.00
6.0000 Pekerja Rp. #REF! Rp. #REF!
0.3000 Mandor Rp. #REF! Rp. #REF!
1.0000 Tukang Rp. #REF! Rp. #REF!
0.1000 Kepala Tukang Rp. #REF! Rp. #REF!
Jumlah Rp. #REF!
Anl.G.50.H 1 M2 PLESTERAN 1 : 2
BAHAN
0.1400 Zak Semen Andalas @ 40 Kg Rp. #REF! Rp. #REF!
0.0114 M3 Pasir Pasang Rp. 0.00 Rp. 0.00
Rp. #REF!
UPAH
0.1500 Tukang Rp. 0.00 Rp. 0.00
0.0150 Kepala Tukang Rp. 0.00 Rp. 0.00
0.4000 Pekerja Rp. 0.00 Rp. 0.00
0.0200 Mandor Rp. 0.00 Rp. 0.00
Jumlah Rp. 0.00
Anl.G.50.Q 1 M2 PLESTERAN 1 : 4
BAHAN
0.1080 Zak Semen Andalas @ 40 Kg Rp. 0.00 Rp. 0.00
0.0140 M3 Pasir Pasang Rp. 0.00 Rp. 0.00
Rp. 0.00
UPAH
0.2000 Tukang Rp. 0.00 Rp. 0.00
0.0200 Kepala Tukang Rp. 0.00 Rp. 0.00
0.4000 Pekerja Rp. 0.00 Rp. 0.00
0.0200 Mandor Rp. Rp. 0.00
Jumlah Rp. 0.00
D. PEKERJAAN PLAPOND
F. PEKERJAAN LANTAI
KESIMPULAN
Himpunan Supl.V a : Untuk beton dengan 110 Kg besi/M3
Lantai I
Anl.G-41 ''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''' Rp. #VALUE!
Anl.I-2 1.100 x Rp. #VALUE! Rp. #VALUE!
Anl.F-8 ''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''' Rp. #VALUE!
Jumlah Rp. #VALUE!
Himpunan Supl.V b : Untuk beton dengan 125 Kg besi/M3
Lantai I
Anl.G-41 ''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''' Rp. #VALUE!
Anl.I-2 1.250 x Rp. #VALUE! Rp. #VALUE!
Anl.F-8 ''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''' Rp. #VALUE!
Jumlah Rp. #VALUE!
Himpunan Supl.V 3 : Untuk beton dengan 150 Kg besi/M3
Lantai I
Anl.G-41 ''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''' Rp. #VALUE!
Anl.I-2 1.500 x Rp. #VALUE! Rp. #VALUE!
Anl.F-8 ''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''' Rp. #VALUE!
Jumlah Rp. #VALUE!
Himpunan Supl.V 4 : Untuk beton dengan 165 Kg besi/M3
Lantai I
Anl.G-41 ''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''' Rp. #VALUE!
Anl.I-2 1.650 x Rp. #VALUE! Rp. #VALUE!
Anl.F-8 ''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''' Rp. #VALUE!
Jumlah Rp. #VALUE!
Himpunan Supl.V 5 : Untuk beton dengan 220 Kg besi/M3
Lantai I
Anl.G-41 ''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''' Rp. #VALUE!
Anl.I-2 2.200 x Rp. #VALUE! Rp. #VALUE!
Anl.F-8 ''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''' Rp. #VALUE!
Jumlah Rp. #VALUE!
TERBILANG : " Tiga Ratus Empat Belas Juta Seratus Ribu Rupiah"
314,100,000.00
#REF!
DAFTAR KUANTITAS DAN HARGA
BADAN : BRR NAD NIAS KANWIL REGIONAL - V, KABUPATEN ACEH SINGKIL
SATKER : BRR- PENDIDIKAN, KESEHATAN DAN GENGER WILAYAH- V
NAMA PAKET : REVITALISASI AKPER KABUPATEN ACEH SINGKIL
PENAWAR : CV. MITRA PERSADA
I. PEKERJAAN PENDAHULUAN
A PEKERJAAN PERSIAPAN
1 Barak Kerja/ Gudang Ditaksir 1.00 Unit 800,000.00 800,000.00
2 Pengadaan Air / Listrik Kerja Ls 1.00 - 1,400,000.00 1,400,000.00
3 Fhoto Dokumentasi Ls 1.00 - 1,100,000.00 1,100,000.00
4 Pembersihan Lahan Ditaksir 576.00 M2 1,000,000.00 1,000,000.00
5 Pembuatan Pagar Sementara tinggi ›2 M' Setara seng Ditaksir 88.25 M'
6 Papan Nama Proyek (90 x 120 cm) Ditaksir 1.00 Bh
7 P3K dan Keamanan Ls 1.00 Set
8 Pekerjaan Bowplank Taksir 90.00 M'
Sub Jumlah I 4,300,000.00
B PEKERJAAN PONDASI
1 Pondasi Pasangan Batu 1: 4 G. 32.h 45.000 M3 - 0.00
2 Pasangan Batu Bata 1: 2 G.33 L 0.530 M3 - 0.00
3 Cor Pondasi Tapak Beton Bertulang 1 : 2 : 3 Spl. V J 16.000 M3 #REF! #REF!
4 Pekerjaan Batu Kosong G. 2 6.110 M3 0.00 0.00
5 Cor Beton 1 : 3 : 5 G. 43..a 20.000 M3 0.00 0.00
Sub Jumlah B #REF!
D PEKERJAAN DINDING
1 Pasangan Batu Bata 1 : 2 G.33 L 40.00 M3 145,000.00 5,800,000.00
2 Plesteran 1: 2 G.50 h 400.00 M2 #REF! #REF!
3 Pasangan Batu Bata 1 : 4 G.33 H 78.62 M3 120,000.00 9,434,400.00
4 Plesteran 1: 4 G.50 q 1050.00 M2 #REF! #REF!
5 Pekerjaan Relief Beton 10 Cm Taksir 2.80 M' 35,225.00 98,630.00
Sub Jumlah D #REF!
F PEKERJAAN LANTAI
1 Pek. Lantai Beton cor 1 : 3 : 6 tebal 7 cm G.67 20.00 M2 85,000.00 1,700,000.00
2 Pek. Lantai keramik 40 x 40 cm G.69 a 450.00 M2 15,000.00 6,750,000.00
3 Pek. Lantai keramik 20 x 20 cm G.69 b 30.00 M2
4 Pek. Lantai keramik 20 x 25 cm G.69 c 76.00 M2
5 Pek. Bon- Bon Keramik Taksir 50.00 M' 12,000.00 600,000.00
Sub Jumlah F 9,050,000.00
H PEKERJAAN PENGECATAN
1 Pek. Cat Kayu K.9+23+30a 738.22 M2 #REF! #REF!
2 Pek. Cat Dinding K.9+23+30 1,480.00 M2
3 Pek. Cat Plafond Gypsum K.9+23+30 29.96 M2 #REF! #REF!
Sub Jumlah H #REF!
B SANITASI
1 Pipa Distribusi Air bersih PVC Ø 3/4" H.18 c 177.51 M' 40,000.00 7,100,400.00
Sub Jumlah III B 7,100,400.00
PPN 10 % #REF!
PEMBULATAN
Medan,
0.00027 2,945,500,000.00
0.00048 2,945,500,000.00
0.00037 2,945,500,000.00
0.00034 2,945,500,000.00
2,945,500,000.00
- 2,945,500,000.00
0.00154 2,945,500,000.00
0.00010 2,945,500,000.00
0.00380 2,945,500,000.00
2,945,500,000.00
- 2,945,500,000.00
#REF! 2,945,500,000.00
#VALUE! 2,945,500,000.00
#VALUE! 2,945,500,000.00
#VALUE! 2,945,500,000.00
#VALUE! 2,945,500,000.00
#VALUE! 2,945,500,000.00
- 2,945,500,000.00 0
2,945,500,000.00
- 2,945,500,000.00
#REF! 2,945,500,000.00
0.00003 2,945,500,000.00
2,945,500,000.00
- 2,945,500,000.00
0.02926 2,945,500,000.00
0.00333 2,945,500,000.00
2,945,500,000.00
- 2,945,500,000.00
- 2,945,500,000.00
- 2,945,500,000.00
- 2,945,500,000.00
- 2,945,500,000.00
- 2,945,500,000.00
- 2,945,500,000.00
- 2,945,500,000.00
- 2,945,500,000.00
- 2,945,500,000.00
- 2,945,500,000.00
- 2,945,500,000.00
- 2,945,500,000.00
- 2,945,500,000.00
2,945,500,000.00
- 2,945,500,000.00
- 2,945,500,000.00
- 2,945,500,000.00
0.00058 2,945,500,000.00 16568437.5 122.4 2 * 4 0.612
0.00229 2,945,500,000.00
- 2,945,500,000.00
0.00228 2,945,500,000.00
0.00014 2,945,500,000.00
0.00001 2,945,500,000.00
0.00002 2,945,500,000.00
0.00012 2,945,500,000.00
0.00012 2,945,500,000.00
0.00005 2,945,500,000.00
2,945,500,000.00
- 2,945,500,000.00
#REF! 2,945,500,000.00
#REF! 2,945,500,000.00
2,945,500,000.00 #REF!
- 2,945,500,000.00
0.00237 2,945,500,000.00
- 2,945,500,000.00
#REF! 2,945,500,000.00
- 2,945,500,000.00
2,945,500,000.00
2,945,500,000.00
#REF! 2,945,500,000.00
0
130.5
Kontraktor Pelaksana
TIME SCHEDULE SATUAN KERJA SEMENTARA BRR PENDIDIKAN
CV. SAUDARA TUA & Co.
DAN KESEHATAN
PEKERJAAN : BRR NAD NIAS KANWIL REGIONAL - V, KABUPATEN ACEH SINGKIL