SURVEI HARGA BAHAN DAN ALAT

Propinsi : Nusa Tenggara Timur No. RAB : 1 s/d 20


Kabupaten : Sumba Barat Daya Program : PNPM - MP TA. 2011
Kecamatan : Kodi Balaghar Jenis Kegiatan : Pemb. Gedung SD
Desa : Waiha Ukuran / Dimensi: 24 X 7 M2

No Uraian Bahan / Alat Satuan Harga Satuan

I. Bahan
1 Air kerja ( Tangki 5000 Ltr ) Liter 50
2 Amplas Lembar 4,000
3 Kayu Bagesting Batang 3,000
4 Bambu andang Batang 5,000
5 Batu Gunung 15/20 M3 60,000
6 Batu Gunung 10/15 M3 60,000
7 Batu potong Buah 2,000
8 Besi beton 10 mm Asli Staf / lonjor 75,000
9 Besi beton 6 mm Asli Staf / lonjor 34,000
10 Baut 15 & 25 Bh 7,500
11 Beugel U plat Bh 30,000
12 Beugel U bulat Bh 27,500
13 Besi Strip Bh 30,000
14 Cat Seng Biru Muda Merk Boyo Kg 30,000
15 Cat Plafon (Oker Putih) Kg 7,500
16 Cat Tembok (Matex Warna) Kg 12,500
17 Cat Kayu (Cokelat) Kg 35,000
18 Daun Jendela Paniel Kaca 3 MM (0.60 x 1.20) Unit 350,000
19 Dumpul Kayu Kg 24,000
20 Daun Jendela Nako Set 175,000
21 Daun pintu panil ( papan jati / mahoni ) 2.17 x 1. Unit 1,100,000
22 Daun Pintu Paniel Triplex 6 MM) Lapis seng dala Unit 750,000
23 Engsel + skrup Buah 12,500
24 Grendel + skrup Buah 7,500
25 Kayu Kls I (Jati Lokal) M3 2,500,000
26 Kayu klas II 6/12 ( Mahoni ) M3 2,100,000
27 Kerikil M3 175,000
28 Kawat ikat Kg 20,000
29 Keramik 30 x 30 M2 50,000
30 Kait angin roda + skrup Buah 25,000
31 Err:509 Unit 175,600
32 Kunci Tanam ( merek Koday) Bh 125,000
33 L bok paralo 4 " Buah 17,500
37 Kloset jongkok Buah 150,000
38 L Bok Paralon 2" Bh 12,900
39 Meni kayu Kg 25,000
40 Minyak cat Kg 15,000
35 Papan cor ( Klas III ) M3 700,000
36 Papan klas II 3/20x4m M3 2,100,000
41 Pasir pasang M3 110,000
42 Pasir urugan M3 75,000
43 Paku 7 - 10 cm Kg 18,000
44 Paku seng Kg 22,800
45 Paku tripleks Kg 25,100
46 Paku putih 15 & 20 cm Kg 22,500
47 Plamur Kg 25,000
48 Pipa udara T Buah 165,000
49 Pipa Paralon ( 4 " ) Batang 125,000
50 Pipa Paralon 2" Btg 84,000
51 Semen warna Kg 12,000
52 Sirtu gunung M3 60,000
53 Stop Kran " Bh 35,000
54 Semen Tonasa/ Gresik 50 Kg Zak 68,000
55 Seng Gelombang BJLS 0.20 Lembar 39,000
56 Seng licin M' 20,000
57 Tripleks 9 mm Lembar 120,000
58 Tripleks 3 mm Lembar 50,000

SURVEI HARGA BAHAN DAN ALAT

Propinsi :
Kabupaten : PNPM - MP TA. 2011
Kecamatan : Pemb. Gedung SD
Desa : 24 X 7 M2

No Uraian Bahan / Alat Satuan Harga Satuan

Talang M 80,000
59 Terpal Lembar 300,000
34 Usuk klas III M3 700,000
60 Usuk 5/7 M3 1,900,000
II.Alat
1 Ember Campuran Buah 10,000
2 Sekop Buah 80,000
3 Linggis Buah 65,000
4 Benang nilon Pis/kpl 10,000
5 Selang waterpas M' 4,000
6 Kuas cat Buah 11,000
7 Kuas rol Buah 23,000
8 Gergaji Besi Buah 49,000
9 Anak Gergaji Buah 16,000
10 Kunci besi ( kunci 10 dan kunci 6 ) Buah 20,000
11 Kawat ayak M' 31,000
III. Meubeler
1 Meja Siswa (Papan Kls II) Unit 300,000
2 Kursi Siswa (Papan Kls II) Unit 200,000
3 Lemari 2 Pintu (180 x 140) Unit 1,100,000
4 Meja 1/2 Biro Unit 800,000
5 Kursi Guru (Spon) Unit 250,000
6 Papan Tulis Unit 550,000
III. Tenaga Kerja
1 Pekerja HOK 25,000
2 Tukang HOK 35,000
PNPM Mandiri - Perdesaan Form.23

Hasil Survei Harga Bahan/Alat


Kabupaten : Sumba Barat Daya
Kecamatan :
Desa : ..

HARGA ON SITE

No. Jenis Bahan/Alat Satuan HARGA GUDANG PERKIRAAN


TAHUN 2013
TAHUN 2014

I MEBELER

1 Meja Siswa (Papan Kls II) Bh 400,000.00 350,000.00 350,000.00

2 Kursi Siswa (Papan Kls II) Bh 230,000.00 200,000.00 200,000.00

3 Lemari 2 Pintu (180 x 140) Bh 1,200,000.00 1,100,000.00 1,100,000.00

4 Meja 1/2 Biro Bh 1,000,000.00 900,000.00 900,000.00

5 Kursi Guru (Spon) Bh 350,000.00 250,000.00 250,000.00

6 Papan Tulis Bh 300,000.00 250,000.00 250,000.00

7 Daun Pintu Paniel Papan Kls I Bh 1,500,000.00 1,000,000.00 1,000,000.00


Daun Pintu Paniel Triplex
8 Lapis Seng Dalam Bh 750,000.00 750,000.00 750,000.00
Daun Jendela Paniel Kaca 5
9 MM Bh 425,000.00 400,000.00 400,000.00

Tertanda
CV/ Toko .

(..)

.,.2013
Mengetahui: Dibuat Oleh:
Ketua TPK Kader Teknik

(..) (...)

Formulir untuk Desa


KET.

Formulir untuk Desa


PNPM Mandiri - Perdesaan For

Hasil Survei Harga Bahan/Alat


Kabupaten : Sumba Barat Daya
Kecamatan :
Desa : ..

HARGA ON SITE

No. Jenis Bahan/Alat Satuan HARGA GUDANG PERKIRAAN


TAHUN 2013
TAHUN 2014

I BAHAN LOKAL

1 Pasir Pasang M3 110,000.00 120,000.00 115,000.00

2 Batu Karang M3 60,000.00 70,000.00 65,000.00

3 Batu Pecah M3 240,000.00 250,000.00 245,000.00

4 Kayu 6/12 Kls II M3 2,000,000.00 2,150,000.00 2,100,000.00

5 Kayu 8/12Kls II M3 2,000,000.00 2,150,000.00 2,100,000.00

6 Balok Kelapa M3 1,500,000.00 1,650,000.00 1,600,000.00

7 Kayu Kls I 6/12 Jati Lokal M3 2,500,000.00 3,700,000.00 2,650,000.00


Usuk 5/7 Kls II Mahoni/ Jati
8 Putih M3 2,000,000.00 2,150,000.00 2,100,000.00

9 Usuk 5/7 (Kelapa) M3 1,500,000.00 1,650,000.00 1,600,000.00

10 Papan Kls II M3 2,000,000.00 2,150,000.00 2,100,000.00

11 Batako Bh 3,000.00 3,000.00 3,500.00

12 Batu Potong Bh 2,000.00 2,500.00 2,500.00

13 Sirtu Gunung M3 60,000.00 60,000.00 65,000.00

14 Air Kerja Tanki

Tertanda
CV/ Toko .

(..)

.,.2013
Mengetahui: Dibuat Oleh:
Ketua TPK Kader Teknik

Formulir untuk Desa


(..) (...)

Formulir untuk Desa


Form.23

KET.

110,000.00

60,000.00

240,000.00

2,000,000.00

2,000,000.00

1,500,000.00

2,500,000.00

2,000,000.00

1,500,000.00

2,000,000.00

3,000.00

2,000.00

60,000.00

Formulir untuk Desa


Formulir untuk Desa
PNPM Mandiri - Perdesaan Form

Hasil Survei Harga Bahan/Alat


Kabupaten : Sumba Barat Daya
Kecamatan :
Desa : ..

HARGA ON SITE

No. Jenis Bahan/Alat Satuan HARGA TOKO PERKIRAAN


TAHUN 2013
TAHUN 2014

I BAHAN NON LOKAL

1 Amplas Lembar
Staf /
2 Besi Beton 12 mm Asli (SNI) lonjor
Staf /
3 Besi Beton 10 mm Asli (SNI) lonjor
Staf /
4 Besi Beton 6 mm Asli (SNI) lonjor

5 Baut 15 & 25 Bh

6 Beugel U plat Bh

7 Beugel U bulat Bh

8 Besi Strip Bh
Cat Seng Biru Muda Merk
9 Boyo Kg

10 Cat Plafon (Oker Putih) 20 Kg Galon


Cat Tembok (Matex Warna) 20
11 Kg Galon

12 Cat Kayu (Cokelat) Kg

13 Dumpul Kayu Kg

14 Engsel + skrup Psg

15 Grendel + skrup Buah

16 Kawat ikat Kg

17 Keramik 30 x 30 M2

18 Keramik 20 x 20 M2

19 Kait Angin 8" (Kotak) Buah


Kaca Polos 5 MM (110 x 60
20 cm) Lembar

Formulir untuk Desa


21 Kaca Reben 5 MM Lembar

22 Kaca Polos 3 MM Lembar

Formulir untuk Desa


23 Kaca Reben 3 MM Lembar

24 Kunci Tanam (Odesta) Bh

25 L bok paralo 4 " Buah

26 Kloset Jongkok INA Buah

27 L Bok Paralon 2" Bh

28 Meni kayu Kg

29 Minyak cat Kg

30 Paku 7 - 10 cm Kg

31 Paku seng Kg

32 Paku tripleks Kg

33 Paku putih 15 & 20 cm Kg

34 Plamur 25 Kg Galon

35 Pipa udara T Buah

36 Pipa Paralon ( 4 " ) Batang

37 Pipa Paralon 2" Btg

38 Semen warna Kg

39 Stop Kran " Bh

40 Semen Tonasa/ Gresik 50 Kg Zak

41 Seng Gelombang BJLS 0.20 Lembar


Seng Gelombang BJLS 0.20/
42 Warna Lembar

43 Seng licin M'

44 Tripleks 9 mm Lembar

45 Tripleks 3 mm Lembar

46 Triplex 4 mm Lembar

Formulir untuk Desa


47 Take Wood Lembar

48 Talang Air (4m) M

49 Terpal Air (5 x 7) M Lembar

50 Ember Cor (Ban) Buah

51 Sekop Cap Mata Buah

52 Linggis Buah

53 Benang nilon Pis/kpl

54 Selang waterpas M'

55 Kuas cat Buah

56 Kuas rol Buah

57 Gergaji Besi Buah

58 Anak Gergaji Buah


Kunci besi ( kunci 10 dan kunci
59 6 ) Buah

60 Kawat ayak M'


Tertanda
CV/ Toko .

(..)

.,.2013
Mengetahui: Dibuat Oleh:
Ketua TPK Kader Teknik

(..) (...)

Formulir untuk Desa


Form.23

KET.

Formulir untuk Desa


Formulir untuk Desa
Formulir untuk Desa
Formulir untuk Desa
ANALISA HARGA SATUAN S.N.I

NO. URAIAN KOEF SAT

A B C D
I PEKERJAAN PERSIAPAN
ANALISA 001 1 m' Pagar Sementara dari Kayu tinggi 2 m
Bahan
Dolken Kayu 8 - 10/400 cm 1.250 btg
Semen Portland 2.500 Kg
Pasir Beton 0.005 m3
Koral Beton 0.009 m3
Kaso 5 / 7 ( albasiah ) 0.072 m3
Paku Biasa 2" - 5" 0.060 Kg
Residu 0.400 Lt
Tenaga
Tukang Kayu 0.200 Oh
Perkerja 0.400 Oh
Kepala Tukang 0.020 Oh
Mandor 0.020 Oh

ANALISA 002 1 m' Pagar Sementara dari Seng Gelombang tinggi 2 m


Bahan
Dolken Kayu 8 - 10/400 cm 1.250 btg
Semen Portland 2.500 Kg
Pasir Beton 1.200 m3
Koral Beton 0.009 m3
Kaso 5 / 7 ( albasiah ) 0.072 m3
Paku Biasa 2" - 5" 0.060 Kg
Meni Besi 0.450 Lt
Tenaga
Tukang Kayu 0.200 Oh
Perkerja 0.400 Oh
Kepala Tukang 0.020 Oh
Mandor 0.020 Oh

ANALISA 003 1 m' Pagar Sementara dari Kawat Duri tinggi 1.8 m
Bahan
Dolken Kayu 8 - 10/400 cm 1.000 btg
Semen Portland 2.000 Kg
Kawat Duri 25.000 Kg
Pasir Beton 0.005 m3
Koral Beton 0.009 m3
Paku Biasa 2" - 5" 0.060 Kg
Tenaga
Tukang Kayu 0.200 Oh
Perkerja 0.300 Oh
Kepala Tukang 0.020 Oh
Mandor 0.020 Oh

ANALISA 004 1 m' Pek. Pengukuran kembali (site) & Pemasangan Bowplank
Bahan
Kayu Kaso 5 / 7 (borneo) 0.012 m3
Paku Biasa 2" - 5" 0.020 Kg
Kayu Papan 3 / 20 borneo 0.007 m3
Tenaga
Tukang Kayu 0.100 Oh
Perkerja 0.100 Oh
Kepala Tukang 0.010 Oh
Mandor 0.005 Oh

ANALISA 005 1 m Pek. Kantor Direksi Keet , dengan lantai plesteran


Bahan
Dolken Kayu 8 - 10/400 cm 1.250 btg
Kayu Balok Borneo 0.180 m3
Paku 0.850 Kg
Besi Strip 1.100 Kg
Semen Portland 35.000 Kg
Pasir Pasang 0.150 m3
Pasir Beton 0.100 m3
Koral Beton 0.150 m3
Bata merah kelas I 30.000 bh
Seng Plat 0.250 lbr
Jendela Nako 2.000 bh
Kaca Polos 0.080 m2
Kunci Tanam 0.150 bh
Plywood 4 mm 0.060 lbr
Tenaga
Tukang Kayu 2.000 Oh
Tukang Batu 1.000 Oh
Perkerja 2.000 Oh
Kepala Tukang 0.300 Oh
Mandor 0.050 Oh

ANALISA 006 1 m Pembuatan Gudang Semen dan Alat - alat


Bahan
Dolken Kayu 8 - 10/400 cm 1.700 btg
Kayu Balok Borneo 0.210 m3
Paku 0.300 Kg
Semen Portland 10.500 Kg
Pasir Beton 0.030 m3
Koral Beton 0.050 m3
Seng Gelombang BJLS 32 1.500 lbr
Tenaga
Tukang Kayu 2.000 Oh
Perkerja 1.000 Oh
Kepala Tukang 0.200 Oh
Mandor 0.050 Oh

ANALISA 007 1 m Pembuatan Rumah Jaga / Konstruksi Kayu


Bahan
Dolken Kayu 8 - 10/400 cm 3.000 btg
Kayu Balok Borneo 0.276 m3
Paku 0.700 Kg
Seng Gelombang BJLS 32 1.500 lbr
Tenaga
Tukang Kayu 1.500 Oh
Perkerja 1.000 Oh
Kepala Tukang 0.150 Oh
Mandor 0.050 Oh

ANALISA 008 Membersihkan Lapangan dan Perataan


Tenaga
Perkerja 0.100 Oh
Mandor 0.050 Oh

ANALISA 009 1 m Pembuatan Bedeng Buruh


Bahan
Dolken Kayu 8 - 10/400 cm 1.250 btg
Kayu Balok Borneo 0.186 m3
Paku 0.300 Kg
Semen Portland 18.000 Kg
Pasir Beton 0.030 m3
Koral Beton 0.050 m3
Seng Gelombang BJLS 32 1.500 lbr
Plywood 4 mm 1.350 lbr
Tenaga
Tukang Kayu 2.000 Oh
Perkerja 1.000 Oh
Kepala Tukang 0.200 Oh
Mandor 0.050 Oh

ANALISA 010 1 m Pembuatan Bak Adukan ( 40 x 50 x 20 ) cm


Bahan
Kayu Terentang 0.186 m3
Paku 0.300 Kg
Kayu Kaso 5 / 7 (borneo) 1.000 btg
Tenaga
Tukang Kayu 2.000 Oh
Mandor 0.050 Oh

ANALISA 011 1 m Pembuatan Stegger dari Bambu, ( 40 x 50 x 20 ) cm


Bahan
Bambu 6 - 8 / 600 cm 1.000 btg
Tali Ijuk 0.250 Kg
Tenaga
Tukang Kayu 2.000 Oh
Perkerja 1.000 Oh
Kepala Tukang 0.200 Oh
Mandor 0.050 Oh

ANALISA 012 1 m Pembuatan Jalan Sementara


Bahan
Batu Belah 5 / 20 0.150 m3
Batu Belah 5 / 7 0.090 m3
Pasir Pasang 0.010 m3
Tenaga
Perkerja 1.000 Oh
Mandor 0.050 Oh

ANALISA 013 1 m Bongkaran Beton Bertulang


Tenaga
Perkerja 6.667 Oh
Mandor 0.333 Oh
ANALISA 014 1 m Bongkaran Dinding Tembok Bata Merah
Tenaga
Perkerja 6.667 Oh
Mandor 0.033 Oh

II PEKERJAAN TANAH
ANALISA 015 1 m3 Pek. Galian Tanah Biasa Max Kedalaman 1 m'
Tenaga
Perkerja 0.400 Oh
Tukang Gali Oh
Kepala Tukang Oh
Mandor 0.040 Oh

ANALISA 016 1 m3 Pek. Galian Tanah Biasa Max Kedalaman 2 m'


Tenaga
Perkerja 0.525 Oh
Tukang Gali Oh
Kepala Tukang Oh
Mandor 0.052 Oh

ANALISA 017 1 m3 Pek. Galian Tanah Biasa Max Kedalaman 3 m'


Tenaga
Perkerja 0.735 Oh
Tukang Gali - Oh
Kepala Tukang - Oh
Mandor 0.073 Oh

ANALISA 018 1 m3 Pek. Galian Tanah Keras Max Kedalaman 1 m'


Tenaga
Perkerja 0.625 Oh
Tukang Gali - Oh
Kepala Tukang - Oh
Mandor 0.062 Oh

ANALISA 019 1 m3 Pek. Galian Tanah Cadas Max Kedalaman 1 m'


Tenaga
Perkerja 1.250 Oh
Tukang Gali - Oh
Kepala Tukang - Oh
Mandor 0.125 Oh

ANALISA 020 1 m3 Pek. Galian Tanah Lumpur Max Kedalaman 1 m'


Tenaga
Perkerja 0.823 Oh
Tukang Gali - Oh
Kepala Tukang - Oh
Mandor 0.083 Oh

ANALISA 021 1 m Pek. Stripping 1 m


Tenaga
Perkerja 0.050 Oh
Tukang Gali - Oh
Kepala Tukang - Oh
Mandor 0.005 Oh

ANALISA 022 1 m Pembuangan Tanah sejauh 150 m


Tenaga
Perkerja 0.192 Oh
Tukang Gali - Oh
Kepala Tukang - Oh
Mandor 0.050 Oh

ANALISA 023 1 m3 Urugan Tanah Kembali


Tenaga
Perkerja 0.192 Oh
Tukang Gali - Oh
Kepala Tukang - Oh
Mandor 0.019 Oh

ANALISA 024 1 m3 Pemadatan tanah


Tenaga
Perkerja 0.500 Oh
Tukang Gali - Oh
Kepala Tukang - Oh
Mandor 0.050 Oh

ANALISA 025 1 m3 Pek. Urugan Pasir


Bahan
Pasir Urug 1.200 m3
Tenaga
Perkerja 0.300 Oh
Tukang Gali - Oh
Kepala Tukang - Oh
Mandor 0.010 Oh
ANALISA 026 1 m3 Pemasangan Lapisan ijuk
Bahan
Ijuk 1.200 m3
Tenaga
Perkerja 0.150 Oh
Tukang Gali - Oh
Kepala Tukang - Oh
Mandor 0.015 Oh

III PEKERJAAN PONDASI


ANALISA 027 1 m' Pembuatan Tiang Pancang ( 35 x 35 ) cm, Beton Bertulang
Bahan
Pasir Urug Darat 0.016 m3
Pasir Beton 0.080 m3
Koral Beton 0.125 m3
Semen Portland 49.000 Kg
Besi Beton 34.500 Kg
Kawat Beton 0.700 Kg
Kayu Kaso 5 / 7 (borneo) 0.270 m3
Paku 0.120 Kg
Minyak Bekisting 0.090 lt
Plamuur Tembok 0.200 Kg
Tenaga
Perkerja 0.800 Oh
Tukang Batu 0.500 Oh
Kepala Tukang 0.050 Oh
Mandor 0.040 Oh

ANALISA 028 1 m3 Pasangan Batu kali 1 Pc : 3Ps


Bahan
Batu Belah 15 / 20 1.100 m3
Semen Portland 392.000 Kg
Pasir Pasang 0.314 m3
Tenaga
Perkerja 1.500 Oh
Tukang Batu 0.600 Oh
Kepala Tukang 0.060 Oh
Mandor 0.075 Oh

ANALISA 029 1 m3 Pasangan Batu kali 1 Pc : 5Ps


Bahan
Batu Belah 15 / 20 1.100 m3
Semen Portland 136.000 Kg
Pasir Pasang 0.544 m3
Tenaga
Perkerja 1.500 Oh
Tukang Batu 0.600 Oh
Kepala Tukang 0.060 Oh
Mandor 0.075 Oh

IV PEKERJAAN DINDING
ANALISA 030 1 m2 Pasangan Bata Merah 1Pc : 3Ps 1 Bata
Bahan
Bata merah kelas I 140.000 bh
Semen Portland 32.950 Kg
Pasir Pasang 0.091 m3
Tenaga
Perkerja 0.650 Oh
Tukang Batu 0.200 Oh
Kepala Tukang 0.020 Oh
Mandor 0.030 Oh

ANALISA 031 1 m2 Pasangan Bata Merah 1Pc : 5Ps 1 Bata


Bahan
Bata merah kelas I 140.000 bh
Semen Portland 22.200 Kg
Pasir Pasang 0.102 m3
Tenaga
Perkerja 0.650 Oh
Tukang Batu 0.200 Oh
Kepala Tukang 0.020 Oh
Mandor 0.030 Oh

ANALISA 032 1 m2 Pasangan Bata Merah 1Pc : 3Ps 1/2 Bata


Bahan
Bata merah kelas I 70.000 bh
Semen Portland 14.370 Kg
Pasir Pasang 0.040 m3
Tenaga
Perkerja 0.320 Oh
Tukang Batu 0.100 Oh
Kepala Tukang 0.010 Oh
Mandor 0.015 Oh
ANALISA 033 1 m2 Pasangan Bata Merah 1Pc : 5Ps 1/2 Bata
Bahan
Bata merah kelas I 70.000 bh
Semen Portland 9.680 Kg
Pasir Pasang 0.045 m3
Tenaga
Perkerja 0.320 Oh
Tukang Batu 0.100 Oh
Kepala Tukang 0.010 Oh
Mandor 0.015 Oh

V PEKERJAAN PELESTERAN
ANALISA 032 1 m2 Plesteran Dinding 1Pc : 3Ps
Bahan
Semen Portland 6.480 Kg
Pasir Pasang 0.019 m3
Tenaga
Perkerja 0.200 Oh
Tukang Batu 0.150 Oh
Kepala Tukang 0.015 Oh
Mandor 0.010 Oh

ANALISA 033 1 m2 Plesteran Dinding 1Pc : 5Ps


Bahan
Semen Portland 4.320 Kg
Pasir Pasang 0.022 m3
Tenaga
Perkerja 0.200 Oh
Tukang Batu 0.150 Oh
Kepala Tukang 0.015 Oh
Mandor 0.010 Oh

ANALISA 034 1 m2 Plesteran Dinding 1Pc : 0. 5Kp : 3 Ps, tebal 15 mm


Bahan
Semen Portland 4.320 Kg
Kapur Padam 0.003 m3
Pasir Pasang 0.013 m3
Tenaga
Perkerja 0.200 Oh
Tukang Batu 0.150 Oh
Kepala Tukang 0.015 Oh
Mandor 0.010 Oh

ANALISA 035 1 m2 Plesteran Dinding 1Pc : 3Kp : 10Ps, tebal 15 mm


Bahan
Semen Portland 1.840 Kg
Kapur Padam 0.006 m3
Pasir Pasang 0.014 m3
Tenaga
Perkerja 0.200 Oh
Tukang Batu 0.150 Oh
Kepala Tukang 0.015 Oh
Mandor 0.010 Oh

ANALISA 036 1 m2 Plesteran 0.5Pc : 1Kp : 4Ps, tebal 15 mm


Bahan
Semen Portland 3.000 Kg
Kapur Padam 0.005 m3
Pasir Pasang 0.019 m3
Tenaga
Perkerja 0.200 Oh
Tukang Batu 0.150 Oh
Kepala Tukang 0.015 Oh
Mandor 0.010 Oh

ANALISA 037 1 m2 Plesteran 1Kp : 1 Sm : 1Ps, tebal 15 mm


Bahan
Semen Merah 0.009 Kg
Kapur Padam 0.009 m3
Pasir Pasang 0.009 m3
Tenaga
Perkerja 0.200 Oh
Tukang Batu 0.150 Oh
Kepala Tukang 0.015 Oh
Mandor 0.010 Oh

ANALISA 038 1 m2 Plesteran 1Kp : 1 Sm : 2Ps, tebal 15 mm


Bahan
Semen Merah 0.007 Kg
Kapur Padam 0.007 m3
Pasir Pasang 0.015 m3
Tenaga
Perkerja 0.200 Oh
Tukang Batu 0.150 Oh
Kepala Tukang 0.015 Oh
Mandor 0.010 Oh

ANALISA 039 1 m2 Plesteran 1Pc : 2 Ps, tebal 20 mm


Bahan
Semen Portland 14.280 Kg
Pasir Pasang 0.023 m3
Tenaga
Perkerja 0.250 Oh
Tukang Batu 0.200 Oh
Kepala Tukang 0.020 Oh
Mandor 0.0125 Oh

ANALISA 040 1 m2 Plesteran 1Pc : 3 Ps, tebal 20 mm


Bahan
Semen Portland 10.800 Kg
Pasir Pasang 0.026 m3
Tenaga
Perkerja 0.250 Oh
Tukang Batu 0.200 Oh
Kepala Tukang 0.020 Oh
Mandor 0.0125 Oh

ANALISA 041 1 m2 Plesteran 1Pc : 4Ps, tebal 20 mm


Bahan
Semen Portland 8.680 Kg
Pasir Pasang 0.028 m3
Tenaga
Perkerja 0.250 Oh
Tukang Batu 0.200 Oh
Kepala Tukang 0.020 Oh
Mandor 0.0125 Oh

ANALISA 042 1 m2 Plesteran 1Pc : 5Ps, tebal 20 mm


Bahan
7.29 Semen Portland 7.290 Kg
Pasir Pasang 0.028 m3
Tenaga
Perkerja 0.250 Oh
Tukang Batu 0.200 Oh
Kepala Tukang 0.020 Oh
Mandor 0.0125 Oh

ANALISA 043 1 m2 Plesteran 1Pc : 6Ps, tebal 20 mm


Bahan
Semen Portland 6.240 Kg
Pasir Pasang 0.030 m3
Tenaga
Perkerja 0.250 Oh
Tukang Batu 0.200 Oh
Kepala Tukang 0.020 Oh
Mandor 0.0125 Oh

ANALISA 044 1 m2 Plesteran 1Kp : 1 Sm : 2Ps, tebal 15 mm


Bahan
Semen Merah 0.009 Kg
Kapur Padam 0.009 m3
Pasir Pasang 0.018 m3
Tenaga
Perkerja 0.250 Oh
Tukang Batu 0.200 Oh
Kepala Tukang 0.020 Oh
Mandor 0.0125 Oh

ANALISA 045 1 m2 Plesteran 1Pc : 2Ps, tebal 25 mm


Bahan
Semen Portland 15.500 Kg
Pasir Pasang 0.013 m3
Tenaga
Perkerja 0.300 Oh
Tukang Batu 0.200 Oh
Kepala Tukang 0.020 Oh
Mandor 0.013 Oh

ANALISA 046 1 m2 Plesteran 1Pc : 3Ps, tebal 25 mm


Bahan
Semen Portland 11.750 Kg
Pasir Pasang 0.035 m3
Tenaga
Perkerja 0.300 Oh
Tukang Batu 0.200 Oh
Kepala Tukang 0.020 Oh
Mandor 0.013 Oh
ANALISA 047 1 m2 Plesteran 1Pc : 4Ps, tebal 25 mm
Bahan
Semen Portland 9.480 Kg
Pasir Pasang 0.038 m3
Tenaga
Perkerja 0.300 Oh
Tukang Batu 0.200 Oh
Kepala Tukang 0.020 Oh
Mandor 0.013 Oh

ANALISA 048 1 m2 Plesteran 1Pc : 5Ps, tebal 25 mm


Bahan
Semen Portland 7.940 Kg
Pasir Pasang 0.039 m3
Tenaga
Perkerja 0.300 Oh
Tukang Batu 0.200 Oh
Kepala Tukang 0.020 Oh
Mandor 0.013 Oh

ANALISA 049 1 m2 Plesteran 1Pc : 2Ps, tebal 30 mm


Bahan
Semen Portland 18.650 Kg
Pasir Pasang 0.035 m3
Tenaga
Perkerja 0.320 Oh
Tukang Batu 0.250 Oh
Kepala Tukang 0.025 Oh
Mandor 0.015 Oh

ANALISA 050 1 m2 Plesteran 1Pc : 3Ps, tebal 30 mm


Bahan
Semen Portland 14.150 Kg
Pasir Pasang 0.039 m3
Tenaga
Perkerja 0.320 Oh
Tukang Batu 0.250 Oh
Kepala Tukang 0.025 Oh
Mandor 0.015 Oh

ANALISA 051 1 m2 Plesteran 1Pc : 4Ps, tebal 30 mm


Bahan
Semen Portland 11.380 Kg
Pasir Pasang 0.042 m3
Tenaga
Perkerja 0.320 Oh
Tukang Batu 0.250 Oh
Kepala Tukang 0.025 Oh
Mandor 0.015 Oh

ANALISA 052 1 m2 Plesteran 1Pc : 5Ps, tebal 30 mm


Bahan
Semen Portland 8.190 Kg
Pasir Pasang 0.045 m3
Tenaga
Perkerja 0.320 Oh
Tukang Batu 0.250 Oh
Kepala Tukang 0.025 Oh
Mandor 0.015 Oh

ANALISA 053 1 m2 Berapen 1Pc : 3Ps, tebal 30 mm


Bahan
Semen Portland 7.070 Kg
Pasir Pasang 0.021 m3
Tenaga
Perkerja 0.150 Oh
Tukang Batu 0.070 Oh
Kepala Tukang 0.007 Oh
Mandor 0.008 Oh

ANALISA 054 1 m2 Berapen 1Pc : 5Ps, tebal 15 mm


Bahan
Semen Portland 5.670 Kg
Pasir Pasang 0.023 m3
Tenaga
Perkerja 0.150 Oh
Tukang Batu 0.070 Oh
Kepala Tukang 0.007 Oh
Mandor 0.008 Oh

ANALISA 055 1 m2 Pelesteran Beton 1Pc : 2Ps, tebal 15 mm


Bahan
Semen Portland 9.300 Kg
Pasir Pasang 0.018 m3
Tenaga
Perkerja 0.260 Oh
Tukang Batu 0.200 Oh
Kepala Tukang 0.020 Oh
Mandor 0.013 Oh

ANALISA 056 1 m2 Pelesteran Beton 1Pc : 3Ps, tebal 15 mm


Bahan
Semen Portland 7.070 Kg
Pasir Pasang 0.021 m3
Tenaga
Perkerja 0.260 Oh
Tukang Batu 0.200 Oh
Kepala Tukang 0.020 Oh
Mandor 0.013 Oh

ANALISA 057 1 m2 Pelesteran Skoring 1Pc : 2Ps


Bahan
Semen Portland 0.500 Kg
Pasir Pasang 0.002 m3
Tenaga
Perkerja 0.057 Oh
Tukang Batu 0.038 Oh
Kepala Tukang 0.038 Oh
Mandor 0.002 Oh

ANALISA 058 1 m2 Pelesteran Granito 1Pc Warna : 2 Granito, tebal 10 mm


Bahan
PC Warna 0.144 Kg
Batu Granito 15.000 Kg
Tenaga
Perkerja 0.050 Oh
Tukang Batu 0.020 Oh
Kepala Tukang 0.002 Oh
Mandor 0.005 Oh

ANALISA 059 1 m2 Pelesteran Teraso 1Pc Warna : 2 Batu Teraso, tebal 10 mm


Bahan
PC Warna 0.440 Kg
Batu Teraso 11.500 Kg
Tenaga
Perkerja 0.450 Oh
Tukang Batu 0.200 Oh
Kepala Tukang 0.020 Oh
Mandor 0.025 Oh

ANALISA 060 1 m2 Pelesteran Ciprat 1 Pc : 2 Ps


Bahan
Semen Portland 4.320 Kg
Pasir Pasang 0.016 m3
Tenaga
Perkerja 0.250 Oh
Tukang Batu 0.100 Oh
Kepala Tukang 0.010 Oh
Mandor 0.015 Oh

ANALISA 061 1 m2 Pelesteran Siar Adukan 1 Pc : 2 Ps


Bahan
Semen Portland 4.320 Kg
Pasir Pasang 0.016 m3
Tenaga
Perkerja 0.150 Oh
Tukang Batu 0.070 Oh
Kepala Tukang 0.007 Oh
Mandor 0.008 Oh

ANALISA 062 1 m2 Pelesteran Waterfroof Batacote 3 lapis


Bahan
Semen Portland 0.500 Kg
Batacote 2.900 Kg
Pasir Pasang 0.006 m3
Tenaga
Perkerja 0.300 Oh
Tukang Batu 0.200 Oh
Kepala Tukang 0.020 Oh
Mandor 0.015 Oh

ANALISA 063 1 m2 Plesteran Dinding 1 : 3 + ACIAN


Bahan
Semen Portland 8.0000 kg
Pasir Pasang 0.0260 m3
Tenaga
Perkerja 0.2250 org
Tukang Batu 0.1525 org
Kepala Tukang 0.0100 org
Mandor 0.0080 org

1 m2 Plesteran Dinding 1 : 5 + ACIAN


Bahan
Semen Portland 5.4000 kg
Pasir Pasang 0.0280 m3
Tenaga
Perkerja 0.2250 org
Tukang Batu 0.1525 org
Kepala Tukang 0.0100 org
Mandor 0.0080 org

III PEKERJAAN KAYU


1m Pasang Kusen Pintu dan Jendela Kayu Jati
Bahan
Kayu Balok Jati 1.100 m3
Tenaga
Perkerja 6.000 Oh
Tukang Kayu 20.000 Oh
Kepala Tukang 2.000 Oh
Mandor 0.300 Oh

1m Pasang Kusen Pintu dan Jendela Kayu Borneo


Bahan
Kayu Balok Borneo 1.200 m3
Tenaga
Perkerja 6.000 Oh
Tukang Kayu 18.000 Oh
Kepala Tukang 2.000 Oh
Mandor 0.300 Oh

1m Pasang Kusen Pintu dan Jendela Kayu Damar Laut


Bahan
Kayu Balok Damar Laut 1.200 m3
Tenaga
Perkerja 6.000 Oh
Tukang Kayu 18.000 Oh
Kepala Tukang 2.000 Oh
Mandor 0.300 Oh
1m Pasang Pintu Klamp Kayu Kamper
Bahan
Papan Kayu Kamper 0.036 m3
Paku Biasa 2" - 5" 0.050 Kg
Tenaga
Perkerja 0.350 Oh
Tukang Kayu 1.050 Oh
Kepala Tukang 0.105 Oh
Mandor 0.018 Oh

1m Pasang Pintu Klamp Kayu Borneo


Bahan
Papan Kayu Borneo 0.036 m3
Paku Biasa 2" - 5" 0.050 Kg
Tenaga
Perkerja 0.350 Oh
Tukang Kayu 1.050 Oh
Kepala Tukang 0.105 Oh
Mandor 0.018 Oh

1m Pasang Pintu Panel Kayu Jati


Bahan
Papan Kayu Jati 0.050 m3
Tenaga
Perkerja 1.000 Oh
Tukang Kayu 2.500 Oh
Kepala Tukang 0.250 Oh
Mandor 0.050 Oh

1m Pasang Pintu Panel Kayu Kamper


Bahan
Papan Kayu Kamper 0.040 m3
Tenaga
Perkerja 1.000 Oh
Tukang Kayu 2.500 Oh
Kepala Tukang 0.250 Oh
Mandor 0.050 Oh

1m Pasang Pintu dan Jendela Kaca Kayu Jati


Bahan
Papan Kayu Jati 0.035 m3
Tenaga
Perkerja 0.800 Oh
Tukang Kayu 2.000 Oh
Kepala Tukang 0.200 Oh
Mandor 0.040 Oh

1m Pasang Pintu dan Jendela Kaca Kayu Kamper


Bahan
Papan Kayu Kamper 0.035 m3
Tenaga
Perkerja 0.800 Oh
Tukang Kayu 2.000 Oh
Kepala Tukang 0.200 Oh
Mandor 0.040 Oh

1m Pasang Pintu dan Jendela Kaca Kayu Borneo


Bahan
Papan Kayu Borneo 0.035 m3
Tenaga
Perkerja 0.800 Oh
Tukang Kayu 2.000 Oh
Kepala Tukang 0.200 Oh
Mandor 0.040 Oh

1m Pasang Pintu dan Jendela Jalusi Kayu Borneo


Bahan
Papan Kayu Borneo 0.064 m3
Tenaga
Perkerja 1.000 Oh
Tukang Kayu 3.000 Oh
Kepala Tukang 0.300 Oh
Mandor 0.300 Oh

1m Pasang Pintu dan Jendela Jalusi Kayu Kamper


Bahan
Papan Kayu Borneo 0.064 m3
Tenaga
Perkerja 1.000 Oh
Tukang Kayu 3.000 Oh
Kepala Tukang 0.300 Oh
Mandor 0.500 Oh

1m Pasang Pintu Plywood rangkap, rangka kayu Jati


Bahan
Papan Kayu Jati 0.0196 m3
Paku Biasa " - 1" 0.030 Kg
Lem Kayu 0.300 Lt
Plywood 4 mm 1.000 Lbr
Tenaga
Perkerja 0.600 Oh
Tukang Kayu 2.000 Oh
Kepala Tukang 0.200 Oh
Mandor 0.030 Oh

1m Pasang Pintu Plywood rangkap, rangka kayu Kamper


Bahan
Papan Kayu Jati 0.0196 m3
Paku Biasa " - 1" 0.030 Kg
Lem Kayu 0.300 Lt
Plywood 4 mm 1.000 Lbr
Tenaga
Perkerja 0.600 Oh
Tukang Kayu 2.000 Oh
Kepala Tukang 0.200 Oh
Mandor 0.030 Oh

1m Pasang Jalusi Mati Kusen Kayu Jati


Bahan
Papan Kayu Jati 0.0600 m3
Paku Biasa " - 1" 0.150 Kg
Tenaga
Perkerja 0.500 Oh
Tukang Kayu 2.000 Oh
Kepala Tukang 0.200 Oh
Mandor 0.025 Oh

1m Pasang Jalusi Mati Kusen Kayu Kamper


Bahan
Papan Kayu Jati 0.0600 m3
Paku Biasa " - 1" 0.150 Kg
Tenaga
Perkerja 0.500 Oh
Tukang Kayu 2.000 Oh
Kepala Tukang 0.200 Oh
Mandor 0.025 Oh
1m Pasang Pintu Plywood Rangkap, rangka Kayu Borneo
Bahan
Papan Kayu Borneo 0.0196 m3
Paku Biasa " - 1" 0.030 Kg
Lem Kayu 0.300 Lt
Plywood 4 mm 1.000 lbr
Tenaga
Perkerja 0.600 Oh
Tukang Kayu 2.000 Oh
Kepala Tukang 0.200 Oh
Mandor 0.030 Oh

1m Pasang Pintu Teakwood Rangkap, rangka Kayu Jati


Bahan
Papan Kayu Jati 0.0196 m3
Paku Biasa " - 1" 0.300 Kg
Lem Kayu 0.300 Lt
Plywood 4 mm 1.000 lbr
Tenaga
Perkerja 0.600 Oh
Tukang Kayu 2.000 Oh
Kepala Tukang 0.200 Oh
Mandor 0.030 Oh

1m Pasang Pintu Teakwood Rangkap, rangka Kayu Kamper


Bahan
Papan Kayu Jati 0.0196 m3
Paku Biasa " - 1" 0.300 Kg
Lem Kayu 0.300 Lt
Plywood 4 mm 1.000 lbr
Tenaga
Perkerja 0.600 Oh
Tukang Kayu 2.000 Oh
Kepala Tukang 0.200 Oh
Mandor 0.030 Oh

1m Pasang Pintu Plywood & Formika, rangka Kayu Jati


Bahan
Papan Kayu Jati 0.0196 m3
Paku Biasa " - 1" 0.300 Kg
Lem Kayu 0.800 Lt
Plywood 4 mm 1.000 lbr
Formika 4' x 3' 0.500 lbr
Tenaga
Perkerja 0.800 Oh
Tukang Kayu 2.500 Oh
Kepala Tukang 0.250 Oh
Mandor 0.040 Oh

1m Pasang Pintu Plywood & Formika, rangka Kayu Kamper


Bahan
Papan Kayu Kamper 0.0196 m3
Paku Biasa " - 1" 0.300 Kg
Lem Kayu 0.800 Lt
Plywood 4 mm 1.000 lbr
Formika 4' x 3' 0.500 lbr
Tenaga
Perkerja 0.800 Oh
Tukang Kayu 2.500 Oh
Kepala Tukang 0.250 Oh
Mandor 0.040 Oh

1m Pasang Pintu Teakwood & Formika, rangka Kayu Jati


Bahan
Papan Kayu Jati 0.0196 m3
Paku Biasa " - 1" 0.300 Kg
Lem Kayu 0.800 Lt
Plywood 4 mm 1.000 lbr
Formika 4' x 3' 0.500 lbr
Tenaga
Perkerja 0.800 Oh
Tukang Kayu 2.500 Oh
Kepala Tukang 0.250 Oh
Mandor 0.040 Oh

1m Pasang Pintu Teakwood & Formika, rangka Kayu Kamper ( divernis )


Bahan
Papan Kayu Jati 0.0196 m3
Paku Biasa " - 1" 0.300 Kg
Lem Kayu 0.800 Lt
Plywood 4 mm 0.500 lbr
Formika 4' x 3' 0.500 lbr
Tenaga
Perkerja 0.800 Oh
Tukang Kayu 2.500 Oh
Kepala Tukang 0.250 Oh
Mandor 0.040 Oh

1m Pasang Pintu Formika Double, rangka Kayu Jati


Bahan
Papan Kayu Jati 0.0196 m3
Paku Biasa " - 1" 0.300 Kg
Lem Kayu 1.200 Lt
Plywood 4 mm 1.000 lbr
Formika 4' x 3' 1.000 lbr
Tenaga
Perkerja 1.000 Oh
Tukang Kayu 2.600 Oh
Kepala Tukang 0.260 Oh
Mandor 0.050 Oh

1m Pasang Pintu Formika Double, rangka Kayu Kamper


Bahan
Papan Kayu Kamper 0.0196 m3
Paku Biasa " - 1" 0.300 Kg
Lem Kayu 1.200 Lt
Plywood 4 mm 1.000 lbr
Formika 4' x 3' 1.000 lbr
Tenaga
Perkerja 1.000 Oh
Tukang Kayu 2.600 Oh
Kepala Tukang 0.260 Oh
Mandor 0.050 Oh

1m3 Pasang Konstruksi Kuda - kuda Kayu Jati


Bahan
Balok Kayu Jati 1.100 m3
Besi Strip 15.000
Paku Biasa 2" - 5" 0.800 Kg
Tenaga
Perkerja 4.000 Oh
Tukang Kayu 12.000 Oh
Kepala Tukang 1.200 Oh
Mandor 0.200 Oh
1m3 Pasang Konstruksi Kuda - kuda Kayu Kamper
Bahan
Balok Kayu Kamper 1.100 m3
Besi Strip 15.000 Kg
Paku Biasa 2" - 5" 0.800 Kg
Tenaga
Perkerja 4.000 Oh
Tukang Kayu 12.000 Oh
Kepala Tukang 1.200 Oh
Mandor 0.200 Oh

1m3 Pasang Konstruksi Kuda - kuda Kayu Borneo


Bahan
Balok Kayu Borneo 1.100 m3
Besi Strip 15.000 Kg
Paku Biasa 2" - 5" 0.800 Kg
Tenaga
Perkerja 4.000 Oh
Tukang Kayu 12.000 Oh
Kepala Tukang 1.200 Oh
Mandor 0.200 Oh

1m3 Pasang Konstruksi Kuda - kuda Kayu Kruing


Bahan
Balok Kayu Kruing 1.100 m3
Besi Strip 15.000 Kg
Paku Biasa 2" - 5" 0.800 Kg
Tenaga
Perkerja 4.000 Oh
Tukang Kayu 12.000 Oh
Kepala Tukang 1.200 Oh
Mandor 0.200 Oh

1m Pasang Kaso + Reng Genteng Kodok Kayu Kamper


Bahan
Balok Kayu Kamper 0.012 m3
Paku Biasa 2" - 5" 0.150 Kg
Tenaga
Perkerja 0.100 Oh
Tukang Kayu 0.100 Oh
Kepala Tukang 0.010 Oh
Mandor 0.005 Oh
1m Pasang Kaso + Reng Genteng Kodok Kayu Borneo
Bahan
Balok Kayu Borneo 0.012 m3
Paku Biasa 2" - 5" 0.150 Kg
Tenaga
Perkerja 0.100 Oh
Tukang Kayu 0.100 Oh
Kepala Tukang 0.010 Oh
Mandor 0.005 Oh

1m Pasang Kaso + Reng Genteng Monier Kayu Jati


Bahan
Balok Kayu Jati 0.014 m3
Paku Biasa 2" - 5" 0.150 Kg
Tenaga
Perkerja 0.100 Oh
Tukang Kayu 0.100 Oh
Kepala Tukang 0.010 Oh
Mandor 0.005 Oh

1m Pasang Kaso + Reng Genteng Monier Kayu Kamper


Bahan
Balok Kayu Kamper 0.014 m3
Paku Biasa 2" - 5" 0.150 Kg
Tenaga
Perkerja 0.100 Oh
Tukang Kayu 0.100 Oh
Kepala Tukang 0.010 Oh
Mandor 0.005 Oh

1m Pasang Kaso + Reng Genteng Beton Kayu Borneo


Bahan
Balok Kayu Borneo 0.014 m3
Paku Biasa 2" - 5" 0.150 Kg
Tenaga
Perkerja 0.100 Oh
Tukang Kayu 0.100 Oh
Kepala Tukang 0.010 Oh
Mandor 0.005 Oh

1m Pasang Kaso + Reng Atap Sirap Kayu Kamper


Bahan
Balok Kayu Kamper 0.165 m3
Paku Biasa 2" - 5" 0.200 Kg
Tenaga
Perkerja 0.120 Oh
Tukang Kayu 0.120 Oh
Kepala Tukang 0.012 Oh
Mandor 0.006 Oh

1m Pasang Kaso + Reng Atap Sirap Kayu Borneo


Bahan
Balok Kayu Kamper 0.165 m3
Paku Biasa 2" - 5" 0.200 Kg
Tenaga
Perkerja 0.120 Oh
Tukang Kayu 0.120 Oh
Kepala Tukang 0.012 Oh
Mandor 0.006 Oh

1m Pasang Rangka Langit - langit ( 1 x 1 ) m Kayu Jati


Bahan
Balok Kayu Jati 0.012 m3
Paku Biasa 2" - 5" 0.100 Kg
Tenaga
Perkerja 0.150 Oh
Tukang Kayu 0.250 Oh
Kepala Tukang 0.025 Oh
Mandor 0.075 Oh

1m' Pasang papan ruiter ( 3 x 20 )cm Kayu Borneo


Bahan
Kayu Papan 3 / 20 borneo 0.0072 m3
Paku Biasa 2" - 5" 0.050 Kg
Tenaga
Perkerja 0.100 Oh
Tukang Kayu 0.200 Oh
Kepala Tukang 0.025 Oh
Mandor 0.005 Oh

1m Pasang Rangka Langit - langit ( 1 x 1 ) m Kayu Kamper


Bahan
Balok Kayu Kamper 0.012 m3
Paku Biasa 2" - 5" 0.100 Kg
Tenaga
Perkerja 0.150 Oh
Tukang Kayu 0.250 Oh
Kepala Tukang 0.025 Oh
Mandor 0.075 Oh

1m Pasang Rangka Langit - langit ( 1 x 1 ) m Kayu Borneo


Bahan
Balok Kayu Kamper 0.012 m3
Paku Biasa 2" - 5" 0.100 Kg
Tenaga
Perkerja 0.150 Oh
Tukang Kayu 0.250 Oh
Kepala Tukang 0.025 Oh
Mandor 0.075 Oh

1m Pasang Rangka Langit - langit ( 30 x 60 )cm Kayu Jati


Bahan
Balok Kayu Jati 0.023 m3
Paku Biasa 2" - 5" 0.150 Kg
Tenaga
Perkerja 0.200 Oh
Tukang Kayu 0.300 Oh
Kepala Tukang 0.030 Oh
Mandor 0.010 Oh

1m Pasang Rangka Langit - langit ( 30 x 60 )cm Kayu Kamper


Bahan
Balok Kayu Kamper 0.023 m3
Paku Biasa 2" - 5" 0.150 Kg
Tenaga
Perkerja 0.200 Oh
Tukang Kayu 0.300 Oh
Kepala Tukang 0.030 Oh
Mandor 0.010 Oh

1m Pasang Rangka Langit - langit ( 30 x 60 )cm Kayu Borneo


Bahan
Balok Kayu Borneo 0.023 m3
Paku Biasa 2" - 5" 0.150 Kg
Tenaga
Perkerja 0.200 Oh
Tukang Kayu 0.300 Oh
Kepala Tukang 0.030 Oh
Mandor 0.010 Oh

1m Pasang Rangka Langit - langit ( 30 x 30 )cm Kayu Jati


Bahan
Balok Kayu Jati 0.027 m3
Paku Biasa 2" - 5" 0.200 Kg
Tenaga
Perkerja 0.250 Oh
Tukang Kayu 0.350 Oh
Kepala Tukang 0.035 Oh
Mandor 0.0125 Oh

1m Pasang Rangka Langit - langit ( 30 x 30 )cm Kayu Kamper


Bahan
Balok Kayu Kamper 0.027 m3
Paku Biasa 2" - 5" 0.200 Kg
Tenaga
Perkerja 0.250 Oh
Tukang Kayu 0.350 Oh
Kepala Tukang 0.035 Oh
Mandor 0.0125 Oh

1m Pasang Rangka Langit - langit ( 30 x 30 )cm Kayu Borneo


Bahan
Balok Kayu Borneo 0.027 m3
Paku Biasa 2" - 5" 0.200 Kg
Tenaga
Perkerja 0.250 Oh
Tukang Kayu 0.350 Oh
Kepala Tukang 0.035 Oh
Mandor 0.0125 Oh

1m' Pasang Lisplank ( 3 x 20 )cm Kayu Jati


Bahan
Papan Kayu Jati 0.0072 m3
Paku Biasa 2" - 5" 0.050 Kg
Tenaga
Perkerja 0.100 Oh
Tukang Kayu 0.200 Oh
Kepala Tukang 0.025 Oh
Mandor 0.005 Oh

1m' Pasang Lisplank ( 3 x 20 )cm Kayu Kamper


Bahan
Papan Kayu Kamper 0.0072 m3
Paku Biasa 2" - 5" 0.050 Kg
Tenaga
Perkerja 0.100 Oh
Tukang Kayu 0.200 Oh
Kepala Tukang 0.025 Oh
Mandor 0.005 Oh

1m' Pasang Lisplank ( 3 x 30 )cm Kayu Jati


Bahan
Papan Kayu Jati 0.0110 m3
Paku Biasa 2" - 5" 0.050 Kg
Tenaga
Perkerja 0.110 Oh
Tukang Kayu 0.220 Oh
Kepala Tukang 0.022 Oh
Mandor 0.005 Oh

1m' Pasang Lisplank ( 3 x 30 )cm Kayu Kamper


Bahan
Papan Kayu Kamper 0.0110 m3
Paku Biasa 2" - 5" 0.050 Kg
Tenaga
Perkerja 0.110 Oh
Tukang Kayu 0.220 Oh
Kepala Tukang 0.022 Oh
Mandor 0.005 Oh

1m' Pasang Lisplank 2 x( 3 x 20 )cm Kayu Kamper


Bahan
Papan Kayu Kamper 0.0145 m3
Paku Biasa 2" - 5" 0.060 Kg
Tenaga
Perkerja 0.150 Oh
Tukang Kayu 0.250 Oh
Kepala Tukang 0.025 Oh
Mandor 0.075 Oh
1m' Pasang Lisplank 2 x( 2 x 20 )cm Kayu Kamper
Bahan
Papan Kayu Kamper 0.0086 m3
Paku Biasa 2" - 5" 0.060 Kg
Tenaga
Perkerja 0.100 Oh
Tukang Kayu 0.100 Oh
Kepala Tukang 0.010 Oh
Mandor 0.050 Oh

1m' Pasang Lisplank 2 x( 2 x 20 )cm Kayu Borneo


Bahan
Papan Kayu Borneo 0.0088 m3
Paku Biasa 2" - 5" 0.060 Kg
Tenaga
Perkerja 0.100 Oh
Tukang Kayu 0.100 Oh
Kepala Tukang 0.010 Oh
Mandor 0.050 Oh

1m Pasang Rangka Dinding Pemisah Kayu Kamper


Bahan
Balok Kayu Kamper 0.0195 m3
Papan Kayu Kamper 0.007 m3
Paku Biasa 2" - 5" 0.100 Kg
Tenaga
Perkerja 0.150 Oh
Tukang Kayu 0.450 Oh
Kepala Tukang 0.045 Oh
Mandor 0.075 Oh

1m Pasang Rangka Dinding Pemisah Kayu Borneo


Bahan
Balok Kayu Borneo 0.0195 m3
Papan Kayu Borneo 0.007 m3
Paku Biasa 2" - 5" 0.100 Kg
Tenaga
Perkerja 0.150 Oh
Tukang Kayu 0.450 Oh
Kepala Tukang 0.045 Oh
Mandor 0.075 Oh
1m Pasang Dinding Pemisah Teakwood Rangkap, RangkaKayu Kamper
Bahan
Balok Kayu Kamper 0.0195 m3
Papan Kayu Kamper 0.007 m3
Paku Biasa 2" - 5" 0.100 Kg
Tenaga
Perkerja 0.150 Oh
Tukang Kayu 0.450 Oh
Kepala Tukang 0.045 Oh
Mandor 0.075 Oh

1m Pasang Dinding Pemisah Teakwood Rangkap, Rangka Kayu Kamper


Bahan
Balok Kayu Kamper 0.0195 m3
Papan Kayu Kamper 0.007 m3
Paku Biasa 2" - 5" 0.100 Kg
Tenaga
Perkerja 0.150 Oh
Tukang Kayu 0.450 Oh
Kepala Tukang 0.045 Oh
Mandor 0.075 Oh

1m Pasang Dinding Pemisah Plywood Rangkap, Rangka Kayu Kamper


Bahan
Balok Kayu Kamper 0.0195 m3
Papan Kayu Kamper 0.007 m3
Paku Biasa 2" - 5" 0.100 Kg
Lem Kayu 0.560 lt
Plywood 4 mm 1.000 lbr
Tenaga
Perkerja 0.200 Oh
Tukang Kayu 0.600 Oh
Kepala Tukang 0.060 Oh
Mandor 0.010 Oh

1m Pasang Dinding Lambriziring dari papan Kayu jati


Bahan
Papan Kayu Jati 0.007 m3
Paku Biasa 2" - 5" 0.100 Kg
Paku Skrup 3.5" 0.150 Kg
Tenaga
Perkerja 0.600 Oh
Tukang Kayu 1.800 Oh
Kepala Tukang 0.180 Oh
Mandor 0.030 Oh

1m Pasang Plywood tebal 4mm, untuk dinding


Bahan
Plywood 4 mm 0.400 lbr
Paku Biasa " - 1" 0.050 Kg
Tenaga
Perkerja 0.025 Oh
Tukang Kayu 0.075 Oh
Kepala Tukang 0.0075 Oh
Mandor 0.0013 Oh

1m Pasang List Plafond Kayu Profil


Bahan
Kayu Profil 1.050 m'
Tenaga
Perkerja 0.021 Oh
Tukang Kayu 0.021 Oh
Kepala Tukang 0.0020 Oh
Mandor 0.0010 Oh

PEKERJAAN BETON
1 m2 Membuat Lantai Kerja Beton Tumbuk 1 Pc : 3 Ps : 5 Kr
Bahan
Semen Portland 10.000 Kg
Pasir Beton 0.026 m3
Koral Beton 0.044 m3
Tenaga
Perkerja 1.150 Oh
Tukang Batu 0.020 Oh
Kepala Tukang 0.002 Oh
Mandor 0.006 Oh

1 m Membuat Beton Tumbuk 1 Pc : 3 Ps : 5 Kr


Bahan
Semen Portland 218.000 Kg
Pasir Beton 0.520 m3
Koral Beton 0.870 m3
Tenaga
Perkerja 1.650 Oh
Tukang Batu 0.250 Oh
Kepala Tukang 0.025 Oh
Mandor 0.080 Oh

1 m Membuat Beton Tumbuk 1 Pc : 3 Ps : 6 Kr


Bahan
Semen Portland 197.000 Kg
Pasir Beton 0.470 m3
Koral Beton 0.940 m3
Tenaga
Perkerja 1.650 Oh
Tukang Batu 0.250 Oh
Kepala Tukang 0.025 Oh
Mandor 0.080 Oh

1 m Membuat Beton Tumbuk 1 Pc : 4 Ps : 6 Kr


Bahan
Semen Portland 173.000 Kg
Pasir Beton 0.570 m3
Koral Beton 0.870 m3
Tenaga
Perkerja 1.650 Oh
Tukang Batu 0.250 Oh
Kepala Tukang 0.025 Oh
Mandor 0.080 Oh

1 m Membuat Beton 1 Pc : 2 Ps : 3 Kr
Bahan
Semen Portland 232.000 Kg
Pasir Beton 0.520 m3
Koral Beton 0.780 m3
Tenaga
Perkerja 1.650 Oh
Tukang Batu 0.250 Oh
Kepala Tukang 0.025 Oh
Mandor 0.080 Oh

1 m Membuat Beton Bertulang 1 Pc : 2 Ps : 4 Kr


Bahan
Semen Portland 280.000 Kg
Pasir Beton 0.450 m3
Koral Beton 0.900 m3
Tenaga
Perkerja 1.650 Oh
Tukang Batu 0.250 Oh
Kepala Tukang 0.025 Oh
Mandor 0.080 Oh

1 m Membuat Beton Bertulang 1 Pc : 2 Ps : 2.5 Kr


Bahan
Semen Portland 352.000 Kg
Pasir Beton 0.560 m3
Koral Beton 0.700 m3
Tenaga
Perkerja 1.650 Oh
Tukang Batu 0.250 Oh
Kepala Tukang 0.025 Oh
Mandor 0.080 Oh

1 m Membuat Beton Bertulang 1 Pc : 1.5 Ps : 3Kr


Bahan
Semen Portland 357.000 Kg
Pasir Beton 0.420 m3
Koral Beton 0.540 m3
Tenaga
Perkerja 1.650 Oh
Tukang Batu 0.250 Oh
Kepala Tukang 0.025 Oh
Mandor 0.080 Oh

1 m Membuat Beton Bertulang 1 Pc : 1.5 Ps : 2.5Kr


Bahan
Semen Portland 386.000 Kg
Pasir Beton 0.470 m3
Koral Beton 0.780 m3
Tenaga
Perkerja 1.650 Oh
Tukang Batu 0.250 Oh
Kepala Tukang 0.025 Oh
Mandor 0.080 Oh

1 m Membuat Beton Bertulang 1 Pc : 1 Ps : 2Kr


Bahan
Semen Portland 479.000 Kg
Pasir Beton 0.370 m3
Koral Beton 0.740 m3
Tenaga
Perkerja 1.650 Oh
Tukang Batu 0.250 Oh
Kepala Tukang 0.025 Oh
Mandor 0.080 Oh

1 m Membuat Tiang Pancang Prestressed Beton


Bahan
Semen Portland 479.000 Kg
Pasir Beton 0.370 m3
Koral Beton 0.740 m3
Rapidrant 2.460 gln
Tenaga
Perkerja 1.650 Oh
Tukang Batu 0.250 Oh
Kepala Tukang 0.025 Oh
Mandor 0.080 Oh

1 m Membuat Beton Bertulang 1 Pc : 2Ps : 3 Splt


Bahan
Semen Portland 336.000 Kg
Pasir Beton 0.540 m3
Koral Beton 0.810 m3
Tenaga
Perkerja 2.000 Oh
Tukang Batu 0.350 Oh
Kepala Tukang 0.035 Oh
Mandor 1.000 Oh

1 m Membuat Beton Bertulang 1 Pc : 2Ps : 4 Splt


Bahan
Semen Portland 291.000 Kg
Pasir Beton 0.470 m3
Koral Beton 0.930 m3
Tenaga
Perkerja 2.000 Oh
Tukang Batu 0.350 Oh
Kepala Tukang 0.035 Oh
Mandor 1.000 Oh

1 m Membuat Beton Bertulang 1 Pc : 1.5Ps : 3 Splt


Bahan
Semen Portland 367.000 Kg
Pasir Beton 0.440 m3
Koral Beton 0.880 m3
Tenaga
Perkerja 2.000 Oh
Tukang Batu 0.350 Oh
Kepala Tukang 0.035 Oh
Mandor 1.000 Oh

1 m Membuat Beton Bertulang 1 Pc : 1.5Ps : 2.5 Splt


Bahan
Semen Portland 400.000 Kg
Pasir Beton 0.480 m3
Koral Beton 0.800 m3
Tenaga
Perkerja 2.000 Oh
Tukang Batu 0.350 Oh
Kepala Tukang 0.035 Oh
Mandor 1.000 Oh

1 m Membuat Beton Bertulang 1 Pc : 1Ps : 1Splt


Bahan
Semen Portland 615.000 Kg
Pasir Beton 0.520 m3
Koral Beton 0.520 m3
Tenaga
Perkerja 2.000 Oh
Tukang Batu 0.350 Oh
Kepala Tukang 0.035 Oh
Mandor 1.000 Oh

1 m Membuat Beton Kedap Air dengan Strorox - 100


Bahan
Semen Portland 400.000 Kg
Pasir Beton 0.480 m3
Koral Beton 0.800 m3
Strorox - 100 1.200 Kg
Tenaga
Perkerja 2.000 Oh
Tukang Batu 0.350 Oh
Kepala Tukang 0.035 Oh
Mandor 1.000 Oh

1 m' Memasang PVC Waterstop lebar 150 mm


Bahan
Waterstop lebar 150 mm 1.050 m'
Tenaga
Perkerja 0.050 Oh
Tukang Batu 0.030 Oh
Kepala Tukang 0.003 Oh
Mandor 0.002 Oh

1 m' Memasang PVC Waterstop lebar 200 mm


Bahan
Waterstop lebar 200 mm 1.050 m'
Tenaga
Perkerja 0.050 Oh
Tukang Batu 0.030 Oh
Kepala Tukang 0.0035 Oh
Mandor 0.002 Oh

1 m' Memasang PVC Waterstop lebar 230 mm


Bahan
Waterstop lebar 230 mm 1.050 m'
Tenaga
Perkerja 0.550 Oh
Tukang Batu 0.350 Oh
Mandor 0.003 Oh

1 m' Memasang PVC Waterstop lebar 250 mm


Bahan
Waterstop lebar 250 mm 1.050 m'
Tenaga
Perkerja 0.550 Oh
Tukang Batu 0.350 Oh
Mandor 0.003 Oh

1 m' Memasang PVC Waterstop lebar 300 mm


Bahan
Waterstop lebar 300 mm 1.050 m'
Tenaga
Perkerja 0.550 Oh
Tukang Batu 0.350 Oh
Mandor 0.003 Oh

1 m' Memasang PVC Waterstop lebar 320 mm


Bahan
Waterstop lebar 320 mm 1.050 m'
Tenaga
Perkerja 0.550 Oh
Tukang Batu 0.350 Oh
Mandor 0.003 Oh

1 Kg Pembesian dengan Besi Polos atau Besi Ulir


Bahan
Besi Beton ( Polos / Ulir ) 1.050 Kg
Kawat Beton 0.015 Kg
Tenaga
Perkerja 0.007 Oh
Tukang Besi 0.007 Oh
Kepala Tukang 0.0007 Oh
Mandor 0.0003 Oh

1 Kg Kabel Presstressed Polos / Strands


Bahan
Besi Beton ( Polos / Ulir ) 1.050 Kg
Kawat Beton 0.010 Kg
Tenaga
Perkerja 0.005 Oh
Tukang Besi 0.005 Oh
Kepala Tukang 0.0005 Oh
Mandor 0.0003 Oh

1 Kg Jaring Kawat Baja


Bahan
Besi Jaring Kawat Baja 1.020 Kg
Kawat Beton 0.805 Kg
Tenaga
Perkerja 0.025 Oh
Tukang Besi 0.025 Oh
Kepala Tukang 0.0025 Oh
Mandor 0.0015 Oh
1 m2 Pasang Bekisting
Bahan
Kayu Terentang 0.040 m3
Paku Biasa 2" - 5" 0.400 Kg
Minyak Bekisting 0.200 Lt
Plywood 9 mm 0.350 lbr
Dolken Kayu Galam 8 - 10 / 4m 2.000 btg
Tenaga
Perkerja 0.300 Oh
Tukang Kayu 0.330 Oh
Kepala Tukang 0.0330 Oh
Mandor 0.0060 Oh

1 m2 Pasangan Stoot Werk


Bahan
Kayu Kaso 5 / 7 (borneo) 0.0882 m3
Paku 0.5000 kg
Tenaga
Perkerja 0.1500 org
Tukang Kayu 0.2000 org
Kepala Tukang 0.2000 org
Mandor 0.0170 org

1 m2 Pasang Bekisting untuk Pondasi


Bahan
Kayu Terentang 0.040 m3
Paku Biasa 2" - 5" 0.300 Kg
Minyak Bekisting 0.100 Lt
Tenaga
Perkerja 0.300 Oh
Tukang Kayu 0.260 Oh
Kepala Tukang 0.0260 Oh
Mandor 0.0050 Oh

1 m2 Pasang Bekisting untuk Sloof


Bahan
Kayu Terentang 0.040 m3
Paku Biasa 2" - 5" 0.300 Kg
Minyak Bekisting 0.100 Lt
Tenaga
Perkerja 0.300 Oh
Tukang Kayu 0.260 Oh
Kepala Tukang 0.0260 Oh
Mandor 0.0050 Oh

1 m2 Pasang Bekisting untuk Kolom


Bahan
Kayu Terentang 0.040 m3
Paku Biasa 2" - 5" 0.400 Kg
Minyak Bekisting 0.200 Lt
Balok Kayu Borneo 0.015 m3
Plywood 9 mm 0.350 lbr
Dolken Kayu Galam 8 - 10 / 4m 2.000 btg
Tenaga
Perkerja 0.300 Oh
Tukang Kayu 0.330 Oh
Kepala Tukang 0.0330 Oh
Mandor 0.0060 Oh

1 m2 Pasang Bekisting untuk Balok


Bahan
Kayu Terentang 0.040 m3
Paku Biasa 2" - 5" 0.400 Kg
Minyak Bekisting 0.200 Lt
Balok Kayu Borneo 0.018 m3
Plywood 9 mm 0.350 lbr
Dolken Kayu Galam 8 - 10 / 4m 2.000 btg
Tenaga
Perkerja 0.320 Oh
Tukang Kayu 0.330 Oh
Kepala Tukang 0.0330 Oh
Mandor 0.0060 Oh

1 m2 Pasang Bekisting untuk Lantai


Bahan
Kayu Terentang 0.040 m3
Paku Biasa 2" - 5" 0.400 Kg
Minyak Bekisting 0.200 Lt
Balok Kayu Borneo 0.015 m3
Plywood 9 mm 0.350 lbr
Dolken Kayu Galam 8 - 10 / 4m 6.000 btg
Tenaga
Perkerja 0.320 Oh
Tukang Batu 0.330 Oh
Kepala Tukang 0.033 Oh
Mandor 0.006 Oh

1 m2 Pasang Bekisting untuk Dinding


Bahan
Kayu Terentang 0.040 m3
Paku Biasa 2" - 5" 0.400 Kg
Minyak Bekisting 0.200 Lt
Balok Kayu Borneo 0.015 m3
Plywood 9 mm 0.350 lbr
Dolken Kayu Galam 8 - 10 / 4m 6.000 btg
Formtie / penjaga jarak bekisting 4.000 bh
Tenaga
Perkerja 0.320 Oh
Tukang Kayu 0.330 Oh
Kepala Tukang 0.033 Oh
Mandor 0.006 Oh

1 m2 Pasang Bekisting untuk Tangga


Bahan
Kayu Terentang 0.030 m3
Paku Biasa 2" - 5" 0.400 Kg
Minyak Bekisting 0.150 Lt
Balok Kayu Borneo 0.015 m3
Plywood 9 mm 0.350 lbr
Dolken Kayu Galam 8 - 10 / 4m 2.000 btg
Tenaga
Perkerja 0.320 Oh
Tukang Kayu 0.330 Oh
Kepala Tukang 0.033 Oh
Mandor 0.006 Oh

1 m Membuat Pondasi Beton Bertulang ( 150 Kg + bekisting )


Bahan
Kayu Terentang 0.200 m3
Paku Biasa 2" - 5" 1.500 Kg
Minyak Bekisting 0.400 Lt
Besi Beton Polos 150.000 Kg
Kawat Beton 2.250 Kg
Semen Portland 323.000 Kg
Pasir Beton 0.520 m3
Koral Beton 0.780 m3
Tenaga
Perkerja 3.900 Oh
Tukang Batu 0.350 Oh
Tukang Kayu 1.040 Oh
Tukang Besi 1.050 Oh
Kepala Tukang 0.245 Oh
Mandor 0.165 Oh

1 m Membuat Sloof Beton Bertulang ( 200 Kg + bekisting )


Bahan
Kayu Terentang 0.270 m3
Paku Biasa 2" - 5" 2.000 Kg
Minyak Bekisting 0.600 Lt
Besi Beton Polos 200.000 Kg
Kawat Beton 3.000 Kg
Semen Portland 323.000 Kg
Pasir Beton 0.520 m3
Koral Beton 0.780 m3
Tenaga
Perkerja 4.850 Oh
Tukang Batu 0.350 Oh
Tukang Kayu 1.560 Oh
Tukang Besi 1.400 Oh
Kepala Tukang 0.331 Oh
Mandor 0.170 Oh

1 m Membuat Kolom Beton Bertulang ( 300 Kg + bekisting )


Bahan
Kayu Terentang 0.400 m3
Paku Biasa 2" - 5" 4.000 Kg
Minyak Bekisting 2.000 Lt
Besi Beton Polos 300.000 Kg
Kawat Beton 4.500 Kg
Semen Portland 323.000 Kg
Pasir Beton 0.520 m3
Koral Beton 0.780 m3
Kayu Balok Borneo 0.150 m3
Plywood 9 mm 3.500 lbr
Dolken 8 / 4 m 20.000 btg
Tenaga
Perkerja 7.300 Oh
Tukang Batu 0.350 Oh
Tukang Kayu 3.300 Oh
Tukang Besi 2.100 Oh
Kepala Tukang 0.570 Oh
Mandor 0.250 Oh

1 m Membuat Balok Beton Bertulang ( 200 Kg + bekisting )


Bahan
Kayu Terentang 0.320 m3
Paku Biasa 2" - 5" 3.200 Kg
Minyak Bekisting 1.600 Lt
Besi Beton Polos 200.000 Kg
Kawat Beton 3.000 Kg
Semen Portland 323.000 Kg
Pasir Beton 0.520 m3
Koral Beton 0.780 m3
Kayu Balok Borneo 0.140 m3
Plywood 9 mm 2.800 lbr
Dolken 8 / 4 m 16.000 btg
Tenaga
Perkerja 5.960 Oh
Tukang Batu 0.350 Oh
Tukang Kayu 2.800 Oh
Tukang Besi 1.400 Oh
Kepala Tukang 0.455 Oh
Mandor 0.208 Oh

1 m Membuat Balok Beton Bertulang ( 150 Kg + bekisting )


Bahan
Kayu Terentang 0.320 m3
Paku Biasa 2" - 5" 3.200 Kg
Minyak Bekisting 1.600 Lt
Besi Beton Polos 150.000 Kg
Kawat Beton 2.250 Kg
Semen Portland 323.000 Kg
Pasir Beton 0.520 m3
Koral Beton 0.780 m3
Kayu Balok Borneo 0.120 m3
Plywood 9 mm 2.800 lbr
Dolken 8 / 4 m 32.000 btg
Tenaga
Perkerja 5.800 Oh
Tukang Batu 0.350 Oh
Tukang Kayu 2.800 Oh
Tukang Besi 1.050 Oh
Kepala Tukang 0.420 Oh
Mandor 0.185 Oh

1 m Membuat Dinding Beton Bertulang ( 150 Kg + bekisting )


Bahan
Kayu Terentang 0.240 m3
Paku Biasa 2" - 5" 3.200 Kg
Minyak Bekisting 1.600 Lt
Besi Beton Polos 150.000 Kg
Kawat Beton 2.250 Kg
Semen Portland 323.000 Kg
Pasir Beton 0.520 m3
Koral Beton 0.780 m3
Kayu Balok Borneo 0.160 m3
Plywood 9 mm 2.800 lbr
Dolken 8 / 4 m 24.000 btg
Tenaga
Perkerja 5.600 Oh
Tukang Batu 0.350 Oh
Tukang Kayu 2.640 Oh
Tukang Besi 1.050 Oh
Kepala Tukang 0.400 Oh
Mandor 0.193 Oh

1 m Membuat Tangga Beton Bertulang ( 200 Kg + bekisting )


Bahan
Kayu Terentang 0.250 m3
Paku Biasa 2" - 5" 3.000 Kg
Minyak Bekisting 1.200 Lt
Besi Beton Polos 200.000 Kg
Kawat Beton 3.000 Kg
Semen Portland 323.000 Kg
Pasir Beton 0.520 m3
Koral Beton 0.780 m3
Kayu Balok Borneo 0.105 m3
Plywood 9 mm 2.500 lbr
Dolken 8 / 4 m 14.000 btg
Tenaga
Perkerja 5.600 Oh
Tukang Batu 0.350 Oh
Tukang Kayu 2.300 Oh
Tukang Besi 1.400 Oh
Kepala Tukang 0.405 Oh
Mandor 0.202 Oh

1 m Membuat Kolom Penguat Beton Bertulang (11 x 11) cm


Bahan
Kayu Terentang 0.002 m3
Paku Biasa 2" - 5" 0.010 Kg
Besi Beton Polos 3.000 Kg
Kawat Beton 0.450 Kg
Semen Portland 4.000 Kg
Pasir Beton 0.006 m3
Koral Beton 0.009 m3
Tenaga
Perkerja 0.060 Oh
Tukang Batu 0.020 Oh
Tukang Kayu 0.020 Oh
Tukang Besi 0.020 Oh
Kepala Tukang 0.006 Oh
Mandor 0.003 Oh

1 m Membuat Ring Balok Beton Bertulang (10 x 15) cm


Bahan
Kayu Albasiah 0.003 m3
Paku Biasa 2" - 5" 0.200 Kg
Besi Beton Polos 3.600 Kg
Kawat Beton 0.050 Kg
Semen Portland 5.500 Kg
Pasir Beton 0.009 m3
Koral Beton 0.015 m3
Tenaga
Perkerja 0.100 Oh
Tukang Batu 0.330 Oh
Tukang Kayu 0.033 Oh
Tukang Besi 0.033 Oh
Kepala Tukang 0.010 Oh
Mandor 0.005 Oh

V PEKERJAAN PENTUP ATAP


1m Pasang Atap Genteng Palentong Kecil
Bahan
Genteng Palentong 25.000 bh
Tenaga
Perkerja 0.150 Oh
Tukang Kayu 0.075 Oh
Kepala Tukang 0.008 Oh
Mandor 0.008 Oh

1m Pasang Atap Genteng Kodok / Glazzur


Bahan
Genteng Kodok 25.000 bh
Tenaga
Perkerja 0.150 Oh
Tukang Kayu 0.075 Oh
Kepala Tukang 0.008 Oh
Mandor 0.008 Oh

1m Pasang Atap Genteng Palentong Super / Besar


Bahan
Genteng Palentong Super 12.000 bh
Tenaga
Perkerja 0.150 Oh
Tukang Kayu 0.060 Oh
Kepala Tukang 0.006 Oh
Mandor 0.008 Oh

1m' Pasang Genteng Bubung Palentong


Bahan
Genteng Bubung Palentong 5.000 bh
Semen Portland 8.000 Kg
Pasir Pasang 0.032 m3
Tenaga
Perkerja 0.400 Oh
Tukang Kayu 0.200 Oh
Kepala Tukang 0.020 Oh
Mandor 0.002 Oh

1m' Pasang Genteng Bubung Kodok Glazzur


Bahan
Genteng Bubung Kodok 5.000 bh
Semen Portland 8.000 Kg
Pasir Pasang 0.032 m3
Tenaga
Perkerja 0.400 Oh
Tukang Kayu 0.200 Oh
Kepala Tukang 0.020 Oh
Mandor 0.002 Oh

1m' Pasang Genteng Bubung Palentong Besar


Bahan
Genteng Bubung Palentong 4.000 bh
Semen Portland 8.000 Kg
Pasir Pasang 0.032 m3
Tenaga
Perkerja 0.400 Oh
Tukang Kayu 0.200 Oh
Kepala Tukang 0.020 Oh
Mandor 0.002 Oh

1m' Pasang Rooflight Fiberglass ( 180 x 90 ) cm


Bahan
Roof Light Fiberglass 0.600 lbr
Paku 0.050 Kg
Tenaga
Perkerja 0.140 Oh
Tukang Kayu 0.067 Oh
Kepala Tukang 0.007 Oh
Mandor 0.007 Oh

1m' Pasang Atap Asbes Gelombang ( 2.50 x 0.92 m ) X 5mm


Bahan
Asbes Gelombang 0.500 lbr
Paku Pancing 60 x 230 0.120 Kg
Tenaga
Perkerja 0.140 Oh
Tukang Kayu 0.075 Oh
Kepala Tukang 0.008 Oh
Mandor 0.008 Oh

1m' Pasang Atap Asbes Gelombang ( 2.25 x 0.92 m ) X 5mm


Bahan
Asbes Gelombang 0.600 lbr
Paku Pancing 60 x 230 0.120 Kg
Tenaga
Perkerja 0.140 Oh
Tukang Kayu 0.075 Oh
Kepala Tukang 0.008 Oh
Mandor 0.008 Oh

1m' Pasang Atap Asbes Gelombang ( 2.00 x 0.92 m ) X 5mm


Bahan
Asbes Gelombang 0.600 lbr
Paku Pancing 60 x 230 0.120 Kg
Tenaga
Perkerja 0.140 Oh
Tukang Kayu 0.070 Oh
Kepala Tukang 0.007 Oh
Mandor 0.007 Oh

1m' Pasang Atap Asbes Gelombang ( 1.80 x 0.92 m ) X 5mm


Bahan
Asbes Gelombang 0.750 lbr
Paku Pancing 60 x 230 0.120 Kg
Tenaga
Perkerja 0.140 Oh
Tukang Kayu 0.070 Oh
Kepala Tukang 0.007 Oh
Mandor 0.007 Oh

1m Pasang Atap Asbes Gelombang ( 300 x 1.05 m ) X 4mm


Bahan
Asbes Gelombang 0.350 lbr
Paku Pancing 60 x 230 0.120 Kg
Tenaga
Perkerja 0.140 Oh
Tukang Kayu 0.070 Oh
Kepala Tukang 0.007 Oh
Mandor 0.007 Oh

1m Pasang Atap Asbes Gelombang ( 270 x 1.05 m ) X 4mm


Bahan
Asbes Gelombang 0.420 lbr
Paku Pancing 60 x 230 0.120 Kg
Tenaga
Perkerja 0.140 Oh
Tukang Kayu 0.070 Oh
Kepala Tukang 0.007 Oh
Mandor 0.007 Oh

1m Pasang Atap Asbes Gelombang ( 240 x 1.05 m ) X 4mm


Bahan
Asbes Gelombang 0.440 lbr
Paku Pancing 60 x 230 0.120 Kg
Tenaga
Perkerja 0.140 Oh
Tukang Kayu 0.067 Oh
Kepala Tukang 0.007 Oh
Mandor 0.007 Oh

1m Pasang Atap Asbes Gelombang ( 210 x 1.05 m ) X 4mm


Bahan
Asbes Gelombang 0.510 lbr
Paku Pancing 60 x 230 0.120 Kg
Tenaga
Perkerja 0.140 Oh
Tukang Kayu 0.067 Oh
Kepala Tukang 0.007 Oh
Mandor 0.007 Oh

1m Pasang Atap Asbes Gelombang ( 1.5 x 1.05 m ) X 4mm


Bahan
Asbes Gelombang 0.800 lbr
Paku Pancing 60 x 230 0.120 Kg
Tenaga
Perkerja 0.140 Oh
Tukang Kayu 0.067 Oh
Kepala Tukang 0.007 Oh
Mandor 0.007 Oh

1m Pasang Atap Asbes Gelombang ( 3.00 x 1.08 m ) X 6mm


Bahan
Asbes Gelombang 0.370 lbr
Paku Pancing 60 x 230 0.120 Kg
Tenaga
Perkerja 0.140 Oh
Tukang Kayu 0.067 Oh
Kepala Tukang 0.007 Oh
Mandor 0.007 Oh
1m Pasang Atap Asbes Gelombang ( 2.7 x 1.08 m ) X 6mm
Bahan
Asbes Gelombang 0.380 lbr
Paku Pancing 60 x 230 0.120 Kg
Tenaga
Perkerja 0.140 Oh
Tukang Kayu 0.067 Oh
Kepala Tukang 0.007 Oh
Mandor 0.007 Oh

1m Pasang Atap Asbes Gelombang ( 2.4 x 1.08 m ) X 6mm


Bahan
Asbes Gelombang 0.460 lbr
Paku Pancing 60 x 230 0.120 Kg
Tenaga
Perkerja 0.140 Oh
Tukang Kayu 0.067 Oh
Kepala Tukang 0.007 Oh
Mandor 0.007 Oh

1m Pasang Atap Asbes Gelombang ( 2.1 x 1.08 m ) X 6mm


Bahan
Asbes Gelombang 0.490 lbr
Paku Pancing 60 x 230 0.120 Kg
Tenaga
Perkerja 0.140 Oh
Tukang Kayu 0.067 Oh
Kepala Tukang 0.007 Oh
Mandor 0.007 Oh

1m Pasang Atap Asbes Gelombang ( 1.80 x 1.08 m ) X 6mm


Bahan
Asbes Gelombang 0.570 lbr
Paku Pancing 60 x 230 0.120 Kg
Tenaga
Perkerja 0.140 Oh
Tukang Kayu 0.067 Oh
Kepala Tukang 0.007 Oh
Mandor 0.007 Oh

1m' Pasang Bubung Stel Gelombang 0.92m


Bahan
Asbes Gelombang 2.400 lbr
Paku Pancing 60 x 230 6.000 Kg
Tenaga
Perkerja 0.084 Oh
Tukang Kayu 0.125 Oh
Kepala Tukang 0.013 Oh
Mandor 0.004 Oh

1m' Pasang Nok Stel Gelombang 0.92m


Bahan
Asbes Gelombang 2.400 lbr
Paku Skrup 3.5" 6.000 bh
Tenaga
Perkerja 0.084 Oh
Tukang Kayu 0.125 Oh
Kepala Tukang 0.013 Oh
Mandor 0.004 Oh

1m' Pasang Nok Stel Gelombang 1.05m


Bahan
Asbes Gelombang 2.100 lbr
Paku Skrup 3.5" 6.000 bh
Tenaga
Perkerja 0.084 Oh
Tukang Kayu 0.125 Oh
Kepala Tukang 0.013 Oh
Mandor 0.004 Oh

1m' Pasang Nok Stel Gelombang 1.08m


Bahan
Asbes Gelombang 2.050 lbr
Paku Skrup 3.5" 6.000 bh
Tenaga
Perkerja 0.084 Oh
Tukang Kayu 0.125 Oh
Kepala Tukang 0.013 Oh
Mandor 0.004 Oh

1m' Pasang Nok Paten 0.92m


Bahan
Nok Paten 1.200 lbr
Paku Skrup 3.5" 6.000 bh
Tenaga
Perkerja 0.084 Oh
Tukang Kayu 0.125 Oh
Kepala Tukang 0.013 Oh
Mandor 0.004 Oh

1m' Pasang Nok Paten 1.05m


Bahan
Nok Paten 1.200 lbr
Paku Skrup 3.5" 6.000 bh
Tenaga
Perkerja 0.084 Oh
Tukang Kayu 0.125 Oh
Kepala Tukang 0.013 Oh
Mandor 0.004 Oh

1m' Pasang Nok Paten 1.08m


Bahan
Nok Paten 1.200 lbr
Paku Skrup 3.5" 6.000 bh
Tenaga
Perkerja 0.084 Oh
Tukang Kayu 0.125 Oh
Kepala Tukang 0.013 Oh
Mandor 0.004 Oh

1m' Pasang Nok Stel rata 0.92m


Bahan
Nok Stel rata 1.100 lbr
Paku Skrup 3.5" 6.000 bh
Tenaga
Perkerja 0.100 Oh
Tukang Kayu 0.150 Oh
Kepala Tukang 0.013 Oh
Mandor 0.004 Oh

1m' Pasang Nok Stel rata 1.05m


Bahan
Nok Stel rata 1.100 lbr
Paku Skrup 3.5" 6.000 bh
Tenaga
Perkerja 0.084 Oh
Tukang Kayu 0.125 Oh
Kepala Tukang 0.013 Oh
Mandor 0.004 Oh

1m Pasang Atap Genteng Beton


Bahan
Genteng Beton 11.000 lbr
Paku Biasa 2" - 5" 0.030 bh
Tenaga
Perkerja 0.200 Oh
Tukang Kayu 0.100 Oh
Kepala Tukang 0.010 Oh
Mandor 0.010 Oh

1m Pasang Atap Genteng Aspal


Bahan
Genteng Aspal 6.900 lbr
Plywood 4 mm 0.350 lbr
Paku Biasa 1/2" - 1" 0.030 Kg
Plastic Aerator 0.500 Bh
Tenaga
Perkerja 0.200 Oh
Tukang Kayu 0.300 Oh
Kepala Tukang 0.003 Oh
Mandor 0.010 Oh

1m Pasang Atap Genteng Metal


Bahan
Genteng Metal 1.020 lbr
Paku Biasa 2" - 5" 0.200 Kg
Tenaga
Perkerja 0.200 Oh
Tukang Kayu 0.100 Oh
Kepala Tukang 0.010 Oh
Mandor 0.001 Oh

1m Pasang Atap Sirap


Bahan
Genteng Sirap 60.000 lbr
Paku Biasa " - 1" 0.200 Kg
Tenaga
Perkerja 0.166 Oh
Tukang Kayu 0.250 Oh
Kepala Tukang 0.025 Oh
Mandor 0.008 Oh

1m' Pasang Nok Genteng Beton


Bahan
Genteng Beton 3.500 lbr
Paku Biasa 2" - 5" 0.050 Kg
Semen abu -abu 10.800 Kg
Pasir Pasang 0.032 m3
Semen Warna 1.000 Kg
Tenaga
Perkerja 0.400 Oh
Tukang Kayu 0.200 Oh
Kepala Tukang 0.020 Oh
Mandor 0.020 Oh

1m' Pasang Nok Genteng Aspal


Bahan
Genteng Aspal 2.000 lbr
Paku Biasa " - 1" 0.050 Kg
Balok Kayu Borneo 0.0035 Kg
Tenaga
Perkerja 0.125 Oh
Tukang Kayu 0.250 Oh
Kepala Tukang 0.025 Oh
Mandor 0.006 Oh

1m' Pasang Nok Genteng Metal


Bahan
Genteng Decra Bond 1.100 lbr
Paku Biasa " - 1" 0.050 Kg
Tenaga
Perkerja 0.250 Oh
Tukang Kayu 0.150 Oh
Kepala Tukang 0.015 Oh
Mandor 0.013 Oh

1m' Pasang Nok Genteng Metal


Bahan
Genteng Decra Bond 1.100 lbr
Paku Biasa " - 1" 0.050 Kg
Tenaga
Perkerja 0.250 Oh
Tukang Kayu 0.150 Oh
Kepala Tukang 0.015 Oh
Mandor 0.013 Oh

1m' Pasang Nok Sirap


Bahan
Seng Plat 3" x 6" BJLS 28 0.400 Lbr
Paku Biasa " - 1" 0.060 Kg
Paku Biasa 2" - 5" 0.050 Kg
Papan Kayu Borneo tebal 3cm 0.004 m3
Tenaga
Perkerja 0.125 Oh
Tukang Kayu 0.250 Oh
Kepala Tukang 0.025 Oh
Mandor 0.006 Oh

1m Pasang Atap Seng Gelombang


Bahan
Seng Gelombang 3" x 6" BJLS 28 0.700 Lbr

Paku Biasa " - 1" 0.020 Kg


Tenaga
Perkerja 0.120 Oh
Tukang Kayu 0.060 Oh
Kepala Tukang 0.006 Oh
Mandor 0.006 Oh

1m Pasang Atap Nok Seng


Bahan
Seng Plat 3" x 6" BJLS 28 0.300 Lbr
Paku Biasa " - 1" 0.040 Kg
Tenaga
Perkerja 0.015 Oh
Tukang Kayu 0.070 Oh
Kepala Tukang 0.008 Oh
Mandor 0.006 Oh

1m Pasang Atap Alluminium


Bahan
Atap Alluminium Gelombang tebal 0.55 1.050 m2
Paku Hak Pnjang 15 cm 0.020 Kg
Tenaga
Perkerja 0.015 Oh
Tukang Kayu 0.075 Oh
Kepala Tukang 0.008 Oh
Mandor 0.006 Oh

1m Pasang Nok Alluminium


Bahan
Nok standar 40 cm 18, swg 22 1.200 m2
Paku Hak Pnjang 15 cm 0.040 Kg
Tenaga
Perkerja 0.100 Oh
Tukang Kayu 1.000 Oh
Kepala Tukang 0.010 Oh
Mandor 0.010 Oh

1m Pasang Alluminium Foil / Sisalation


Bahan
Sisalation / Alluminium Foil 1.050 m2
Tenaga
Perkerja 0.150 Oh
Tukang Kayu 0.050 Oh
Kepala Tukang 0.005 Oh
Mandor 0.008 Oh

VII PEKERJAAN LANGIT - LANGIT


1 m2 Pas. Rangka Plapond Kayu Kls I (Hanya Rangka)
Bahan
Kayu Balok Borneo 0.0210 m3
Paku 0.2200 kg
Tenaga
Perkerja 0.1875 org
Tukang Kayu 0.2250 org
Kepala Tukang 0.0375 org
Mandor 0.0105 org

1 m Langit - langit Asbes ( 1.00 x 1.00 )m tebal 5 mm


Bahan
Pelat Asbes tebal 5 mm 1.100 lbr
Paku 0.010 Kg
Tenaga
Perkerja 0.030 Oh
Tukang Kayu 0.070 Oh
Kepala Tukang 0.007 Oh
Mandor 0.0015 Oh

1 m Langit - langit Asbes ( 1.00 x 1.00 )m tebal 4 mm


Bahan
Pelat Asbes tebal 4 mm 1.100 lbr
Paku 0.010 Kg
Tenaga
Perkerja 0.030 Oh
Tukang Kayu 0.070 Oh
Kepala Tukang 0.007 Oh
Mandor 0.0015 Oh

1 m Langit - langit Asbes ( 1.00 x 1.00 )m tebal 3.5 mm


Bahan
Pelat Asbes tebal 4 mm 1.100 lbr
Paku 0.010 Kg
Tenaga
Perkerja 0.030 Oh
Tukang Kayu 0.070 Oh
Kepala Tukang 0.007 Oh
Mandor 0.0015 Oh

1 m Langit - langit Akustik ( 30 x 30 )cm


Bahan
Akustik 30 x 30 cm 11.500 lbr
Paku 0.050 Kg
Tenaga
Perkerja 0.060 Oh
Tukang Kayu 0.120 Oh
Kepala Tukang 0.012 Oh
Mandor 0.0030 Oh

1 m Langit - langit Akustik ( 30 x 60 )cm


Bahan
Akustik 30 x 60 cm 5.800 lbr
Paku 0.050 Kg
Tenaga
Perkerja 0.060 Oh
Tukang Kayu 0.100 Oh
Kepala Tukang 0.010 Oh
Mandor 0.0030 Oh

1 m Langit - langit Akustik ( 60 x 120 )cm


Bahan
Akustik Arm Strong Ukuran 30 x 120 cm 1.500 lbr
Paku 0.050 Kg
Tenaga
Perkerja 0.060 Oh
Tukang Kayu 0.100 Oh
Kepala Tukang 0.010 Oh
Mandor 0.0030 Oh

1 m Langit - langit Plywood ( 30 x 60 )cm, tebal 4 mm


Bahan
Plywood 4 mm 0.360 lbr
Paku 0.030 Kg
Tenaga
Perkerja 0.070 Oh
Tukang Kayu 0.100 Oh
Kepala Tukang 0.010 Oh
Mandor 0.0035 Oh

1 m Langit - langit Plywood ( 30 x 60 )cm, tebal 6 mm


Bahan
Plywood 4 mm 0.360 lbr
Paku 0.030 Kg
Tenaga
Perkerja 0.070 Oh
Tukang Kayu 0.100 Oh
Kepala Tukang 0.010 Oh
Mandor 0.0035 Oh

1 m Langit - langit Plywood ( 60 x 120 )cm, tebal 4 mm


Bahan
Plywood 4 mm 0.360 lbr
Paku 0.030 Kg
Tenaga
Perkerja 0.070 Oh
Tukang Kayu 0.100 Oh
Kepala Tukang 0.010 Oh
Mandor 0.0035 Oh

1 m Langit - langit Plywood ( 60 x 120 )cm, tebal 6 mm


Bahan
Plywood 4 mm 0.360 lbr
Paku 0.030 Kg
Tenaga
Perkerja 0.070 Oh
Tukang Kayu 0.100 Oh
Kepala Tukang 0.010 Oh
Mandor 0.0035 Oh

1 m Langit - langit Teakwood ( 30 x 60 )cm, tebal 4 mm


Bahan
Teakwood 4' x 8' x 4mm 0.360 lbr
Paku 0.030 Kg
Tenaga
Perkerja 0.070 Oh
Tukang Kayu 0.100 Oh
Kepala Tukang 0.010 Oh
Mandor 0.0035 Oh

1 m Langit - langit Teakwood ( 60 x 120 )cm, tebal 4 mm


Bahan
Teakwood 4' x 8' x 4mm 0.360 lbr
Paku 0.030 Kg
Tenaga
Perkerja 0.070 Oh
Tukang Kayu 0.100 Oh
Kepala Tukang 0.010 Oh
Mandor 0.0035 Oh

1 m Langit - langit Gypsum


Bahan
Gypsum 0.360 lbr
Paku 0.030 Kg
Tenaga
Perkerja 0.070 Oh
Tukang Kayu 0.100 Oh
Kepala Tukang 0.010 Oh
Mandor 0.0035 Oh
1 m Langit - langit Kayu Jati
Bahan
Papan Kayu Jati 0.024 m3
Paku 0.010 Kg
Paku Sekrup 0.050 Kg
Tenaga
Perkerja 0.200 Oh
Tukang Kayu 0.600 Oh
Kepala Tukang 0.060 Oh
Mandor 0.0100 Oh

1 m Langit - langit Kayu Ramin


Bahan
Papan Kayu Ramin 0.024 lbr
Paku 0.010 Kg
Paku Sekrup 0.050 Kg
Tenaga
Perkerja 0.200 Oh
Tukang Kayu 0.600 Oh
Kepala Tukang 0.060 Oh
Mandor 0.0100 Oh

1 m Langit - langit Kayu Kamper


Bahan
Papan Kayu Kamper 0.024 lbr
Paku 0.010 Kg
Paku Sekrup 0.050 Kg
Tenaga
Perkerja 0.200 Oh
Tukang Kayu 0.600 Oh
Kepala Tukang 0.060 Oh
Mandor 0.0100 Oh

1 m Langit - langit Softboard


Bahan
Softboard 4' x 8' x 4mm 0.350 lbr
Paku 0.030 Kg
Tenaga
Perkerja 0.600 Oh
Tukang Kayu 0.100 Oh
Kepala Tukang 0.010 Oh
Mandor 0.0030 Oh
1 m Langit - langit Akustik 60 x 120 cm + rangka Alluminium
Bahan
Profil Alluminium " T " 3.600 m'
Kawat seng polos 0.150 Kg
Ramset / Dinabolt 1.000 bh
Akustik Armstrom 60 x 120cm 1.500 lbr
Tenaga
Perkerja 0.150 Oh
Tukang Kayu 0.500 Oh
Kepala Tukang 0.050 Oh
Mandor 0.0075 Oh

1 m List Langit - langit Kayu Profil


Bahan
List Kayu Profil 1.100 m'
Paku 0.010 Kg
Tenaga
Perkerja 0.050 Oh
Tukang Kayu 0.050 Oh
Kepala Tukang 0.005 Oh
Mandor 0.0030 Oh

1 m Langit - langit Plywood 4 mm + RangkaKayu Borneo


Bahan
Balok Kayu Borneo 0.023 m3
Paku 0.060 Kg
Plywood 4 mm 0.390 lbr

Tenaga
Perkerja 0.270 Oh
Tukang Kayu 0.400 Oh
Kepala Tukang 0.040 Oh
Mandor 0.0135 Oh

1 m Langit - langit Asbes ( 1.00 x 1.00 )m, tebal 3.2mm Rangka Borneo
Bahan
Balok Kayu Borneo 0.012 m3
Paku 0.060 Kg
Asbes 1.100 lbr
Tenaga
Perkerja 0.180 Oh
Tukang Kayu 0.320 Oh
Kepala Tukang 0.032 Oh
Mandor 0.0090 Oh

1 m Langit - langit Akustik ( 30 x 60 )cm + Rangka Kayu Borneo


Bahan
Balok Kayu Borneo 0.023 m3
Paku 0.060 Kg
Akustik 30 x 60 cm 5.800 lbr
Tenaga
Perkerja 0.260 Oh
Tukang Kayu 0.400 Oh
Kepala Tukang 0.040 Oh
Mandor 0.0130 Oh

1 m Langit - langit Akustik ( 30 x 30 )cm + Rangka Kayu Borneo


Bahan
Balok Kayu Borneo 0.027 m3
Paku 0.060 Kg
Akustik 30 x 30 cm 11.500 lbr
Tenaga
Perkerja 0.310 Oh
Tukang Kayu 0.470 Oh
Kepala Tukang 0.047 Oh
Mandor 0.0155 Oh

IX PEKERJAAN SANITASI
Memasang 1 buah Kloset Duduk / Monoblok
Bahan
Kloset Duduk / Monoblok 1.000 bh
Perlengkapan 30% Dari bahan
Tenaga
Perkerja 3.300 Oh
Tukang Batu 1.100 Oh
Kepala Tukang 0.001 Oh
Mandor 0.1600 Oh

Memasang 1 buah Kloset Jongkok Porselen


Bahan
Kloset Jongkok Porselen 1.000 bh
Semen Portland 6.000 Kg
Pasir Pasang 0.010 m3
Tenaga
Perkerja 1.000 Oh
Tukang Batu 1.500 Oh
Kepala Tukang 1.500 Oh
Mandor 0.1600 Oh

Memasang 1 buah Kloset Jongkok Teraso


Bahan
Kloset Jongkok Teraso 1.000 bh
Bata merah kelas I 7.000 bh
Semen Portland 6.000 Kg
Pasir Pasang 0.010 m3
Tenaga
Perkerja 1.000 Oh
Tukang Batu 1.500 Oh
Kepala Tukang 0.300 Oh
Mandor 0.1100 Oh

Memasang 1 buah Urinoir


Bahan
Urinoir 1.000 bh
Perlengkapan 30% Harga Urinoir
Semen Portland 6.000 Kg
Pasir Pasang 0.010 m3
Tenaga
Perkerja 1.000 Oh
Tukang Batu 1.000 Oh
Kepala Tukang 0.100 Oh
Mandor 0.1000 Oh

Memasang 1 buah Wastafel


Bahan
Urinoir 1.000 bh
Perlengkapan 12% Harga Urinoir
Semen Abu -abu 6.000 Kg
Pasir Pasang 0.010 m3
Tenaga
Perkerja 1.000 Oh
Tukang Batu 1.450 Oh
Kepala Tukang 0.150 Oh
Mandor 0.1000 Oh
Memasang 1 buah Bak Mandi Teraso, volume 0.30 m
Bahan
Bak Teraso 1.000 bh
Semen Portland 6.000 Kg
Pasir Pasang 0.010 m3
Tenaga
Perkerja 2.100 Oh
Tukang Batu 0.750 Oh
Kepala Tukang 0.070 Oh
Mandor 0.1100 Oh

Memasang 1 buah Bak Mandi Fiberglass, volume 0.30 m


Bahan
Bak Fiberglass 1.000 bh
Perlengkapan 18% Harga Bak
Tenaga
Perkerja 1.800 Oh
Tukang Batu 2.700 Oh
Kepala Tukang 0.540 Oh
Mandor 0.1100 Oh

Memasang 1 buah Bak Mandi Batu bata, volume 0.30 m


Bahan
Bata merah kelas I 0.400 m3
Semen Portland 120.000 Kg
Pasir Pasang 0.300 m3
Porselen ( 11 x 11 ) cm 360.000 bh
Semen Nat 6.000 Kg
Tenaga
Perkerja 6.000 Oh
Tukang Batu 3.000 Oh
Kepala Tukang 0.300 Oh
Mandor 0.3000 Oh

Memasang 1 buah Badkip Porselen


Bahan
Badkip 1.000 bh
Perlengkapan 20% harga Badkip
Tenaga
Perkerja - Oh
Tukang Batu 0.075 Oh
Kepala Tukang 0.750 Oh
Mandor 0.2500 Oh

Memasang 1 buah Bak Fiberglass volume 1 m air


Bahan
Bak Fiberglass 1.000 bh
Perlengkapan 12% Harga Bak
Tenaga
Perkerja 3.000 Oh
Tukang Batu 4.500 Oh
Kepala Tukang 0.900 Oh
Mandor 0.9000 Oh

Memasang 1 m' Pipa Penyalur Air limbah jenis Pipa Tanah 15 cm


Bahan
Pipa Tanah 1.600 bh
Semen Portland 0.680 Kg
Pasir Pasang 0.013 m3
Pasir Urug 0.011 m3
Tenaga
Perkerja 0.060 Oh
Tukang Batu 0.030 Oh
Kepala Tukang 0.003 Oh
Mandor 0.0025 Oh

Memasang 1 m' Pipa Penyalur Air limbah jenis Pipa Tanah 20 cm


Bahan
Pipa Tanah 1.600 bh
Semen Portland 0.870 Kg
Pasir Pasang 0.014 m3
Pasir Urug 0.014 m3
Tenaga
Perkerja 0.080 Oh
Tukang Batu 0.040 Oh
Kepala Tukang 0.004 Oh
Mandor 0.0070 Oh

Memasang 1 m' Pipa Beton 5 cm - 20 cm


Bahan
Pipa Beton 1.100 bh
Bata merah kelas I 0.270 m3
Semen Portland 3.920 Kg
Pasir Pasang 0.056 m3
Pasir Urug 0.024 m3
Tenaga
Perkerja 0.140 Oh
Tukang Batu 0.070 Oh
Kepala Tukang 0.007 Oh
Mandor 0.0070 Oh

Memasang 1 m' Pipa Beton 30 cm - 100 cm


Bahan
Pipa Beton 1.100 bh
Bata merah kelas I 0.550 m3
Semen Portland 10.300 Kg
Pasir Pasang 0.061 m3
Pasir Urug 0.069 m3
Tenaga
Perkerja 0.380 Oh
Tukang Batu 0.190 Oh
Kepala Tukang 0.019 Oh
Mandor 0.0190 Oh

Memasang 1 m' buah Bak Kontrol pasangan Batu Bata ukuran (30 x 30 )cm, t = 35cm
Bahan
Bata merah kelas I 0.145 m3
Semen Portland 44.000 Kg
Pasir Pasang 0.070 m3
Batu Kerikil 0.070 m3
Besi Beton 1.600 Kg
Pasir Beton 0.060 m3
Tenaga
Perkerja 3.200 Oh
Tukang Batu 1.015 Oh
Kepala Tukang 0.0015 Oh
Mandor 0.0160 Oh

Memasang 1 m' buah Bak Kontrol pasangan Batu Bata ukuran (45 x 45 )cm, t = 50cm
Bahan
Bata merah kelas I 0.250 m3
Semen Portland 77.000 Kg
Pasir Pasang 0.130 m3
Batu Kerikil 0.020 m3
Besi Beton 2.600 Kg
Pasir Beton 0.090 m3
Tenaga
Perkerja 1.420 Oh
Tukang Batu 0.473 Oh
Kepala Tukang 0.0470 Oh
Mandor 0.0710 Oh

Memasang 1 m' buah Bak Kontrol pasangan Batu Bata ukuran (60 x 60 )cm, t = 65cm
Bahan
Bata merah kelas I 0.371 m3
Semen Portland 114.000 Kg
Pasir Pasang 0.184 m3
Batu Koral 0.033 m3
Besi Beton 4.850 Kg
Pasir Beton 0.120 m3
Tenaga
Perkerja 2.160 Oh
Tukang Batu 0.720 Oh
Kepala Tukang 0.0720 Oh
Mandor 0.1080 Oh
Tukang Gali 0.1000 Oh

Memasang 1 m' Pipa Galvanis "


Bahan
Pipa Galvanis 1.200 m'
Perlengkapan 35% Harga Pipa
Tenaga
Perkerja 0.054 Oh
Tukang Batu 0.090 Oh
Kepala Tukang 0.0090 Oh
Mandor 0.0270 Oh

Memasang 1 m' Pipa Galvanis "


Bahan
Pipa Galvanis 1.200 m'
Perlengkapan 35% Harga Pipa
Tenaga
Perkerja 0.054 Oh
Tukang Batu 0.090 Oh
Kepala Tukang 0.0090 Oh
Mandor 0.0270 Oh
Memasang 1 m' Pipa Galvanis 1"
Bahan
Pipa Galvanis 1.200 m'
Perlengkapan 35% Harga Pipa
Tenaga
Perkerja 0.054 Oh
Tukang Batu 0.090 Oh
Kepala Tukang 0.0090 Oh
Mandor 0.0270 Oh

Memasang 1 m' Pipa Galvanis 1"


Bahan
Pipa Galvanis 1.200 m'
Perlengkapan 35% Harga Pipa
Tenaga
Perkerja 0.108 Oh
Tukang Batu 0.180 Oh
Kepala Tukang 0.0180 Oh
Mandor 0.0054 Oh

Memasang 1 m' Pipa Galvanis 3"


Bahan
Pipa Galvanis 1.200 m'
Perlengkapan 35% Harga Pipa
Tenaga
Perkerja 0.108 Oh
Tukang Batu 0.180 Oh
Kepala Tukang 0.0180 Oh
Mandor 0.0054 Oh

Memasang 1 m' Pipa Galvanis 4"


Bahan
Pipa Galvanis D 4" 1.200 m'
Perlengkapan 35% Harga Pipa
Tenaga
Perkerja 0.135 Oh
Tukang Batu 0.225 Oh
Kepala Tukang 0.0225 Oh
Mandor 0.0068 Oh

Memasang 1 m' Pipa PVC tipe AW "


Bahan
Pipa PVC D 1/2" 1.200 m'
Perlengkapan 35% Harga Pipa
Tenaga
Perkerja 0.036 Oh
Tukang Batu 0.060 Oh
Kepala Tukang 0.0060 Oh
Mandor 0.0018 Oh

Memasang 1 m' Pipa PVC tipe AW "


Bahan
Pipa PVC tipe AW " 1.200 m'
Perlengkapan 35% Harga Pipa
Tenaga
Perkerja 0.036 Oh
Tukang Batu 0.060 Oh
Kepala Tukang 0.0060 Oh
Mandor 0.0018 Oh

Memasang 1 m' Pipa PVC tipe AW 1"


Bahan
Pipa PVC tipe AW 1" 1.200 m'
Perlengkapan 35% Harga Pipa
Tenaga
Perkerja 0.036 Oh
Tukang Batu 0.060 Oh
Kepala Tukang 0.0060 Oh
Mandor 0.0018 Oh

Memasang 1 m' Pipa PVC tipe AW 1"


Bahan
Pipa PVC tipe AW 1" 1.200 m'
Perlengkapan 35% Harga Pipa
Tenaga
Perkerja 0.036 Oh
Tukang Batu 0.060 Oh
Kepala Tukang 0.0060 Oh
Mandor 0.0018 Oh

Memasang 1 m' Pipa PVC tipe AW 2"


Bahan
Pipa PVC tipe AW 2" 1.200 m'
Perlengkapan 35% Harga Pipa
Tenaga
Perkerja 0.054 Oh
Tukang Batu 0.090 Oh
Kepala Tukang 0.0090 Oh
Mandor 0.0027 Oh

Memasang 1 m' Pipa PVC tipe AW 2"


Bahan
Pipa PVC tipe AW 2" 1.200 m'
Perlengkapan 35% Harga Pipa
Tenaga
Perkerja 0.036 Oh
Tukang Batu 0.060 Oh
Kepala Tukang 0.0060 Oh
Mandor 0.0018 Oh

Memasang 1 m' Pipa PVC tipe AW 3"


Bahan
Pipa PVC tipe AW 3" 1.200 m'
Perlengkapan 35% Harga Pipa
Tenaga
Perkerja 0.081 Oh
Tukang Batu 0.135 Oh
Kepala Tukang 0.0135 Oh
Mandor 0.0041 Oh

Memasang 1 m' Pipa PVC tipe AW 4"


Bahan
Pipa PVC tipe AW 4" 1.200 m'
Perlengkapan 35% Harga Pipa
Tenaga
Perkerja 0.081 Oh
Tukang Batu 0.135 Oh
Kepala Tukang 0.0135 Oh
Mandor 0.0041 Oh

Memasang 1 bh Bak Cuci Piring Stainles Steel


Bahan
Bak cuci Stainless steel 1.000 bh
Water Drain + Asesories 1.000 set
Tenaga
Perkerja 0.030 Oh
Tukang Batu 0.300 Oh
Kepala Tukang 0.0300 Oh
Mandor 0.0015 Oh

Memasang 1 bh Bak Cuci Piring Teraso


Bahan
Bak cuci Teraso 1.000 bh
Water Drain + Asesories 1.000 set
Semen Portland 20.000 Kg
Pasir Pasang 0.050 m3
Tenaga
Perkerja 0.050 Oh
Tukang Batu 0.500 Oh
Kepala Tukang 0.0500 Oh
Mandor 0.0025 Oh

Memasang 1 bh Kran " atau "


Bahan
Kran Air 1.000 bh
Seal tape 0.025 bh
Tenaga
Perkerja 0.010 Oh
Tukang Batu 0.100 Oh
Kepala Tukang 0.0100 Oh
Mandor 0.0050 Oh

Memasang 1 bh Floor Drain


Bahan
Kran Air 1.000 bh
Tenaga
Perkerja 0.010 Oh
Tukang Batu 0.100 Oh
Kepala Tukang 0.0100 Oh
Mandor 0.0050 Oh

VII PEKERJAAN BESI DAN ALLUMINIUM


1 Kg Pasang Rangka Atap Baja
Bahan
Besi Profil WF 1.100 Kg
Meni Besi 0.080 Kg
Tenaga
Perkerja 0.006 Oh
Tukang Besi 0.060 Oh
Kepala Tukang 0.0060 Oh
Mandor 0.0003 Oh

1 m Pasang Pintu Besi Baja


Bahan
Pintu Besi Baja 1.000 m2
Tenaga
Perkerja 0.650 Oh
Tukang Besi Konstruksi 0.650 Oh
Kepala Tukang 0.0650 Oh
Mandor 0.0320 Oh

1 m Pasang Jendela Besi


Bahan
Jendela Besi 1.000 m2
Tenaga
Perkerja 1.050 Oh
Tukang Besi Konstruksi 1.050 Oh
Kepala Tukang 0.1050 Oh
Mandor 0.00525 Oh

1 m Pasang Jendela Besi Tahan Api


Bahan
Jendela Besi Tahan Api 1.000 m2
Tenaga
Perkerja 1.022 Oh
Tukang Besi Konstruksi 1.200 Oh
Kepala Tukang 0.1200 Oh
Mandor 0.0060 Oh

1 m Pasang Pintu gulung besi


Bahan
Pintu gulung besi 1.000 m2
Tenaga
Perkerja 1.200 Oh
Tukang Besi Konstruksi 1.200 Oh
Kepala Tukang 0.1200 Oh
Mandor 0.0060 Oh

1 m Pasang Pintu Lipat


Bahan
Pintu Lipat 1.000 m2
Tenaga
Perkerja 1.050 Oh
Tukang Besi Konstruksi 1.050 Oh
Kepala Tukang 0.1050 Oh
Mandor 0.0052 Oh

1 m Pasang Pintu Suncreen Allumunium


Bahan
Suncreen Allumunium 1.000 m2
Tenaga
Perkerja 0.080 Oh
Tukang Besi Konstruksi 0.800 Oh
Kepala Tukang 0.080 Oh
Mandor 0.004 Oh

1 m Pasang Rolling Door


Bahan
Rolling Door 1.000 m2
Tenaga
Perkerja 1.050 Oh
Tukang Besi Konstruksi 1.500 Oh
Kepala Tukang 0.105 Oh
Mandor 0.0052 Oh

1 m Pasang Pintu Allumunium


Bahan
Pintu Allumunium 1.000 m2
Tenaga
Perkerja 1.050 Oh
Tukang Besi Konstruksi 1.050 Oh
Kepala Tukang 0.105 Oh
Mandor 0.0052 Oh

1 m Pasang Venetions Blinds


Bahan
Venetions Blinds 1.000 m2
Tenaga
Perkerja 0.350 Oh
Tukang Kayu 0.350 Oh
Kepala Tukang 0.035 Oh
Mandor 0.00175 Oh
1 m Pasang Vertikals Blinds
Bahan
Venetions Blinds 1.000 m2
Tenaga
Perkerja 0.350 Oh
Tukang Kayu 0.350 Oh
Kepala Tukang 0.035 Oh
Mandor 0.00175 Oh

1 m Pasang Terali Besi


Bahan
Terali Besi 2 x 3 11.500 m'
Tenaga
Perkerja 1.200 Oh
Tukang Las 1.200 Oh
Kepala Tukang 0.012 Oh
Mandor 0.0006 Oh

1 m Pasang Kawat Harmonika


Bahan
Kawat Harmonika 1.100 m2
Paku Biasa " - 1" 0.020 Kg
Papan Kayu Kamper 0.0018 m3
Tenaga
Perkerja 0.100 Oh
Tukang Kayu 0.100 Oh
Kepala Tukang 0.010 Oh
Mandor 0.0005 Oh

1 m Pasang Kawat Nyamuk


Bahan
Kawat Nyamuk 1.100 m2
Paku Biasa " - 1" 0.020 Kg
Papan Kayu Kamper 0.0018 m3
Tenaga
Perkerja 0.100 Oh
Tukang Kayu 0.100 Oh
Kepala Tukang 0.010 Oh
Mandor 0.0005 Oh
1 m Pasang Kawat Kassa
Bahan
Kawat Kassa 1.100 m2
Paku Biasa " - 1" 0.020 Kg
Papan Kayu Kamper 0.0018 m3
Tenaga
Perkerja 0.100 Oh
Tukang Kayu 0.100 Oh
Kepala Tukang 0.010 Oh
Mandor 0.0005 Oh

1 m Pasang Kawat Burung


Bahan
Kawat Burung 1.100 m2
Paku Biasa " - 1" 0.020 Kg
Papan Kayu Kamper 0.0018 m3
Tenaga
Perkerja 0.100 Oh
Tukang Kayu 0.100 Oh
Kepala Tukang 0.010 Oh
Mandor 0.0005 Oh

1 m Pasang Jendela Nako & Tralis


Bahan
Jendela Nako 1.100 m2
Paku Biasa " - 1" atau Sekrup 0.020 Kg
Besi Strip 0.0250 m2
Tenaga
Perkerja 0.200 Oh
Tukang Kayu 0.200 Oh
Kepala Tukang 0.020 Oh
Mandor 0.0010 Oh

1 m Pasang Talang Datar , Seng BJLS 28


Bahan
Seng Plat 3" x 6" BJLS 28 0.500 Lbr
Paku Biasa " - 1" atau Sekrup 0.015 Kg
Papan Kayu Borneo 0.0096 m3
Flincote / Meni Besi 0.2500 Kg
Tenaga
Perkerja 0.150 Oh
Tukang Kayu 0.400 Oh
Kepala Tukang 0.025 Oh
Mandor 0.00125 Oh

1 m Pasang Talang Miring , Seng BJLS 28


Bahan
Seng Plat 3" x 6" BJLS 28 0.500 Lbr
Paku Biasa " - 1" atau Sekrup 0.015 Kg
Papan Kayu Borneo 0.0190 m3
Flincote / Meni Besi 0.3000 Kg
Tenaga
Perkerja 0.040 Oh
Tukang Kayu 0.400 Oh
Kepala Tukang 0.025 Oh
Mandor 0.00125 Oh

1 m Pasang Talang Lingkaran 10 cm, Seng BJLS 28


Bahan
Seng Gelombang 3" x 6" BJLS 28 0.300 Lbr
Paku Biasa " - 1" atau Sekrup 0.100 Kg
Papan Kayu Borneo 0.0190 m3
Besi Strip 0.5000 Kg
Tenaga
Perkerja 0.150 Oh
Tukang Kayu 0.250 Oh
Kepala Tukang 0.025 Oh
Mandor 0.00125 Oh

1 m Pasang Talang Lingkaran 10 cm, Seng BJLS 24


Bahan
Seng Plat 3 x 6 BJLS 24 0.300 Lbr
Paku Biasa " - 1" atau Sekrup 0.100 Kg
Papan Kayu Borneo 0.0190 m3
Besi Strip 0.5000 Kg
Tenaga
Perkerja 0.150 Oh
Tukang Kayu 0.250 Oh
Kepala Tukang 0.025 Oh
Mandor 0.00125 Oh

VI PEKERJAAN KUNCI DAN KACA


1 Buah Pasang Kunsi Tanam Antik
Bahan
Kunsi Tanam Antik 1.000 Bh
Tenaga
Perkerja 0.060 Oh
Tukang Kayu 0.600 Oh
Kepala Tukang 0.060 Oh
Mandor 0.003 Oh

1 Buah Pasang Kunsi Tanam Biasa


Bahan
Kunsi Tanam Biasa 1.000 Bh
Tenaga
Perkerja 0.010 Oh
Tukang Kayu 0.500 Oh
Kepala Tukang 0.010 Oh
Mandor 0.005 Oh

1 Buah Pasang Kunsi Tanam Kamar Mandi


Bahan
Kunsi Tanam Kamar Mandi 1.000 Bh
Tenaga
Perkerja 0.005 Oh
Tukang Kayu 0.500 Oh
Kepala Tukang 0.005 Oh
Mandor 0.0025 Oh

1 Buah Pasang Kunsi Silinder


Bahan
Kunsi Silinder 1.000 Bh
Tenaga
Perkerja 0.005 Oh
Tukang Kayu 0.500 Oh
Kepala Tukang 0.005 Oh
Mandor 0.00025 Oh

1 Buah Pasang Engsel Pintu


Bahan
Engsel Pintu 1.000 Bh
Tenaga
Perkerja 0.015 Oh
Tukang Kayu 0.150 Oh
Kepala Tukang 0.015 Oh
Mandor 0.00075 Oh
1 Buah Pasang Engsel Jendela Kupu - kupu
Bahan
Engsel Jendela 1.000 Bh
Tenaga
Perkerja 0.010 Oh
Tukang Kayu 0.100 Oh
Kepala Tukang 0.010 Oh
Mandor 0.00050 Oh

1 Buah Pasang Engsel Angin


Bahan
Engsel Angin 1.000 Bh
Tenaga
Perkerja 0.020 Oh
Tukang Kayu 0.200 Oh
Kepala Tukang 0.020 Oh
Mandor 0.01000 Oh

1 Buah Pasang Spring Knip


Bahan
Spring Knip 1.000 Bh
Tenaga
Perkerja 0.015 Oh
Tukang Kayu 0.150 Oh
Kepala Tukang 0.015 Oh
Mandor 0.00075 Oh

1 Buah Pasang Kait angin


Bahan
Kait Angin 1.000 Bh
Tenaga
Perkerja 0.015 Oh
Tukang Kayu 0.150 Oh
Kepala Tukang 0.015 Oh
Mandor 0.00075 Oh

1 Buah Pasang Door Closer


Bahan
Door Closer 1.000 Bh
Tenaga
Perkerja 0.050 Oh
Tukang Kayu 0.500 Oh
Kepala Tukang 0.050 Oh
Mandor 0.00250 Oh

1 Buah Pasang Kunci Selot


Bahan
Kunci Selot 1.000 Bh
Tenaga
Perkerja 0.020 Oh
Tukang Kayu 0.200 Oh
Kepala Tukang 0.020 Oh
Mandor 0.001 Oh

1 Buah Pasang Pegangan Pintu / Door Holder


Bahan
Door Holder 1.000 Bh
Tenaga
Perkerja 0.050 Oh
Tukang Kayu 0.500 Oh
Kepala Tukang 0.050 Oh
Mandor 0.0025 Oh

1 Buah Pasang Door Stop


Bahan
Door Stop 1.000 Bh
Tenaga
Perkerja 0.010 Oh
Tukang Kayu 0.100 Oh
Kepala Tukang 0.010 Oh
Mandor 0.0005 Oh

1 Buah Pasang Rel Pintu Dorong


Bahan
Rel Pintu Dorong 1.000 Bh
Tenaga
Perkerja 0.060 Oh
Tukang Kayu 0.600 Oh
Kepala Tukang 0.060 Oh
Mandor 0.0030 Oh

1 Buah Pasang Kunci Lemari


Bahan
Kunci Lemari 1.000 Bh
Tenaga
Perkerja 0.025 Oh
Tukang Kayu 0.250 Oh
Kepala Tukang 0.025 Oh
Mandor 0.00125 Oh

1 Buah Pasang Kaca tebal 3 mm


Bahan
Kaca Polos 1.100 m2
Tenaga
Perkerja 0.015 Oh
Tukang Kayu 0.150 Oh
Kepala Tukang 0.015 Oh
Mandor 0.00075 Oh

1 Buah Pasang Kaca tebal 5 mm


Bahan
Kaca Polos 1.100 m2
Tenaga
Perkerja 0.015 Oh
Tukang Kayu 0.150 Oh
Kepala Tukang 0.015 Oh
Mandor 0.00075 Oh

1 Buah Pasang Kaca tebal 8 mm


Bahan
Kaca Polos 1.100 m2
Tenaga
Perkerja 0.0165 Oh
Tukang Kayu 0.165 Oh
Kepala Tukang 0.0165 Oh
Mandor 0.00080 Oh

1 Buah Pasang Kaca Buram tebal 12 mm


Bahan
Kaca Buram 1.100 m2
Tenaga
Perkerja 0.0250 Oh
Tukang Kayu 0.250 Oh
Kepala Tukang 0.0250 Oh
Mandor 0.00125 Oh
1 Buah Pasang Kaca Cermin tebal 5 mm
Bahan
Kaca Cermin 1.100 m2
Tenaga
Perkerja 0.0150 Oh
Tukang Kayu 0.150 Oh
Kepala Tukang 0.0150 Oh
Mandor 0.00075 Oh

1 Buah Pasang Kaca Cermin tebal 6 mm


Bahan
Kaca Cermin 1.100 m2
Tenaga
Perkerja 0.0150 Oh
Tukang Kayu 0.150 Oh
Kepala Tukang 0.0150 Oh
Mandor 0.00075 Oh

1 Buah Pasang Kaca Cermin tebal 8 mm


Bahan
Kaca Cermin 1.100 m2
Tenaga
Perkerja 0.0165 Oh
Tukang Kayu 0.165 Oh
Kepala Tukang 0.0165 Oh
Mandor 0.00080 Oh

1 Buah Pasang Kaca Wireglass tebal 5 mm


Bahan
Kaca Wireglass 1.100 m2
Tenaga
Perkerja 0.0150 Oh
Tukang Kayu 0.150 Oh
Kepala Tukang 0.0150 Oh
Mandor 0.00075 Oh

1 Buah Pasang Kaca Patri tebal 5 mm


Bahan
Kaca Patri 1.100 m2
Tenaga
Perkerja 0.0150 Oh
Tukang Kayu 0.150 Oh
Kepala Tukang 0.0150 Oh
Mandor 0.00075 Oh

VI PEKERJAAN PENUTUP LANTAI DAN DINDING


1 m Pasang Lantai Ubin PC Abu - abu ukuran 40 x 40 cm
Bahan
Ubin Abu -abu 40 x40 cm 6.630 bh
Semen Portland 9.800 Kg
Pasir Pasang 0.0215 m3

Tenaga
Perkerja 0.2500 Oh
Tukang Batu 0.120 Oh
Kepala Tukang 0.0120 Oh
Mandor 0.0125 Oh

1 m Pasang Lantai Ubin PC Abu - abu ukuran 30 x 30 cm


Bahan
Ubin Abu -abu 30 x 30 cm 11.870 bh
Semen Portland 10.000 Kg
Pasir Pasang 0.0215 m3

Tenaga
Perkerja 0.2600 Oh
Tukang Batu 0.125 Oh
Kepala Tukang 0.0125 Oh
Mandor 0.0130 Oh

1 m Pasang Lantai Ubin PC Abu - abu ukuran 20 x 20 cm


Bahan
Ubin Abu -abu 20 x 20 cm 26.500 bh
Semen Portland 10.400 Kg
Pasir Pasang 0.0135 m3

Tenaga
Perkerja 0.2700 Oh
Tukang Batu 0.130 Oh
Kepala Tukang 0.0130 Oh
Mandor 0.0135 Oh

1 m Pasang Lantai Ubin Warna ukuran 40 x 40 cm


Bahan
Ubin Warna 40 x 40 cm 6.630 bh
Semen Portland 8.160 Kg
Pasir Pasang 0.0230 m3
Semen Warna 0.9000 Kg

Tenaga
Perkerja 0.2500 Oh
Tukang Batu 0.120 Oh
Kepala Tukang 0.0120 Oh
Mandor 0.0125 Oh

1 m Pasang Lantai Ubin Warna ukuran 30 x 30 cm


Bahan
Ubin Warna 30 x 30 cm 11.870 bh
Semen Portland 8.360 Kg
Pasir Pasang 0.0230 m3
Semen Warna 0.9000 Kg

Tenaga
Perkerja 0.2500 Oh
Tukang Batu 0.120 Oh
Kepala Tukang 0.0120 Oh
Mandor 0.0125 Oh

1 m Pasang Lantai Ubin Warna ukuran 20 x 20 cm


Bahan
Ubin Warna 20 x 20 cm 26.500 bh
Semen Portland 8.760 Kg
Pasir Pasang 0.0230 m3
Semen Warna 0.9000 Kg

Tenaga
Perkerja 0.2700 Oh
Tukang Batu 0.130 Oh
Kepala Tukang 0.0130 Oh
Mandor 0.0135 Oh

1 m Pasang Lantai Ubin Teraso ukuran 40 x 40 cm


Bahan
Ubin Teraso 40 x 40 cm 6.250 bh
Semen Portland 8.800 Kg
Pasir Pasang 0.0215 m3
Semen Warna 0.9000 Kg

Tenaga
Perkerja 0.2500 Oh
Tukang Batu 0.120 Oh
Kepala Tukang 0.0120 Oh
Mandor 0.0125 Oh

1 m Pasang Lantai Ubin Teraso ukuran 30 x 30 cm


Bahan
Ubin Teraso 30 x 30 cm 1.870 bh
Semen Portland 10.000 Kg
Pasir Pasang 0.0215 m3
Semen Warna 1.5400 Kg

Tenaga
Perkerja 0.2600 Oh
Tukang Batu 0.125 Oh
Kepala Tukang 0.0125 Oh
Mandor 0.0130 Oh

1 m Pasang Lantai Ubin Granito ukuran 40 x 40 cm


Bahan
Ubin Granito 40 x 40 cm 6.930 bh
Semen Portland 9.800 Kg
Pasir Pasang 0.0215 m3
Semen Warna 1.3000 Kg

Tenaga
Perkerja 0.2500 Oh
Tukang Batu 0.120 Oh
Kepala Tukang 0.0125 Oh
Mandor 0.0125 Oh

1 m Pasang Lantai Ubin Granito ukuran 30 x 30 cm


Bahan
Ubin Granito 30 x 30 cm 11.870 bh
Semen Portland 10.000 Kg
Pasir Pasang 0.0215 m3
Semen Warna 1.5000 Kg
Tenaga
Perkerja 0.2600 Oh
Tukang Batu 0.125 Oh
Kepala Tukang 0.0125 Oh
Mandor 0.0130 Oh

1 m Pasang Lantai Ubin Teralux Kerang ukuran 40 x 40 cm


Bahan
Ubin Teralux Kerang 40 x 40 cm 6.250 bh
Semen Portland 8.800 Kg
Pasir Pasang 0.0215 m3
Semen Warna 1.3000 Kg

Tenaga
Perkerja 0.2500 Oh
Tukang Batu 0.120 Oh
Kepala Tukang 0.0120 Oh
Mandor 0.0125 Oh

1 m Pasang Lantai Ubin Teralux Kerang ukuran 30 x 30 cm


Bahan
Ubin Teralux Kerang 30 x 30 cm 11.807 bh
Semen Portland 10.000 Kg
Pasir Pasang 0.0215 m3
Semen Warna 1.1250 Kg

Tenaga
Perkerja 0.2500 Oh
Tukang Batu 0.120 Oh
Kepala Tukang 0.0120 Oh
Mandor 0.0125 Oh

1 m Pasang Lantai Ubin Teralux Marmer ukuran 60 x 60 cm


Bahan
Ubin Teralux Marmer 60 x 60 cm 5.600 bh
Semen Portland 8.190 Kg
Pasir Pasang 0.0450 m3
Semen Warna 1.0000 Kg

Tenaga
Perkerja 0.2500 Oh
Tukang Batu 0.120 Oh
Kepala Tukang 0.0120 Oh
Mandor 0.0125 Oh

1 m Pasang Lantai Ubin Teralux Marmer ukuran 40 x 40 cm


Bahan
Ubin Teralux Marmer 40 x 40 cm 6.250 bh
Semen Portland 8.800 Kg
Pasir Pasang 0.0215 m3
Semen Warna 1.3000 Kg

Tenaga
Perkerja 0.6720 Oh
Tukang Batu 0.224 Oh
Kepala Tukang 0.0220 Oh
Mandor 0.0340 Oh

1 m Pasang Lantai Ubin Teralux Marmer ukuran 30 x 30 cm


Bahan
Ubin Teralux Marmer 30 x 30 cm 11.870 bh
Semen Portland 10.000 Kg
Pasir Pasang 0.0215 m3
Semen Warna 1.5000 Kg

Tenaga
Perkerja 0.7000 Oh
Tukang Batu 0.340 Oh
Kepala Tukang 0.0340 Oh
Mandor 0.0350 Oh

1 m Pasang Plint Ubin PC Abu - abu ukuran 15 x 20 cm


Bahan
Plint Ubin PC Abu - abu 15 x 20 cm 5.300 bh
Semen Portland 1.560 Kg
Pasir Pasang 0.0040 m3

Tenaga
Perkerja 0.0600 Oh
Tukang Batu 0.030 Oh
Kepala Tukang 0.0030 Oh
Mandor 0.0030 Oh

1 m Pasang Plint Ubin PC Abu - abu ukuran 10 x 30 cm


Bahan
Plint Ubin PC Abu -abu 10 x 30 cm 3.530 bh
Semen Portland 1.560 Kg
Pasir Pasang 0.0030 m3

Tenaga
Perkerja 0.0600 Oh
Tukang Batu 0.030 Oh
Kepala Tukang 0.0030 Oh
Mandor 0.0030 Oh

1 m Pasang Plint Ubin PC Abu - abu ukuran 10 x 40 cm


Bahan
Plint Ubin PC Abu - abu 10 x 40 cm 2.650 bh
Semen Portland 1.560 Kg
Pasir Pasang 0.0030 m3

Tenaga
Perkerja 0.0600 Oh
Tukang Batu 0.030 Oh
Kepala Tukang 0.0030 Oh
Mandor 0.0030 Oh

1 m Pasang Plint Ubin PC Warna ukuran 10 x 20 cm


Bahan
Plint Ubin PC Warna 10 x 20 cm 5.300 bh
Semen Portland 1.200 Kg
Pasir Pasang 0.0030 m3
Semen Warna 0.1900 Kg

Tenaga
Perkerja 0.0600 Oh
Tukang Batu 0.030 Oh
Kepala Tukang 0.0030 Oh
Mandor 0.0030 Oh

1 m Pasang Plint Ubin PC Warna ukuran 10 x 30 cm


Bahan
Plint Ubin PC Warna 10 x 30 cm 3.330 bh
Semen Portland 1.650 Kg
Pasir Pasang 0.0032 m3
Semen Warna 0.1000 Kg
Tenaga
Perkerja 0.0600 Oh
Tukang Batu 0.030 Oh
Kepala Tukang 0.0030 Oh
Mandor 0.0030 Oh

1 m Pasang Plint Ubin PC Warna ukuran 10 x 40 cm


Bahan
Plint Ubin PC Warna 10 x 40 cm 2.650 bh
Semen Portland 1.200 Kg
Pasir Pasang 0.0030 m3
Semen Warna 0.1000 Kg

Tenaga
Perkerja 0.0800 Oh
Tukang Batu 0.040 Oh
Kepala Tukang 0.0040 Oh
Mandor 0.0040 Oh

1 m Pasang Plint Ubin Teraso ukuran 10 x 30 cm


Bahan
Plint Ubin Teraso 10 x 30 cm 3.530 bh
Semen Portland 1.560 Kg
Pasir Pasang 0.0030 m3
Semen Warna 0.1900 Kg

Tenaga
Perkerja 0.0800 Oh
Tukang Batu 0.040 Oh
Kepala Tukang 0.0040 Oh
Mandor 0.0040 Oh

1 m Pasang Plint Ubin Teraso ukuran 10 x 40 cm


Bahan
Plint Ubin Teraso 10 x 40 cm 2.650 bh
Semen Portland 1.200 Kg
Pasir Pasang 0.0030 m3
Semen Warna 0.1000 Kg

Tenaga
Perkerja 0.0800 Oh
Tukang Batu 0.040 Oh
Kepala Tukang 0.0040 Oh
Mandor 0.0040 Oh

1 m Pasang Plint Ubin Granito ukuran 10 x 40 cm


Bahan
Plint Ubin Granito 10 x 40 cm 2.650 bh
Semen Portland 1.200 Kg
Pasir Pasang 0.0030 m3
Semen Warna 0.1000 Kg

Tenaga
Perkerja 0.0600 Oh
Tukang Batu 0.030 Oh
Kepala Tukang 0.0030 Oh
Mandor 0.0030 Oh

1 m Pasang Plint Ubin Granito ukuran 10 x 30 cm


Bahan
Plint Ubin Granito 10 x 30 cm 3.330 bh
Semen Portland 1.650 Kg
Pasir Pasang 0.0032 m3
Semen Warna 0.1000 Kg

Tenaga
Perkerja 0.9000 Oh
Tukang Batu 0.090 Oh
Kepala Tukang 0.0090 Oh
Mandor 0.0045 Oh

1 m Pasang Plint Ubin Teralux Kerang ukuran 10 x 40 cm


Bahan
Plint Ubin Teralux Kerang 10 x 40 cm 2.500 bh
Semen Portland 1.650 Kg
Pasir Pasang 0.0032 m3
Semen Warna 0.1000 Kg

Tenaga
Perkerja 0.9000 Oh
Tukang Batu 0.090 Oh
Kepala Tukang 0.0090 Oh
Mandor 0.0045 Oh
1 m Pasang Plint Ubin Teralux Kerang ukuran 10 x 30 cm
Bahan
Plint Ubin Teralux Kerang 10 x 30 cm 3.330 bh
Semen Portland 1.650 Kg
Pasir Pasang 0.0032 m3
Semen Warna 0.1000 Kg

Tenaga
Perkerja 0.9000 Oh
Tukang Batu 0.090 Oh
Kepala Tukang 0.0090 Oh
Mandor 0.0045 Oh

1 m Pasang Plint Ubin Teralux Marmer ukuran 10 x 60 cm


Bahan
Plint Ubin Teralux Marmer 10 x 60 cm 1.700 bh
Semen Portland 1.650 Kg
Pasir Pasang 0.0032 m3
Semen Warna 0.1000 Kg

Tenaga
Perkerja 0.9000 Oh
Tukang Batu 0.090 Oh
Kepala Tukang 0.0090 Oh
Mandor 0.0045 Oh

1 m Pasang Plint Ubin Teralux Marmer ukuran 10 x 40 cm


Bahan
Plint Ubin Teralux Marmer 10 x 40 cm 2.500 bh
Semen Portland 1.650 Kg
Pasir Pasang 0.0032 m3
Semen Warna 0.1000 Kg

Tenaga
Perkerja 0.9000 Oh
Tukang Batu 0.090 Oh
Kepala Tukang 0.0090 Oh
Mandor 0.0045 Oh

1 m Pasang Plint Ubin Teralux Marmer ukuran 10 x 30 cm


Bahan
Plint Ubin Teralux Marmer 10 x 30 cm 3.330 bh
Semen Portland 1.650 Kg
Pasir Pasang 0.0032 m3
Semen Warna 0.1000 Kg

Tenaga
Perkerja 0.9000 Oh
Tukang Batu 0.090 Oh
Kepala Tukang 0.0090 Oh
Mandor 0.0045 Oh

1 m Pasang Teraso Cor ditempat


Bahan
Bahan Teraso Cor 0.0036 m3

Tenaga
Perkerja 0.9000 Oh
Tukang Batu 0.090 Oh
Kepala Tukang 0.0090 Oh
Mandor 0.0045 Oh

1 m Pasang Teralux Cor ditempat, tebal 3 cm


Bahan
Bahan Teraso Cor 0.0036 m3

Tenaga
Perkerja 0.9000 Oh
Tukang Batu 0.090 Oh
Kepala Tukang 0.0090 Oh
Mandor 0.0045 Oh

1 m Pasang Ubin Tahan Asam


Bahan
Ubin Tahan Asam 1.0500 m2
Semen Tanam Asam 14.1400 Kg
Pasir Pasang 0.0400 m3

Tenaga
Perkerja 0.2700 Oh
Tukang Batu 0.150 Oh
Kepala Tukang 0.0150 Oh
Mandor 0.0135 Oh
1 m Pasang Lantai Keramik Artistik 10 x 20 cm
Bahan
Ubin Keramik Artistik 10 x 20 cm 5.0000 bh
Semen Portland 11.3800 Kg
Pasir Pasang 0.0420 m3
Semen Warna 1.5000 Kg

Tenaga
Perkerja 0.6200 Oh
Tukang Batu 0.350 Oh
Kepala Tukang 0.0350 Oh
Mandor 0.0300 Oh

1 m' Pasang Plint Keramik Artistik ukuran 10 x 20 cm


Bahan
Plint Keramik Artistik 10 x 20 cm 5.000 bh
Semen Portland 1.650 Kg
Pasir Pasang 0.0032 m3
Semen Warna 0.1000 Kg

Tenaga
Perkerja 0.0900 Oh
Tukang Batu 0.090 Oh
Kepala Tukang 0.0090 Oh
Mandor 0.0045 Oh

1 m' Pasang Plint Keramik Artistik ukuran 10 x 10 cm


Bahan
Plint Keramik Artistik 10 x 10 cm 5.000 bh
Semen Portland 1.650 Kg
Pasir Pasang 0.0032 m3
Semen Warna 0.1200 Kg

Tenaga
Perkerja 0.0900 Oh
Tukang Batu 0.090 Oh
Kepala Tukang 0.0090 Oh
Mandor 0.0045 Oh

1 m' Pasang Plint Keramik Artistik ukuran 5 x 20 cm


Bahan
Plint Keramik Artistik 5 x 20 cm 5.000 bh
Semen Portland 0.850 Kg
Pasir Pasang 0.0022 m3
Semen Warna 0.0800 Kg

Tenaga
Perkerja 0.0900 Oh
Tukang Batu 0.090 Oh
Kepala Tukang 0.0090 Oh
Mandor 0.0045 Oh

1 m' Pasang Plint Vinyl tanpa adukan


Bahan
Lt. Vinyl Karet 30 x 30 kwl I 3.500 bh
Lem Vinyl 0.080 Kg

Tenaga
Perkerja 0.0800 Oh
Tukang Batu 0.080 Oh
Kepala Tukang 0.0080 Oh
Mandor 0.0040 Oh

1 m Pasang Lantai Keramik 10 x 20 cm


Bahan
Ubin Keramik 10 x 20 cm 50.000 bh
Semen Portland 11.380 Kg
Pasir Pasang 0.042 m3
Semen Warna 1.500 Kg

Tenaga
Perkerja 0.6200 Oh
Tukang Batu 0.350 Oh
Kepala Tukang 0.0350 Oh
Mandor 0.0300 Oh

1 m Pasang Lantai Keramik 15 x 15 cm


Bahan
Ubin Keramik 15 x 15 cm 44.000 bh
Semen Portland 11.380 Kg
Pasir Pasang 0.042 m3
Semen Warna 1.500 Kg
Tenaga
Perkerja 0.6200 Oh
Tukang Batu 0.350 Oh
Kepala Tukang 0.0350 Oh
Mandor 0.0300 Oh

1 m Pasang Lantai Keramik 20 x 20 cm


Bahan
Ubin Keramik 20 x 20 cm 25.000 bh
Semen Portland 11.380 Kg
Pasir Pasang 0.042 m3
Semen Warna 1.500 Kg

Tenaga
Perkerja 0.6200 Oh
Tukang Batu 0.350 Oh
Kepala Tukang 0.0350 Oh
Mandor 0.0300 Oh

1 m Pasang Lantai Keramik 25 x 25 cm


Bahan
Ubin Keramik 25 x 25 cm 16.000 bh
Semen Portland 11.380 Kg
Pasir Pasang 0.042 m3
Semen Warna 1.500 Kg

Tenaga
Perkerja 0.6200 Oh
Tukang Batu 0.350 Oh
Kepala Tukang 0.0350 Oh
Mandor 0.0300 Oh

1 m Pasang Lantai Keramik 15 x 20 cm


Bahan
Ubin Keramik 15 x 20 cm 35.000 bh
Semen Portland 11.380 Kg
Pasir Pasang 0.042 m3
Semen Warna 1.500 Kg

Tenaga
Perkerja 0.6200 Oh
Tukang Batu 0.350 Oh
Kepala Tukang 0.0350 Oh
Mandor 0.0300 Oh

1 m Pasang Lantai Keramik 33 x 33 cm


Bahan
Ubin Keramik 33 x 33 cm 10.000 bh
Semen Portland 11.380 Kg
Pasir Pasang 0.042 m3
Semen Warna 1.500 Kg

Tenaga
Perkerja 0.6200 Oh
Tukang Batu 0.350 Oh
Kepala Tukang 0.0350 Oh
Mandor 0.0300 Oh

1 m Pasang Lantai Keramik 33 x 33 cm anti slip


Bahan
Ubin Keramik 33 x 33 cm anti slip 10.000 bh
Semen Portland 11.380 Kg
Pasir Pasang 0.042 m3
Semen Warna 1.500 Kg

Tenaga
Perkerja 0.6200 Oh
Tukang Batu 0.350 Oh
Kepala Tukang 0.0350 Oh
Mandor 0.0300 Oh

1 m Pasang Lantai Keramik 10 x 33 cm


Bahan
Ubin Keramik 10 x 33 cm 33.000 bh
Semen Portland 11.380 Kg
Pasir Pasang 0.042 m3
Semen Warna 1.500 Kg

Tenaga
Perkerja 0.6200 Oh
Tukang Batu 0.350 Oh
Kepala Tukang 0.0350 Oh
Mandor 0.0300 Oh
1 m Pasang Lantai Mozaik 30 x 30 cm, ex lokal
Bahan
Mozaik 30 x 30 cm 12.000 bh
Semen Portland 14.150 Kg
Pasir Pasang 0.039 m3
Semen Warna 2.000 Kg

Tenaga
Perkerja 0.6200 Oh
Tukang Batu 0.350 Oh
Kepala Tukang 0.0350 Oh
Mandor 0.0300 Oh

1 m Pasang Lantai Marmer


Bahan
Marmer 1.052 M2
Semen Portland 14.150 Kg
Pasir Pasang 0.039 m3
Semen Warna 2.000 Kg

Tenaga
Perkerja 0.6200 Oh
Tukang Batu 0.350 Oh
Kepala Tukang 0.0350 Oh
Mandor 0.0300 Oh

1 m Pasang Lantai Karpet 100% Wool


Bahan
Feltex 100% Wool - T - 21 1.050 m2
Lem Vinyl 0.350 Kg

Tenaga
Perkerja 0.1700 Oh
Tukang Batu 0.170 Oh
Kepala Tukang 0.0170 Oh
Mandor 0.0085 Oh

1 m Pasang Lantai Karpet 100% Wool, 20% Nylon


Bahan
Carpet 80% Wool, 20% Nylon 1.050 m2
Lem Vinyl 0.350 Kg
Tenaga
Perkerja 0.1700 Oh
Tukang Batu 0.170 Oh
Kepala Tukang 0.0170 Oh
Mandor 0.0085 Oh

1 m Pasang Underlyer, tebal 6 mm


Bahan
Underlyer, tebal 6 mm / Rubber Corrugated 1.050 m2

Tenaga
Perkerja 0.1200 Oh
Tukang Batu 0.120 Oh
Kepala Tukang 0.0120 Oh
Mandor 0.0060 Oh

1 m Pasang Lantai Karpet


Bahan
Carpet 1.050 m2
Lem Vinyl 0.350 Kg

Tenaga
Perkerja 0.1700 Oh
Tukang Batu 0.170 Oh
Kepala Tukang 0.0170 Oh
Mandor 0.0085 Oh

1 m Pasang Lantai Parquet Jati


Bahan
Parquet Jati 1.050 m2
Lem Vinyl 0.600 Kg

Tenaga
Perkerja 0.6500 Oh
Tukang Batu 0.350 Oh
Kepala Tukang 0.0350 Oh
Mandor 0.0325 Oh

1 m Pasang Dinding Porselen 11 x 11 cm, putih


Bahan
Porselen 11 x 11 cm putih 83.000 Bh
Semen Abu -abu 9.300 Kg
Pasir Pasang 0.018 m3
Semen Warna 1.500 Kg
Tenaga
Perkerja 0.6200 Oh
Tukang Batu 0.500 Oh
Kepala Tukang 0.0500 Oh
Mandor 0.0300 Oh

1 m Pasang Dinding Porselen 11 x 11 cm, warna


Bahan
Porselen 11 x 11 cm warna 83.000 Bh
Semen Abu -abu 9.300 Kg
Pasir Pasang 0.018 m3
Semen Warna 1.500 Kg
Tenaga
Perkerja 0.6200 Oh
Tukang Batu 0.500 Oh
Kepala Tukang 0.0500 Oh
Mandor 0.0300 Oh

1 m Pasang Dinding Porselen 15 x 15 cm, putih


Bahan
Porselen 15 x 15 cm putih 45.000 Bh
Semen Abu -abu 9.300 Kg
Pasir Pasang 0.018 m3
Semen Warna 1.500 Kg
Tenaga
Perkerja 0.6000 Oh
Tukang Batu 0.450 Oh
Kepala Tukang 0.0450 Oh
Mandor 0.0300 Oh

1 m Pasang Dinding Porselen 15 x 15 cm, warna


Bahan
Porselen 15 x 15 cm warna 45.000 Bh
Semen Abu -abu 9.300 Kg
Pasir Pasang 0.018 m3
Semen Warna 1.500 Kg
Tenaga
Perkerja 0.6000 Oh
Tukang Batu 0.450 Oh
Kepala Tukang 0.0450 Oh
Mandor 0.0300 Oh

1 m Pasang Dinding Porselen 10 x 20 cm, warna


Bahan
Porselen 10 x 20 cm warna 50.000 Bh
Semen Abu -abu 9.300 Kg
Pasir Pasang 0.018 m3
Semen Warna 1.500 Kg
Tenaga
Perkerja 0.6000 Oh
Tukang Batu 0.450 Oh
Kepala Tukang 0.0450 Oh
Mandor 0.0300 Oh

1 m Pasang Dinding Porselen 20 x 20 cm, warna


Bahan
Porselen 20 x 20 cm warna 25.000 Bh
Semen Abu -abu 9.300 Kg
Pasir Pasang 0.018 m3
Semen Warna 1.500 Kg
Tenaga
Perkerja 0.6000 Oh
Tukang Batu 0.450 Oh
Kepala Tukang 0.0450 Oh
Mandor 0.0300 Oh

1 m Pasang Dinding Keramik Artistik 10 x 20 cm, warna


Bahan
Keramik Artistik 10 x 20 cm 100.000 Bh
Semen Abu -abu 9.300 Kg
Pasir Pasang 0.018 m3
Semen Warna 1.500 Kg
Tenaga
Perkerja 0.6000 Oh
Tukang Batu 0.450 Oh
Kepala Tukang 0.0450 Oh
Mandor 0.0300 Oh

1 m Pasang Dinding Keramik Artistik 5 x 20 cm, warna


Bahan
Keramik Artistik 5 x 20 cm 100.000 Bh
Semen Abu -abu 9.300 Kg
Pasir Pasang 0.018 m3
Semen Warna 1.500 Kg
Tenaga
Perkerja 0.6000 Oh
Tukang Batu 0.450 Oh
Kepala Tukang 0.0450 Oh
Mandor 0.0300 Oh

1 m Pasang Dinding Keramik 10 x 20 cm


Bahan
Keramik 10 x 20 cm 50.000 Bh
Semen Abu -abu 9.300 Kg
Pasir Pasang 0.018 m3
Semen Warna 1.500 Kg
Tenaga
Perkerja 0.6000 Oh
Tukang Batu 0.450 Oh
Kepala Tukang 0.0450 Oh
Mandor 0.0300 Oh

1 m Pasang Dinding Keramik 15 x 15 cm


Bahan
Keramik 15 x 15 cm 45.000 Bh
Semen Abu -abu 9.300 Kg
Pasir Pasang 0.018 m3
Semen Warna 1.500 Kg
Tenaga
Perkerja 0.6000 Oh
Tukang Batu 0.450 Oh
Kepala Tukang 0.0450 Oh
Mandor 0.0300 Oh

1 m Pasang Dinding Keramik 20 x 20 cm


Bahan
Keramik 20 x 20 cm 25.000 Bh
Semen Abu -abu 9.300 Kg
Pasir Pasang 0.018 m3
Semen Warna 1.500 Kg
Tenaga
Perkerja 0.6000 Oh
Tukang Batu 0.100 Oh
Kepala Tukang 0.0450 Oh
Mandor 0.0300 Oh

1 m Pasang Dinding Keramik 10 x 20 cm


Bahan
Keramik 10 x 20 cm 50.000 Bh
Semen Abu -abu 9.300 Kg
Pasir Pasang 0.018 m3
Semen Warna 1.500 Kg
Tenaga
Perkerja 0.6000 Oh
Tukang Batu 0.125 Oh
Kepala Tukang 0.0125 Oh
Mandor 0.0300 Oh

1 m Pasang Dinding Marmer


Bahan
Marmer 1.020 M2
Semen Abu -abu 12.440 Kg
Pasir Pasang 0.025 m3
Semen Warna 1.500 Kg
Tenaga
Perkerja 0.7200 Oh
Tukang Batu 0.650 Oh
Kepala Tukang 0.0650 Oh
Mandor 0.0350 Oh

1 m Pasang Dinding Bata Klinker 5 x 5 x 24 cm


Bahan
Bata Pelapis Klinker 80.000 Bh
Semen Abu -abu 12.440 Kg
Pasir Pasang 0.025 m3
Tenaga
Perkerja 0.6200 Oh
Tukang Batu 0.350 Oh
Kepala Tukang 0.0350 Oh
Mandor 0.0300 Oh

1 m Pasang Dinding Batu Paros


Bahan
Batu Paros 1.050 Bh
Semen Abu -abu 11.750 Kg
Pasir Pasang 0.035 m3
Tenaga
Perkerja 0.6200 Oh
Tukang Batu 0.350 Oh
Kepala Tukang 0.0350 Oh
Mandor 0.0300 Oh

1 m Pasang Dinding Batu Tempel Hitam


Bahan
Batu Tempel Hitam 1.050 Bh
Semen Abu -abu 11.750 Kg
Pasir Pasang 0.035 m3
Tenaga
Perkerja 0.6200 Oh
Tukang Batu 0.350 Oh
Kepala Tukang 0.0350 Oh
Mandor 0.0300 Oh

1 m Pasang Lantai Vinyl Karet 30 x 30 cm KL I


Bahan
Vinyl Karet 30 x 30 cm KL I 11.050 Bh
Lem Vinyl 0.350 Kg
Tenaga
Perkerja 0.1500 Oh
Tukang Batu 0.150 Oh
Kepala Tukang 0.0150 Oh
Mandor 0.0075 Oh

1 m Pasang Lantai Vinyl Karet 30 x 30 cm KL II


Bahan
Vinyl Karet 30 x 30 cm KL II 11.050 Bh
Lem Vinyl 0.350 Kg
Tenaga
Perkerja 0.1500 Oh
Tukang Batu 0.150 Oh
Kepala Tukang 0.0150 Oh
Mandor 0.0075 Oh

1 m Pasang Lantai Vinyl Asbes 30 x 30 cm


Bahan
Vinyl Asbes 30 x 30 cm 11.050 Bh
Lem Vinyl 0.350 Kg
Tenaga
Perkerja 0.1500 Oh
Tukang Batu 0.150 Oh
Kepala Tukang 0.0150 Oh
Mandor 0.0075 Oh

1 m Pasang Lantai Vinyl Motif Kembang 30 x 30 cm


Bahan
Vinyl Motif Kembang ex DN 11.050 Bh
Lem Vinyl 0.350 Kg
Tenaga
Perkerja 0.1500 Oh
Tukang Batu 0.150 Oh
Kepala Tukang 0.0150 Oh
Mandor 0.0075 Oh

1 m Pasang Wall Covering lebar 50 cm


Bahan
Vinyl Wall Covering lebar 50 cm 1.100 m2
Lem 0.250 Kg
Tenaga
Perkerja 0.7500 Oh
Tukang Batu 0.170 Oh
Kepala Tukang 0.0170 Oh
Mandor 0.0085 Oh

1 m Floor Hardener Ferrovax


Bahan
Floor Hardener Ferrovax 3.000 Kg
Tenaga
Perkerja 0.1200 Oh
Tukang Batu 0.120 Oh
Kepala Tukang 0.0120 Oh
Mandor 0.0060 Oh

1 m Floor Hardener Mastercron


Bahan
Floor Hardener Ferrovax 5.000 Kg
Tenaga
Perkerja 0.1200 Oh
Tukang Batu 0.120 Oh
Kepala Tukang 0.0120 Oh
Mandor 0.0060 Oh

1 m Plint Kayu 2 x 10 cm
Bahan
Papan Kayu Jati 0.002 m3
Paku Skrup 3.5" 0.050 Kg
Tenaga
Perkerja 0.1200 Oh
Tukang Kayu 0.120 Oh
Kepala Tukang 0.0120 Oh
Mandor 0.0060 Oh

VI PEKERJAAN PENGECATAN
1 m Mengikis / Mengerok Permukaan Cat Tembok Lama
Bahan
Soda Api 0.050 Kg
Tenaga
Perkerja 0.1500 Oh
Tukang Cat - Oh
Kepala Tukang - Oh
Mandor 0.0025 Oh

1 m Mencuci Bidang Permukaan Tembok yang Pernah dicat


Bahan
Sabun 0.050 Kg
Tenaga
Perkerja 0.1500 Oh
Tukang Cat - Oh
Kepala Tukang - Oh
Mandor 0.0025 Oh

1 m Mengerok Karat Cat Lama Permukaan Baja dengan Cara Manual


Bahan
Sabun 0.050 Kg
Tenaga
Perkerja 0.1500 Oh
Tukang Cat - Oh
Kepala Tukang - Oh
Mandor 0.0025 Oh
1 m Menyabun Permukaan Tembok Lama
Bahan
Sabun 0.050 Kg
Tenaga
Perkerja 0.1500 Oh
Tukang Cat - Oh
Kepala Tukang - Oh
Mandor 0.0025 Oh

1 m Mengerok Karat atau Cat Lama Permukaan Baja dgn Pancar Pasir ( Sanblasting ) dgn Tingkat K
Bahan
Pasir Silika 40.000 Kg
BBM 10.000 Ltr
Peralatan
Kompresor, Blasting Pot , Selang Dan Nozzle sewa / Hr
Tenaga
Perkerja 1.6000 Oh
Tukang Cat 1.600 Oh
Kepala Tukang 0.8000 Oh
Mandor 0.5000 Oh

1 m Mendempul dan Menggosok Kayu


Bahan
Dempul Jadi 0.080 Kg
Minyak Cat 0.020 Kg
Batu Apung 0.010 Kg
Tenaga
Perkerja 0.0400 Oh
Tukang Cat 0.040 Oh
Kepala Tukang 0.0040 Oh
Mandor 0.0025 Oh

1 m Mengecatan Bidang Kayu Lama


Bahan
Plamir 0.150 Kg
Cat Dasar 0.170 Kg
Cat Penutup 0.170 Kg
Tenaga
Perkerja 0.0700 Oh
Tukang Cat 0.075 Oh
Kepala Tukang 0.0075 Oh
Mandor 0.0025 Oh
1 m Mengecatan Bidang Kayu Baru ( 1 Lapis Plamir ), 1 Lapis Cat Dasar, 2 Lapis Cat Penutup
Bahan
Cat Meni 0.200 Kg
Plamir 0.150 Kg
Cat Dasar 0.170 Kg
Cat Kayu glotek 0.260 Kg

Tenaga
Perkerja 0.0700 Oh
Tukang Cat 0.009 Oh
Kepala Tukang 0.0060 Oh
Mandor 0.0025 Oh

1 m Mengecatan Bidang Kayu Baru ( 1 Lapis Plamir ), 1 Lapis Cat Dasar, 3 Lapis Cat Penutup
Bahan
Cat Meni 0.200 Kg
Plamir 0.150 Kg
Cat Dasar 0.170 Kg
Cat Kayu glotek 0.350 Kg

Tenaga
Perkerja 0.0700 Oh
Tukang Cat 0.105 Oh
Kepala Tukang 0.0040 Oh
Mandor 0.0025 Oh

1 m Mengecatan Bidang Kayu Baru ( 1 Lapis Plamir ), 1 Lapis Cat Dasar, 3 Lapis Cat Penutup
Bahan
Cat Meni 0.200 Kg
Plamir 0.150 Kg
Cat Dasar 0.170 Kg
Cat Kayu glotek 0.350 Kg

Tenaga
Perkerja 0.0700 Oh
Tukang Cat 0.105 Oh
Kepala Tukang 0.0040 Oh
Mandor 0.0025 Oh

1 m Pelaburan Bidang Kayu dengan Teak Oil


Bahan
Teak Oil 0.360 Ltr
Tenaga
Perkerja 0.0400 Oh
Tukang Cat 0.063 Oh
Kepala Tukang 0.0630 Oh
Mandor 0.0025 Oh

1 m Pelaburan Bidang Kayu dengan Pelitur


Bahan
Pelitur 0.150 Ltr
Pelitur Jadi 0.372 Ltr
Ampelas 2.000 Lbr
Tenaga
Perkerja 0.0400 Oh
Tukang Cat 0.063 Oh
Kepala Tukang 0.0630 Oh
Mandor 0.0025 Oh

1 m Pelaburan Bidang Kayu dengan Cat Residu dan Ter


Bahan
Residu atau Ter 0.350 Ltr
Tenaga
Perkerja 0.1000 Oh
Tukang Cat - Oh
Kepala Tukang - Oh
Mandor 0.0060 Oh

1 m Pelaburan Bidang Kayu dengan Vernis


Bahan
Vernis 0.150 Ltr
Dempul 0.050 Kg
Ampelas 0.100 Lbr
Kuas 0.010 Bh
Tenaga
Perkerja 0.1600 Oh
Tukang Cat 0.160 Oh
Kepala Tukang 0.0160 Oh
Mandor 0.0025 Oh

1 m Pengecatan Tembok Baru ( 1 Plamir, 1 Lapis Cat Dasar, 2 Lapis Cat Penutup )
Bahan
Plamir 0.100 Kg
Cat Dasar 0.100 Kg
Cat Tembok vinilex 0.260 Kg
Tenaga
Perkerja 0.0200 Oh
Tukang Cat 0.063 Oh
Kepala Tukang 0.0063 Oh
Mandor 0.0025 Oh

1 m Melabur Tembok dengan Kapur Sirih


Bahan
Ampelas 0.100 Lbr
Alang - alang 0.250 ikat
Perancah Kayu 0.002 m3
Kapur Sirih 0.150 Kg
Tenaga
Perkerja 0.1500 Oh
Tukang Cat 0.001 Oh
Kepala Tukang 0.0001 Oh
Mandor 0.0025 Oh

1 m Melabur Tembok Lama dengan Kapur Sirih ( untuk pemeliharaan )


Bahan
Perancah Kayu 0.002 m3
Kapur Sirih 0.300 Kg
Tenaga
Perkerja 0.0400 Oh
Tukang Cat 0.005 Oh
Kepala Tukang 0.0005 Oh
Mandor 0.0025 Oh

1 m Pemasangan Wall Paper


Bahan
Wall Paper 1.200 m3
Perekat 0.200 Kg
Tenaga
Perkerja 0.0200 Oh
Tukang Cat 0.200 Oh
Kepala Tukang 0.0020 Oh
Mandor 0.0025 Oh

1 m Pengecatan Permukaan Baja dengan Meni Besi


Bahan
Meni Besi 0.100 Kg
Kuas 0.010 Bh
Tenaga
Perkerja 0.0200 Oh
Tukang Cat 0.200 Oh
Kepala Tukang 0.0200 Oh
Mandor 0.0100 Oh

1 m Pengecatan Permukaan Baja dengan Meni Besi dan Perancah


Bahan
Meni Besi 0.100 Kg
Kuas 0.010 Bh
Perancah Kayu 0.002 m3
Tenaga
Perkerja 0.2500 Oh
Tukang Cat 0.225 Oh
Kepala Tukang 0.0225 Oh
Mandor 0.0075 Oh

1 m Pengecatan Permukaan Baja Lapis Seng ( Galbani ) secara Manual Sistem 4 Lapis Cat Konvens
Bahan
Meni ( Read Lead ) A 0.100 Kg
Meni ( Read Lead ) B 0.100 Kg
Alluminium C 0.040 Kg
Alluminium B 0.040 Kg
Pengencer 0.010 Ltr
Perancah Kayu 0.002 m3
Tenaga
Perkerja 0.0060 Oh
Tukang Cat 0.006 Oh
Kepala Tukang 0.0225 Oh
Mandor 0.0075 Oh

1 m Pengecatan Permukaan Baja Lapis Seng ( Galbani ) secara Manual Sistem 1 Lapis Cat Mutakhir
Bahan
Meni Besi 0.300 Kg
Tenaga
Perkerja 0.0060 Oh
Tukang Cat 0.060 Oh
Kepala Tukang 0.0120 Oh
Mandor 0.0060 Oh
1 m Pengecatan Permukaan Baja Lapis Seng ( Galbani ) secara Manual Sistem 3 Lapis Cat Konvens
Bahan
Cat Dasar 0.110 Kg
Cat Antara 0.170 Kg
Cat Penutup 0.080 Kg
Tenaga 0.360
Perkerja 0.5000 Oh
Tukang Cat 0.800 Oh
Kepala Tukang 0.3000 Oh
Mandor 0.2000 Oh

1 m Pengecatan Permukaan Baja Lapis Seng ( Galbani ) secara Semprot ( Airless Spray ) dgn Sistem
Bahan
Cat Dasar 0.300 Kg
Tenaga
Perkerja 0.4000 Oh
Tukang Cat 0.700 Oh
Kepala Tukang 0.2000 Oh
Mandor 0.2000 Oh
HARGA SAT matrial HARGA SAT upah JUMLAH matrial JUMLAH upah TOTAL harga

E F G=(CXE) H = (C X F ) I=(G+H)

0.00 38,691.56 38,691.56

Rp - Rp -
Rp - Rp -
Rp - Rp -
Rp - Rp -
Rp - Rp -
Rp - Rp -
Rp - Rp -

Rp 65,734.00 Rp 13,146.80
Rp 55,798.00 Rp 22,319.20
Rp 75,671.00 Rp 1,513.42
Rp 85,607.00 Rp 1,712.14

0.00 38,691.56 38,691.56

Rp - 0.00
Rp - 0.00
Rp - 0.00
Rp - 0.00
Rp - 0.00
Rp - 0.00
Rp - 0.00

Rp 65,734.00 Rp 13,146.80
Rp 55,798.00 Rp 22,319.20
Rp 75,671.00 Rp 1,513.42
Rp 85,607.00 Rp 1,712.14

0.00 33,111.76 33,111.76

Rp - 0.00
Rp - 0.00
Rp - 0.00
Rp - 0.00
Rp - 0.00
Rp - 0.00

Rp 65,734.00 13,147
Rp 55,798.00 16,739
Rp 75,671.00 1,513
Rp 85,607.00 1,712

0.00 13,337.95 13,337.95

Rp - 0.00
Rp - 0.00
Rp - 0.00

Rp 65,734.00 6,573
Rp 55,798.00 5,580
Rp 75,671.00 757
Rp 85,607.00 428

0.00 0.00 0.00

Rp - 0.00
Rp - 0.00
Rp - 0.00
Rp - 0.00
Rp - 0.00
Rp - 0.00
Rp - 0.00
Rp - 0.00
Rp - 0.00
Rp - 0.00
Rp - 0.00
Rp - 0.00
Rp - 0.00
Rp - 0.00

Rp - -
Rp - -
Rp - -
Rp - -
Rp - -

0.00 0.00 0.00

Rp - 0.00
Rp - 0.00
Rp - 0.00
Rp - 0.00
Rp - 0.00
Rp - 0.00
Rp - 0.00

Rp - -
Rp - -
Rp - -
Rp - -

0.00 0.00 0.00

Rp - 0.00
Rp - 0.00
Rp - 0.00
Rp - 0.00

Rp - -
Rp - -
Rp - -
Rp - -

0.00 5,500.00 5,500.00

27,500.00 2,750
55,000.00 2,750

547,485.00 116,050.00 663,535.00

8,800.00 11,000.00
1,815,000.00 337,590.00
34,100.00 10,230.00
1,100.00 19,800.00
215,000.00 6,450.00
275,000.00 13,750.00
60,500.00 90,750.00
42,900.00 57,915.00

38,500.00 77,000
27,500.00 27,500
44,000.00 8,800
55,000.00 2,750

2,331,670.00 79,750.00 2,411,420.00

1,540,000.00 286,440.00
34,100.00 10,230.00
2,035,000.00 2,035,000.00

38,500.00 77,000
55,000.00 2,750

17,600.00 116,050.00 133,650.00

13,200.00 13,200.00
17,600.00 4,400.00

38,500.00 77,000
27,500.00 27,500
44,000.00 8,800
55,000.00 2,750

55,280.00 30,250.00 85,530.00

209,000.00 31,350.00
242,000.00 21,780.00
215,000.00 2,150.00

27,500.00 27,500
55,000.00 2,750

0.00 201,657.50 201,657.50

27,500.00 183,343
55,000.00 18,315
0.00 185,157.50 185,157.50

27,500.00 183,343
55,000.00 1,815

0.00 13,200.00 13,200.00

27,500.00 11,000
33,000.00 -
44,000.00 -
55,000.00 2,200

0.00 17,297.50 17,297.50

27,500.00 14,438
33,000.00 -
44,000.00 -
55,000.00 2,860

0.00 #VALUE! #VALUE!

27,500.00 20,213
33,000.00 #VALUE!
44,000.00 #VALUE!
55,000.00 4,015

0.00 #VALUE! #VALUE!

27,500.00 17,188
33,000.00 #VALUE!
44,000.00 #VALUE!
55,000.00 3,410

0.00 #VALUE! #VALUE!

27,500.00 34,375
33,000.00 #VALUE!
44,000.00 #VALUE!
55,000.00 6,875

0.00 #VALUE! #VALUE!


27,500.00 22,633
33,000.00 #VALUE!
44,000.00 #VALUE!
55,000.00 4,565

0.00 #VALUE! #VALUE!

27,500.00 1,375
33,000.00 #VALUE!
44,000.00 #VALUE!
55,000.00 275

0.00 #VALUE! #VALUE!

27,500.00 5,280
33,000.00 #VALUE!
44,000.00 #VALUE!
55,000.00 2,750

0.00 #VALUE! #VALUE!

27,500.00 5,280
33,000.00 #VALUE!
44,000.00 #VALUE!
55,000.00 1,045

0.00 #VALUE! #VALUE!

27,500.00 13,750
33,000.00 #VALUE!
44,000.00 #VALUE!
55,000.00 2,750

105,600.00 #VALUE! #VALUE!

88,000.00 105,600.00

27,500.00 8,250
33,000.00 #VALUE!
44,000.00 #VALUE!
55,000.00 550
19,800.00 #VALUE! #VALUE!

16,500.00 19,800.00

27,500.00 4,125
33,000.00 #VALUE!
44,000.00 #VALUE!
55,000.00 825

1,231,009.50 44,275.00 1,275,284.50

35,750.00 572.00
215,000.00 17,200.00
275,000.00 34,375.00
1,100.00 53,900.00
16,000.00 552,000.00
21,450.00 15,015.00
2,035,000.00 549,450.00
34,100.00 4,092.00
4,950.00 445.50
19,800.00 3,960.00

27,500.00 22,000
35,750.00 17,875
44,000.00 2,200
55,000.00 2,200

710,460.00 69,465.00 779,925.00

192,500.00 211,750.00
1,100.00 431,200.00
215,000.00 67,510.00

27,500.00 41,250
35,750.00 21,450
44,000.00 2,640
55,000.00 4,125

478,310.00 69,468.40 547,778.40


192,500.00 211,750.00
1,100.00 149,600.00
215,000.00 116,960.00 3

27,500.00 41,250
35,750.00 21,450
44,000.00 2,640
55,000.00 4,125

140,510.00 27,555.00 168,065.00

605.00 84,700.00
1,100.00 36,245.00
215,000.00 19,565.00

27,500.00 17,875
35,750.00 7,150
44,000.00 880
55,000.00 1,650

131,050.00 27,555.00 158,605.00

605.00 84,700.00
1,100.00 24,420.00
215,000.00 21,930.00

27,500.00 17,875
35,750.00 7,150
44,000.00 880
55,000.00 1,650

66,757.00 13,640.00 80,397.00

605.00 42,350.00
1,100.00 15,807.00 0.35925
215,000.00 8,600.00

27,500.00 8,800
35,750.00 3,575
44,000.00 440
55,000.00 825
62,673.00 13,640.00 76,313.00

605.00 42,350.00
1,100.00 10,648.00 0.242
215,000.00 9,675.00

27,500.00 8,800
35,750.00 3,575
44,000.00 440
55,000.00 825

11,213.00 12,072.50 23,285.50

1,100.00 7,128.00
215,000.00 4,085.00

27,500.00 5,500
35,750.00 5,363
44,000.00 660
55,000.00 550

9,482.00 12,072.50 21,554.50

1,100.00 4,752.00 0.108


215,000.00 4,730.00

27,500.00 5,500
35,750.00 5,363
44,000.00 660
55,000.00 550

8,075.00 12,072.50 20,147.50

1,100.00 4,752.00
176,000.00 528.00
215,000.00 2,795.00

27,500.00 5,500
35,750.00 5,363
44,000.00 660
55,000.00 550

6,090.00 12,072.50 18,162.50

1,100.00 2,024.00
176,000.00 1,056.00
215,000.00 3,010.00

27,500.00 5,500
35,750.00 5,363
44,000.00 660
55,000.00 550

8,265.00 12,072.50 20,337.50

1,100.00 3,300.00
176,000.00 880.00
215,000.00 4,085.00

27,500.00 5,500
35,750.00 5,363
44,000.00 660
55,000.00 550

3,529.89 12,072.50 15,602.39

1,210.00 10.89
176,000.00 1,584.00
215,000.00 1,935.00

27,500.00 5,500
35,750.00 5,363
44,000.00 660
55,000.00 550

4,465.47 12,072.50 16,537.97

1,210.00 8.47
176,000.00 1,232.00
215,000.00 3,225.00

27,500.00 5,500
35,750.00 5,363
44,000.00 660
55,000.00 550

20,653.00 15,592.50 36,245.50

1,100.00 15,708.00
215,000.00 4,945.00

27,500.00 6,875
35,750.00 7,150
44,000.00 880
55,000.00 688

17,470.00 15,592.50 33,062.50

1,100.00 11,880.00
215,000.00 5,590.00

27,500.00 6,875
35,750.00 7,150
44,000.00 880
55,000.00 688

15,568.00 15,592.50 31,160.50

1,100.00 9,548.00
215,000.00 6,020.00

27,500.00 6,875
35,750.00 7,150
44,000.00 880
55,000.00 688

14,039.00 15,592.50 29,631.50

1,100.00 8,019.00
215,000.00 6,020.00

27,500.00 6,875
35,750.00 7,150
44,000.00 880
55,000.00 688

13,314.00 15,592.50 28,906.50

1,100.00 6,864.00
215,000.00 6,450.00

27,500.00 6,875
35,750.00 7,150
44,000.00 880
55,000.00 688

5,464.89 15,592.50 21,057.39

1,210.00 10.89
176,000.00 1,584.00
215,000.00 3,870.00

27,500.00 6,875
35,750.00 7,150
44,000.00 880
55,000.00 688

19,845.00 16,995.00 36,840.00

1,100.00 17,050.00
215,000.00 2,795.00

27,500.00 8,250
35,750.00 7,150
44,000.00 880
55,000.00 715

20,450.00 16,995.00 37,445.00

1,100.00 12,925.00
215,000.00 7,525.00

27,500.00 8,250
35,750.00 7,150
44,000.00 880
55,000.00 715
18,598.00 16,995.00 35,593.00

1,100.00 10,428.00
215,000.00 8,170.00

27,500.00 8,250
35,750.00 7,150
44,000.00 880
55,000.00 715

17,119.00 16,995.00 34,114.00

1,100.00 8,734.00
215,000.00 8,385.00

27,500.00 8,250
35,750.00 7,150
44,000.00 880
55,000.00 715

28,040.00 19,662.50 47,702.50

1,100.00 20,515.00
215,000.00 7,525.00

27,500.00 8,800
35,750.00 8,938
44,000.00 1,100
55,000.00 825

23,950.00 19,662.50 43,612.50

1,100.00 15,565.00
215,000.00 8,385.00

27,500.00 8,800
35,750.00 8,938
44,000.00 1,100
55,000.00 825

21,548.00 19,662.50 41,210.50


1,100.00 12,518.00
215,000.00 9,030.00

27,500.00 8,800
35,750.00 8,938
44,000.00 1,100
55,000.00 825

18,684.00 19,662.50 38,346.50

1,100.00 9,009.00
215,000.00 9,675.00

27,500.00 8,800
35,750.00 8,938
44,000.00 1,100
55,000.00 825

12,292.00 7,375.50 19,667.50

1,100.00 7,777.00
215,000.00 4,515.00

27,500.00 4,125
35,750.00 2,503
44,000.00 308
55,000.00 440

11,182.00 7,375.50 18,557.50

1,100.00 6,237.00
215,000.00 4,945.00

27,500.00 4,125
35,750.00 2,503
44,000.00 308
55,000.00 440

14,100.00 15,895.00 29,995.00

1,100.00 10,230.00
215,000.00 3,870.00

27,500.00 7,150
35,750.00 7,150
44,000.00 880
55,000.00 715

12,292.00 15,895.00 28,187.00

1,100.00 7,777.00
215,000.00 4,515.00

27,500.00 7,150
35,750.00 7,150
44,000.00 880
55,000.00 715

980.00 4,708.00 5,688.00

1,100.00 550.00
215,000.00 430.00

27,500.00 1,568
35,750.00 1,359
44,000.00 1,672
55,000.00 110

330,190.08 2,453.00 332,643.08

1,320.00 190.08
22,000.00 330,000.00

27,500.00 1,375
35,750.00 715
44,000.00 88
55,000.00 275

202,980.80 21,780.00 224,760.80

1,320.00 580.80
17,600.00 202,400.00
27,500.00 12,375
35,750.00 7,150
44,000.00 880
55,000.00 1,375

8,192.00 11,715.00 19,907.00

1,100.00 4,752.00
215,000.00 3,440.00

27,500.00 6,875
35,750.00 3,575
44,000.00 440
55,000.00 825

8,192.00 7,375.50 15,567.50

1,100.00 4,752.00
215,000.00 3,440.00

27,500.00 4,125
35,750.00 2,503
44,000.00 308
55,000.00 440

59,260.00 17,105.00 76,365.00

1,100.00 550.00
19,800.00 57,420.00
215,000.00 1,290.00

27,500.00 8,250
35,750.00 7,150
44,000.00 880
55,000.00 825

14,390.00 12,519.38 26,909.38

1,100.00 8,800.00
215,000.00 5,590.00

27,500.00 6,188 0.00


35,750.00 5,452 0.00
44,000.00 440 0.00
55,000.00 440 0.00

11,960.00 12,519.38 24,479.38

1,100.00 5,940.00
215,000.00 6,020.00

27,500.00 6,188 0.00


35,750.00 5,452 0.00
44,000.00 440 0.00
55,000.00 440 0.00

30,250,000.00 1,039,500.00 31,289,500.00

27,500,000.00 30,250,000.00

27,500.00 165,000
38,500.00 770,000
44,000.00 88,000
55,000.00 16,500

2,178,000.00 962,500.00 3,140,500.00

1,815,000.00 2,178,000.00

27,500.00 165,000
38,500.00 693,000
44,000.00 88,000
55,000.00 16,500

2,442,000.00 962,500.00 3,404,500.00

2,035,000.00 2,442,000.00

27,500.00 165,000
38,500.00 693,000
44,000.00 88,000
55,000.00 16,500
74,965.00 55,660.00 130,625.00

2,035,000.00 73,260.00
34,100.00 1,705.00

27,500.00 9,625
38,500.00 40,425
44,000.00 4,620
55,000.00 990

74,965.00 55,660.00 130,625.00

2,035,000.00 73,260.00
34,100.00 1,705.00

27,500.00 9,625
38,500.00 40,425
44,000.00 4,620
55,000.00 990

1,375,000.00 137,500.00 1,512,500.00

27,500,000.00 1,375,000.00

27,500.00 27,500
38,500.00 96,250
44,000.00 11,000
55,000.00 2,750

81,400.00 137,500.00 218,900.00

2,035,000.00 81,400.00

27,500.00 27,500
38,500.00 96,250
44,000.00 11,000
55,000.00 2,750

962,500.00 110,000.00 1,072,500.00

27,500,000.00 962,500.00
27,500.00 22,000
38,500.00 77,000
44,000.00 8,800
55,000.00 2,200

71,225.00 110,000.00 181,225.00

2,035,000.00 71,225.00

27,500.00 22,000
38,500.00 77,000
44,000.00 8,800
55,000.00 2,200

71,225.00 110,000.00 181,225.00

2,035,000.00 71,225.00

27,500.00 22,000
38,500.00 77,000
44,000.00 8,800
55,000.00 2,200

130,240.00 172,700.00 302,940.00

2,035,000.00 130,240.00

27,500.00 27,500
38,500.00 115,500
44,000.00 13,200
55,000.00 16,500

130,240.00 183,700.00 313,940.00

2,035,000.00 130,240.00

27,500.00 27,500
38,500.00 115,500
44,000.00 13,200
55,000.00 27,500

585,893.00 103,950.00 689,843.00


27,500,000.00 539,000.00
34,100.00 1,023.00
9,900.00 2,970.00
42,900.00 42,900.00

27,500.00 16,500
38,500.00 77,000
44,000.00 8,800
55,000.00 1,650

585,893.00 103,950.00 689,843.00

27,500,000.00 539,000.00
34,100.00 1,023.00
9,900.00 2,970.00
42,900.00 42,900.00

27,500.00 16,500
38,500.00 77,000
44,000.00 8,800
55,000.00 1,650

1,655,115.00 100,925.00 1,756,040.00

27,500,000.00 1,650,000.00
34,100.00 5,115.00

27,500.00 13,750
38,500.00 77,000
44,000.00 8,800
55,000.00 1,375

1,655,115.00 100,925.00 1,756,040.00

27,500,000.00 1,650,000.00
34,100.00 5,115.00

27,500.00 13,750
38,500.00 77,000
44,000.00 8,800
55,000.00 1,375
86,779.00 103,950.00 190,729.00

2,035,000.00 39,886.00
34,100.00 1,023.00
9,900.00 2,970.00
42,900.00 42,900.00

27,500.00 16,500
38,500.00 77,000
44,000.00 8,800
55,000.00 1,650

595,100.00 103,950.00 699,050.00

27,500,000.00 539,000.00
34,100.00 10,230.00
9,900.00 2,970.00
42,900.00 42,900.00

27,500.00 16,500
38,500.00 77,000
44,000.00 8,800
55,000.00 1,650

595,100.00 103,950.00 699,050.00

27,500,000.00 539,000.00
34,100.00 10,230.00
9,900.00 2,970.00
42,900.00 42,900.00

27,500.00 16,500
38,500.00 77,000
44,000.00 8,800
55,000.00 1,650

633,050.00 131,450.00 764,500.00

27,500,000.00 539,000.00
34,100.00 10,230.00
9,900.00 7,920.00
42,900.00 42,900.00
66,000.00 33,000.00

27,500.00 22,000
38,500.00 96,250
44,000.00 11,000
55,000.00 2,200

133,936.00 131,450.00 265,386.00

2,035,000.00 39,886.00
34,100.00 10,230.00
9,900.00 7,920.00
42,900.00 42,900.00
66,000.00 33,000.00

27,500.00 22,000
38,500.00 96,250
44,000.00 11,000
55,000.00 2,200

633,050.00 131,450.00 764,500.00

27,500,000.00 539,000.00
34,100.00 10,230.00
9,900.00 7,920.00
42,900.00 42,900.00
66,000.00 33,000.00

27,500.00 22,000
38,500.00 96,250
44,000.00 11,000
55,000.00 2,200

611,600.00 131,450.00 743,050.00

27,500,000.00 539,000.00
34,100.00 10,230.00
9,900.00 7,920.00
42,900.00 21,450.00
66,000.00 33,000.00
27,500.00 22,000
38,500.00 96,250
44,000.00 11,000
55,000.00 2,200

670,010.00 141,790.00 811,800.00

27,500,000.00 539,000.00
34,100.00 10,230.00
9,900.00 11,880.00
42,900.00 42,900.00
66,000.00 66,000.00

27,500.00 27,500
38,500.00 100,100
44,000.00 11,440
55,000.00 2,750

170,896.00 141,790.00 312,686.00

2,035,000.00 39,886.00
34,100.00 10,230.00
9,900.00 11,880.00
42,900.00 42,900.00
66,000.00 66,000.00

27,500.00 27,500
38,500.00 100,100
44,000.00 11,440
55,000.00 2,750

30,450,530.00 635,800.00 31,086,330.00

27,500,000.00 30,250,000.00
11,550.00 173,250.00
34,100.00 27,280.00

27,500.00 110,000
38,500.00 462,000
44,000.00 52,800
55,000.00 11,000
2,015,530.00 635,800.00 2,651,330.00

1,650,000.00 1,815,000.00
11,550.00 173,250.00
34,100.00 27,280.00

27,500.00 110,000
38,500.00 462,000
44,000.00 52,800
55,000.00 11,000

1,960,530.00 635,800.00 2,596,330.00

1,600,000.00 1,760,000.00
11,550.00 173,250.00
34,100.00 27,280.00

27,500.00 110,000
38,500.00 462,000
44,000.00 52,800
55,000.00 11,000

1,834,030.00 635,800.00 2,469,830.00

1,485,000.00 1,633,500.00
11,550.00 173,250.00
34,100.00 27,280.00

27,500.00 110,000
38,500.00 462,000
44,000.00 52,800
55,000.00 11,000

24,915.00 7,315.00 32,230.00

1,650,000.00 19,800.00
34,100.00 5,115.00

27,500.00 2,750
38,500.00 3,850
44,000.00 440
55,000.00 275
24,315.00 7,315.00 31,630.00

1,600,000.00 19,200.00
34,100.00 5,115.00

27,500.00 2,750
38,500.00 3,850
44,000.00 440
55,000.00 275

390,115.00 7,315.00 397,430.00

27,500,000.00 385,000.00
34,100.00 5,115.00

27,500.00 2,750
38,500.00 3,850
44,000.00 440
55,000.00 275

28,215.00 7,315.00 35,530.00

1,650,000.00 23,100.00
34,100.00 5,115.00

27,500.00 2,750
38,500.00 3,850
44,000.00 440
55,000.00 275

27,515.00 7,315.00 34,830.00

1,600,000.00 22,400.00
34,100.00 5,115.00

27,500.00 2,750
38,500.00 3,850
44,000.00 440
55,000.00 275

279,070.00 8,778.00 287,848.00


1,650,000.00 272,250.00
34,100.00 6,820.00

27,500.00 3,300
38,500.00 4,620
44,000.00 528
55,000.00 330

279,070.00 8,778.00 287,848.00

1,650,000.00 272,250.00
34,100.00 6,820.00

27,500.00 3,300
38,500.00 4,620
44,000.00 528
55,000.00 330

333,410.00 18,975.00 352,385.00

27,500,000.00 330,000.00
34,100.00 3,410.00

27,500.00 4,125
38,500.00 9,625
44,000.00 1,100
55,000.00 4,125

16,357.00 11,825.00 28,182.00

2,035,000.00 14,652.00
34,100.00 1,705.00

27,500.00 2,750
38,500.00 7,700
44,000.00 1,100
55,000.00 275

23,210.00 18,975.00 42,185.00

1,650,000.00 19,800.00
34,100.00 3,410.00

27,500.00 4,125
38,500.00 9,625
44,000.00 1,100
55,000.00 4,125

23,210.00 18,975.00 42,185.00

1,650,000.00 19,800.00
34,100.00 3,410.00

27,500.00 4,125
38,500.00 9,625
44,000.00 1,100
55,000.00 4,125

637,615.00 18,920.00 656,535.00

27,500,000.00 632,500.00
34,100.00 5,115.00

27,500.00 5,500
38,500.00 11,550
44,000.00 1,320
55,000.00 550

43,065.00 18,920.00 61,985.00

1,650,000.00 37,950.00
34,100.00 5,115.00

27,500.00 5,500
38,500.00 11,550
44,000.00 1,320
55,000.00 550

41,915.00 18,920.00 60,835.00

1,600,000.00 36,800.00
34,100.00 5,115.00
27,500.00 5,500
38,500.00 11,550
44,000.00 1,320
55,000.00 550

749,320.00 22,577.50 771,897.50

27,500,000.00 742,500.00
34,100.00 6,820.00

27,500.00 6,875
38,500.00 13,475
44,000.00 1,540
55,000.00 688

51,370.00 22,577.50 73,947.50

1,650,000.00 44,550.00
34,100.00 6,820.00

27,500.00 6,875
38,500.00 13,475
44,000.00 1,540
55,000.00 688

50,020.00 22,577.50 72,597.50

1,600,000.00 43,200.00
34,100.00 6,820.00

27,500.00 6,875
38,500.00 13,475
44,000.00 1,540
55,000.00 688

199,705.00 11,825.00 211,530.00

27,500,000.00 198,000.00
34,100.00 1,705.00

27,500.00 2,750
38,500.00 7,700
44,000.00 1,100
55,000.00 275

16,357.00 11,825.00 28,182.00

2,035,000.00 14,652.00
34,100.00 1,705.00

27,500.00 2,750
38,500.00 7,700
44,000.00 1,100
55,000.00 275

304,205.00 12,738.00 316,943.00

27,500,000.00 302,500.00
34,100.00 1,705.00

27,500.00 3,025
38,500.00 8,470
44,000.00 968
55,000.00 275

24,090.00 12,738.00 36,828.00

2,035,000.00 22,385.00
34,100.00 1,705.00

27,500.00 3,025
38,500.00 8,470
44,000.00 968
55,000.00 275

31,553.50 18,975.00 50,528.50

2,035,000.00 29,507.50
34,100.00 2,046.00

27,500.00 4,125
38,500.00 9,625
44,000.00 1,100
55,000.00 4,125
19,547.00 9,790.00 29,337.00

2,035,000.00 17,501.00
34,100.00 2,046.00

27,500.00 2,750
38,500.00 3,850
44,000.00 440
55,000.00 2,750

19,954.00 9,790.00 29,744.00

2,035,000.00 17,908.00
34,100.00 2,046.00

27,500.00 2,750
38,500.00 3,850
44,000.00 440
55,000.00 2,750

49,830.00 27,555.00 77,385.00

1,650,000.00 32,175.00
2,035,000.00 14,245.00
34,100.00 3,410.00

27,500.00 4,125
38,500.00 17,325
44,000.00 1,980
55,000.00 4,125

48,855.00 27,555.00 76,410.00

1,600,000.00 31,200.00
2,035,000.00 14,245.00
34,100.00 3,410.00

27,500.00 4,125
38,500.00 17,325
44,000.00 1,980
55,000.00 4,125
49,830.00 27,555.00 77,385.00

1,650,000.00 32,175.00
2,035,000.00 14,245.00
34,100.00 3,410.00

27,500.00 4,125
38,500.00 17,325
44,000.00 1,980
55,000.00 4,125

49,830.00 27,555.00 77,385.00

1,650,000.00 32,175.00
2,035,000.00 14,245.00
34,100.00 3,410.00

27,500.00 4,125
38,500.00 17,325
44,000.00 1,980
55,000.00 4,125

98,274.00 31,790.00 130,064.00

1,650,000.00 32,175.00
2,035,000.00 14,245.00
34,100.00 3,410.00
9,900.00 5,544.00
42,900.00 42,900.00

27,500.00 5,500
38,500.00 23,100
44,000.00 2,640
55,000.00 550

201,025.00 95,370.00 296,395.00

27,500,000.00 192,500.00
34,100.00 3,410.00
34,100.00 5,115.00
27,500.00 16,500
38,500.00 69,300
44,000.00 7,920
55,000.00 1,650

18,865.00 3,976.50 22,841.50

42,900.00 17,160.00
34,100.00 1,705.00

27,500.00 688
38,500.00 2,888
44,000.00 330
55,000.00 72

18,480.00 1,529.00 20,009.00

17,600.00 18,480.00

27,500.00 578
38,500.00 809
44,000.00 88
55,000.00 55

28,690.00 32,758.00 61,448.00

1,100.00 11,000.00
215,000.00 5,590.00
275,000.00 12,100.00

27,500.00 31,625
35,750.00 715
44,000.00 88
55,000.00 330

590,850.00 59,812.50 650,662.50

1,100.00 239,800.00
215,000.00 111,800.00
275,000.00 239,250.00
27,500.00 45,375
35,750.00 8,938
44,000.00 1,100
55,000.00 4,400

576,250.00 59,812.50 636,062.50

1,100.00 216,700.00
215,000.00 101,050.00
275,000.00 258,500.00

27,500.00 45,375
35,750.00 8,938
44,000.00 1,100
55,000.00 4,400

552,100.00 59,812.50 611,912.50

1,100.00 190,300.00
215,000.00 122,550.00
275,000.00 239,250.00

27,500.00 45,375
35,750.00 8,938
44,000.00 1,100
55,000.00 4,400

581,500.00 59,812.50 641,312.50

1,100.00 255,200.00
215,000.00 111,800.00
275,000.00 214,500.00

27,500.00 45,375
35,750.00 8,938
44,000.00 1,100
55,000.00 4,400

652,250.00 59,812.50 712,062.50

1,100.00 308,000.00
215,000.00 96,750.00
275,000.00 247,500.00

27,500.00 45,375
35,750.00 8,938
44,000.00 1,100
55,000.00 4,400

700,100.00 59,812.50 759,912.50

1,100.00 387,200.00
215,000.00 120,400.00
275,000.00 192,500.00

27,500.00 45,375
35,750.00 8,938
44,000.00 1,100
55,000.00 4,400

631,500.00 59,812.50 691,312.50

1,100.00 392,700.00
215,000.00 90,300.00
275,000.00 148,500.00

27,500.00 45,375
35,750.00 8,938
44,000.00 1,100
55,000.00 4,400

740,150.00 59,812.50 799,962.50

1,100.00 424,600.00
215,000.00 101,050.00
275,000.00 214,500.00

27,500.00 45,375
35,750.00 8,938
44,000.00 1,100
55,000.00 4,400

809,950.00 59,812.50 869,762.50


1,100.00 526,900.00
215,000.00 79,550.00
275,000.00 203,500.00

27,500.00 45,375
35,750.00 8,938
44,000.00 1,100
55,000.00 4,400

828,892.00 59,812.50 888,704.50

1,100.00 526,900.00
215,000.00 79,550.00
275,000.00 203,500.00
7,700.00 18,942.00

27,500.00 45,375
35,750.00 8,938
44,000.00 1,100
55,000.00 4,400

708,450.00 124,052.50 832,502.50

1,100.00 369,600.00
215,000.00 116,100.00
275,000.00 222,750.00

27,500.00 55,000
35,750.00 12,513
44,000.00 1,540
55,000.00 55,000

676,900.00 124,052.50 800,952.50

1,100.00 320,100.00
215,000.00 101,050.00
275,000.00 255,750.00

27,500.00 55,000
35,750.00 12,513
44,000.00 1,540
55,000.00 55,000

740,300.00 124,052.50 864,352.50

1,100.00 403,700.00
215,000.00 94,600.00
275,000.00 242,000.00

27,500.00 55,000
35,750.00 12,513
44,000.00 1,540
55,000.00 55,000

763,200.00 124,052.50 887,252.50

1,100.00 440,000.00
215,000.00 103,200.00
275,000.00 220,000.00

27,500.00 55,000
35,750.00 12,513
44,000.00 1,540
55,000.00 55,000

931,300.00 124,052.50 1,055,352.50

1,100.00 676,500.00
215,000.00 111,800.00
275,000.00 143,000.00

27,500.00 55,000
35,750.00 12,513
44,000.00 1,540
55,000.00 55,000

769,140.00 124,052.50 893,192.50

1,100.00 440,000.00
215,000.00 103,200.00
275,000.00 220,000.00
4,950.00 5,940.00
27,500.00 55,000
35,750.00 12,513
44,000.00 1,540
55,000.00 55,000

36,960.00 2,689.50 39,649.50

35,200.00 36,960.00

27,500.00 1,375
35,750.00 1,073
44,000.00 132
55,000.00 110

40,425.00 2,711.50 43,136.50

38,500.00 40,425.00

27,500.00 1,375
35,750.00 1,073
44,000.00 154
55,000.00 110

42,735.00 27,802.50 70,537.50

40,700.00 42,735.00

27,500.00 15,125
35,750.00 12,513
55,000.00 165

47,355.00 27,802.50 75,157.50

45,100.00 47,355.00

27,500.00 15,125
35,750.00 12,513
55,000.00 165

53,130.00 27,802.50 80,932.50

50,600.00 53,130.00
27,500.00 15,125
35,750.00 12,513
55,000.00 165

75,075.00 27,802.50 102,877.50

71,500.00 75,075.00

27,500.00 15,125
35,750.00 12,513
55,000.00 165

17,646.75 490.05 18,136.80

16,500.00 17,325.00
21,450.00 321.75

27,500.00 193
35,750.00 250
44,000.00 31
55,000.00 17

17,539.50 354.75 17,894.25

16,500.00 17,325.00
21,450.00 214.50

27,500.00 138
35,750.00 179
44,000.00 22
55,000.00 17

39,707.25 1,773.75 41,481.00

22,000.00 22,440.00
21,450.00 17,267.25

27,500.00 688
35,750.00 894
44,000.00 110
55,000.00 83
108,955.00 22,737.00 131,692.00

1,540,000.00 61,600.00
34,100.00 13,640.00
4,950.00 990.00
49,500.00 17,325.00
7,700.00 15,400.00

27,500.00 8,250
38,500.00 12,705
44,000.00 1,452
55,000.00 330

196,537.00 21,560.00 218,097.00

2,035,000.00 179,487.00
34,100.00 17,050.00

27,500.00 4,125
38,500.00 7,700
44,000.00 8,800
55,000.00 935

72,325.00 19,679.00 92,004.00

1,540,000.00 61,600.00
34,100.00 10,230.00
4,950.00 495.00

27,500.00 8,250
38,500.00 10,010
44,000.00 1,144
55,000.00 275

72,325.00 19,679.00 92,004.00

1,540,000.00 61,600.00
34,100.00 10,230.00
4,950.00 495.00

27,500.00 8,250
38,500.00 10,010
44,000.00 1,144
55,000.00 275

132,955.00 22,737.00 155,692.00

1,540,000.00 61,600.00
34,100.00 13,640.00
4,950.00 990.00
1,600,000.00 24,000.00
49,500.00 17,325.00
7,700.00 15,400.00

27,500.00 8,250
38,500.00 12,705
44,000.00 1,452
55,000.00 330

137,755.00 23,287.00 161,042.00

1,540,000.00 61,600.00
34,100.00 13,640.00
4,950.00 990.00
1,600,000.00 28,800.00
49,500.00 17,325.00
7,700.00 15,400.00

27,500.00 8,800
38,500.00 12,705
44,000.00 1,452
55,000.00 330

163,755.00 22,379.50 186,134.50

1,540,000.00 61,600.00
34,100.00 13,640.00
4,950.00 990.00
1,600,000.00 24,000.00
49,500.00 17,325.00
7,700.00 46,200.00

27,500.00 8,800
35,750.00 11,798
44,000.00 1,452
55,000.00 330

449,755.00 23,287.00 473,042.00

1,540,000.00 61,600.00
34,100.00 13,640.00
4,950.00 990.00
1,600,000.00 24,000.00
49,500.00 17,325.00
7,700.00 46,200.00
71,500.00 286,000.00

27,500.00 8,800
38,500.00 12,705
44,000.00 1,452
55,000.00 330

117,307.50 23,287.00 140,594.50

1,540,000.00 46,200.00
34,100.00 13,640.00
4,950.00 742.50
1,600,000.00 24,000.00
49,500.00 17,325.00
7,700.00 15,400.00

27,500.00 8,800
38,500.00 12,705
44,000.00 1,452
55,000.00 330

3,490,992.50 217,195.00 3,708,187.50

1,540,000.00 308,000.00
34,100.00 51,150.00
4,950.00 1,980.00
16,000.00 2,400,000.00
21,450.00 48,262.50
1,100.00 355,300.00
215,000.00 111,800.00
275,000.00 214,500.00

27,500.00 107,250
35,750.00 12,513
38,500.00 40,040
35,750.00 37,538
44,000.00 10,780
55,000.00 9,075

4,432,920.00 279,911.50 4,712,831.50

1,540,000.00 415,800.00
34,100.00 68,200.00
4,950.00 2,970.00
16,000.00 3,200,000.00
21,450.00 64,350.00
1,100.00 355,300.00 6.46
215,000.00 111,800.00
275,000.00 214,500.00

27,500.00 133,375
35,750.00 12,513
38,500.00 60,060
35,750.00 50,050
44,000.00 14,564
55,000.00 9,350

6,961,925.00 454,217.50 7,416,142.50

1,540,000.00 616,000.00
34,100.00 136,400.00
4,950.00 9,900.00
16,000.00 4,800,000.00
21,450.00 96,525.00
1,100.00 355,300.00
215,000.00 111,800.00
275,000.00 214,500.00
1,815,000.00 272,250.00
49,500.00 173,250.00
8,800.00 176,000.00

27,500.00 200,750
35,750.00 12,513
38,500.00 127,050
35,750.00 75,075
44,000.00 25,080
55,000.00 13,750

5,089,290.00 365,722.50 5,455,012.50

1,540,000.00 492,800.00
34,100.00 109,120.00
4,950.00 7,920.00
16,000.00 3,200,000.00
21,450.00 64,350.00
1,100.00 355,300.00
215,000.00 111,800.00
275,000.00 214,500.00
1,815,000.00 254,100.00
49,500.00 138,600.00
8,800.00 140,800.00

27,500.00 163,900
35,750.00 12,513
38,500.00 107,800
35,750.00 50,050
44,000.00 20,020
55,000.00 11,440

4,377,702.50 346,005.00 4,723,707.50

1,540,000.00 492,800.00
34,100.00 109,120.00
4,950.00 7,920.00
16,000.00 2,400,000.00
21,450.00 48,262.50
1,100.00 355,300.00
215,000.00 111,800.00
275,000.00 214,500.00
1,815,000.00 217,800.00
49,500.00 138,600.00
8,800.00 281,600.00

27,500.00 159,500
35,750.00 12,513
38,500.00 107,800
35,750.00 37,538
44,000.00 18,480
55,000.00 10,175

4,256,702.50 333,905.00 4,590,607.50

1,540,000.00 369,600.00
34,100.00 109,120.00
4,950.00 7,920.00
16,000.00 2,400,000.00
21,450.00 48,262.50
1,100.00 355,300.00
215,000.00 111,800.00
275,000.00 214,500.00
1,815,000.00 290,400.00
49,500.00 138,600.00
8,800.00 211,200.00

27,500.00 154,000
35,750.00 12,513
38,500.00 101,640
35,750.00 37,538
44,000.00 17,600
55,000.00 10,615

4,876,715.00 334,042.50 5,210,757.50

1,540,000.00 385,000.00
34,100.00 102,300.00
4,950.00 5,940.00
16,000.00 3,200,000.00
21,450.00 64,350.00
1,100.00 355,300.00
215,000.00 111,800.00
275,000.00 214,500.00
1,815,000.00 190,575.00
49,500.00 123,750.00
8,800.00 123,200.00

27,500.00 154,000
35,750.00 12,513
38,500.00 88,550
35,750.00 50,050
44,000.00 17,820
55,000.00 11,110

69,238.50 4,279.00 73,517.50

1,540,000.00 3,080.00
34,100.00 341.00
16,000.00 48,000.00
21,450.00 9,652.50
1,100.00 4,400.00
215,000.00 1,290.00
275,000.00 2,475.00

27,500.00 1,650
35,750.00 715
38,500.00 770
35,750.00 715
44,000.00 264
55,000.00 165

79,087.50 17,712.75 96,800.25

495,000.00 1,485.00
34,100.00 6,820.00
16,000.00 57,600.00
21,450.00 1,072.50
1,100.00 6,050.00
215,000.00 1,935.00
275,000.00 4,125.00

27,500.00 2,750
35,750.00 11,798
38,500.00 1,271
35,750.00 1,180
44,000.00 440
55,000.00 275

41,250.00 7,804.50 49,054.50


1,650.00 41,250.00

27,500.00 4,125
38,500.00 2,888
44,000.00 352
55,000.00 440

126,500.00 7,804.50 134,304.50

5,060.00 126,500.00

27,500.00 4,125
38,500.00 2,888
44,000.00 352
55,000.00 440

29,040.00 7,139.00 36,179.00

2,420.00 29,040.00

27,500.00 4,125
38,500.00 2,310
44,000.00 264
55,000.00 440

40,430.00 19,690.00 60,120.00

4,950.00 24,750.00
1,100.00 8,800.00
215,000.00 6,880.00

27,500.00 11,000
38,500.00 7,700
44,000.00 880
55,000.00 110

54,180.00 19,690.00 73,870.00

7,700.00 38,500.00
1,100.00 8,800.00
215,000.00 6,880.00
27,500.00 11,000
38,500.00 7,700
44,000.00 880
55,000.00 110

35,480.00 19,690.00 55,170.00

4,950.00 19,800.00
1,100.00 8,800.00
215,000.00 6,880.00

27,500.00 11,000
38,500.00 7,700
44,000.00 880
55,000.00 110

232,705.00 7,122.50 239,827.50

385,000.00 231,000.00
34,100.00 1,705.00

27,500.00 3,850
38,500.00 2,580
44,000.00 308
55,000.00 385

13,992.00 7,529.50 21,521.50

19,800.00 9,900.00
34,100.00 4,092.00

27,500.00 3,850
38,500.00 2,888
44,000.00 352
55,000.00 440

15,972.00 7,529.50 23,501.50

19,800.00 11,880.00
34,100.00 4,092.00
27,500.00 3,850
38,500.00 2,888
44,000.00 352
55,000.00 440

15,972.00 7,238.00 23,210.00

19,800.00 11,880.00
34,100.00 4,092.00

27,500.00 3,850
38,500.00 2,695
44,000.00 308
55,000.00 385

18,942.00 7,238.00 26,180.00

19,800.00 14,850.00
34,100.00 4,092.00

27,500.00 3,850
38,500.00 2,695
44,000.00 308
55,000.00 385

11,022.00 7,238.00 18,260.00

19,800.00 6,930.00
34,100.00 4,092.00

27,500.00 3,850
38,500.00 2,695
44,000.00 308
55,000.00 385

12,408.00 7,238.00 19,646.00

19,800.00 8,316.00
34,100.00 4,092.00

27,500.00 3,850
38,500.00 2,695
44,000.00 308
55,000.00 385

12,804.00 7,122.50 19,926.50

19,800.00 8,712.00
34,100.00 4,092.00

27,500.00 3,850
38,500.00 2,580
44,000.00 308
55,000.00 385

14,190.00 7,122.50 21,312.50

19,800.00 10,098.00
34,100.00 4,092.00

27,500.00 3,850
38,500.00 2,580
44,000.00 308
55,000.00 385

19,932.00 7,122.50 27,054.50

19,800.00 15,840.00
34,100.00 4,092.00

27,500.00 3,850
38,500.00 2,580
44,000.00 308
55,000.00 385

11,418.00 7,122.50 18,540.50

19,800.00 7,326.00
34,100.00 4,092.00

27,500.00 3,850
38,500.00 2,580
44,000.00 308
55,000.00 385
11,616.00 7,122.50 18,738.50

19,800.00 7,524.00
34,100.00 4,092.00

27,500.00 3,850
38,500.00 2,580
44,000.00 308
55,000.00 385

13,200.00 7,122.50 20,322.50

19,800.00 9,108.00
34,100.00 4,092.00

27,500.00 3,850
38,500.00 2,580
44,000.00 308
55,000.00 385

13,794.00 7,122.50 20,916.50

19,800.00 9,702.00
34,100.00 4,092.00

27,500.00 3,850
38,500.00 2,580
44,000.00 308
55,000.00 385

15,378.00 7,122.50 22,500.50

19,800.00 11,286.00
34,100.00 4,092.00

27,500.00 3,850
38,500.00 2,580
44,000.00 308
55,000.00 385

252,120.00 7,914.50 260,034.50


19,800.00 47,520.00
34,100.00 204,600.00

27,500.00 2,310
38,500.00 4,813
44,000.00 572
55,000.00 220

252,120.00 7,914.50 260,034.50

19,800.00 47,520.00
34,100.00 204,600.00

27,500.00 2,310
38,500.00 4,813
44,000.00 572
55,000.00 220

246,180.00 7,914.50 254,094.50

19,800.00 41,580.00
34,100.00 204,600.00

27,500.00 2,310
38,500.00 4,813
44,000.00 572
55,000.00 220

245,190.00 7,914.50 253,104.50

19,800.00 40,590.00
34,100.00 204,600.00

27,500.00 2,310
38,500.00 4,813
44,000.00 572
55,000.00 220

208,560.00 7,914.50 216,474.50

3,300.00 3,960.00
34,100.00 204,600.00

27,500.00 2,310
38,500.00 4,813
44,000.00 572
55,000.00 220

208,560.00 7,914.50 216,474.50

3,300.00 3,960.00
34,100.00 204,600.00

27,500.00 2,310
38,500.00 4,813
44,000.00 572
55,000.00 220

208,560.00 7,914.50 216,474.50

3,300.00 3,960.00
34,100.00 204,600.00

27,500.00 2,310
38,500.00 4,813
44,000.00 572
55,000.00 220

209,440.00 9,317.00 218,757.00

4,400.00 4,840.00
34,100.00 204,600.00

27,500.00 2,750
38,500.00 5,775
44,000.00 572
55,000.00 220

209,440.00 7,914.50 217,354.50

4,400.00 4,840.00
34,100.00 204,600.00
27,500.00 2,310
38,500.00 4,813
44,000.00 572
55,000.00 220

92,983.00 10,340.00 103,323.00

8,360.00 91,960.00
34,100.00 1,023.00

27,500.00 5,500
38,500.00 3,850
44,000.00 440
55,000.00 550

92,378.00 17,732.00 110,110.00

11,000.00 75,900.00
42,900.00 15,015.00
34,100.00 1,023.00
880.00 440.00

27,500.00 5,500
38,500.00 11,550
44,000.00 132
55,000.00 550

51,475.60 9,845.00 61,320.60

43,780.00 44,655.60
34,100.00 6,820.00

27,500.00 5,500
38,500.00 3,850
44,000.00 440
55,000.00 55

34,320.00 15,730.00 50,050.00

458.33 27,500.00
34,100.00 6,820.00
27,500.00 4,565
38,500.00 9,625
44,000.00 1,100
55,000.00 440

51,045.00 20,680.00 71,725.00

8,360.00 29,260.00
34,100.00 1,705.00
1,100.00 11,880.00
215,000.00 6,880.00
1,320.00 1,320.00

27,500.00 11,000
38,500.00 7,700
44,000.00 880
55,000.00 1,100

29,305.00 14,492.50 43,797.50

11,000.00 22,000.00
34,100.00 1,705.00
1,600,000.00 5,600.00

27,500.00 3,438
38,500.00 9,625
44,000.00 1,100
55,000.00 330

44,055.00 14,025.00 58,080.00

38,500.00 42,350.00
34,100.00 1,705.00

27,500.00 6,875
38,500.00 5,775
44,000.00 660
55,000.00 715

44,055.00 14,025.00 58,080.00

38,500.00 42,350.00
34,100.00 1,705.00

27,500.00 6,875
38,500.00 5,775
44,000.00 660
55,000.00 715

27,291.00 14,492.50 41,783.50

38,500.00 15,400.00
34,100.00 2,046.00
34,100.00 1,705.00
2,035,000.00 8,140.00

27,500.00 3,438
38,500.00 9,625
44,000.00 1,100
55,000.00 330

35,332.00 6,204.00 41,536.00

49,500.00 34,650.00

34,100.00 682.00

27,500.00 3,300
38,500.00 2,310
44,000.00 264
55,000.00 330

12,914.00 3,789.50 16,703.50

38,500.00 11,550.00
34,100.00 1,364.00

27,500.00 413
38,500.00 2,695
44,000.00 352
55,000.00 330

46,882.00 3,982.00 50,864.00


44,000.00 46,200.00
34,100.00 682.00

27,500.00 413
38,500.00 2,888
44,000.00 352
55,000.00 330

9,284.00 42,240.00 51,524.00

6,600.00 7,920.00
34,100.00 1,364.00

27,500.00 2,750
38,500.00 38,500
44,000.00 440
55,000.00 550

4,042.50 6,710.00 10,752.50

3,850.00 4,042.50

27,500.00 4,125
38,500.00 1,925
44,000.00 220
55,000.00 440

45,617.00 16,046.25 61,663.25

1,815,000.00 38,115.00
34,100.00 7,502.00

27,500.00 5,156 0.00


38,500.00 8,663 0.00
44,000.00 1,650 0.00
55,000.00 578 0.00

48,741.00 3,910.50 52,651.50

44,000.00 48,400.00
34,100.00 341.00
27,500.00 825
38,500.00 2,695
44,000.00 308
55,000.00 83

42,691.00 3,910.50 46,601.50

38,500.00 42,350.00
34,100.00 341.00

27,500.00 825
38,500.00 2,695
44,000.00 308
55,000.00 83

42,691.00 3,910.50 46,601.50

38,500.00 42,350.00
34,100.00 341.00

27,500.00 825
38,500.00 2,695
44,000.00 308
55,000.00 83

570,955.00 6,963.00 577,918.00

49,500.00 569,250.00
34,100.00 1,705.00

27,500.00 1,650
38,500.00 4,620
44,000.00 528
55,000.00 165

314,325.00 6,105.00 320,430.00

53,900.00 312,620.00
34,100.00 1,705.00

27,500.00 1,650
38,500.00 3,850
44,000.00 440
55,000.00 165

100,705.00 6,105.00 106,810.00

66,000.00 99,000.00
34,100.00 1,705.00

27,500.00 1,650
38,500.00 3,850
44,000.00 440
55,000.00 165

16,467.00 6,407.50 22,874.50

42,900.00 15,444.00
34,100.00 1,023.00

27,500.00 1,925
38,500.00 3,850
44,000.00 440
55,000.00 193

16,467.00 6,407.50 22,874.50

42,900.00 15,444.00
34,100.00 1,023.00

27,500.00 1,925
38,500.00 3,850
44,000.00 440
55,000.00 193

16,467.00 6,407.50 22,874.50

42,900.00 15,444.00
34,100.00 1,023.00

27,500.00 1,925
38,500.00 3,850
44,000.00 440
55,000.00 193

16,467.00 6,407.50 22,874.50

42,900.00 15,444.00
34,100.00 1,023.00

27,500.00 1,925
38,500.00 3,850
44,000.00 440
55,000.00 193

30,723.00 6,407.50 37,130.50

82,500.00 29,700.00
34,100.00 1,023.00

27,500.00 1,925
38,500.00 3,850
44,000.00 440
55,000.00 193

30,723.00 6,407.50 37,130.50

82,500.00 29,700.00
34,100.00 1,023.00

27,500.00 1,925
38,500.00 3,850
44,000.00 440
55,000.00 193

28,023.00 6,407.50 34,430.50

75,000.00 27,000.00
34,100.00 1,023.00

27,500.00 1,925
38,500.00 3,850
44,000.00 440
55,000.00 193
662,046.00 31,790.00 693,836.00

27,500,000.00 660,000.00
34,100.00 341.00
34,100.00 1,705.00

27,500.00 5,500
38,500.00 23,100
44,000.00 2,640
55,000.00 550

3,804.24 31,790.00 35,594.24

73,260.00 1,758.24
34,100.00 341.00
34,100.00 1,705.00

27,500.00 5,500
38,500.00 23,100
44,000.00 2,640
55,000.00 550

50,886.00 31,790.00 82,676.00

2,035,000.00 48,840.00
34,100.00 341.00
34,100.00 1,705.00

27,500.00 5,500
38,500.00 23,100
44,000.00 2,640
55,000.00 550

33,748.00 20,955.00 54,703.00

93,500.00 32,725.00
34,100.00 1,023.00

27,500.00 16,500
38,500.00 3,850
44,000.00 440
55,000.00 165
379,885.00 25,987.50 405,872.50

71,500.00 257,400.00
20,900.00 3,135.00
12,100.00 12,100.00
71,500.00 107,250.00

27,500.00 4,125
38,500.00 19,250
44,000.00 2,200
55,000.00 413

16,071.00 3,685.00 19,756.00

14,300.00 15,730.00
34,100.00 341.00

27,500.00 1,375
38,500.00 1,925
44,000.00 220
55,000.00 165

55,577.00 25,327.50 80,904.50

1,600,000.00 36,800.00
34,100.00 2,046.00
42,900.00 16,731.00

27,500.00 7,425
38,500.00 15,400
44,000.00 1,760
55,000.00 743

angka Borneo 43,026.00 19,173.00 62,199.00

1,600,000.00 19,200.00
34,100.00 2,046.00
19,800.00 21,780.00

27,500.00 4,950
38,500.00 12,320
44,000.00 1,408
55,000.00 495

351,466.00 25,025.00 376,491.00

1,600,000.00 36,800.00
34,100.00 2,046.00
53,900.00 312,620.00

27,500.00 7,150
38,500.00 15,400
44,000.00 1,760
55,000.00 715

614,496.00 29,540.50 644,036.50

1,600,000.00 43,200.00
34,100.00 2,046.00
49,500.00 569,250.00

27,500.00 8,525
38,500.00 18,095
44,000.00 2,068
55,000.00 853

1,859,000.00 138,919.00 1,997,919.00

1,430,000.00 1,430,000.00
429,000.00 429,000.00

27,500.00 90,750
35,750.00 39,325
44,000.00 44
55,000.00 8,800

173,750.00 155,925.00 329,675.00

165,000.00 165,000.00
1,100.00 6,600.00
215,000.00 2,150.00
27,500.00 27,500
35,750.00 53,625
44,000.00 66,000
55,000.00 8,800

117,485.00 100,375.00 217,860.00

104,500.00 104,500.00
605.00 4,235.00
1,100.00 6,600.00
215,000.00 2,150.00

27,500.00 27,500
35,750.00 53,625
44,000.00 13,200
55,000.00 6,050

652,250.00 73,150.00 725,400.00

495,000.00 495,000.00
148,500.00 148,500.00
1,100.00 6,600.00
215,000.00 2,150.00

27,500.00 27,500
35,750.00 35,750
44,000.00 4,400
55,000.00 5,500

563,150.00 91,437.50 654,587.50

495,000.00 495,000.00
59,400.00 59,400.00
1,100.00 6,600.00
215,000.00 2,150.00

27,500.00 27,500
35,750.00 51,838
44,000.00 6,600
55,000.00 5,500
140,750.00 93,692.50 234,442.50

132,000.00 132,000.00
1,100.00 6,600.00
215,000.00 2,150.00

27,500.00 57,750
35,750.00 26,813
44,000.00 3,080
55,000.00 6,050

233,640.00 175,835.00 409,475.00

198,000.00 198,000.00
35,640.00 35,640.00

27,500.00 49,500
35,750.00 96,525
44,000.00 23,760
55,000.00 6,050

420,284.00 301,950.00 722,234.00

605.00 242.00
1,100.00 132,000.00
215,000.00 64,500.00
598.95 215,622.00
1,320.00 7,920.00

27,500.00 165,000
35,750.00 107,250
44,000.00 13,200
55,000.00 16,500

858,000.00 #VALUE! #VALUE!

715,000.00 715,000.00
143,000.00 143,000.00

27,500.00 #VALUE!
35,750.00 2,681
44,000.00 33,000
55,000.00 13,750

221,760.00 332,475.00 554,235.00

198,000.00 198,000.00
23,760.00

27,500.00 82,500
35,750.00 160,875
44,000.00 39,600
55,000.00 49,500

154,111.00 2,992.00 157,103.00

93,500.00 149,600.00
1,100.00 748.00
215,000.00 2,795.00
88,000.00 968.00

27,500.00 1,650
35,750.00 1,073
44,000.00 132
55,000.00 138

154,799.00 4,191.00 158,990.00

93,500.00 149,600.00
1,100.00 957.00
215,000.00 3,010.00
88,000.00 1,232.00

27,500.00 2,200
35,750.00 1,430
44,000.00 176
55,000.00 385

115,427.35 7,045.50 122,472.85

88,000.00 96,800.00
605.00 163.35
1,100.00 4,312.00
215,000.00 12,040.00
88,000.00 2,112.00

27,500.00 3,850
35,750.00 2,503
44,000.00 308
55,000.00 385

127,649.75 19,123.50 146,773.25

88,000.00 96,800.00
605.00 332.75
1,100.00 11,330.00
215,000.00 13,115.00
88,000.00 6,072.00

27,500.00 10,450
35,750.00 6,793
44,000.00 836
55,000.00 1,045

x 30 )cm, t = 35cm 121,287.73 125,232.25 246,519.98

605.00 87.73
1,100.00 48,400.00
215,000.00 15,050.00
275,000.00 19,250.00
16,000.00 25,600.00
215,000.00 12,900.00

27,500.00 88,000
35,750.00 36,286
44,000.00 66
55,000.00 880

x 45 )cm, t = 50cm 179,251.25 61,932.75 241,184.00

605.00 151.25
1,100.00 84,700.00
215,000.00 27,950.00
275,000.00 5,500.00
16,000.00 41,600.00
215,000.00 19,350.00

27,500.00 39,050
35,750.00 16,910
44,000.00 2,068
55,000.00 3,905

x 60 )cm, t = 65cm 277,659.46 97,548.00 375,207.46

605.00 224.46
1,100.00 125,400.00
215,000.00 39,560.00
275,000.00 9,075.00
16,000.00 77,600.00
215,000.00 25,800.00

27,500.00 59,400
35,750.00 25,740
44,000.00 3,168
55,000.00 5,940
33,000.00 3,300

201,500.00 6,583.50 208,083.50

130,000.00 156,000.00
45,500.00 45,500.00

27,500.00 1,485
35,750.00 3,218
44,000.00 396
55,000.00 1,485

201,500.00 6,583.50 208,083.50

130,000.00 156,000.00
45,500.00 45,500.00

27,500.00 1,485
35,750.00 3,218
44,000.00 396
55,000.00 1,485
201,500.00 6,583.50 208,083.50

130,000.00 156,000.00
45,500.00 45,500.00

27,500.00 1,485
35,750.00 3,218
44,000.00 396
55,000.00 1,485

201,500.00 10,494.00 211,994.00

130,000.00 156,000.00
45,500.00 45,500.00

27,500.00 2,970
35,750.00 6,435
44,000.00 792
55,000.00 297

#VALUE! 10,494.00 #VALUE!

130,000.00 156,000.00
45,500.00 #VALUE!

27,500.00 2,970
35,750.00 6,435
44,000.00 792
55,000.00 297

28,416.67 13,120.25 41,536.92

18,333.33 22,000.00
6,416.67 6,416.67

27,500.00 3,713
35,750.00 8,044
44,000.00 990
55,000.00 374

3,912.98 3,498.00 7,410.98


2,524.50 3,029.40
883.58 883.58

27,500.00 990
35,750.00 2,145
44,000.00 264
55,000.00 99

6,146.53 3,498.00 9,644.53

3,965.50 4,758.60
1,387.93 1,387.93

27,500.00 990
35,750.00 2,145
44,000.00 264
55,000.00 99

8,439.75 3,498.00 11,937.75

5,445.00 6,534.00
1,905.75 1,905.75

27,500.00 990
35,750.00 2,145
44,000.00 264
55,000.00 99

28,626.95 3,498.00 32,124.95

18,469.00 22,162.80
6,464.15 6,464.15

27,500.00 990
35,750.00 2,145
44,000.00 264
55,000.00 99

31,073.63 5,247.00 36,320.63

20,047.50 24,057.00
7,016.63 7,016.63
27,500.00 1,485
35,750.00 3,218
44,000.00 396
55,000.00 149

51,150.00 3,498.00 54,648.00

33,000.00 39,600.00
11,550.00 11,550.00

27,500.00 990
35,750.00 2,145
44,000.00 264
55,000.00 99

61,763.63 7,873.25 69,636.88

39,847.50 47,817.00
13,946.63 13,946.63

27,500.00 2,228
35,750.00 4,826
44,000.00 594
55,000.00 226

90,365.00 7,873.25 98,238.25

58,300.00 69,960.00
20,405.00 20,405.00

27,500.00 2,228
35,750.00 4,826
44,000.00 594
55,000.00 226

566,500.00 12,952.50 579,452.50

495,000.00 495,000.00
71,500.00 71,500.00

27,500.00 825
35,750.00 10,725
44,000.00 1,320
55,000.00 83

489,250.00 21,587.50 510,837.50

385,000.00 385,000.00
71,500.00 71,500.00
1,100.00 22,000.00
215,000.00 10,750.00

27,500.00 1,375
35,750.00 17,875
44,000.00 2,200
55,000.00 138

33,123.75 4,565.00 37,688.75

33,000.00 33,000.00
4,950.00 123.75

27,500.00 275
35,750.00 3,575
44,000.00 440
55,000.00 275

33,000.00 4,565.00 37,565.00

33,000.00 33,000.00

27,500.00 275
35,750.00 3,575
44,000.00 440
55,000.00 275

23,100.00 2,590.50 25,690.50

19,800.00 21,780.00
16,500.00 1,320.00

27,500.00 165
35,750.00 2,145
44,000.00 264
55,000.00 17

495,000.00 47,520.00 542,520.00

495,000.00 495,000.00

27,500.00 17,875
38,500.00 25,025
44,000.00 2,860
55,000.00 1,760

495,000.00 74,208.75 569,208.75

495,000.00 495,000.00

27,500.00 28,875
38,500.00 40,425
44,000.00 4,620
55,000.00 289

715,000.00 79,915.00 794,915.00

715,000.00 715,000.00

27,500.00 28,105
38,500.00 46,200
44,000.00 5,280
55,000.00 330

495,000.00 84,810.00 579,810.00

495,000.00 495,000.00

27,500.00 33,000
38,500.00 46,200
44,000.00 5,280
55,000.00 330

715,000.00 74,206.00 789,206.00


715,000.00 715,000.00

27,500.00 28,875
38,500.00 40,425
44,000.00 4,620
55,000.00 286

385,000.00 36,740.00 421,740.00

385,000.00 385,000.00

27,500.00 2,200
38,500.00 30,800
44,000.00 3,520
55,000.00 220

715,000.00 91,531.00 806,531.00

715,000.00 715,000.00

27,500.00 28,875
38,500.00 57,750
44,000.00 4,620
55,000.00 286

385,000.00 74,206.00 459,206.00

385,000.00 385,000.00

27,500.00 28,875
38,500.00 40,425
44,000.00 4,620
55,000.00 286

143,000.00 24,736.25 167,736.25

143,000.00 143,000.00

27,500.00 9,625
38,500.00 13,475
44,000.00 1,540
55,000.00 96
143,000.00 24,736.25 167,736.25

143,000.00 143,000.00

27,500.00 9,625
38,500.00 13,475
44,000.00 1,540
55,000.00 96

202,400.00 79,761.00 282,161.00

17,600.00 202,400.00

27,500.00 33,000
38,500.00 46,200
44,000.00 528
55,000.00 33

197,945.00 7,067.50 205,012.50

176,000.00 193,600.00
34,100.00 682.00
2,035,000.00 3,663.00

27,500.00 2,750
38,500.00 3,850
44,000.00 440
55,000.00 28

52,745.00 7,067.50 59,812.50

44,000.00 48,400.00
34,100.00 682.00
2,035,000.00 3,663.00

27,500.00 2,750
38,500.00 3,850
44,000.00 440
55,000.00 28
76,945.00 7,067.50 84,012.50

66,000.00 72,600.00
34,100.00 682.00
2,035,000.00 3,663.00

27,500.00 2,750
38,500.00 3,850
44,000.00 440
55,000.00 28

46,695.00 7,067.50 53,762.50

38,500.00 42,350.00
34,100.00 682.00
2,035,000.00 3,663.00

27,500.00 2,750
38,500.00 3,850
44,000.00 440
55,000.00 28

11,860.75 14,135.00 25,995.75

9,900.00 10,890.00
34,100.00 682.00
11,550.00 288.75

27,500.00 5,500
38,500.00 7,700
44,000.00 880
55,000.00 55

46,447.50 20,693.75 67,141.25

38,500.00 19,250.00
34,100.00 511.50
2,035,000.00 19,536.00
28,600.00 7,150.00

27,500.00 4,125
38,500.00 15,400
44,000.00 1,100
55,000.00 69

67,006.50 17,668.75 84,675.25

38,500.00 19,250.00
34,100.00 511.50
2,035,000.00 38,665.00
28,600.00 8,580.00

27,500.00 1,100
38,500.00 15,400
44,000.00 1,100
55,000.00 69

62,700.00 14,918.75 77,618.75

49,500.00 14,850.00
34,100.00 3,410.00
2,035,000.00 38,665.00
11,550.00 5,775.00

27,500.00 4,125
38,500.00 9,625
44,000.00 1,100
55,000.00 69

57,750.00 14,918.75 72,668.75

33,000.00 9,900.00
34,100.00 3,410.00
2,035,000.00 38,665.00
11,550.00 5,775.00

27,500.00 4,125
38,500.00 9,625
44,000.00 1,100
55,000.00 69

220,000.00 27,555.00 247,555.00


220,000.00 220,000.00

27,500.00 1,650
38,500.00 23,100
44,000.00 2,640
55,000.00 165

99,000.00 20,240.00 119,240.00

99,000.00 99,000.00

27,500.00 275
38,500.00 19,250
44,000.00 440
55,000.00 275

132,000.00 19,745.00 151,745.00

132,000.00 132,000.00

27,500.00 138
38,500.00 19,250
44,000.00 220
55,000.00 138

165,000.00 19,621.25 184,621.25

165,000.00 165,000.00

27,500.00 138
38,500.00 19,250
44,000.00 220
55,000.00 14

30,250.00 6,888.75 37,138.75

30,250.00 30,250.00

27,500.00 413
38,500.00 5,775
44,000.00 660
55,000.00 41
27,500.00 4,592.50 32,092.50

27,500.00 27,500.00

27,500.00 275
38,500.00 3,850
44,000.00 440
55,000.00 28

33,000.00 9,680.00 42,680.00

33,000.00 33,000.00

27,500.00 550
38,500.00 7,700
44,000.00 880
55,000.00 550

3,850.00 6,888.75 10,738.75

3,850.00 3,850.00

27,500.00 413
38,500.00 5,775
44,000.00 660
55,000.00 41

38,500.00 6,888.75 45,388.75

38,500.00 38,500.00

27,500.00 413
38,500.00 5,775
44,000.00 660
55,000.00 41

165,000.00 22,962.50 187,962.50

165,000.00 165,000.00

27,500.00 1,375
38,500.00 19,250
44,000.00 2,200
55,000.00 138

22,000.00 9,185.00 31,185.00

22,000.00 22,000.00

27,500.00 550
38,500.00 7,700
44,000.00 880
55,000.00 55

231,000.00 22,962.50 253,962.50

231,000.00 231,000.00

27,500.00 1,375
38,500.00 19,250
44,000.00 2,200
55,000.00 138

165,000.00 4,592.50 169,592.50

165,000.00 165,000.00

27,500.00 275
38,500.00 3,850
44,000.00 440
55,000.00 28

275,000.00 27,555.00 302,555.00

275,000.00 275,000.00

27,500.00 1,650
38,500.00 23,100
44,000.00 2,640
55,000.00 165

27,500.00 11,481.25 38,981.25


27,500.00 27,500.00

27,500.00 688
38,500.00 9,625
44,000.00 1,100
55,000.00 69

78,650.00 6,888.75 85,538.75

71,500.00 78,650.00

27,500.00 413
38,500.00 5,775
44,000.00 660
55,000.00 41

78,650.00 6,888.75 85,538.75

71,500.00 78,650.00

27,500.00 413
38,500.00 5,775
44,000.00 660
55,000.00 41

78,650.00 7,576.25 86,226.25

71,500.00 78,650.00

27,500.00 454
38,500.00 6,353
44,000.00 726
55,000.00 44

102,850.00 11,481.25 114,331.25

93,500.00 102,850.00

27,500.00 688
38,500.00 9,625
44,000.00 1,100
55,000.00 69
96,800.00 6,888.75 103,688.75

88,000.00 96,800.00

27,500.00 413
38,500.00 5,775
44,000.00 660
55,000.00 41

96,800.00 6,888.75 103,688.75

88,000.00 96,800.00

27,500.00 413
38,500.00 5,775
44,000.00 660
55,000.00 41

96,800.00 7,576.25 104,376.25

88,000.00 96,800.00

27,500.00 454
38,500.00 6,353
44,000.00 726
55,000.00 44

145,200.00 6,888.75 152,088.75

132,000.00 145,200.00

27,500.00 413
38,500.00 5,775
44,000.00 660
55,000.00 41

423,500.00 6,888.75 430,388.75

385,000.00 423,500.00

27,500.00 413
38,500.00 5,775
44,000.00 660
55,000.00 41

56,243.30 12,380.50 68,623.80

6,160.00 40,840.80
1,100.00 10,780.00
215,000.00 4,622.50

27,500.00 6,875
35,750.00 4,290
44,000.00 528
55,000.00 688

56,752.05 12,883.75 69,635.80

3,465.00 41,129.55
1,100.00 11,000.00
215,000.00 4,622.50

27,500.00 7,150
35,750.00 4,469
44,000.00 550
55,000.00 715

55,152.50 13,387.00 68,539.50

1,540.00 40,810.00
1,100.00 11,440.00
215,000.00 2,902.50

27,500.00 7,425
35,750.00 4,648
44,000.00 572
55,000.00 743

55,949.80 12,380.50 68,330.30


6,160.00 40,840.80
1,100.00 8,976.00
215,000.00 4,945.00
1,320.00 1,188.00

27,500.00 6,875
35,750.00 4,290
44,000.00 528
55,000.00 688

56,458.55 12,380.50 68,839.05

3,465.00 41,129.55
1,100.00 9,196.00
215,000.00 4,945.00
1,320.00 1,188.00

27,500.00 6,875
35,750.00 4,290
44,000.00 528
55,000.00 688

56,579.00 13,387.00 69,966.00

1,540.00 40,810.00
1,100.00 9,636.00
215,000.00 4,945.00
1,320.00 1,188.00

27,500.00 7,425
35,750.00 4,648
44,000.00 572
55,000.00 743

48,490.50 12,380.50 60,871.00

5,280.00 33,000.00
1,100.00 9,680.00
215,000.00 4,622.50
1,320.00 1,188.00

27,500.00 6,875
35,750.00 4,290
44,000.00 528
55,000.00 688

23,209.20 12,883.75 36,092.95

2,970.00 5,553.90
1,100.00 11,000.00
215,000.00 4,622.50
1,320.00 2,032.80

27,500.00 7,150
35,750.00 4,469
44,000.00 550
55,000.00 715

224,464.10 12,402.50 236,866.60

29,920.00 207,345.60
1,100.00 10,780.00
215,000.00 4,622.50
1,320.00 1,716.00

27,500.00 6,875
35,750.00 4,290
44,000.00 550
55,000.00 688

217,374.60 12,883.75 230,258.35

16,830.00 199,772.10
1,100.00 11,000.00
215,000.00 4,622.50
1,320.00 1,980.00
27,500.00 7,150
35,750.00 4,469
44,000.00 550
55,000.00 715

98,518.50 12,380.50 110,899.00

13,200.00 82,500.00
1,100.00 9,680.00
215,000.00 4,622.50
1,320.00 1,716.00

27,500.00 6,875
35,750.00 4,290
44,000.00 528
55,000.00 688

104,774.48 12,380.50 117,154.98

7,425.00 87,666.98
1,100.00 11,000.00
215,000.00 4,622.50
1,320.00 1,485.00

27,500.00 6,875
35,750.00 4,290
44,000.00 528
55,000.00 688

286,116.00 12,380.50 298,496.50

47,520.00 266,112.00
1,100.00 9,009.00
215,000.00 9,675.00
1,320.00 1,320.00

27,500.00 6,875
35,750.00 4,290
44,000.00 528
55,000.00 688

148,018.50 29,326.00 177,344.50

21,120.00 132,000.00
1,100.00 9,680.00
215,000.00 4,622.50
1,320.00 1,716.00

27,500.00 18,480
35,750.00 8,008
44,000.00 968
55,000.00 1,870

158,618.10 34,826.00 193,444.10

11,880.00 141,015.60
1,100.00 11,000.00
215,000.00 4,622.50
1,320.00 1,980.00

27,500.00 19,250
35,750.00 12,155
44,000.00 1,496
55,000.00 1,925

8,697.50 3,019.50 11,717.00

1,155.00 6,121.50
1,100.00 1,716.00
215,000.00 860.00

27,500.00 1,650
35,750.00 1,073
44,000.00 132
55,000.00 165

6,438.15 3,019.50 9,457.65


1,155.00 4,077.15
1,100.00 1,716.00
215,000.00 645.00

27,500.00 1,650
35,750.00 1,073
44,000.00 132
55,000.00 165

5,859.00 3,019.50 8,878.50

1,320.00 3,498.00
1,100.00 1,716.00
215,000.00 645.00

27,500.00 1,650
35,750.00 1,073
44,000.00 132
55,000.00 165

6,879.80 3,019.50 9,899.30

880.00 4,664.00
1,100.00 1,320.00
215,000.00 645.00
1,320.00 250.80

27,500.00 1,650
35,750.00 1,073
44,000.00 132
55,000.00 165

7,030.60 3,019.50 10,050.10

1,320.00 4,395.60
1,100.00 1,815.00
215,000.00 688.00
1,320.00 132.00
27,500.00 1,650
35,750.00 1,073
44,000.00 132
55,000.00 165

6,761.00 4,026.00 10,787.00

1,760.00 4,664.00
1,100.00 1,320.00
215,000.00 645.00
1,320.00 132.00

27,500.00 2,200
35,750.00 1,430
44,000.00 176
55,000.00 220

6,688.95 4,026.00 10,714.95

1,155.00 4,077.15
1,100.00 1,716.00
215,000.00 645.00
1,320.00 250.80

27,500.00 2,200
35,750.00 1,430
44,000.00 176
55,000.00 220

6,178.00 4,026.00 10,204.00

1,540.00 4,081.00
1,100.00 1,320.00
215,000.00 645.00
1,320.00 132.00

27,500.00 2,200
35,750.00 1,430
44,000.00 176
55,000.00 220

21,919.00 3,019.50 24,938.50

7,480.00 19,822.00
1,100.00 1,320.00
215,000.00 645.00
1,320.00 132.00

27,500.00 1,650
35,750.00 1,073
44,000.00 132
55,000.00 165

21,316.30 28,611.00 49,927.30

5,610.00 18,681.30
1,100.00 1,815.00
215,000.00 688.00
1,320.00 132.00

27,500.00 24,750
35,750.00 3,218
44,000.00 396
55,000.00 248

10,885.00 28,611.00 39,496.00

3,300.00 8,250.00
1,100.00 1,815.00
215,000.00 688.00
1,320.00 132.00

27,500.00 24,750
35,750.00 3,218
44,000.00 396
55,000.00 248
10,876.75 28,611.00 39,487.75

2,475.00 8,241.75
1,100.00 1,815.00
215,000.00 688.00
1,320.00 132.00

27,500.00 24,750
35,750.00 3,218
44,000.00 396
55,000.00 248

16,099.00 28,611.00 44,710.00

7,920.00 13,464.00
1,100.00 1,815.00
215,000.00 688.00
1,320.00 132.00

27,500.00 24,750
35,750.00 3,218
44,000.00 396
55,000.00 248

15,835.00 28,611.00 44,446.00

5,280.00 13,200.00
1,100.00 1,815.00
215,000.00 688.00
1,320.00 132.00

27,500.00 24,750
35,750.00 3,218
44,000.00 396
55,000.00 248

15,821.80 28,611.00 44,432.80


3,960.00 13,186.80
1,100.00 1,815.00
215,000.00 688.00
1,320.00 132.00

27,500.00 24,750
35,750.00 3,218
44,000.00 396
55,000.00 248

118.80 28,611.00 28,729.80

33,000.00 118.80

27,500.00 24,750
35,750.00 3,218
44,000.00 396
55,000.00 248

118.80 28,611.00 28,729.80

33,000.00 118.80

27,500.00 24,750
35,750.00 3,218
44,000.00 396
55,000.00 248

178,970.20 14,190.00 193,160.20

143,000.00 150,150.00
1,430.00 20,220.20
215,000.00 8,600.00

27,500.00 7,425
35,750.00 5,363
44,000.00 660
55,000.00 743
32,108.00 32,752.50 64,860.50

1,716.00 8,580.00
1,100.00 12,518.00
215,000.00 9,030.00
1,320.00 1,980.00

27,500.00 17,050
35,750.00 12,513
44,000.00 1,540
55,000.00 1,650

9,235.00 6,336.00 15,571.00

1,320.00 6,600.00
1,100.00 1,815.00
215,000.00 688.00
1,320.00 132.00

27,500.00 2,475
35,750.00 3,218
44,000.00 396
55,000.00 248

35,661.40 6,336.00 41,997.40

6,600.00 33,000.00
1,100.00 1,815.00
215,000.00 688.00
1,320.00 158.40

27,500.00 2,475
35,750.00 3,218
44,000.00 396
55,000.00 248

4,813.60 6,336.00 11,149.60


660.00 3,300.00
1,100.00 935.00
215,000.00 473.00
1,320.00 105.60

27,500.00 2,475
35,750.00 3,218
44,000.00 396
55,000.00 248

15,620.00 5,632.00 21,252.00

2,200.00 7,700.00
99,000.00 7,920.00

27,500.00 2,200
35,750.00 2,860
44,000.00 352
55,000.00 220

62,028.00 32,752.50 94,780.50

770.00 38,500.00
1,100.00 12,518.00
215,000.00 9,030.00
1,320.00 1,980.00

27,500.00 17,050
35,750.00 12,513
44,000.00 1,540
55,000.00 1,650

72,533.00 32,752.50 105,285.50

1,113.75 49,005.00
1,100.00 12,518.00
215,000.00 9,030.00
1,320.00 1,980.00
27,500.00 17,050
35,750.00 12,513
44,000.00 1,540
55,000.00 1,650

73,028.00 32,752.50 105,780.50

1,980.00 49,500.00
1,100.00 12,518.00
215,000.00 9,030.00
1,320.00 1,980.00

27,500.00 17,050
35,750.00 12,513
44,000.00 1,540
55,000.00 1,650

73,028.00 32,752.50 105,780.50

3,093.75 49,500.00
1,100.00 12,518.00
215,000.00 9,030.00
1,320.00 1,980.00

27,500.00 17,050
35,750.00 12,513
44,000.00 1,540
55,000.00 1,650

75,503.00 32,752.50 108,255.50

1,485.00 51,975.00
1,100.00 12,518.00
215,000.00 9,030.00
1,320.00 1,980.00

27,500.00 17,050
35,750.00 12,513
44,000.00 1,540
55,000.00 1,650

77,433.50 32,752.50 110,186.00

5,390.55 53,905.50
1,100.00 12,518.00
215,000.00 9,030.00
1,320.00 1,980.00

27,500.00 17,050
35,750.00 12,513
44,000.00 1,540
55,000.00 1,650

89,412.50 32,752.50 122,165.00

6,588.45 65,884.50
1,100.00 12,518.00
215,000.00 9,030.00
1,320.00 1,980.00

27,500.00 17,050
35,750.00 12,513
44,000.00 1,540
55,000.00 1,650

77,433.50 32,752.50 110,186.00

1,633.50 53,905.50
1,100.00 12,518.00
215,000.00 9,030.00
1,320.00 1,980.00

27,500.00 17,050
35,750.00 12,513
44,000.00 1,540
55,000.00 1,650
92,590.00 32,752.50 125,342.50

5,500.00 66,000.00
1,100.00 15,565.00
215,000.00 8,385.00
1,320.00 2,640.00

27,500.00 17,050
35,750.00 12,513
44,000.00 1,540
55,000.00 1,650

177,026.00 32,752.50 209,778.50

143,000.00 150,436.00
1,100.00 15,565.00
215,000.00 8,385.00
1,320.00 2,640.00

27,500.00 17,050
35,750.00 12,513
44,000.00 1,540
55,000.00 1,650

219,450.00 11,968.00 231,418.00

176,000.00 184,800.00
99,000.00 34,650.00

27,500.00 4,675
35,750.00 6,078
44,000.00 748
55,000.00 468

127,050.00 11,968.00 139,018.00

88,000.00 92,400.00
99,000.00 34,650.00
27,500.00 4,675
35,750.00 6,078
44,000.00 748
55,000.00 468

99,330.00 8,448.00 107,778.00

94,600.00 99,330.00

27,500.00 3,300
35,750.00 4,290
44,000.00 528
55,000.00 330

63,525.00 11,968.00 75,493.00

27,500.00 28,875.00
99,000.00 34,650.00

27,500.00 4,675
35,750.00 6,078
44,000.00 748
55,000.00 468

244,200.00 33,715.00 277,915.00

176,000.00 184,800.00
99,000.00 59,400.00

27,500.00 17,875
35,750.00 12,513
44,000.00 1,540
55,000.00 1,788

57,165.00 38,775.00 95,940.00


495.00 41,085.00
1,100.00 10,230.00
215,000.00 3,870.00
1,320.00 1,980.00

27,500.00 17,050
35,750.00 17,875
44,000.00 2,200
55,000.00 1,650

66,295.00 38,775.00 105,070.00

605.00 50,215.00
1,100.00 10,230.00
215,000.00 3,870.00
1,320.00 1,980.00

27,500.00 17,050
35,750.00 17,875
44,000.00 2,200
55,000.00 1,650

66,198.75 36,217.50 102,416.25

1,113.75 50,118.75
1,100.00 10,230.00
215,000.00 3,870.00
1,320.00 1,980.00

27,500.00 16,500
35,750.00 16,088
44,000.00 1,980
55,000.00 1,650

77,336.25 36,217.50 113,553.75

1,361.25 61,256.25
1,100.00 10,230.00
215,000.00 3,870.00
1,320.00 1,980.00

27,500.00 16,500
35,750.00 16,088
44,000.00 1,980
55,000.00 1,650

76,580.00 36,217.50 112,797.50

1,210.00 60,500.00
1,100.00 10,230.00
215,000.00 3,870.00
1,320.00 1,980.00

27,500.00 16,500
35,750.00 16,088
44,000.00 1,980
55,000.00 1,650

76,580.00 36,217.50 112,797.50

2,420.00 60,500.00
1,100.00 10,230.00
215,000.00 3,870.00
1,320.00 1,980.00

27,500.00 16,500
35,750.00 16,088
44,000.00 1,980
55,000.00 1,650

786,080.00 36,217.50 822,297.50

7,700.00 770,000.00
1,100.00 10,230.00
215,000.00 3,870.00
1,320.00 1,980.00

27,500.00 16,500
35,750.00 16,088
44,000.00 1,980
55,000.00 1,650

731,080.00 36,217.50 767,297.50


7,150.00 715,000.00
1,100.00 10,230.00
215,000.00 3,870.00
1,320.00 1,980.00

27,500.00 16,500
35,750.00 16,088
44,000.00 1,980
55,000.00 1,650

208,580.00 36,217.50 244,797.50

3,850.00 192,500.00
1,100.00 10,230.00
215,000.00 3,870.00
1,320.00 1,980.00

27,500.00 16,500
35,750.00 16,088
44,000.00 1,980
55,000.00 1,650

189,330.00 36,217.50 225,547.50

3,850.00 173,250.00
1,100.00 10,230.00
215,000.00 3,870.00
1,320.00 1,980.00

27,500.00 16,500
35,750.00 16,088
44,000.00 1,980
55,000.00 1,650

112,330.00 23,705.00 136,035.00

3,850.00 96,250.00
1,100.00 10,230.00
215,000.00 3,870.00
1,320.00 1,980.00

27,500.00 16,500
35,750.00 3,575
44,000.00 1,980
55,000.00 1,650

208,580.00 23,168.75 231,748.75

3,850.00 192,500.00
1,100.00 10,230.00
215,000.00 3,870.00
1,320.00 1,980.00

27,500.00 16,500
35,750.00 4,469
44,000.00 550
55,000.00 1,650

166,899.00 47,822.50 214,721.50

143,000.00 145,860.00
1,100.00 13,684.00
215,000.00 5,375.00
1,320.00 1,980.00

27,500.00 19,800
35,750.00 23,238
44,000.00 2,860
55,000.00 1,925

107,059.00 32,752.50 139,811.50

1,100.00 88,000.00
1,100.00 13,684.00
215,000.00 5,375.00

27,500.00 17,050
35,750.00 12,513
44,000.00 1,540
55,000.00 1,650

309,200.00 32,752.50 341,952.50


275,000.00 288,750.00
1,100.00 12,925.00
215,000.00 7,525.00

27,500.00 17,050
35,750.00 12,513
44,000.00 1,540
55,000.00 1,650

112,850.00 32,752.50 145,602.50

88,000.00 92,400.00
1,100.00 12,925.00
215,000.00 7,525.00

27,500.00 17,050
35,750.00 12,513
44,000.00 1,540
55,000.00 1,650

144,045.00 10,560.00 154,605.00

9,900.00 109,395.00
99,000.00 34,650.00

27,500.00 4,125
35,750.00 5,363
44,000.00 660
55,000.00 413

131,890.00 10,560.00 142,450.00

8,800.00 97,240.00
99,000.00 34,650.00

27,500.00 4,125
35,750.00 5,363
44,000.00 660
55,000.00 413

107,580.00 10,560.00 118,140.00


6,600.00 72,930.00
99,000.00 34,650.00

27,500.00 4,125
35,750.00 5,363
44,000.00 660
55,000.00 413

125,812.50 10,560.00 136,372.50

8,250.00 91,162.50
99,000.00 34,650.00

27,500.00 4,125
35,750.00 5,363
44,000.00 660
55,000.00 413

23,188.00 27,918.00 51,106.00

19,580.00 21,538.00
6,600.00 1,650.00

27,500.00 20,625
35,750.00 6,078
44,000.00 748
55,000.00 468

92,400.00 8,448.00 100,848.00

30,800.00 92,400.00

27,500.00 3,300
35,750.00 4,290
44,000.00 528
55,000.00 330

154,000.00 8,448.00 162,448.00

30,800.00 154,000.00

27,500.00 3,300
35,750.00 4,290
44,000.00 528
55,000.00 330

67,705.00 8,778.00 76,483.00

27,500,000.00 66,000.00
34,100.00 1,705.00

27,500.00 3,300
38,500.00 4,620
44,000.00 528
55,000.00 330

357.50 #VALUE! #VALUE!

7,150.00 357.50

27,500.00 4,125
33,000.00 #VALUE!
44,000.00 #VALUE!
55,000.00 138

192.50 #VALUE! #VALUE!

3,850.00 192.50

27,500.00 4,125
33,000.00 #VALUE!
44,000.00 #VALUE!
55,000.00 138

192.50 #VALUE! #VALUE!

3,850.00 192.50

27,500.00 4,125
33,000.00 #VALUE!
44,000.00 #VALUE!
55,000.00 138
192.50 #VALUE! #VALUE!

3,850.00 192.50

27,500.00 4,125
33,000.00 #VALUE!
44,000.00 #VALUE!
55,000.00 138

Pasir ( Sanblasting ) dgn Tingkat Kebersihan Sa 2 . 577,500.00 159,500.00 737,000.00

13,200.00 528,000.00
4,950.00 49,500.00

27,500.00 44,000
33,000.00 52,800
44,000.00 35,200
55,000.00 27,500

2,464.00 2,733.50 5,197.50

23,100.00 1,848.00
27,500.00 550.00
6,600.00 66.00

27,500.00 1,100
33,000.00 1,320
44,000.00 176
55,000.00 138

7,084.00 4,867.50 11,951.50

19,800.00 2,970.00
11,000.00 1,870.00
13,200.00 2,244.00

27,500.00 1,925
33,000.00 2,475
44,000.00 330
55,000.00 138
t Dasar, 2 Lapis Cat Penutup 15,290.00 2,623.50 17,913.50

16,500.00 3,300.00
19,800.00 2,970.00
11,000.00 1,870.00
27,500.00 7,150.00

27,500.00 1,925
33,000.00 297
44,000.00 264
55,000.00 138

t Dasar, 3 Lapis Cat Penutup 17,765.00 5,703.50 23,468.50

16,500.00 3,300.00
19,800.00 2,970.00
11,000.00 1,870.00
27,500.00 9,625.00

27,500.00 1,925
33,000.00 3,465
44,000.00 176
55,000.00 138

t Dasar, 3 Lapis Cat Penutup 17,765.00 5,703.50 23,468.50

16,500.00 3,300.00
19,800.00 2,970.00
11,000.00 1,870.00
27,500.00 9,625.00

27,500.00 1,925
33,000.00 3,465
44,000.00 176
55,000.00 138

7,920.00 6,088.50 14,008.50


22,000.00 7,920.00

27,500.00 1,100
33,000.00 2,079
44,000.00 2,772
55,000.00 138

49,511.00 6,088.50 55,599.50

38,500.00 5,775.00
88,000.00 32,736.00
5,500.00 11,000.00

27,500.00 1,100
33,000.00 2,079
44,000.00 2,772
55,000.00 138

5,390.00 #VALUE! #VALUE!

15,400.00 5,390.00

27,500.00 2,750
33,000.00 #VALUE!
44,000.00 #VALUE!
55,000.00 330

6,897.00 10,521.50 17,418.50

34,100.00 5,115.00
23,100.00 1,155.00
5,500.00 550.00
7,700.00 77.00

27,500.00 4,400
33,000.00 5,280
44,000.00 704
55,000.00 138

pis Cat Penutup ) 6,512.00 3,043.70 9,555.70

19,800.00 1,980.00
11,000.00 1,100.00
13,200.00 3,432.00

27,500.00 550
33,000.00 2,079
44,000.00 277
55,000.00 138

5,302.00 4,299.90 9,601.90

5,500.00 550.00
6,600.00 1,650.00
1,485,000.00 2,970.00
880.00 132.00

27,500.00 4,125
33,000.00 33
44,000.00 4
55,000.00 138

3,234.00 1,424.50 4,658.50

1,485,000.00 2,970.00
880.00 264.00

27,500.00 1,100
33,000.00 165
44,000.00 22
55,000.00 138

47,960.00 7,375.50 55,335.50

38,500.00 46,200.00
8,800.00 1,760.00

27,500.00 550
33,000.00 6,600
44,000.00 88
55,000.00 138

1,727.00 8,580.00 10,307.00


16,500.00 1,650.00
7,700.00 77.00

27,500.00 550
33,000.00 6,600
44,000.00 880
55,000.00 550

4,697.00 15,702.50 20,399.50

16,500.00 1,650.00
7,700.00 77.00
1,485,000.00 2,970.00

27,500.00 6,875
33,000.00 7,425
44,000.00 990
55,000.00 413

Manual Sistem 4 Lapis Cat Konvensional, tebal 200 um 7,524.00 1,765.50 9,289.50

9,900.00 990.00
12,100.00 1,210.00
27,500.00 1,100.00
29,700.00 1,188.00
6,600.00 66.00
1,485,000.00 2,970.00

27,500.00 165
33,000.00 198
44,000.00 990
55,000.00 413

Manual Sistem 1 Lapis Cat Mutakhir, tebal 200 um 4,950.00 3,003.00 7,953.00

16,500.00 4,950.00

27,500.00 165
33,000.00 1,980
44,000.00 528
55,000.00 330
Manual Sistem 3 Lapis Cat Konvensional, tebal 200 um 4,136.00 64,350.00 68,486.00

11,000.00 1,210.00
11,000.00 1,870.00
13,200.00 1,056.00

27,500.00 13,750
33,000.00 26,400
44,000.00 13,200
55,000.00 11,000

Semprot ( Airless Spray ) dgn Sistem 1 Lapis Cat Mutakhir, tebal 200
3,300.00
um 53,900.00 57,200.00

11,000.00 3,300.00

27,500.00 11,000
33,000.00 23,100
44,000.00 8,800
55,000.00 11,000
ANALISA HARGA SATUAN PEKERJAAN

Nomor Harga Satuan


Uraian Kuantitas Satuan
analisa (Rp.)

66.40
1 M' Uitset dan pasang bouwplank
Kayu 5/7 0.0120 m3 1,150,000.00
Paku 0.0200 kg 18,000.00
Papan 0.0070 m3 1,250,000.00
Tukang Kayu 0.1000 org 40,000.00
Perkerja 0.1000 org 33,000.00
Kepala Tukang 0.0100 org 50,000.00
Mandor 0.0050 org 43,000.00

14.52 1 M3 Galian tanah


Pekerja 0.7500 org 33,000.00
Mandor 0.0250 org 43,000.00

1 M3 Galian pondasi sumuran dan telapak


Pekerja 1.2000 org 33,000.00
Mandor 0.2000 org 43,000.00

1 M3 Galian tanah cadas


Pekerja 1.2500 org 33,000.00
Mandor 0.1250 org 43,000.00

4.84 1 M3 Urugan tanah kembali


Pekerja 0.1920 org 33,000.00
Mandor 0.0190 org 43,000.00

1.51 1 M3 Urugan pasir


Pasir urug 1.1000 m3 145,000.00
Pekerja 0.3000 org 33,000.00
Mandor 0.0100 org 43,000.00

31.68 1 M3 Urugan sirtu


Sirtu 1.1000 m3 60,000.00
Pekerja 0.3000 org 33,000.00
Mandor 0.0100 org 43,000.00

1 M3 Urugan Tanah
Tanah 1.1000 m3 25,000.00
Pekerja 0.3000 org 33,000.00
Nomor Harga Satuan
Uraian Kuantitas Satuan
analisa (Rp.)

Mandor 0.0100 org 43,000.00

1 M3 Urugan tanah humus


Tanah humus 1.2000 m3 85,000.00
Pekerja 0.3000 org 33,000.00
Mandor 0.0100 org 43,000.00
Nomor Harga Satuan
Uraian Kuantitas Satuan
analisa (Rp.)

3.02 1 M3 Pasangan aanstamping


Batu karang 1.1500 m3 65,000.00
Pasir urug 0.5000 m3 145,000.00
Pekerja 0.7800 org 33,000.00
Mandor 0.0390 org 43,000.00
Tukang batu 0.3900 org 40,000.00
Kepala tukang batu 0.0390 org 50,000.00

13.48 1 M3 Pasangan pondasi 1:5


Batu karang 1.2000 m3 65,000.00
Pasir pasang 0.5440 m3 185,000.00
Semen 2.7200 zak 72,000.00
Pekerja 1.5000 org 33,000.00
Mandor 0.0750 org 43,000.00
Tukang batu 0.0600 org 40,000.00
Kepala tukang batu 0.0600 org 50,000.00

101.94 1 M2 Pasangan batu batu potong camp, 1 pc : 5 psr


Pasir pasang 0.0380 m3 185,000.00
Semen 0.4730 zak 72,000.00
Batu potong 25.0000 bh 1,800.00
Pekerja 0.3200 org 33,000.00
Mandor 0.0150 org 43,000.00
Tukang batu 0.1000 org 40,000.00
Kepala tukang batu 0.0100 org 50,000.00

1 M3 Pasangan batu potong camp, 1 pc : 5 psr


Pasir pasang 0.3800 m3 185,000.00
Semen 0.3300 zak 72,000.00
Batu potong 160.0000 bh 1,800.00
Pekerja 2.6000 org 33,000.00
Mandor 0.1300 org 43,000.00
Tukang batu 1.2000 org 40,000.00
Kepala tukang batu 0.1200 org 50,000.00

1 M2 Pasangan batu bataco camp, 1 pc : 5 psr


Pasir pasang 0.0380 m3 185,000.00
Semen 0.4730 zak 72,000.00
Batu bataco 15.0000 bh 3,400.00
Pekerja 0.3200 org 33,000.00
Mandor 0.0150 org 43,000.00
Tukang batu 0.1000 org 40,000.00
Kepala tukang batu 0.0100 org 50,000.00
Nomor Harga Satuan
Uraian Kuantitas Satuan
analisa (Rp.)

1 M3 Pasangan batu bataco camp, 1 pc : 5 psr


Pasir pasang 0.3800 m3 185,000.00
Semen 0.3300 zak 72,000.00
Batu bataco 150.0000 bh 3,400.00
Pekerja 2.6000 org 33,000.00
Nomor Harga Satuan
Uraian Kuantitas Satuan
analisa (Rp.)

Mandor 0.1300 org 43,000.00


Tukang batu 1.2000 org 40,000.00
Kepala tukang batu 0.1200 org 50,000.00

1 M2 Plesteran trasram camp, 1 pc : 2 psr tebal 2 cm


Pasir pasang 0.0270 m3 185,000.00
Semen 0.2700 zak 72,000.00
Pekerja 0.2600 org 33,000.00
Mandor 0.0130 org 43,000.00
Tukang batu 0.2000 org 40,000.00
Kepala tukang batu 0.0200 org 50,000.00

222.61 1 M2 Plesteran biasa camp, 1 pc : 5 psr tebal 2 cm


Pasir pasang 0.0250 m3 185,000.00
Semen 0.1300 zak 72,000.00
Pekerja 0.2000 org 33,000.00
Mandor 0.0200 org 43,000.00
Tukang batu 0.2000 org 40,000.00
Kepala tukang batu 0.0200 org 50,000.00

1 M2 Plesteran beton, 1 pc : 3 psr pembesaran kolom tebal 2 cm


Pasir pasang 0.0270 m3 185,000.00
Semen 0.2726 zak 72,000.00
Pekerja 0.2600 org 33,000.00
Mandor 0.2000 org 43,000.00
Tukang batu 0.0200 org 40,000.00
Kepala tukang batu 0.0130 org 50,000.00

222.61 1 M2 Acian PC
Semen 0.0650 zak 72,000.00
Pekerja 0.0150 org 33,000.00
Mandor 0.0080 org 43,000.00
Tukang batu 0.0800 org 40,000.00
Kepala Tukang 0.0080 org 50,000.00

1 M3 Pekerjaan kuda/Gording kayu klas I


Balok kayu klas I 1.1000 m3 2,500,000.00
Pekerja 4.0000 org 33,000.00
Mandor 0.2000 org 43,000.00
Tukang kayu 12.0000 org 40,000.00
Kepala tukang kayu 1.2000 org 50,000.00

0.39 1 M3 Pekerjaan kusen pintu / jendela


Balok kayu klas I 1.2000 m3 2,500,000.00
Nomor Harga Satuan
Uraian Kuantitas Satuan
analisa (Rp.)

Pekerja 6.0000 org 33,000.00


Mandor 0.3000 org 43,000.00
Tukang kayu 20.0000 org 40,000.00
Kepala tukang kayu 2.0000 org 50,000.00
Nomor Harga Satuan
Uraian Kuantitas Satuan
analisa (Rp.)

1 M2 Pekerjaan daun pintu double teakwood


Papan kayu klas I 0.0196 m3 2,500,000.00
Paku 0.3000 kg 18,000.00
Lem aica aibon 0.3000 kg 35,000.00
Teakwood 3 mm 1.0000 lbr 65,000.00
Pekerja 0.6000 org 33,000.00
Mandor 0.0300 org 43,000.00
Tukang kayu 2.0000 org 40,000.00
Kepala tukang kayu 0.2000 org 50,000.00

1 M2 Pekerjaan daun pintu lapis teakwood + tripleks lapis aluminium


Papan kayu klas I 0.0196 m3 2,500,000.00
Paku 0.3000 kg 18,000.00
Lem aica aibon 0.8000 kg 35,000.00
Teakwood 0.5000 lbr 65,000.00
Tripleks lapis Aluminium 0.5000 lbr 120,000.00
Pekerja 0.8000 org 33,000.00
Mandor 0.0400 org 43,000.00
Tukang kayu 2.5000 org 40,000.00
Kepala tukang kayu 0.2500 org 50,000.00

2.20 1 M2 Pasangan jendela kaca mati 5 mm


Kaca polos 5 mm 1.2000 m2 85,000.00
Plamur/Dempul kayu 0.0470 kg 35,000.00
List kaca 4.0000 m' 12,000.00
Paku halus 0.0050 kg 25,000.00
Pekerja 0.0150 org 33,000.00
Mandor 0.0008 org 43,000.00
Tukang kayu 0.1500 org 40,000.00
Kepala tukang kayu 0.0150 org 50,000.00

1 M2 Pasangan jendela kaca mati 8 mm


Kaca warna 8 mm 1.1000 m2 145,000.00
List kaca 4.0000 m' 12,000.00
Paku halus 0.0050 kg 18,000.00
Pekerja 0.0150 org 33,000.00
Mandor 0.0008 org 43,000.00
Tukang kayu 0.1500 org 40,000.00
Kepala tukang kayu 0.0150 org 50,000.00

3.46 1 M2 Pasangan kaca Zigsag 5 mm


Kaca polos 5 mm 1.2000 m2 85,000.00
Plamur/Dempul kayu 0.0470 kg 35,000.00
List kaca 4.0000 m' 12,000.00
Nomor Harga Satuan
Uraian Kuantitas Satuan
analisa (Rp.)

Paku halus 0.0050 kg 25,000.00


Pekerja 0.0150 org 33,000.00
Mandor 0.0008 org 43,000.00
Tukang kayu 0.1500 org 40,000.00
Kepala tukang kayu 0.0150 org 50,000.00
Nomor Harga Satuan
Uraian Kuantitas Satuan
analisa (Rp.)

1.86 1 M2 Pekerjaan daun pintu panil


Papan kayu klas I 0.0400 M3 2,500,000.00
Tukang Kayu 2.5000 org 40,000.00
Kepala Tukang kayu 0.2500 org 50,000.00
Pekerja 1.0000 org 33,000.00
Mandor 0.0500 org 43,000.00

2.94 1 M2 Pasangan daun jendela kaca polos 5 mm


Kaca polos 5 mm 1.0000 m2 85,000.00
Papan kayu klas I 0.0350 m2 2,500,000.00
Pekerja 0.8150 org 33,000.00
Mandor 0.0401 org 43,000.00
Tukang kayu 2.1500 org 40,000.00
Kepala tukang kayu 0.2150 org 50,000.00

1 M2 Pasangan daun pintu kaca frame aluminium


Frame aluminium warna coklat 3.5000 m' 95,000.00
Kaca sand blast 5 mm 1.0000 m2 120,000.00
Ongkos kerja 1.0000 Ls 25,000.00

1 M2 Pasangan daun jendela kaca frame aluminium


Frame aluminium warna coklat 4.5000 m' 95,000.00
Kaca sand blast 5 mm 1.0000 m2 120,000.00
Ongkos kerja 1.0000 Ls 25,000.00

1 M1 Pasangan jalusi
Papan klas II 0.0024 m3 2,000,000.00
Paku 0.0050 kg 18,000.00
Pekerja 0.0183 org 33,000.00
Mandor 0.0009 org 43,000.00
Tukang kayu 0.0733 org 40,000.00
Kepala tukang kayu 0.0073 org 50,000.00

45.26 1 M1 Pasangan listplank


Papan klas I 0.0110 m3 2,500,000.00
Paku 0.0600 kg 18,000.00
Pekerja 0.1100 org 33,000.00
Mandor 0.0500 org 43,000.00
Tukang kayu 0.2200 org 40,000.00
Kepala tukang kayu 0.0220 org 50,000.00

2.51 1 M3 Pekerjaan kuda-kuda, gording


Balok kayu klas II 1.1000 m3 2,000,000.00
Paku 0.8000 kg 18,000.00
Nomor Harga Satuan
Uraian Kuantitas Satuan
analisa (Rp.)

Pekerja 4.0000 org 33,000.00


Mandor 0.4000 org 43,000.00
Tukang kayu 12.0000 org 40,000.00
Kepala tukang kayu 1.2000 org 50,000.00
Nomor Harga Satuan
Uraian Kuantitas Satuan
analisa (Rp.)

1 M2 Pekerjaan kaso+reng kayu klas I


Balok kayu klas I 0.0120 m3 2,500,000.00
Paku 0.1500 kg 18,000.00
Pekerja 0.1000 org 33,000.00
Mandor 0.1000 org 43,000.00
Tukang kayu 0.0100 org 40,000.00
Kepala tukang kayu 0.0050 org 50,000.00

1 M1 Pekerjaan kuda-kuda baja ringan


Web/truss C81.31.1 mm 1.0000 m 38,437.50
Screw 10 0.0200 bh 500.00
Screw 12 0.0200 bh 500.00
Dynabolt 0.0200 bh 500.00
Pekerja 0.3400 org 33,000.00
Mandor 0.0170 org 43,000.00
Tukang baja ringan 0.6800 org 40,000.00
Kepala tukang baja ringan 0.0680 org 50,000.00

1 M1 Pekerjaan kuda-kuda baja ringan


Web/truss C75.35. 0,75 mm 1.0000 m 28,975.50
Screw 10 0.0200 bh 500.00
Screw 12 0.0200 bh 500.00
Dynabolt 0.0200 bh 500.00
Pekerja 0.0340 org 33,000.00
Mandor 0.0017 org 43,000.00
Tukang baja ringan 0.0170 org 40,000.00
Kepala tukang baja ringan 0.0017 org 50,000.00

1 M1 Pekerjaan kuda-kuda baja ringan


Web/truss C75.35.0,65 mm 1.0000 m 27,572.50
Screw 10 0.0200 bh 500.00
Screw 12 0.0200 bh 500.00
Dynabolt 0.0200 bh 500.00
Pekerja 0.0340 org 33,000.00
Mandor 0.0017 org 43,000.00
Tukang baja ringan 0.0170 org 40,000.00
Kepala tukang baja ringan 0.0017 org 50,000.00

1 M2 Pekerjaan kuda-kuda baja ringan


Truss C75.0.75 mm zinkalum 1.0000 m2 195,000.00
Screw 10 0.0200 bh 500.00
Screw 12 0.0200 bh 500.00
Dynabolt 0.0200 bh 500.00
Nomor Harga Satuan
Uraian Kuantitas Satuan
analisa (Rp.)

Pekerja 0.3400 org 43,000.00


Mandor 0.0170 org 40,000.00
Tukang baja ringan 0.6800 org 50,000.00
Kepala tukang baja ringan 0.0680 org 50,000.00

1 M2 Pekerjaan kuda-kuda baja ringan


Web C75.0,65 mm 1.0000 m2 195,000.00
Screw 10 0.0200 bh 500.00
Screw 12 0.0200 bh 500.00
Dynabolt 0.0200 bh 500.00
Pekerja 0.0340 org 43,000.00
Mandor 0.0017 org 40,000.00
Tukang baja ringan 0.0170 org 50,000.00
Kepala tukang baja ringan 0.0017 org 50,000.00

1 M1Pekerjaan Reng baja ringan type V


Reng type V (batten Reng Kecil 30.30.0.5) 1.0000 m1 19,821.17
Screw 10 0.0200 bh 500.00
Screw 12 0.0200 bh 500.00
Dynabolt 0.0200 bh 500.00
Pekerja 0.0340 org 43,000.00
Mandor 0.0017 org 40,000.00
Tukang baja ringan 0.0170 org 50,000.00
Kepala tukang baja ringan 0.0017 org 50,000.00

1 M2 Pekerjaan dinding pemisah teakwood rangkap, rangka kayu kelas II


Balok kayu klas II 6/12 0.0280 m3 2,200,000.00
Paku 5 dan 10 0.1500 kg 18,000.00
Teakwood tebal 4 mm ukuran 120 x 240 0.8600 Lembar 90,000.00
Lem Kayu 0.5600 kg 35,000.00
Pekerja 0.1500 org 33,000.00
Mandor 0.4500 org 43,000.00
Tukang kayu 0.0450 org 40,000.00
Kepala tukang kayu 0.0080 org 50,000.00

1 m2 Pemasangan Atap gtg metal


Atap gtg metal 3 mm Pasiran 1.1600 m2 90,000.00
Paku skrup 0.2000 kg 30,000.00
Pekerja 0.2000 org 33,000.00
Mandor 0.0010 org 43,000.00
Tukang kayu 0.1000 org 40,000.00
Kepala tukang 0.0100 org 50,000.00

1 m2 Pemasangan Atap Seng Zinc Galvalum


Nomor Harga Satuan
Uraian Kuantitas Satuan
analisa (Rp.)

Atap seng zinc galvalum 1.1600 m2 90,000.00


Paku skrup 0.2000 kg 30,000.00
Pekerja 0.2000 org 33,000.00
Mandor 0.0010 org 43,000.00
Tukang kayu 0.1000 org 40,000.00
Kepala tukang 0.0100 org 50,000.00

1 m2 Pemasangan Atap Seng anti karat


Atap seng anti karat 1.1600 m2 95,000.00
Paku skrup 0.2000 kg 30,000.00
Pekerja 0.2000 org 33,000.00
Mandor 0.0010 org 43,000.00
Tukang kayu 0.1000 org 40,000.00
Kepala tukang 0.0100 org 50,000.00

1 m' Pemasangan bubungan/jurai atap genteng anti karat


Bubungan genteng seng anti karat 1.0500 m' 52,777.78
Paku skrup 0.0500 kg 30,000.00
Pekerja 0.2500 org 33,000.00
Mandor 0.0130 org 43,000.00
Tukang kayu 0.1500 org 40,000.00
Kepala tukang 0.0150 org 50,000.00

1 m' Pemasangan bubungan/jurai atap genteng metal


Bubungan genteng metal 1.0500 m' 55,000.00
Paku skrup 0.0500 kg 30,000.00
Pekerja 0.2500 org 33,000.00
Mandor 0.0130 org 43,000.00
Tukang kayu 0.1500 org 40,000.00
Kepala tukang 0.0150 org 50,000.00

133.13 1 m' Pemasangan seng gelombang 0,30


Seng Gelombang 0,30 0.7000 Lembar 45,000.00
Paku Seng 0.0200 Kg 20,000.00
Pekerja 0.1200 org 33,000.00
Tukang Kayu 0.0600 org 40,000.00
Kepala Tukang 0.0060 org 50,000.00

10.20 1 m' Pemasangan seng gelombang 0,30


1 m' Pelat Seng Gelombang 0,30 1.1000 m' 20,000.00
Paku Seng 0.0200 kg 20,000.00
Pekerja 0.1200 org 33,000.00
Tukang Kayu 0.0600 org 40,000.00
Kepala Tukang 0.0060 org 50,000.00
Nomor Harga Satuan
Uraian Kuantitas Satuan
analisa (Rp.)

1 M2 Plafond Gypsum 9 mm + rangka


Usuk kayu klas II 0.0131 m3 1,800,000.00
Gypsum Board t=9 mm 0.4000 lbr 110,000.00
Paku skrup 0.0400 kg 30,000.00
Paku reng 0.2000 kg 30,000.00
Pekerja 0.2000 org 33,000.00
Mandor 0.0450 org 43,000.00
Tukang kayu 0.9000 org 40,000.00
Kepala tukang kayu 0.0900 org 50,000.00

1 M2 Plafond Kalsiboard 4,5 mm + rangka


Usuk kayu klas II 0.0131 m3 1,800,000.00
KalsiBoard t=4,5 mm 0.4000 lbr 20,000.00
Paku skrup 0.0400 kg 30,000.00
Paku reng 0.2000 kg 30,000.00
Pekerja 0.2000 org 33,000.00
Mandor 0.0450 org 43,000.00
Tukang kayu 0.9000 org 40,000.00
Kepala tukang kayu 0.0900 org 50,000.00

1 M2 Plafond Gypsum bord + rangka hollo


Rangka hollo 0.0131 m2 19,821.17
Gypsum bord t = 9 mm 0.4000 lbr 110,000.00
Paku skrup 0.0400 kg 30,000.00
Paku reng 0.2000 kg 30,000.00
Pekerja 0.2000 org 33,000.00
Mandor 0.0450 org 43,000.00
Tukang kayu 0.9000 org 40,000.00
Kepala tukang kayu 0.0900 org 50,000.00

1 m' Pekerjaan list Plafond Profil


Plafond Profil 1.1000 bh 40,000.00
Paku list 0.0150 kg 25,000.00
Pekerja 0.0008 org 33,000.00
Mandor 0.1500 org 40,000.00
Tukang Kayu 0.0150 org 50,000.00

0.00 1 M2 Plafond Tripleks 3 mm + rangka


Usuk kayu klas II 0.0131 m3 1,800,000.00
Triplek 3 mm 0.3470 lbr 65,000.00
Paku skrup 0.2000 kg 30,000.00
Paku reng 0.2000 kg 30,000.00
Nomor Harga Satuan
Uraian Kuantitas Satuan
analisa (Rp.)

Pekerja 0.2000 org 33,000.00


Mandor 0.0450 org 43,000.00
Tukang Kayu 0.9000 org 40,000.00
Kepala tukang kayu 0.0900 org 50,000.00

0.00 1 m' Pekerjaan list Plafond tripleks 3 mm


Plafond tripleks 3 mm 1.1000 m 10,000.00
Paku list 0.0150 kg 25,000.00
Pekerja 0.0008 org 33,000.00
Mandor 0.1500 org 43,000.00
Tukang Kayu 0.0150 org 40,000.00

1 M2 Pekerjaan meni kayu


Cat Meni 0.1800 kg 20,000.00
Minyak cat 0.0300 kg 14,000.00
Kuas biasa 4" 0.0800 bh 6,000.00
Pekerja 0.0600 org 33,000.00
Mandor 0.0030 org 43,000.00
Tukang cat 0.1000 org 45,000.00
Kepala tukang cat 0.0100 org 50,000.00

31.38 1 M2 Pekerjaan cat kayu : 1x plamir +1 x dasar + 3 x cat kilap list plank
Cat dasar 0.1700 kg 17,000.00
Cat menie 0.2000 kg 20,000.00
Cat kilap 0.3500 kg 17,000.00
Minyak cat 0.0500 ltr 16,000.00
Plamir/Dempul kayu 0.1500 kg 17,000.00
Kuas biasa 4" 0.0800 bh 7,500.00
Amplas 0.2000 lbr 6,000.00
Pekerja 0.0700 org 33,000.00
Mandor 0.0025 org 43,000.00
Tukang cat 0.0900 org 40,000.00
Kepala tukang cat 0.0060 org 50,000.00

0.00 1 M2 Pekerjaan vernish daun pintu & jendela


Vernish 0.3500 kg 45,000.00
Minyak cat 0.0500 ltr 16,000.00
Plamir/Dempul kayu 0.1500 kg 17,000.00
Kuas biasa 4" 0.0800 bh 7,500.00
Amplas 0.2000 lbr 6,000.00
Pekerja 0.0700 org 33,000.00
Mandor 0.0025 org 43,000.00
Tukang cat 0.0900 org 40,000.00
Nomor Harga Satuan
Uraian Kuantitas Satuan
analisa (Rp.)

Kepala tukang cat 0.0060 org 50,000.00

0.00 1 M2 Pekerjaan cat kayu : 1x plamir +1 x dasar + 3 x cat kilap (Kusen)


Cat dasar 0.1700 kg 17,000.00
Cat menie 0.2000 kg 20,000.00
Cat kilap 0.3500 kg 17,000.00
Minyak cat 0.0500 ltr 16,000.00
Plamir/Dempul kayu 0.1500 kg 17,000.00
Kuas biasa 4" 0.0800 bh 7,500.00
Amplas 0.2000 lbr 6,000.00
Pekerja 0.0700 org 33,000.00
Mandor 0.0025 org 43,000.00
Tukang cat 0.0900 org 40,000.00
Kepala tukang cat 0.0060 org 50,000.00

0.00 1 M2 Pekerjaan cat plafond


Plamur kayu/dempul 0.2600 kg 17,000.00
Cat dasar 0.1000 kg 17,000.00
Plamur dinding 0.1000 kg 14,000.00
Kuas roll 0.0440 bh 17,000.00
Amplas 0.2000 lbr 6,000.00
Pekerja 0.0200 org 33,000.00
Mandor 0.0025 org 43,000.00
Tukang cat 0.0630 org 40,000.00
Kepala tukang cat 0.0063 org 50,000.00

0.00 1 M2 Pekerjaan cat List plafond


Plamur kayu/dempul 0.26 kg 17,000.00
Cat dasar 0.10 kg 17,000.00
Plamur dinding 0.10 kg 14,000.00
Kuas roll 0.04 bh 17,000.00
Amplas 0.20 lbr 6,000.00
Pekerja 0.02 org 33,000.00
Mandor 0.00 org 43,000.00
Tukang cat 0.06 org 40,000.00
Kepala tukang cat 0.01 org 50,000.00

111.30 1 M2 Pekerjaan cat dinding dalam 3x amplas 2x plamir + 2 x cat


Cat tembok/plafond (Setara Catylac) 0.3380 kg 17,000.00
Cat dasar 0.3000 kg 17,000.00
Plamur dinding 0.1500 kg 14,000.00
Kuas roll 0.0440 bh 17,000.00
Amplas 0.2000 lbr 6,000.00
Pekerja 0.0400 org 33,000.00
Nomor Harga Satuan
Uraian Kuantitas Satuan
analisa (Rp.)

Mandor 0.0050 org 43,000.00


Tukang cat 0.1260 org 40,000.00
Kepala tukang cat 0.0126 org 50,000.00

111.30 1 M2 Pekerjaan cat dinding luar lantai I 3x amplas 2x plamir + 2 x cat


Cat tembok setara ICI 0.3380 kg 17,000.00
Cat dasar 0.3000 kg 17,000.00
Plamur dinding 0.1500 kg 14,000.00
Kuas roll 0.0440 bh 17,000.00
Amplas 0.2000 lbr 6,000.00
Pekerja 0.0400 org 33,000.00
Mandor 0.0050 org 43,000.00
Tukang cat 0.1260 org 40,000.00
Kepala tukang cat 0.0126 org 50,000.00
Nomor Harga Satuan
Uraian Kuantitas Satuan
analisa (Rp.)

0.00 1 M2 Pekerjaan cat Seng


Cat kilap 0.3500 kg 17,000.00
Minyak cat 0.0500 ltr 16,000.00
Kuas biasa 4" 0.0800 bh 7,500.00
Pekerja 0.0700 org 33,000.00
Mandor 0.0025 org 43,000.00
Tukang cat 0.0900 org 40,000.00
Kepala tukang cat 0.0060 org 50,000.00

1 M2 Pekerjaan cat dinding luar lantai II + atap 3x amplas 2x plamir + 2 x cat


Cat tembok setara ICI 0.3380 kg 62,000.00
Cat dasar 0.3000 kg 17,000.00
Plamur dinding 0.1500 kg 14,000.00
Kuas roll 0.0440 bh 17,000.00
Amplas 0.2000 lbr 6,000.00
Pekerja 0.0800 org 33,000.00
Mandor 0.0100 org 43,000.00
Tukang cat 0.2520 org 40,000.00
Kepala tukang cat 0.0252 org 50,000.00

1 M2 Pekerjaan Teak oil


Teak oil 0.3600 ltr 38,500.00
Pekerja 0.0400 org 33,000.00
Mandor 0.0025 org 43,000.00
Tukang cat 0.0630 org 40,000.00
Kepala tukang cat 0.0630 org 50,000.00

1 M2 Lantai Tegel granit 60/60


Tegel granit 60x60 1.0500 m2 120,000.00
Pasir 0.0875 m3 185,000.00
Semen 0.2760 zak 72,000.00
Semen warna 0.3500 kg 1,000.00
Pekerja 0.5000 org 33,000.00
Mandor 0.0500 org 43,000.00
Tukang batu 1.0000 org 40,000.00
Kepala tukang batu 0.0150 org 50,000.00

1 M2 Lantai Tegel Keramik 40/40 KW I


Keramik 40x40 KW I 1.1000 m2 84,000.00
Pasir 0.0230 m3 185,000.00
Semen 0.2090 zak 72,000.00
Semen warna 0.9000 kg 1,000.00
Pekerja 0.3750 org 33,000.00
Mandor 0.0375 org 43,000.00
Nomor Harga Satuan
Uraian Kuantitas Satuan
analisa (Rp.)

Tukang batu 0.1800 org 40,000.00


Kepala tukang batu 0.0180 org 50,000.00

1 M2 Lantai Tegel wafel keramik 20/20 cm KW I


Keramik 20x20 KW I 1.1000 m2 84,000.00
Pasir 0.0460 m3 185,000.00
Semen 0.4180 zak 72,000.00
Semen warna 1.8000 kg 1,000.00
Pekerja 0.5000 org 33,000.00
Mandor 0.0250 org 43,000.00
Tukang batu 0.2400 org 40,000.00
Kepala tukang batu 0.0240 org 50,000.00

70.40 1 M2 Lantai/Plint Tegel keramik dinding 30/30 cm KW 2


Keramik 30/30 KW 2 1.1000 m2 57,000.00
Pasir 0.0460 m3 185,000.00
Semen 0.4180 zak 72,000.00
Semen warna 1.8000 kg 1,000.00
Pekerja 0.4600 org 33,000.00
Mandor 0.0200 org 43,000.00
Tukang batu 0.2200 org 40,000.00
Kepala tukang batu 0.0220 org 50,000.00

1 M2 Pasang paving blok


Paving blok 50.0000 m2 72,000.00
Pasir 0.0654 m3 185,000.00
Semen 0.2340 zak 72,000.00
Pekerja 0.5000 org 33,000.00
Mandor 0.0250 org 43,000.00
Tukang batu 0.2400 org 40,000.00
Kepala tukang batu 0.0240 org 50,000.00

1 M2 Pasangan Batu alam expose


Batu alam expose 68.0000 m2 200,000.00
Pasir 0.0840 m3 185,000.00
Semen 0.6340 zak 72,000.00
Pekerja 0.8700 org 33,000.00
Mandor 0.0840 org 43,000.00
Tukang batu 0.9860 org 40,000.00
Kepala tukang batu 0.0986 org 50,000.00

1 M1 Tegel Plint keramik 10/40 cm KW I


Keramik Plint 10/40 KW I 3.5000 bh 2,500.00
Pasir 0.0050 m3 185,000.00
Nomor Harga Satuan
Uraian Kuantitas Satuan
analisa (Rp.)

Semen 0.0600 zak 72,000.00


Semen warna 0.0500 kg 1,000.00
Pekerja 0.3500 org 33,000.00
Mandor 0.0350 org 43,000.00
Tukang batu 0.3500 org 40,000.00
Kepala tukang batu 0.0350 org 50,000.00

1 M2 Tegel Plint keramik 10/30 cm KW I


Keramik Plint 10/30 KW I 33.3333 bh 2,500.00
Pasir 0.0050 m3 185,000.00
Semen 0.0600 zak 72,000.00
Semen warna 0.0500 kg 1,000.00
Pekerja 0.3500 org 33,000.00
Mandor 0.0350 org 43,000.00
Tukang batu 0.3500 org 40,000.00
Kepala tukang batu 0.0350 org 50,000.00

1 M2 Plafond Gypsum + rangka hollow galvalume


Bahan Rangka hollow galvalume 3.6000 m' 18,000.00
Gypsum 0.3640 lbr 110,000.00
Paku sekrup 0.1100 kg 30,000.00
Pekerja 0.2500 org 33,000.00
Mandor 0.0125 org 43,000.00
Tukang kayu 0.5500 org 40,000.00
Kepala tukang kayu 0.0550 org 50,000.00

1 m' Pekerjaan list Plafond gypsum Profil 7x7,5cm


Plafond Profil 1.1000 m' 22,000.00
Paku list 0.0150 kg 25,000.00
Pekerja 0.0008 org 33,000.00
Mandor 0.1500 org 43,000.00
Tukang Kayu 0.0150 org 40,000.00

100 Kg Pekerjaan Pembesian beton


Besi beton 102.0000 kg 14,000.00
Kawat beton 1.5000 kg 17,000.00
Pekerja 0.5000 org 33,000.00
Mandor 0.0300 org 43,000.00
Tukang besi 0.5000 org 40,000.00
Kepala tukang besi 0.0500 org 50,000.00

1 m2 Begesting Multiplek 9 mm
Multiplek 9 mm 0.3470 lbr 145,000.00
Nomor Harga Satuan
Uraian Kuantitas Satuan
analisa (Rp.)

Usuk kayu 5/7 0.0175 m3 1,800,000.00


Paku > 5 cm 0.2000 kg 18,000.00
Pekerja 0.1400 org 33,000.00
Mandor 0.0140 org 43,000.00
Tukang kayu 0.6000 org 40,000.00
Kepala tukang kayu 0.0600 org 50,000.00

1 m2 Begesting Triplex 3,8 mm


Triplex 3 mm 0.3470 lbr 65,000.00
Usuk kayu 5/7 0.0175 m3 1,800,000.00
Paku > 5 cm 0.2000 kg 80,000.00
Pekerja 0.1400 org 33,000.00
Mandor 0.0140 org 43,000.00
Tukang kayu 0.6000 org 40,000.00
Kepala tukang kayu 0.0600 org 50,000.00

1 Unit Perancah untuk 1 m2luas pelat lantai


Kayu dolken 15.0000 btg 4,000.00
Paku > 5 cm 0.2500 kg 18,000.00
Pekerja 0.5000 org 33,000.00
Mandor 0.0500 org 43,000.00
Tukang kayu 1.0000 org 43,000.00
Kepala tukang kayu 0.1000 org 50,000.00

7.04 1 M3 Urugan pasir


Pasir urug 1.1000 m3 145,000.00
Pekerja 0.3000 org 33,000.00
Mandor 0.0100 org 43,000.00

3.32 1 M3 Beton rabat camp. 1 pc : 3 psr : 5 krl


Semen 3.2000 zak 72,000.00
Pasir pasang 0.5200 m3 185,000.00
Kerikil 0.8700 m3 230,000.00
Pekerja 1.6500 org 33,000.00
Mandor 0.0800 org 43,000.00
Tukang batu 0.2500 org 40,000.00
Kepala tukang batu 0.0250 org 50,000.00

3.16 1 M3 Campuran beton 1 pc : 2 psr : 3 krl


Semen 4.6400 zak 72,000.00
Pasir pasang 0.4700 m3 185,000.00
Batu pecah 0.7800 m3 230,000.00
Besi Beton 10 MM SNI 14.66 Lnjr 80,000
Besi Beton 6 MM SNI 14.35 Lnjr 37,000
Nomor Harga Satuan
Uraian Kuantitas Satuan
analisa (Rp.)

Kawat Ikat 2.5 Kg 17,000


Pekerja 1.6500 org 33,000.00
Mandor 0.0800 org 43,000.00
Tukang batu 0.2500 org 40,000.00
Kepala tukang batu 0.0250 org 50,000.00

1 M3 Campuran beton 1 pc : 1,5 psr : 2,5 krl


Semen 7.2800 zak 72,000.00
Pasir pasang 0.4700 m3 185,000.00
Batu pecah 0.7800 m3 230,000.00
Pekerja 1.4600 org 33,000.00
Mandor 0.0800 org 43,000.00
Tukang batu 0.2500 org 40,000.00
Kepala tukang batu 0.0250 org 50,000.00

1 unit Pemeliharaan/siram 1 m3 beton


Pekerja 1.2000 org 33,000.00

1 unit Pembongkaran begisting 1 m3beton bertulang


Pekerja 1.2000 org 33,000.00

1 M3 beton bertulang pelat lantai tebal 10 cm pembesian 90 kg/m3


Beton Cor campuran 1PC : 2Psr : 3Krl 1.0000 m3 2,415,820.00
Pekerjaan Pembesian 0.9000 Unit 1,493,790.00
Pekerjaan Pemeliharaan 1.0000 unit 39,600.00
Nomor Harga Satuan
Uraian Kuantitas Satuan
analisa (Rp.)

1 M3 beton bertulang kolom, sloof , Ring balk praktis 190 kg/m3


Beton Cor campuran 1PC:2Psr:3Krl 1.0000 m3 2,415,820.00
Pekerjaan Pembesian 1.9000 Unit 1,493,790.00
Pekerjaan begisting triplex 12.0000 m2 102,277.00

1 M3 beton kerb
Beton Cor campuran 1PC:2Psr:3Krl 1.0000 m3 2,415,820.00
Pekerjaan begisting triplex 1.9000 Unit 102,277.00
Pekerjaan pemeliharaan 1.0000 unit 39,600.00

1 M3 beton bertulang pelat lantai tebal 12 cm pembesian 80 kg/m3


Beton Cor campuran 1PC:1,5Psr:2,5Krl 1.0000 m3 853,380.00
Pekerjaan Pembesian 0.8000 Unit 1,493,790.00
Pekerjaan begisting multiplek 9 mm 8.5000 m2 117,637.00
Pekerjaan perancah 8.1000 m2 131,150.00
Pekerjaan pembongkaran begisting 1.0000 Unit 39,600.00
Pekerjaan Pemeliharaan 1.0000 unit 39,600.00

1 M3 beton bertulang listplank dan talang tebal 12 cm pembesian 100 kg/m3


Beton Cor campuran 1PC:1,5Psr:2,5Krl 1.0000 m3 853,380.00
Pekerjaan Pembesian 1.0000 Unit 1,493,790.00
Pekerjaan begisting multiplek 9 mm 11.2800 m2 117,637.00
Pekerjaan perancah 10.8200 m 2
131,150.00
Pekerjaan pembongkaran begisting 1.0000 Unit 39,600.00
Pekerjaan Pemeliharaan 1.0000 unit 39,600.00

1 M3 beton bertulang pelat atap tebal 10 cm pembesian 110 kg/m3


Beton Cor campuran 1PC:1,5Psr:2,5Krl m3 853,380.00
Pekerjaan Pembesian 1.1000 Unit 1,493,790.00
Pekerjaan begisting multiplek 9 mm 9.6000 m2 117,637.00
Pekerjaan perancah 9.0000 m2 131,150.00
Pekerjaan pembongkaran begisting 1.0000 Unit 39,600.00
Pekerjaan Pemeliharaan 1.0000 unit 39,600.00

1 M3 beton bertulang kolom 60/60 pembesian 120 kg/m3


Beton Cor campuran 1PC:1,5Psr:2,5Krl 1.0000 m3 853,380.00
Pekerjaan Pembesian 1.2000 Unit 1,493,790.00
Pekerjaan begisting mutiplek 9 mm 12.0000 m2 117,637.00
Pekerjaan pembongkaran begisting 1.0000 Unit 39,600.00
Pekerjaan pemeliharaan 1.0000 unit 39,600.00

1 M3 beton bertulang kolom 45/45 pembesian 125 kg/m3


Beton Cor campuran 1PC:1,5Psr:2,5Krl 1.0000 m3 853,380.00
Pekerjaan Pembesian 1.2500 Unit 1,493,790.00
Nomor Harga Satuan
Uraian Kuantitas Satuan
analisa (Rp.)

Pekerjaan begisting mutiplek 9 mm 12.0000 m2 117,637.00


Pekerjaan pembongkaran begisting 1.0000 Unit 39,600.00
Pekerjaan pemeliharaan 1.0000 unit 39,600.00

1 M3 beton bertulang kolom 15/25 pembesian 180 kg/m3


Beton Cor campuran 1PC:1,5Psr:2,5Krl 1.0000 m3 853,380.00
Pekerjaan Pembesian 1.8000 Unit 1,493,790.00
Pekerjaan begisting triplex 12.0000 m2 102,277.00
Pekerjaan pembongkaran begisting 1.0000 Unit 39,600.00
Pekerjaan pemeliharaan 1.0000 unit 39,600.00
Nomor Harga Satuan
Uraian Kuantitas Satuan
analisa (Rp.)

1 M3 beton bertulang listplank/talang pembesian 130 kg/m3


Beton Cor campuran 1PC:1,5Psr:2,5Krl 1.0000 m3 853,380.00
Pekerjaan Pembesian 1.3000 Unit 1,493,790.00
Pekerjaan begisting mutiplek 9 mm 14.2000 m2 117,637.00
Pekerjaan pembongkaran begisting 1.0000 Unit 39,600.00
Pekerjaan pemeliharaan 1.0000 unit 39,600.00

1 M3 beton bertulang konsol pembesian 150 kg/m3


Beton Cor campuran 1PC:1,5Psr:2,5Krl 1.0000 m3 853,380.00
Pekerjaan Pembesian 1.5000 Unit 1,493,790.00
Pekerjaan begisting mutiplek 9 mm 12.0000 m2 117,637.00
Pekerjaan pembongkaran begisting 1.0000 Unit 39,600.00
Pekerjaan pemeliharaan 1.0000 unit 39,600.00

1 M3 beton bertulang kolom struktur 20/20 pembesian 200 kg/m3


Beton Cor campuran 1PC:1,5Psr:2,5Krl 1.0000 m3 853,380.00
Pekerjaan Pembesian 2.0000 Unit 1,493,790.00
Pekerjaan begisting mutiplek 9 mm 8.9000 m2 117,637.00
Pekerjaan pembongkaran begisting 1.0000 Unit 39,600.00
Pekerjaan pemeliharaan 1.0000 unit 39,600.00

1 M3 beton bertulang slof 35/60 pembesian 110 kg/m3


Beton Cor campuran 1PC:2Psr:3Krl 1.0000 m3 853,380.00
Pekerjaan Pembesian 1.1000 Unit 1,493,790.00
Pekerjaan begisting mutiplek 9 mm 5.7000 m2 117,637.00
Pekerjaan pembongkaran begisting 1.0000 Unit 39,600.00
Pekerjaan pemeliharaan 1.0000 unit 39,600.00

1 M3 beton bertulang sloof 20/30 pembesian 120 kg/m3


Beton Cor campuran 1PC:1,5Psr:2,5Krl 1.0000 m3 853,380.00
Pekerjaan Pembesian 1.2000 Unit 1,493,790.00
Pekerjaan begisting triplex 10.0000 m2 102,277.00
Pekerjaan pembongkaran begisting 1.0000 Unit 39,600.00
Pekerjaan pemeliharaan 1.0000 unit 39,600.00

1 M3 beton balok tangga dan ring balk 40/70 pembesian 120 kg/m3
Beton Cor campuran 1PC:1,5Psr:2,5Krl 1.0000 m3 853,380.00
Pekerjaan Pembesian 1.2000 Unit 1,493,790.00
Pekerjaan begisting mutiplek 9 mm 10.7100 m2 117,637.00
Pekerjaan perancah 3.5700 m 2
131,150.00
Pekerjaan pembongkaran begisting 1.0000 Unit 39,600.00
Pekerjaan pemeliharaan 1.0000 unit 39,600.00

1 M3 beton bertulang Sloof struktur 35/65 Pembesian 150 kg/m3


Nomor Harga Satuan
Uraian Kuantitas Satuan
analisa (Rp.)

Beton Cor campuran 1PC:1,5Psr:2,5Krl 1.0000 m3 853,380.00


Pekerjaan Pembesian 1.8500 Unit 1,493,790.00
Pekerjaan begisting mutiplek 9 mm 5.7100 m2 117,637.00
Pekerjaan pembongkaran begisting 1.0000 Unit 39,600.00
Pekerjaan pemeliharaan 1.0000 unit 39,600.00
Nomor Harga Satuan
Uraian Kuantitas Satuan
analisa (Rp.)

1 M3 beton bertulang balok struktur 40/75 pembesian 210 kg/m3


Beton Cor campuran 1PC:1,5Psr:2,5Krl 1.0000 m3 853,380.00
Pekerjaan Pembesian 2.1000 Unit 1,493,790.00
Pekerjaan begisting multiplek 9 mm 10.2000 m2 117,637.00
Pekerjaan perancah 3.4000 m2 131,150.00
Pekerjaan pembongkaran begisting 1.0000 Unit 39,600.00
Pekerjaan pemeliharaan 1.0000 unit 39,600.00

1 M3 beton bertulang balok anak 15/30 pembesian 155 kg/m3


Beton Cor campuran 1PC:1,5Psr:2,5Krl 1.0000 m3 853,380.00
Pekerjaan Pembesian 1.5500 Unit 1,493,790.00
Pekerjaan begisting multiplek 9 mm 16.6650 m2 117,637.00
Pekerjaan perancah 5.5550 m2 131,150.00
Pekerjaan pembongkaran begisting 1.0000 Unit 39,600.00
Pekerjaan pemeliharaan 1.0000 unit 39,600.00

1 M3 beton bertulang ring balk 20/25 Pembesian 175 kg/m3


Beton Cor campuran 1 PC: 2 Psr: 3 Krl 1.0000 m3 853,380.00
Pekerjaan Pembesian 1.7500 Unit 1,493,790.00
Pekerjaan begisting multiplek 9 mm 13.4000 m2 117,637.00
Pekerjaan pembongkaran begisting 1.0000 Unit 39,600.00
Pekerjaan pemeliharaan 1.0000 unit 39,600.00

1 M3 beton bertulang balok lengkung 20/40 Pembesian 150 kg/m3


Beton Cor campuran 1PC:1,5Psr:2,5Krl 1.0000 m3 853,380.00
Pekerjaan Pembesian 1.5000 Unit 1,493,790.00
Pekerjaan begisting multiplek 9 mm 10.0000 m2 117,637.00
Pekerjaan perancah 3.3333 m 2
131,150.00
Pekerjaan pembongkaran begisting 1.0000 Unit 39,600.00
Pekerjaan pemeliharaan 1.0000 unit 39,600.00

1 M3 beton bertulang kolom bulat 30cm Pembesian 150 kg/m3


Beton Cor campuran 1PC:1,5Psr:2,5Krl 1.0000 m3 853,380.00
Pekerjaan Pembesian 1.5000 Unit 1,493,790.00
Pekerjaan begisting multiplek 9 mm 10.0000 m2 117,637.00
Pekerjaan pembongkaran begisting 1.0000 Unit 39,600.00
Pekerjaan pemeliharaan 1.0000 unit 39,600.00

1 M3 beton bertulang balok anak 25/45 Pembesian 155 kg/m3


Beton Cor campuran 1PC:1,5Psr:2,5Krl 1.0000 m3 853,380.00
Pekerjaan Pembesian 1.5500 Unit 1,493,790.00
Pekerjaan begisting multiplek 9 mm 8.0000 m2 117,637.00
Pekerjaan perancah 2.6667 m2 131,150.00
Pekerjaan pembongkaran begisting 1.0000 Unit 39,600.00
Nomor Harga Satuan
Uraian Kuantitas Satuan
analisa (Rp.)

Pekerjaan pemeliharaan 1.0000 unit 39,600.00

1 M3 beton bertulang kolom, sloof , Ring balk praktis 110 kg/m3


Beton Cor campuran 1PC:2Psr:3Krl 1.0000 m3 2,415,820.00
Pekerjaan Pembesian 1.1000 Unit 1,493,790.00
Pekerjaan begisting 3.0000 m2 102,277.00

1 M3 beton bertulang pondasi telapak pembesian 150 kg/m3


Beton Cor campuran 1PC:1,5Psr:2,5Krl 1.0000 m3 853,380.00
Pekerjaan Pembesian 1.5000 Unit 1,493,790.00
Pekerjaan begisting triplex 1.5000 m2 102,277.00
Pekerjaan pembongkaran begisting 1.0000 Unit 39,600.00
Pekerjaan pemeliharaan 1.0000 unit 39,600.00
Nomor Harga Satuan
Uraian Kuantitas Satuan
analisa (Rp.)

1 M3 beton bertulang tangga pembesian 140 kg/m3


Beton Cor campuran 1PC:1,5Psr:2,5Krl 1.0000 m3 853,380.00
Pekerjaan Pembesian 1.4000 Unit 1,493,790.00
Pekerjaan begisting 14.0000 m2 117,637.00
Perancah 4.6667 Unit 131,150.00
Pekerjaan pembongkaran begisting 1.0000 Unit 39,600.00
Pekerjaan pemeliharaan 1.0000 unit 39,600.00

1 M3 beton bertulang kolom, sloof dan Ring balk struktur pembesian 250 kg/m3
Beton Cor campuran 1PC:1,5Psr:2,5Krl 1.0000 m3 853,380.00
Pekerjaan Pembesian 2.5000 Unit 1,493,790.00
Pekerjaan begisting 6.4350 m 2
117,637.00
Pekerjaan pembongkaran begisting 1.0000 Unit 39,600.00
Pekerjaan pemeliharaan 1.0000 unit 39,600.00

1 M3 beton bertulang pondasi telapak pembesian 80 kg/m3


Beton Cor campuran 1PC:1,5Psr:2,5Krl 1.0000 m3 853,380.00
Pekerjaan Pembesian 0.8000 Unit 1,493,790.00
Pekerjaan begisting 1.0000 m2 117,637.00
Pekerjaan pembongkaran begisting 1.0000 Unit 39,600.00
Pekerjaan pemeliharaan 1.0000 unit 39,600.00

1 M3 beton bertulang Ring balk 20/30 pembesian 171kg/m3


Beton Cor campuran 1PC:1,5Psr:2,5Krl 1.0000 m3 853,380.00
Pekerjaan Pembesian 1.7100 Unit 1,493,790.00
Pekerjaan begisting 5.0000 m2 117,637.00
Pekerjaan pembongkaran begisting 1.0000 Unit 39,600.00
Pekerjaan pemeliharaan 1.0000 unit 39,600.00

1 M3 Dinding Beton bertulang lift tebal 15 cm pembesian 140 kg/m3


Beton Cor campuran 1PC:1,5Psr:2,5Krl 1.0000 m3 853,380.00
Pekerjaan Pembesian 1.4000 Unit 1,493,790.00
Pekerjaan begisting multiplek 9 mm 7.0000 m 2
117,637.00
Pekerjaan perancah 7.0000 Unit 117,637.00
Pekerjaan pembongkaran begisting 1.0000 Unit 39,600.00
Pekerjaan Pemeliharaan 1.0000 unit 39,600.00

1 m' Pasang kusen aluminium


Profil Alumunium 1.1000 m' 95,000.00
Skrup Fixer 2.0000 buah 90,000.00
Sealant 0.0600 Tube 150,000.00
Pekerja 0.0430 org 33,000.00
Mandor 0.0021 org 43,000.00
Tukang Besi 0.0430 org 40,000.00
Nomor Harga Satuan
Uraian Kuantitas Satuan
analisa (Rp.)

Kepala Tukang 0.0043 org 50,000.00

1 M2 Pintu / Jendela Kaca Rangka Alumunium


Kaca sandblast 5 mm 1.0500 m2 120,000.00
Rangka Alumunium 4.4000 m' 70,000.00
Profil Kaca 4.5000 m' 35,000.00
Sealant 0.2700 Tube 150,000.00
Pekerja 0.0850 org 33,000.00
Mandor 0.0040 org 43,000.00
Tukang Besi 0.0850 org 40,000.00
Kepala Tukang 0.0080 org 50,000.00
Nomor Harga Satuan
Uraian Kuantitas Satuan
analisa (Rp.)

1 M2 Jendela Kaca Rangka Alumunium


Kaca sandblast 5 mm 1.0500 m2 120,000.00
Rangka Alumunium 2.5000 m' 70,000.00
Profil Kaca 2.6000 m' 35,000.00
Sealant 0.2000 Tube 150,000.00
Pekerja 0.0765 org 33,000.00
Mandor 0.0036 org 43,000.00
Tukang Besi 0.0765 org 40,000.00
Kepala Tukang 0.0072 org 50,000.00

1 M2 Dinding Partisi
Balok kayu klas I 6/12 0.1288 m3 2,500,000.00
Multirifleks 9 mm 0.3470 lbr 145,000.00
Paku 5-12 0.2000 kg 18,000.00
Paku halus 0.1250 kg 25,000.00
Lem kayu 0.0120 kg 35,000.00
Pekerja 0.3000 org 33,000.00
Mandor 0.0300 org 43,000.00
Tukang kayu 0.1500 org 40,000.00
Kepala tukang kayu 0.0075 org 50,000.00

1 M' Ram besi penutup saluran


2 x 1m Besi siku L30.30.3 2.7200 kg 22,500.00
4 x 1m Besi Ulir D16 6.3147 kg 14,000.00
Pengelasan/Pabrikasi 1.0000 ls 50,000.00
ongkos pasang/Ereksi 1.0000 ls 25,000.00

1 M' Pasangan saluran pembuangan air hujan type 0,30


Pasangan batu gunung 0.4100 kg 432,605.00
Plesteran Saluran 1.2000 m2 30,445.00
Acian Saluran 1.2000 m2 9,119.00

1 Kg Pasang Rangka Atap Baja


Baja Profil WF 1.1000 kg 17,000.00
Menie Besi 0.0800 kg 20,000.00
Pekerja 0.0060 OH 33,000.00
Mandor 0.0003 OH 43,000.00
Tukang Besi 0.0600 OH 40,000.00
Kepala Tukang 0.0060 OH 50,000.00

Memasang 1 bh Floor Drain


Floor Drain 1.000 bh 45,000.00
Perkerja 0.010 OH 33,000.00
Tukang Batu 0.100 OH 40,000.00
Nomor Harga Satuan
Uraian Kuantitas Satuan
analisa (Rp.)

Kepala Tukang 0.0100 OH 43,000.00


Mandor 0.0050 OH 50,000.00

Memasang 1 m' Pipa PVC tipe AW "


Pipa PVC 1.2000 15,000.00
Perlengkapan 35% dari harga pipa 5,250.00
Perkerja 0.036 OH 33,000.00
Tukang Batu 0.060 OH 40,000.00
Kepala Tukang 0.0060 OH 43,000.00
Mandor 0.0018 OH 50,000.00
Nomor Harga Satuan
Uraian Kuantitas Satuan
analisa (Rp.)

Memasang 1 m' Pipa PVC tipe AW 1 "


Pipa PVC 1.2000 27,000.00
Perlengkapan 35% dari harga pipa 9,450.00
Perkerja 0.0360 OH 33,000.00
Tukang Batu 0.0600 OH 40,000.00
Kepala Tukang 0.0060 OH 43,000.00
Mandor 0.0018 OH 50,000.00

Memasang 1 m' Pipa PVC tipe AW 2"


Pipa PVC 1.2000 45,000.00
Perlengkapan 35% dari harga pipa 15,750.00
Perkerja 0.0360 OH 33,000.00
Tukang Batu 0.0600 OH 40,000.00
Kepala Tukang 0.0060 OH 43,000.00
Mandor 0.0018 OH 50,000.00

Memasang 1 m' Pipa Galvanis 1 "


Pipa Galvanis 1.100 45,000.00
Perlengkapan 35% dari harga pipa 9,450.00
Perkerja 0.0360 OH 33,000.00
Tukang Batu 0.0600 OH 40,000.00
Kepala Tukang 0.0060 OH 43,000.00
Mandor 0.0018 OH 50,000.00

Memasang 1 m' Pipa Galvanis 2"


Pipa Galvanis 1.100 50,000.00
Perlengkapan 35% dari harga pipa 15,750.00
Perkerja 0.0360 OH 33,000.00
Tukang Batu 0.0600 OH 40,000.00
Kepala Tukang 0.0060 OH 43,000.00
Mandor 0.0018 OH 50,000.00

Pipa air kotor 4"


Pipa PVC 4" 1.100 m1 32,000.00
Perlengkapan 35% dari harga pipa 11,200.00
Pasir Pasang 0.013 M3 185,000.00
Pasir Urug 0.011 M3 145,000.00
Perkerja 0.060 OH 33,000.00
Tukang Batu 0.030 OH 40,000.00
Kepala Tukang 0.003 OH 43,000.00
Mandor 0.0025 OH 50,000.00

Pipa air kotor 2"


Pipa PVC 2" 1.100 m1 35,000.00
Nomor Harga Satuan
Uraian Kuantitas Satuan
analisa (Rp.)

Semen Portland 0.014 Zak 15,750.00


Pasir Pasang 0.013 M3 185,000.00
Pasir Urug 0.011 M3 145,000.00
Perkerja 0.060 OH 33,000.00
Tukang Batu 0.030 OH 40,000.00
Kepala Tukang 0.003 OH 50,000.00
Mandor 0.0025 OH 43,000.00
Nomor Harga Satuan
Uraian Kuantitas Satuan
analisa (Rp.)

1 Buah Pasang Kunci Tanam Biasa


Kunci Tanam Biasa 1.000 bh 175,000.00
Perkerja 0.010 OH 33,000.00
Tukang Kayu 0.500 OH 40,000.00
Kepala Tukang 0.010 OH 43,000.00
Mandor 0.005 OH 50,000.00

1 bh Pekerjaan Pasang kunci tanam besar


Kunci pintu 1.0000 bh 30,000.00
Pekerja 0.0100 org 33,000.00
Mandor 0.0050 org 43,000.00
Tukang kayu 0.5000 org 40,000.00
Kepala tukang kayu 0.0100 org 50,000.00

1 bh Pekerjaan Pasang kunci tanam KM/WC (kunci tanam kecil)


Kunci pintu 1.0000 bh 175,000.00
Pekerja 0.0100 org 33,000.00
Mandor 0.0050 org 43,000.00
Tukang kayu 0.5000 org 40,000.00
Kepala tukang kayu 0.0100 org 50,000.00
Nomor Harga Satuan
Uraian Kuantitas Satuan
analisa (Rp.)

1.00 1 bh Pekerjaan Pasang kunci tanam KM/WC (double slaag)


Kunci pintu 1.0000 bh 125,000.00
Pekerja 0.0100 org 33,000.00
Mandor 0.0050 org 43,000.00
Tukang kayu 0.5000 org 40,000.00
Kepala tukang kayu 0.0100 org 50,000.00

1 pasang Pekerjaan Pasang espagnolet


Espagnolet 1.0000 Pasang 25,000.00
Pekerja 0.0100 org 33,000.00
Mandor 0.0050 org 43,000.00
Tukang kayu 0.5000 org 40,000.00
Kepala tukang kayu 0.0100 org 50,000.00

1 m' pasang hand railing tangga


Handrailing tangga 1.1000 m' 65,000.00
Pekerja 0.0100 org 33,000.00
Mandor 0.0050 org 43,000.00
Tukang kayu 0.5000 org 40,000.00
Kepala tukang kayu 0.0100 org 50,000.00

11.00 1 bh Pekerjaan Pasang engsel pintu


Engsel pintu 1.0000 bh 12,000.00
Pekerja 0.0150 org 33,000.00
Mandor 0.0008 org 43,000.00
Tukang kayu 0.1500 org 40,000.00
Kepala tukang kayu 0.0150 org 50,000.00

4.00 1 bh Pekerjaan Pasang gerendel pintu


Gerendel pintu 1.0000 bh 17,000.00
Pekerja 0.0150 org 33,000.00
Mandor 0.0008 org 43,000.00
Tukang kayu 0.1500 org 40,000.00
Kepala tukang kayu 0.0150 org 50,000.00

1 bh Pekerjaan Pasang gerendel jendela/boven


Gerendel jendela 1.0000 bh 17,000.00
Pekerja 0.0150 org 33,000.00
Mandor 0.0008 org 43,000.00
Tukang kayu 0.1500 org 40,000.00
Kepala tukang kayu 0.0150 org 50,000.00

4.00 1 bh Pekerjaan kait angin jendela


Nomor Harga Satuan
Uraian Kuantitas Satuan
analisa (Rp.)

Kait Angin 1.0000 bh 12,000.00


Pekerja 0.0150 org 33,000.00
Mandor 0.0008 org 43,000.00
Tukang kayu 0.1500 org 40,000.00
Kepala tukang kayu 0.0150 org 50,000.00
A HARGA SATUAN PEKERJAAN

Jumlah Nomor
(Rp.) analisa

13,800.00
360.00
8,750.00
4,000.00
3,300.00
500.00
215.00
30,925.00

24,750.00
1,075.00
25,825.00 14.52

39,600.00
8,600.00
48,200.00 0.00

41,250.00
5,375.00
46,625.00 0.00

6,336.00
817.00
7,153.00 4.84

159,500.00
9,900.00
430.00
169,830.00 1.51

66,000.00
9,900.00
430.00
76,330.00 31.68

27,500.00
9,900.00
Jumlah Nomor
(Rp.) analisa

430.00
37,830.00 0.00

102,000.00
9,900.00
430.00
112,330.00 0.00
Jumlah Nomor
(Rp.) analisa

74,750.00
72,500.00
25,740.00
1,677.00
15,600.00
1,950.00
192,217.00 3.02

78,000.00
100,640.00
195,840.00
49,500.00
3,225.00
2,400.00
3,000.00
432,605.00 13.48

7,030.00
34,056.00
45,000.00
10,560.00
645.00
4,000.00
500.00
101,791.00 101.94

70,300.00
23,760.00
288,000.00
85,800.00
5,590.00
48,000.00
6,000.00
527,450.00 0.00

7,030.00
34,056.00
51,000.00
10,560.00
645.00
4,000.00
500.00
Jumlah Nomor
(Rp.) analisa

107,791.00 0.00

70,300.00
23,760.00
510,000.00
85,800.00
Jumlah Nomor
(Rp.) analisa

5,590.00
48,000.00
6,000.00
749,450.00 0.00

4,995.00
19,440.00
8,580.00
559.00
8,000.00
1,000.00
42,574.00 0.00

4,625.00
9,360.00
6,600.00
860.00
8,000.00
1,000.00
30,445.00 222.61

4,995.00
19,627.20
8,580.00
8,600.00
800.00
650.00
43,252.20 0.00

4,680.00
495.00
344.00
3,200.00
400.00
9,119.00 222.61

2,750,000.00
132,000.00
8,600.00
480,000.00
60,000.00
3,430,600.00 0.00

3,000,000.00
Jumlah Nomor
(Rp.) analisa

198,000.00
12,900.00
800,000.00
100,000.00
4,110,900.00 0.39
Jumlah Nomor
(Rp.) analisa

49,000.00
5,400.00
10,500.00
65,000.00
19,800.00
1,290.00
80,000.00
10,000.00
240,990.00 0.00

49,000.00
5,400.00
28,000.00
32,500.00
60,000.00
26,400.00
1,720.00
100,000.00
12,500.00
315,520.00 0.00

102,000.00
1,645.00
48,000.00
125.00
495.00
32.25
6,000.00
750.00
159,047.25 2.20

159,500.00
48,000.00
90.00
495.00
32.25
6,000.00
750.00
214,867.25 0.00

102,000.00
1,645.00
48,000.00
Jumlah Nomor
(Rp.) analisa

125.00
495.00
32.25
6,000.00
750.00
159,047.25 3.46
Jumlah Nomor
(Rp.) analisa

100,000.00
100,000.00
12,500.00
33,000.00
2,150.00
247,650.00 1.86

85,000.00
87,500.00
26,895.00
1,723.23
86,000.00
10,750.00
297,868.23 2.94

332,500.00
120,000.00
25,000.00
477,500.00 0.00

427,500.00
120,000.00
25,000.00
572,500.00 0.00

4,800.00
90.00
604.89
38.70
2,932.00
365.00
8,830.59 0.00

27,500.00
1,080.00
3,630.00
2,150.00
8,800.00
1,100.00
44,260.00 45.26

2,200,000.00
14,400.00
Jumlah Nomor
(Rp.) analisa

132,000.00
17,200.00
480,000.00
60,000.00
2,903,600.00 2.51
Jumlah Nomor
(Rp.) analisa

30,000.00
2,700.00
3,300.00
4,300.00
400.00
250.00
40,950.00 0.00

38,437.50
10.00
10.00
10.00
11,220.00
731.00
27,200.00
3,400.00
81,018.50 0.00

28,975.50
10.00
10.00
10.00
1,122.00
73.10
680.00
85.00
30,965.60 0.00

27,572.50
10.00
10.00
10.00
1,122.00
73.10
680.00
85.00
29,562.60 0.00

195,000.00
10.00
10.00
10.00
Jumlah Nomor
(Rp.) analisa

14,620.00
680.00
34,000.00
3,400.00
247,730.00 0.00

195,000.00
10.00
10.00
10.00
1,462.00
68.00
850.00
85.00
197,495.00 0.00

19,821.17
10.00
10.00
10.00
1,462.00
68.00
850.00
85.00
22,316.17 0.00

61,600.00
2,700.00
77,400.00
19,600.00
4,950.00
19,350.00
1,800.00
400.00
187,800.00 0.00

104,400.00
6,000.00
6,600.00
43.00
4,000.00
500.00
121,543.00 0.00
Jumlah Nomor
(Rp.) analisa

104,400.00
6,000.00
6,600.00
43.00
4,000.00
500.00
121,543.00 0.00

110,200.00
6,000.00
6,600.00
43.00
4,000.00
500.00
127,343.00 0.00

55,416.67
1,500.00
8,250.00
559.00
6,000.00
750.00
72,475.67 0.00

57,750.00
1,500.00
8,250.00
559.00
6,000.00
750.00
74,809.00 0.00

31,500.00
400.00
3,960.00
2,400.00
300.00
38,560.00 0.00

22,000.00
400.00
3,960.00
2,400.00
300.00
Jumlah Nomor
(Rp.) analisa

29,060.00 0.00

23,580.00
44,000.00
1,200.00
6,000.00
6,600.00
1,935.00
36,000.00
4,500.00
123,815.00 0.00

23,580.00
8,000.00
1,200.00
6,000.00
6,600.00
1,935.00
36,000.00
4,500.00
87,815.00 0.00

259.66
44,000.00
1,200.00
6,000.00
6,600.00
1,935.00
36,000.00
4,500.00
100,494.66 0.00

44,000.00
375.00
24.75
6,000.00
750.00
51,149.75 0.00

23,580.00
22,555.00
6,000.00
6,000.00
Jumlah Nomor
(Rp.) analisa

6,600.00
1,935.00
36,000.00
4,500.00
107,170.00 0.00

11,000.00
375.00
24.75
6,450.00
600.00
18,449.75 0.00

3,600.00
420.00
480.00
1,980.00
129.00
4,500.00
500.00
11,609.00 0.00

2,890.00
4,000.00
5,950.00
800.00
2,550.00
600.00
1,200.00
2,310.00
107.50
3,600.00
300.00
24,307.50 31.38

15,750.00
800.00
2,550.00
600.00
1,200.00
2,310.00
107.50
3,600.00
Jumlah Nomor
(Rp.) analisa

300.00
27,217.50 0.00

2,890.00
4,000.00
5,950.00
800.00
2,550.00
600.00
1,200.00
2,310.00
107.50
3,600.00
300.00
24,307.50 0.00

4,420.00
1,700.00
1,400.00
748.00
1,200.00
660.00
107.50
2,520.00
315.00
13,070.50 0.00

4,420.00
1,700.00
1,400.00
748.00
1,200.00
660.00
107.50
2,520.00
315.00
13,070.50 0.00

5,746.00
5,100.00
2,100.00
748.00
1,200.00
1,320.00
Jumlah Nomor
(Rp.) analisa

215.00
5,040.00
630.00
22,099.00 111.30

5,746.00
5,100.00
2,100.00
748.00
1,200.00
1,320.00
215.00
5,040.00
630.00
22,099.00 111.30
Jumlah Nomor
(Rp.) analisa

5,950.00
800.00
600.00
2,310.00
107.50
3,600.00
300.00
13,667.50 0.00

20,956.00
5,100.00
2,100.00
748.00
1,200.00
2,640.00
430.00
10,080.00
1,260.00
44,514.00 0.00

13,860.00
1,320.00
107.50
2,520.00
3,150.00
20,957.50 0.00

126,000.00
16,187.50
19,872.00
350.00
16,500.00
2,150.00
40,000.00
750.00
221,809.50 0.00

92,400.00
4,255.00
15,048.00
900.00
12,375.00
1,612.50
Jumlah Nomor
(Rp.) analisa

7,200.00
900.00
134,690.50 0.00

92,400.00
8,510.00
30,096.00
1,800.00
16,500.00
1,075.00
9,600.00
1,200.00
161,181.00 0.00

62,700.00
8,510.00
30,096.00
1,800.00
15,180.00
860.00
8,800.00
1,100.00
129,046.00 70.40

3,600,000.00
12,099.00
16,848.00
16,500.00
1,075.00
9,600.00
1,200.00
3,657,322.00 0.00

13,600,000.00
15,540.00
45,648.00
28,710.00
3,612.00
39,440.00
4,930.00
13,737,880.00 0.00

8,750.00
925.00
Jumlah Nomor
(Rp.) analisa

4,320.00
50.00
11,550.00
1,505.00
14,000.00
1,750.00
42,850.00 0.00

83,333.33
925.00
4,320.00
50.00
11,550.00
1,505.00
14,000.00
1,750.00
117,433.33

64,800.00
40,040.00
3,300.00
8,250.00
537.50
22,000.00
2,750.00
141,677.50 0.00

24,200.00
375.00
24.75
6,450.00
600.00
31,649.75 0.00

1,428,000.00
25,500.00
16,500.00
1,290.00
20,000.00
2,500.00
1,493,790.00 0.00

50,315.00
Jumlah Nomor
(Rp.) analisa

31,500.00
3,600.00
4,620.00
602.00
24,000.00
3,000.00
117,637.00 0.00

22,555.00
31,500.00
16,000.00
4,620.00
602.00
24,000.00
3,000.00
102,277.00 0.00

60,000.00
4,500.00
16,500.00
2,150.00
43,000.00
5,000.00
131,150.00 0.00

159,500.00
9,900.00
430.00
169,830.00 7.04

230,400.00
96,200.00
200,100.00
54,450.00
3,440.00
10,000.00
1,250.00
595,840.00 3.32

334,080.00
86,950.00
179,400.00
1,172,800
530,950
Jumlah Nomor
(Rp.) analisa

42,500
54,450.00
3,440.00
10,000.00
1,250.00
2,415,820.00 3.16

524,160.00
86,950.00
179,400.00
48,180.00
3,440.00
10,000.00
1,250.00
853,380.00 0.00

39,600.00
39,600.00 0.00

39,600.00
39,600.00 0.00

2,415,820.00
1,344,411.00
39,600.00
3,799,831.00 0.00
Jumlah Nomor
(Rp.) analisa

2,415,820.00
2,838,201.00
1,227,324.00
6,481,345.00 0.00

2,415,820.00
194,326.30
39,600.00
2,649,746.30 0.00

853,380.00
1,195,032.00
999,914.50
1,062,315.00
39,600.00
39,600.00
4,189,841.50 0.00

853,380.00
1,493,790.00
1,326,945.36
1,419,043.00
39,600.00
39,600.00
5,172,358.36 0.00

#VALUE!
1,643,169.00
1,129,315.20
1,180,350.00
39,600.00
39,600.00
#VALUE! 0.00

853,380.00
1,792,548.00
1,411,644.00
39,600.00
39,600.00
4,136,772.00 0.00

853,380.00
1,867,237.50
Jumlah Nomor
(Rp.) analisa

1,411,644.00
39,600.00
39,600.00
4,211,461.50 0.00

853,380.00
2,688,822.00
1,227,324.00
39,600.00
39,600.00
4,848,726.00 0.00
Jumlah Nomor
(Rp.) analisa

853,380.00
1,941,927.00
1,670,445.40
39,600.00
39,600.00
4,544,952.40 0.00

853,380.00
2,240,685.00
1,411,644.00
39,600.00
39,600.00
4,584,909.00 0.00

853,380.00
2,987,580.00
1,046,969.30
39,600.00
39,600.00
4,967,129.30 0.00

853,380.00
1,643,169.00
670,530.90
39,600.00
39,600.00
3,246,279.90 0.00

853,380.00
1,792,548.00
1,022,770.00
39,600.00
39,600.00
3,747,898.00 0.00

853,380.00
1,792,548.00
1,259,892.27
468,205.50
39,600.00
39,600.00
4,453,225.77 0.00
Jumlah Nomor
(Rp.) analisa

853,380.00
2,763,511.50
671,707.27
39,600.00
39,600.00
4,367,798.77 0.00
Jumlah Nomor
(Rp.) analisa

853,380.00
3,136,959.00
1,199,897.40
445,910.00
39,600.00
39,600.00
5,715,346.40 0.00

853,380.00
2,315,374.50
1,960,420.61
728,538.25
39,600.00
39,600.00
5,936,913.36 0.00

853,380.00
2,614,132.50
1,576,335.80
39,600.00
39,600.00
5,123,048.30 0.00

853,380.00
2,240,685.00
1,176,370.00
437,166.67
39,600.00
39,600.00
4,786,801.67 0.00

853,380.00
2,240,685.00
1,176,370.00
39,600.00
39,600.00
4,349,635.00 0.00

853,380.00
2,315,374.50
941,096.00
349,733.33
39,600.00
Jumlah Nomor
(Rp.) analisa

39,600.00
4,538,783.83 0.00

2,415,820.00
1,643,169.00
306,831.00
4,365,820.00 0.00

853,380.00
2,240,685.00
153,415.50
39,600.00
39,600.00
3,326,680.50 0.00
Jumlah Nomor
(Rp.) analisa

853,380.00
2,091,306.00
1,646,918.00
612,033.33
39,600.00
39,600.00
5,282,837.33 0.00

853,380.00
3,734,475.00
756,994.10
39,600.00
39,600.00
5,424,049.10 0.00

853,380.00
1,195,032.00
117,637.00
39,600.00
39,600.00
2,245,249.00 0.00

853,380.00
2,554,380.90
588,185.00
39,600.00
39,600.00
4,075,145.90 0.00

853,380.00
2,091,306.00
823,459.00
823,459.00
39,600.00
39,600.00
4,670,804.00 0.00

104,500.00
180,000.00
9,000.00
1,419.00
90.30
1,720.00
Jumlah Nomor
(Rp.) analisa

215.00
296,944.30 0.00

126,000.00
308,000.00
157,500.00
40,500.00
2,805.00
172.00
3,400.00
400.00
638,777.00 -
Jumlah Nomor
(Rp.) analisa

126,000.00
175,000.00
91,000.00
30,000.00
2,524.50
154.80
3,060.00
360.00
428,099.30 -

322,000.00
50,315.00
3,600.00
3,125.00
420.00
9,900.00
1,290.00
6,000.00
375.00
397,025.00 -

61,200.00
88,405.33
50,000.00
25,000.00
224,605.33 -

177,368.05
36,534.00
10,942.80
224,844.85 -

18,700.00
1,600.00
198.00
12.90
2,400.00
300.00
23,210.90 -

45,000.00
330.00
4,000.00
Jumlah Nomor
(Rp.) analisa

430.00
250.00
50,010.00

18,000.00
5,250.00
1,188.00
2,400.00
258.00
90.00
27,186.00
Jumlah Nomor
(Rp.) analisa

32,400.00
9,450.00
1,188.00
2,400.00
258.00
90.00
45,786.00

54,000.00
15,750.00
1,188.00
2,400.00
258.00
90.00
73,686.00

32,400.00
9,450.00
1,008.00
2,100.00
210.00
81.00
45,249.00

54,000.00
15,750.00
1,008.00
2,100.00
210.00
81.00
73,149.00

35,200.00
11,200.00
2,405.00
1,595.00
1,980.00
1,200.00
129.00
125.00
53,834.00

38,500.00
Jumlah Nomor
(Rp.) analisa

15,750.00
2,405.00
1,595.00
1,980.00
1,200.00
150.00
107.50
61,687.50
Jumlah Nomor
(Rp.) analisa

175,000.00
330.00
20,000.00
430.00
250.00
196,010.00

30,000.00
330.00
215.00
20,000.00
500.00
51,045.00 0.00

175,000.00
330.00
215.00
20,000.00
500.00
196,045.00 0.00
Jumlah Nomor
(Rp.) analisa

125,000.00
330.00
215.00
20,000.00
500.00
146,045.00 1.00

25,000.00
330.00
215.00
20,000.00
500.00
46,045.00 0.00

71,500.00
330.00
215.00
20,000.00
500.00
92,545.00 0.00

12,000.00
495.00
32.25
6,000.00
750.00
19,277.25 11.00

17,000.00
495.00
32.25
6,000.00
750.00
24,277.25 4.00

17,000.00
495.00
32.25
6,000.00
750.00
24,277.25 0.00
Jumlah Nomor
(Rp.) analisa

12,000.00
495.00
32.25
6,000.00
750.00
19,277.25 4.00
PROGRAM NASIONAL PEMBERDAYAAN MASYARAKAT MANDIRI PERDESAAN
UNIT PENGELOLA KEGIATAN ( UPK )
KECAMATAN KODI UTARA
NOMOR :.
Telah Terima Dari : Tim Pengelola Kegiatan ( TPK ) Desa Kalembu Kaha
Uang Sebesar : EMPAT PULUH ENAM JUTA DUA BELAS RIBU LIMA RATUS RUPIAH
Terbilang : #REF!
Untuk Keperluan : Pembayaran Bahan Dan Alat Non Lokal
1 . #REF! 6 Lmbr #REF! 21 . #REF!

2 . #REF! 90 Lonjor Rp 7,830,000 22 . #REF!

3 . #REF! 80 Lonjor Rp 2,960,000 23 . #REF!

4 . #REF! 73 Bh Rp 438,000 24 . #REF!

5 . #REF! 6 Bh Rp 210,000 25 . #REF!

6 . #REF! 12 Bh Rp 420,000 26 . #REF!

7 . #REF! 36 Bh Rp 540,000 27 . #REF!

8 . #REF! 6 Kg Rp 270,000 28 . #REF!

9 . #REF! 2 Kg Rp 50,000 29 . #REF!

10 . #REF! 66 Psg Rp 1,980,000 30 . #REF!

11 . #REF! 21 Psg Rp 157,500 31 . #REF!

12 . #REF! 25 Kg Rp 500,000 32 . #REF!

13 #REF! 36 Psg Rp 1,260,000 33 #REF!

14 #REF! 4 Bh Rp 60,000 34 #REF!

15 #REF! 4 Bh Rp 30,000 35 #REF!

16 #REF! 4 Kg Rp 100,000 36 #REF!

17 . #REF! 4 Kg Rp 100,000 37 . #REF!

18 . #REF! 60 Kg Rp 1,020,000 38 . #REF!

19 . #REF! 12 Kg Rp 270,000 .

20 . #REF! 7 Kg Rp 175,000 .
Sub Total #REF! Sub Total
Total #REF!

Kalembu Kaha, 02 Ok
Setuju dibayar Lunas dibayar Yang Menerim
Ketua TPK Bedahara TPK Direktur
Desa Kalembu Kaha Desa Kalembu Kaha
LORENSIUS UMBU DIMA MARGARETHA RA BOTA

Mengetahui
KEPALA DESA KALEMBU KAHA

(MARTINUS M. GHELLO)
PROGRAM NASIONAL PEMBERDAYAAN MASYARAKAT MANDIRI PERDESAAN
UNIT PENGELOLA KEGIATAN ( UPK )
KECAMATAN KODI UTARA
NOMOR :.

Telah Terima Dari : Tim Pengelola Kegiatan ( TPK ) Desa Kalembu Kaha
Uang Sebesar : DUA PULUH DELAPAN JUTA DELAPAN RATUS DELAPAN PULUH LIMA RIBU RUPIAH
Terbilang : #REF!
Untuk Keperluan : Pembayaran Bahan Dan Alat Lokal
1 . #REF! 60 M3 #REF! .
2 . #REF! 36 M3 #REF! .
3 . #REF! 18 M3 #REF! .
4 . #REF! 4,300 Bh #REF! .
5 . #REF! 105 M3 #REF! .
6 . #REF! 4 Tanki Rp 560,000 .
. .
. .
. .
. .
.
.
Sub Total #REF! Sub Total
Total #REF!

Kalembu Kaha, 02 Ok
Setuju dibayar Lunas dibayar Yang Menerim
Ketua TPK Bedahara TPK
Desa Kalembu Kaha Desa Kalembu Kaha

Materai 600

LORENSIUS UMBU DIMA MARGARETHA RA BOTA (

Mengetahui
KEPALA DESA KALEMBU KAHA

(MARTINUS M. GHELLO)
PROGRAM NASIONAL PEMBERDAYAAN MASYARAKAT MANDIRI PERDESAAN
UNIT PENGELOLA KEGIATAN ( UPK )
KECAMATAN KODI UTARA
NOMOR :.

Telah Terima Dari : Tim Pengelola Kegiatan ( TPK ) Desa Kalembu Kaha
Uang Sebesar : SEBELAS JUTA EMPAT RATUS RIBU RUPIAH
Terbilang : Rp 11,400,000
Untuk Keperluan : Pembayaran Mebeler
Kusen Pintu (1 x 2.5 M) + Jelusi/
1 . Kayu KLS I Jati Lokal 3 Unit Rp 1,050,000 .
2 . Kusen Pintu WC (0.7 x 2 M) 2 Unit Rp 500,000 .

Kusen Jendela 3 Lubang + Jeluasi


3 . (198 x 166)/ Kayu KLS I Jati Lokal 3 Unit Rp 2,550,000 .

Kusen Jendela 2 Lubang + Jelusi


4 . (144 x 166)/ Kayu KLS I Jati Lokal 6 Unit Rp 4,500,000 .
Boven 3 Lubang (50 x 198) +
5 . Jelusi/ Kayu KLS I Jati Lokal 6 Unit Rp 1,500,000 .
Boven 1 Lubang (50 x 72) + Jelusi/
6 . Kayu KLS I Jati Lokal 2 Unit Rp 500,000 .
Boven Gewel (60 x 100) + Jelusi/
7 . Kayu KLS I Jati Lokal 4 Unit Rp 800,000 .
.
.
.

.
Sub Total Rp 11,400,000 Sub Total
Total Rp 11,400,000

Kalembu Kaha, 02 Ok
Setuju dibayar Lunas dibayar Yang Menerim
Ketua TPK Bedahara TPK
Desa Kalembu Kaha Desa Kalembu Kaha

Materai 600

LORENSIUS UMBU DIMA MARGARETHA RA BOTA (

Mengetahui
KEPALA DESA KALEMBU KAHA

(MARTINUS M. GHELLO)
ERDAYAAN MASYARAKAT MANDIRI PERDESAAN
NGELOLA KEGIATAN ( UPK )
CAMATAN KODI UTARA
.

kal
10 Kg Rp 225,000

1 Btg Rp 150,000

2 Btg Rp 260,000

2 Btg Rp 120,000

8 Kg Rp 100,000

311 Zak Rp 23,947,000

30 M Rp 480,000

30 M #REF!

1 Bh Rp 250,000

10 Bh Rp 300,000

8 Bh Rp 480,000

3 Pis Rp 22,500

25 M #REF!

6 Bh Rp 30,000

1 Bh Rp 60,000

2 Bh Rp 30,000

4 Bh Rp 50,000

4M #REF!

#REF!

Kalembu Kaha, 02 Oktober 2012


Yang Menerima
Direktur
..

Mengetahui
ALA DESA KALEMBU KAHA

MARTINUS M. GHELLO)
ERDAYAAN MASYARAKAT MANDIRI PERDESAAN
NGELOLA KEGIATAN ( UPK )
CAMATAN KODI UTARA
.

okal

Rp -

Kalembu Kaha, 02 Oktober 2012


Yang Menerima

Materai 6000

( )

Mengetahui
ALA DESA KALEMBU KAHA

MARTINUS M. GHELLO)
ERDAYAAN MASYARAKAT MANDIRI PERDESAAN
NGELOLA KEGIATAN ( UPK )
CAMATAN KODI UTARA
.

Rp -

Kalembu Kaha, 02 Oktober 2012


Yang Menerima

Materai 6000

( )

Mengetahui
ALA DESA KALEMBU KAHA

MARTINUS M. GHELLO)
PROGRAM NASIONAL PEMBERDAYAAN MASYARAKAT MANDIRI PERDESAAN
UNIT PENGELOLA KEGIATAN ( UPK )
KECAMATAN KODI UTARA
NOMOR :.
Telah Terima Dari : Tim Pengelola Kegiatan ( TPK ) Desa Kalembu Kaha
Uang Sebesar : Lima Puluh Tiga Juta Dua Ratus Empat Puluh Lima Ribu Rupiah
Terbilang : #REF!
Untuk Keperluan : Pembayaran Bahan Dan Alat Non Lokal
1 . #REF! 50 Lonjor Rp 4,350,000

2 . #REF! 86 Lonjor Rp 516,000

3 . #REF! 60 Kg Rp 1,320,000

4 . #REF! 40 Kg Rp 600,000

5 . #REF! 200 Kg #REF!

6 . #REF! 2 Bh Rp 600,000

7 . #REF! 224 Dos Rp 12,544,000

8 . #REF! 3 Lembar Rp 300,000

9 . #REF! 2 Bh Rp 320,000

10 . #REF! 80 Kg Rp 800,000

11 . #REF! 137 Zak Rp 10,549,000

12 . #REF! 264 Lembar Rp 10,560,000

13 #REF! 102 Lembar Rp 7,650,000

14 #REF! 8 Bh Rp 136,000

.
Sub Total #REF! Sub Total
Total #REF!

Kalembu Kaha, 06 Des


Setuju dibayar Lunas dibayar Yang Menerim
Ketua TPK Bedahara TPK Direktur
Desa Kalembu Kaha Desa Kalembu Kaha

LORENSIUS UMBU DIMA MARGARETHA RA BOTA

Mengetahui
KEPALA DESA KALEMBU KAHA
(MARTINUS M. GHELLO)
PROGRAM NASIONAL PEMBERDAYAAN MASYARAKAT MANDIRI PERDESAAN
UNIT PENGELOLA KEGIATAN ( UPK )
KECAMATAN KODI UTARA
NOMOR :.

Telah Terima Dari : Tim Pengelola Kegiatan ( TPK ) Desa Kalembu Kaha
Uang Sebesar : Sembilan Juta Tujuh Ratus Sembilan Puluh Dua Ribu Rupiah
Terbilang : #REF!
Untuk Keperluan : Pembayaran Bahan Dan Alat Lokal
1 . #REF! 30 M3 #REF! .
2 . #REF! 2,756 M3 #REF! .
3 . #REF! 7 Tanki Rp 980,000 .
.
.
.
Sub Total #REF! Sub Total
Total #REF!

Kalembu Kaha, 06 Des


Setuju dibayar Lunas dibayar Yang Menerim
Ketua TPK Bedahara TPK
Desa Kalembu Kaha Desa Kalembu Kaha

Materai 600

LORENSIUS UMBU DIMA MARGARETHA RA BOTA (

Mengetahui
KEPALA DESA KALEMBU KAHA

(MARTINUS M. GHELLO)
PROGRAM NASIONAL PEMBERDAYAAN MASYARAKAT MANDIRI PERDESAAN
UNIT PENGELOLA KEGIATAN ( UPK )
KECAMATAN KODI UTARA
NOMOR :.

Telah Terima Dari : Tim Pengelola Kegiatan ( TPK ) Desa Kalembu Kaha
Uang Sebesar : SEBELAS JUTA EMPAT RATUS RIBU RUPIAH
Terbilang : Rp 11,400,000
Untuk Keperluan : Pembayaran Mebeler
Kusen Pintu (1 x 2.5 M) + Jelusi/
1 . Kayu KLS I Jati Lokal 3 Unit Rp 1,050,000 .
2 . Kusen Pintu WC (0.7 x 2 M) 2 Unit Rp 500,000 .

Kusen Jendela 3 Lubang + Jeluasi


3 . (198 x 166)/ Kayu KLS I Jati Lokal 3 Unit Rp 2,550,000 .

Kusen Jendela 2 Lubang + Jelusi


4 . (144 x 166)/ Kayu KLS I Jati Lokal 6 Unit Rp 4,500,000 .
Boven 3 Lubang (50 x 198) +
5 . Jelusi/ Kayu KLS I Jati Lokal 6 Unit Rp 1,500,000 .
Boven 1 Lubang (50 x 72) + Jelusi/
6 . Kayu KLS I Jati Lokal 2 Unit Rp 500,000 .
Boven Gewel (60 x 100) + Jelusi/
7 . Kayu KLS I Jati Lokal 4 Unit Rp 800,000 .
.
.
.

.
Sub Total Rp 11,400,000 Sub Total
Total Rp 11,400,000

Kalembu Kaha, 06 Des


Setuju dibayar Lunas dibayar Yang Menerim
Ketua TPK Bedahara TPK
Desa Kalembu Kaha Desa Kalembu Kaha

Materai 600

LORENSIUS UMBU DIMA MARGARETHA RA BOTA (

Mengetahui
KEPALA DESA KALEMBU KAHA

(MARTINUS M. GHELLO)
ERDAYAAN MASYARAKAT MANDIRI PERDESAAN
NGELOLA KEGIATAN ( UPK )
CAMATAN KODI UTARA
.

kal

Rp -

Kalembu Kaha, 06 Desember 2012


Yang Menerima
Direktur

..

Mengetahui
ALA DESA KALEMBU KAHA
MARTINUS M. GHELLO)
ERDAYAAN MASYARAKAT MANDIRI PERDESAAN
NGELOLA KEGIATAN ( UPK )
CAMATAN KODI UTARA
.

okal

Rp -

Kalembu Kaha, 06 Desember 2012


Yang Menerima

Materai 6000

( )

Mengetahui
ALA DESA KALEMBU KAHA

MARTINUS M. GHELLO)
ERDAYAAN MASYARAKAT MANDIRI PERDESAAN
NGELOLA KEGIATAN ( UPK )
CAMATAN KODI UTARA
.

Rp -

Kalembu Kaha, 06 Desember 2012


Yang Menerima

Materai 6000

( )

Mengetahui
ALA DESA KALEMBU KAHA

MARTINUS M. GHELLO)
PROGRAM NASIONAL PEMBERDAYAAN MASYARAKAT MANDIRI P
SERTIFIKASI PENERIMAAN PEKERJAAN

Pekerjaan yang dapat diterima TAHAP

Item Pekerjaan VOLUME

Kalembu Kaha,

KETUA TPK FASILITATOR


DESA KALEMBU KAHA

LORENSIUS UMBU DIMA WALTER


FK
ONAL PEMBERDAYAAN MASYARAKAT MANDIRI PERDESAAN
ERTIFIKASI PENERIMAAN PEKERJAAN

: .

Keterangan

Kalembu Kaha, ..2013

FASILITATOR KECAMATAN

WALTERIUS MEKA
FK-T
PROGRAM NASIONAL PEMBERDAYAAN MASYARAKAT MANDIRI PERDESAAN
TIM PENGELOLA KEGIATAN (TPK)
DESA WAIMARINGI

NOMOR :.

Telah Terima Dari : Tim Pengelola Kegiatan ( TPK ) Desa Waimaringi

Uang Sebesar : Empat Puluh Enam Juta Sembilan Ratus Sembilan Puluh Satu Ribu Lima Ratus Rupia

Terbilang : #REF!

Untuk Keperluan : Pembayaran Bahan dan Alat Non Lokal

I . BAHAN 17 . #REF!
1 . #REF! #REF! #REF! #REF!
II ALAT
2 . #REF! #REF! #REF! #REF! 1 . #REF!

3 . #REF! #REF! #REF! #REF! 2 . #REF!

4 . #REF! #REF! #REF! #REF!

5 . #REF! #REF! #REF! #REF!

6 . #REF! #REF! #REF! #REF!

7 . #REF! #REF! #REF! #REF!

8 . #REF! #REF! #REF! #REF!

9 . #REF! #REF! #REF! #REF!

10 . #REF! #REF! #REF! #REF!

11 . #REF! #REF! #REF! #REF!

12 . #REF! #REF! #REF! #REF!

13 . #REF! #REF! #REF! #REF!

14 . #REF! #REF! #REF! #REF!

15 . #REF! #REF! #REF! #REF!

16 . #REF! #REF! #REF! #REF!

Sub Total #REF! Sub Total

Total #REF!

Waimaringi, 22 No
Setuju dibayar Lunas dibayar Yang Mener
Ketua TPK Bedahara TPK Direktur CV.
Desa Waimaringi Desa Waimaringi
Materai
6000

Mengetahui
Kepala Desa Waimaringi

..
PROGRAM NASIONAL PEMBERDAYAAN MASYARAKAT MANDIRI PERDESAAN
TIM PENGELOLA KEGIATAN (TPK)
DESA WAIMARINGI

NOMOR :.

Telah Terima Dari : Tim Pengelola Kegiatan ( TPK ) Desa Waimaringi

Uang Sebesar : Sebelas Juta Rupiah

Terbilang : #REF!
Untuk Keperluan : Pembayaran Bahan Lokal
I . BAHAN
1 . #REF! #REF! #REF! #REF!

2 . #REF! #REF! #REF! #REF!

Sub Total #REF! Sub Total


Total #REF!

Waimaringi, 22 No
Setuju dibayar Lunas dibayar Yang Mener
Ketua TPK Bedahara TPK Direktur CV.
Desa Waimaringi Desa Waimaringi
Materai
6000

. .

Mengetahui
Kepala Desa Waimaringi

..
PROGRAM NASIONAL PEMBERDAYAAN MASYARAKAT MANDIRI PERDESAAN
DESA WAIMARINGI
DESA WAIMARINGI

NOMOR :.

Telah Terima Dari : Tim Pengelola Kegiatan ( TPK ) Desa Waimaringi

Uang Sebesar : Lima Juta Delapan Ratus Lima Puluh Ribu Rupiah

Terbilang : #REF!
Untuk Keperluan : Pembayaran Mebeler

1 . #REF! #REF! #REF! #REF!

2 . #REF! #REF! #REF! #REF!

3 . #REF! #REF! #REF! #REF!

4 . #REF! #REF! #REF! #REF!

5 . #REF! #REF! #REF! #REF!

6 . #REF! #REF! #REF! #REF!

Sub Total #REF! Sub Total


Total #REF!

Waimaringi, 22 No
Setuju dibayar Lunas dibayar Yang Mener

Ketua TPK Bedahara TPK Direktur CV.


Desa Waimaringi Desa Waimaringi
Materai
6000

. .
Mengetahui
Kepala Desa Waimaringi

..
RDAYAAN MASYARAKAT MANDIRI PERDESAAN
NGELOLA KEGIATAN (TPK)
DESA WAIMARINGI

n Ratus Sembilan Puluh Satu Ribu Lima Ratus Rupiah

### #REF! #REF!

### #REF! #REF!

### #REF! #REF!

#REF!

#REF!

Waimaringi, 22 November 2013


Yang Menerima
Direktur CV.

Mengetahui
pala Desa Waimaringi

..
RDAYAAN MASYARAKAT MANDIRI PERDESAAN
NGELOLA KEGIATAN (TPK)
DESA WAIMARINGI

Rp -

Waimaringi, 22 November 2013


Yang Menerima
Direktur CV.

Mengetahui
pala Desa Waimaringi

..
RDAYAAN MASYARAKAT MANDIRI PERDESAAN
DESA WAIMARINGI
DESA WAIMARINGI

uluh Ribu Rupiah

Rp -

Waimaringi, 22 November 2013


Yang Menerima

Direktur CV.

.
Mengetahui
pala Desa Waimaringi

..
PROGRAM NASIONAL PEMBERDAYAAN MASYARAKAT- MANDIRI PERDESAAN
KECAMATAN KODI BALAGHAR
KUITANSI ( KW-2 )

NOMOR : / KK-BLM PNPM MPd

Telah Terima Dari : UNIT PENGELOLA KEGIATAN (UPK) KECAMATAN KODI BALAGHAR

Uang Sebesar : Tujuh Puluh Juta Delapan Ratus Tiga Puluh Enam Ribu Lima Ratus Rupiah

Terbilang : #REF!

Untuk keprluan : Pembayaran Biaya


A. BAHAN #REF!
B. ALAT #REF!
C. HOK #REF!
D. BELANJA TPK #REF!
E. OPS 2% #REF!
F. OPS 3% #REF!

Untuk Kegiatan : Pembangunan RKB SD Paralel Kapapa Hari

Atas Nama : TPK Desa Waimaringi

Waiha, 22 November 2013


Yang Memberi Yang Menerima
Ketua UPK TPK Desa Waimaringi

YUSUP ANA LETE ANDREAS TARU

MENYETUJUI
FASILITATOR KECAMATAN
WALTERIUS MEKA YOHANES K. NIRON
FK-T FK-P
PROGRAM NASIONAL PEMBERDAYAAN MASYARAKAT- MANDIRI PERDESAAN
KECAMATAN KODI BALAGHAR
UNIT PENGELOLA KEGIATAN (UPK)

NOMOR : / KK-BLM PNPM MPd

Telah Terima Dari : UNIT PENGELOLA KEGIATAN (UPK) KECAMATAN KODI BALAGHAR

Uang Sebesar : Satu Juta Tujuh Ratus Lima Puluh Ribu Rupiah

Terbilang : #REF!

Untuk Pembayaran : Biaya OPS 3 % TPK Desa Waimaringi

Waiha, 22 November 2013


Disetuju Yang Menerima Yang Membayar
Ketua TPK Bendahara TPK Bendahara UPK
Desa Waimaringi Desa Waimaringi Kec. Kodi Balaghar

ANDREAS TARU YOHANIS METE MARLINA ROSDIANA HEO

MENYETUJUI
FASILITATOR KECAMATAN

WALTERIUS MEKA YOHANES K. NIRON


FK-T FK-P
PROGRAM NASIONAL PEMBERDAYAAN MASYARAKAT- MANDIRI PERDESAAN
KECAMATAN KODI BALAGHAR
DESA WAIMARINGI

NOMOR : ..

Telah Terima Dari : TIM PENGELOLA KEGIATAN (TPK) DESA WAIMARINGI

Uang Sebesar : Satu Juta Lima Ratus Ribu Rupiah

Terbilang : #REF!

Untuk Pembayaran : Biaya OPS 2 % UPK

Waimaringi, 22 November 2013


Diketahui Lunas Dibayar Yang Menerima
Ketua TPK Bendahara TPK Bendahara UPK
Desa Waimaringi Desa Waimaringi Kec. Kodi Balaghar

ANDREAS TARU YOHANIS METE MARLINA ROSDIANA HEO

MENGETAHUI
KEPALA DESA WAIMARINGI


KWITANSI PENYERAHAN JAMINAN

Telah Terima Dari : CV. .

Uang Sebesar : Dua Belas Juta Empat Ratus Ribu Rupiah

Terbilang : Rp 12,400,000

Untuk Pembayaran : Jaminan Pengadaan Bahan dan Alat (5%) Desa Waimaringi

Panenggo Ede, 02 Agustus 2013


Yang Memberi Yang Menerima
A.N. CV. . Bendahara UPK

MARLINA ROSDIANA HEO

MENYETUJUI
FASILITATOR KECAMATAN

WALTERIUS MEKA BENYAMIN B. U. L. KAMURI


FK-T FK-P
JADWAL PELAKSANAAN PEKERJAAN

Desa : WAIMARINGI Target Volume Kegiatan : 1 (Sat


Kecamatan : KODI BALAGHAR Total waktu penyelesaian : 90 Ha
Kabupaten : SUMBA BARAT DAYA

M Kebu TAHUN 20
Kebut
Targe ATarget biaya (Rp) uhan
tuha Bulan Juli
Bulan Agu
sat N Bobot n
No Uraian Kegiatan t tenag
uan D JUMLAH (%) a kerja wakt
volu TUKANG PEKERJA 1 2 3 4 1 2
O HOK u
me (orang
R (hari)
)
I PERSIAPAN /
- pengukuran,
1 psg patok 306 M2

2 Galian 37 M3### ### ### 1.83

3 Pas. Pondasi 31 M3### ### ### ### 7.22

4 Timbunan Pondasi
Pengecoran Sloof 97 M3### 840,000 840,000 1.47
+ Kolom + Ring
5 Balk 7 M3### ### 540,000 700,000 1.22

6 Pek. Pasangan Tem 246 M2### ### ### ### ###


Pek. Kab & Kuda-
7 kuda + Gording 6 Unit
### ### 960,000 ### 8.51

8 Pek. List Plank 75 M ### ### 420,000 ### 2.20

9 Pek. Atap seng Ge 310 M2### - - - -

10 Pek. Plester & Acian 516 M2### ### ### ### ###

11 Pek. Lantai Rabat 15 M3### ### ### ### 3.51

12 Pek. Plafond & Gan 263 M2### ### ### ### 8.80
Pek. Pasang
13 Keramik 216 M3### ### ### ### ###

14 Cat Plafond 263 M2### ### 150,000 710,000 1.24

15 Pek.
Cat Tembok
Gantung 516 M2
### ### 870,000 ### 7.87
Daun Pintu &
16 Jendela 1 Ls### ### 450,000 ### 2.81
Cat Kayu (Kusen &
17 List Plank) 1 Ls### ### 90,000 250,000 0.44

18 Pek. WC 1 Unit
### ### ### ### 7.42

19 Pek. PAH 1 Unit ### 240,000 440,000 0.77

IV PEMBERSIHAN 1 Ls Swadaya - -
### 32,477,000 24,843,000 ### 100
Diperiksa oleh Dibuat oleh
FT/FK TPK
1.WALTERIUS MEKA : FK-T
1.

2. : FK-P
2.

3.

KPMD-T
1.
CATATAN:
JADWAL DI ATAS ADALAH CONTOH UNTUK ACUAN KERJA DI LAPANGAN, MERUPAKAN DETAIL DAR
Apabila Pelaksanaan Kegiatan tidak sesuai dengan Jadwal yang telah dibuat maka dikenakan Sa
: 1 (Satu) Unit
: 90 Hari Kalender

Keter
Dibuat unt pelaksanaan
TAHUN 2012 anga
Bulan Sept. n
Bulan Agusts

3 4 1 2 3 4

1,090,000.00 40,000 -

4,140,000.00 - -

840,000.00 - 392,200 ###

700,000.00 - ###

7,880,000.00 - #REF!

4,880,000.00 - #REF!

1,260,000.00 - -

2,450,000.00 2,450,000 -

11,520,000.00 - -

2,010,000.00 - ###

5,045,040.00 40 -

6,220,000.00 -

710,000.00 -

4,510,000.00 -

1,610,000.00 -

250,000.00 -

4,254,854.96 (145)

440,000.00 - 392,200

392,200

: Ketua

: Sekertari

: Bendaha.

KPMD-T
N DETAIL DARI JADWAL YANG ADA DI LAMPIRAN SPPB
dikenakan Sanksi sesuai kesepakatan MAD (Sanksi Lokal)
0
SURVEI HARGA BAHAN DAN ALAT

Propinsi : Nusa Tenggara Timur No. RAB


Kabupaten : Sumba Barat Daya Program
Kecamatan : Kodi Balaghar Jenis Kegiatan
Desa : Waiha Ukuran / Dimensi

No Uraian Bahan / Alat Satuan

I. Bahan
1 Air kerja ( Tangki 5000 Ltr ) Liter
2 Amplas Lembar
3 Besi Beton 12 mm Asli (SNI) Staf / lonjor
4 Besi Beton 10 mm Asli (SNI) Staf / lonjor
5 Besi Beton 6 mm Asli (SNI) Staf / lonjor
6 Baut 15 & 25 Bh
7 Beugel U plat Bh
8 Beugel U bulat Bh
9 Besi Strip Bh
10 Cat Seng Biru Muda Merk Boyo Kg
11 Cat Plafon (Oker Putih) Kg
12 Cat Tembok (Matex Warna) 20 Kg Kg

13 Cat Kayu (Cokelat) Kg


14 Dumpul Kayu Kg
15 Engsel + skrup Psg
16 Grendel + skrup Buah
17 Kawat ikat Kg
18 Keramik 30 x 30 M2
19 Keramik 20 x 20 M2
20 Kait Angin 8" (Kotak) Buah
21 Kaca Polos 5 MM (110 x 60 cm) Lembar
22 Kaca Reben 5 MM Lembar
23 Kaca Polos 3 MM Lembar
24 Kaca Reben 3 MM Lembar
25 Kunci Tanam (Odesta) Bh
26 L bok paralo 4 " Buah
27 Kloset jongkok Buah
28 L Bok Paralon 2" Bh
29 Meni kayu Kg
30 Minyak cat Kg
31 Paku 7 - 10 cm Kg
32 Paku seng Kg
33 Paku tripleks Kg
37 Paku putih 15 & 20 cm Kg
38 Plamur Kg
39 Pipa udara T Buah
40 Pipa Paralon ( 4 " ) Batang
41 Pipa Paralon 2" Btg
42 Semen warna Kg
43 Stop Kran " Bh
44 Semen Tonasa/ Gresik 50 Kg Zak
45 Seng Gelombang BJLS 0.20 (Warna) Lembar
46 Seng licin M'
47 List Papan Profile M
48 Tripleks 3 mm Lembar
49 Triplex 4 mm Lembar
50 Take Wood Lembar
51 Talang Air (4m) Btg
II.Alat
1 Terpal Lembar
2 Ember Cor (Ban) Buah
3 Sekop Cap Mata Buah
4 Linggis Buah
5 Benang nilon Pis/kpl
6 Selang waterpas M'
7 Kuas cat Buah
8 Kuas rol Buah
9 Gergaji Besi Buah
10 Anak Gergaji Buah
11 Kunci besi ( kunci 10 dan kunci 6 ) Buah
12 Kawat ayak M'

III. BAHAN LOKAL .,.2011

1 Pasir Pasang M3
2 Batu Karang M3
3 Batu Pecah M3
4 Kayu 6/12 Kls II M3
5 Kayu 8/12Kls II M3
6 Balok Kelapa M3
7 Kayu Kls I 6/12 Jati Lokal M3
8 Usuk 5/7 Kls II Mahoni/ Jati Putih M3
9 Usuk 5/7 (Kelapa) M3
10 Papan Kls II M3
11 Batako Bh
12 Batu Potong Bh
13 Sirtu Gunung M3
14 Air Kerja Liter

SURVEI HARGA BAHAN DAN ALAT


III. Meubeler
1 Meja Siswa (Papan Kls II) Bh
2 Kursi Siswa (Papan Kls II) Bh
3 Lemari 2 Pintu (180 x 140) Bh
4 Meja 1/2 Biro Bh
5 Kursi Guru (Spon) Bh
9 Papan Tulis Bh
6 Daun Pintu Paniel Papan Kls I Bh
7 Daun Pintu Paniel Triplex Lapis Seng Dalam Bh
8 Daun Jendela Paniel Kaca 5 MM Bh 0
III. Tenaga Kerja
1 Pekerja HOK
2 Tukang HOK
SURVEI HARGA BAHAN DAN ALAT

: 1 s/d 20
: PNPM - MP TA. 2011
: Pemb. Gedung SD
: 24 X 7 M2

Harga Satuan

50
5,000
105,000
95,000
42,500
8,000
18,000
18,000
7,500
15,000
17,500
17,500

50,000
25,000
15,000
10,000
25,000
65,000
65,000
15,000
142,000
-
-
-
150,000
22,000
170,000
15,000
25,000
30,000
21,000
25,000
25,000
25,000
15,000
175,000
149,000
96,000
10,000
37,000
82,500
65,000
20,000
7,500
59,000
75,000
-
120,000

350,000
15,000
80,000
80,000
10,000
3,500
10,000
17,500
50,000
16,000
15,000
30,000

.,.2011

120,000
75,000
225,000
2,200,000
2,200,000
1,600,000
2,500,000
2,200,000
1,660,000
2,200,000
3,000
2,000
65,000
50

SURVEI HARGA BAHAN DAN ALAT

300,000
200,000
1,100,000
800,000
250,000
550,000
1,250,000
750,000
350,000
25,000
35,000
PNPM - Mandiri Perdesaan

TAKE OF SHEET
Propinsi : Nusa Tenggara Timur
Kabupaten : Sumba Barat Daya
Kecamatan : Kodi Balaghar

Janis Kegiatan DIMENSI Volume Analisa kebutuhan baha,Ala


Gambar Skedsa L1 L2 L T1 T2 P Pekerjaan Sat dan Tenaga
Bahan,alat
No M M M M M M dan Tenaga Koef
1 2 3 4 5 6 7 8 9 10 11
1 PEMBERSIHAN LOKASI 12.00 30 360.00 M2 Pekerja 0.06

2 PENGUKURAN DAN BOWPLANK


3 GALIAN TANAH POND
0.55
a.Pondasi Utama 0.50 1 0.85 97.4 82.79 Pekerja 0.4
b. Pondasi Teras 0.45 0.4 34.2 6.16
0.70 0.55 88.946
4 URUGAN TANAH POND 29.65 Pekerja 0.192
Tanah Urug 1.25
5 PAS.BATU KOSONG
a. Pas batu Kosong Pond.Utama 1 0.2 97.4 19.48 M3 Pekerja 0.78
b. Pas batu Kosong Pond.Teras 0.4 0.2 34.2 2.74 M3 Batu 15/20 1.3
22.22 M3

0.15 0.15

0.70
0.55

6 URUGAN PASIR
a. Pondasi Utama 1 0.06 97.4 5.84 M3 Pekerja 0.3
b. Pondasi Teras 0.05 0.4 0.06 34.2 0.82 M3 Pasir Urug 1.2
0.70 6.66 M3
0.05
0.55
7 Pas Batu 1: 4
a. Pondasi Utama II 0.525 1 97.4 51.14 Pekerja 1.5
Tukang 0.6
Batu 15/20 1.3
b. Pondasi Teras Pasir Pasang 0.544
0.35 0.75 34.2 8.98 Semen 3.04
60.11 Air Kerja 100
8 Beton 1:2:3

a. Sloof 0.15 0.2 97.4 2.92 Pekerja 2.00


b. Ringbalk 0.15 0.15 97.4 2.19 Tukang 0.385
Mandor 1
c. Kolom 0.2 0.2 78.2 3.13 Pasir 0.52
d. Tembok Gunung 0.15 0.15 39 0.88 Kerikil 0.81
Semen 6.72
358.8 Besi 10 mm
9.12 Besi 6 mm
0.20 0.15 0.15
Kunci Besi
Kawat ikat 3
Papan Cor
0.20 0.15 0.15 Usuk Kls III
Beugel Kolom : Beugel Ring Balk : Beugel Sloof :
P : 0.94 m/ Bh P : 0.74 m/ Bh P : 0.74 m/ Bh Paku 7 - 10 cm 1.5
jmlh : 423Bh jmlh : 410Bh jmlh : 410Bh
Air Kerja 100
9 Kosen Pintu,Jendela dan Boven 0.12 0.08 209.4 2.01 Pekerja 6.3
Tukang 22
Kayu 6/12 1.2
Papan 2/20
Paku 7 - 10 cm
28 P1
63 J2 Kunci Tanam 2x Slaag
50.32 J3 Engsel Pintu
47.68 BV3 Engsel Jendela
8.64 BV2 Grendel Jendela
Kait Angin
11.76 V Ampals
6 bh 209.4
3 bh

3 bh

6 bh 2 bh
6 bh 2 bh
0.65
0.06
P = 10.8
0.80 L = 5.16
0.51
0.06 BH 4
2.15
0.50
0.06
BH 3
0.06
1.20 54.97

Pintu dan jendela Bh 36 1.00


a. Pintu Panel Papan 0.60
d. Jendela Panel Kaca Reben 3 mm
11 Dinding
a. Pas. Bataco 1:5 Tembok Pekerja 0.33
1.Luas Kosen P/J dan Boven 50.23 M2 Tukang 0.38
2.Luas Tembok Tanpan Kosen 3.4 97.4 331.16 M2 Batu Potong 27
Luas tembok = 2 - 1 + Pas batu Tembok Gunung 280.93 M2 Pasir Pasang 0.045
b. Pas.Bataco 1: 5 Gunungan 33.25 M2 Semen 0.242
314.18 M2
b. Plesteran dan acian 653.36 M2 Pekerja 0.215
M3 Tukang 0.28
Pasir Pasang 0.025
1.83 Semen 0.195
3.4
Kawat Ayak 0.02
Air Kerja 25

12 Atap
a. Kuda-kuda 0.12 0.08 293.9 2.82 Pekerja 4.2
Tukang 13
Balok 8/12 kls II 1.1
Beugel U Bulat
Beugel U Plat
Baut dan mur
Paku Putih
Besi Strip

b. Gording 0.12 0.06 594 4.28 M3 Pekerja 4.4


kloss 0.12 0.06 43.2 0.31 Tukang 13.2
4.59 Kayu 6/12 1.1
Paku 0.8
c. Atap Seng 11.12 32.9 365.848 M2 Pekerja 0.12
Tukang 0.07
Seng BJLS 0.20 0.75
Paku seng 0.02

d. Bubungan 26 M Pekerja 0.12


Tukang 0.066
Seng plat 40 cm 1.1
Paku seng 0.02

f. Listplank 1 1 88.04 176.08 `M Pekerja 0.16


Tukang 0.242
Papan 3/25 0.011
Paku 0.06
Pekerjaan Lantai
a. Ugan Tanah
1. Ugan Tanah 8.5 0.45 31 118.575 M3 Pekerja 0.192
Sirtu 1.2
118.575 M3

b. Urugan Pasir 8.5 0.06 31 15.81 M3 Pekerja 0.3


Pasir Urug 1.2
15.81 M3
c. Rabat 5 cm camp 1:3:5 I 8.5 0.12 31 31.62 M3 Pekerja 1.73
Tukang 0.275
31.62 M3 Kerikil 0.87
Pasir pasang 0.52
Semen 3.2
Air Kerja 350
d. Pasangan lantai keramik 263.5 M2 Semen 0.19
Pasir pasang 0.046
Keramik 30 x 30 1.05
Semen Warna 0.04
Pekerja 0.462
Tukang 0.242

Plafon 7.0 31 217 M2 Pekerja 0.2


0.6
1.20 1.5 31 46.5 M2 Tukang 0.3
1.20
1.0 31 31 M2 Tripleks 4 mm 0.36
11.12 2 22.24 M2 Kayu 5/7 0.015
TOTAL LUAS PLAFOND 316.74 M2 Paku 5 - 7 CM 0.12
Paku Triplex 0.03
272.48 M2 List Papan Profile 1.1
Pengecatan
a. Pengecatan Tembok 653.36 M2 Pekerja 0.045
Tukang 0.1386
Cat tembok (Matex Warna) 0.4
Plamir 0.15
Amplas 0.2

b. Pengecatan Seng 0.0 M2 Pekerja 0.0725


Tukang 0.096
Cat seng Biru Muda (Merk Ped 0.35
Minyak cat 0

c. Pengecatan Kayu 41.9 M2 Pekerja 0.075


Tukang 0.096
Meni Kayu 0.2
Dumpul kayu 0.15
Cat Kayu 0.35
Minyak cat 0.05
Amplas 0.2

d. Pengecatan Plafon 217 M2 Pekerja 0.0225


Tukang 0.06633
Cat Plafon (Oker Putih) 0.2
SALURAN
a. Pas. Bataco 1:6 Pekerja 1
0.4 87 34.80 M2 Tukang 0.5
- M2 Batu Potong 27
- M2 Pasir Pasang 0.038
34.80 M2 Semen 0.196
M2
b. Plesteran dan acian 0.75 87 65.25 M2 Pekerja 0.8
Tukang 0.4
Pasir Pasang 0.038
Semen 0.196
Kawat Ayak 0.02
Air Kerja 10
c. Rabat 5 cm camp 1:3:5 I 0.25 0.05 87 1.0875 M3 Pekerja 2.5
Tukang 2
1.0875 Kerikil 0.91
Pasir pasang 0.54
Semen 5.675
Batu 5/7 1.3
Air Kerja 300
Talang Air 33

PAH Pekerja 1.2


a.Pondasi 1 : 4 Tukang 0.9
0.3 0.4 0.12 16 1.92 M2 Batu 15/20 1.3
- M2 Pasir Pasang 0.544
- M2 Semen 2.7
1.92 M2 Air Kerja 100
Sirtu 1.3

a. Pas. Bataco 1:6 Pekerja 1


8 1.55 12.40 M2 Tukang 0.5
- M2 Batu Potong 27
- M2 Pasir Pasang 0.038
12.40 M2 Semen 0.196
M2

b. Plesteran dan acian 24.80 M2 Pekerja 0.8


Tukang 0.4
Pasir Pasang 0.038
Semen 0.196
Kawat Ayak 0.02
Air Kerja 10

c. Rabat 10 cm camp 1:3:5 I 2 0.12 2 0.48 M3 Pekerja 2.5


Tukang 2
0.96 Kerikil 0.91
Pasir pasang 0.54
Semen 5.675
Air Kerja 300

d. Beton Tulangan Camp 1 : 2 : 3 0.2 0.2 22.8 0.4 1.312 M3 Pekerja 2.5
Sloof + Kolom 93.9 Tukang 2
Plat Penutup 25.3 55.7 Kerikil 0.91
Besi 10 mm 150 12 12.47 Pasir pasang 0.54
Beugel 152 0.75 125 12 10.45 Semen 5.8
Air Kerja 300
Besi 10 mm
Besi 6 mm
Kawat Ikat 3
Mebeler 1 Pkt
Meja 1/2 Biro
Lemari
0.40 0.60
Meja murid
laci terbuka Kursi Murid
0.80
0.40 Kursi Guru
Papan Tulis
laci 3
1.40

0.80 0.40
MEJA 1/2 BIRO
0.20
0.4 1.10
1.20 5
0.1
LEMARI BUKU 8
0.50
0.3 0.2
5 5 0.70
0.3
4

0.1
0
MEJA MURID

0.40
KURSI MURID
INSTALASI LISTRIK 1. Stop Kontak
2. Saklar Seri
3. Viting Lampu Tempel
4. Lampu Philips 20 Watt
5. Kabel listrik ( 1 Roll - 40 m )
6. Isolasi
7. Pipa PVC 1/4 "
8. Embol Dos
TOTAL HOK + 9. Paku Kabel
- 10. Saklar Tunggal
11. Sekering Group
AKE OF SHEET

Analisa kebutuhan baha,Alat


dan Tenaga

Volume Sat
12 13
22 Hok

36 Hok

6 Hok
37

17 Hok
29 M3

2 Hok
8 M3
90 Hok
36 Hok
80 M3
30 M3
180 Sak
6,010 Liter
18 Hok
- Hok
10 Hok
- M3
10 M3
60 Sak
128 Btg
80 Btg
4 Bh
27 Kg
2 M3
0 M3
14 Kg
912 Liter
13 Hok
44 Hok
2 M3
1 M3
4 Kg

- Bh
12 Bh
36 Bh
18 Bh
36 Psng
30 Lbr
3 Bh
36 Bh

104 Hok
120 Hok
8,480 Bh
10 M3
80 Sak

140 Hok
180 Hok
20 M3
130 Sak
10 M
16,330 Liter

12 Hok
40 Hok
- M3
12 Bh
6 Bh
150 Bh
10 Kg
36 Bh

20 Hok
60 Hok
10 M3
4 Kg
44 Hok
20 Hok
274 Lbr
10 Kg

3 Hok
- Hok
30 M'
- Kg

14 Hok
20 Hok
- M3
10 Kg

23 Hok
142 M3

5 Hok
19 M3

55 Hok
10 Hok
30 M3
20 M3
100 Sak
11,070 Liter
50 Zak
10 M3
280 Dos
10 Kg
120 Hok
60 Hok

63 Hok
100 Hok
110 Lbr
- M3
40 Kg
10 Kg
300 M'

29 Hok
90 Hok
260 Kg
100 Kg
130 Lbr

- Hok
- Hok
- Kg
- Kg

3 Hok
- Hok
10 Kg
10 Kg
10 Kg
- Kg
10 Lbr

5 Hok
10 Hok
40 Kg
35 Hok
20 Hok
940 Bh
- M3
10 Sak

52 Hok
30 Hok
- M3
10 Sak
- M
650 Liter
3 Hok
- Hok
- M3
- M3
10 Sak
- M3
330 Liter
36 M

2 Hok
- Hok
- M3
- M3
10 Sak
190 Liter
6 M3

- Hok
- Hok
- Bh
- M3
- Sak

- Hok
- Hok
- M3
- Sak
- M
- Liter

2 Hok
2 Hok
1 M3
1 M3
5 Sak
288 Liter

- Hok
- Hok
- M3
- M3
- Sak
- Liter
- Lonjor
- Lonjor
- Kg
1 Pkt
3 Bh
3 Bh
60 Bh
120 Bh
3 Bh
3 Bh
3
1
11
11
6
6
20
15
8
3
1
Program Pengembanagan Sistem Pembangunan Partisipatif
REKAPITULASI ANGGARAN BIAYA

Propinsi : Nusa Tenggara Timur


Kabupaten : Sumba Barat Daya
Kecamatan : Kodi Balahar
Desa/ Kel : Waiha

Kegiatan Pemasangan Kegiatan Pasangan Batu Kegiatan Cor Beton Kegiatan Pas.
Bowplank + 1:4 1:2:3 Tembok
Galian Pondasi Bobot Bobot Bobot Bobot
No. Uraian
% % % %
Ukuran 88.95 Ukuran : 30.88 M3 Ukuran : 7.14 Ukuran :245.46 M2
Jumlah : Jumlah : Jumlah : Jumlah :
No. RAB : 01 No. RAB : 02 No. RAB : 03 No. RAB : 04
PNPM-MP PNPM-MP Swad
(Rp) Swad (Rp) (Rp) Swad (Rp) PNPM-MP (Rp) (Rp) PNPM-MP (Rp) Swad (Rp)

BAHAN
I 63,000 663,600 0.02 23,018,050 3,890,000 5.85 24,482,100 6.23 25,416,000 6.46

PERALATAN
II 1,077,500 320,000 0.27 225,000 0.06 142,000 0.04 - -

UPAH
III 1,090,000 690,000 0.28 4,140,000 1.05 700,000 0.18 7,880,000 2.00
IV LAIN -LAIN 1,400,000 - 0.36 - - -

Jumlah 3,630,500 1,673,600 0.92 27,383,050 3,890,000 6.96 25,324,100 - 6.44 33,296,000 - 8.47
V Operasional
UPK 2 %

VI Operasional
TPK 3 %

JUMLAH TOTAL
Jumlah Biaya Upah 1,090,000 4,140,000 700,000 7,880,000
Jumlah HOK Konstruksi HOK HOK HOK

Disetujui Oleh : Dibuat Oleh :

PjOK, Ketua TPK, FASILITATOR TEKNIK

Paskalis Generosis Tao Bio, S.Ip ( WALTERIUS MEKA )


NIP. 19870717 201001 1 010
Program Pengembanagan Sistem Pembangunan Partisipatif
REKAPITULASI ANGGARAN BIAYA

Propinsi : Nusa Tenggara Timur


Kabupaten : Sumba Barat Daya
Kecamatan : Kodi Balahar
Desa/ Kel : Waiha

Kegiatan Kegiatan Kegiatan Kegiatan


Atap Seng Plesteran & Pek. List Plafon +
Gelombang Acian Plank Gantungan
Bobot Bobot Bobot Bobot
No. Uraian
% % % %
Ukuran : 310.40 M2 Ukuran : 515.92 M2 Ukuran : 74.4 M Ukuran : 263.62 M2
Jumlah : Jumlah : Jumlah : Jumlah :
No. RAB : 07 No. RAB : 08 No. RAB : 09 No. RAB : 10
PNPM-MP PNPM-MP Swad
(Rp) Swad (Rp) (Rp) Swad (Rp) PNPM-MP (Rp) (Rp) PNPM-MP (Rp) Swad (Rp)

BAHAN
I 18,590,000 - 4.73 13,214,200 - 3.36 2,305,000 0.59 22,848,000 - 5.81

PERALATAN
II - - 390,000 - 0.10 - - - -

UPAH
III 2,450,000 0.62 11,520,000 - 2.93 1,260,000 0.32 5,045,040 1.28
IV LAIN -LAIN - - - - - - - -

Jumlah 21,040,000 - 5.35 25,124,200 - 6.39 3,565,000 - 0.91 27,893,040 - 7.09


V Operasional
UPK 2 %

VI Operasional
TPK 3 %

JUMLAH TOTAL
Jumlah Biaya Upah 2,450,000 11,520,000 1,260,000 5,045,040
Jumlah HOK Konstruksi HOK HOK HOK

Disetujui Oleh :

PjOK,

Paskalis Generosis Tao Bio, S.Ip


NIP. 19870717 201001 1 010
Program Pengembanagan Sistem Pembangunan Partisipatif
REKAPITULASI ANGGARAN BIAYA

Propinsi : Nusa Tenggara Timur


Kabupaten : Sumba Barat Daya
Kecamatan : Kodi Balahar
Desa/ Kel : Waiha

Kegiatan Kegiatan Kegiatan Kegiatan


Pas. Keramik Cat Tembok Cat Plafon Cat Atap
Bobot Bobot Bobot Bobot
No. Uraian
Ukuran % Ukuran % Ukuran % Ukuran %
: 216 m2 : 515.92 m2 263.62 M2 : 310.4 M2
Jumlah : Jumlah : Jumlah : Jumlah :
No. RAB : 13 No. RAB : 14 No. RAB : 15 No. RAB : 16
PNPM-MP PNPM-MP Swad
(Rp) Swad (Rp) (Rp) Swad (Rp) PNPM-MP (Rp) (Rp) PNPM-MP (Rp) Swad (Rp)

BAHAN
I 23,680,000 - 6.02 6,037,500 - 1.54 752,500 0.19 -

PERALATAN
II - - 140,000 - 0.04 87,500 0.02 -

UPAH
III 6,220,000 1.58 4,510,000 - 1.15 710,000 0.18 -
IV LAIN -LAIN - - - - - - -

Jumlah 29,900,000 - 7.60 10,687,500 - 2.72 1,550,000 - 0.39 - - 0.00


V Operasional
UPK 2 %

VI Operasional
TPK 3 %

JUMLAH TOTAL
Jumlah Biaya Upah 6,220,000 4,510,000 710,000 -
Jumlah HOK Konstruksi HOK HOK HOK

Disetujui Oleh :

PjOK,

Paskalis Generosis Tao Bio, S.Ip


NIP. 19870717 201001 1 010
Program Pengembanagan Sistem Pembangunan Partisipatif
REKAPITULASI ANGGARAN BIAYA

Propinsi : Nusa Tenggara Timur


Kabupaten : Sumba Barat Daya
Kecamatan : Kodi Balahar
Desa/ Kel : Waiha

Kegiatan Kegiatan Kegiatan Kegiatan


SANITASI : WC PAH Mebeler
Bobot Bobot Bobot Bobot
No. Uraian
Ukuran % Ukuran % Ukuran % Ukuran %
87 : 1 :
Jumlah : Jumlah : 1 UNIT Jumlah : Jumlah 3
No. RAB : 19 No. RAB : 20 No. RAB : No. RAB : 21

PNPM-MP PNPM-MP Swad


(Rp) Swad (Rp) (Rp) Swad (Rp) PNPM-MP (Rp) (Rp) PNPM-MP (Rp) Swad (Rp)

BAHAN
I - - 18,437,991 4.69 9,246,000 2.35 50,100,000 12.74

PERALATAN
II - - - - - - -

UPAH
III - 4,254,855 1.08 440,000 0.11 -
IV LAIN -LAIN - - - - - -

Jumlah - - 0.00 22,692,846 - 5.77 9,686,000 - 2.46 50,100,000 - 12.74


V Operasional
UPK 2 %

VI Operasional
TPK 3 %

JUMLAH TOTAL
Jumlah Biaya Upah - 4,254,855 440,000 -
Jumlah HOK Konstruksi HOK HOK HOK

Disetujui Oleh :

PjOK,

Paskalis Generosis Tao Bio, S.Ip


NIP. 19870717 201001 1 010
ASI ANGGARAN BIAYA

Program : PNPM - MP TA. 2013


Jenis Kegiatan : Pemb. RKB SD Paralel Kapapa Hari
Ukuran / dimensi : 24 X 8.5 M

Kegiatan : Pek. Kegiatan Kab &


Kusen Gording
Pintu, Bobot Bobot
Jendela Bobot %
% % Jumlah Total
Ukuran dan
25 Boven Ukuran : 6.56 M3
Jumlah : Jumlah :
No. RAB : 05 No. RAB : 06

PNPM-MP (Rp) Swad (Rp) PNPM-MP (Rp) Swad (Rp) PNPM-MP (Rp) Swad (Rp)

6,247,290 1.59 19,728,000 5.02 98,954,000 4,553,600 25.17

- - - - 1,445,000 320,000 0.37

2,150,000 0.55 4,880,000 1.24 20,840,000 690,000 5.30


- - 1,400,000 - 0.36

8,397,290 - 2.14 24,608,000 6.26 122,639,000 5,563,600 31.19

2,582,000

3,873,000

129,094,000
2,150,000 4,880,000 20,840,000
HOK HOK -
ASI ANGGARAN BIAYA

Program : PNPM - MP TA. 2013


Jenis Kegiatan : Pemb. RKB SD Paralel Kapapa Hari
Ukuran / dimensi : 24 X 8.5 M

Kegiatan Pek. Kegiatan


Peninggi Lantai Rabat
Lantai Bobot Bobot
Bobot %
% % Jumlah Total
Ukuran : 97.2 M3 Ukuran 31.62
Jumlah : Jumlah :
No. RAB : 11 No. RAB : 12

PNPM-MP (Rp) Swad (Rp) PNPM-MP (Rp) Swad (Rp) PNPM-MP (Rp) Swad (Rp)

11,510,000 2.93 17,105,850 4.35 184,527,000 4,553,600 46.93


-
- - 1,835,000 320,000 0.47
-
840,000 0.21 2,010,000 0.51 43,965,000 690,000 11.18
-
- - 1,400,000 - 0.36

12,350,000 - 3.14 19,115,850 4.86 231,727,000 5,563,600 58.94


4,878,000

7,318,000

243,923,000
840,000 2,010,000 43,965,040
HOK HOK -

Dibuat Oleh :

Ketua TPK, FASILITATOR TEKNIK

( WALTERIUS MEKA )
ASI ANGGARAN BIAYA

Program : PNPM - MP TA. 2013


Jenis Kegiatan : Pemb. RKB SD Paralel Kapapa Hari
Ukuran / dimensi : 24 X 8.5 M

Kegiatan Kegiatan Gantung


Cat Kayu
Pintu Jendela
Bobot Bobot
Bobot %
Ukuran % Ukuran % Jumlah Total
41.88 27
Jumlah : Jumlah :
No. RAB : 17 No. RAB : 18

PNPM-MP (Rp) Swad (Rp) PNPM-MP (Rp) Swad (Rp) PNPM-MP (Rp) Swad (Rp)

1,200,000 0.31 14,063,000 3.58 230,260,000 4,553,600 58.56


-
60,000 0.02 - 2,123,000 320,000 0.54
-
250,000 0.06 1,610,000 0.41 57,265,000 690,000 14.56
-
- - 1,400,000 - 0.36

1,510,000 - 0.38 15,673,000 3.99 291,048,000 5,563,600 74.02279

6,127,000

9,191,000

306,366,000
250,000 1,610,000 57,265,040
HOK HOK -

Dibuat Oleh :

Ketua TPK, FASILITATOR TEKNIK

( WALTERIUS MEKA )
ASI ANGGARAN BIAYA

Program : PNPM - MP TA. 2013


Jenis Kegiatan : Pemb. RKB SD Paralel Kapapa Hari
Ukuran / dimensi : 24 X 8.5 M

Kegiatan : Honor Kegiatan


Guru
Bobot Bobot
Bobot %
Ukuran % Ukuran % Jumlah Total
: 12 Bulan
Jumlah : 2 Orang Jumlah

No. RAB No. RAB

PNPM-MP (Rp) Swad (Rp) PNPM-MP (Rp) Swad (Rp) PNPM-MP (Rp) Swad (Rp)

- - 308,044,000 4,553,600 78.35


-
- 2,123,000 320,000 0.54
-
- 61,960,000 690,000 15.76
-
1,400,000 - 0.36

- - 0 - 0 373,527,000 5,563,600 94.99983


7,864,000

11,796,000

393,187,000
- - 61,960,000
HOK HOK -

Dibuat Oleh :

Ketua TPK, FASILITATOR TEKNIK

( WALTERIUS MEKA )
PNPM - Mandiri Perdesaan

TAKE OF SHEET WC
Propinsi : Nusa Tenggara Timur
Kabupaten : Sumba Barat Daya
Kecamatan : Kodi Balaghar

Janis Kegiatan DIMENSI Volume Analisa kebutuhan baha,Ala


Gambar Skedsa L1 L2 L T1 T2 P Pekerjaan Sat dan Tenaga
Bahan,alat
No M M M M M M dan Tenaga Koef
1 2 3 4 5 6 7 8 9 10 11
1 PEMBERSIHAN LOKASI 3.00 5.5 16.50 M2 Pekerja 0.06

2 PENGUKURAN DAN BOWPLANK


3 GALIAN TANAH POND
0.55
a.Pondasi Utama 0.50 0.7 0.55 12.5 4.8125 Pekerja 0.7
b. Pondasi Teras 0.55 0.5 5.6 1.54
0.70 0.55 6.3525
4 URUGAN TANAH POND 2.12 Pekerja 0.75
Tanah Urug 1.25
5 PAS.BATU KOSONG
a. Pas batu Kosong Pond.Utama 0.7 0.1 12.5 0.875 M3 Pekerja 0.3
b. Pas batu Kosong Pond.Teras 0.6 0.1 5.6 0.34 M3 Batu 15/20 1.3
1.21 M3

0.15 0.15

0.70
0.55

6 URUGAN PASIR
a. Pondasi Utama 0.7 0.05 12.5 0.44 M3 Pekerja 0.5
b. Pondasi Teras 0.05 0.6 0.05 5.6 0.17 M3 Pasir Urug 1.2
0.70 0.61 M3
0.05
0.55
7 Pas Batu 1: 4 0.25

a. Pondasi Utama II 0.375 0.5 12.5 2.34 Pekerja 1.2


0.55 Tukang 0.9
Batu 15/20 1.3
0.35 0.60
b. Pondasi Teras Pasir Pasang 0.544
0.35 0.65 5.6 1.27 Semen 2.7
0.65
3.62 Air Kerja 100
8 Beton 1:2:3

a. Sloof 0.15 0.15 12.5 0.28 Pekerja 2


b. Ringbalk 0.15 0.15 12.5 0.28 Tukang 0.385
Mandor 1
c. Kolom 0.2 0.2 15.45 0.62 Pasir 0.52
d. Tembok Gunung Kerikil 0.78
E. TERAS Semen 6.72
46.5175 Besi 10 mm
1.18 Besi 6 mm
0.20 0.15 0.15
Kunci Besi
Kawat ikat 3
Papan Cor
0.20 0.15 0.15 Usuk Kls III
Beugel Kolom : Beugel Ring Balk : Beugel Sloof :
P : 0.94 m/ Bh P : 0.74 m/ Bh P : 0.74 m/ Bh Paku 7 - 10 cm 2
jmlh : 423Bh jmlh : 410Bh jmlh : 410Bh
Air Kerja 100
9 Kosen Pintu,Jendela dan Boven 0.12 0.06 17.64 0.13 Pekerja 6.3
0.04 0.25 3.6 0.16 Tukang 22
0.29 Kayu 6/12 1.2
0.12 Papan 2/20 1.2
0.25 Paku 7 - 10 cm
1.90
Kunci Tanam 2x Slaag
0.20 17.64 Kusen Engsel Pintu
J2.2 : 4 Bh
3.6 Engsel Jendela
Grendel Jendela
0.82 Kait Angin
BH 2
Ampals
0.50
17.64

1.35
BV2 : 2 Bh
d. Jendela Panel Kaca Reben 3 mm
11 Dinding
a. Pas. Bataco 1:5 Tembok Pekerja 0.40
1.Luas Kosen P/J dan Boven 4.47 M2 Tukang 0.2
2.Luas Tembok Tanpan Kosen 2.45 12.5 30.56 M2 Batu Potong 27
Luas tembok = 2 - 1 + Pas batu Tembok Gunung 26.10 M2 Pasir Pasang 0.045
Semen 0.242
26.10 M2
b. Plesteran dan acian 55.99 M2 Pekerja 0.2
M3 Tukang 0.14
Pasir Pasang 0.038
1.68 Semen 0.227
3.15
Kawat Ayak 0.02
Air Kerja 25

12 Atap
a. Kuda-kuda 4.54 0.12 0.06 15.5 0.11 Pekerja 3
5.67 kuda2 gewel 0 0 - - Tukang 21
1.85 0.11 Balok 8/12 kls II 1.2
Beugel U Bulat
Beugel U Plat
3.6 3.56 1.00
Baut dan mur
Paku Putih
Besi Strip

b. Gording utama 0.12 0.06 31.5 0.23 M3 Pekerja 4


Gording Teras
kloss 0.12 0.06 3 0.02 Tukang 10
0.25 Kayu 6/12 1.2
Paku 6
c. Atap Seng 20.646 1 20.646 M2 Pekerja 0.04
Tukang 0.13
Seng BJLS 0.20 0.8
Paku seng 0.03

d. Bubungan 6.3 M Pekerja 0.15


Tukang 0.25
Seng plat 40 cm 1.1
Paku seng 0.075

f. Listplank 0.25 0.03 19.2 0.14 M3 Pekerja 0.05


Tukang 0.1
Papan 3/25 1.2
Paku 1.7
Pekerjaan Lantai
a. Ugan Tanah
1. Ugan Tanah 4 0.2 2 1.25 M3 Pekerja 0.35
teras 4 0.2 1 0.45 M3 Sirtu 1.2

1.7 M3

b. Urugan Pasir 4 0.05 2 0.05 M3 Pekerja 0.3


teras 4 0.05 1 0.2 M3 Pasir Urug 1.2

0.25 M3
c. Rabat 5 cm camp 1:3:5 I 4 0.07 2 0.21 M3 Pekerja 2.5
teras 4 0.07 1 0.28 M3 Tukang 2

0.49 M3 Kerikil 0.91


Pasir pasang 0.54
Semen 4.4
Air Kerja 350
d. Pasangan lantai keramik 0 M2 Semen 0.19
Pasir pasang 0.026
Keramik 30 x 30 1.04
Semen Warna 0.04
Pekerja 0.25
Tukang 0.55
Pengecatan
a. Pengecatan Tembok 55.99 M2 Pekerja 0.03
Tukang 0.08
Cat tembok (Matex Warna) 0.36
Plamir 0.15
Amplas 0.2

b. Pengecatan Seng 20.6 M2 Pekerja 0.01


Tukang 0.06
Cat seng Biru Muda (Merk Ped 0.2
Minyak cat 0
c. Pengecatan Kayu 3.2 M2 Pekerja 0.075
Tukang 0.1
Meni Kayu 0.145
Dumpul kayu 0.067
Cat Kayu 0.2
Minyak cat 0.15
Amplas 0.2

d. Pengecatan Plafon 0 M2 Pekerja 0.03


Tukang 0.05
Cat Plafon (Oker Putih) 0.3
LUBANG WC
a.Galian
2 2 2 0 8.00 M3 Pekerja 1.2

a. Pas. Bataco 1:6 2 8 16.00 M2 Pekerja 0.7


Tukang 0.35
Batu Potong 27
Pasir Pasang 0.038
Semen 0.196

b. Plesteran dan acian 16.00 M2 Pekerja 0.6


Tukang 0.3
Pasir Pasang 0.038
Semen 0.196
Kawat Ayak 0.02
Air Kerja 10

c. Plat Penutup 2 2 0.15 0.6 Pekerja 2


Tukang 0.039
Mandor 0
Pasir 0.52
Kerikil 0.78
Semen 6.72
Besi 10 mm

Pekerja
Tukang
1 Pasir Pasang
2 Batu Gunung
3 Kerikil
4 Batu Potong
5 Kayu 6/12 Kls II
6 Papan 3/25 Kls II
7 Besi 10 MM
8 Besi 6 MM
9 Semen
10 Seng Gel. Bjls 0.20
11 Seng Plat
12 Baut 25 cm
13 Paku 7 - 10 cm
14 Paku Putih
15 Paku Seng
16 Talang Air
17 Kawat Ikat
18 Kloset Jongkok
19 Pipa Udara T
20 Fiber 40 x 40
21 Plamir
22 Cat tembok
23 Cat Seng
24 Cat Kayu
25 Minyak Cat
26 Paralon 4"
27 L Bok Paralon 4"
28 Air Kerja
INSTALASI LISTRIK 1. Stop Kontak
2. Saklar Seri
3. Viting Lampu Tempel
4. Lampu Philips 20 Watt
5. Kabel listrik ( 1 Roll - 40 m )
6. Isolasi
7. Pipa PVC 1/4 "
8. Embol Dos
TOTAL HOK + 9. Paku Kabel
#REF! 10. Saklar Tunggal
11. Sekering Group
E OF SHEET WC

Analisa kebutuhan baha,Alat


dan Tenaga

Volume Sat
12 13
1.00 Hok

4.00 Hok

2.00 Hok
3.00

- Hok
2.00 M3

- Hok
1.00 M3
4.00 Hok
- Hok
- M3
- M3
10.00 Sak
360.00 Liter
2.00 Hok
- Hok
- Hok
- M3
- M3
10.00 Sak
16.00 Btg
13.00 Btg
4.00 Bh
3.54 Kg
0.26 M3
- M3
- Kg
120.00 Liter
2.00 Hok
6.00 Hok
0.15 M3
0.19 M3
0.50 Kg

- Bh
6.00 Bh
- Bh
2.00 Bh
- Psng
6.00 Lbr

10.00 Hok
10.00 Hok
700.00 Bh
- M3
10.00 Sak
11.00 Hok
10.00 Hok
- M3
10.00 Sak
- M
1,400.00 Liter

0.34 Hok
2.35 Hok
0.13 M3
- Bh
- Bh
9.00 Bh
0.50 Kg
- Bh

1.00 Hok

2.00 Hok
0.30 M3
1.00 Kg
1.00 Hok
- Hok
20.00 Lbr
- Kg

1.00 Hok
- Hok
10.00 M'
0.50 Kg

1.00 Hok
2.00 Hok
0.17 M3
0.24 Kg

1.00 Hok
2.00 M3

0.08 Hok
0.30 M3

1.00 Hok
1.00 Hok

0.50 M3
0.25 M3
2.00 Sak
172.00 Liter
- Zak
- M3
- Dos
- Kg
0 Hok
0 Hok
2.00 Hok
- Hok
20.00 Kg
10.00 Kg
10.00 Lbr

0.20 Hok
1.00 Hok
4.00 Kg
- Kg
0.50 Hok
0.50 Hok
0.50 Kg
0.50 Kg
1.00 Kg
0.50 Kg
1.00 Lbr

- Hok
- Hok
- Kg
10.00 Hok

11.00 Hok
10.00 Hok
430.00 Bh
- M3
- Sak

10.00 Hok
- Hok
- M3
- Sak
- M
160.00 Liter

1.00 Hok
- Hok
- Hok
0.50 M3
0.50 M3
- Sak
7.00 Lonjor

74.04 Hok
50.85 Hok
10.05 M3
5.00 M3
2.00 M3
1,137.00 Bh
0.43 M3
0.17 M3
23.00 Lonjor
13.00 Lonjor
49.00 Sak
17.00 Lembar
7.00 M
9.00 Btg
3.74 Kg
0.50 Kg
1.50 Kg
30.00 M
2.00 M
2.00 Bh
1.00 Bh
2.00 Bh
8.00 Kg
20.00 Kg
4.00 Kg
1.00 Kg
0.50 Kg
2.00 Btg
4.00 Bh
2,212.00 Liter
3.00
1.00
11.00
11.00
6.00
6.00
20.00
15.00
8.00
3.00
1.00
REKAPITULASI RENCANA KEBUTHAN BAHAN, ALAT, TENAGA KERJA DAN BIAYA SETIAP ITEM PEKERJAAN

Propinsi : Nusa Tenggara Timur No. RAB


Kabupaten : Sumba Barat Daya Program
Kecamatan : Kodi Balaghar Jenis Kegiatan
Desa : Waiha Ukuran / Dimensi

Beton slof, kolom, ring

7 Atap seng gelombang

10 Plafond + Gantungan
Kusen pintu, jendela,

Pek. Peninggi Lantai

Pasang daun pintu


bowplank + Galian

Pasangan Tembok

Cat Kayu ( Kusen,

dan daun jendela


Pek. Cat Tembok
Kuda - kuda dan

Pasang Keramik
Plester + Acian

Pek. Cat Atap


Pek. Pondasi
Pemasangan

Lantai Rabat

MEBELER
Cat Plafon

Lisplank )
Lis plank
ventilasi

sanitasi
Pondasi

gording
No Uraian Bahan/ Alat / Tenaga Kerja

PAH
balk

WC
12

13

14

15

16

17

18

19

21
11
I. Bahan
-1

9
1 Papan 2/20 - 3 m' Perancah 1
-

2 Kayu 5/7- 4 m' Perancah -


3 Bambu 0
4 Amplas 8
6 Besi Beton 10 mm Asli (SNI) 128 23 0.00
7 Besi Beton 6 mm Asli (SNI) 80 13 0
8 Baut 15 & 25 150 9
9 Beugel U plat 6
10 Beugel U bulat 12.0
11 Besi Strip 36
12 Cat Seng Biru Muda Merk Boyo 0
13 Cat Plafon (Oker Putih) 43
14 Cat Tembok (Matex Warna) 20 Kg 261 20 0
18 Cat Kayu (Cokelat) 15 1
19 Dumpul Kayu 6
20 Engsel + skrup 73
Fiber 40 x 40 2
21 Grendel + skrup 21
22 Kawat ikat 27 2 0
23 Keramik 30 x 30 277
25 Kait Angin 8" (Kotak) 36
26 Kaca Polos 5 MM (110 x 60 cm) 4
31 L bok paralo 4 " 4
32 Kloset jongkok 2
33 L Bok Paralon 2" 4
34 Meni kayu 8
35 Minyak cat 2 1
36 Paku 7 - 10 cm 3 14 4 4 5 38 4
37 Paku seng 8 2
38 Paku tripleks 10
39 Paku putih 15 & 20 cm 10 1
40 Plamur 98 8
REKAPITULASI RENCANA KEBUTHAN BAHAN, ALAT, TENAGA KERJA DAN BIAYA SETIAP ITEM PEKERJAAN

17 ( Kusen, Lisplank
14 Pek. Cat Tembok
Kuda - kuda dan
jendela, ventilasi

13 Pasang Keramik
kolom, ring balk

Plester + Acian

18 pintu dan daun


Pek. Peninggi

Pek. Cat Atap

Pasang daun
Pemasangan

Kusen pintu,

Lantai Rabat
Gantungan
Beton slof,

gelombang

MEBELER
Atap seng
Pasangan

Pasangan

Cat Plafon
Plafond +

Cat Kayu
bowplank

ponndasi

Lis plank
Tembok

sanitasi
gording

jendela
Lantai
No Uraian Bahan/ Alat / Tenaga Kerja

PAH
WC
)
10

12

15

16

19

21
11
I.Bahan

9
41 Pipa udara T 1
42 Pipa Paralon ( 4 " ) 2
43 Pipa Paralon 2" 2
44 Semen warna 11
45 Stop Kran "
46 Semen Tonasa/ Gresik 50 Kg 183 61 76 127 101 50 49 5
47 Seng Gelombang BJLS 0.20 (Warna) 274 17
48 Seng licin 29 7
49 List Papan Profile 300
50 Tripleks 3 mm
51 Triplex 4 mm 114
52 Take Wood
53 Talang Air (4m) 26
J U M L A H B I A Y A B A H A N

III. BAHAN LOKAL


1 Pasir Pasang 18 5 14 16 19 16 12 10 2
2 Batu Karang 60 5 2
3 Batu Pecah 7 28 2 1
4 Kayu 6/12 Kls II 5 0
5 Kayu 8/12Kls II 3
6 Balok Kelapa
7 Kayu Kls I 6/12 Jati Lokal 2
8 Usuk 5/7 Kls II Mahoni/ Jati Putih 5
9 Usuk 5/7 (Kelapa)
10 Papan Kls II 1 1 0
11 Batako
12 Batu Potong 8483 1,137 0
13 Sirtu Gunung 142 6
14 Air Kerja 6011 912 10000 16334 11067 2212 480

J U M L A H B I A Y A B A H A N L O K A L
REKAPITULASI RENCANA KEBUTHAN BAHAN, ALAT, TENAGA KERJA DAN BIAYA SETIAP ITEM PEKERJAAN

II.Alat
1 Terpal
2 Ember Cor (Ban) 15
3 Sekop Cap Mata 12
4 Linggis
5 Benang nilon 3
6 Selang waterpas 25
7 Kuas cat 6
8 Kuas rol 8 5
9 Gergaji Besi 1
10 Anak Gergaji 2
11 Kunci besi ( kunci 10 dan kunci 6 ) 4
12 Kawat ayak 13
J U M L A H B I A Y A A L A T
III. Meubeler
1 Meja Siswa (Papan Kls II) 60
2 Kursi Siswa (Papan Kls II) 120
3 Lemari 2 Pintu (180 x 140) 3
4 Meja 1/2 Biro 3
5 Kursi Guru (Spon) 3
9 Papan Tulis 3
6 Daun Pintu Paniel Papan Kls I 4
7 Daun Pintu Paniel Triplex Lapis Seng Dalam 2
8 Daun Jendela Paniel Kaca 5 MM 19
J U M L A H B I A Y A U N T U K M E U B E L E R
IV. LAIN-LAIN
1 Papan Kegiatan 1
2 Prasasti + Logo PNPM-MP 1
J U M L A H B I A Y A DOKUMENTASI

10

12

13

14

15

16

17

18

19

20

21

22
11
III. Tenaga Kerja
1

1 Pekerja 35 90 18 104 13 32 47 140 14 56 28 55 122 29 5 3 15 74 8


2 Tukang 1 36 4 119 44 98 26 183 21 84 0 9 64 91 14 4 29 51 5
2 Mandor 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
36 126 22 223 57 130 73 162 28 13
J U M L A H B I A Y A T E N A G A K E R J A
T O T A L B I A Y A ( BAHAN + ALAT + TENAGA KERJA + )
IV. Operasional UPK dan TPK
1 Operasional UPK ( 2 % )
2 Operasional TPK ( 3 % )
JUMLA
T O T A L B I A Y A ( BAHAN + ALAT + TENAGA KERJA + OPERASIONAL UPK + OPERASIONAL TPK )

36 126 22 223 57 28 492

DIPERIKSA OLEH : DI
TPK DES

(WALTERIUS MEKA) (..) YOAK


FK-T FK-P

MENGETAHUI
PJOK KECAMATAN KODI UTARA

Paskalis G. T. Bio, S.Ip


NIP. 19870717 201001 1 010
ALAT, TENAGA KERJA DAN BIAYA SETIAP ITEM PEKERJAAN

: 1 s/d 20
: PNPM - MP TA. 2011
: Pemb. Gedung SD
: 24 X 9 m

Total Volume
Harga

Satuan
Total Biaya
Satuan

Rp. Rp.
1 M3 700,000 700,000
- M3 700,000 -
- Btg 5,000 -

8 Lembar 5,000 40,000

151 Staf / lonjor 95,000 14,345,000

93 Staf / lonjor 42,500 3,952,500

159 Bh 8,000 1,272,000

6 Bh 18,000 108,000

12 Bh 18,000 216,000

36 Bh 7,500 270,000

- Kg 15,000 -

43 Kg 17,500 752,500

281 Kg 17,500 4,917,500

16 Buah 50,000 800,000

6 Kg 25,000 150,000

73 M2 15,000 1,095,000

2 Bh 350,000 700,000

21 M2 10,000 210,000

29 Buah 25,000 725,000

277 Lembar 65,000 18,005,000

36 Lembar 15,000 540,000


4 Lembar 142,000 568,000

4 Kg 22,000 88,000

2 Kg 170,000 340,000

4 Kg 15,000 60,000

8 Kg 25,000 200,000

3 Kg 30,000 75,000

72 Kg 21,000 1,506,641

10 Kg 25,000 237,500

10 Buah 25,000 250,000

11 Batang 25,000 262,500

106 Btg 15,000 1,590,000


ALAT, TENAGA KERJA DAN BIAYA SETIAP ITEM PEKERJAAN

Total Volume
Harga

Satuan
Total Biaya
Satuan

Rp. Rp.
1 Buah 175,000 175,000
2 Batang 149,000 298,000
2 Btg 96,000 192,000
11 Kg 10,000 110,000
- Bh 37,000 -
652 Zak 82,500 53,790,000
291 Lembar 65,000 18,915,000
36 M' 20,000 720,000
300 M 7,500 2,250,000
- Lembar 59,000 -
114 Lembar 75,000 8,550,000
- Lembar - -
26 Btg 30,000 780,000
A Y A B A H A N
139,756,141

112 M3 120,000 13,446,000


67 M3 75,000 5,025,000
38 M3 225,000 8,550,000
5.43 M3 2,200,000 11,950,590
3 M3 2,200,000 6,600,000
- M3 1,600,000 -
2 M3 2,500,000 5,000,000
5 M3 2,200,000 11,000,000
- M3 1,660,000 -
2 M3 2,200,000 3,743,450
- Bh 3,000 -
9,620 Bh 2,000 19,240,000
148 M3 65,000 9,620,000
47,016 Liter 50 2,350,800

A B A H A N L O K A L 96,525,840
N, ALAT, TENAGA KERJA DAN BIAYA SETIAP ITEM PEKERJAAN

- Lembar 350,000 -
15 Buah 15,000 225,000
12 Buah 80,000 960,000
- Buah 80,000 -
3 Pis/kpl 10,000 30,000
25 M' 3,500 87,500
6 Buah 10,000 60,000
13 Buah 17,500 227,500
1 Buah 50,000 50,000
2 Buah 16,000 32,000
4 Buah 15,000 60,000
13 M' 30,000 390,000
I A Y A A L A T 2,122,000

60 Bh 300,000 18,000,000
120 Bh 200,000 24,000,000
3 Bh 1,100,000 3,300,000
3 Bh 800,000 2,400,000
3 Bh 250,000 750,000
3 Bh 550,000 1,650,000
4 Bh 1,250,000 5,000,000
2 Bh 750,000 1,500,000
19 Bh 350,000 6,650,000
N T U K M E U B E L E R 63,250,000

1 Unit 150,000 150,000


1 Unit 1,250,000 1,250,000
Y A DOKUMENTASI 1,400,000

888 HOK 30,000 26,642,730


883 HOK 40,000 35,317,164
- HOK 40,000 -
870
T E N A G A K E R J A 61,959,895
AHAN + ALAT + TENAGA KERJA + ) 365,013,875
perasional UPK dan TPK
nal UPK ( 2 % ) 7,684,503
nal TPK ( 3 % ) 11,526,754
JUMLAH OPERASIONAL UPK + TPK 19,211,257
GA KERJA + OPERASIONAL UPK + OPERASIONAL TPK ) 384,225,132

Homba Karipit, 23 Juni 2011

DIBUAT OLEH :
TPK DESA HOMBA KARIPIT

YOAKIM D. KAMAMBU
KETUA

MENGETAHUI
ECAMATAN KODI UTARA

skalis G. T. Bio, S.Ip


19870717 201001 1 010
PNPM - Mandiri Perdesaan

RENCANA ANGGARAN BIAYA

Propinsi : Nusa Tenggara Timur No. RAB


Kabupaten : Sumba Barat Daya Program
Kecamatan : Kodi Balaghar Jenis Kegiatan
Desa/Kel : Waiha Ukuran / dimensi
Harga
Volume Satuan
Dari Satuan Kategori
Uraian Dari Dana
Total Swadaya Biaya
Swadaya PNPM-MP
Bahan (Rp)
1 Meja Siswa (Papan Kls II) 60.00 - 60.00 Bh IA 300,000
2 Kursi Siswa (Papan Kls II) 120.00 - 120.00 Bh IA 200,000
3 Lemari 2 Pintu (180 x 140) 3.00 - 3.00 Bh IA 1,100,000
4 Meja 1/2 Biro 3.00 - 3.00 Bh IA 800,000
5 Kursi Guru (Spon) 3.00 - 3.00 Bh IA 250,000
6 Papan Tulis 3.00 - 3.00 Bh IB 550,000
Sub Total 1)
Alat

Sub Total 2)
Upah

Sub Total 3)
Lain - lain

Sub Total 4)
TOTAL BIAYA

Dari PNPM - MP
Sumber Dana
Dari Swadaya :

Disetujui Oleh : Dibuat Oleh :


PjOK, Ketua TPK,

Paskalis G. T. Bio, S.Ip


NIP. 19870717 201001 1 010
PNPM - Mandiri Perdesaan

RENCANA ANGGARAN BIAYA

Propinsi : Nusa Tenggara Timur No. RAB


Kabupaten : Sumba Barat Daya Program
Kecamatan : Kodi Balaghar Jenis Kegiatan
Desa/Kel : Waiha Ukuran / dimensi
Harga
Volume Satuan
Dari Satuan Kategori
Uraian Dari Dana
Total Swadaya Biaya
Swadaya PNPM-MP
Bahan (Rp)
1 Daun Jendela Kaca 5 MM 15.00 - 15.00 Bh 350,000
2 Daun Pintu Paniel Papan(Kunci Koday) 3.00 - 3.00 Bh 1,100,000
3 Engsel Pintu 9.00 - 9.00 Psg 12,500
4 Engsel Jendela 15.00 - 15.00 Psg 12,500
5 Grendel 18.00 - 18.00 Bh 7,500
6 Kait Angin Roda 30.00 - 30.00 Bh 25,000
7 Jendela Nako + Kaca 12.00 - 12.00 Unit 175,000
8 Kaca Polos 5 mm (1.12 cm x 0.62 cm) 15.00 - 15.00 Unit 175,600
- - -
- - -
Sub Total 1)
Alat

Sub Total 2)
Upah
1 Pekerja 15 - 15 HOK 25,000
2 Tukang 30 - 30 HOK 35,000

Sub Total 3)
Lain - lain

Sub Total 4)
TOTAL BIAYA

Dari PNPM - MP
Sumber Dana
Dari Swadaya :

Disetujui Oleh : Dibuat Oleh :


PjOK, Ketua TPK,

Paskalis G. T. Bio, S.Ip


NIP. 19870717 201001 1 010
: 22
: PNPM-MPd
: Mebeler
: 3 Unit

Jumlah Total
Swadaya PNPM - MP Keterangan
(Rp) ( Rp )

- 18,000,000
- 24,000,000
- 3,300,000
- 2,400,000
- 750,000
- 1,650,000
- 50,100,000

- -

- -

- 50,100,000

50,100,000
-

Dibuat Oleh :
Fasilitator Teknik

WALTERIUS MEKA
: 20
: PNPM - MP
enis Kegiatan : Gantung Pintu Jendela
Ukuran / dimensi : 1 Ls

Jumlah Total
Swadaya PNPM - MP Keterangan
(Rp) ( Rp )

- 5,250,000
- 3,300,000
- 112,500
- 187,500
- 135,000
- 750,000
- 2,100,000
- 2,634,000
- -
- -
- 14,469,000

- -

- 375,000
- 1,050,000

- 1,425,000

- -
- 15,894,000

15,894,000
-

Dibuat Oleh :
Fasilitator Teknik

WALTERIUS MEKA
PNPM - Mandiri Perdesaan

RENCANA ANGGARAN BIAYA

Propinsi : Nusa Tenggara Timur No. RAB


Kabupaten : Sumba Barat Daya Program
Kecamatan : Kodi Balaghar Jenis Kegiatan
Desa/Kel : Waiha Ukuran / dimensi
Harga
Volume Satuan
Dari Satuan Kategori
Uraian Dari Dana
Total Swadaya Biaya
Swadaya PNPM-MP
Bahan (Rp)
1 Meja Siswa (Papan Kls II) 60.00 - 60.00 Bh IA 300,000
2 Kursi Siswa (Papan Kls II) 120.00 - 120.00 Bh IA 200,000
3 Lemari 2 Pintu (180 x 140) 3.00 - 3.00 Bh IA 1,100,000
4 Meja 1/2 Biro 3.00 - 3.00 Bh IA 800,000
5 Kursi Guru (Spon) 3.00 - 3.00 Bh IA 250,000
6 Papan Tulis 3.00 - 3.00 Bh IB 550,000
Sub Total 1)
Alat

Sub Total 2)
Upah

Sub Total 3)
Lain - lain

Sub Total 4)
TOTAL BIAYA

Dari PNPM - MP
Sumber Dana
Dari Swadaya :

Disetujui Oleh : Dibuat Oleh :


PjOK, Ketua TPK,

Paskalis G. T. Bio, S.Ip


NIP. 19870717 201001 1 010
PNPM - Mandiri Perdesaan

RENCANA ANGGARAN BIAYA

Propinsi : Nusa Tenggara Timur No. RAB


Kabupaten : Sumba Barat Daya Program
Kecamatan : Kodi Balaghar Jenis Kegiatan
Desa/Kel : Waiha Ukuran / dimensi
Harga
Volume Satuan
Dari Satuan Kategori
Uraian Dari Dana
Total Swadaya Biaya
Swadaya PNPM-MP
Bahan (Rp)
1 Daun Jendela Kaca 5 MM 15.00 - 15.00 Bh 350,000
2 Daun Pintu Paniel Papan(Kunci Koday) 3.00 - 3.00 Bh 1,100,000
3 Engsel Pintu 9.00 - 9.00 Psg 12,500
4 Engsel Jendela 15.00 - 15.00 Psg 12,500
5 Grendel 18.00 - 18.00 Bh 7,500
6 Kait Angin Roda 30.00 - 30.00 Bh 25,000
7 Jendela Nako + Kaca 12.00 - 12.00 Unit 175,000
8 Kaca Polos 5 mm (1.12 cm x 0.62 cm) 15.00 - 15.00 Unit 175,600
- - -
- - -
Sub Total 1)
Alat

Sub Total 2)
Upah
1 Pekerja 15 - 15 HOK 25,000
2 Tukang 30 - 30 HOK 35,000

Sub Total 3)
Lain - lain

Sub Total 4)
TOTAL BIAYA

Dari PNPM - MP
Sumber Dana
Dari Swadaya :

Disetujui Oleh : Dibuat Oleh :


PjOK, Ketua TPK,

Paskalis G. T. Bio, S.Ip


NIP. 19870717 201001 1 010
: 22
: PNPM-MPd
: Mebeler
: 3 Unit

Jumlah Total
Swadaya PNPM - MP Keterangan
(Rp) ( Rp )

- 18,000,000
- 24,000,000
- 3,300,000
- 2,400,000
- 750,000
- 1,650,000
- 50,100,000

- -

- -

- 50,100,000

50,100,000
-

Dibuat Oleh :
Fasilitator Teknik

WALTERIUS MEKA
: 20
: PNPM - MP
enis Kegiatan : Gantung Pintu Jendela
Ukuran / dimensi : 1 Ls

Jumlah Total
Swadaya PNPM - MP Keterangan
(Rp) ( Rp )

- 5,250,000
- 3,300,000
- 112,500
- 187,500
- 135,000
- 750,000
- 2,100,000
- 2,634,000
- -
- -
- 14,469,000

- -

- 375,000
- 1,050,000

- 1,425,000

- -
- 15,894,000

15,894,000
-

Dibuat Oleh :
Fasilitator Teknik

WALTERIUS MEKA
PNPM - Mandiri Perdesaan

RENCANA ANGGARAN BIAYA

Propinsi : Nusa Tenggara Timur No. RAB


Kabupaten : Sumba Barat Daya Program
Kecamatan : Kodi Balaghar Jenis Kegiatan
Desa/Kel : Waiha Ukuran / dimensi

Volume
Dari Satuan Kategori
Uraian Dari Dana
Total Swadaya Biaya
Swadaya PNPM-MP
Bahan
1 Pasir Pasang 10.05 - 10.05 Bh IA
2 Batu Gunung 5.00 - 5.00 M3 IA
3 Kerikil 2.00 - 2.00 M3 IA
4 Batu Potong 1,137.00 - 1,137.00 M3 IA
5 Kayu 6/12 Kls II 0.43 - 0.43 Zak IA
6 Papan 3/25 Kls II 0.17 - 0.17 Lonjor IA
7 Besi 10 MM 23.00 - 23.00 Lonjor IB
8 Besi 6 MM 13.00 - 13.00 Lembar IB
9 Semen 49.00 - 49.00 Batang IB
10 Seng Gel. Bjls 0.20 17.00 - 17.00 Bh IB
11 Seng Plat 7.00 - 7.00 Batang IB
12 Baut 25 cm 9.00 - 9.00 M3 IB
13 Paku 7 - 10 cm 3.74 - 3.74 Bh IB
14 Paku Putih 0.50 - 0.50 Kg IB
15 Paku Seng 1.50 - 1.50 Kg IB
16 Talang Air 26.00 - 26.00 M3 IB
17 Kawat Ikat 2.00 - 2.00 Kg IB
18 Kloset Jongkok 2.00 - 2.00 Kg IB
19 Pipa Udara T 1.00 - 1.00 Kg IB
20 Fiber 40 x 40 2.00 - 2.00 Kg IB
21 Plamir 8.00 - 8.00 Kg IB
22 Cat tembok 20.00 - 20.00 Kg IB

1.00 Kg
24 Cat Kayu 1.00 IB

0.50 Kg
25 Minyak Cat 0.50 IB
26 Paralon 4" 2.00 - 2.00 Bh IB
27 L Bok Paralon 4" 4.00 - 4.00 Liter IB
28 Air Kerja 2,212.00 - 2,212.00 M3 IB
Daun Pintu Paniel triplex 9 mm Lapis
29 Seng Dalam 2.00 - 2.00 Bh IA
Sub Total 1)
Alat

Sub Total 2)
Upah
1 Pekerja 74.04 - 74.04 HOK IIIA
2 Tukang 50.85 - 50.85 HOK IIIA
3 Mandor - - - HOK IIIA

Sub Total 3)
Lain - lain
Sub Total 4)
TOTAL BIAYA

Dari PNPM - MP
Sumber Dana
Dari Swadaya :

Disetujui Oleh : Dibuat Oleh


PjOK, Ketua TPK,

Paskalis G. T. Bio, S.Ip


NIP. 19870717 201001 1 010
AN BIAYA

: 21
: PNPM-MPd
Jenis Kegiatan : WC
Ukuran / dimensi : 1 Unit
Harga
Satuan Jumlah Total
Swadaya PNPM - MP Keterangan
(Rp) ( Rp )
(Rp)
120,000 - 1,206,000
75,000 - 375,000
225,000 - 450,000
2,000 - 2,274,000
2,200,000 - 950,590
2,200,000 - 380,160
95,000 - 2,185,000
42,500 - 552,500
82,500 - 4,042,500
65,000 - 1,105,000
20,000 - 140,000
8,000 - 72,000
21,000 - 78,641
25,000 - 12,500
25,000 - 37,500
30,000 - 780,000
25,000 - 50,000
170,000 - 340,000
175,000 - 175,000
350,000 - 700,000
15,000 - 120,000
17,500 - 350,000

50,000 50,000

30,000 15,000

149,000 - 298,000
22,000 - 88,000
50 - 110,600

750,000 - 1,500,000
- 18,437,991

30,000 - 2,221,050 6 Jam


40,000 - 2,033,804 6 Jam
40,000 - - 6 Jam

- 4,254,855
- 22,692,846

Dari PNPM - MP 22,692,846


Dari Swadaya : -

Dibuat Oleh :
Fasilitator Teknik

WALTERIUS MEKA
PNPM - Mandiri Perdesaan

RENCANA ANGGARAN BIAYA

Propinsi : Nusa Tenggara Timur No. RAB


Kabupaten : Sumba Barat Daya Program
Kecamatan : Kodi Balaghar Jenis Kegiatan
Desa/Kel : Waiha Ukuran / dimensi

Volume
Dari Satuan Kategori
Uraian Dari Dana
Total Swadaya Biaya
Swadaya PNPM-MP
Bahan
1 Semen 5.00 5 Zak
2 Fiber 5200 1.00 1 Bh
5 Pasir Pasang 2.00 2 M3
6 Batu Pecah 3/5 1.00 1 M3
7 Batu Karang 2.00 2 M3
8 Batu Potong - 0 Bh
9 Sirtu 6.00 6 M3
11 Cat Tembok 3 3 Kg
12 Air Kerja 480.00 480 Liter
13 L Bok Paralon 2" 4.00 4 Bh
15 Pipa Paralon 2" 2.00 2 Btg
Sub Total 1)
Alat

Sub Total 2)
Upah
1 Pekerja 8 - 8 HOK
2 Tukang 5 - 5 HOK

Sub Total 3)
Lain - lain

Sub Total 4)
TOTAL BIAYA

Dari PNPM - MP
Sumber Dana
Dari Swadaya :

Disetujui Oleh : Dibuat Oleh


PjOK, Ketua TPK,

Paskalis G. T. Bio, S.Ip


NIP. 19870717 201001 1 010
AN BIAYA

: 20
: PNPM-MPd
Jenis Kegiatan : PAH
Ukuran / dimensi : 1 Unit
Harga
Satuan Jumlah Total
Swadaya PNPM - MP Keterangan
(Rp) ( Rp )
(Rp)
82,500 412,500
7,500,000 7,500,000
120,000 240,000
225,000 225,000
75,000 150,000
2,000 -
65,000 390,000
17,500 52,500
50 24,000
15,000 60,000
96,000 192,000
- 9,246,000

- -

30,000 - 240,000
40,000 - 200,000

- 440,000

- -
- 9,686,000

Dari PNPM - MP 9,686,000


Dari Swadaya : -

Dibuat Oleh :
Fasilitator Teknik

WALTERIUS MEKA
PNPM - Mandiri Perdesaan

RENCANA ANGGARAN BIAYA

Propinsi : Nusa Tenggara Timur No. RAB


Kabupaten : Sumba Barat Daya Program
Kecamatan : Kodi Balaghar Jenis Kegiatan
Desa/Kel : Waiha Ukuran / dimensi

Volume
Dari Satuan Kategori
Uraian Dari Dana
Total Swadaya Biaya
Swadaya PNPM-MP
Bahan
1 Batu Potong 940.00 - 940.00 BH IA
2 Pasir Pasang 4.00 - 4.00 M3 IA
3 Semen 26.00 - 26.00 ZAK IB
4 Kerikil 1.00 - 1.00 M3 IA
5 Batu 5/7 1.00 - 1.00 M3 IA
7 Air Kerja 979.00 - 979.00 Liter IA
- -
Sub Total 1)
Alat

Sub Total 2)
Upah
1 Pekerja 90 - 90 HOK IIIA
2 Tukang 45 - 45 HOK IIIA
3 Mandor - - - HOK IIIA
Sub Total 3)
Lain - lain

Sub Total 4)
TOTAL BIAYA

Dari PNPM - MP
Sumber Dana
Dari Swadaya :

Disetujui Oleh : Dibuat Oleh


PjOK, Ketua TPK,

Paskalis G. T. Bio, S.Ip


NIP. 19870717 201001 1 010
AN BIAYA

: 19
: PNPM-MPd
Jenis Kegiatan : SANITASI
Ukuran / dimensi : 87 M
Harga
Satuan Jumlah Total
Swadaya PNPM - MP Keterangan
(Rp) ( Rp )
(Rp)
2,000 - 1,880,000
120,000 - 480,000
82,500 - 2,145,000
225,000 - 225,000
75,000 75,000
50 48,950
- - -
- 4,853,950

- -

30,000 - 2,700,000
40,000 - 1,800,000
40,000 - - 6 Jam
- 4,500,000

- -
- 9,353,950

Dari PNPM - MP 9,353,950


Dari Swadaya : -

Dibuat Oleh :
Fasilitator Teknik

WALTERIUS MEKA
PNPM - Mandiri Perdesaan

RENCANA ANGGARAN BIAYA

Propinsi : Nusa Tenggara Timur No. RAB


Kabupaten : Sumba Barat Daya Program
Kecamatan : Kodi Balaghar Jenis Kegiatan
Desa/Kel : Waiha Ukuran / dimensi

Volume
Dari Satuan Kategori
Uraian Dari Dana
Total Swadaya Biaya
Swadaya PNPM-MP
Bahan
1 Daun Jendela Kaca 5 MM 19.00 - 19.00 Bh IB
2 Daun Pintu Paniel Papan(Kunci Koday) 4.00 - 4.00 Bh IA
3 Engsel Pintu 16.00 - 16.00 Psg IB
4 Engsel Jendela 57.00 - 57.00 Psg IB
5 Grendel 21.00 - 21.00 Bh IB
6 Kait Angin Roda 36.00 - 36.00 Bh IB
7 Kaca Polos 5 mm (1.12 cm x 0.62 cm) 4.00 - 4.00 Unit IB
- -
- -
Sub Total 1)
Alat

Sub Total 2)
Upah
1 Pekerja 15 - 15 HOK IIIA
2 Tukang 29 - 29 HOK IIIA
3 Mandor - - - HOK IIIA
Sub Total 3)
Lain - lain

Sub Total 4)
TOTAL BIAYA

Dari PNPM - MP
Sumber Dana
Dari Swadaya :

Disetujui Oleh : Dibuat Oleh


PjOK, Ketua TPK,

Paskalis G. T. Bio, S.Ip


NIP. 19870717 201001 1 010
AN BIAYA

: 18
: PNPM-MPd
Jenis Kegiatan : Gantung Pintu Jendela
Ukuran / dimensi : 27 Unit
Harga
Satuan Jumlah Total
Swadaya PNPM - MP Keterangan
(Rp) ( Rp )
(Rp)
350,000 - 6,650,000
1,250,000 - 5,000,000
15,000 - 240,000
15,000 - 855,000
10,000 - 210,000
15,000 - 540,000
142,000 - 568,000
- - -
- - -
- 14,063,000

- -

30,000 - 450,000
40,000 - 1,160,000
40,000 - - 6 Jam
- 1,610,000

- -
- 15,673,000

Dari PNPM - MP 15,673,000


Dari Swadaya : -

Dibuat Oleh :
Fasilitator Teknik

WALTERIUS MEKA
PNPM - Mandiri Perdesaan

RENCANA ANGGARAN BIAYA

Propinsi : Nusa Tenggara Timur No. RAB


Kabupaten : Sumba Barat Daya Program
Kecamatan : Kodi Balaghar Jenis Kegiatan
Desa/Kel : Waiha Ukuran / dimensi

Volume
Dari Satuan Kategori
Uraian Dari Dana
Total Swadaya Biaya
Swadaya PNPM-MP
Bahan
1 Meni Kayu 8.00 - 8.00 Kg IB
2 Dumpul kayu 6.00 - 6.00 Kg IB
3 Cat Kayu 15.00 15.00 Kg IB
4 Minyak cat 2.00 2.00 Kg IB
5 Amplas 8.00 8.00 Lbr IB

Sub Total 1)
Alat
1 Kuas Cat 6.00 - 6.00 Bh IIA

Sub Total 2)
Upah
1 Pekerja 3.00 - 3.00 HOK IIIA
2 Tukang 4.00 - 4.00 HOK IIIA
3 Mandor - - - HOK IIIA
Sub Total 3)
Lain - lain

Sub Total 4)
TOTAL BIAYA

Dari PNPM - MP
Sumber Dana
Dari Swadaya :

Disetujui Oleh : Dibuat Oleh


PjOK, Ketua TPK,

Paskalis G. T. Bio, S.Ip


NIP. 19870717 201001 1 010
AN BIAYA

: 17
: PNPM-MPd
Jenis Kegiatan : Cat Kayu
Ukuran / dimensi : 41.88 M2
Harga
Satuan Jumlah Total
Swadaya PNPM - MP Keterangan
(Rp) ( Rp )
(Rp)
25,000 - 200,000
25,000 - 150,000
50,000 - 750,000
30,000 - 60,000
5,000 - 40,000

- 1,200,000

10,000 - 60,000

- 60,000

30,000 - 90,000 6 Jam


40,000 - 160,000 6 Jam
40,000 - - 6 Jam
- 250,000

-
- 1,510,000

Dari PNPM - MP 1,510,000


Dari Swadaya : -

Dibuat Oleh :
Fasilitator Teknik

WALTERIUS MEKA
PNPM - Mandiri Perdesaan

RENCANA ANGGARAN BIAYA

Propinsi : Nusa Tenggara Timur No. RAB


Kabupaten : Sumba Barat Daya Program
Kecamatan : Kodi Balaghar Jenis Kegiatan
Desa/Kel : Waiha Ukuran / dimensi

Volume
Dari Satuan Kategori
Uraian Dari Dana
Total Swadaya Biaya
Swadaya PNPM-MP
Bahan
1 Cat seng Biru Muda (Merk Pedang) - - - Kg IB

Sub Total 1)
Alat
1 Kuas Cat 6.00 - 6.00 Bh IIA

Sub Total 2)
Upah
1 Pekerja - - - HOK IIIA
2 Tukang - - - HOK IIIA
3 Mandor - - - HOK IIIA
Sub Total 3)
Lain - lain

Sub Total 4)
TOTAL BIAYA

Dari PNPM - MP
Sumber Dana
Dari Swadaya :

Disetujui Oleh : Dibuat Oleh


PjOK, Ketua TPK,

Paskalis G. T. Bio, S.Ip


NIP. 19870717 201001 1 010
AN BIAYA

: 16
: PNPM-MPd
Jenis Kegiatan : Cat Atap
Ukuran / dimensi : 365.85 M2
Harga
Satuan Jumlah Total
Swadaya PNPM - MP Keterangan
(Rp) ( Rp )
(Rp)
15,000 - -

- -

10,000 - 60,000

- 60,000

30,000 - - 6 Jam
40,000 - - 6 Jam
40,000 - - 6 Jam
- -

-
- 60,000

Dari PNPM - MP 60,000


Dari Swadaya : -

Dibuat Oleh :
Fasilitator Teknik

WALTERIUS MEKA
PNPM - Mandiri Perdesaan

RENCANA ANGGARAN BIAYA

Propinsi : Nusa Tenggara Timur No. RAB


Kabupaten : Sumba Barat Daya Program
Kecamatan : Kodi Balaghar Jenis Kegiatan
Desa/Kel : Waiha Ukuran / dimensi

Volume
Dari Satuan Kategori
Uraian Dari Dana
Total Swadaya Biaya
Swadaya PNPM-MP
Bahan
1 Cat Plafon (Oker Putih) 43.00 - 43.00 Kg IB

Sub Total 1)
Alat
1 Kuas Roll (15 Cm) 5.00 - 5.00 Bh IIA

Sub Total 2)
Upah
1 Pekerja 5.00 - 5.00 HOK IIIA
2 Tukang 14.00 - 14.00 HOK IIIA
3 Mandor - - - HOK IIIA
Sub Total 3)
Lain - lain

Sub Total 4)
TOTAL BIAYA

Dari PNPM - MP
Sumber Dana
Dari Swadaya :

Disetujui Oleh : Dibuat Oleh


PjOK, Ketua TPK,

Paskalis G. T. Bio, S.Ip


NIP. 19870717 201001 1 010
AN BIAYA

: 15
: PNPM-MPd
Jenis Kegiatan : Cat Plafon
Ukuran / dimensi : 316.74 M2
Harga
Satuan Jumlah Total
Swadaya PNPM - MP Keterangan
(Rp) ( Rp )
(Rp)
17,500 - 752,500

- 752,500

17,500 - 87,500

- 87,500

30,000 - 150,000 6 Jam


40,000 - 560,000 6 Jam
40,000 - - 6 Jam
- 710,000

-
- 1,550,000

Dari PNPM - MP 1,550,000


Dari Swadaya : -

Dibuat Oleh :
Fasilitator Teknik

WALTERIUS MEKA
PNPM - Mandiri Perdesaan

RENCANA ANGGARAN BIAYA

Propinsi : Nusa Tenggara Timur No. RAB


Kabupaten : Sumba Barat Daya Program
Kecamatan : Kodi Balaghar Jenis Kegiatan
Desa/Kel : Waiha Ukuran / dimensi

Volume
Dari Satuan Kategori
Uraian Dari Dana
Total Swadaya Biaya
Swadaya PNPM-MP
Bahan
1 Cat tembok (Matex Warna) 261.00 - 261.00 Kg IB
2 Plamir 98.00 - 98.00 Kg IB

Sub Total 1)
Alat
1 Kuas Roll 15 Cm 8.00 - 8.00 Bh IIA

Sub Total 2)
Upah
1 Pekerja 29.00 - 29.00 HOK IIIA
2 Tukang 91.00 - 91.00 HOK IIIA
3 Mandor - - - HOK IIIA
Sub Total 3)
Lain - lain

Sub Total 4)
TOTAL BIAYA

Dari PNPM - MP
Sumber Dana
Dari Swadaya :

Disetujui Oleh : Dibuat Oleh


PjOK, Ketua TPK,

Paskalis G. T. Bio, S.Ip


NIP. 19870717 201001 1 010
AN BIAYA

: 14
: PNPM-MPd
Jenis Kegiatan : Cat Tembok
Ukuran / dimensi : 653.36 M2
Harga
Satuan Jumlah Total
Swadaya PNPM - MP Keterangan
(Rp) ( Rp )
(Rp)
17,500 - 4,567,500
15,000 - 1,470,000

- 6,037,500

17,500 - 140,000

- 140,000

30,000 - 870,000 6 Jam


40,000 - 3,640,000 6 Jam
40,000 - - 6 Jam
- 4,510,000

-
- 10,687,500

Dari PNPM - MP 10,687,500


Dari Swadaya : -

Dibuat Oleh :
Fasilitator Teknik

WALTERIUS MEKA
PNPM - Mandiri Perdesaan

RENCANA ANGGARAN BIAYA

Propinsi : Nusa Tenggara Timur No. RAB


Kabupaten : Sumba Barat Daya Program
Kecamatan : Kodi Balaghar Jenis Kegiatan
Desa/Kel : Waiha Ukuran / dimensi

Volume
Dari Satuan Kategori
Uraian Dari Dana
Total Swadaya Biaya
Swadaya PNPM-MP
Bahan
1 Semen 50.00 - 50.00 Zak IB
2 Pasir pasang 12.00 - 12.00 M3 IA
3 Keramik 30 x 30 277.00 - 277.00 M3 IB
4 Semen Warna 11.00 - 11.00 Kg IB

Sub Total 1)
Alat

Sub Total 2)
Upah
1 Pekerja 122.00 - 122.00 HOK IIIA
2 Tukang 64.00 - 64.00 HOK IIIA
3 Mandor - - - HOK IIIA

Sub Total 3)
Lain - lain

Sub Total 4)
TOTAL BIAYA

Dari PNPM - MP
Sumber Dana
Dari Swadaya :

Disetujui Oleh : Dibuat Oleh


PjOK, Ketua TPK,

Paskalis G. T. Bio, S.Ip


NIP. 19870717 201001 1 010
AN BIAYA

: 13
: PNPM-MPd
Jenis Kegiatan : Pas. Keramik
Ukuran / dimensi : 263.5 M3
Harga
Satuan Jumlah Total
Swadaya PNPM - MP Keterangan
(Rp) ( Rp )
(Rp)
82,500 - 4,125,000
120,000 - 1,440,000
65,000 - 18,005,000
10,000 - 110,000

- 23,680,000

- -

30,000 - 3,660,000 6 Jam


40,000 - 2,560,000 6 Jam
40,000 - - 6 Jam

- 6,220,000

- 29,900,000

Dari PNPM - MP 29,900,000


Dari Swadaya : -

Dibuat Oleh :
Fasilitator Teknik

WALTERIUS MEKA
PNPM - Mandiri Perdesaan

RENCANA ANGGARAN BIAYA

Propinsi : Nusa Tenggara Timur No. RAB


Kabupaten : Sumba Barat Daya Program
Kecamatan : Kodi Balaghar Jenis Kegiatan
Desa/Kel : Waiha Ukuran / dimensi

Volume
Dari Satuan Kategori
Uraian Dari Dana
Total Swadaya Biaya
Swadaya PNPM-MP
Bahan
1 Kerikil 28.00 - 28.00 M3 IA
2 Pasir pasang 16.00 - 16.00 M3 IA
3 Semen 101.00 - 101.00 M3 IB
4 Air Kerja 11,067.00 - 11,067.00 Liter IA

Sub Total 1)
Alat

Sub Total 2)
Upah
1 Pekerja 55.00 - 55.00 HOK IIIA
2 Tukang 9.00 - 9.00 HOK IIIA
3 Mandor - - - HOK IIIA

Sub Total 3)
Lain - lain

Sub Total 4)
TOTAL BIAYA

Dari PNPM - MP
Sumber Dana
Dari Swadaya :

Disetujui Oleh : Dibuat Oleh


PjOK, Ketua TPK,

Paskalis G. T. Bio, S.Ip


NIP. 19870717 201001 1 010
AN BIAYA

: 12
: PNPM-MPd
Jenis Kegiatan : Lantai Rabat
Ukuran / dimensi : 31.62 M3
Harga
Satuan Jumlah Total
Swadaya PNPM - MP Keterangan
(Rp) ( Rp )
(Rp)
225,000 - 6,300,000
120,000 - 1,920,000
82,500 - 8,332,500
50 - 553,350

- 17,105,850

- -

30,000 - 1,650,000 6 Jam


40,000 - 360,000 6 Jam
40,000 - - 6 Jam

- 2,010,000

- 19,115,850

Dari PNPM - MP 19,115,850


Dari Swadaya : -

Dibuat Oleh :
Fasilitator Teknik

WALTERIUS MEKA
PNPM - Mandiri Perdesaan

RENCANA ANGGARAN BIAYA

Propinsi : Nusa Tenggara Timur No. RAB


Kabupaten : Sumba Barat Daya Program
Kecamatan : Kodi Balaghar Jenis Kegiatan
Desa/Kel : Waiha Ukuran / dimensi

Volume
Dari Satuan Kategori
Uraian Dari Dana
Total Swadaya Biaya
Swadaya PNPM-MP
Bahan
1 Sirtu 142.00 - 142.00 M3 IA
2 Pasir Urug 19.00 - 19.00 M3 IA

Sub Total 1)
Alat

Sub Total 2)
Upah
1 Pekerja 28.00 - 28.00 HOK IIIA
2 Tukang - - - HOK IIIA
3 Mandor - - - HOK IIIA
Sub Total 3)
Lain - lain

Sub Total 4)
TOTAL BIAYA

Dari PNPM - MP
Sumber Dana
Dari Swadaya :

Disetujui Oleh : Dibuat Oleh


PjOK, Ketua TPK,

Paskalis G. T. Bio, S.Ip


NIP. 19870717 201001 1 010
AN BIAYA

: 11
: PNPM-MPd
Jenis Kegiatan : Pek. Peninggi Lantai
Ukuran / dimensi : 134.385 M3
Harga
Satuan Jumlah Total
Swadaya PNPM - MP Keterangan
(Rp) ( Rp )
(Rp)
65,000 - 9,230,000
120,000 - 2,280,000

- 11,510,000

30,000 - 840,000 6 Jam


40,000 - - 6 Jam
40,000 - - 6 Jam
- 840,000

- 12,350,000

Dari PNPM - MP 12,350,000


Dari Swadaya : -

Dibuat Oleh :
Fasilitator Teknik

WALTERIUS MEKA
PNPM - Mandiri Perdesaan

RENCANA ANGGARAN BIAYA

Propinsi : Nusa Tenggara Timur No. RAB


Kabupaten : Sumba Barat Daya Program
Kecamatan : Kodi Balaghar Jenis Kegiatan
Desa/Kel : Waiha Ukuran / dimensi

Volume
Dari Satuan Kategori
Uraian Dari Dana
Total Swadaya Biaya
Swadaya PNPM-MP
Bahan
1 Tripleks 4 mm 114.00 - 114.00 Lbr IB
2 Kayu 5/7 5.00 - 5.00 M3 IA
3 Paku 5 - 7 CM 38.00 - 38.00 Kg IB
4 List Papan Profile 300.00 - 300.00 M' IA
5 Paku Triplex 10.00 10 Kg IB
Sub Total 1)
Alat

Sub Total 2)
Upah
1 Pekerja 56.06 - 56.06 HOK IIIA
2 Tukang 84.08 - 84.08 HOK IIIA
3 Mandor - - - HOK IIIA
Sub Total 3)
Lain - lain

Sub Total 4)
TOTAL BIAYA

Dari PNPM - MP
Sumber Dana
Dari Swadaya :

Disetujui Oleh : Dibuat Oleh


PjOK, Ketua TPK,

Paskalis G. T. Bio, S.Ip


NIP. 19870717 201001 1 010
AN BIAYA

: 10
: PNPM-MPd
Jenis Kegiatan : Plafon + Gantungan
Ukuran / dimensi : 316.74 M2
Harga
Satuan Jumlah Total
Swadaya PNPM - MP Keterangan
(Rp) ( Rp )
(Rp)
75,000 - 8,550,000
2,200,000 - 11,000,000
21,000 - 798,000
7,500 - 2,250,000
25,000 - 250,000
- 22,848,000

30,000 - 1,681,680 6 Jam


40,000 - 3,363,360 6 Jam
40,000 - - 6 Jam
- 5,045,040

- 27,893,040

Dari PNPM - MP 27,893,040


Dari Swadaya : -

Dibuat Oleh :
Fasilitator Teknik

WALTERIUS MEKA
PNPM - Mandiri Perdesaan

RENCANA ANGGARAN BIAYA

Propinsi : Nusa Tenggara Timur No. RAB


Kabupaten : Sumba Barat Daya Program
Kecamatan : Kodi Balaghar Jenis Kegiatan
Desa/Kel : Waiha Ukuran / dimensi

Volume
Dari Satuan Kategori
Uraian Dari Dana
Total Swadaya Biaya
Swadaya PNPM-MP
Bahan
1 Papan 3/25 1.000 - 1.00 M3 IA
2 Paku 5.00 - 5.00 Kg IB

Sub Total 1)
Alat

Sub Total 2)
Upah
1 Pekerja 14.00 - 14.00 HOK IIIA
2 Tukang 21.00 - 21.00 HOK IIIA
3 Mandor - - - HOK IIIA
Sub Total 3)
Lain - lain

Sub Total 4)
TOTAL BIAYA

Dari PNPM - MP
Sumber Dana
Dari Swadaya :

Disetujui Oleh : Dibuat Oleh


PjOK, Ketua TPK,

Paskalis G. T. Bio, S.Ip


NIP. 19870717 201001 1 010
AN BIAYA

: 09
: PNPM-MPd
Jenis Kegiatan : Pek. List Plank
Ukuran / dimensi : 88.04 M
Harga
Satuan Jumlah Total
Swadaya PNPM - MP Keterangan
(Rp) ( Rp )
(Rp)
2,200,000 - 2,200,000
21,000 - 105,000

- 2,305,000

30,000 - 420,000 6 Jam


40,000 - 840,000 6 Jam
40,000 - - 6 Jam
- 1,260,000

- 3,565,000

Dari PNPM - MP 3,565,000


Dari Swadaya : -

Dibuat Oleh :
Fasilitator Teknik

WALTERIUS MEKA
PNPM - Mandiri Perdesaan

RENCANA ANGGARAN BIAYA

Propinsi : Nusa Tenggara Timur No. RAB


Kabupaten : Sumba Barat Daya Program
Kecamatan : Kodi Balaghar Jenis Kegiatan
Desa/Kel : Waiha Ukuran / dimensi

Volume
Dari Satuan Kategori
Uraian Dari Dana
Total Swadaya Biaya
Swadaya PNPM-MP
Bahan
1 Pasir Pasang 16.00 - 16.00 M3 IA
2 Semen 127.00 - 127.00 Sak IB
3 Air Kerja 16,334.00 - 16,334.00 Liter IA
Sub Total 1)
Alat
1 Kawat Ayak 13 13 M IIA

Sub Total 2)
Upah
1 Pekerja 140 - 140 HOK IIIA
2 Tukang 183 - 183 HOK IIIA
3 Mandor - - - HOK IIIA
Sub Total 3)
Lain - lain

Sub Total 4)
TOTAL BIAYA

Dari PNPM - MP
Sumber Dana
Dari Swadaya :

Disetujui Oleh : Dibuat Oleh


PjOK, Ketua TPK,

Paskalis G. T. Bio, S.Ip


NIP. 19870717 201001 1 010
AN BIAYA

: 08
: PNPM-MPd
Jenis Kegiatan : Plesteran & Acian
Ukuran / dimensi : 653.36 M2
Harga
Satuan Jumlah Total
Swadaya PNPM - MP Keterangan
(Rp) ( Rp )
(Rp)
120,000 - 1,920,000
82,500 - 10,477,500
50 - 816,700
- 13,214,200

30,000 390,000
-
- 390,000

30,000 - 4,200,000 6 Jam


40,000 - 7,320,000 6 Jam
40,000 - - 6 Jam
- 11,520,000

- 25,124,200

Dari PNPM - MP 25,124,200


Dari Swadaya : -

Dibuat Oleh :
Fasilitator Teknik

WALTERIUS MEKA
PNPM - Mandiri Perdesaan

RENCANA ANGGARAN BIAYA

Propinsi : Nusa Tenggara Timur No. RAB


Kabupaten : Sumba Barat Daya Program
Kecamatan : Kodi Balaghar Jenis Kegiatan
Desa/Kel : Waiha Ukuran / dimensi

Volume
Dari Satuan Kategori
Uraian Dari Dana
Total Swadaya Biaya
Swadaya PNPM-MP
Bahan
1 Seng BJLS 0.20 274.00 - 274.00 Lbr IB
2 Seng plat 40 cm 29.00 - 29.00 m IB
3 Paku seng 8.00 - 8.00 Kg IB

Sub Total 1)
Alat

Sub Total 2)
Upah
1 Pekerja 47.00 - 47.00 HOK IIIA
2 Tukang 26.00 - 26.00 HOK IIIA
3 Mandor - - - HOK IIIA
Sub Total 3)
Lain - lain

Sub Total 4)
TOTAL BIAYA

Dari PNPM - MP
Sumber Dana
Dari Swadaya :

Disetujui Oleh : Dibuat Oleh


PjOK, Ketua TPK,

Paskalis G. T. Bio, S.Ip


NIP. 19870717 201001 1 010
AN BIAYA

: 07
: PNPM-MPd
Jenis Kegiatan : Atap Seng Gelombang
Ukuran / dimensi : 365.848 M2
Harga
Satuan Jumlah Total
Swadaya PNPM - MP Keterangan
(Rp) ( Rp )
(Rp)
65,000 - 17,810,000
20,000 - 580,000
25,000 - 200,000

- 18,590,000

30,000 - 1,410,000 6 Jam


40,000 - 1,040,000 6 Jam
40,000 - - 6 Jam
- 2,450,000

- 21,040,000

Dari PNPM - MP 21,040,000


Dari Swadaya : -

Dibuat Oleh :
Fasilitator Teknik

WALTERIUS MEKA
PNPM - Mandiri Perdesaan

RENCANA ANGGARAN BIAYA

Propinsi : Nusa Tenggara Timur No. RAB


Kabupaten : Sumba Barat Daya Program
Kecamatan : Kodi Balaghar Jenis Kegiatan
Desa/Kel : Waiha Ukuran / dimensi

Volume
Dari Satuan Kategori
Uraian Dari Dana
Total Swadaya Biaya
Swadaya PNPM-MP
Bahan
1 Balok 8/12 kls II 3.00 - 3.00 M3 IA
2 Beugel U Bulat 12.00 - 12.00 Bh IB
3 Beugel U Plat 6.00 - 6.00 Bh IB
4 Baut dan mur 150.00 - 150.00 Bh IB
5 Paku Putih 10.00 - 10.00 Kg IB
6 Paku 7 - 10 cm 4.00 4.00 Bh IB
7 Kayu 6/12 5.00 - 5.00 M3 IA
8 Besi Strip 36.00 - 36.00 Bh IB

Sub Total 1)
Alat

Sub Total 2)
Upah
1 Pekerja 32.00 - 32.00 HOK IIIA
2 Tukang 98.00 - 98.00 HOK IIIA
3 Mandor - - - HOK IIIA
Sub Total 3)
Lain - lain

Sub Total 4)
TOTAL BIAYA

Dari PNPM - MP
Sumber Dana
Dari Swadaya :

Disetujui Oleh : Dibuat Oleh


PjOK, Ketua TPK,

Paskalis G. T. Bio, S.Ip


NIP. 19870717 201001 1 010
AN BIAYA

: 06
: PNPM-MPd
Jenis Kegiatan : Kab & Gording
Ukuran / dimensi : 7.41 M3
Harga
Satuan Jumlah Total
Swadaya PNPM - MP Keterangan
(Rp) ( Rp )
(Rp)
2,200,000 - 6,600,000
18,000 - 216,000
18,000 - 108,000
8,000 - 1,200,000
25,000 - 250,000
21,000 - 84,000
2,200,000 - 11,000,000
7,500 - 270,000

- 19,728,000

30,000 - 960,000 6 Jam


40,000 - 3,920,000 6 Jam
40,000 - - 6 Jam
- 4,880,000

- 24,608,000

Dari PNPM - MP 24,608,000


Dari Swadaya : -

Dibuat Oleh :
Fasilitator Teknik

WALTERIUS MEKA
PNPM - Mandiri Perdesaan

RENCANA ANGGARAN BIAYA

Propinsi : Nusa Tenggara Timur No. RAB


Kabupaten : Sumba Barat Daya Program
Kecamatan
: Kodi Balaghar Jenis Kegiatan
Desa/Kel : Waiha Ukuran / dimensi
Harga
Volume Satuan
Dari Satuan Kategori
Uraian Dari Dana
Total Swadaya Biaya
Swadaya PNPM-MP
Bahan (Rp)
1 Kayu Kls I (Jati Lokal) 2.00 - 2.00 M3 IA 2,500,000
2 Papan 2/20 0.53 - 0.53 M3 IA 2,200,000
3 Paku 7 - 10 cm 4.00 - 4.00 Kg IB 21,000

Sub Total 1)
Alat

Sub Total 2)
Upah
1 Pekerja 13.00 - 13.00 HOK IIIA 30,000
2 Tukang 44.00 - 44.00 HOK IIIA 40,000

Sub Total 3)
Lain - lain

Sub Total 4)
TOTAL BIAYA

Dari PNPM - MP
Sumber Dana
Dari Swadaya :

Disetujui Oleh : Dibuat Oleh


PjOK, Ketua TPK,

Paskalis G. T. Bio, S.Ip


NIP. 19870717 201001 1 010
: 05
: PNPM-MPd
Kosen Pintu, Jendela &
: Boven
: 25 Unit

Jumlah Total
Swadaya PNPM - MP Keterangan
(Rp) ( Rp )

- 5,000,000
- 1,163,290
- 84,000

- 6,247,290

- 390,000 6 Jam
- 1,760,000 6 Jam

- 2,150,000

- 8,397,290

8,397,290
-

Dibuat Oleh :
Fasilitator Teknik

WALTERIUS MEKA
PNPM - Mandiri Perdesaan

RENCANA ANGGARAN BIAYA

Propinsi : Nusa Tenggara Timur No. RAB


Kabupaten : Sumba Barat Daya Program
Kecamatan : Kodi Balaghar Jenis Kegiatan
Desa/Kel : Waiha Ukuran / dimensi

Volume
Dari Satuan Kategori
Uraian Dari Dana
Total Swadaya Biaya
Swadaya PNPM-MP
Bahan
1 Batu Potong 8,483.00 - 8,483.00 Bh IA
2 Pasir Pasang 14.00 - 14.00 M3 IA
3 Semen 76.00 - 76.00 Zak IB
4 Air Kerja 10,000.00 - 10,000.00 Liter IA
Sub Total 1)
Alat

Sub Total 2)
Upah
1 Pekerja 104 - 104 HOK IIIA
2 Tukang 119 - 119 HOK IIIA
3 Mandor - - - HOK
Sub Total 3)
Lain - lain

Sub Total 4)
TOTAL BIAYA

Dari PNPM - MP
Sumber Dana
Dari Swadaya :

Disetujui Oleh : Dibuat Oleh


PjOK, Ketua TPK,

Paskalis G. T. Bio, S.Ip


NIP. 19870717 201001 1 010
AN BIAYA

: 04
: PNPM-MPd
Jenis Kegiatan : Pas. Tembok
Ukuran / dimensi : 314.18 M2
Harga
Satuan Jumlah Total
Swadaya PNPM - MP Keterangan
(Rp) ( Rp )
(Rp)
2,000 - 16,966,000
120,000 - 1,680,000
82,500 - 6,270,000
50 - 500,000
- 25,416,000

- -

30,000 - 3,120,000 6 Jam


40,000 - 4,760,000 6 Jam
40,000 - - 6 Jam
- 7,880,000

- 33,296,000

Dari PNPM - MP 33,296,000


Dari Swadaya : -

Dibuat Oleh :
Fasilitator Teknik

WALTERIUS MEKA
PNPM Mandiri - Perdesaan

Hasil Survei Harga Bahan/Alat


Kabupaten : Sumba Barat Daya
Kecamatan : Kodi Utara
Desa : ..

Nama dan Alamat Sup

No. Jenis Bahan/Alat Satuan


CRYSTAL EKA PUTRA HAMBERS

I BAHAN NON LOKAL

1 Amplas Lembar 4,000.00 4,000.00 5,000.00

2 Besi Beton 12 mm Asli (SNI) Staf / lonjor 95,000.00 95,000.00 105,000.00

3 Besi Beton 10 mm Asli (SNI) Staf / lonjor 70,000.00 70,000.00 85,000.00

4 Besi Beton 6 mm Asli (SNI) Staf / lonjor 30,000.00 30,000.00 34,000.00

5 Baut 15 & 25 Bh 6,875.00 7,500.00 6,250.00

6 Beugel U plat Bh 13,750.00 13,500.00 35,000.00

7 Beugel U bulat Bh 13,750.00 15,000.00 30,000.00

8 Besi Strip Bh 5,500.00 5,500.00 7,000.00

9 Cat Seng Biru Muda Merk Boyo Kg 25,000.00 25,000.00 17,000.00

10 Cat Plafon (Oker Putih) Kg 6,000.00 14,500.00

11 Cat Tembok (Matex Warna) 25 Kg Kg 10,800.00 10,600.00 11,600.00

12 Cat Kayu (Cokelat) Kg 42,500.00 42,500.00 50,000.00

13 Dumpul Kayu Kg 25,000.00 25,000.00 25,000.00

Formulir untuk Desa


14 Engsel + skrup Psg 7,500.00 7,500.00 15,000.00

15 Grendel + skrup Buah 5,000.00 5,000.00 8,000.00

16 Kawat ikat Kg 22,000.00 20,000.00 20,000.00

17 Keramik 30 x 30 M2 50,000.00 50,000.00 50,000.00

18 Keramik 20 x 20 M2 60,000.00

19 Kait Angin 8" (Kotak) Buah 10,000.00

20 Kaca Polos 5 MM (110 x 60 cm) Lembar 95,000.00

21 Kaca Reben 5 MM Lembar

22 Kaca Polos 3 MM Lembar

23 Kaca Reben 3 MM Lembar

24 Kunci Tanam (Odesta) Bh 130,000.00

25 L bok paralo 4 " Buah 15,000.00 15,000.00 15,000.00

26 Kloset jongkok Buah 100,000.00 100,000.00 150,000.00

27 L Bok Paralon 2" Bh 7,500.00 7,500.00 7,500.00

28 Meni kayu Kg 25,000.00 25,000.00 25,000.00

29 Minyak cat Kg 20,000.00 15,000.00 25,000.00

30 Paku 7 - 10 cm Kg 15,000.00 15,000.00 17,000.00

31 Paku seng Kg 20,000.00 20,000.00 22,500.00

32 Paku tripleks Kg 20,000.00 20,000.00 25,000.00

33 Paku putih 15 & 20 cm Kg 20,000.00 20,000.00 22,500.00

34 Plamur Kg 6,000.00 6,000.00 25,000.00

35 Pipa udara T Buah 150,000.00

36 Pipa Paralon ( 4 " ) Batang 150,000.00 150,000.00 140,000.00

Formulir untuk Desa


37 Pipa Paralon 2" Btg 90,000.00 90,000.00 65,000.00

38 Semen warna Kg 7,500.00 7,500.00 12,500.00

39 Stop Kran " Bh 10,000.00 10,000.00 50,000.00

Formulir untuk Desa


40 Semen Tonasa/ Gresik 50 Kg Zak 68,000.00 70,000.00 80,000.00

41 Seng Gelombang BJLS 0.20 Lembar 40,000.00 40,000.00 42,000.00

42 Seng licin M' 17,500.00 17,500.00 17,000.00

43 Tripleks 9 mm Lembar 115,000.00 120,000.00 125,000.00

44 Tripleks 3 mm Lembar 52,500.00 55,000.00 55,000.00

45 Triplex 4 mm Lembar

46 Take Wood Lembar 90,000.00 85,000.00

47 Talang Air (4m) M 16,000.00 16,000.00 30,000.00

48 Terpal Lembar 200,000.00 200,000.00 275,000.00

49 Ember Cor (Ban) Buah 6,000.00 6,000.00 12,500.00

50 Sekop Cap Mata Buah 60,000.00

51 Linggis Buah 60,000.00

52 Benang nilon Pis/kpl 6,000.00 6,000.00 7,500.00

53 Selang waterpas M' 2,500.00 2,500.00 3,000.00

54 Kuas cat Buah 5,000.00 10,000.00 7,500.00

55 Kuas rol Buah 15,000.00 15,000.00 17,500.00

56 Gergaji Besi Buah 25,000.00 50,000.00 60,000.00

57 Anak Gergaji Buah 5,000.00 12,500.00 15,000.00

58 Kunci besi ( kunci 10 dan kunci 6 ) Buah 12,000.00 12,500.00 15,000.00

59 Kawat ayak M' 25,000.00 25,000.00 35,000.00

BAHAN LOKAL .,.

1 MTG ????? BUNDA MULIA

2 Pasir Pasang M3 110,000.00 120,000.00 115,000.00

Formulir untuk Desa


3 Batu Karang M3 60,000.00 70,000.00 65,000.00

4 Batu Pecah M3 240,000.00 250,000.00 245,000.00

5 Kayu 6/12 Kls II M3 2,000,000.00 2,150,000.00 2,100,000.00

6 Kayu 8/12Kls II M3 2,000,000.00 2,150,000.00 2,100,000.00

7 Balok Kelapa M3 1,500,000.00 1,650,000.00 1,600,000.00

8 Kayu Kls I 6/12 Jati Lokal M3 2,500,000.00 3,700,000.00 2,650,000.00

9 Usuk 5/7 Kls II Mahoni/ Jati Putih M3 2,000,000.00 2,150,000.00 2,100,000.00

10 Usuk 5/7 (Kelapa) M3 1,500,000.00 1,650,000.00 1,600,000.00

11 Papan Kls II M3 2,000,000.00 2,150,000.00 2,100,000.00

12 Batako Bh 3,000.00 3,000.00 3,500.00

13 Batu Potong Bh 2,000.00 2,500.00 2,500.00

14 Sirtu Gunung M3 60,000.00 60,000.00 65,000.00

15 Air Kerja Liter

MEBELER MIMPI MTG

Meja Siswa (Papan Kls II) Bh 400,000.00 350,000.00 350,000.00

Kursi Siswa (Papan Kls II) Bh 230,000.00 200,000.00 200,000.00

Lemari 2 Pintu (180 x 140) Bh 1,200,000.00 1,100,000.00 1,100,000.00

Meja 1/2 Biro Bh 1,000,000.00 900,000.00 900,000.00

Kursi Guru (Spon) Bh 350,000.00 250,000.00 250,000.00

Papan Tulis Bh 300,000.00 250,000.00 250,000.00

Daun Pintu Paniel Papan Kls I Bh 1,500,000.00 1,000,000.00 1,000,000.00


Daun Pintu Paniel Triplex Lapis Seng
Dalam Bh 750,000.00 750,000.00 750,000.00

Daun Jendela Paniel Kaca 5 MM Bh 425,000.00 400,000.00 400,000.00

Formulir untuk Desa


Tertanda
CV/ Toko Pemilik Bahan d

(
.,.2011
Mengetahui: Dibuat Oleh:
Ketua TPK Sekretaris TPK

(..) (..

Formulir untuk Desa


Form.23 Form.23

an/Alat

an Alamat Suplier

Harga Satuan
OLYMPIC SAMUDRA

5,000.00 6,000.00 4,800.00

95,000.00 95,000.00 97,000.00

75,000.00 75,000.00 75,000.00

40,000.00 40,000.00 34,800.00

20,000.00 20,000.00 12,125.00

20,000.00 20,000.00 20,450.00

20,000.00 20,000.00 19,750.00

20,000.00 20,000.00 11,600.00

50,000.00 50,000.00 33,400.00

20,000.00 20,000.00 15125

18,000.00 18,000.00 13,800.00

50,000.00 50,000.00 47,000.00

35,000.00 35,000.00 29,000.00

Formulir untuk Desa


20,000.00 20,000.00 14,000.00

20,000.00 20,000.00 11,600.00

30,000.00 30,000.00 24,400.00

65,000.00 45,000.00 52,000.00

60,000.00 60,000.00 60,000.00

20,000.00 20,000.00 16,666.67

150,000.00 150,000.00 131,666.67

150,000.00 155,000.00 145,000.00

30,000.00 35,000.00 22,000.00

250,000.00 225,000.00 165,000.00

15,000.00 15,000.00 10,500.00

30,000.00 30,000.00 27,000.00

40,000.00 40,000.00 28,000.00

25,000.00 25,000.00 19,400.00

35,000.00 30,000.00 25,500.00

40,000.00 40,000.00 29,000.00

45,000.00 35,000.00 28,500.00

30,000.00 30,000.00 19,400.00

250,000.00 200,000.00 200,000.00

125,000.00 125,000.00 138,000.00

Formulir untuk Desa


100,000.00 100,000.00 89,000.00

10,000.00 10,000.00 9,500.00

50,000.00 50,000.00 34,000.00

Formulir untuk Desa


85,000.00 85,000.00 77,600.00

50,000.00 50,000.00 44,400.00

25,000.00 25,000.00 20,400.00

175,000.00 150,000.00 137,000.00

54,166.67

65,000.00 65,000.00 65,000.00

120,000.00 120,000.00 103,750.00

30,000.00 30,000.00 24,400.00

350,000.00 350,000.00 275,000.00

35,000.00 25,000.00 16,900.00

100,000.00 100,000.00 86,666.67

100,000.00 100,000.00 86,666.67

15,000.00 10,000.00 8,900.00

5,000.00 5,000.00 3,600.00

15,000.00 15,000.00 10,500.00

30,000.00 30,000.00 21,500.00

40,000.00 50,000.00 45,000.00

25,000.00 15,000.00 14,500.00

30,000.00 25,000.00 18,900.00

30,000.00 30,000.00 29,000.00

.,.2011

110,000.00 110,000.00 111,666.67

Formulir untuk Desa


60,000.00 60,000.00 61,666.67

240,000.00 240,000.00 243,000.00

2,000,000.00 2,000,000.00 2,050,000.00

2,000,000.00 2,000,000.00 2,050,000.00

1,500,000.00 1,500,000.00 1,550,000.00

2,500,000.00 2,500,000.00 2,770,000.00

2,000,000.00 2,000,000.00 2,050,000.00

1,500,000.00 1,500,000.00 1,550,000.00

2,000,000.00 2,000,000.00 2,050,000.00

3,000.00 3,000.00 3,100.00

2,000.00 2,000.00 2,200.00

60,000.00 60,000.00 61,000.00

50.00

366,666.67

210,000.00

1,133,333.33

933,333.33

283,333.33

266,666.67

1,166,666.67

750,000.00

408,333.33

Formulir untuk Desa


Tertanda
o Pemilik Bahan dan Alat

..)

Dibuat Oleh:
Sekretaris TPK

...)

Formulir untuk Desa


PNPM - Mandiri Perdesaan

RENCANA ANGGARAN BIAYA

Propinsi : Nusa Tenggara Timur No. RAB


Kabupaten : Sumba Barat Daya Program
Kecamatan : Kodi Balaghar Jenis Kegiatan
Desa/Kel : Waiha Ukuran / dimensi
Harga
Volume Satuan
Dari Satuan Kategori
Uraian Dari Dana
Total Swadaya Biaya
Swadaya PNPM-MP
Bahan (Rp)
1 Bambu 50.00 50.00 - Btng IA 5,000
2 Pasir 5.00 - 5.00 M3 IA 120,000
3 Kerikil 7.00 - 7.00 M3 IB 225,000
4 Semen 61.00 - 61.00 Sak IB 82,500
5 Besi 10 mm 128.00 - 128.00 Btg IB 95,000
6 Besi 6 mm 80.00 - 80.00 Btg IB 42,500
7 Kawat ikat 27.00 - 27.00 Kg IB 25,000
8 Papan Cor 1.92 0.92 1.00 M3 IA 700,000
9 Usuk Kls III 0.35 0.35 - M3 IA 700,000
10 Paku 7 - 10 cm 14.00 - 14.00 Kg IB 21,000
11 Air Kerja 912.00 - 912.00 Liter IA 50

Sub Total 1)
Alat
1 Gergaji Besi 1 - 1 Bh IIA 50,000
2 Anak gergaji besi ( Waja ) 2 - 2 Set IIA 16,000
3 Kunci Besi 4 - 4 Bh IIA 15,000

Sub Total 2)
Upah
1 Pekerja 18.00 - 18.00 HOK IIIA 30,000
2 Tukang 4.00 - 4.00 HOK IIIA 40,000
3 Mandor - - - HOK IIIA 40,000
Sub Total 3)
Lain - lain

Sub Total 4)
TOTAL BIAYA

Dari PNPM - MP
Sumber Dana
Dari Swadaya :

Disetujui Oleh : Dibuat Oleh


PjOK, Ketua TPK,

Paskalis G. T. Bio, S.Ip


NIP. 19870717 201001 1 010
: 03
: PNPM-MPd
: Cor Beton 1 : 2 : 3
: 9.12 M3

Jumlah Total
Swadaya PNPM - MP Keterangan
(Rp) ( Rp )

250,000 -
- 600,000
- 1,575,000
- 5,032,500
- 12,160,000
- 3,400,000
- 675,000
644,000 700,000
245,000 -
- 294,000
- 45,600

1,139,000 24,482,100

- 50,000
- 32,000
- 60,000

- 142,000

- 540,000 6 Jam
- 160,000 6 Jam
- - 6 Jam
- 700,000

1,139,000 25,324,100

25,324,100
1,139,000

Dibuat Oleh :
Fasilitator Teknik

WALTERIUS MEKA
PNPM - Mandiri Perdesaan

RENCANA ANGGARAN BIAYA

Propinsi : Nusa Tenggara Timur No. RAB


Kabupaten : Sumba Barat Daya Program
Kecamatan : Kodi Balaghar Jenis Kegiatan
Desa/Kel : Waiha Ukuran / dimensi

Volume
Dari Satuan Kategori
Uraian Dari Dana
Total Swadaya Biaya
Swadaya PNPM-MP
Bahan
1 Batu 15/20 78.00 18.00 60.00 M3 IA
2 Pasir Urug 8.00 - 8.00 M3 IA
3 Pasir Pasang 33.00 15.00 18.00 M3 IA
4 Semen 183.00 - 183.00 Zak IB
5 Tanah Urug 37.00 37.00 - M3 IA
6 Air Kerja 6,011.00 - 6,011.00 Liter IA
Sub Total 1)
Alat
1 Ember Cor 15.00 - 15.00 Bh IIA

Sub Total 2)
Upah
1 Pekerja 90 - 90 HOK IIIA
2 Tukang 36 - 36 HOK IIIA
3 Mandor - - - HOK IIIA
Sub Total 3)
Lain - lain

Sub Total 4)
TOTAL BIAYA

Dari PNPM - MP
Sumber Dana
Dari Swadaya :

Disetujui Oleh : Dibuat Ole


PjOK, Ketua TPK,

Paskalis G. T. Bio, S.Ip


NIP. 19870717 201001 1 010
AN BIAYA

: 02
: PNPM-MPd
Jenis Kegiatan : Pasangan Batu 1 : 4
Ukuran / dimensi : 60.11 M3
Harga
Satuan Jumlah Total
Swadaya PNPM - MP Keterangan
(Rp) ( Rp )
(Rp)
75,000 1,350,000 4,500,000
120,000 - 960,000
120,000 1,800,000 2,160,000
82,500 - 15,097,500
20,000 740,000 -
50 - 300,550
3,890,000 23,018,050

15,000 - 225,000

- 225,000

30,000 - 2,700,000 6 Jam


40,000 - 1,440,000 6 Jam
40,000 - - 7 Jam
- 4,140,000

-
3,890,000 27,383,050

Dari PNPM - MP 27,383,050


Dari Swadaya : 3,890,000

Dibuat Oleh :
Fasilitator Teknik

WALTERIUS MEKA
PNPM - Mandiri Perdesaan

RENCANA ANGGARAN BIAYA

Propinsi : Nusa Tenggara Timur No. RAB


Kabupaten : Sumba Barat Daya Program

Kecamatan : Kodi Balaghar Jenis Kegiatan


Desa/Kel : Waiha Ukuran / dimensi
Harga
Volume Satuan
Kategori
Uraian Dari Dari Dana Satuan
Total Biaya
Swadaya PNPM-MP
Bahan (Rp)
1 Papan 2/20 - 3 m' Perancah 0.64 0.64 - Lbr IA 700,000
2 Kayu 5/7- 4 m' Perancah 0.31 0.31 - Btg IA 700,000
3 Paku Campur 3.00 - 3.00 Kg IIA 21,000

Sub Total 1)
Alat
1 Sekop 12.00 - 12.00 Bh IIA 80,000
2 Linggis 4.00 4.00 - Btg IIA 80,000
3 Benang Nilon 3.00 - 3.00 Pori IIA 10,000
4 Selang Water pass 25.00 - 25.00 M IIA 3,500

Sub Total 2)
Upah
1 Pekerja 58.00 23.00 35 HOK IIIA 30,000
2 Tukang 1.00 - 1.00 HOK IIIA 40,000
3 Mandor - - - HOK IIIA 40,000

Sub Total 3)
Lain - lain
1 Papan Kegiatan 1 - 1 Unit 150,000
2 Prasati + Logo 1 - 1 Unit 1,250,000

Sub Total 4)
TOTAL BIAYA

Dari PNPM - MP :
Sumber Dana
Dari Swadaya :

Disetujui Oleh : Dibuat Oleh :


PjOK, Ketua TPK,

Paskalis G. T. Bio, S.Ip


NIP. 19870717 201001 1 010
: 01
: PNPM-MPd
Pemasangan Bowplank +
: Galian Pondasi
: 88.95 M3

Jumlah Total
Swadaya PNPM - MP Keterangan
(Rp) ( Rp )

448,000 -
215,600 -
- 63,000

663,600 63,000

- 960,000
320,000 -
- 30,000
- 87,500

320,000 1,077,500

690,000 1,050,000
- 40,000
- -

690,000 1,090,000

- 150,000
- 1,250,000

- 1,400,000
1,673,600 3,630,500

3,630,500
1,673,600

Dibuat Oleh :
Fasilitator Teknik

WALTERIUS MEKA

You might also like