Professional Documents
Culture Documents
BAHAN UMUM
H
MUARA TEWEH
NO. URAIAN KODE SATUAN
DALAM KOTA
MUARA TEWEH
102,500
220,000.00 240,000.00 260,000 45,000
104,500.00 114,000.00 123,500 100,000
302,500.00 330,000.00 357,500 -
-
-
(6) (7) (8) 16,250
27,500.00 30,000.00 32,500 102,500
220,000.00 240,000.00 260,000 1,210
2,750.00 3,000.00 3,250 1,452
3,300.00 3,600.00 3,900 1,202
3,300.00 3,600.00 3,900 1,200
2,750.00 3,000.00 3,250 310,000
495,000.00 540,000.00 585,000 54,000
220,000.00 240,000.00 260,000 34,500
137,500.00 150,000.00 162,500
16,500.00 18,000.00 19,500
A B C D E F G
1 Pasir Ayak untuk beton/ M 01a m3 100,000.00 100,000.00 100,000.00
Pasir Barito (pasir dan kerikil) 150,000.00 150,000.00 150,000.00
2 Pasir Pasang M 01b m3 100,000.00 100,000.00 100,000.00
150,000.00 150,000.00 150,000.00
3 Pasir Halus (untuk HRS) M 01c m3 100,000.00 100,000.00 100,000.00
150,000.00 150,000.00 150,000.00
4 Pasir Urug/Timbunan M 01c m3 100,000.00 100,000.00 100,000.00
(Pasir dan Kerikil) 150,000.00 150,000.00 150,000.00
5 Batu Gunung M 02 m3 200,000.00 200,000.00 200,000.00
(Granit/Andesit) 250,000.00 250,000.00 250,000.00
6 Batu Belah/ Kerakal M 06 m3 200,000.00 200,000.00 200,000.00
250,000.00 250,000.00 250,000.00
7 Kerikil Sungai/ Kerikil Gunung m3 150,000.00 150,000.00 150,000.00
200,000.00 200,000.00 200,000.00
8 Batu Pecah Tersaring m3 400,000.00 400,000.00 400,000.00
(Alat) (Produksi)(Granit/Andesit) 400,000.00 400,000.00 400,000.00
9 Debu Batu m3 200,000.00 200,000.00 200,000.00
(Granit/Andesit) 200,000.00 200,000.00 200,000.00
10 Batu Pecah 10 - 15 cm m3 200,000.00 200,000.00 200,000.00
( Manual) (Granit/Andesit) 200,000.00 200,000.00 200,000.00
11 Tanah Timbunan Biasa M 08 m3 40,000.00 40,000.00 40,000.00
40,000.00 40,000.00 40,000.00
12 Tanah Timbunan Pilihan M 09 m3 50,000.00 50,000.00 50,000.00
50,000.00 50,000.00 50,000.00
13 Aspal M 10 kg 12,800.00 12,800.00 12,800.00
12,800.00 12,800.00 12,800.00
14 Semen Portland M 12 Zak 85,000.00 85,000.00 85,000.00
( 1 zak = 50 kg) 85,000.00 85,000.00 85,000.00
15 Besi Beton polos M 14 kg 14,300.00 14,300.00 14,300.00
14,300.00 14,300.00 14,300.00
16 Besi Beton Ulir (profil) M 14 kg 14,700.00 14,700.00 14,700.00
14,700.00 14,700.00 14,700.00
17 Kerikil Galian Bukit M 16 m3 60,000.00 60,000.00 60,000.00
(Awcas)(Pasir dan Kerikil) 60,000.00 60,000.00 60,000.00
18 Kayu Ulin Balok Besar m3 7,500,000.00 7,500,000.00 7,500,000.00
(Panjang s/d 4 m) 7,500,000.00 7,500,000.00 7,500,000.00
19 Kayu Ulin Balok Besar m3 7,500,000.00 7,500,000.00 7,500,000.00
(Panjang di atas 4 m) 7,500,000.00 7,500,000.00 7,500,000.00
20 Kayu Ulin Balok Kecil m3 7,500,000.00 7,500,000.00 7,500,000.00
7,500,000.00 7,500,000.00 7,500,000.00
21 Papan Ulin m3 7,500,000.00 7,500,000.00 7,500,000.00
7,500,000.00 7,500,000.00 7,500,000.00
TEWEH SELATAN LAHEI LAHEI BARAT GNG TIMANG MONTALLAT TEWEH TIMUR GUNUNG PUREI
H I J K L M N
100,000.00 150,000.00 130,000.00 272,800 180,000.00 180,000.00 180,000.00
150,000.00 200,000.00 180,000.00 372,800.00 230,000.00 260,000.00 260,000.00
100,000.00 150,000.00 130,000.00 272,800 180,000.00 180,000.00 180,000.00
150,000.00 200,000.00 180,000.00 372,800.00 230,000.00 260,000.00 260,000.00
100,000.00 150,000.00 130,000.00 272,800 180,000.00 180,000.00 180,000.00
150,000.00 200,000.00 180,000.00 372,800.00 230,000.00 260,000.00 260,000.00
100,000.00 150,000.00 130,000.00 272,800 180,000.00 180,000.00 180,000.00
150,000.00 200,000.00 180,000.00 372,800.00 230,000.00 260,000.00 260,000.00
200,000.00 118,800.00 184,800.00 272,800 448,800.00 200,000.00 200,000.00
250,000.00 368,800.00 434,800.00 522,800.00 698,800.00 280,000.00 280,000.00
200,000.00 118,800.00 184,800.00 272,800 448,800.00 200,000.00 200,000.00
250,000.00 318,800.00 384,800.00 472,800.00 648,800.00 280,000.00 280,000.00
150,000.00 175,000.00 170,000.00 272,800 320,000.00 180,000.00 180,000.00
200,000.00 225,000.00 220,000.00 422,800.00 320,000.00 260,000.00 260,000.00
400,000.00 118,800.00 184,800.00 303,111 498,666.67 449,777.78 743,111.11
400,000.00 518,800.00 584,800.00 703,111.11 898,666.67 849,777.78 1,143,111.11
200,000.00 118,800.00 205,333.33 303,111 498,666.67 449,777.78 743,111.11
200,000.00 318,800.00 405,333.33 503,111.11 698,666.67 649,777.78 943,111.11
200,000.00 118,800.00 184,800.00 272,800 448,800.00 404,800.00 668,800.00
200,000.00 318,800.00 384,800.00 472,800.00 648,800.00 604,800.00 868,800.00
40,000.00 118,800.00 184,800.00 40,000 40,000.00 40,000.00 40,000.00
40,000.00 158,800.00 224,800.00 40,000.00 40,000.00 40,000.00 40,000.00
50,000.00 118,800.00 184,800.00 50,000 50,000.00 50,000.00 50,000.00
50,000.00 168,800.00 234,800.00 50,000.00 50,000.00 50,000.00 50,000.00
12,800.00 132.00 205.33 303 498.67 449.78 743.11
12,800.00 12,932.00 13,005.33 13,103.11 13,298.67 13,249.78 13,543.11
85,000.00 2,970.00 4,620.00 6,820 11,220.00 10,120.00 16,720.00
85,000.00 87,970.00 89,620.00 91,820.00 96,220.00 95,120.00 101,720.00
14,300.00 74.25 115.50 171 280.50 253.00 418.00
14,300.00 14,374.25 14,415.50 14,470.50 14,580.50 14,553.00 14,718.00
14,700.00 74.25 115.50 171 280.50 253.00 418.00
14,700.00 14,774.25 14,815.50 14,870.50 14,980.50 14,953.00 15,118.00
60,000.00 118,800.00 184,800.00 272,800 448,800.00 404,800.00 668,800.00
60,000.00 178,800.00 244,800.00 332,800.00 508,800.00 464,800.00 728,800.00
7,500,000.00 7,500,000.00 184,800.00 7,500,000.00 7,500,000.00 7,500,000.00 7,500,000.00
7,500,000.00 7,500,000.00 184,800.00 7,500,000.00 7,500,000.00 7,500,000.00 7,500,000.00
7,500,000.00 7,500,000.00 7,500,000.00 7,500,000.00 7,500,000.00 7,500,000.00 7,500,000.00
7,500,000.00 7,500,000.00 7,500,000.00 7,500,000.00 7,500,000.00 7,500,000.00 7,500,000.00
7,500,000.00 7,500,000.00 7,500,000.00 7,500,000.00 7,500,000.00 7,500,000.00 7,500,000.00
7,500,000.00 7,500,000.00 7,500,000.00 7,500,000.00 7,500,000.00 7,500,000.00 7,500,000.00
7,500,000.00 7,500,000.00 7,500,000.00 7,500,000.00 7,500,000.00 7,500,000.00 7,500,000.00
7,500,000.00 7,500,000.00 7,500,000.00 7,500,000.00 7,500,000.00 7,500,000.00 7,500,000.00
A.2.2.1 HARGA SATUAN PEKERJAAN PERSIAPAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.400 90,000.00 36,000.00
Tukang Kayu L.02 OH 0.200 100,000.00 20,000.00
Kepala Tukang L.03 OH 0.020 110,000.00 2,200.00
Mandor L.04 OH 0.020 115,000.00 2,300.00
JUMLAH TENAGA KERJA 60,500.00
B BAHAN
Dolken kayu Ø 8-
10/400 cm Batang 1.250 12,000.00 15,000.00
Semen portland Kg 5.000 1,700.00 8,500.00
Pasir beton m3 0.005 38,000.00 190.00
Koral beton m3 0.009 150,000.00 1,350.00
Kayu 5/7 m3 0.072 200,000.00 14,400.00
Paku biasa 2” – 5” Kg 0.060 3,750,000.00 225,000.00
Residu Liter 0.400 7,500.00 3,000.00
JUMLAH HARGA BAHAN 267,440.00
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.200 90,000.00 18,000.00
Tukang Kayu L.02 OH 0.400 100,000.00 40,000.00
Kepala Tukang L.03 OH 0.020 110,000.00 2,200.00
Mandor L.04 OH 0.020 115,000.00 2,300.00
JUMLAH TENAGA KERJA 62,500.00
B BAHAN
Dolken kayu Ø 8-
10/400 cm Batang 1.250 12,000.00 15,000.00
Semen portland Kg 2.500 1,700.00 4,250.00
Seng gelombang Lbr 1.200 38,000.00 45,600.00
Pasir beton m3 0.005 150,000.00 750.00
Koral beton m3 0.009 200,000.00 1,800.00
Kayu 5/7 m3 0.072 3,750,000.00 270,000.00
Paku biasa 2” – 5” Kg 0.060 15,000.00 900.00
Meni besi Liter 0.450 50,000.00 22,500.00
JUMLAH HARGA BAHAN 360,800.00
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.200 90,000.00 18,000.00
Tukang Kayu L.02 OH 0.300 100,000.00 30,000.00
Kepala Tukang L.03 OH 0.020 110,000.00 2,200.00
Mandor L.04 OH 0.020 115,000.00 2,300.00
JUMLAH TENAGA KERJA 52,500.00
B BAHAN
Dolken kayu Ø 8-
10/400 cm Batang 1.000 12,000.00 12,000.00
Semen portland Kg 2.000 1,700.00 3,400.00
Kawat duri M’ 25.000 90,000.00 2,250,000.00
Pasir beton m3 0.005 150,000.00 750.00
Koral beton m3 0.009 200,000.00 1,800.00
Paku biasa 2” – 5” Kg 0.060 15,000.00 900.00
JUMLAH HARGA BAHAN 2,256,850.00
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.100 90,000.00 9,000.00
Tukang Kayu L.02 OH 0.100 100,000.00 10,000.00
Kepala Tukang L.03 OH 0.010 110,000.00 1,100.00
Mandor L.04 OH 0.005 115,000.00 575.00
JUMLAH TENAGA KERJA 20,675.00
B BAHAN
Kayu balok 5/7 m3 0.012 3,750,000.00 45,000.00
Paku 2”-3” Kg 0.020 15,000.00 300.00
Kayu papan 3/20 m3 0.007 2,500,000.00 17,500.00
JUMLAH HARGA BAHAN 62,800.00
C PERALATAN
JUMLAH HARGA ALAT
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 2.000 90,000.00 180,000.00
Tukang Kayu L.02 OH 2.000 100,000.00 200,000.00
Tukang batu L.02 OH 1.000 100,000.00 100,000.00
Kepala Tukang L.03 OH 0.300 110,000.00 33,000.00
Mandor L.04 OH 0.050 115,000.00 5,750.00
JUMLAH TENAGA KERJA 518,750.00
B BAHAN
Dolken kayu Ø 8-
10/400 cm Batang 1.250 12,000.00 15,000.00
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 1.000 90,000.00 90,000.00
Tukang Kayu L.02 OH 1.500 100,000.00 150,000.00
Kepala tukang L.03 0.150 110,000.00 16,500.00
Mandor L.04 OH 0.050 115,000.00 5,750.00
JUMLAH TENAGA KERJA 262,250.00
B BAHAN
Dolken kayu Ø 8-
10/400 cm Batang 3.000 12,000.00 36,000.00
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 1.000 90,000.00 90,000.00
Tukang Kayu L.02 OH 2.000 100,000.00 200,000.00
Kepala Tukang L.03 OH 0.200 110,000.00 22,000.00
Mandor L.04 OH 0.050 115,000.00 5,750.00
JUMLAH TENAGA KERJA 317,750.00
B BAHAN
Dolken kayu Ø 8-
10/400 cm Batang 1.700 12,000.00 20,400.00
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 1.000 90,000.00 90,000.00
Tukang Kayu L.02 OH 2.000 100,000.00 200,000.00
Kepala Tukang L.03 OH 0.200 110,000.00 22,000.00
Mandor L.04 OH 0.050 115,000.00 5,750.00
JUMLAH TENAGA KERJA 317,750.00
B BAHAN
Dolken kayu Ø 8-
10/400 cm Batang 1.250 12,000.00 15,000.00
Kayu m 3
0.186 3,750,000.00 697,500.00
Paku biasa Kg 0.300 15,000.00 4,500.00
Semen Portland Kg 18.000 1,700.00 30,600.00
Pasir beton m3 0.030 150,000.00 4,500.00
Koral beton m3 0.050 200,000.00 10,000.00
Seng gelombang Lbr 1.500 38,000.00 57,000.00
Plywood 4mm Lbr 1.350 67,500.00 91,125.00
JUMLAH HARGA BAHAN 910,225.00
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.100 90,000.00 9,000.00
Mandor L.04 OH 0.050 115,000.00 5,750.00
JUMLAH TENAGA KERJA 14,750.00
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 1.000 90,000.00 90,000.00
Tukang Kayu L.02 OH 2.000 100,000.00 200,000.00
Kepala Tukang L.03 OH 0.200 110,000.00 22,000.00
Mandor L.04 OH 0.050 115,000.00 5,750.00
JUMLAH TENAGA KERJA -
B BAHAN
Bambu diameter 6-
Batang 1.250 -
8/600 cm
Tali ijuk m3 0.186 -
JUMLAH HARGA BAHAN -
C PERALATAN
D Jumlah (A+B+C) -
E Overhead & Profit 10 % 10 % x D -
F Harga Satuan Pekerjaan (D+E) -
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Tukang Kayu L.02 OH 0.300 100,000.00 30,000.00
Kepala Tukang L.03 OH 0.030 110,000.00 3,300.00
JUMLAH TENAGA KERJA 33,300.00
B BAHAN
Kayu papan kelas III m3 0.036 2,500,000.00 90,000.00
Kayu balok 5/7 kelas
m 3
3,500,000.00 -
III
Paku biasa kg 0.080 15,000.00 1,200.00
JUMLAH HARGA BAHAN 91,200.00
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 1.000 90,000.00 90,000.00
Mandor L.04 0.005 115,000.00 575.00
JUMLAH TENAGA KERJA 90,575.00
B BAHAN
Batu belah m3 0.150 250,000.00 37,500.00
Batu pecah m3 0.090 200,000.00 18,000.00
Pasir pasang m3 0.010 150,000.00 1,500.00
JUMLAH HARGA BAHAN 57,000.00
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 13.334 90,000.00 1,200,060.00
Mandor L.04 0.666 115,000.00 76,590.00
JUMLAH TENAGA KERJA 1,276,650.00
B BAHAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 6.667 90,000.00 600,030.00
Mandor L.04 0.333 115,000.00 38,295.00
JUMLAH TENAGA KERJA 638,325.00
B BAHAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 0.042 90,000.00 3,780.00
Tukang L.02 0.004 100,000.00 400.00
Kepala Tukang L.03 0.002 110,000.00 220.00
Mandor L.04 0.042 115,000.00 4,830.00
JUMLAH TENAGA KERJA 9,230.00
B BAHAN
Kawat jaring Lbr 0.143 37,500.00 5,377.50
JUMLAH HARGA BAHAN 5,377.50
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 0.375 90,000.00 33,750.00
Tukang L.02 0.125 100,000.00 12,500.00
Kepala Tukang L.03 0.012 110,000.00 1,320.00
Mandor L.04 0.019 115,000.00 2,185.00
JUMLAH TENAGA KERJA 49,755.00
B BAHAN
Panel beton pracetak Lbr 0.986 100,000.00 98,600.00
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.75 90,000.00 67,500.00
Mandor L.04 OH 0.03 115,000.00 2,875.00
JUMLAH TENAGA KERJA 70,375.00
B BAHAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.90 90,000.00 81,000.00
Mandor L.04 OH 0.05 115,000.00 5,175.00
JUMLAH TENAGA KERJA 86,175.00
B BAHAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 1.05 90,000.00 94,500.00
Mandor L.04 OH 0.07 115,000.00 7,705.00
JUMLAH TENAGA KERJA 102,205.00
B BAHAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 1.00 90,000.00 90,000.00
Mandor L.04 OH 0.03 115,000.00 3,680.00
JUMLAH TENAGA KERJA 93,680.00
B BAHAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 1.50 90,000.00 135,000.00
Mandor L.04 OH 0.06 115,000.00 6,900.00
JUMLAH TENAGA KERJA 141,900.00
B BAHAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 1.20 90,000.00 108,000.00
Mandor L.04 OH 0.05 115,000.00 5,175.00
JUMLAH TENAGA KERJA 113,175.00
B BAHAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.05 90,000.00 4,500.00
Mandor L.04 OH 0.01 115,000.00 575.00
JUMLAH TENAGA KERJA 5,075.00
B BAHAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.33 90,000.00 29,700.00
Mandor L.04 OH 0.01 115,000.00 1,150.00
JUMLAH TENAGA KERJA 30,850.00
B BAHAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.50 90,000.00 45,000.00
Mandor L.04 OH 0.05 115,000.00 5,750.00
JUMLAH TENAGA KERJA 50,750.00
B BAHAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.50 90,000.00 45,000.00
Mandor L.04 OH 0.05 115,000.00 5,750.00
JUMLAH TENAGA KERJA 50,750.00
B BAHAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.30 90,000.00 27,000.00
Mandor L.04 OH 0.01 115,000.00 1,150.00
JUMLAH TENAGA KERJA 28,150.00
B BAHAN
Pasir urug 1.20 150,000.00 180,000.00
JUMLAH HARGA BAHAN 180,000.00
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.80 90,000.00 72,000.00
Tukang L.02 OH 0.40 100,000.00 40,000.00
Kepala Tukang L.03 OH 0.04 110,000.00 4,400.00
Mandor L.04 OH 0.08 115,000.00 9,200.00
JUMLAH TENAGA KERJA 125,600.00
B BAHAN
Kapur Padam m3 0.14 2,000.00 270.00
Pasir Pasang m3 0.40 150,000.00 60,000.00
Tanah Liat m3 0.95 40,000.00 37,920.00
JUMLAH HARGA BAHAN
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.15 90,000.00 13,500.00
Mandor L.04 OH 0.02 115,000.00 1,725.00
JUMLAH TENAGA KERJA 15,225.00
B BAHAN
Ijuk m3 6.00 10,000.00 60,000.00
JUMLAH HARGA BAHAN 60,000.00
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.25 90,000.00 22,500.00
Mandor L.04 OH 0.03 115,000.00 2,875.00
JUMLAH TENAGA KERJA 25,375.00
B BAHAN
Sirtu m3 1.20 50,000.00 60,000.00
JUMLAH HARGA BAHAN 60,000.00
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 1.50 90,000.00 135,000.00
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 1.50 90,000.00 135,000.00
Tukang Batu L.02 OH 0.75 100,000.00 75,000.00
Kepala Tukang L.03 OH 0.08 110,000.00 8,250.00
Mandor L.04 OH 0.08 115,000.00 8,625.00
JUMLAH TENAGA KERJA 226,875.00
B BAHAN
Batu belah m3 1.20 250,000.00 300,000.00
Semen Portland Kg 163.00 1,700.00 277,100.00
Pasir Pasang m3 0.52 150,000.00 78,000.00
JUMLAH HARGA BAHAN 655,100.00
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 1.50 90,000.00 135,000.00
Tukang Batu L.02 OH 0.75 100,000.00 75,000.00
Kepala Tukang L.03 OH 0.08 110,000.00 8,250.00
Mandor L.04 OH 0.08 115,000.00 8,625.00
JUMLAH TENAGA KERJA 226,875.00
B BAHAN
Batu belah m3 1.20 250,000.00 300,000.00
Semen Portland Kg 136.00 1,700.00 231,200.00
Pasir Pasang m3 0.54 150,000.00 81,600.00
JUMLAH HARGA BAHAN 612,800.00
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 1.50 90,000.00 135,000.00
Tukang Batu L.02 OH 0.75 100,000.00 75,000.00
Kepala Tukang L.03 OH 0.08 110,000.00 8,250.00
Mandor L.04 OH 0.08 115,000.00 8,625.00
JUMLAH TENAGA KERJA 226,875.00
B BAHAN
Batu belah m3 1.20 250,000.00 300,000.00
Semen Portland Kg 117.00 1,700.00 198,900.00
Pasir Pasang m3 0.56 150,000.00 84,150.00
JUMLAH HARGA BAHAN 583,050.00
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 1.50 90,000.00 135,000.00
Tukang Batu L.02 OH 0.75 100,000.00 75,000.00
Kepala Tukang L.03 OH 0.08 110,000.00 8,250.00
Mandor L.04 OH 0.08 115,000.00 8,625.00
JUMLAH TENAGA KERJA 226,875.00
B BAHAN
Batu belah m3 1.20 250,000.00 300,000.00
Semen Portland Kg 91.00 1,700.00 154,700.00
Pasir Pasang m3 0.58 150,000.00 87,600.00
JUMLAH HARGA BAHAN 542,300.00
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 1.50 90,000.00 135,000.00
Tukang Batu L.02 OH 0.75 100,000.00 75,000.00
Kepala Tukang L.03 OH 0.08 110,000.00 8,250.00
Mandor L.04 OH 0.08 115,000.00 8,625.00
JUMLAH TENAGA KERJA 226,875.00
B BAHAN
Batu belah m3 1.20 250,000.00 300,000.00
Kapur m3 0.17 2,000.00 340.00
Semen Portland Kg 0.17 1,700.00 289.00
Pasir Pasang m3 0.34 150,000.00 51,000.00
JUMLAH HARGA BAHAN 351,629.00
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 1.50 90,000.00 135,000.00
Tukang Batu L.02 OH 0.75 100,000.00 75,000.00
Kepala Tukang L.03 OH 0.08 110,000.00 8,250.00
Mandor L.04 OH 0.08 115,000.00 8,625.00
JUMLAH TENAGA KERJA 226,875.00
B BAHAN
Batu belah m3 1.20 250,000.00 300,000.00
Semen Portland Kg 61.00 1,700.00 103,700.00
Kapur m3 0.15 2,000.00 294.00
Pasir Pasang m3 0.49 150,000.00 73,800.00
JUMLAH HARGA BAHAN 477,794.00
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 1.50 90,000.00 135,000.00
Tukang Batu L.02 OH 0.75 100,000.00 75,000.00
Kepala Tukang L.03 OH 0.08 110,000.00 8,250.00
Mandor L.04 OH 0.08 115,000.00 8,625.00
JUMLAH TENAGA KERJA 226,875.00
B BAHAN
Batu belah m3 1.20 250,000.00 300,000.00
Semen Portland Kg 41.00 1,700.00 69,700.00
Kapur m3 0.13 2,000.00 262.00
Pasir Pasang m3 0.52 150,000.00 78,450.00
JUMLAH HARGA BAHAN 448,412.00
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.78 90,000.00 70,200.00
Tukang Batu L.02 OH 0.39 100,000.00 39,000.00
Kepala Tukang L.03 OH 0.04 110,000.00 4,290.00
Mandor L.04 OH 0.04 115,000.00 4,485.00
JUMLAH TENAGA KERJA 117,975.00
B BAHAN
Batu belah m3 1.20 250,000.00 300,000.00
Pasir urug m3 0.43 150,000.00 64,800.00
JUMLAH HARGA BAHAN 364,800.00
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 3.40 90,000.00 306,000.00
Tukang Batu L.02 OH 0.85 100,000.00 85,000.00
Kepala Tukang L.03 OH 0.09 110,000.00 9,350.00
Mandor L.04 OH 0.17 115,000.00 19,550.00
JUMLAH TENAGA KERJA 419,900.00
B BAHAN
Batu belah m3 0.48 250,000.00 120,000.00
Semen Portland Kg 194.00 1,700.00 329,800.00
Pasir Beton m3 0.31 150,000.00 46,800.00
Kerikil m3 0.47 200,000.00 93,600.00
Besi beton Kg 126.00 14,300.00 1,801,800.00
Kawat beton Kg 1.80 20,000.00 36,000.00
JUMLAH HARGA BAHAN 2,428,000.00
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 2.40 90,000.00 216,000.00
Tukang Batu L.02 OH 0.80 100,000.00 80,000.00
Kepala Tukang L.03 OH 0.08 110,000.00 8,800.00
Mandor L.04 OH 0.12 115,000.00 13,685.00
JUMLAH TENAGA KERJA 318,485.00
B BAHAN
Batu belah m3 0.45 250,000.00 112,500.00
Semen Portland Kg 194.00 1,700.00 329,800.00
Pasir Beton m3 0.31 150,000.00 46,800.00
Kerikil m3 0.47 200,000.00 93,600.00
JUMLAH HARGA BAHAN 582,700.00
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 1.65 90,000.00 148,500.00
Tukang Batu L.02 OH 0.28 100,000.00 27,500.00
Kepala Tukang L.03 OH 0.03 110,000.00 3,080.00
Mandor L.04 OH 0.08 115,000.00 9,545.00
JUMLAH TENAGA KERJA 188,625.00
B BAHAN
Semen Portland kg 247.00 1,700.00 419,900.00
Pasir Beton kg 869.00 107.14 93,107.14
Kerikil(Maks 30mm) kg 999.00 148.15 148,000.00
Air Liter 215.00 75.00 16,125.00
JUMLAH HARGA BAHAN 677,132.14
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 1.65 90,000.00 148,500.00
Tukang Batu L.02 OH 0.28 100,000.00 27,500.00
Kepala Tukang L.03 OH 0.03 110,000.00 3,080.00
Mandor L.04 OH 0.08 115,000.00 9,545.00
JUMLAH TENAGA KERJA 188,625.00
B BAHAN
Semen Portland kg 276.00 1,700.00 469,200.00
Pasir Beton kg 828.00 107.14 88,714.29
Kerikil(Maks 30mm) kg 1,012.00 148.15 149,925.93
Air Liter 215.00 75.00 16,125.00
JUMLAH HARGA BAHAN 723,965.21
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 1.65 90,000.00 148,500.00
Tukang Batu L.02 OH 0.28 100,000.00 27,500.00
Kepala Tukang L.03 OH 0.03 110,000.00 3,080.00
Mandor L.04 OH 0.08 115,000.00 9,545.00
JUMLAH TENAGA KERJA 188,625.00
B BAHAN
Semen Portland kg 299.00 1,700.00 508,300.00
Pasir Beton kg 799.00 107.14 85,607.14
Kerikil(Maks 30mm) kg 1,017.00 148.15 150,666.67
Air Liter 215.00 75.00 16,125.00
JUMLAH HARGA BAHAN 760,698.81
C PERALATAN
JUMLAH HARGA ALAT
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 1.20 90,000.00 108,000.00
Tukang Batu L.02 OH 0.20 100,000.00 20,000.00
Kepala Tukang L.03 OH 0.02 110,000.00 2,200.00
Mandor L.04 OH 0.06 115,000.00 6,900.00
JUMLAH TENAGA KERJA 137,100.00
B BAHAN
Semen Portland kg 230.00 1,700.00 391,000.00
Pasir Beton kg 893.00 107.14 95,678.57
Kerikil(Maks 30mm) kg 1,027.00 148.15 152,148.15
Air Liter 200.00 75.00 15,000.00
JUMLAH HARGA BAHAN 653,826.72
C PERALATAN
A. A.4.1.1.5. Membuat 1 m3 beton mutu f’c = 14,5 MPa (K 175), slump (12 ± 2) cm, w/c = 0,66
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 1.65 90,000.00 148,500.00
Tukang Batu L.02 OH 0.28 100,000.00 27,500.00
Kepala Tukang L.03 OH 0.03 110,000.00 3,080.00
Mandor L.04 OH 0.08 115,000.00 9,545.00
JUMLAH TENAGA KERJA 188,625.00
B BAHAN
Semen Portland kg 326.00 1,700.00 554,200.00
Pasir Beton kg 760.00 107.14 81,428.57
Kerikil(Maks 30mm) kg 1,029.00 148.15 152,444.44
Air Liter 215.00 75.00 16,125.00
JUMLAH HARGA BAHAN 804,198.02
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 1.65 90,000.00 148,500.00
Tukang Batu L.02 OH 0.28 100,000.00 27,500.00
Kepala Tukang L.03 OH 0.03 110,000.00 3,080.00
Mandor L.04 OH 0.08 115,000.00 9,545.00
JUMLAH TENAGA KERJA 188,625.00
B BAHAN
Semen Portland kg 352.00 1,700.00 598,400.00
Pasir Beton kg 731.00 107.14 78,321.43
Kerikil(Maks 30mm) kg 1,031.00 148.15 152,740.74
Air Liter 215.00 75.00 16,125.00
JUMLAH HARGA BAHAN 845,587.17
C PERALATAN
JUMLAH HARGA ALAT
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 1.65 90,000.00 148,500.00
Tukang Batu L.02 OH 0.28 100,000.00 27,500.00
Kepala Tukang L.03 OH 0.03 110,000.00 3,080.00
Mandor L.04 OH 0.08 115,000.00 9,545.00
JUMLAH TENAGA KERJA 188,625.00
B BAHAN
Semen Portland kg 371.00 1,700.00 630,700.00
Pasir Beton kg 698.00 107.14 74,785.71
Kerikil (Maks 30mm) kg 1,047.00 148.15 155,111.11
Air Liter 215.00 75.00 16,125.00
JUMLAH HARGA BAHAN 876,721.83
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 1.65 90,000.00 148,500.00
Tukang Batu L.02 OH 0.28 100,000.00 27,500.00
Kepala Tukang L.03 OH 0.03 110,000.00 3,080.00
Mandor L.04 OH 0.08 115,000.00 9,545.00
JUMLAH TENAGA KERJA 188,625.00
B BAHAN
Semen Portland kg 384.00 1,700.00 652,800.00
Pasir Beton kg 692.00 107.14 74,142.86
Kerikil(Maks 30mm) kg 1,039.00 148.15 153,925.93
Air Liter 215.00 75.00 16,125.00
JUMLAH HARGA BAHAN 896,993.78
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 1.65 90,000.00 148,500.00
Tukang Batu L.02 OH 0.28 100,000.00 27,500.00
Kepala Tukang L.03 OH 0.03 110,000.00 3,080.00
Mandor L.04 OH 0.08 115,000.00 9,545.00
JUMLAH TENAGA KERJA 188,625.00
B BAHAN
Semen Portland kg 406.00 1,700.00 690,200.00
Pasir Beton kg 684.00 107.14 73,285.71
Kerikil (Maks 30mm) kg 1,026.00 148.15 152,000.00
Air Liter 215.00 75.00 16,125.00
JUMLAH HARGA BAHAN 931,610.71
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 1.65 90,000.00 148,500.00
Tukang Batu L.02 OH 0.28 100,000.00 27,500.00
Kepala Tukang L.03 OH 0.03 110,000.00 3,080.00
Mandor L.04 OH 0.08 115,000.00 9,545.00
JUMLAH TENAGA KERJA 188,625.00
B BAHAN
Semen Portland kg 413.00 1,700.00 702,100.00
Pasir Beton kg 681.00 107.14 72,964.29
Kerikil (Maks 30mm) kg 1,021.00 148.15 151,259.26
Air Liter 215.00 75.00 16,125.00
JUMLAH HARGA BAHAN 942,448.54
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 2.10 90,000.00 189,000.00
Tukang Batu L.02 OH 0.35 100,000.00 35,000.00
Kepala Tukang L.03 OH 0.04 110,000.00 3,850.00
Mandor L.04 OH 0.11 115,000.00 12,075.00
JUMLAH TENAGA KERJA 239,925.00
B BAHAN
Semen Portland kg 439.00 1,700.00 746,300.00
Pasir Beton kg 670.00 107.14 71,785.71
Kerikil (Maks 30mm) kg 1,006.00 148.15 149,037.04
Air Liter 215.00 75.00 16,125.00
JUMLAH HARGA BAHAN 983,247.75
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 2.10 90,000.00 189,000.00
Tukang Batu L.02 OH 0.35 100,000.00 35,000.00
Kepala Tukang L.03 OH 0.04 110,000.00 3,850.00
Mandor L.04 OH 0.11 115,000.00 12,075.00
JUMLAH TENAGA KERJA 239,925.00
B BAHAN
Semen Portland kg 448.00 1,700.00 761,600.00
Pasir Beton kg 667.00 107.14 71,464.29
Kerikil (Maks 30mm) kg 1,000.00 148.15 148,148.15
Air Liter 215.00 75.00 16,125.00
JUMLAH HARGA BAHAN 997,337.43
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 2.10 90,000.00 189,000.00
Tukang Batu L.02 OH 0.35 100,000.00 35,000.00
Kepala Tukang L.03 OH 0.04 110,000.00 3,850.00
Mandor L.04 OH 0.11 115,000.00 12,075.00
JUMLAH TENAGA KERJA 0.00
B BAHAN
Semen Portland kg 400.00 1,700.00 680,000.00
Pasir Beton m3 0.48 150,000.00 72,000.00
Kerikil (2cm/3cm) m3 0.80 200,000.00 160,000.00
Strorox – 100 kg 1.20
JUMLAH HARGA BAHAN 0.00
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.06 90,000.00 5,400.00
Tukang Batu/Pipa L.02 OH 0.03 100,000.00 3,000.00
Kepala Tukang L.03 OH 0.00 110,000.00 330.00
Mandor L.04 OH 0.00 115,000.00 345.00
JUMLAH TENAGA KERJA 0.00
B BAHAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.07 90,000.00 6,300.00
Tukang Batu/Pipa L.02 OH 0.04 100,000.00 3,500.00
Kepala Tukang L.03 OH 0.00 110,000.00 440.00
Mandor L.04 OH 0.01 115,000.00 805.00
JUMLAH TENAGA KERJA
B BAHAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.08 90,000.00 7,200.00
Tukang Batu L.02 OH 0.04 100,000.00 4,000.00
Kepala Tukang L.03 OH 0.00 110,000.00 440.00
Mandor L.04 OH 0.00 115,000.00 460.00
JUMLAH TENAGA KERJA
B BAHAN
Waterstop lebar 230 mm
m 1.05
- 320 mm
JUMLAH HARGA BAHAN
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.07 90,000.00 6,300.00
Tukang Besi L.02 OH 0.07 100,000.00 7,000.00
Kepala Tukang L.03 OH 0.01 110,000.00 770.00
Mandor L.04 OH 0.00 115,000.00 460.00
JUMLAH TENAGA KERJA 14,530.00
B BAHAN
Besi beton (polos/ulir) kg 10.50 14,300.00 150,150.00
Kawat beton kg 0.15 20,000.00 3,000.00
JUMLAH HARGA BAHAN 153,150.00
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.07 90,000.00 6,300.00
Tukang Besi L.02 OH 0.07 100,000.00 7,000.00
Kepala Tukang L.03 OH 0.01 110,000.00 770.00
Mandor L.04 OH 0.00 115,000.00 460.00
JUMLAH TENAGA KERJA 14,530.00
B BAHAN
Besi beton (polos/ulir) kg 10.50 14,700.00 154,350.00
Kawat beton kg 0.15 20,000.00 3,000.00
JUMLAH HARGA BAHAN 157,350.00
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.05 90,000.00 4,500.00
Tukang Besi L.02 OH 0.05 100,000.00 5,000.00
Kepala Tukang L.03 OH 0.01 110,000.00 550.00
Mandor L.04 OH 0.00 115,000.00 345.00
JUMLAH TENAGA KERJA 10,395.00
B BAHAN
Besi beton (polos/ulir) kg 10.50 14,300.00 150,150.00
Kawat beton kg 0.10 20,000.00 2,000.00
JUMLAH HARGA BAHAN 152,150.00
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.03 90,000.00 2,250.00
Tukang Besi L.02 OH 0.03 100,000.00 2,500.00
Kepala Tukang L.03 OH 0.03 110,000.00 2,750.00
Mandor L.04 OH 0.00 115,000.00 115.00
JUMLAH TENAGA KERJA 0.00
B BAHAN
Jaring kawat baja dilas kg 10.20 0.00
Kawat beton kg 0.05 20,000.00 1,000.00
JUMLAH HARGA BAHAN
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.52 90,000.00 46,800.00
Tukang Kayu L.02 OH 0.26 100,000.00 26,000.00
Kepala Tukang L.03 OH 0.03 110,000.00 2,860.00
Mandor L.04 OH 0.03 115,000.00 2,990.00
JUMLAH TENAGA KERJA 78,650.00
B BAHAN
Kayu kelas III m3 0.04 3,500,000.00 140,000.00
Paku 5 – 10 cm kg 0.30 15,000.00 4,500.00
Minyak bekisting Liter 0.10 0.00
JUMLAH HARGA BAHAN 144,500.00
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.52 90,000.00 46,800.00
Tukang Kayu L.02 OH 0.26 100,000.00 26,000.00
Kepala Tukang L.03 OH 0.03 110,000.00 2,860.00
Mandor L.04 OH 0.03 115,000.00 2,990.00
JUMLAH TENAGA KERJA 78,650.00
B BAHAN
Kayu kelas III m3 0.05 3,500,000.00 157,500.00
Paku 5 cm – 10 cm kg 0.30 15,000.00 4,500.00
Minyak bekisting Liter 0.10 0.00
JUMLAH HARGA BAHAN 162,000.00
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.66 90,000.00 59,400.00
Tukang Kayu L.02 OH 0.33 100,000.00 33,000.00
Kepala Tukang L.03 OH 0.03 110,000.00 3,630.00
Mandor L.04 OH 0.03 115,000.00 3,795.00
JUMLAH TENAGA KERJA 99,825.00
B BAHAN
Kayu kelas III m3 0.04 3,500,000.00 140,000.00
Paku 5 cm – 12 cm kg 0.40 15,000.00 6,000.00
Minyak bekisting Liter 0.20 0.00
Balok kayu kelas II m3 0.02 3,750,000.00 56,250.00
Plywood tebal 9 mm Lbr 0.35 112,500.00 39,375.00
Dolken kayu Ø 8–10
Batang 2.00 12,000.00 24,000.00
panj 4m
JUMLAH HARGA BAHAN 265,625.00
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.66 90,000.00 59,400.00
Tukang Kayu L.02 OH 0.33 100,000.00 33,000.00
Kepala Tukang L.03 OH 0.03 110,000.00 3,630.00
Mandor L.04 OH 0.03 115,000.00 3,795.00
JUMLAH TENAGA KERJA 99,825.00
B BAHAN
Kayu kelas III m3 0.04 3,500,000.00 140,000.00
Paku 5 cm – 12 cm kg 0.40 15,000.00 6,000.00
Minyak bekisting Liter 0.20 0.00
Balok kayu kelas II m3 0.02 3,750,000.00 67,500.00
Plywood tebal 9 mm Lbr 0.35 112,500.00 39,375.00
Dolken kayu galam, 8–
Batang 2.00 12,000.00 24,000.00
10 cm panj 4 m
JUMLAH HARGA BAHAN 276,875.00
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.66 90,000.00 59,400.00
Tukang Kayu L.02 OH 0.33 100,000.00 33,000.00
Kepala Tukang L.03 OH 0.03 110,000.00 3,630.00
Mandor L.04 OH 0.03 115,000.00 3,795.00
JUMLAH TENAGA KERJA 99,825.00
B BAHAN
Kayu kelas III m3 0.04 3,500,000.00 140,000.00
Paku 5 cm – 12 cm kg 0.40 15,000.00 6,000.00
Minyak bekisting Liter 0.20 0.00
Balok kayu kelas II m3 0.02 3,750,000.00 56,250.00
Plywood tebal 9 mm Lbr 0.35 112,500.00 39,375.00
Dolken kayu galam, 8–
Batang 6.00 12,000.00 72,000.00
10 cm panj 4 m
JUMLAH HARGA BAHAN 313,625.00
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.66 90,000.00 59,400.00
Tukang Kayu L.02 OH 0.33 100,000.00 33,000.00
Kepala Tukang L.03 OH 0.03 110,000.00 3,630.00
Mandor L.04 OH 0.03 115,000.00 3,795.00
JUMLAH TENAGA KERJA 99,825.00
B BAHAN
Kayu kelas III m3 0.03 3,500,000.00 105,000.00
Paku 5 cm – 12 cm kg 0.40 15,000.00 6,000.00
Minyak bekisting Liter 0.20 0.00
Balok kayu kelas II m3 0.02 3,750,000.00 75,000.00
Plywood tebal 9 mm Lbr 0.35 112,500.00 39,375.00
Dolken kayu Ø 8–10
Batang 3.00 12,000.00 36,000.00
panj 4m
Penjaga jarak
Buah 4.00
bekisting/spacer
JUMLAH HARGA BAHAN 261,375.00
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.66 90,000.00 59,400.00
Tukang Kayu L.02 OH 0.33 100,000.00 33,000.00
Kepala Tukang L.03 OH 0.03 110,000.00 3,630.00
Mandor L.04 OH 0.03 115,000.00 3,795.00
JUMLAH TENAGA KERJA 99,825.00
B BAHAN
Kayu kelas III m3 0.03 3,500,000.00 105,000.00
Paku 5 cm – 12 cm kg 0.40 15,000.00 6,000.00
Minyak bekisting Liter 0.15 0.00
Balok kayu kelas II m3 0.02 3,750,000.00 56,250.00
Plywood tebal 9 mm Lbr 0.35 112,500.00 39,375.00
Dolken kayu Ø 8–10
Batang 2.00 12,000.00 24,000.00
panj 4m
JUMLAH HARGA BAHAN 230,625.00
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.15 90,000.00 13,500.00
Tukang Kayu L.02 OH 0.05 100,000.00 5,000.00
Kepala Tukang L.03 OH 0.01 110,000.00 550.00
Mandor L.04 OH 0.01 115,000.00 920.00
JUMLAH TENAGA KERJA 19,970.00
B BAHAN
Kayu kelas III (papan) m3 0.03 2,420,000.00 63,888.00
Paku 5 cm – 12 cm kg 0.60 15,000.00 9,000.00
Dolken kayu Ø 8–10
Batang 0.50 12,000.00 6,000.00
panj 4m
JUMLAH HARGA BAHAN 78,888.00
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 5.30 90,000.00 477,000.00
Tukang batu L.02 OH 0.28 100,000.00 27,500.00
Tukang kayu L.02 OH 1.30 100,000.00 130,000.00
Tukang besi L.02 OH 1.05 100,000.00 105,000.00
Kepala tukang L.03 OH 0.26 110,000.00 28,820.00
Mandor L.04 OH 0.27 115,000.00 30,475.00
JUMLAH TENAGA KERJA 798,795.00
B BAHAN
Kayu kelas III m3 0.20 3,500,000.00 700,000.00
Paku 5 cm – 12 cm kg 1.50 15,000.00 22,500.00
Minyak bekisting Liter 0.40 0.00
Besi beton polos kg 157.50 14,300.00 2,252,250.00
Kawat beton kg 2.25 20,000.00 45,000.00
Semen Portland kg 336.00 1,700.00 571,200.00
Pasir Beton m3 0.54 150,000.00 81,000.00
Kerikil m3 0.81 200,000.00 162,000.00
JUMLAH HARGA BAHAN 3,833,950.00
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 5.65 90,000.00 508,500.00
Tukang batu L.02 OH 0.28 100,000.00 27,500.00
Tukang kayu L.02 OH 1.56 100,000.00 156,000.00
Tukang besi L.02 OH 1.40 100,000.00 140,000.00
Kepala tukang L.03 OH 0.32 110,000.00 35,530.00
Mandor L.04 OH 0.28 115,000.00 32,545.00
JUMLAH TENAGA KERJA 900,075.00
B BAHAN
Kayu kelas III m3 0.27 3,500,000.00 945,000.00
Paku 5 cm – 12 cm kg 2.00 15,000.00 30,000.00
Minyak bekisting Liter 0.60 0.00
Besi beton polos kg 210.00 14,300.00 3,003,000.00
Kawat beton kg 3.00 20,000.00 60,000.00
Semen Portland kg 336.00 1,700.00 571,200.00
Pasir Beton m3 0.54 150,000.00 81,000.00
Kerikil m3 0.81 200,000.00 162,000.00
JUMLAH HARGA BAHAN 4,852,200.00
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 7.05 90,000.00 634,500.00
Tukang batu L.02 OH 0.28 100,000.00 27,500.00
Tukang kayu L.02 OH 1.65 100,000.00 165,000.00
Tukang besi L.02 OH 2.10 100,000.00 210,000.00
Kepala tukang L.03 OH 0.40 110,000.00 44,330.00
Mandor L.04 OH 0.35 115,000.00 40,595.00
JUMLAH TENAGA KERJA 1,121,925.00
B BAHAN
Kayu kelas III m3 0.40 3,500,000.00 1,400,000.00
Paku 5 cm – 12cm kg 4.00 15,000.00 60,000.00
Minyak bekisting Liter 2.00 0.00
Besi beton polos kg 315.00 14,300.00 4,504,500.00
Kawat beton kg 4.50 20,000.00 90,000.00
Semen Portland kg 336.00 1,700.00 571,200.00
Pasir Beton m3 0.54 150,000.00 81,000.00
Kerikil m3 0.81 200,000.00 162,000.00
Kayu kelas II balok M3 0.15 3,750,000.00 562,500.00
Plywood 9 mm Lbr 3.50 112,500.00 393,750.00
Dolken kayu Ø (8-10)
Batang 20.00 12,000.00 240,000.00
cm, panj 4 m
JUMLAH HARGA BAHAN 8,064,950.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 9,186,875.00
E Overhead & Profit (Contoh 15%) 10 % x D 918,687.50
F Harga Satuan Pekerjaan (D+E) 10,105,562.50
A.4.1.1.31 Membuat 1 m3 balok beton bertulang (200 kg besi + bekisting)
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 6.35 90,000.00 571,500.00
Tukang batu L.02 OH 0.28 100,000.00 27,500.00
Tukang kayu L.02 OH 1.65 100,000.00 165,000.00
Tukang besi L.02 OH 1.40 100,000.00 140,000.00
Kepala tukang L.03 OH 0.33 110,000.00 36,630.00
Mandor L.04 OH 0.32 115,000.00 36,570.00
JUMLAH TENAGA KERJA 977,200.00
B BAHAN
Kayu kelas III m3 0.32 3,500,000.00 1,120,000.00
Paku 5 cm – 12 cm kg 3.20 15,000.00 48,000.00
Minyak bekisting Liter 1.60 0.00
Besi beton polos kg 210.00 14,300.00 3,003,000.00
Kawat beton kg 3.00 20,000.00 60,000.00
Semen Portland kg 336.00 1,700.00 571,200.00
Pasir Beton m3 0.54 150,000.00 81,000.00
Kerikil m3 0.81 200,000.00 162,000.00
Kayu kelas II balok m3 0.14 3,750,000.00 525,000.00
Plywood 9 mm Lembar 2.80 112,500.00 315,000.00
Dolken kayu Ø (8-10)
Batang 16.00 12,000.00 192,000.00
cm, panj 4 m
JUMLAH HARGA BAHAN 6,077,200.00
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 5.30 90,000.00 477,000.00
Tukang batu L.02 OH 0.28 100,000.00 27,500.00
Tukang kayu L.02 OH 1.30 100,000.00 130,000.00
Tukang besi L.02 OH 1.05 100,000.00 105,000.00
Kepala tukang L.03 OH 0.27 110,000.00 29,150.00
Mandor L.04 OH 0.27 115,000.00 30,475.00
JUMLAH TENAGA KERJA 799,125.00
B BAHAN
Kayu kelas III m3 0.32 3,500,000.00 1,120,000.00
Paku 5 cm – 12 cm kg 3.20 15,000.00 48,000.00
Minyak bekisting Liter 1.60 0.00
Besi beton polos kg 157.50 14,300.00 2,252,250.00
Kawat beton kg 2.25 20,000.00 45,000.00
Semen Portland kg 336.00 1,700.00 571,200.00
Pasir Beton m3 0.54 150,000.00 81,000.00
Kerikil m3 0.81 200,000.00 162,000.00
Kayu kelas II balok m3 0.12 3,750,000.00 450,000.00
Plywood 9 mm Lembar 2.80 112,500.00 315,000.00
Dolken kayu Ø (8-10) cm, Batang 32.00
panjang 4 m 12,000.00 384,000.00
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 5.30 90,000.00 477,000.00
Tukang batu L.02 OH 0.28 100,000.00 27,500.00
Tukang kayu L.02 OH 1.30 100,000.00 130,000.00
Tukang besi L.02 OH 1.05 100,000.00 105,000.00
Kepala tukang L.03 OH 0.26 110,000.00 28,820.00
Mandor L.04 OH 0.27 115,000.00 30,475.00
JUMLAH TENAGA KERJA 798,795.00
B BAHAN
Kayu kelas III m3 0.24 3,500,000.00 840,000.00
Paku 5 cm – 12 cm kg 3.20 15,000.00 48,000.00
Minyak bekisting Liter 1.60 0.00
Besi beton polos kg 157.50 14,300.00 2,252,250.00
Kawat beton kg 2.25 20,000.00 45,000.00
Semen Portland kg 336.00 1,700.00 571,200.00
Pasir Beton m3 0.54 150,000.00 81,000.00
Kerikil m3 0.81 200,000.00 162,000.00
Kayu kelas II balok m3 0.16 3,750,000.00 600,000.00
Plywood 9 mm Lembar 2.80 112,500.00 315,000.00
Dolken kayu Ø(8-10)
Batang 24.00 12,000.00 288,000.00
cm, panjang 4 m
JUMLAH HARGA BAHAN 5,202,450.00
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 5.65 90,000.00 508,500.00
Tukang batu L.02 OH 0.28 100,000.00 27,500.00
Tukang kayu L.02 OH 1.56 100,000.00 156,000.00
Tukang besi L.02 OH 1.40 100,000.00 140,000.00
Kepala tukang L.03 OH 0.32 110,000.00 35,530.00
Mandor L.04 OH 0.28 115,000.00 32,545.00
JUMLAH TENAGA KERJA 900,075.00
B BAHAN
Kayu kelas III m3 0.25 3,500,000.00 875,000.00
Paku 5 cm – 12 cm kg 3.00 15,000.00 45,000.00
Minyak bekisting Liter 1.20 0.00
Besi beton polos kg 210.00 14,300.00 3,003,000.00
Kawat beton kg 3.00 20,000.00 60,000.00
Semen Portland kg 336.00 1,700.00 571,200.00
Pasir Beton m3 0.54 150,000.00 81,000.00
Kerikil m3 0.81 200,000.00 162,000.00
Kayu kelas II balok m3 0.11 3,750,000.00 393,750.00
Plywood 9 mm Lembar 2.50 112,500.00 281,250.00
Dolken kayu Ø(8-10)
Batang 14.00 12,000.00 168,000.00
cm, panj 4 m
JUMLAH HARGA BAHAN 5,640,200.00
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.18 90,000.00 16,200.00
Tukang batu L.02 OH 0.02 100,000.00 2,000.00
Tukang kayu L.02 OH 0.02 100,000.00 2,000.00
Tukang besi L.02 OH 0.02 100,000.00 2,000.00
Kepala tukang L.03 OH 0.01 110,000.00 660.00
Mandor L.04 OH 0.01 115,000.00 1,035.00
JUMLAH TENAGA KERJA 23,895.00
B BAHAN
Kayu kelas III m3 0.00 3,500,000.00 7,000.00
Paku 5 cm – 12 cm kg 0.01 15,000.00 150.00
Minyak bekisting Liter 0.00
Besi beton polos kg 3.00 14,300.00 42,900.00
Kawat beton kg 0.45 20,000.00 9,000.00
Semen Portland kg 4.00 1,700.00 6,800.00
Pasir Beton m3 0.01 150,000.00 900.00
Kerikil m3 0.01 200,000.00 1,800.00
JUMLAH HARGA BAHAN 68,550.00
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.30 90,000.00 26,730.00
Tukang batu L.02 OH 0.03 100,000.00 3,300.00
Tukang kayu L.02 OH 0.03 100,000.00 3,300.00
Tukang besi L.02 OH 0.03 100,000.00 3,300.00
Kepala tukang L.03 OH 0.01 110,000.00 1,100.00
Mandor L.04 OH 0.02 115,000.00 1,725.00
JUMLAH TENAGA KERJA 39,455.00
B BAHAN
Kayu kelas III m3 0.00 3,500,000.00 10,500.00
Paku 5 cm – 12 cm kg 0.02 15,000.00 300.00
Minyak bekisting Liter 0.00
Besi beton polos kg 3.60 14,300.00 51,480.00
Kawat beton kg 0.05 20,000.00 1,000.00
Semen Portland kg 5.50 1,700.00 9,350.00
Pasir Beton m3 0.01 150,000.00 1,350.00
Kerikil m3 0.02 200,000.00 3,000.00
JUMLAH HARGA BAHAN 76,980.00
C PERALATAN
A.4.1.2.1. Pembuatan 1 m2 lahan produksi tebal 8cm beton f’c 14,5 Mpa (K 175) slump (12 ± 2) cm
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.13 90,000.00 11,880.00
Tukang batu L.02 OH 0.02 100,000.00 2,200.00
Kepala tukang L.03 OH 0.00 110,000.00 220.00
Mandor L.04 OH 0.01 115,000.00 805.00
JUMLAH TENAGA KERJA 15,105.00
B BAHAN
Semen PC Kg 26.08 1,700.00 44,336.00
Pasir beton Kg 60.80 107.14 6,514.29
Kerikil (maks 30mm) Kg 82.32 148.15 12,195.56
Air L 17.20 75.00 1,290.00
JUMLAH HARGA BAHAN 64,335.84
C PERALATAN
A.4.1.2.2. Pembuatan 1 m2 lahan produksi tebal 10 cm beton f’c 14,5 Mpa (K 175) slump (12 ± 2) cm
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.17 90,000.00 14,850.00
Tukang batu L.02 OH 0.03 100,000.00 2,800.00
Kepala tukang L.03 OH 0.00 110,000.00 330.00
Mandor L.04 OH 0.01 115,000.00 920.00
JUMLAH TENAGA KERJA 18,900.00
B BAHAN
Semen PC Kg 32.60 1,700.00 55,420.00
Pasir beton Kg 76.00 107.14 8,142.86
Kerikil (maks 30mm) Kg 102.90 148.15 15,244.44
Air L 21.50 75.00 1,612.50
JUMLAH HARGA BAHAN 80,419.80
C PERALATAN
A.4.1.2.3. Pembuatan 1 m2 lahan produksi tebal 12 cm beton f’c 14,5 Mpa (K 175) slump (12 ± 2) cm
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.20 90,000.00 17,820.00
Tukang batu L.02 OH 0.03 100,000.00 3,300.00
Kepala tukang L.03 OH 0.00 110,000.00 330.00
Mandor L.04 OH 0.01 115,000.00 1,150.00
JUMLAH TENAGA KERJA 22,600.00
B BAHAN
Semen PC Kg 32.12 1,700.00 54,604.00
Pasir beton Kg 91.20 107.14 9,771.43
Kerikil (maks 30mm) Kg 123.48 148.15 18,293.33
Air L 25.80 75.00 1,935.00
JUMLAH HARGA BAHAN 84,603.76
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.25 90,000.00 22,320.00
Tukang batu L.02 OH 0.04 100,000.00 4,100.00
Kepala tukang L.03 OH 0.00 110,000.00 440.00
Mandor L.04 OH 0.01 115,000.00 1,495.00
JUMLAH TENAGA KERJA 28,355.00
B BAHAN
Semen PC Kg 48.90 1,700.00 83,130.00
Pasir beton Kg 114.00 107.14 12,214.29
Kerikil (maks 30mm) Kg 154.35 148.15 22,866.67
Air L 32.25 75.00 2,418.75
JUMLAH HARGA BAHAN 120,629.70
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.01 90,000.00 630.00
Tukang batu L.02 OH 0.08 100,000.00 7,600.00
Kepala tukang L.03 OH 0.01 110,000.00 880.00
Mandor L.04 OH 0.00 115,000.00 115.00
JUMLAH TENAGA KERJA 9,225.00
B BAHAN
Lantai kerja tebal 10 cm m3 0.08
Besi hollow 50.50.3 Kg 9.39
Kayu kaso 5/7 m3 0.01
Phenol film 12mm Lbr 0.08
Minyak bekisting L 0.20
Dinabolt dia 12mm
Bh 3.88
(10-15cm)
JUMLAH HARGA BAHAN
C PERALATAN
A.4.1.2.6. Pembuatan 1 m2 bekisting untuk balok beton pracetak ( 10-12 kali pakai)
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.00 90,000.00 360.00
Tukang batu L.02 OH 0.04 100,000.00 3,800.00
Kepala tukang L.03 OH 0.00 110,000.00 440.00
Mandor L.04 OH 0.00 115,000.00 115.00
JUMLAH TENAGA KERJA 4,715.00
B BAHAN
Kayu kaso 5/7 m3 0.01
Phenol film 12mm Lbr 0.04
Minyak bekisting L 0.20
Dinabolt dia 12mm
Bh 0.69
(10-15cm)
JUMLAH HARGA BAHAN
C PERALATAN
A.4.1.2.7. Pembuatan 1 m2 bekisting untuk kolom beton pracetak (10-12 kali pakai)
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.00 90,000.00 360.00
Tukang batu L.02 OH 0.04 100,000.00 3,800.00
Kepala tukang L.03 OH 0.00 110,000.00 440.00
Mandor L.04 OH 0.00 115,000.00 115.00
JUMLAH TENAGA KERJA
B BAHAN
Kayu kaso 5/7 m3 0.00
Phenol film 12mm Lbr 0.05
Minyak bekisting L 0.20
Paku 5-7cm Kg 0.05
Dinabolt dia 12mm
Bh 0.69
(10-15cm)
JUMLAH HARGA BAHAN
C PERALATAN
A.4.1.2.8. Pemasangan dan membuka bekisting 1 buah komponen plat beton pracetak
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.05
Tukang kayu OH 0.02
Mandor L.04 OH 0.01
JUMLAH TENAGA KERJA
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN
A.4.1.2.9. Pemasangan dan membuka bekisting 1 buah komponen balok beton pracetak
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.09
Tukang kayu OH 0.03
Mandor L.04 OH 0.01
JUMLAH TENAGA KERJA
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.07
Tukang kayu OH 0.02
Mandor L.04 OH 0.01
JUMLAH TENAGA KERJA
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.06
Tukang batu L.02 OH 0.24
Tukang vibrator L.02 OH 0.13
Kepala Tukang L.03 OH 0.03
Mandor L.04 OH 0.07
JUMLAH TENAGA KERJA
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.07
Tukang batu L.02 OH 0.24
Tukang vibrator L.02 OH 0.14
Kepala Tukang L.03 OH 0.04
Mandor L.04 OH 0.07
JUMLAH TENAGA KERJA
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.06
Tukang batu L.02 OH 0.21
Tukang vibrator L.02 OH 0.12
Kepala Tukang L.03 OH 0.03
Mandor L.04 OH 0.07
JUMLAH TENAGA KERJA
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.07
Tukang batu L.02 OH 0.07
Tukang erection L.02 OH 0.13
Kepala Tukang L.03 OH 0.07
Mandor L.04 OH 0.07
JUMLAH TENAGA KERJA
B BAHAN
Solar L 6.68
JUMLAH HARGA BAHAN
C PERALATAN
Sewa crane UH 0.07
Sewa pipe support UH 1.10
JUMLAH HARGA ALAT
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.06
Tukang batu L.02 OH 0.06
Tukang erection L.02 OH 0.12
Operator crane OH 0.06
Pembantu operator
OH 0.06
crane
Kepala Tukang L.03 OH 0.06
Mandor L.04 OH 0.06
JUMLAH TENAGA KERJA
B BAHAN
Solar L 6.11
JUMLAH HARGA BAHAN
C PERALATAN
Sewa crane UH 0.06
Sewa chaffolding UH 1.10
JUMLAH HARGA ALAT
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.08
Tukang batu L.02 OH 0.08
Tukang erection L.02 OH 0.17
Operator crane OH 0.08
Pembantu operator
OH 0.08
crane
Kepala Tukang L.03 OH 0.08
Mandor L.04 OH 0.08
JUMLAH TENAGA KERJA
B BAHAN
Solar L 8.28
JUMLAH HARGA BAHAN
C PERALATAN
Sewa crane UH 0.08
Sewa pipe support UH 2.20
JUMLAH HARGA ALAT
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.02
Tukang batu L.02 OH 0.04
Operator crane OH 0.02
Pembantu operator
OH 0.02
crane
JUMLAH TENAGA KERJA
B BAHAN
Solar L 1.90
JUMLAH HARGA BAHAN
C PERALATAN
Sewa crane UH 0.02
JUMLAH HARGA ALAT
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.02
Tukang batu L.02 OH 0.04
Operator crane OH 0.02
Pembantu operator
OH 0.02
crane
JUMLAH TENAGA KERJA
B BAHAN
Solar L 1.90
JUMLAH HARGA BAHAN
C PERALATAN
Sewa crane UH 0.02
JUMLAH HARGA ALAT
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.02
Tukang batu L.02 OH 0.04
Operator crane OH 0.02
Pembantu operator
OH 0.02
crane
JUMLAH TENAGA KERJA
B BAHAN
Solar L 1.90
JUMLAH HARGA BAHAN
C PERALATAN
Sewa crane UH 0.02
JUMLAH HARGA ALAT
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
JUMLAH TENAGA KERJA
B BAHAN
Semen grout Kg 1,200.00
Screening Kg 650.00
Air L 350.00
JUMLAH HARGA BAHAN
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
JUMLAH TENAGA KERJA
B BAHAN
Semen grout Kg 1,850.00
Air L 400.00
JUMLAH HARGA BAHAN
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Tukang batu L.02 OH 0.37
Kepal tukang L.03 OH 0.07
Mandor L.04 OH 0.04
JUMLAH TENAGA KERJA
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja 0.15
Tukang kayu L.02 OH 0.15
Kepala tukang L.03 OH 0.02
Mandor L.04 OH 0.01
JUMLAH TENAGA KERJA
B BAHAN
Kayu kaso 5/7 m3 0.01
Papan cor m3 0.00
Paku 5-7cm Kg 0.26
JUMLAH HARGA BAHAN
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja 0.22
Tukang kayu L.02 OH 0.22
Tukang besi L.02 OH 0.22
Mandor L.04 OH 0.01
JUMLAH TENAGA KERJA
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.06 90,000.00 5,400.00
Tukang Las Konstruksi L.03 OH 0.06 100,000.00 6,000.00
Kepala tukang L.03 OH 0.01 110,000.00 660.00
Mandor L.04 OH 0.00 115,000.00 345.00
JUMLAH TENAGA KERJA 12,405.00
B BAHAN
Besi Profil Kg 1.15 0.00
JUMLAH HARGA BAHAN 0.00
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.06 90,000.00 5,400.00
Tukang Las Konstruksi L.03 OH 0.06 100,000.00 6,000.00
Kepala tukang L.03 OH 0.01 110,000.00 660.00
Mandor L.04 OH 0.00 115,000.00 345.00
JUMLAH TENAGA KERJA
B BAHAN
Besi Baja IWF Kg 1.15
JUMLAH HARGA BAHAN
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.10 90,000.00 9,000.00
Tukang Besi Konstruksi L.03 OH 0.10 100,000.00 10,000.00
Kepala tukang L.03 OH 0.00 110,000.00 110.00
Mandor L.04 OH 0.01 115,000.00 575.00
JUMLAH TENAGA KERJA
B BAHAN
Solar Liter 1.00
Minyak pelumas Liter 0.10
JUMLAH HARGA BAHAN
C PERALATAN
1. Sewa alat Jam 0.80
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 0.00
E Overhead & Profit10 % 10 % x D 0.00
F Harga Satuan Pekerjaan (D+E) 0.00
A.4.2.1.4. Pembuatan 1 m2 pintu besi plat baja tebal 2 mm rangkap, rangka baja siku
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 1.05 90,000.00 94,500.00
Tukang Las Biasa L.03 OH 1.05 100,000.00 105,000.00
Kepala tukang L.03 OH 0.11 110,000.00 11,550.00
Mandor L.04 OH 0.05 115,000.00 5,980.00
JUMLAH TENAGA KERJA
B BAHAN
Besi siku L 30.30.3 Kg 15.00
Besi plat baja Kg 32.80
Kawat las Kg 0.05
JUMLAH HARGA BAHAN
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.04 90,000.00 3,600.00
Tukang Besi Konstruksi L.03 OH 0.02 100,000.00 2,000.00
Kepala tukang L.03 OH 0.00 110,000.00 220.00
Mandor L.04 OH 0.00 115,000.00 230.00
JUMLAH TENAGA KERJA
B BAHAN
Kawat las listrik Kg 0.40
Solar Liter 0.30
Minyak pelumas Liter 0.04
JUMLAH HARGA BAHAN
C PERALATAN
Sewa alat Jam 0.17
JUMLAH HARGA ALAT
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.65 90,000.00 58,500.00
Tukang Las Biasa L.03 OH 0.65 100,000.00 65,000.00
Kepala tukang L.03 OH 0.07 110,000.00 7,150.00
Mandor L.04 OH 0.03 115,000.00 3,680.00
JUMLAH TENAGA KERJA
B BAHAN
Besi scuare tube m 4.76
Besi lis kaca (1 x 1) cm m 4.52
Pengelasan cm 20.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 1.20 90,000.00 108,000.00
Tukang Las Biasa L.03 OH 1.20 100,000.00 120,000.00
Kepala tukang L.03 OH 0.12 110,000.00 13,200.00
Mandor L.04 OH 0.01 115,000.00 690.00
JUMLAH TENAGA KERJA
B BAHAN
Pintu gulung besi m2 1.00
JUMLAH HARGA BAHAN
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.44 90,000.00 39,600.00
Tukang L.03 OH 0.44 100,000.00 44,000.00
Kepala tukang L.03 OH 0.04 110,000.00 4,840.00
Mandor L.04 OH 0.02 115,000.00 2,530.00
JUMLAH TENAGA KERJA
B BAHAN
Pintu lipat m2 1.00
JUMLAH HARGA BAHAN
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.08 90,000.00 7,200.00
Tukang L.03 OH 0.80 100,000.00 80,000.00
Kepala tukang L.03 OH 0.08 110,000.00 8,800.00
Mandor L.04 OH 0.00 115,000.00 460.00
JUMLAH TENAGA KERJA
B BAHAN
Sunscreen alluminium m2 1.00
JUMLAH HARGA BAHAN
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 1.00 90,000.00 90,000.00
Tukang Khusus Alumunium L.03 OH 1.00 100,000.00 100,000.00
Kepala tukang L.03 OH 0.10 110,000.00 11,000.00
Mandor L.04 OH 0.05 115,000.00 5,750.00
JUMLAH TENAGA KERJA
B BAHAN
Rolling dor alluminium m2 1.00
JUMLAH HARGA BAHAN
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.04 90,000.00 3,870.00
Tukang Khusus Alumunium L.03 OH 0.04 100,000.00 4,300.00
Kepala tukang L.03 OH 0.00 110,000.00 473.00
Mandor L.04 OH 0.00 115,000.00 241.50
JUMLAH TENAGA KERJA
B BAHAN
Profil alluminium m 1.10
Skrup fixer buah 2.00
Sealant Tube 0.06
JUMLAH HARGA BAHAN
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.09 90,000.00 7,650.00
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.09 90,000.00 7,650.00
Tukang Allumunium/Kaca L.03 OH 0.09 100,000.00 8,500.00
Kepala tukang L.03 OH 0.01 110,000.00 990.00
Mandor L.04 OH 0.01 115,000.00 575.00
JUMLAH TENAGA KERJA
B BAHAN
Pintu alluminium m 4.40
Profil kaca m 4.50
Sealant Tube 0.27
JUMLAH HARGA BAHAN
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.35 90,000.00 31,500.00
Tukang L.03 OH 0.35 100,000.00 35,000.00
Kepala tukang L.03 OH 0.04 110,000.00 3,850.00
Mandor L.04 OH 0.02 115,000.00 2,070.00
JUMLAH TENAGA KERJA
B BAHAN
Venetions blinds dan
m2 1.00
vertical blinds (tirai)
JUMLAH HARGA BAHAN
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 1.67 90,000.00 150,300.00
Tukang Las L.03 OH 0.17 100,000.00 16,700.00
Kepala tukang L.03 OH 0.17 110,000.00 18,370.00
Mandor L.04 OH 0.08 115,000.00 9,545.00
JUMLAH TENAGA KERJA 194,915.00
B BAHAN
Besi strip kg 6.18 16,500.00 101,920.50
Pengelasan cm 27.08 500.00 13,540.00
JUMLAH HARGA BAHAN 115,460.50
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.10 90,000.00 9,000.00
Tukang L.03 OH 0.10 100,000.00 10,000.00
Kepala tukang L.03 OH 0.01 110,000.00 1,100.00
Mandor L.04 OH 0.01 115,000.00 575.00
JUMLAH TENAGA KERJA
B BAHAN
Kawat nyamuk m2 1.10
Pengelasan cm 11.11
Baja strip (0,2 x 2) cm kg 1.72
JUMLAH HARGA BAHAN
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.20 90,000.00 18,000.00
Tukang L.03 OH 0.20 100,000.00 20,000.00
Kepala tukang L.03 OH 0.02 110,000.00 2,200.00
Mandor L.04 OH 0.00 115,000.00 115.00
JUMLAH TENAGA KERJA
B BAHAN
Jendela nako
m2 1.10
(rangka + kaca 5 mm)
Paku skrup
buah 10.00
1 cm – 2,5 cm
Besi strip m 7.00
JUMLAH HARGA BAHAN
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.20 90,000.00 18,000.00
Tukang L.03 OH 0.20 100,000.00 20,000.00
Kepala tukang L.03 OH 0.02 110,000.00 2,200.00
Mandor L.04 OH 0.00 115,000.00 115.00
JUMLAH TENAGA KERJA 40,315.00
B BAHAN
Seng plat m 1.05 42,000.00 44,100.00
Paku 1 cm - 2,5 cm kg 0.02 15,000.00 225.00
Papan kayu kelas II atau III m3 0.02 3,750,000.00 71,250.00
JUMLAH HARGA BAHAN 115,575.00
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.15 90,000.00 13,500.00
Tukang L.03 OH 0.30 100,000.00 30,000.00
Kepala tukang L.03 OH 0.03 110,000.00 3,300.00
Mandor L.04 OH 0.01 115,000.00 920.00
JUMLAH TENAGA KERJA 47,720.00
B BAHAN
Seng plat m 1.05 42,000.00 44,100.00
Paku 1 cm – 2,5 cm kg 0.01 15,000.00 150.00
Besi strip kg 0.50 16,500.00 8,250.00
JUMLAH HARGA BAHAN 52,500.00
C PERALATAN
A.4.2.1.20.Pemasangan 1 m2 rangka besi hollow 1x40.40.2mm, modul 60 x 120 cm, dinding partisi
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.25 90,000.00 22,500.00
Tukang Besi L.02 OH 0.25 100,000.00 25,000.00
Kepala Tukang L.03 OH 0.03 110,000.00 2,750.00
Mandor L.04 OH 0.01 115,000.00 1,495.00
JUMLAH TENAGA KERJA 51,745.00
B BAHAN
Rangka metal hollow
m' 3.50 5,637.50 19,731.25
40.40.2 mm
Assesoris (perkuatan, las
Ls 3.50 5,637.50 19,731.25
dll)
JUMLAH HARGA BAHAN 39,462.50
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.35 90,000.00 31,500.00
Tukang Besi L.02 OH 0.35 100,000.00 35,000.00
Kepala Tukang L.03 OH 0.04 110,000.00 3,850.00
Mandor L.04 OH 0.02 115,000.00 2,070.00
JUMLAH TENAGA KERJA 72,420.00
B BAHAN
Rangka metal hollow
m' 4.00 5,637.50 22,550.00
40.40.2 mm
Assesoris (perkuatan, las
Ls 4.00 5,637.50 22,550.00
dll)
JUMLAH HARGA BAHAN 45,100.00
C PERALATAN
JUMLAH HARGA ALAT
A. 4.4.1.1. Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1SP : 2PP
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.60 90,000.00 54,000.00
Tukang Batu L.02 OH 0.20 100,000.00 20,000.00
Kepala Tukang L.03 OH 0.02 110,000.00 2,200.00
Mandor L.04 OH 0.03 115,000.00 3,450.00
JUMLAH TENAGA KERJA 79,650.00
B BAHAN
Bata merah bh 140.00 875.00 122,500.00
Semen Portland Kg 43.50 1,700.00 73,950.00
Pasir Pasang m3 0.08 150,000.00 12,000.00
JUMLAH HARGA BAHAN 208,450.00
C PERALATAN
A. 4.4.1.2. Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1SP : 3PP
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.60 90,000.00 54,000.00
Tukang Batu L.02 OH 0.20 100,000.00 20,000.00
Kepala Tukang L.03 OH 0.02 110,000.00 2,200.00
Mandor L.04 OH 0.03 115,000.00 3,450.00
JUMLAH TENAGA KERJA 79,650.00
B BAHAN
Bata merah bh 140.00 875.00 122,500.00
Semen Portland Kg 32.95 1,700.00 56,015.00
Pasir Pasang m3 0.09 150,000.00 13,650.00
JUMLAH HARGA BAHAN 192,165.00
C PERALATAN
A. 4.4.1.3. Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1SP : 4PP
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.60 90,000.00 54,000.00
Tukang Batu L.02 OH 0.20 100,000.00 20,000.00
Kepala Tukang L.03 OH 0.02 110,000.00 2,200.00
Mandor L.04 OH 0.03 115,000.00 3,450.00
JUMLAH TENAGA KERJA 79,650.00
B BAHAN
Bata merah bh 140.00 875.00 122,500.00
Semen Portland Kg 26.55 1,700.00 45,135.00
Pasir Pasang m3 0.09 150,000.00 13,950.00
JUMLAH HARGA BAHAN 181,585.00
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.60 90,000.00 54,000.00
Tukang Batu L.02 OH 0.20 100,000.00 20,000.00
Kepala Tukang L.03 OH 0.02 110,000.00 2,200.00
Mandor L.04 OH 0.03 115,000.00 3,450.00
JUMLAH TENAGA KERJA 79,650.00
B BAHAN
Bata merah bh 140.00 875.00 122,500.00
Semen Portland Kg 22.20 1,700.00 37,740.00
Pasir Pasang m3 0.10 150,000.00 15,300.00
JUMLAH HARGA BAHAN 175,540.00
C PERALATAN
A. 4.4.1.5 Pemasangan 1m2 Dinding Bata Merah (5x11x22) cm tebal 1 batu campuran 1SP : 6PP
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.60 90,000.00 54,000.00
Tukang Batu L.02 OH 0.20 100,000.00 20,000.00
Kepala Tukang L.03 OH 0.02 110,000.00 2,200.00
Mandor L.04 OH 0.03 115,000.00 3,450.00
JUMLAH TENAGA KERJA 79,650.00
B BAHAN
Bata merah bh 140.00 875.00 122,500.00
Semen Portland Kg 18.50 1,700.00 31,450.00
Pasir Pasang m3 0.12 150,000.00 18,300.00
JUMLAH HARGA BAHAN 172,250.00
C PERALATAN
A. 4.4.1.6 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1SP : 3KP : 10PP
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.60 90,000.00 54,000.00
Tukang Batu L.02 OH 0.20 100,000.00 20,000.00
Kepala Tukang L.03 OH 0.02 110,000.00 2,200.00
Mandor L.04 OH 0.03 115,000.00 3,450.00
JUMLAH TENAGA KERJA 79,650.00
B BAHAN
Bata merah bh 140.00 875.00 122,500.00
Semen Portland Kg 10.08 1,700.00 17,136.00
Kapur Padam m3 0.03 2,000.00 55.00
Pasir Pasang m3 0.09 150,000.00 13,875.00
JUMLAH HARGA BAHAN 153,566.00
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.30 90,000.00 27,000.00
Tukang Batu L.02 OH 0.10 100,000.00 10,000.00
Kepala Tukang L.03 OH 0.01 110,000.00 1,100.00
Mandor L.04 OH 0.02 115,000.00 1,725.00
JUMLAH TENAGA KERJA 39,825.00
B BAHAN
Bata merah bh 70.00 875.00 61,250.00
Semen Portland Kg 18.95 1,700.00 32,215.00
Pasir Pasang m3 0.04 150,000.00 5,700.00
JUMLAH HARGA BAHAN 99,165.00
C PERALATAN
A. 4.4.1.8 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP : 3PP
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.30 90,000.00 27,000.00
Tukang Batu L.02 OH 0.10 100,000.00 10,000.00
Kepala Tukang L.03 OH 0.01 110,000.00 1,100.00
Mandor L.04 OH 0.02 115,000.00 1,725.00
JUMLAH TENAGA KERJA 39,825.00
B BAHAN
Bata merah bh 70.00 875.00 61,250.00
Semen Portland Kg 14.37 1,700.00 24,429.00
Pasir Pasang m3 0.04 150,000.00 6,000.00
JUMLAH HARGA BAHAN 91,679.00
C PERALATAN
A.4.4.1.9 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP :4PP
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.30 90,000.00 27,000.00
Tukang Batu L.02 OH 0.10 100,000.00 10,000.00
Kepala Tukang L.03 OH 0.01 110,000.00 1,100.00
Mandor L.04 OH 0.02 115,000.00 1,725.00
JUMLAH TENAGA KERJA 39,825.00
B BAHAN
Bata merah bh 70.00 875.00 61,250.00
Semen Portland Kg 11.50 1,700.00 19,550.00
Pasir Pasang m3 0.04 150,000.00 6,450.00
JUMLAH HARGA BAHAN 87,250.00
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.30 90,000.00 27,000.00
Tukang Batu L.02 OH 0.10 100,000.00 10,000.00
Kepala Tukang L.03 OH 0.01 110,000.00 1,100.00
Mandor L.04 OH 0.02 115,000.00 1,725.00
JUMLAH TENAGA KERJA 39,825.00
B BAHAN
Bata merah bh 70.00 875.00 61,250.00
Semen Portland Kg 9.68 1,700.00 16,456.00
Pasir Pasang m3 0.05 150,000.00 6,750.00
JUMLAH HARGA BAHAN 84,456.00
C PERALATAN
A. 4.4.1.11 Pemasangan 1m2 dinding bata merah (5x11x22)cm tebal ½ batu campuran 1SP : 6PP
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.30 90,000.00 27,000.00
Tukang Batu L.02 OH 0.10 100,000.00 10,000.00
Kepala Tukang L.03 OH 0.01 110,000.00 1,100.00
Mandor L.04 OH 0.02 115,000.00 1,725.00
JUMLAH TENAGA KERJA 39,825.00
B BAHAN
Bata merah bh 70.00 875.00 61,250.00
Semen Portlandd Kg 8.32 1,700.00 14,144.00
Pasir Pasang m3 0.05 150,000.00 7,350.00
JUMLAH HARGA BAHAN 82,744.00
C PERALATAN
A. 4.4.1.12 Pemasangan 1m2 dinding bata merah (5x11x22)cm tebal ½ batu campuran 1SP :8PP
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.30 90,000.00 27,000.00
Tukang Batu L.02 OH 0.10 100,000.00 10,000.00
Kepala Tukang L.03 OH 0.01 110,000.00 1,100.00
Mandor L.04 OH 0.02 115,000.00 1,725.00
JUMLAH TENAGA KERJA 39,825.00
B BAHAN
Bata merah bh 70.00 875.00 61,250.00
Semen Portlandd Kg 6.50 1,700.00 11,050.00
Pasir Pasang m3 0.05 150,000.00 7,500.00
JUMLAH HARGA BAHAN 79,800.00
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.30 90,000.00 27,000.00
Tukang Batu L.02 OH 0.10 100,000.00 10,000.00
Kepala Tukang L.03 OH 0.01 110,000.00 1,100.00
Mandor L.04 OH 0.02 115,000.00 1,725.00
JUMLAH TENAGA KERJA 39,825.00
B BAHAN
Bata merah bh 70.00 875.00 61,250.00
Semen Portland Kg 4.50 1,700.00 7,650.00
Kapur Padam m3 0.02 2,000.00 30.00
Pasir Pasang m3 0.05 150,000.00 7,500.00
JUMLAH HARGA BAHAN 76,430.00
C PERALATAN
A. 4.4.1.14 Pemasangan 1m2 dinding bata merah (5x11x22)cm tebal ½ batu campuran 1SM : 1KP :1PP
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.30 90,000.00 27,000.00
Tukang Batu L.02 OH 0.10 100,000.00 10,000.00
Kepala Tukang L.03 OH 0.01 110,000.00 1,100.00
Mandor L.04 OH 0.02 115,000.00 1,725.00
JUMLAH TENAGA KERJA 39,825.00
B BAHAN
Bata merah bh 70.00 875.00 61,250.00
Semen Merah Kg 0.02 13,000.00 234.00
Kapur Padam m3 0.02 2,000.00 36.00
Pasir Pasang m3 0.02 150,000.00 2,700.00
JUMLAH HARGA BAHAN 64,220.00
C PERALATAN
A. 4.4.1.15 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SM : 1KP :2PP
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.30 90,000.00 27,000.00
Tukang Batu L.02 OH 0.10 100,000.00 10,000.00
Kepala Tukang L.03 OH 0.01 110,000.00 1,100.00
Mandor L.04 OH 0.02 115,000.00 1,725.00
JUMLAH TENAGA KERJA 39,825.00
B BAHAN
Bata merah bh 70.00 875.00 61,250.00
Semen Merah Kg 0.01 13,000.00 182.00
Kapur Padam m3 0.01 2,000.00 28.00
Pasir Pasang m3 0.03 150,000.00 4,200.00
JUMLAH HARGA BAHAN 65,660.00
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.35 90,000.00 31,500.00
Tukang Batu L.02 OH 0.15 100,000.00 15,000.00
Kepala Tukang L.03 OH 0.02 110,000.00 1,650.00
Mandor L.04 OH 0.02 115,000.00 2,070.00
JUMLAH TENAGA KERJA 50,220.00
B BAHAN
HB-20 bh 12.50 3,250.00 40,625.00
Semen Portland Kg 30.32 1,700.00 51,544.00
Pasir Pasang m3 0.73 150,000.00 109,200.00
Besi angker diameter 8 Kg 0.28 16,500.00 4,620.00
JUMLAH HARGA BAHAN 205,989.00
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.35 90,000.00 31,500.00
Tukang Batu L.02 OH 0.15 100,000.00 15,000.00
Kepala Tukang L.03 OH 0.02 110,000.00 1,650.00
Mandor L.04 OH 0.02 115,000.00 2,070.00
JUMLAH TENAGA KERJA 50,220.00
B BAHAN
HB-20 bh 12.50 3,250.00 40,625.00
Semen Portland Kg 24.26 1,700.00 41,242.00
Pasir Pasang m3 0.77 150,000.00 115,800.00
Besi angker dia 8 Kg 0.28 16,500.00 4,620.00
JUMLAH HARGA BAHAN 202,287.00
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.32 90,000.00 28,800.00
Tukang Batu L.02 OH 0.12 100,000.00 12,000.00
Kepala Tukang L.03 OH 0.01 110,000.00 1,320.00
Mandor L.04 OH 0.02 115,000.00 1,840.00
JUMLAH TENAGA KERJA 43,960.00
B BAHAN
HB-15 bh 12.50 3,250.00 40,625.00
Semen Portland Kg 22.74 1,700.00 38,658.00
Pasir Pasang m3 0.55 150,000.00 82,500.00
Besi angker dia 8 Kg 0.28 16,500.00 4,620.00
JUMLAH HARGA BAHAN 166,403.00
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.32 90,000.00 28,800.00
Tukang Batu L.02 OH 0.12 100,000.00 12,000.00
Kepala Tukang L.03 OH 0.01 110,000.00 1,320.00
Mandor L.04 OH 0.02 115,000.00 1,840.00
JUMLAH TENAGA KERJA 43,960.00
B BAHAN
HB-15 bh 12.50 3,250.00 40,625.00
Semen Portland Kg 18.20 1,700.00 30,940.00
Pasir Pasang m3 0.58 150,000.00 87,300.00
Besi angker dia 8 Kg 0.28 16,500.00 4,620.00
JUMLAH HARGA BAHAN 163,485.00
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.30 90,000.00 27,000.00
Tukang Batu L.02 OH 0.10 100,000.00 10,000.00
Kepala Tukang L.03 OH 0.01 110,000.00 1,100.00
Mandor L.04 OH 0.02 115,000.00 1,725.00
JUMLAH TENAGA KERJA 39,825.00
B BAHAN
HB-10 bh 12.50 3,250.00 40,625.00
Semen Portland Kg 15.16 1,700.00 25,772.00
Pasir Pasang m3 0.36 150,000.00 54,600.00
Besi angker dia 8 Kg 0.28 16,500.00 4,620.00
JUMLAH HARGA BAHAN 125,617.00
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.30 90,000.00 27,000.00
Tukang Batu L.02 OH 0.10 100,000.00 10,000.00
Kepala Tukang L.03 OH 0.01 110,000.00 1,100.00
Mandor L.04 OH 0.02 115,000.00 1,725.00
JUMLAH TENAGA KERJA 39,825.00
B BAHAN
HB-10 bh 12.50 3,250.00 40,625.00
Semen Portland Kg 12.13 1,700.00 20,621.00
Pasir Pasang m3 0.39 150,000.00 58,200.00
Besi angker dia 8 Kg 0.28 16,500.00 4,620.00
JUMLAH HARGA BAHAN 124,066.00
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.30 90,000.00 27,000.00
Tukang Batu L.02 OH 0.10 100,000.00 10,000.00
Kepala Tukang L.03 OH 0.01 110,000.00 1,100.00
Mandor L.04 OH 0.02 115,000.00 1,725.00
JUMLAH TENAGA KERJA 39,825.00
B BAHAN
Bata rooster bh 30.00 75,000.00 2,250,000.00
Semen Portland Kg 11.00 1,700.00 18,700.00
Pasir Pasang m3 0.04 150,000.00 5,250.00
JUMLAH HARGA BAHAN 2,273,950.00
C PERALATAN
A. 4.4.1.23 Pemasangan 1 cm2 dinding terawang (rooster) 12x11x24 campuran 1SP :4PP
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.30 90,000.00 27,000.00
Tukang Batu L.02 OH 0.10 100,000.00 10,000.00
Kepala Tukang L.03 OH 0.01 110,000.00 1,100.00
Mandor L.04 OH 0.02 115,000.00 1,725.00
JUMLAH TENAGA KERJA 39,825.00
B BAHAN
Bata berongga bh 30.00 75,000.00 2,250,000.00
Semen Portland Kg 11.00 1,700.00 18,700.00
Pasir Pasang m3 0.04 150,000.00 5,250.00
JUMLAH HARGA BAHAN 2,273,950.00
C PERALATAN
A. 4.4.1.24 Pemasangan 1 cm2 dinding bata berongga ekspose 12x11x24 campuran 1SP :3PP
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.30 90,000.00 27,000.00
Tukang Batu L.02 OH 0.15 100,000.00 15,000.00
Kepala Tukang L.03 OH 0.02 110,000.00 1,650.00
Mandor L.04 OH 0.02 115,000.00 1,725.00
JUMLAH TENAGA KERJA 45,375.00
B BAHAN
Bata rooster bh 70.00 75,000.00 5,250,000.00
Semen Portland Kg 14.00 1,700.00 23,800.00
Pasir Pasang m3 0.03 150,000.00 4,800.00
JUMLAH HARGA BAHAN 5,278,600.00
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.30 90,000.00 27,000.00
Tukang Batu L.03 OH 0.15 100,000.00 15,000.00
Kepala Tukang L.03 OH 0.02 110,000.00 1,650.00
Mandor L.04 OH 0.02 115,000.00 1,725.00
JUMLAH TENAGA KERJA 45,375.00
B BAHAN
1. PC Kg 15.50 1,700.00 26,356.80
2. PP m3 0.02 150,000.00 2,400.00
JUMLAH HARGA BAHAN 28,756.80
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.30 90,000.00 27,000.00
Tukang Batu L.03 OH 0.15 100,000.00 15,000.00
Kepala Tukang L.03 OH 0.02 110,000.00 1,650.00
Mandor L.04 OH 0.02 115,000.00 1,725.00
JUMLAH TENAGA KERJA 45,375.00
B BAHAN
1. PC Kg 10.22 1,700.00 17,380.80
2. PP m3 0.02 150,000.00 3,000.00
JUMLAH HARGA BAHAN 20,380.80
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.30 90,000.00 27,000.00
Tukang Batu L.03 OH 0.15 100,000.00 15,000.00
Kepala Tukang L.03 OH 0.02 110,000.00 1,650.00
Mandor L.04 OH 0.02 115,000.00 1,725.00
JUMLAH TENAGA KERJA 45,375.00
B BAHAN
1. PC Kg 7.78 1,700.00 13,219.20
2. PP m3 0.02 150,000.00 3,450.00
JUMLAH HARGA BAHAN 16,669.20
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.30 90,000.00 27,000.00
Tukang Batu L.03 OH 0.15 100,000.00 15,000.00
Kepala Tukang L.03 OH 0.02 110,000.00 1,650.00
Mandor L.04 OH 0.02 115,000.00 1,725.00
JUMLAH TENAGA KERJA 45,375.00
B BAHAN
1. PC Kg 6.24 1,700.00 10,608.00
2. PP m3 0.02 150,000.00 3,600.00
JUMLAH HARGA BAHAN 14,208.00
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.30 90,000.00 27,000.00
Tukang Batu L.03 OH 0.15 100,000.00 15,000.00
Kepala Tukang L.03 OH 0.02 110,000.00 1,650.00
Mandor L.04 OH 0.02 115,000.00 1,725.00
JUMLAH TENAGA KERJA 45,375.00
B BAHAN
1. PC Kg 5.18 1,700.00 8,812.80
2. PP m3 0.03 150,000.00 3,900.00
JUMLAH HARGA BAHAN 12,712.80
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.30 90,000.00 27,000.00
Tukang Batu L.03 OH 0.15 100,000.00 15,000.00
Kepala Tukang L.03 OH 0.02 110,000.00 1,650.00
Mandor L.04 OH 0.02 115,000.00 1,725.00
JUMLAH TENAGA KERJA 45,375.00
B BAHAN
1. PC Kg 4.42 1,700.00 7,507.20
2. PP m3 0.03 150,000.00 4,050.00
JUMLAH HARGA BAHAN 11,557.20
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.30 90,000.00 27,000.00
Tukang Batu L.03 OH 0.15 100,000.00 15,000.00
Kepala Tukang L.03 OH 0.02 110,000.00 1,650.00
Mandor L.04 OH 0.02 115,000.00 1,725.00
JUMLAH TENAGA KERJA 45,375.00
B BAHAN
1. PC Kg 3.94 1,700.00 6,691.20
2. PP m3 0.03 150,000.00 4,200.00
JUMLAH HARGA BAHAN 10,891.20
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.30 90,000.00 27,000.00
Tukang Batu L.03 OH 0.15 100,000.00 15,000.00
Kepala Tukang L.03 OH 0.02 110,000.00 1,650.00
Mandor L.04 OH 0.02 115,000.00 1,725.00
JUMLAH TENAGA KERJA 45,375.00
B BAHAN
1. PC Kg 3.46 1,700.00 5,875.20
2. PP m3 0.03 150,000.00 4,350.00
JUMLAH HARGA BAHAN 10,225.20
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.36 90,000.00 32,400.00
Tukang Batu L.03 OH 0.12 100,000.00 12,000.00
Kepala Tukang L.03 OH 0.01 110,000.00 1,320.00
Mandor L.04 OH 0.02 115,000.00 2,070.00
JUMLAH TENAGA KERJA 47,790.00
B BAHAN
1. PC Kg 5.76 1,700.00 9,792.00
2. KP m3 0.00 200,000.00 600.00
3. PP m3 0.01 150,000.00 1,950.00
JUMLAH HARGA BAHAN 12,342.00
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.36 90,000.00 32,400.00
Tukang Batu L.03 OH 0.12 100,000.00 12,000.00
Kepala Tukang L.03 OH 0.01 110,000.00 1,320.00
Mandor L.04 OH 0.02 115,000.00 2,070.00
JUMLAH TENAGA KERJA 47,790.00
B BAHAN
1. PC Kg 3.00 1,700.00 5,100.00
2. KP m3 0.01 200,000.00 1,000.00
3. PP m3 0.02 150,000.00 3,000.00
JUMLAH HARGA BAHAN 9,100.00
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.36 90,000.00 32,400.00
Tukang Batu L.03 OH 0.12 100,000.00 12,000.00
Kepala Tukang L.03 OH 0.01 110,000.00 1,320.00
Mandor L.04 OH 0.02 115,000.00 2,070.00
JUMLAH TENAGA KERJA 47,790.00
B BAHAN
1. SM m3 0.01 1,700.00 15.30
2. KP m3 0.01 200,000.00 1,800.00
3. PP m3 0.01 150,000.00 1,350.00
JUMLAH HARGA BAHAN 3,165.30
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.36 90,000.00 32,400.00
Tukang Batu L.03 OH 0.12 100,000.00 12,000.00
Kepala Tukang L.03 OH 0.01 110,000.00 1,320.00
Mandor L.04 OH 0.02 115,000.00 2,070.00
JUMLAH TENAGA KERJA 47,790.00
B BAHAN
1. SM m3 0.01 1,700.00 11.90
2. KP m3 0.01 200,000.00 1,400.00
3. PP m3 0.02 150,000.00 2,250.00
JUMLAH HARGA BAHAN 3,661.90
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.40 90,000.00 36,000.00
Tukang Batu L.03 OH 0.20 100,000.00 20,000.00
Kepala Tukang L.03 OH 0.02 110,000.00 2,200.00
Mandor L.04 OH 0.02 115,000.00 2,530.00
JUMLAH TENAGA KERJA 60,730.00
B BAHAN
1. PC Kg 13.63 1,700.00 23,174.40
2. PP m3 0.03 150,000.00 4,050.00
JUMLAH HARGA BAHAN 27,224.40
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.26 90,000.00 23,400.00
Tukang Batu L.03 OH 0.20 100,000.00 20,000.00
Kepala Tukang L.03 OH 0.02 110,000.00 2,200.00
Mandor L.04 OH 0.01 115,000.00 1,495.00
JUMLAH TENAGA KERJA 47,095.00
B BAHAN
1. PC Kg 10.37 1,700.00 17,625.60
2. PP m3 0.03 150,000.00 4,650.00
JUMLAH HARGA BAHAN 22,275.60
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.40 90,000.00 36,000.00
Tukang Batu L.03 OH 0.20 100,000.00 20,000.00
Kepala Tukang L.03 OH 0.02 110,000.00 2,200.00
Mandor L.04 OH 0.02 115,000.00 2,530.00
JUMLAH TENAGA KERJA 60,730.00
B BAHAN
1. PC Kg 8.32 1,700.00 14,144.00
2. PP m3 0.03 150,000.00 4,800.00
JUMLAH HARGA BAHAN 18,944.00
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.40 90,000.00 36,000.00
Tukang Batu L.03 OH 0.20 100,000.00 20,000.00
Kepala Tukang L.03 OH 0.02 110,000.00 2,200.00
Mandor L.04 OH 0.02 115,000.00 2,530.00
JUMLAH TENAGA KERJA 60,730.00
B BAHAN
1. PC Kg 6.91 1,700.00 11,750.40
2. PP m3 0.04 150,000.00 5,250.00
JUMLAH HARGA BAHAN 17,000.40
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.40 90,000.00 36,000.00
Tukang Batu L.03 OH 0.20 100,000.00 20,000.00
Kepala Tukang L.03 OH 0.02 110,000.00 2,200.00
Mandor L.04 OH 0.02 115,000.00 2,530.00
JUMLAH TENAGA KERJA 60,730.00
B BAHAN
1. PC Kg 5.89 1,700.00 10,009.60
2. PP m3 0.04 150,000.00 5,400.00
JUMLAH HARGA BAHAN 15,409.60
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.44 90,000.00 39,600.00
Tukang Batu L.03 OH 0.22 100,000.00 22,000.00
Kepala Tukang L.03 OH 0.02 110,000.00 2,420.00
Mandor L.04 OH 0.02 115,000.00 2,530.00
JUMLAH TENAGA KERJA 66,550.00
B BAHAN
1. SM m3 0.01 1,700.00 15.30
2. KP m3 0.01 200,000.00 1,800.00
3. PP m3 0.02 150,000.00 2,700.00
JUMLAH HARGA BAHAN 4,515.30
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.15 90,000.00 13,500.00
Tukang Batu L.03 OH 0.08 100,000.00 7,500.00
Kepala Tukang L.03 OH 0.01 110,000.00 880.00
Mandor L.04 OH 0.01 115,000.00 920.00
JUMLAH TENAGA KERJA 22,800.00
B BAHAN
PC Kg 5.18 1,700.00 8,812.80
PP m3 0.03 150,000.00 3,900.00
JUMLAH HARGA BAHAN 12,712.80
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.08 90,000.00 7,200.00
Tukang Batu L.03 OH 0.40 100,000.00 40,000.00
Kepala Tukang L.03 OH 0.04 110,000.00 4,400.00
Mandor L.04 OH 0.00 115,000.00 460.00
JUMLAH TENAGA KERJA 52,060.00
B BAHAN
Semen PC Kg 0.50 1,700.00 850.00
Pasir pasang m3 0.01 150,000.00 1,950.00
JUMLAH HARGA BAHAN 2,800.00
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.45 90,000.00
Tukang Batu L.03 OH 0.23 100,000.00
Kepala Tukang L.03 OH 0.02 110,000.00
Mandor L.04 OH 0.02 115,000.00
JUMLAH TENAGA KERJA
B BAHAN
Semen PC Kg 10.00
Batu granit Kg 15.00
JUMLAH HARGA BAHAN
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.45 90,000.00
Tukang Batu L.03 OH 0.23 100,000.00
Kepala Tukang L.03 OH 0.02 110,000.00
Mandor L.04 OH 0.02 115,000.00
JUMLAH TENAGA KERJA
B BAHAN
Semen PC Kg 10.00
Batu traso Kg 15.00
JUMLAH HARGA BAHAN
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.30 90,000.00 27,000.00
Tukang Batu L.03 OH 0.10 100,000.00 10,000.00
Kepala Tukang L.03 OH 0.01 110,000.00 1,100.00
Mandor L.04 OH 0.02 115,000.00 1,725.00
JUMLAH TENAGA KERJA 39,825.00
B BAHAN
Semen PC Kg 4.32 1,700.00 7,344.00
Pasir pasang Kg 0.01 150,000.00 900.00
JUMLAH HARGA BAHAN 8,244.00
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.15 90,000.00 13,500.00
Tukang Batu L.03 OH 0.08 100,000.00 7,500.00
Kepala Tukang L.03 OH 0.01 110,000.00 880.00
Mandor L.04 OH 0.01 115,000.00 920.00
JUMLAH TENAGA KERJA 22,800.00
B BAHAN
Semen PC Kg 3.11 1,700.00 5,283.60
JUMLAH HARGA BAHAN 5,283.60
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.07 90,000.00 6,300.00
Tukang Batu L.03 OH 0.04 100,000.00 3,500.00
Kepala Tukang L.03 OH 0.00 110,000.00 440.00
Mandor L.04 OH 0.00 115,000.00 460.00
JUMLAH TENAGA KERJA 10,700.00
B BAHAN
Semen PC Kg 1.60 1,700.00 2,720.00
JUMLAH HARGA BAHAN 2,720.00
C PERALATAN
A.4.4.2.26. Pemasangan 1 m2 finishing siar pasangan batu kali, campuran 1SP : 2PP.
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.30 90,000.00 27,000.00
Tukang Batu L.03 OH 0.15 100,000.00 15,000.00
Kepala Tukang L.03 OH 0.02 110,000.00 1,650.00
Mandor L.04 OH 0.02 115,000.00 1,725.00
JUMLAH TENAGA KERJA 45,375.00
B BAHAN
Semen PC Kg 6.34 1,700.00 10,778.00
Pasir pasang m3 0.01 150,000.00 1,800.00
JUMLAH HARGA BAHAN 12,578.00
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.20 90,000.00 18,000.00
Tukang Batu L.03 OH 0.10 100,000.00 10,000.00
Kepala Tukang L.03 OH 0.01 110,000.00 1,100.00
Mandor L.04 OH 0.01 115,000.00 1,150.00
JUMLAH TENAGA KERJA 30,250.00
B BAHAN
Semen PC Kg 3.25 1,700.00 5,525.00
JUMLAH HARGA BAHAN 5,525.00
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.25 90,000.00 22,500.00
Tukang Batu L.02 OH 0.13 100,000.00 12,500.00
Kepala tukang L.03 OH 0.01 110,000.00 1,430.00
Mandor L.04 OH 0.01 115,000.00 1,495.00
JUMLAH TENAGA KERJA 37,925.00
B BAHAN
Ubin abu-abu Bh 6.63 12,820.51 85,000.00
Semen Portland kg 9.80 1,700.00 16,660.00
Pasir pasang M3 0.05 150,000.00 6,750.00
JUMLAH HARGA BAHAN 108,410.00
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.25 90,000.00 22,500.00
Tukang Batu L.02 OH 0.13 100,000.00 12,500.00
Kepala tukang L.03 OH 0.01 110,000.00 1,430.00
Mandor L.04 OH 0.01 115,000.00 1,495.00
JUMLAH TENAGA KERJA 37,925.00
B BAHAN
Ubin abu-abu Bh 11.87 5,475.99 65,000.00
Semen Portland kg 10.00 1,700.00 17,000.00
Pasir pasang M3 0.05 150,000.00 6,750.00
JUMLAH HARGA BAHAN 88,750.00
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.27 90,000.00 24,300.00
Tukang Batu L.02 OH 0.14 100,000.00 13,500.00
Kepala tukang L.03 OH 0.01 110,000.00 1,540.00
Mandor L.04 OH 0.01 115,000.00 1,610.00
JUMLAH TENAGA KERJA 40,950.00
B BAHAN
Ubin abu-abu Bh 26.50 2,500.00 66,250.00
Semen Portland kg 10.40 1,700.00 17,680.00
Pasir pasang M3 0.05 150,000.00 6,750.00
JUMLAH HARGA BAHAN 90,680.00
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.25 90,000.00 22,500.00
Tukang Batu L.02 OH 0.13 100,000.00 12,500.00
Kepala tukang L.03 OH 0.01 110,000.00 1,430.00
Mandor L.04 OH 0.01 115,000.00 1,495.00
JUMLAH TENAGA KERJA 37,925.00
B BAHAN
Ubin warna Bh 6.63 12,820.51 85,000.00
Semen Portland kg 9.80 1,700.00 16,660.00
Semen warna Kg 1.30 13,000.00 16,900.00
Pasir pasang M3 0.05 150,000.00 6,750.00
JUMLAH HARGA BAHAN 125,310.00
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.26 90,000.00 23,400.00
Tukang Batu L.02 OH 0.13 100,000.00 13,000.00
Kepala tukang L.03 OH 0.01 110,000.00 1,430.00
Mandor L.04 OH 0.01 115,000.00 1,495.00
JUMLAH TENAGA KERJA 39,325.00
B BAHAN
Ubin warna Bh 11.87 5,475.99 65,000.00
Semen Portland kg 10.00 1,700.00 17,000.00
Semen warna Kg 1.50 13,000.00 19,500.00
Pasir pasang M3 0.05 150,000.00 6,750.00
JUMLAH HARGA BAHAN 108,250.00
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.27 90,000.00 24,300.00
Tukang Batu L.02 OH 0.14 100,000.00 13,500.00
Kepala tukang L.03 OH 0.01 110,000.00 1,540.00
Mandor L.04 OH 0.01 115,000.00 1,610.00
JUMLAH TENAGA KERJA 40,950.00
B BAHAN
Ubin warna Bh 26.50 3,000.00 79,500.00
Semen Portland kg 10.40 1,700.00 17,680.00
Semen warna Kg 1.62 13,000.00 21,060.00
Pasir pasang M3 0.05 150,000.00 6,750.00
JUMLAH HARGA BAHAN 124,990.00
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.25 90,000.00 22,500.00
Tukang Batu L.02 OH 0.13 100,000.00 12,500.00
Kepala tukang L.03 OH 0.01 110,000.00 1,430.00
Mandor L.04 OH 0.01 115,000.00 1,495.00
JUMLAH TENAGA KERJA
B BAHAN
Ubin teraso Bh 6.63 0.00
Semen Portland kg 9.80 1,700.00 16,660.00
Semen warna Kg 1.30 13,000.00 16,900.00
Pasir pasang M3 0.05 150,000.00 6,750.00
JUMLAH HARGA BAHAN
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.26 90,000.00 23,400.00
Tukang Batu L.02 OH 0.13 100,000.00 13,000.00
Kepala tukang L.03 OH 0.01 110,000.00 1,430.00
Mandor L.04 OH 0.01 115,000.00 1,495.00
JUMLAH TENAGA KERJA 39,325.00
B BAHAN
Ubin teraso Bh 11.87 2,500.00 29,675.00
Semen Portland kg 10.00 1,700.00 17,000.00
Semen warna Kg 1.50 13,000.00 19,500.00
Pasir pasang M3 0.05 150,000.00 6,750.00
JUMLAH HARGA BAHAN 72,925.00
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.25 90,000.00 22,500.00
Tukang Batu L.02 OH 0.13 100,000.00 12,500.00
Kepala tukang L.03 OH 0.01 110,000.00 1,430.00
Mandor L.04 OH 0.01 115,000.00 1,495.00
JUMLAH TENAGA KERJA
B BAHAN
Ubin granit Bh 6.63
Semen Portland kg 9.80 1,700.00
Semen warna Kg 1.30 13,000.00
Pasir pasang M3 0.05 150,000.00
JUMLAH HARGA BAHAN
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.26 90,000.00 23,400.00
Tukang Batu L.02 OH 0.13 100,000.00 13,000.00
Kepala tukang L.03 OH 0.01 110,000.00 1,430.00
Mandor L.04 OH 0.01 115,000.00 1,495.00
JUMLAH TENAGA KERJA
B BAHAN
Ubin granit Bh 11.87
Semen Portland kg 10.00 1,700.00
Semen warna Kg 1.50 13,000.00
Pasir pasang M3 0.05 150,000.00
JUMLAH HARGA BAHAN
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.25 90,000.00 22,500.00
Tukang Batu L.02 OH 0.13 100,000.00 12,500.00
Kepala tukang L.03 OH 0.01 110,000.00 1,430.00
Mandor L.04 OH 0.01 115,000.00 1,495.00
JUMLAH TENAGA KERJA
B BAHAN
Ubin teralux Bh 6.63
Semen Portland kg 9.80 1,700.00
Semen warna Kg 1.30 13,000.00
Pasir pasang M3 0.05 150,000.00
JUMLAH HARGA BAHAN
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.26 90,000.00 23,400.00
Tukang Batu L.02 OH 0.13 100,000.00 13,000.00
Kepala tukang L.03 OH 0.01 110,000.00 1,430.00
Mandor L.04 OH 0.01 115,000.00 1,495.00
JUMLAH TENAGA KERJA
B BAHAN
Ubin teralux Bh 11.87
Semen Portland kg 10.00 1,700.00
Semen warna Kg 1.50 13,000.00
Pasir pasang M3 0.05 150,000.00
JUMLAH HARGA BAHAN
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.24 90,000.00 21,600.00
Tukang Batu L.02 OH 0.12 100,000.00 12,000.00
Kepala tukang L.03 OH 0.01 110,000.00 1,320.00
Mandor L.04 OH 0.01 115,000.00 1,380.00
JUMLAH TENAGA KERJA
B BAHAN
Ubin teralux marmer Bh 3.10
Semen Portland kg 9.60 1,700.00
Semen warna Kg 1.50 13,000.00
Pasir pasang M3 0.05 150,000.00
JUMLAH HARGA BAHAN
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.25 90,000.00 22,500.00
Tukang Batu L.02 OH 0.13 100,000.00 12,500.00
Kepala tukang L.03 OH 0.01 110,000.00 1,430.00
Mandor L.04 OH 0.01 115,000.00 1,495.00
JUMLAH TENAGA KERJA
B BAHAN
Ubin teralux marmer Bh 6.63
Semen Portland kg 9.80 1,700.00
Semen warna Kg 1.30 13,000.00
Pasir pasang M3 0.05 150,000.00
JUMLAH HARGA BAHAN
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.26 90,000.00 23,400.00
Tukang Batu L.02 OH 0.13 100,000.00 13,000.00
Kepala tukang L.03 OH 0.01 110,000.00 1,430.00
Mandor L.04 OH 0.01 115,000.00 1,495.00
JUMLAH TENAGA KERJA
B BAHAN
Ubin teralux marmer Bh 11.87
Semen Portland kg 10.00 1,700.00
Semen warna Kg 1.50 13,000.00
Pasir pasang M3 0.05 150,000.00
JUMLAH HARGA BAHAN
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.09 90,000.00 8,100.00
Tukang Batu L.02 OH 0.09 100,000.00 9,000.00
Kepala tukang L.03 OH 0.01 110,000.00 990.00
Mandor L.04 OH 0.01 115,000.00 575.00
JUMLAH TENAGA KERJA
B BAHAN
Plint ubin PC Bh 5.30
Semen Portlandd kg 1.65
Pasir pasang M3 0.00
JUMLAH HARGA BAHAN
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.09 90,000.00 8,100.00
Tukang Batu L.02 OH 0.09 100,000.00 9,000.00
Kepala tukang L.03 OH 0.01 110,000.00 990.00
Mandor L.04 OH 0.01 115,000.00 575.00
JUMLAH TENAGA KERJA
B BAHAN
Plint ubin PC Bh 3.53
Semen Portlandd kg 1.24
Pasir pasang M3 0.00
JUMLAH HARGA BAHAN
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.09 90,000.00 8,100.00
Tukang Batu L.02 OH 0.09 100,000.00 9,000.00
Kepala tukang L.03 OH 0.01 110,000.00 990.00
Mandor L.04 OH 0.01 115,000.00 575.00
JUMLAH TENAGA KERJA
B BAHAN
Plint ubin PC Bh 2.65
Semen Portland kg 1.24
Pasir pasang M3 0.00
JUMLAH HARGA BAHAN
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.09 90,000.00 8,100.00
Tukang Batu L.02 OH 0.09 100,000.00 9,000.00
Kepala tukang L.03 OH 0.01 110,000.00 990.00
Mandor L.04 OH 0.01 115,000.00 575.00
JUMLAH TENAGA KERJA
B BAHAN
Plint ubin warna Bh 2.65
Semen Portland kg 1.14 1,700.00
Semen warna Kg 0.10 13,000.00
Pasir pasang M3 0.00 150,000.00
JUMLAH HARGA BAHAN
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.09 90,000.00 8,100.00
Tukang Batu L.02 OH 0.09 100,000.00 9,000.00
Kepala tukang L.03 OH 0.01 110,000.00 990.00
Mandor L.04 OH 0.01 115,000.00 575.00
JUMLAH TENAGA KERJA
B BAHAN
Plint ubin warna Bh 3.53
Semen Portland kg 1.14 1,700.00
Semen warna Kg 0.10 13,000.00
Pasir pasang M3 0.00 150,000.00
JUMLAH HARGA BAHAN
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.09 90,000.00 8,100.00
Tukang Batu L.02 OH 0.09 100,000.00 9,000.00
Kepala tukang L.03 OH 0.01 110,000.00 990.00
Mandor L.04 OH 0.01 115,000.00 575.00
JUMLAH TENAGA KERJA
B BAHAN
Plint ubin warna Bh 2.65
Semen Portland kg 1.14 1,700.00
Semen warna Kg 0.10 13,000.00
Pasir pasang M3 0.00 150,000.00
JUMLAH HARGA BAHAN
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.09 90,000.00 8,100.00
Tukang Batu L.02 OH 0.09 100,000.00 9,000.00
Kepala tukang L.03 OH 0.01 110,000.00 990.00
Mandor L.04 OH 0.01 115,000.00 575.00
JUMLAH TENAGA KERJA
B BAHAN
Plint ubin teraso Bh 3.53
Semen Portland kg 1.14 1,700.00
Semen warna Kg 0.10 13,000.00
Pasir pasang M3 0.00 150,000.00
JUMLAH HARGA BAHAN
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.09 90,000.00 8,100.00
Tukang Batu L.02 OH 0.09 100,000.00 9,000.00
Kepala tukang L.03 OH 0.01 110,000.00 990.00
Mandor L.04 OH 0.01 115,000.00 575.00
JUMLAH TENAGA KERJA
B BAHAN
Plint ubin teraso Bh 2.65
Semen Portland kg 1.14 1,700.00
Semen warna Kg 0.10 13,000.00
Pasir pasang M3 0.00 150,000.00
JUMLAH HARGA BAHAN
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.09 90,000.00 8,100.00
Tukang Batu L.02 OH 0.09 100,000.00 9,000.00
Kepala tukang L.03 OH 0.01 110,000.00 990.00
Mandor L.04 OH 0.01 115,000.00 575.00
JUMLAH TENAGA KERJA
B BAHAN
Plint ubin granit Bh 2.65
Semen Portland kg 1.14 1,700.00
Semen warna Kg 0.10 13,000.00
Pasir pasang M3 0.00 150,000.00
JUMLAH HARGA BAHAN
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.09 90,000.00 8,100.00
Tukang Batu L.02 OH 0.09 100,000.00 9,000.00
Kepala tukang L.03 OH 0.01 110,000.00 990.00
Mandor L.04 OH 0.01 115,000.00 575.00
JUMLAH TENAGA KERJA
B BAHAN
Plint ubin granit Bh 3.53
Semen Portland kg 1.14 1,700.00
Semen warna Kg 0.10 13,000.00
Pasir pasang M3 0.00 150,000.00
JUMLAH HARGA BAHAN
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.09 90,000.00 8,100.00
Tukang Batu L.02 OH 0.09 100,000.00 9,000.00
Kepala tukang L.03 OH 0.01 110,000.00 990.00
Mandor L.04 OH 0.01 115,000.00 575.00
JUMLAH TENAGA KERJA
B BAHAN
Plint teralux kerang Bh 2.63
Semen Portland kg 1.14 1,700.00
Semen warna Kg 0.10 13,000.00
Pasir pasang M3 0.00 150,000.00
JUMLAH HARGA BAHAN
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.09 90,000.00 8,100.00
Tukang Batu L.02 OH 0.09 100,000.00 9,000.00
Kepala tukang L.03 OH 0.01 110,000.00 990.00
Mandor L.04 OH 0.01 115,000.00 575.00
JUMLAH TENAGA KERJA
B BAHAN
Plint teralux kerang Bh 3.53
Semen Portland kg 1.14 1,700.00
Semen warna Kg 0.10 13,000.00
Pasir pasang M3 0.00 150,000.00
JUMLAH HARGA BAHAN
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.09 90,000.00 8,100.00
Tukang Batu L.02 OH 0.09 100,000.00 9,000.00
Kepala tukang L.03 OH 0.01 110,000.00 990.00
Mandor L.04 OH 0.01 115,000.00 575.00
JUMLAH TENAGA KERJA
B BAHAN
Plint teralux marmer Bh 1.70
Semen Portland kg 1.14 1,700.00
Semen warna Kg 0.10 13,000.00
Pasir pasang M3 0.00 150,000.00
JUMLAH HARGA BAHAN
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.09 90,000.00 8,100.00
Tukang Batu L.02 OH 0.09 100,000.00 9,000.00
Kepala tukang L.03 OH 0.01 110,000.00 990.00
Mandor L.04 OH 0.01 115,000.00 575.00
JUMLAH TENAGA KERJA
B BAHAN
Plint teralux marmer Bh 2.65
Semen Portland kg 1.14 1,700.00
Semen warna Kg 0.10 13,000.00
Pasir pasang M3 0.00 150,000.00
JUMLAH HARGA BAHAN
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.09 90,000.00 8,100.00
Tukang Batu L.02 OH 0.09 100,000.00 9,000.00
Kepala tukang L.03 OH 0.01 110,000.00 990.00
Mandor L.04 OH 0.01 115,000.00 575.00
JUMLAH TENAGA KERJA
B BAHAN
Plint teralux marmer Bh 3.53
Semen Portland kg 1.14 1,700.00
Semen warna Kg 0.10 13,000.00
Pasir pasang M3 0.00 150,000.00
JUMLAH HARGA BAHAN
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.36 90,000.00 32,400.00
Tukang Batu L.02 OH 0.18 100,000.00 18,000.00
Kepala tukang L.03 OH 0.02 110,000.00 1,980.00
Mandor L.04 OH 0.02 115,000.00 2,070.00
JUMLAH TENAGA KERJA
B BAHAN
Teraso cor M3 0.036
Semen warna Kg 0.10 13,000.00
JUMLAH HARGA BAHAN
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.70 90,000.00 63,000.00
Tukang Batu L.02 OH 0.35 100,000.00 35,000.00
Kepala tukang L.03 OH 0.04 110,000.00 3,850.00
Mandor L.04 OH 0.04 115,000.00 4,025.00
JUMLAH TENAGA KERJA
B BAHAN
Ubin keramik Bh 53.00
Semen Portland Kg 8.19 1,700.00
Pasir pasang M3 0.05 13,000.00
Semen warna Kg 2.75 150,000.00
JUMLAH HARGA BAHAN
C PERALATAN
A.4.4.3.33.Pemasangan 1m2 lantai keramik artistik 10cm x 10cm atau 5cm x 20cm
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.70 90,000.00 63,000.00
Tukang Batu L.02 OH 0.35 100,000.00 35,000.00
Kepala tukang L.03 OH 0.04 110,000.00 3,850.00
Mandor L.04 OH 0.04 115,000.00 4,025.00
JUMLAH TENAGA KERJA
B BAHAN
Ubin keramik Bh 106.00
Semen Portland Kg 8.19 1,700.00
Pasir pasang M3 0.05 13,000.00
Semen warna Kg 3.20 150,000.00
JUMLAH HARGA BAHAN
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.70 90,000.00 63,000.00
Tukang Batu L.02 OH 0.35 100,000.00 35,000.00
Kepala tukang L.03 OH 0.04 110,000.00 3,850.00
Mandor L.04 OH 0.04 115,000.00 4,025.00
JUMLAH TENAGA KERJA
B BAHAN
Ubin keramik Bh 10.00
Semen Portlandd Kg 8.19 1,700.00
Pasir pasang M3 0.05 13,000.00
Semen warna Kg 1.62 150,000.00
JUMLAH HARGA BAHAN
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.70 90,000.00 63,000.00
Tukang Batu L.02 OH 0.35 100,000.00 35,000.00
Kepala tukang L.03 OH 0.04 110,000.00 3,850.00
Mandor L.04 OH 0.04 115,000.00 4,025.00
JUMLAH TENAGA KERJA
B BAHAN
Ubin keramik Bh 11.87
Semen Portland Kg 10.00 1,700.00
Pasir pasang M3 0.05 13,000.00
Semen warna Kg 1.50 150,000.00
JUMLAH HARGA BAHAN
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.70 90,000.00 63,000.00
Tukang Batu L.02 OH 0.35 100,000.00 35,000.00
Kepala tukang L.03 OH 0.04 110,000.00 3,850.00
Mandor L.04 OH 0.04 115,000.00 4,025.00
JUMLAH TENAGA KERJA
B BAHAN
Ubin keramik Bh 26.50
Semen Portland Kg 10.40 1,700.00
Pasir pasang M3 0.05 13,000.00
Semen warna Kg 1.62 150,000.00
JUMLAH HARGA BAHAN
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 1.05 90,000.00 94,500.00
Tukang Batu L.02 OH 0.53 100,000.00 52,500.00
Kepala tukang L.03 OH 0.05 110,000.00 5,830.00
Mandor L.04 OH 0.05 115,000.00 6,095.00
JUMLAH TENAGA KERJA
B BAHAN
Ubin keramik Bh 33.00
Semen Portland Kg 9.80 1,700.00
Pasir pasang M3 0.05 13,000.00
Semen warna Kg 4.37 150,000.00
JUMLAH HARGA BAHAN
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.70 90,000.00 63,000.00
Tukang Batu L.02 OH 0.35 100,000.00 35,000.00
Kepala tukang L.03 OH 0.04 110,000.00 3,850.00
Mandor L.04 OH 0.04 115,000.00 4,025.00
JUMLAH TENAGA KERJA
B BAHAN
Ubin keramik Bh 11.87
Semen Portland Kg 14.15 1,700.00
Pasir pasang M3 0.04 13,000.00
Semen warna Kg 2.00 150,000.00
JUMLAH HARGA BAHAN
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.09 90,000.00 8,100.00
Tukang Batu L.02 OH 0.09 100,000.00 9,000.00
Kepala tukang L.03 OH 0.04 110,000.00 3,850.00
Mandor L.04 OH 0.01 115,000.00 575.00
JUMLAH TENAGA KERJA
B BAHAN
Plint keramik Bh 5.30
Semen Portland Kg 1.14 1,700.00
Pasir pasang M3 0.00 13,000.00
Semen warna Kg 0.03 150,000.00
JUMLAH HARGA BAHAN
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.09 90,000.00 8,100.00
Tukang Batu L.02 OH 0.09 100,000.00 9,000.00
Kepala tukang L.03 OH 0.04 110,000.00 3,850.00
Mandor L.04 OH 0.01 115,000.00 575.00
JUMLAH TENAGA KERJA
B BAHAN
Plint keramik Bh 10.60
Semen Portlandd Kg 1.14 1,700.00
Pasir pasang M3 0.00 13,000.00
Semen warna Kg 0.05 150,000.00
JUMLAH HARGA BAHAN
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.09 90,000.00 8,100.00
Tukang Batu L.02 OH 0.09 100,000.00 9,000.00
Kepala tukang L.03 OH 0.04 110,000.00 3,850.00
Mandor L.04 OH 0.01 115,000.00 575.00
JUMLAH TENAGA KERJA
B BAHAN
Plint keramik Bh 5.30
Semen Portlandd Kg 0.57 1,700.00
Pasir pasang M3 0.00 13,000.00
Semen warna Kg 0.01 150,000.00
JUMLAH HARGA BAHAN
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.75 90,000.00 67,500.00
Tukang Batu L.02 OH 0.75 100,000.00 75,000.00
Kepala tukang L.03 OH 0.08 110,000.00 8,250.00
Mandor L.04 OH 0.04 115,000.00 4,370.00
JUMLAH TENAGA KERJA
B BAHAN
Internal cove Bh 5.30
Semen Portland Kg 1.14 1,700.00
Pasir pasang M3 0.00 13,000.00
Semen warna Kg 0.10 150,000.00
JUMLAH HARGA BAHAN
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.70 90,000.00 63,000.00
Tukang Batu L.02 OH 0.35 100,000.00 35,000.00
Kepala tukang L.03 OH 0.04 110,000.00 3,850.00
Mandor L.04 OH 0.04 115,000.00 4,025.00
JUMLAH TENAGA KERJA
B BAHAN
Marmer Bh 1.06
Semen Portland Kg 8.19 1,700.00
Pasir pasang M3 0.05 13,000.00
Semen warna Kg 0.65 150,000.00
JUMLAH HARGA BAHAN
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.17 90,000.00 15,300.00
Tukang Kayu L.02 OH 0.17 100,000.00 17,000.00
Kepala tukang L.03 OH 0.02 110,000.00 1,870.00
Mandor L.04 OH 0.01 115,000.00 1,035.00
JUMLAH TENAGA KERJA
B BAHAN
Karpet m2 1.05
Lem Kg 0.35
JUMLAH HARGA BAHAN
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.12 90,000.00 10,800.00
Tukang Kayu L.02 OH 0.12 100,000.00 12,000.00
Kepala tukang L.03 OH 0.01 110,000.00 1,320.00
Mandor L.04 OH 0.01 115,000.00 690.00
JUMLAH TENAGA KERJA
B BAHAN
Underlayer m2 1.05
Lem Kg 0.35
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.70 90,000.00 63,000.00
Tukang Kayu L.02 OH 0.35 100,000.00 35,000.00
Kepala tukang L.03 OH 0.04 110,000.00 3,850.00
Mandor L.04 OH 0.04 115,000.00 4,025.00
JUMLAH TENAGA KERJA
B BAHAN
Parquet m2 1.05
Lem Kg 0.60
JUMLAH HARGA BAHAN
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.70 90,000.00 63,000.00
Tukang Kayu L.02 OH 0.35 100,000.00 35,000.00
Kepala tukang L.03 OH 0.04 110,000.00 3,850.00
Mandor L.04 OH 0.04 115,000.00 4,025.00
JUMLAH TENAGA KERJA
B BAHAN
Parquet m2 1.05
Lem Kg 0.60
JUMLAH HARGA BAHAN
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 1.00 90,000.00 90,000.00
Tukang Batu L.02 OH 0.50 100,000.00 50,000.00
Kepala tukang L.03 OH 0.05 110,000.00 5,500.00
Mandor L.04 OH 0.05 115,000.00 5,750.00
JUMLAH TENAGA KERJA
B BAHAN
Porslen Bh 86.00
Semen Portland Kg 9.30 1,700.00
Pasir pasang M3 0.02 13,000.00
Semen warna Kg 1.50 150,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.90 90,000.00 81,000.00
Tukang Batu L.02 OH 0.45 100,000.00 45,000.00
Kepala tukang L.03 OH 0.05 110,000.00 4,950.00
Mandor L.04 OH 0.05 115,000.00 5,175.00
JUMLAH TENAGA KERJA
B BAHAN
Porslen Bh 53.00
Semen Portland Kg 9.30 1,700.00
Pasir Pasang M3 0.02 13,000.00
Semen warna Kg 2.75 150,000.00
JUMLAH HARGA BAHAN
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.90 90,000.00 81,000.00
Tukang Batu L.02 OH 0.45 100,000.00 45,000.00
Kepala tukang L.03 OH 0.05 110,000.00 4,950.00
Mandor L.04 OH 0.05 115,000.00 5,175.00
JUMLAH TENAGA KERJA
B BAHAN
Porslen Bh 26.00
Semen Portlandd Kg 9.30 1,700.00
Pasir Pasang M3 0.02 13,000.00
Semen warna Kg 1.94 150,000.00
JUMLAH HARGA BAHAN
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.90 90,000.00 81,000.00
Tukang Batu L.02 OH 0.45 100,000.00 45,000.00
Kepala tukang L.03 OH 0.05 110,000.00 4,950.00
Mandor L.04 OH 0.05 115,000.00 5,175.00
JUMLAH TENAGA KERJA
B BAHAN
Keramik artistik Bh 53.00
Semen Portland Kg 9.30 1,700.00
Pasir Pasang M3 0.02 13,000.00
Semen warna Kg 2.75 150,000.00
JUMLAH HARGA BAHAN
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.90 90,000.00 81,000.00
Tukang Batu L.02 OH 0.45 100,000.00 45,000.00
Kepala tukang L.03 OH 0.05 110,000.00 4,950.00
Mandor L.04 OH 0.05 115,000.00 5,175.00
JUMLAH TENAGA KERJA
B BAHAN
Keramik artistik Bh 106.00
Semen Portland Kg 9.30 1,700.00
Pasir Pasang M3 0.02 13,000.00
Semen warna Kg 2.90 150,000.00
JUMLAH HARGA BAHAN
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.90 90,000.00 81,000.00
Tukang Batu L.02 OH 0.45 100,000.00 45,000.00
Kepala tukang L.03 OH 0.05 110,000.00 4,950.00
Mandor L.04 OH 0.05 115,000.00 5,175.00
JUMLAH TENAGA KERJA
B BAHAN
Keramik artistik Bh 53.00
Semen Portland Kg 9.30 1,700.00
Pasir Pasang M3 0.02 13,000.00
Semen warna Kg 2.75 150,000.00
JUMLAH HARGA BAHAN
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.90 90,000.00 81,000.00
Tukang Batu L.02 OH 0.45 100,000.00 45,000.00
Kepala tukang L.03 OH 0.05 110,000.00 4,950.00
Mandor L.04 OH 0.05 115,000.00 5,175.00
JUMLAH TENAGA KERJA
B BAHAN
Keramik artistik Bh 26.50
Semen Portland Kg 9.30 1,700.00
Pasir Pasang M3 0.02 13,000.00
Semen warna Kg 1.94 150,000.00
JUMLAH HARGA BAHAN
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 1.30 90,000.00 117,000.00
Tukang Batu L.02 OH 0.65 100,000.00 65,000.00
Kepala tukang L.03 OH 0.07 110,000.00 7,150.00
Mandor L.04 OH 0.07 115,000.00 7,475.00
JUMLAH TENAGA KERJA
B BAHAN
Marmer Bh 1.06
Semen Portland Kg 12.44 1,700.00
Pasir Pasang M3 0.03 13,000.00
Semen warna Kg 0.65 150,000.00
Paku 12cm Bh 3.03
JUMLAH HARGA BAHAN
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 1.00 90,000.00 90,000.00
Tukang Batu L.02 OH 0.50 100,000.00 50,000.00
Kepala tukang L.03 OH 0.05 110,000.00 5,500.00
Mandor L.04 OH 0.05 115,000.00 5,750.00
JUMLAH TENAGA KERJA
B BAHAN
Bata pelapis Bh 63.00
Semen Portland Kg 12.44 1,700.00
Pasir Pasang M3 0.03 13,000.00
Semen warna Kg 2.75 150,000.00
JUMLAH HARGA BAHAN 0.00
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.70 90,000.00 63,000.00
Tukang Batu L.02 OH 0.35 100,000.00 35,000.00
Kepala tukang L.03 OH 0.04 110,000.00 3,850.00
Mandor L.04 OH 0.04 115,000.00 4,025.00
JUMLAH TENAGA KERJA
B BAHAN
Batu paras Bh 1.10
Semen Portland Kg 11.75 1,700.00
Pasir Pasang M3 0.04 13,000.00
JUMLAH HARGA BAHAN 0.00
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.70 90,000.00 63,000.00
Tukang Batu L.02 OH 0.35 100,000.00 35,000.00
Kepala tukang L.03 OH 0.04 110,000.00 3,850.00
Mandor L.04 OH 0.04 115,000.00 4,025.00
JUMLAH TENAGA KERJA 105,875.00
B BAHAN
Batu tempel hitam Bh 1.10 240,000.00 264,000.00
Semen Portland Kg 11.75 1,700.00 19,975.00
Pasir Pasang M3 0.04 13,000.00 455.00
JUMLAH HARGA BAHAN 284,430.00
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.15 90,000.00 13,500.00
Tukang Batu L.02 OH 0.15 100,000.00 15,000.00
Kepala tukang L.03 OH 0.02 110,000.00 1,650.00
Mandor L.04 OH 0.01 115,000.00 920.00
JUMLAH TENAGA KERJA
B BAHAN
Vynil Bh 11.87
Lem Kg 0.35
JUMLAH HARGA BAHAN 0.00
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.35 90,000.00 31,500.00
Tukang Batu L.02 OH 0.18 100,000.00 17,500.00
Kepala tukang L.03 OH 0.02 110,000.00 1,870.00
Mandor L.04 OH 0.00 115,000.00 230.00
JUMLAH TENAGA KERJA
B BAHAN
Wallpaper m 2.20
Lem Kg 0.25
JUMLAH HARGA BAHAN 0.00
C PERALATAN
JUMLAH HARGA ALAT
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.12 90,000.00 10,800.00
Tukang Batu L.02 OH 0.12 100,000.00 12,000.00
Kepala tukang L.03 OH 0.01 110,000.00 1,320.00
Mandor L.04 OH 0.01 115,000.00 690.00
JUMLAH TENAGA KERJA
B BAHAN
Floor harderner Kg 5.00
JUMLAH HARGA BAHAN 0.00
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.08 90,000.00 7,200.00
Tukang Batu L.02 OH 0.08 100,000.00 8,000.00
Kepala tukang L.03 OH 0.01 110,000.00 880.00
Mandor L.04 OH 0.00 115,000.00 460.00
JUMLAH TENAGA KERJA
B BAHAN
Vynil Bh 1.76
Lem Kg 0.08
JUMLAH HARGA BAHAN 0.00
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.12 90,000.00 10,800.00
Tukang Batu L.02 OH 0.12 100,000.00 12,000.00
Kepala tukang L.03 OH 0.01 110,000.00 1,320.00
Mandor L.04 OH 0.01 115,000.00 690.00
JUMLAH TENAGA KERJA 24,810.00
B BAHAN
Papan kayu kelas 1 M3 0.00 7,500,000.00 22,500.00
Paku/skrup 5cm Kg 0.05 24,000.00 1,200.00
JUMLAH HARGA BAHAN 23,700.00
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.03 90,000.00 2,700.00
Tukang kayu L.02 OH 0.07 100,000.00 7,000.00
Kepala tukang L.03 OH 0.01 110,000.00 770.00
Mandor L.04 OH 0.00 115,000.00 460.00
JUMLAH TENAGA KERJA 0.00
B BAHAN
Asbes semen m2 1.10
Paku tripleks kg 0.01 22,000.00 220.00
JUMLAH HARGA BAHAN
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.12 90,000.00 10,800.00
Tukang kayu L.02 OH 0.12 100,000.00 12,000.00
Kepala tukang L.03 OH 0.01 110,000.00 1,320.00
Mandor L.04 OH 0.01 115,000.00 690.00
JUMLAH TENAGA KERJA
B BAHAN
Akustik Lembar 12.00
Paku tripleks kg 0.05 22,000.00 1,100.00
JUMLAH HARGA BAHAN
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.12 90,000.00 10,800.00
Tukang kayu L.02 OH 0.12 100,000.00 12,000.00
Kepala tukang L.03 OH 0.01 110,000.00 1,320.00
Mandor L.04 OH 0.01 115,000.00 690.00
JUMLAH TENAGA KERJA
B BAHAN
Akustik Lembar 5.80
Paku tripleks kg 0.05 22,000.00 1,100.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.10 90,000.00 9,000.00
Tukang kayu L.02 OH 0.10 100,000.00 10,000.00
Kepala tukang L.03 OH 0.01 110,000.00 1,100.00
Mandor L.04 OH 0.01 115,000.00 575.00
JUMLAH TENAGA KERJA
B BAHAN
Akustik Lembar 1.50
Paku tripleks kg 0.05 22,000.00 1,100.00
JUMLAH HARGA BAHAN
C PERALATAN
A.4.5.1.5. Pemasangan 1 m2 langit-langit tripleks ukuran (120 x 240) cm, tebal 3 mm, 4 mm & 6 mm
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.10000 90,000.00 9,000.00
Tukang kayu L.02 OH 0.10000 100,000.00 10,000.00
Kepala tukang L.03 OH 0.01000 110,000.00 1,100.00
Mandor L.04 OH 0.00500 115,000.00 575.00
JUMLAH TENAGA KERJA 20,675.00
B BAHAN
Tripleks Lembar 0.3750 67,500.00 25,312.50
Paku tripleks kg 0.0300 22,000.00 660.00
JUMLAH HARGA BAHAN 25,972.50
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.80 90,000.00 72,000.00
Tukang kayu L.02 OH 0.80 100,000.00 80,000.00
Kepala tukang L.03 OH 0.08 110,000.00 8,800.00
Mandor L.04 OH 0.04 115,000.00 4,600.00
JUMLAH TENAGA KERJA 165,400.00
B BAHAN
Kayu papan m3 0.02 2,500,000.00 37,500.00
Paku tripleks kg 0.01 22,000.00 220.00
JUMLAH HARGA BAHAN 37,720.00
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.10 90,000.00 9,000.00
Tukang kayu L.02 OH 0.05 100,000.00 5,000.00
Kepala tukang L.03 OH 0.01 110,000.00 550.00
Mandor L.04 OH 0.01 115,000.00 575.00
JUMLAH TENAGA KERJA
B BAHAN
Gypsum board Lembar 0.36
Paku skrup kg 0.11
JUMLAH HARGA BAHAN
C PERALATAN
A.4.5.1.8. Pemasangan 1 m2 langit-langit akustik ukuran (60 x 120) cm berikut rangka alluminium
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.50 90,000.00 45,000.00
Tukang Besi L.02 OH 0.50 100,000.00 50,000.00
Kepala tukang L.03 OH 0.05 110,000.00 5,500.00
Mandor L.04 OH 0.03 115,000.00 2,875.00
JUMLAH TENAGA KERJA
B BAHAN
Profil Allum"T" m 3.60
Kawat dia 4 mm kg 0.15
Ramset Buah 1.05
Akustik 60 x 120 Lembar 1.50
JUMLAH HARGA BAHAN
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.05 90,000.00 4,500.00
Tukang Kayu L.02 OH 0.05 100,000.00 5,000.00
Kepala tukang L.03 OH 0.01 110,000.00 550.00
Mandor L.04 OH 0.00 115,000.00 345.00
JUMLAH TENAGA KERJA 10,395.00
B BAHAN
List kayu profil m 1.05 10,000.00 10,500.00
Paku kg 0.01 15,000.00 150.00
JUMLAH HARGA BAHAN 10,650.00
C PERALATAN
JUMLAH HARGA ALAT
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.15 90,000.00 13,500.00
Tukang Kayu L.03 OH 0.08 100,000.00 7,500.00
Kepala tukang L.11 OH 0.01 110,000.00 825.00
Mandor L.15 OH 0.01 115,000.00 920.00
JUMLAH TENAGA KERJA
B BAHAN
Genteng palentong Bh 25.00
JUMLAH HARGA BAHAN
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.15 90,000.00 13,500.00
Tukang Kayu L.03 OH 0.08 100,000.00 7,500.00
Kepala tukang L.11 OH 0.01 110,000.00 880.00
Mandor L.15 OH 0.01 115,000.00 920.00
JUMLAH TENAGA KERJA 22,800.00
B BAHAN
Genteng kodok Bh 25.00 3,000.00 75,000.00
JUMLAH HARGA BAHAN 75,000.00
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.15 90,000.00 13,500.00
Tukang Kayu L.03 OH 0.08 100,000.00 7,500.00
Kepala tukang L.11 OH 0.01 110,000.00 880.00
Mandor L.15 OH 0.01 115,000.00 920.00
JUMLAH TENAGA KERJA
B BAHAN
Genteng kodok Bh 12.00
JUMLAH HARGA BAHAN
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.40 90,000.00 36,000.00
Tukang Kayu L.03 OH 0.20 100,000.00 20,000.00
Kepala tukang L.11 OH 0.02 110,000.00 2,200.00
Mandor L.15 OH 0.00 115,000.00 230.00
JUMLAH TENAGA KERJA 58,430.00
B BAHAN
Genteng bubung Bh 5.00 3,750.00 18,750.00
Semen Portland Kg 8.00 1,700.00 13,600.00
Pasir pasang M3 0.03 150,000.00 4,800.00
JUMLAH HARGA BAHAN 37,150.00
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.40 90,000.00 36,000.00
Tukang Kayu L.03 OH 0.20 100,000.00 20,000.00
Kepala tukang L.11 OH 0.02 110,000.00 2,200.00
Mandor L.15 OH 0.00 115,000.00 230.00
JUMLAH TENAGA KERJA
B BAHAN
Genteng bubung Bh 5.00
Semen Portland Kg 8.00
Pasir pasang M3 0.03
JUMLAH HARGA BAHAN
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.40 90,000.00 36,000.00
Tukang Kayu L.03 OH 0.20 100,000.00 20,000.00
Kepala tukang L.11 OH 0.02 110,000.00 2,200.00
Mandor L.15 OH 0.00 115,000.00 230.00
JUMLAH TENAGA KERJA
B BAHAN
Genteng bubung Bh 4.00
Semen Portland Kg 8.00
Pasir pasang M3 0.03
JUMLAH HARGA BAHAN
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.14 90,000.00 12,600.00
Tukang Kayu L.03 OH 0.07 100,000.00 6,700.00
Kepala tukang L.11 OH 0.01 110,000.00 770.00
Mandor L.15 OH 0.01 115,000.00 805.00
JUMLAH TENAGA KERJA
B BAHAN
Rooflight 90x180 Lbr 0.60
Paku biasa ½”-1” Kg 0.05
JUMLAH HARGA BAHAN
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.14 90,000.00 12,600.00
Tukang Kayu L.03 OH 0.08 100,000.00 7,500.00
Kepala tukang L.11 OH 0.01 110,000.00 880.00
Mandor L.15 OH 0.01 115,000.00 920.00
JUMLAH TENAGA KERJA
B BAHAN
Asbes gel 92x250 Lbr 0.50
Paku pancing 6x23 Kg 0.12
JUMLAH HARGA BAHAN
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.14 90,000.00 12,600.00
Tukang Kayu L.03 OH 0.08 100,000.00 7,500.00
Kepala tukang L.11 OH 0.01 110,000.00 880.00
Mandor L.15 OH 0.01 115,000.00 920.00
JUMLAH TENAGA KERJA
B BAHAN
Asbes gel 92x250 Lbr 0.60
Paku pancing 6x23 Kg 0.12
JUMLAH HARGA BAHAN
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.14 90,000.00 12,600.00
Tukang Kayu L.03 OH 0.07 100,000.00 7,000.00
Kepala tukang L.11 OH 0.01 110,000.00 770.00
Mandor L.15 OH 0.01 115,000.00 805.00
JUMLAH TENAGA KERJA
B BAHAN
Asbes gel 92x250 Lbr 0.60
Paku pancing 6x23 Kg 0.12
JUMLAH HARGA BAHAN
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.14 90,000.00 12,600.00
Tukang Kayu L.03 OH 0.07 100,000.00 7,000.00
Kepala tukang L.11 OH 0.01 110,000.00 770.00
Mandor L.15 OH 0.01 115,000.00 805.00
JUMLAH TENAGA KERJA
B BAHAN
Asbes gel 92x250 Lbr 0.75
Paku pancing 6x23 Kg 0.12
JUMLAH HARGA BAHAN
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.14 90,000.00 12,600.00
Tukang Kayu L.03 OH 0.07 100,000.00 7,000.00
Kepala tukang L.11 OH 0.01 110,000.00 770.00
Mandor L.15 OH 0.01 115,000.00 805.00
JUMLAH TENAGA KERJA
B BAHAN
Asbes gel 92x250 Lbr 0.35
Paku pancing 6x23 Kg 0.12
JUMLAH HARGA BAHAN
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.14 90,000.00 12,600.00
Tukang Kayu L.03 OH 0.07 100,000.00 7,000.00
Kepala tukang L.11 OH 0.01 110,000.00 770.00
Mandor L.15 OH 0.01 115,000.00 805.00
JUMLAH TENAGA KERJA
B BAHAN
Asbes gel 92x250 Lbr 0.42
Paku pancing 6x23 Kg 0.12
JUMLAH HARGA BAHAN
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.14 90,000.00 12,600.00
Tukang Kayu L.03 OH 0.07 100,000.00 7,000.00
Kepala tukang L.11 OH 0.01 110,000.00 770.00
Mandor L.15 OH 0.01 115,000.00 805.00
JUMLAH TENAGA KERJA
B BAHAN
Asbes gel 92x250 Lbr 0.44
Paku pancing 6x23 Kg 0.12
JUMLAH HARGA BAHAN
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.14 90,000.00 12,600.00
Tukang Kayu L.03 OH 0.07 100,000.00 7,000.00
Kepala tukang L.11 OH 0.01 110,000.00 770.00
Mandor L.15 OH 0.01 115,000.00 805.00
JUMLAH TENAGA KERJA
B BAHAN
Asbes gel 92x250 Lbr 0.51
Paku pancing 6x23 Kg 0.12
JUMLAH HARGA BAHAN
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.14 90,000.00 12,600.00
Tukang Kayu L.03 OH 0.07 100,000.00 7,000.00
Kepala tukang L.11 OH 0.01 110,000.00 770.00
Mandor L.15 OH 0.01 115,000.00 805.00
JUMLAH TENAGA KERJA
B BAHAN
Asbes gel 92x250 Lbr 0.80
Paku pancing 6x23 Kg 0.12
JUMLAH HARGA BAHAN
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.14 90,000.00 12,600.00
Tukang Kayu L.03 OH 0.07 100,000.00 7,000.00
Kepala tukang L.11 OH 0.01 110,000.00 770.00
Mandor L.15 OH 0.01 115,000.00 805.00
JUMLAH TENAGA KERJA
B BAHAN
Asbes gel 92x250 Lbr 0.37
Paku pancing 6x23 Kg 0.12
JUMLAH HARGA BAHAN
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.14 90,000.00 12,600.00
Tukang Kayu L.03 OH 0.07 100,000.00 7,000.00
Kepala tukang L.11 OH 0.01 110,000.00 770.00
Mandor L.15 OH 0.01 115,000.00 805.00
JUMLAH TENAGA KERJA
B BAHAN
Asbes gel 92x250 Lbr 0.38
Paku pancing 6x23 Kg 0.12
JUMLAH HARGA BAHAN
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.14 90,000.00 12,600.00
Tukang Kayu L.03 OH 0.07 100,000.00 7,000.00
Kepala tukang L.11 OH 0.01 110,000.00 770.00
Mandor L.15 OH 0.01 115,000.00 805.00
JUMLAH TENAGA KERJA
B BAHAN
Asbes gel 92x250 Lbr 0.46
Paku pancing 6x23 Kg 0.12
JUMLAH HARGA BAHAN
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.14 90,000.00 12,600.00
Tukang Kayu L.03 OH 0.07 100,000.00 7,000.00
Kepala tukang L.11 OH 0.01 110,000.00 770.00
Mandor L.15 OH 0.01 115,000.00 805.00
JUMLAH TENAGA KERJA
B BAHAN
Asbes gel 92x250 Lbr 0.49
Paku pancing 6x23 Kg 0.12
JUMLAH HARGA BAHAN
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.14 90,000.00 12,600.00
Tukang Kayu L.03 OH 0.07 100,000.00 7,000.00
Kepala tukang L.11 OH 0.01 110,000.00 770.00
Mandor L.15 OH 0.01 115,000.00 805.00
JUMLAH TENAGA KERJA
B BAHAN
Asbes gel 92x250 Lbr 0.57
Paku pancing 6x23 Kg 0.12
JUMLAH HARGA BAHAN
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.08 90,000.00 7,560.00
Tukang Kayu L.03 OH 0.13 100,000.00 12,500.00
Kepala tukang L.11 OH 0.01 110,000.00 1,430.00
Mandor L.15 OH 0.00 115,000.00 460.00
JUMLAH TENAGA KERJA
B BAHAN
Bubung stel gel. Lbr 2.40
Paku skrup 3,5” Bh 6.00
JUMLAH HARGA BAHAN
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.08 90,000.00 7,560.00
Tukang Kayu L.03 OH 0.13 100,000.00 12,500.00
Kepala tukang L.11 OH 0.01 110,000.00 1,430.00
Mandor L.15 OH 0.00 115,000.00 460.00
JUMLAH TENAGA KERJA
B BAHAN
Bubung stel gel. Lbr 2.10
Paku skrup 3,5” Bh 6.00
JUMLAH HARGA BAHAN
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.08 90,000.00 7,560.00
Tukang Kayu L.03 OH 0.13 100,000.00 12,500.00
Kepala tukang L.11 OH 0.01 110,000.00 1,430.00
Mandor L.15 OH 0.00 115,000.00 460.00
JUMLAH TENAGA KERJA
B BAHAN
Bubung stel gel. Lbr 2.05
Paku skrup 3,5” Bh 6.00
JUMLAH HARGA BAHAN
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.08 90,000.00 7,560.00
Tukang Kayu L.03 OH 0.13 100,000.00 12,500.00
Kepala tukang L.11 OH 0.01 110,000.00 1,430.00
Mandor L.15 OH 0.00 115,000.00 460.00
JUMLAH TENAGA KERJA
B BAHAN
Nok paten 92cm Lbr 1.20
Paku skrup 3,5” Bh 6.00
JUMLAH HARGA BAHAN
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.08 90,000.00 7,560.00
Tukang Kayu L.03 OH 0.13 100,000.00 12,500.00
Kepala tukang L.11 OH 0.01 110,000.00 1,430.00
Mandor L.15 OH 0.00 115,000.00 460.00
JUMLAH TENAGA KERJA
B BAHAN
Nok paten 92cm Lbr 1.20
Paku skrup 3,5” Bh 6.00
JUMLAH HARGA BAHAN
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.08 90,000.00 7,560.00
Tukang Kayu L.03 OH 0.13 100,000.00 12,500.00
Kepala tukang L.11 OH 0.01 110,000.00 1,430.00
Mandor L.15 OH 0.00 115,000.00 460.00
JUMLAH TENAGA KERJA
B BAHAN
Nok paten 92cm Lbr 1.20
Paku skrup 3,5” Bh 6.00
JUMLAH HARGA BAHAN
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.10 90,000.00 9,000.00
Tukang Kayu L.03 OH 0.15 100,000.00 15,000.00
Kepala tukang L.11 OH 0.01 110,000.00 1,430.00
Mandor L.15 OH 0.00 115,000.00 460.00
JUMLAH TENAGA KERJA
B BAHAN
Nok paten 92cm Lbr 1.10
Paku skrup 3,5” Bh 6.00
JUMLAH HARGA BAHAN
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.08 90,000.00 7,560.00
Tukang Kayu L.03 OH 0.13 100,000.00 12,500.00
Kepala tukang L.11 OH 0.01 110,000.00 1,430.00
Mandor L.15 OH 0.00 115,000.00 460.00
JUMLAH TENAGA KERJA
B BAHAN
Nok paten 92cm Lbr 1.10
Paku skrup 3,5” Bh 6.00
JUMLAH HARGA BAHAN
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.20 90,000.00 18,000.00
Tukang Kayu L.03 OH 0.10 100,000.00 10,000.00
Kepala tukang L.11 OH 0.01 110,000.00 1,100.00
Mandor L.15 OH 0.01 115,000.00 1,150.00
JUMLAH TENAGA KERJA
B BAHAN
Genteng beton Bh 11.00
Paku biasa 2”-5” Kg 0.03
JUMLAH HARGA BAHAN
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.20 90,000.00 18,000.00
Tukang Kayu L.03 OH 0.30 100,000.00 30,000.00
Kepala tukang L.11 OH 0.00 110,000.00 330.00
Mandor L.15 OH 0.01 115,000.00 1,150.00
JUMLAH TENAGA KERJA
B BAHAN
Genteng aspal Bh 6.90
Plywood 6mm Lbr 0.35
Paku biasa ½”-1” Kg 0.03
Plastic aerator Bh 0.50
JUMLAH HARGA BAHAN
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.20 90,000.00 18,000.00
Tukang Kayu L.03 OH 0.10 100,000.00 10,000.00
Kepala tukang L.11 OH 0.01 110,000.00 1,100.00
Mandor L.15 OH 0.00 115,000.00 115.00
JUMLAH TENAGA KERJA 29,215.00
B BAHAN
Genteng metal Bh 1.02 39,000.00 39,780.00
Paku biasa ½”-1” Kg 0.20 15,000.00 3,000.00
JUMLAH HARGA BAHAN 42,780.00
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.17 90,000.00 14,940.00
Tukang Kayu L.03 OH 0.25 100,000.00 25,000.00
Kepala tukang L.11 OH 0.03 110,000.00 2,750.00
Mandor L.15 OH 0.01 115,000.00 920.00
JUMLAH TENAGA KERJA
B BAHAN
Sirap kayu Bh 30.00
Paku biasa ½”-1” Kg 0.20 15,000.00
JUMLAH HARGA BAHAN
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.40 90,000.00 36,000.00
Tukang Kayu L.03 OH 0.20 100,000.00 20,000.00
Kepala tukang L.11 OH 0.02 110,000.00 2,200.00
Mandor L.15 OH 0.02 115,000.00 2,300.00
JUMLAH TENAGA KERJA 60,500.00
B BAHAN
Nok genteng beton Bh 3.50 6,250.00 21,875.00
Paku biasa ½”-1” Kg 0.05 15,000.00 750.00
Semen PC Kg 10.80 1,700.00 18,360.00
Pasir pasang M3 0.03 150,000.00 4,800.00
Semen warna Kg 1.00 13,000.00 13,000.00
JUMLAH HARGA BAHAN 58,785.00
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.13 90,000.00 11,250.00
Tukang Kayu L.03 OH 0.25 100,000.00 25,000.00
Kepala tukang L.11 OH 0.03 110,000.00 2,750.00
Mandor L.15 OH 0.01 115,000.00 690.00
JUMLAH TENAGA KERJA
B BAHAN
Nok genteng aspal Bh 2.00
Paku biasa ½”-1” Kg 0.05 15,000.00 750.00
Kayu balok borneo M3 0.00
JUMLAH HARGA BAHAN
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.25 90,000.00 22,500.00
Tukang Kayu L.03 OH 0.15 100,000.00 15,000.00
Kepala tukang L.11 OH 0.02 110,000.00 1,650.00
Mandor L.15 OH 0.01 115,000.00 1,495.00
JUMLAH TENAGA KERJA 40,645.00
B BAHAN
Nok genteng metal Bh 1.10 27,500.00 30,250.00
Paku biasa ½”-1” Kg 0.05 15,000.00 750.00
JUMLAH HARGA BAHAN 31,000.00
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.13 90,000.00 11,250.00
Tukang Kayu L.03 OH 0.25 100,000.00 25,000.00
Kepala tukang L.11 OH 0.03 110,000.00 2,750.00
Mandor L.15 OH 0.01 115,000.00 690.00
JUMLAH TENAGA KERJA
B BAHAN
Seng plat 3 x 6” Lbr 0.40
Paku biasa ½”-1” Kg 0.05
Paku biasa 2”-5” Kg 0.05
JUMLAH HARGA BAHAN
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.12000 90,000.00 10,800.00
Tukang Kayu L.03 OH 0.06000 100,000.00 6,000.00
Kepala tukang L.11 OH 0.00600 110,000.00 660.00
Mandor L.15 OH 0.00600 115,000.00 690.00
JUMLAH TENAGA KERJA 18,150.00
B BAHAN
Seng gel 3”x6” Lbr 0.7000 38,000.00 26,600.00
Paku biasa ½”-1” Kg 0.0200 15,000.00 300.00
JUMLAH HARGA BAHAN 26,900.00
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.15 90,000.00 13,500.00
Tukang Kayu L.03 OH 0.07 100,000.00 7,000.00
Kepala tukang L.11 OH 0.01 110,000.00 770.00
Mandor L.15 OH 0.01 115,000.00 690.00
JUMLAH TENAGA KERJA 21,960.00
B BAHAN
Seng plat 3”x6”bjls28 Lbr 0.30 15,000.00 4,500.00
Paku biasa ½”-1” Kg 0.04 15,000.00 600.00
JUMLAH HARGA BAHAN 5,100.00
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.15 90,000.00 13,500.00
Tukang Kayu L.03 OH 0.75 100,000.00 75,000.00
Kepala tukang L.11 OH 0.08 110,000.00 8,800.00
Mandor L.15 OH 0.01 115,000.00 690.00
JUMLAH TENAGA KERJA
B BAHAN
Almn gel tbl 0,55 Lbr 1.05
Paku hak panj 15cm Kg 0.02
JUMLAH HARGA BAHAN
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.10 90,000.00 9,000.00
Tukang Kayu L.03 OH 1.00 100,000.00 100,000.00
Kepala tukang L.11 OH 0.10 110,000.00 11,000.00
Mandor L.15 OH 0.05 115,000.00 5,750.00
JUMLAH TENAGA KERJA
B BAHAN
Nok standar 40x18 Bh 1.20
Paku hak panj 15cm Kg 0.04
JUMLAH HARGA BAHAN
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.15 90,000.00 13,500.00
Tukang Kayu L.03 OH 0.05 100,000.00 5,000.00
Kepala tukang L.11 OH 0.01 110,000.00 550.00
Mandor L.15 OH 0.01 115,000.00 920.00
JUMLAH TENAGA KERJA
B BAHAN
Alumunium foil M2 1.05
JUMLAH HARGA BAHAN
C PERALATAN
A.4.6.1.1. Pembuatan dan pemasangan 1 m3 kusen pintu dan kusen jendela, kayu kelas I
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 7.00 90,000.00 630,000.00
Tukang kayu L.03 OH 21.00 100,000.00 2,100,000.00
Kepala tukang L.03 OH 2.10 110,000.00 231,000.00
Mandor L.04 OH 0.35 115,000.00 40,250.00
JUMLAH TENAGA KERJA 3,001,250.00
B BAHAN
Balok kayu m3 1.10 7,500,000.00 8,250,000.00
Paku 10 cm Kg 1.25 24,000.00 30,000.00
Lem kayu Kg 1.00 30,000.00 30,000.00
JUMLAH HARGA BAHAN 8,310,000.00
C PERALATAN
JUMLAH HARGA ALAT
A.4.6.1.2.a Pembuatan dan pemasangan 1 m3 kusen pintu dan kusen jendela, kayu kelas II
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 6.00 90,000.00 540,000.00
Tukang kayu L.03 OH 18.00 100,000.00 1,800,000.00
Kepala tukang L.03 OH 1.80 110,000.00 198,000.00
Mandor L.04 OH 0.30 115,000.00 34,500.00
JUMLAH TENAGA KERJA 2,572,500.00
B BAHAN
Balok kayu m3 1.20 3,750,000.00 4,500,000.00
Paku 10 cm Kg 1.25 15,000.00 18,750.00
Lem kayu Kg 1.00 30,000.00 30,000.00
JUMLAH HARGA BAHAN 4,548,750.00
C PERALATAN
JUMLAH HARGA ALAT
A.4.6.1.2.b Pembuatan dan pemasangan 1 m3 kusen pintu dan kusen jendela, kayu kelas III
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 6.00 90,000.00 540,000.00
Tukang kayu L.03 OH 18.00 100,000.00 1,800,000.00
Kepala tukang L.03 OH 1.80 110,000.00 198,000.00
Mandor L.04 OH 0.30 115,000.00 34,500.00
JUMLAH TENAGA KERJA 2,572,500.00
B BAHAN
Balok kayu m3 1.20 3,500,000.00 4,200,000.00
Paku 10 cm Kg 1.25 15,000.00 18,750.00
Lem kayu Kg 1.00 30,000.00 30,000.00
JUMLAH HARGA BAHAN 4,248,750.00
C PERALATAN
JUMLAH HARGA ALAT
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.35 90,000.00 31,500.00
Tukang kayu L.03 OH 1.05 100,000.00 105,000.00
Kepala tukang L.03 OH 0.11 110,000.00 11,550.00
Mandor L.04 OH 0.02 115,000.00 2,070.00
JUMLAH TENAGA KERJA 150,120.00
B BAHAN
Papan kayu m3 0.04 2,500,000.00 100,000.00
Paku 5 – 7 cm Kg 0.05 15,000.00 750.00
JUMLAH HARGA BAHAN 100,750.00
C PERALATAN
A.4.6.1.4. Pembuatan dan pemasangan 1 m2 pintu klamp sederhana, kayu kelas III
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.35 90,000.00 31,500.00
Tukang kayu L.03 OH 1.05 100,000.00 105,000.00
Kepala tukang L.03 OH 0.11 110,000.00 11,550.00
Mandor L.04 OH 0.02 115,000.00 2,070.00
JUMLAH TENAGA KERJA 150,120.00
B BAHAN
Papan kayu m3 0.04 2,200,000.00 88,000.00
Paku 5 – 7 cm Kg 0.05 15,000.00 750.00
JUMLAH HARGA BAHAN 88,750.00
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 1.00 90,000.00 90,000.00
Tukang kayu L.03 OH 3.00 100,000.00 300,000.00
Kepala tukang L.03 OH 0.30 110,000.00 33,000.00
Mandor L.04 OH 0.05 115,000.00 5,750.00
JUMLAH TENAGA KERJA 428,750.00
B BAHAN
Papan kayu m3 0.04 7,500,000.00 300,000.00
Lem kayu Kg 0.50 30,000.00 15,000.00
JUMLAH HARGA BAHAN 315,000.00
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 1.00 90,000.00 90,000.00
Tukang kayu L.03 OH 3.00 100,000.00 300,000.00
Kepala tukang L.03 OH 0.30 110,000.00 33,000.00
Mandor L.04 OH 0.05 115,000.00 5,750.00
JUMLAH TENAGA KERJA 428,750.00
B BAHAN
Papan kayu m3 0.04 2,500,000.00 100,000.00
Lem kayu Kg 0.50 30,000.00 15,000.00
JUMLAH HARGA BAHAN 115,000.00
C PERALATAN
A.4.6.1.6.a Pembuatan dan pemasangan 1 m2 pintu dan jendela kaca, kayu kelas I
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.80 90,000.00 72,000.00
Tukang kayu L.03 OH 2.40 100,000.00 240,000.00
Kepala tukang L.03 OH 0.24 110,000.00 26,400.00
Mandor L.04 OH 0.04 115,000.00 4,600.00
JUMLAH TENAGA KERJA 343,000.00
B BAHAN
Papan kayu m3 0.02 7,500,000.00 180,000.00
Lem kayu Kg 0.30 30,000.00 9,000.00
JUMLAH HARGA BAHAN 189,000.00
C PERALATAN
A.4.6.1.6.b Pembuatan dan pemasangan 1 m2 pintu dan jendela kaca, kayu kelas II
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.80 90,000.00 72,000.00
Tukang kayu L.03 OH 2.40 100,000.00 240,000.00
Kepala tukang L.03 OH 0.24 110,000.00 26,400.00
Mandor L.04 OH 0.04 115,000.00 4,600.00
JUMLAH TENAGA KERJA 343,000.00
B BAHAN
Papan kayu m3 0.02 2,500,000.00 60,000.00
Lem kayu Kg 0.30 30,000.00 9,000.00
JUMLAH HARGA BAHAN 69,000.00
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 1.00 90,000.00 90,000.00
Tukang kayu L.03 OH 3.00 100,000.00 300,000.00
Kepala tukang L.03 OH 0.30 110,000.00 33,000.00
Mandor L.04 OH 0.05 115,000.00 5,750.00
JUMLAH TENAGA KERJA 428,750.00
B BAHAN
Papan kayu m3 0.06 7,500,000.00 480,000.00
Lem kayu Kg 0.50 30,000.00 15,000.00
JUMLAH HARGA BAHAN 495,000.00
C PERALATAN
A.4.6.1.7.b Pembuatan dan pemasangan 1 m2 pintu dan jendela jalusi kayu kelas II
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 1.00 90,000.00 90,000.00
Tukang kayu L.03 OH 3.00 100,000.00 300,000.00
Kepala tukang L.03 OH 0.30 110,000.00 33,000.00
Mandor L.04 OH 0.05 115,000.00 5,750.00
JUMLAH TENAGA KERJA 428,750.00
B BAHAN
Papan kayu m3 0.06 2,500,000.00 160,000.00
Lem kayu Kg 0.50 30,000.00 15,000.00
JUMLAH HARGA BAHAN 175,000.00
C PERALATAN
A.4.6.1.8. Pembuatan 1 m2 daun pintu plywood rangkap, rangka kayu kelas II tertutup (lebar sampai 90 cm)
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.70 90,000.00 63,000.00
Tukang kayu L.03 OH 2.10 100,000.00 210,000.00
Kepala tukang L.03 OH 0.21 110,000.00 23,100.00
Mandor L.04 OH 0.04 115,000.00 4,025.00
JUMLAH TENAGA KERJA 300,125.00
B BAHAN
Papan kayu m3 0.03 2,500,000.00 62,500.00
Paku 1 cm – 2,5 cm kg 0.03 15,000.00 450.00
Lem kayu kg 0.50 30,000.00 15,000.00
Plywood tebal 4 mm
Lembar 1.00 67,500.00 15,000.00
Ukuran (90 x 220) cm
JUMLAH HARGA BAHAN 92,950.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 393,075.00
E Overhead & Profit10 % 10 % x D 39,307.50
F Harga Satuan Pekerjaan (D+E) 432,382.50
A.4.6.1.9.a Pembuatan 1 m2 pintu plywood rangkap, rangka expose kayu kelas I
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.80 90,000.00 72,000.00
Tukang kayu L.03 OH 2.40 100,000.00 240,000.00
Kepala tukang L.03 OH 0.24 110,000.00 26,400.00
Mandor L.04 OH 0.04 115,000.00 4,600.00
JUMLAH TENAGA KERJA 343,000.00
B BAHAN
Papan kayu m3 0.03 7,500,000.00 192,000.00
Paku 1 cm – 2,5 cm kg 0.03 24,000.00 720.00
Lem kayu kg 0.50 30,000.00 15,000.00
Plywood 4 mm
Lembar 1.00 67,500.00 67,500.00
(90 x 220) cm
JUMLAH HARGA BAHAN 275,220.00
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.80 90,000.00 72,000.00
Tukang kayu L.03 OH 2.40 100,000.00 240,000.00
Kepala tukang L.03 OH 0.24 110,000.00 26,400.00
Mandor L.04 OH 0.04 115,000.00 4,600.00
JUMLAH TENAGA KERJA 343,000.00
B BAHAN
Papan kayu m3 0.03 2,500,000.00 64,000.00
Paku 1 cm – 2,5 cm kg 0.03 15,000.00 450.00
Lem kayu kg 0.50 30,000.00 15,000.00
Plywood 4 mm
Lembar 1.00 67,500.00 67,500.00
(90 x 220) cm
JUMLAH HARGA BAHAN 146,950.00
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.67 90,000.00 60,300.00
Tukang kayu L.03 OH 2.00 100,000.00 200,000.00
Kepala tukang L.03 OH 0.20 110,000.00 22,000.00
Mandor L.04 OH 0.34 115,000.00 38,525.00
JUMLAH TENAGA KERJA 320,825.00
B BAHAN
Papan kayu m3 0.06 7,500,000.00 450,000.00
Paku 1 – 2,5 cm kg 0.15 24,000.00 3,600.00
JUMLAH HARGA BAHAN 453,600.00
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.67 90,000.00 60,300.00
Tukang kayu L.03 OH 2.00 100,000.00 200,000.00
Kepala tukang L.03 OH 0.20 110,000.00 22,000.00
Mandor L.04 OH 0.34 115,000.00 38,525.00
JUMLAH TENAGA KERJA 320,825.00
B BAHAN
Papan kayu m3 0.06 2,500,000.00 150,000.00
Paku 1 – 2,5 cm kg 0.15 15,000.00 2,250.00
JUMLAH HARGA BAHAN 152,250.00
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.80 90,000.00 72,000.00
Tukang kayu L.03 OH 2.40 100,000.00 240,000.00
Kepala tukang L.03 OH 0.24 110,000.00 26,400.00
Mandor L.04 OH 0.04 115,000.00 4,600.00
JUMLAH TENAGA KERJA
B BAHAN
Papan kayu m3 0.03
Paku 1 – 2,5 cm kg 0.03
Lem kayu kg 0.30
Teakwood 4 mm
Lembar 1.00
90 x 220 cm
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)
A.4.6.1.12. Pemasangan 1 m2 teakwood rangkap lapis formika, rangka expose kayu kelas II
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
1. Pekerja L.01 OH 0.85 90,000.00 76,500.00
2. Tukang kayu L.03 OH 2.55 100,000.00 255,000.00
3. Kepala tukang L.03 OH 0.26 110,000.00 28,050.00
4. Mandor L.04 OH 0.04 115,000.00 4,945.00
JUMLAH TENAGA KERJA
B BAHAN
Papan kayu m3 0.03
Paku 1 – 2,5 cm kg 0.03
Lem kayu kg 0.80
Teakwood 4 mm
Lembar 1.00
90 x 220 cm
Formika Lembar 0.50
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)
A.4.6.1.13.a Pemasangan 1 m3 konstruksi kuda-kuda konvensional, kayu kelas I, II dan III bentang 6 meter
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 4.00 90,000.00 360,000.00
Tukang kayu L.03 OH 12.00 100,000.00 1,200,000.00
Kepala tukang L.03 OH 1.20 110,000.00 132,000.00
Mandor L.04 OH 0.20 115,000.00 23,000.00
JUMLAH TENAGA KERJA 1,715,000.00
B BAHAN
Balok kayu m3 1.10 7,500,000.00 8,250,000.00
Besi strip tebal 5mm kg 15.00 16,500.00 247,500.00
Paku 12 cm kg 5.60 24,000.00 134,400.00
JUMLAH HARGA BAHAN 8,631,900.00
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 4.00 90,000.00 360,000.00
Tukang kayu L.03 OH 12.00 100,000.00 1,200,000.00
Kepala tukang L.03 OH 1.20 110,000.00 132,000.00
Mandor L.04 OH 0.20 115,000.00 23,000.00
JUMLAH TENAGA KERJA 1,715,000.00
B BAHAN
Balok kayu m3 1.10 3,750,000.00 4,125,000.00
Besi strip tebal 5mm kg 15.00 16,500.00 247,500.00
Paku 12 cm kg 5.60 15,000.00 84,000.00
JUMLAH HARGA BAHAN 4,456,500.00
C PERALATAN
A.4.6.1.13.a Pemasangan 1 m3 konstruksi kuda-kuda konvensional, kayu kelas III bentang 6 meter
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 4.00 90,000.00 360,000.00
Tukang kayu L.03 OH 12.00 100,000.00 1,200,000.00
Kepala tukang L.03 OH 1.20 110,000.00 132,000.00
Mandor L.04 OH 0.20 115,000.00 23,000.00
JUMLAH TENAGA KERJA 1,715,000.00
B BAHAN
Balok kayu m3 1.10 3,500,000.00 3,850,000.00
Besi strip tebal 5mm kg 15.00 16,500.00 247,500.00
Paku 12 cm kg 5.60 15,000.00 84,000.00
JUMLAH HARGA BAHAN 4,181,500.00
C PERALATAN
JUMLAH HARGA ALAT
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 6.70 90,000.00 603,000.00
Tukang kayu L.03 OH 20.10 100,000.00 2,010,000.00
Kepala tukang L.03 OH 2.01 110,000.00 221,100.00
Mandor L.04 OH 0.34 115,000.00 38,525.00
JUMLAH TENAGA KERJA 2,872,625.00
B BAHAN
Balok kayu m3 1.20 7,500,000.00 9,000,000.00
Besi strip tebal 5mm kg 15.00 16,500.00 247,500.00
Paku 12 cm kg 5.60 24,000.00 134,400.00
JUMLAH HARGA BAHAN 9,381,900.00
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 6.70 90,000.00 603,000.00
Tukang kayu L.03 OH 20.10 100,000.00 2,010,000.00
Kepala tukang L.03 OH 2.01 110,000.00 221,100.00
Mandor L.04 OH 0.34 115,000.00 38,525.00
JUMLAH TENAGA KERJA 2,872,625.00
B BAHAN
Balok kayu m3 1.10 3,750,000.00 4,125,000.00
Besi strip tebal 5 mm kg 15.00 16,500.00 247,500.00
Paku 12 cm kg 3.00 15,000.00 45,000.00
JUMLAH HARGA BAHAN 4,417,500.00
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.10 90,000.00 9,000.00
Tukang kayu L.03 OH 0.10 100,000.00 10,000.00
Kepala tukang L.03 OH 0.01 110,000.00 1,100.00
Mandor L.04 OH 0.01 115,000.00 575.00
JUMLAH TENAGA KERJA 20,675.00
B BAHAN
1. Kaso-kaso 5 x 7cm m3 0.01 3,750,000.00 52,500.00
2. Reng 2 x 3 cm m3 0.04 3,750,000.00 135,000.00
3. Paku 5 dan 10 cm kg 0.25 15,000.00 3,750.00
JUMLAH HARGA BAHAN 191,250.00
C PERALATAN
JUMLAH HARGA ALAT
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.10 90,000.00 9,000.00
Tukang kayu L.03 OH 0.10 100,000.00 10,000.00
Kepala tukang L.03 OH 0.01 110,000.00 1,100.00
Mandor L.04 OH 0.01 115,000.00 575.00
JUMLAH TENAGA KERJA 20,675.00
B BAHAN
Kaso-kaso 5 x 7cm m3 0.01 3,750,000.00 52,500.00
Reng (3 x 4) cm m3 0.06 3,750,000.00 213,750.00
Paku 5 dan 10 cm kg 0.25 15,000.00 3,750.00
JUMLAH HARGA BAHAN 270,000.00
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.12 90,000.00 10,800.00
Tukang kayu L.03 OH 0.12 100,000.00 12,000.00
Kepala tukang L.03 OH 0.01 110,000.00 1,320.00
Mandor L.04 OH 0.01 115,000.00 690.00
JUMLAH TENAGA KERJA 24,810.00
B BAHAN
Kayu kelas II m3 0.0140 3,750,000.00 52,500.00
Paku 5 - 10 cm m3 0.06 15,000.00 855.00
JUMLAH HARGA BAHAN 53,355.00
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.15 90,000.00 13,500.00
Tukang kayu L.03 OH 0.30 100,000.00 30,000.00
Kepala tukang L.03 OH 0.03 110,000.00 3,300.00
Mandor L.04 OH 0.08 115,000.00 8,625.00
JUMLAH TENAGA KERJA 55,425.00
B BAHAN
Kaso-kaso 5 x 7cm m3 0.02 3,750,000.00 57,750.00
Paku 7 cm – 10 cm kg 0.20 15,000.00 3,000.00
JUMLAH HARGA BAHAN 60,750.00
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.15 90,000.00 13,500.00
Tukang kayu L.03 OH 0.30 100,000.00 30,000.00
Kepala tukang L.03 OH 0.03 110,000.00 3,300.00
Mandor L.04 OH 0.08 115,000.00 8,625.00
JUMLAH TENAGA KERJA 55,425.00
B BAHAN
Kaso-kaso 5 x 7cm m3 0.02 3,500,000.00 53,900.00
Paku 7 cm – 10 cm kg 0.20 15,000.00 3,000.00
JUMLAH HARGA BAHAN 56,900.00
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.20 90,000.00 18,000.00
Tukang kayu L.03 OH 0.30 100,000.00 30,000.00
Kepala tukang L.03 OH 0.03 110,000.00 3,300.00
Mandor L.04 OH 0.01 115,000.00 1,150.00
JUMLAH TENAGA KERJA 52,450.00
B BAHAN
Kaso-kaso 5 x 7cm m3 0.02 3,750,000.00 57,750.00
Paku 7 – 10 cm kg 0.25 15,000.00 3,750.00
JUMLAH HARGA BAHAN 61,500.00
C PERALATAN
A.4.6.1.20.b Pemasangan 1 m2 rangka langit-langit (60 x 60) cm, kayu kelas III
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.20 90,000.00 18,000.00
Tukang kayu L.03 OH 0.30 100,000.00 30,000.00
Kepala tukang L.03 OH 0.03 110,000.00 3,300.00
Mandor L.04 OH 0.01 115,000.00 1,150.00
JUMLAH TENAGA KERJA 52,450.00
B BAHAN
Kaso-kaso 5 x 7cm m3 0.02 3,500,000.00 53,900.00
Paku 7 – 10 cm kg 0.25 15,000.00 3,750.00
JUMLAH HARGA BAHAN 57,650.00
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.10 90,000.00 9,000.00
Tukang kayu L.03 OH 0.20 100,000.00 20,000.00
Kepala tukang L.03 OH 0.02 110,000.00 2,200.00
Mandor L.04 OH 0.01 115,000.00 575.00
JUMLAH TENAGA KERJA 31,775.00
B BAHAN
Papan kayu m3 0.01 7,500,000.00 81,000.00
Paku 5 dan 7 cm kg 0.10 24,000.00 2,400.00
JUMLAH HARGA BAHAN 83,400.00
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.10 90,000.00 9,000.00
Tukang kayu L.03 OH 0.20 100,000.00 20,000.00
Kepala tukang L.03 OH 0.02 110,000.00 2,200.00
Mandor L.04 OH 0.01 115,000.00 575.00
JUMLAH TENAGA KERJA 31,775.00
B BAHAN
Papan kayu m3 0.01 2,500,000.00 27,000.00
Paku 5 dan 7 cm kg 0.10 15,000.00 1,500.00
JUMLAH HARGA BAHAN 28,500.00
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.10 90,000.00 9,000.00
Tukang kayu L.03 OH 0.20 100,000.00 20,000.00
Kepala tukang L.03 OH 0.02 110,000.00 2,200.00
Mandor L.04 OH 0.01 115,000.00 575.00
JUMLAH TENAGA KERJA 31,775.00
B BAHAN
Papan kayu m3 0.01 7,500,000.00 82,500.00
Paku 5 dan 7 cm kg 0.05 24,000.00 1,200.00
JUMLAH HARGA BAHAN 83,700.00
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.10 90,000.00 9,000.00
Tukang kayu L.03 OH 0.20 100,000.00 20,000.00
Kepala tukang L.03 OH 0.02 110,000.00 2,200.00
Mandor L.04 OH 0.01 115,000.00 575.00
JUMLAH TENAGA KERJA 31,775.00
B BAHAN
Papan kayu m3 0.01 2,500,000.00 27,500.00
Paku 5 dan 7 cm kg 0.05 15,000.00 750.00
JUMLAH HARGA BAHAN 28,250.00
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.15 90,000.00 13,500.00
Tukang kayu L.03 OH 0.45 100,000.00 45,000.00
Kepala tukang L.03 OH 0.05 110,000.00 4,950.00
Mandor L.04 OH 0.01 115,000.00 920.00
JUMLAH TENAGA KERJA 64,370.00
B BAHAN
Balok kayu m3 0.03 3,750,000.00 105,000.00
Paku 5 dan 7 cm kg 0.15 15,000.00 2,250.00
JUMLAH HARGA BAHAN 107,250.00
C PERALATAN
A.4.6.1.23.b Pemasangan 1 m2 rangka dinding pemisah (60 x 120) cm kayu kelas III
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.15 90,000.00 13,500.00
Tukang kayu L.03 OH 0.45 100,000.00 45,000.00
Kepala tukang L.03 OH 0.05 110,000.00 4,950.00
Mandor L.04 OH 0.01 115,000.00 920.00
JUMLAH TENAGA KERJA 64,370.00
B BAHAN
Balok kayu m3 0.03 3,500,000.00 98,000.00
Paku 5 dan 7 cm kg 0.15 15,000.00 2,250.00
JUMLAH HARGA BAHAN 100,250.00
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.15 90,000.00 13,500.00
Tukang kayu L.03 OH 0.45 100,000.00 45,000.00
Kepala tukang L.03 OH 0.05 110,000.00 4,950.00
Mandor L.04 OH 0.01 115,000.00 920.00
JUMLAH TENAGA KERJA
B BAHAN
Balok kayu, 6 x 12 m3 0.03
Paku 5 dan 10 kg 0.15
Teakwood 4 mm,
Lembar 0.86
120 x 240
Lem kayu kg 0.56
D Jumlah (A+B+C)
E Overhead & Profit10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.20 90,000.00 18,000.00
Tukang kayu L.03 OH 0.60 100,000.00 60,000.00
Kepala tukang L.03 OH 0.06 110,000.00 6,600.00
Mandor L.04 OH 0.01 115,000.00 1,150.00
JUMLAH TENAGA KERJA 85,750.00
B BAHAN
Balok kayu, 6x12 m3 0.03 3,750,000.00 105,000.00
Paku 5 dan 10 kg 0.15 15,000.00 2,250.00
Plywood 4 mm,
Lembar 0.86 67,500.00 58,050.00
120 x 240
Lem kayu kg 0.56 30,000.00 16,800.00
JUMLAH HARGA BAHAN 182,100.00
C PERALATAN
JUMLAH HARGA ALAT
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.60 90,000.00 54,000.00
Tukang kayu L.03 OH 1.80 100,000.00 180,000.00
Kepala tukang L.03 OH 0.18 110,000.00 19,800.00
Mandor L.04 OH 0.03 115,000.00 3,450.00
JUMLAH TENAGA KERJA 257,250.00
B BAHAN
Papan kayu m3 0.01 7,500,000.00 52,500.00
Paku 5 dan 10 kg 0.10 24,000.00 2,400.00
Paku skrup 10 cm kg 0.15 10,000.00 1,500.00
JUMLAH HARGA BAHAN 56,400.00
C PERALATAN
JUMLAH HARGA ALAT
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.03 90,000.00 2,250.00
Tukang kayu L.03 OH 0.08 100,000.00 7,500.00
Kepala tukang L.03 OH 0.01 110,000.00 880.00
Mandor L.04 OH 0.00 115,000.00 115.00
JUMLAH TENAGA KERJA 10,745.00
B BAHAN
Plywood 4 mm m3 0.40 67,500.00 27,000.00
Paku 1 dan 2,5 kg 0.05 15,000.00 750.00
JUMLAH HARGA BAHAN 27,750.00
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.10 90,000.00 9,000.00
Tukang kayu L.03 OH 0.05 100,000.00 5,000.00
Kepala tukang L.03 OH 0.01 110,000.00 550.00
Mandor L.04 OH 0.01 115,000.00 575.00
JUMLAH TENAGA KERJA
B BAHAN
Bilik bambu m2 1.50
Kaso-kaso 5 x 7 m3 0.01
Paku kg 0.01
List kayu 2/4 m3 0.00
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA KERJA
Pekerja L.01 OH 0.06 90,000.00 5,400.00
Tukang kayu L.02 OH 0.60 100,000.00 60,000.00
Kepala tukang L.03 OH 0.06 110,000.00 6,600.00
Mandor L.04 OH 0.00 115,000.00 345.00
JUMLAH TENAGA KERJA 0.00
B BAHAN
Kunci tanam antik Bh 1.00 0.00
JUMLAH HARGA BAHAN
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA KERJA
Pekerja L.01 OH 0.01 90,000.00 900.00
Tukang kayu L.02 OH 0.50 100,000.00 50,000.00
Kepala tukang L.03 OH 0.05 110,000.00 5,500.00
Mandor L.04 OH 0.01 115,000.00 575.00
JUMLAH TENAGA KERJA 56,975.00
B BAHAN
Kunci tanam biasa Bh 1.00 137,500.00 137,500.00
JUMLAH HARGA BAHAN 137,500.00
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA KERJA
Pekerja L.01 OH 0.01 90,000.00 450.00
Tukang kayu L.02 OH 0.50 100,000.00 50,000.00
Kepala tukang L.03 OH 0.05 110,000.00 5,500.00
Mandor L.04 OH 0.00 115,000.00 345.00
JUMLAH TENAGA KERJA
B BAHAN
Kunci tanam KM Bh 1.00
JUMLAH HARGA BAHAN
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA KERJA
Pekerja L.01 OH 0.01 90,000.00 450.00
Tukang kayu L.02 OH 0.50 100,000.00 50,000.00
Kepala tukang L.03 OH 0.05 110,000.00 5,500.00
Mandor L.04 OH 0.00 115,000.00 345.00
JUMLAH TENAGA KERJA
B BAHAN
Kunci silinder Bh 1.00
JUMLAH HARGA BAHAN
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.02 90,000.00 1,350.00
Tukang kayu L.02 OH 0.15 100,000.00 15,000.00
Kepala tukang L.03 OH 0.02 110,000.00 1,650.00
Mandor L.04 OH 0.00 115,000.00 92.00
JUMLAH TENAGA KERJA 18,092.00
B BAHAN
Engsel pintu Bh 1.00 25,000.00 25,000.00
JUMLAH HARGA BAHAN 25,000.00
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.01 90,000.00 900.00
Tukang kayu L.02 OH 0.10 100,000.00 10,000.00
Kepala tukang L.03 OH 0.01 110,000.00 1,100.00
Mandor L.04 OH 0.00 115,000.00 57.50
JUMLAH TENAGA KERJA 12,057.50
B BAHAN
Engsel kupu-kupu Bh 1.00 0.00
JUMLAH HARGA BAHAN 0.00
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.10 90,000.00 9,000.00
Tukang kayu L.02 0.20 100,000.00 20,000.00
Kepala tukang L.03 0.02 110,000.00 2,200.00
Mandor L.04 OH 0.00 115,000.00 57.50
JUMLAH TENAGA KERJA 0.00
B BAHAN
Engsel angin Bh 1.00 10,000.00 0.00
JUMLAH HARGA BAHAN 0.00
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.02 90,000.00 1,350.00
Tukang kayu L.02 0.15 100,000.00 15,000.00
Kepala tukang L.03 0.02 110,000.00 1,650.00
Mandor L.04 OH 0.01 115,000.00 920.00
JUMLAH TENAGA KERJA
B BAHAN
Spring knip Bh 1.00
JUMLAH HARGA BAHAN
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.02 90,000.00 1,350.00
Tukang kayu L.02 0.15 100,000.00 15,000.00
Kepala tukang L.03 0.02 110,000.00 1,650.00
Mandor L.04 OH 0.01 115,000.00 920.00
JUMLAH TENAGA KERJA 18,920.00
B BAHAN
Kait angin Bh 1.00 10,000.00 10,000.00
JUMLAH HARGA BAHAN
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.05 90,000.00 4,500.00
Tukang kayu L.02 0.50 100,000.00 50,000.00
Kepala tukang L.03 0.05 110,000.00 5,500.00
Mandor L.04 OH 0.00 115,000.00 345.00
JUMLAH TENAGA KERJA
B BAHAN
Door closer set 1.00
JUMLAH HARGA BAHAN
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.02 90,000.00 1,800.00
Tukang kayu L.02 0.20 100,000.00 20,000.00
Kepala tukang L.03 0.02 110,000.00 2,200.00
Mandor L.04 OH 0.00 115,000.00 115.00
JUMLAH TENAGA KERJA
B BAHAN
Kunci slot Bh 1.00
JUMLAH HARGA BAHAN
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.05 90,000.00 4,500.00
Tukang kayu L.02 0.50 100,000.00 50,000.00
Kepala tukang L.03 0.05 110,000.00 5,500.00
Mandor L.04 OH 0.00 115,000.00 345.00
JUMLAH TENAGA KERJA
B BAHAN
Door holder Bh 1.00
JUMLAH HARGA BAHAN
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.01 90,000.00 900.00
Tukang kayu L.02 0.10 100,000.00 10,000.00
Kepala tukang L.03 0.01 110,000.00 1,100.00
Mandor L.04 OH 0.01 115,000.00 575.00
JUMLAH TENAGA KERJA
B BAHAN
Door stop Bh 1.00
JUMLAH HARGA BAHAN
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.06 90,000.00 5,400.00
Tukang kayu L.02 0.60 100,000.00 60,000.00
Kepala tukang L.03 0.06 110,000.00 6,600.00
Mandor L.04 OH 0.00 115,000.00 345.00
JUMLAH TENAGA KERJA
B BAHAN
Rel pintu sorong Set 1.00
JUMLAH HARGA BAHAN
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.03 90,000.00 2,250.00
Tukang kayu L.02 0.25 100,000.00 25,000.00
Kepala tukang L.03 0.03 110,000.00 2,750.00
Mandor L.04 OH 0.00 115,000.00 149.50
JUMLAH TENAGA KERJA
B BAHAN
Kunci lemari Set 1.00
JUMLAH HARGA BAHAN
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.02 90,000.00 1,350.00
Tukang kayu L.02 0.15 100,000.00 15,000.00
Kepala tukang L.03 0.02 110,000.00 1,650.00
Mandor L.04 OH 0.00 115,000.00 92.00
JUMLAH TENAGA KERJA 18,092.00
B BAHAN
Kaca tebal 3mm m2 1.10 100,000.00 110,000.00
Sealant Kg 0.05 0.00
JUMLAH HARGA BAHAN 110,000.00
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.02 90,000.00 1,350.00
Tukang kayu L.02 OH 0.15 100,000.00 15,000.00
Kepala tukang L.03 OH 0.02 110,000.00 1,650.00
Mandor L.04 OH 0.00 115,000.00 92.00
JUMLAH TENAGA KERJA
B BAHAN
Kaca tebal 5 mm m2 1.10 180,000.00 198,000.00
Sealant Kg 0.05 0.00
JUMLAH HARGA BAHAN 198,000.00
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.02 90,000.00 1,530.00
Tukang kayu L.02 OH 0.17 100,000.00 17,000.00
Kepala tukang L.03 OH 0.02 110,000.00 1,870.00
Mandor L.04 OH 0.00 115,000.00 103.50
JUMLAH TENAGA KERJA
B BAHAN
Kaca tebal 8 mm m2 1.10
SEalant Kg 0.07
JUMLAH HARGA BAHAN
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.03 90,000.00 2,250.00
Tukang kayu L.02 OH 0.25 100,000.00 25,000.00
Kepala tukang L.03 OH 0.03 110,000.00 2,750.00
Mandor L.04 OH 0.00 115,000.00 149.50
JUMLAH TENAGA KERJA
B BAHAN
Kaca buram 12 mm m2 1.10
SEalant Kg 0.07
JUMLAH HARGA BAHAN
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.02 90,000.00 1,350.00
Tukang kayu L.02 OH 0.15 100,000.00 15,000.00
Kepala tukang L.03 OH 0.02 110,000.00 1,650.00
Mandor L.04 OH 0.01 115,000.00 920.00
JUMLAH TENAGA KERJA
B BAHAN
Kaca cermin 5 mm m2 1.10
JUMLAH HARGA BAHAN
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.02 90,000.00 1,530.00
Tukang kayu L.02 OH 0.17 100,000.00 17,000.00
Kepala tukang L.03 OH 0.02 110,000.00 1,870.00
Mandor L.04 OH 0.01 115,000.00 1,035.00
JUMLAH TENAGA KERJA
B BAHAN
Kaca cermin 8 mm m2 1.10
JUMLAH HARGA BAHAN
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.02 90,000.00 1,350.00
Tukang kayu L.02 OH 0.15 100,000.00 15,000.00
Kepala tukang L.03 OH 0.02 110,000.00 1,650.00
Mandor L.04 OH 0.01 115,000.00 920.00
JUMLAH TENAGA KERJA
B BAHAN
Kaca wireglassed 5 mm m2 1.10
JUMLAH HARGA BAHAN
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.08 90,000.00 6,750.00
Tukang kayu L.02 OH 0.15 100,000.00 15,000.00
Kepala tukang L.03 OH 0.02 110,000.00 1,650.00
Mandor L.04 OH 0.00 115,000.00 460.00
JUMLAH TENAGA KERJA
B BAHAN
Kaca patri 5mm m2 1.10
Sealant Kg 0.05
JUMLAH HARGA BAHAN
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.15 90,000.00 13,500.00
Mandor L.04 OH 0.00 115,000.00 345.00
JUMLAH TENAGA KERJA
B BAHAN
Soda api Kg 0.05
JUMLAH HARGA BAHAN
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.15 90,000.00 13,500.00
Mandor L.04 OH 0.00 115,000.00 345.00
JUMLAH TENAGA KERJA 13,845.00
B BAHAN
Sabun Kg 0.05 15,000.00 750.00
JUMLAH HARGA BAHAN 750.00
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.15 90,000.00 13,500.00
Mandor L.04 OH 0.01 115,000.00 920.00
JUMLAH TENAGA KERJA 14,420.00
B BAHAN
Sabun Kg 0.05 15,000.00 750.00
JUMLAH HARGA BAHAN 750.00
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.07 90,000.00 6,300.00
Tukang cat L.02 OH 0.01 100,000.00 900.00
Kepala tukang L.03 OH 0.01 110,000.00 660.00
Mandor L.04 OH 0.00 115,000.00 345.00
JUMLAH TENAGA KERJA 8,205.00
B BAHAN
Cat menie Kg 0.20 50,000.00 10,000.00
Plamuur Kg 0.15 50,000.00 7,500.00
Cat dasar Kg 0.17 20,000.00 3,400.00
Cat penutup Kg 0.26 50,000.00 13,000.00
Kuas Bh 0.01 12,000.00 120.00
Pengencer Kg 0.03 25,000.00 750.00
Ampelas Lbr 0.20 5,000.00 1,000.00
JUMLAH HARGA BAHAN 35,770.00
C PERALATAN
A.4.7.1.5. Pengecatan 1 m2 bidang kayu baru (1 lapis plamuur, 1 lapis cat dasar, 3 lapis cat penutup)
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.07 90,000.00 6,300.00
Tukang cat L.02 OH 0.11 100,000.00 10,500.00
Kepala tukang L.03 OH 0.00 110,000.00 440.00
Mandor L.04 OH 0.00 115,000.00 345.00
JUMLAH TENAGA KERJA 17,585.00
B BAHAN
Cat menie Kg 0.20 50,000.00 10,000.00
Plamuur Kg 0.15 50,000.00 7,500.00
Cat dasar Kg 0.17 20,000.00 3,400.00
Cat penutup Kg 0.35 50,000.00 17,500.00
Kuas Bh 0.01 12,000.00 120.00
Pengencer Kg 0.03 25,000.00 750.00
Ampelas Lbr 0.20 5,000.00 1,000.00
JUMLAH HARGA BAHAN 40,270.00
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.04 90,000.00 3,600.00
Tukang cat L.02 OH 0.06 100,000.00 6,300.00
Kepala tukang L.03 OH 0.06 110,000.00 6,930.00
Mandor L.04 OH 0.00 115,000.00 345.00
JUMLAH TENAGA KERJA 0.00
B BAHAN
Teak oil L 0.36
JUMLAH HARGA BAHAN
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.04 90,000.00 3,600.00
Tukang cat L.02 OH 0.06 100,000.00 6,000.00
Kepala tukang L.03 OH 0.02 110,000.00 1,760.00
Mandor L.04 OH 0.00 115,000.00 345.00
JUMLAH TENAGA KERJA 11,705.00
B BAHAN
Politur L 0.15 50,000.00 7,500.00
Politur jadi L 0.37 0.00 0.00
Ampelas Lbr 2.00 5,000.00 10,000.00
JUMLAH HARGA BAHAN 17,500.00
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.10 90,000.00 9,000.00
Mandor L.04 OH 0.01 115,000.00 690.00
JUMLAH TENAGA KERJA 9,690.00
B BAHAN
Residu atau ter L 0.35 7,500.00 2,625.00
JUMLAH HARGA BAHAN 2,625.00
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.16 90,000.00 14,400.00
Tukang cat L.02 OH 0.16 100,000.00 16,000.00
Kepala tukang L.03 OH 0.02 110,000.00 1,760.00
Mandor L.04 OH 0.00 115,000.00 345.00
JUMLAH TENAGA KERJA 32,505.00
B BAHAN
Vernis L 0.15 50,000.00 7,500.00
Dempul Kg 0.05 20,000.00 1,000.00
Ampelas Lbr 0.10 5,000.00 500.00
JUMLAH HARGA BAHAN 9,000.00
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.02 90,000.00 1,800.00
Tukang cat L.02 OH 0.06 100,000.00 6,300.00
Kepala tukang L.03 OH 0.01 110,000.00 693.00
Mandor L.04 OH 0.00 115,000.00 345.00
JUMLAH TENAGA KERJA 9,138.00
B BAHAN
Plamuur Kg 0.10 50,000.00 5,000.00
Cat dasar Kg 0.10 20,000.00 2,000.00
Cat penutup Kg 0.26 18,000.00 4,680.00
JUMLAH HARGA BAHAN 11,680.00
C PERALATAN
A.4.7.1.11. Pengecatan 1 m2 tembok lama ( 1 lapis cat dasar, 2 lapis cat penutup)
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.03 90,000.00 2,520.00
Tukang cat L.02 OH 0.04 100,000.00 4,200.00
Kepala tukang L.03 OH 0.00 110,000.00 462.00
Mandor L.04 OH 0.00 115,000.00 345.00
JUMLAH TENAGA KERJA 7,527.00
B BAHAN
Cat dasar Kg 0.12 20,000.00 2,400.00
Cat penutup Kg 0.18 18,000.00 3,240.00
JUMLAH HARGA BAHAN 5,640.00
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.03 90,000.00 2,520.00
Tukang cat L.02 OH 0.04 100,000.00 4,200.00
Kepala tukang L.03 OH 0.00 110,000.00 462.00
Mandor L.04 OH 0.00 115,000.00 345.00
JUMLAH TENAGA KERJA
B BAHAN
Kalkarium Kg 0.10
JUMLAH HARGA BAHAN
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.15 90,000.00 13,500.00
Tukang cat L.02 OH 0.00 100,000.00 100.00
Kepala tukang L.03 OH 0.00 110,000.00 11.00
Mandor L.04 OH 0.00 115,000.00 287.50
JUMLAH TENAGA KERJA 13,898.50
B BAHAN
Kapur sirih Kg 0.15
Ampelas Lbr 0.10
Alang-alang Ikat 0.25
JUMLAH HARGA BAHAN
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.04 90,000.00 3,600.00
Tukang cat L.02 OH 0.01 100,000.00 500.00
Kepala tukang L.03 OH 0.00 110,000.00 55.00
Mandor L.04 OH 0.00 115,000.00 287.50
JUMLAH TENAGA KERJA
B BAHAN
Kapur sirih Kg 0.30
Ampelas Lbr 0.20
Alang-alang Ikat 0.25
JUMLAH HARGA BAHAN
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.02 90,000.00 1,800.00
Tukang cat L.02 OH 0.20 100,000.00 20,000.00
Kepala tukang L.03 OH 0.02 110,000.00 2,200.00
Mandor L.04 OH 0.00 115,000.00 287.50
JUMLAH TENAGA KERJA
B BAHAN
Wall paper m2 1.20
Lem Kg 0.20
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.02 90,000.00 1,800.00
Tukang cat L.02 OH 0.20 100,000.00 20,000.00
Kepala tukang L.03 OH 0.02 110,000.00 2,200.00
Mandor L.04 OH 0.00 115,000.00 287.50
JUMLAH TENAGA KERJA 24,287.50
B BAHAN
Menie besi Kg 0.10 50,000.00 5,000.00
Kwas Bh 0.01 12,000.00 120.00
JUMLAH HARGA BAHAN 5,120.00
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.25 90,000.00 22,500.00
Tukang cat L.02 OH 0.23 100,000.00 22,500.00
Kepala tukang L.02 OH 0.02 110,000.00 2,475.00
Mandor L.04 OH 0.01 115,000.00 862.50
JUMLAH TENAGA KERJA 48,337.50
B BAHAN
Menie besi Kg 0.10 50,000.00 5,000.00
Pengencer L 0.01 25,000.00 250.00
Kwas Bh 0.01 12,000.00 120.00
Perancah kayu m3 0.00 12,000.00 24.00
JUMLAH HARGA BAHAN 5,394.00
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.25 90,000.00 22,500.00
Tukang cat L.02 OH 0.25 100,000.00 25,000.00
Kepala tukang L.03 OH 0.03 110,000.00 2,750.00
Mandor L.04 OH 0.00 115,000.00 149.50
JUMLAH TENAGA KERJA
B BAHAN
Menie A Kg 0.10
Menie B Kg 0.10
Cat Kg 0.08
Kwas Bh 0.01 12,000.00
Pengencer L 0.01 25,000.00
JUMLAH HARGA BAHAN
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.06 90,000.00 5,400.00
Tukang cat L.02 OH 0.06 100,000.00 6,000.00
Kepala tukang L.03 OH 0.01 110,000.00 1,320.00
Mandor L.04 OH 0.00 115,000.00 345.00
JUMLAH TENAGA KERJA
B BAHAN
Cat Kg 0.30
Kwas Bh 0.01
Pengencer L 0.01
JUMLAH HARGA BAHAN
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.40 90,000.00 36,000.00
Tukang cat L.02 OH 0.80 100,000.00 80,000.00
Kepala tukang L.03 OH 0.08 110,000.00 8,800.00
Mandor L.04 OH 0.02 115,000.00 2,300.00
JUMLAH TENAGA KERJA
B BAHAN
Cat dasar Kg 0.11
Cat antara Kg 0.17
Cat penutup Kg 0.08
Kwas Bh 0.01
Pengencer L 0.01
JUMLAH HARGA BAHAN
C PERALATAN
A.4.7.1.21. Pengecatan 1 m2 permukaan baja galvanis secara semprot sistem 3 lapis cat mutakhir
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.40 90,000.00 36,000.00
Tukang cat L.02 OH 0.70 100,000.00 70,000.00
Kepala tukang L.03 OH 0.07 110,000.00 7,700.00
Mandor L.04 OH 0.02 115,000.00 2,300.00
JUMLAH TENAGA KERJA
B BAHAN
Cat dasar Kg 0.30
Pengencer L 0.01
JUMLAH HARGA BAHAN
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 3.30 90,000.00 297,000.00
Tukang batu L.02 1.10 100,000.00 110,000.00
Kepala tukang L.03 0.01 110,000.00 1,100.00
Mandor L.04 OH 0.16 115,000.00 18,400.00
JUMLAH TENAGA KERJA 426,500.00
B BAHAN
Closet duduk Unit 1.00 3,500,000.00 3,500,000.00
Perlengkapan Ls 6%xClosed 210,000.00 210,000.00
JUMLAH HARGA BAHAN 3,710,000.00
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
TENAGA
Pekerja L.01 OH 1.00 90,000.00 90,000.00
Tukang batu L.02 1.50 100,000.00 150,000.00
Kepala tukang L.03 0.15 110,000.00 16,500.00
Mandor L.04 OH 0.16 115,000.00 18,400.00
JUMLAH TENAGA KERJA 274,900.00
B BAHAN
Closet jongkok Unit 1.00 250,000.00 250,000.00
Semen Portland Kg 6.00 1,700.00 10,200.00
Pasir pasang M3 0.01 150,000.00 1,500.00
JUMLAH HARGA BAHAN 261,700.00
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 1.00 90,000.00 90,000.00
Tukang batu L.02 1.50 100,000.00 150,000.00
Kepala tukang L.03 0.15 110,000.00 16,500.00
Mandor L.04 OH 0.05 115,000.00 5,750.00
JUMLAH TENAGA KERJA 262,250.00
B BAHAN
Closet jongkok Unit 1.00 120,000.00 120,000.00
Semen Portland Kg 6.00 1,700.00 10,200.00
Pasir pasang M3 0.01 150,000.00 1,500.00
Bata merah Bh 7.00 875.00 6,125.00
JUMLAH HARGA BAHAN 137,825.00
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 1.00 90,000.00 90,000.00
Tukang batu L.02 1.00 100,000.00 100,000.00
Kepala tukang L.03 0.10 110,000.00 11,000.00
Mandor L.04 OH 0.05 115,000.00 5,750.00
JUMLAH TENAGA KERJA 206,750.00
B BAHAN
Urinoir Unit 1.00 450,000.00 450,000.00
Semen Portland Kg 6.00 1,700.00 10,200.00
Pasir pasang M3 0.01 150,000.00 1,500.00
Perlengkapan % 30.00 450,000.00 135,000.00
JUMLAH HARGA BAHAN 596,700.00
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 1.20 90,000.00 108,000.00
Tukang batu L.02 1.45 100,000.00 145,000.00
Kepala tukang L.03 0.15 110,000.00 16,500.00
Mandor L.04 OH 0.06 115,000.00 6,900.00
JUMLAH TENAGA KERJA 276,400.00
B BAHAN
Wastafel Unit 1.20 275,000.00 330,000.00
Semen Portland Kg 6.00 1,700.00 10,200.00
Pasir pasang M3 0.01 150,000.00 1,500.00
Perlengkapan % 12.00 275,000.00 33,000.00
JUMLAH HARGA BAHAN 374,700.00
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.08 90,000.00 6,750.00
Tukang batu L.02 0.75 100,000.00 75,000.00
Kepala tukang L.03 0.08 110,000.00 8,250.00
Mandor L.04 OH 0.00 115,000.00 345.00
JUMLAH TENAGA KERJA
B BAHAN
Bathcuip Unit 1.00
Perlengkapan % 20.00 0.00 0.00
JUMLAH HARGA BAHAN
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 3.00 90,000.00 270,000.00
Tukang batu L.02 4.50 100,000.00 450,000.00
Kepala tukang L.03 0.05 110,000.00 5,500.00
Mandor L.04 OH 0.90 115,000.00 103,500.00
JUMLAH TENAGA KERJA 829,000.00
B BAHAN
Bak fibreglass Unit 1.00 250,000.00 250,000.00
Perlengkapan Ls 12%xbak 30,000.00 30,000.00
JUMLAH HARGA BAHAN 280,000.00
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 6.00 90,000.00 540,000.00
Tukang batu L.02 3.00 100,000.00 300,000.00
Kepala tukang L.03 0.30 110,000.00 33,000.00
Mandor L.04 OH 0.03 115,000.00 3,450.00
JUMLAH TENAGA KERJA 876,450.00
B BAHAN
Bata merah M3 150.00 875.00 131,250.00
Semen portland Kg 120.00 1,700.00 204,000.00
Pasir pasang M3 0.30 150,000.00 45,000.00
Porselen 11x11 bh 360.00 731.71 263,414.63
Semen warna Kg 6.00 13,000.00 78,000.00
JUMLAH HARGA BAHAN 721,664.63
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 3.00 90,000.00 270,000.00
Tukang batu L.02 4.50 100,000.00 450,000.00
Kepala tukang L.03 0.05 110,000.00 5,500.00
Mandor L.04 OH 0.90 115,000.00 103,500.00
JUMLAH TENAGA KERJA 829,000.00
B BAHAN
Bak fibreglass Unit 1.00 250,000.00 250,000.00
Perlengkapan Ls 12%xbak 30,000.00 30,000.00
JUMLAH HARGA BAHAN 280,000.00
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.30 90,000.00 27,000.00
Tukang batu L.02 0.45 100,000.00 45,000.00
Kepala tukang L.03 0.05 110,000.00 4,950.00
Mandor L.04 OH 0.02 115,000.00 1,725.00
JUMLAH TENAGA KERJA 78,675.00
B BAHAN
Bak air fibreglass Unit 1.00 50,000.00 50,000.00
Perlengkapan % 12.00 6,000.00 6,000.00
JUMLAH HARGA BAHAN 56,000.00
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 3.50 90,000.00 315,000.00
Tukang batu L.02 4.50 100,000.00 450,000.00
Kepala tukang L.03 0.05 110,000.00 5,500.00
Mandor L.04 OH 0.02 115,000.00 2,070.00
JUMLAH TENAGA KERJA
B BAHAN
Beton 1:2:3 M3 0.90 677,132.14 609,418.93
Baja tulangan Kg 180.00 0.00
Kayu bekisting M2 8.00 0.00
Ubin porselen Bh 500.00 0.00
Perlengkapan % 10.00 0.00
JUMLAH HARGA BAHAN
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.03 90,000.00 2,700.00
Tukang batu L.02 0.30 100,000.00 30,000.00
Kepala tukang L.03 0.03 110,000.00 3,300.00
Mandor L.04 OH 0.02 115,000.00 1,725.00
JUMLAH TENAGA KERJA 37,725.00
B BAHAN
Bak cuci piring Unit 1.00 203,000.00 203,000.00
Waterdrain Bh 1.00 7,000.00 7,000.00
JUMLAH HARGA BAHAN 210,000.00
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.05 90,000.00 4,500.00
Tukang batu L.02 0.50 100,000.00 50,000.00
Kepala tukang L.03 0.05 110,000.00 5,500.00
Mandor L.04 OH 0.03 115,000.00 2,875.00
JUMLAH TENAGA KERJA 62,875.00
B BAHAN
Bak cuci piring Unit 1.00 170,000.00 170,000.00
Waterdrain Bh 1.00 7,000.00 7,000.00
Semen portland Kg 20.00 1,700.00 34,000.00
Pasir pasang M3 0.05 150,000.00 7,500.00
JUMLAH HARGA BAHAN 218,500.00
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.01 90,000.00 900.00
Tukang batu L.02 0.10 100,000.00 10,000.00
Kepala tukang L.03 0.01 110,000.00 1,100.00
Mandor L.04 OH 0.01 115,000.00 575.00
JUMLAH TENAGA KERJA 12,575.00
B BAHAN
Floor drain Unit 1.00 15,000.00 16,500.00
JUMLAH HARGA BAHAN 16,500.00
C PERALATAN
A.5.1.1 15. Pemasangan 1 buah bak kontrol pasangan bata 30x30 tinggi 35 cm
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 2.16 90,000.00 194,400.00
Tukang batu L.02 0.72 100,000.00 72,000.00
Kepala tukang L.03 0.07 110,000.00 7,920.00
Mandor L.04 OH 0.01 115,000.00 1,265.00
JUMLAH TENAGA KERJA 275,585.00
B BAHAN
Bata merah bh 40.00 875.00 35,000.00
Semen portland Kg 44.00 1,700.00 74,800.00
Pasir pasang M3 0.07 150,000.00 10,500.00
Pasir beton M3 0.06 150,000.00 9,000.00
Kerikil M3 0.07 200,000.00 14,000.00
Baja tulangan Kg 1.60 14,300.00 22,880.00
JUMLAH HARGA BAHAN 166,180.00
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 3.20 90,000.00 288,000.00
Tukang batu L.02 1.15 100,000.00 115,000.00
Kepala tukang L.03 0.01 110,000.00 1,210.00
Mandor L.04 OH 0.02 115,000.00 1,840.00
JUMLAH TENAGA KERJA 406,050.00
B BAHAN
Bata merah bh 70.00 875.00 61,250.00
Semen portland Kg 77.00 1,700.00 130,900.00
Pasir pasang M3 0.13 150,000.00 19,500.00
Pasir beton M3 0.09 150,000.00 13,500.00
Kerikil M3 0.02 200,000.00 4,000.00
Baja tulangan Kg 2.60 14,300.00 37,180.00
JUMLAH HARGA BAHAN 266,330.00
C PERALATAN
A.5.1.1 17. Pemasangan 1 buah bak kontrol pasangan bata 60cm x60cm tinggi 65 cm
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 3.20 90,000.00 288,000.00
Tukang batu L.02 1.15 100,000.00 115,000.00
Kepala tukang L.03 0.01 110,000.00 1,210.00
Mandor L.04 OH 0.02 115,000.00 1,840.00
JUMLAH TENAGA KERJA 406,050.00
B BAHAN
Bata merah bh 123.00 875.00 107,625.00
Semen portland Kg 114.00 1,700.00 193,800.00
Pasir pasang M3 0.18 150,000.00 27,600.00
Pasir beton M3 0.12 150,000.00 18,000.00
Kerikil M3 0.03 200,000.00 6,600.00
Baja tulangan Kg 4.85 14,300.00 69,355.00
JUMLAH HARGA BAHAN 422,980.00
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.05 90,000.00 4,860.00
Tukang batu L.02 0.09 100,000.00 9,000.00
Kepala tukang L.03 0.01 110,000.00 990.00
Mandor L.04 OH 0.03 115,000.00 3,105.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa galvanis ½” M 1.20
Perlengkapan Ls 35%xpipa 0.00 0.00
JUMLAH HARGA BAHAN
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA KERJA
Pekerja L.01 OH 0.01 90,000.00 900.00
Tukang batu L.02 0.40 100,000.00 40,000.00
Kepala tukang L.03 0.04 110,000.00 4,400.00
Mandor L.04 OH 0.01 115,000.00 575.00
JUMLAH TENAGA KERJA 45,875.00
B BAHAN
Kran air M 1.00 15,000.00 15,000.00
Sealtape Buah 0.03 4,000.00 100.00
JUMLAH HARGA BAHAN 15,100.00
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.05 90,000.00 4,860.00
Tukang batu L.02 0.09 100,000.00 9,000.00
Kepala tukang L.03 0.01 110,000.00 990.00
Mandor L.04 OH 0.03 115,000.00 3,105.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa galvanis 3/4” M 1.20 0.00
Perlengkapan % 35.00 0.00 0.00
JUMLAH HARGA BAHAN
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.05 90,000.00 4,860.00
Tukang batu L.02 0.09 100,000.00 9,000.00
Kepala tukang L.03 0.01 110,000.00 990.00
Mandor L.04 OH 0.03 115,000.00 3,105.00
JUMLAH TENAGA KERJA 17,955.00
B BAHAN
Pipa galvanis 1” M 1.20 100,000.00 120,000.00
Perlengkapan % 35.00 100,000.00 35,000.00
JUMLAH HARGA BAHAN 155,000.00
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.11 90,000.00 9,720.00
Tukang batu L.02 0.18 100,000.00 18,000.00
Kepala tukang L.03 0.02 110,000.00 1,980.00
Mandor L.04 OH 0.01 115,000.00 575.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa galvanis 11/2” M 1.20 152,500.00 183,000.00
Perlengkapan % 35.00 152,500.00 53,375.00
JUMLAH HARGA BAHAN
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.14 90,000.00 12,150.00
Tukang batu L.02 0.23 100,000.00 22,500.00
Kepala tukang L.03 0.02 110,000.00 2,530.00
Mandor L.04 OH 0.01 115,000.00 805.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa galvanis 3” M 1.20
Perlengkapan % 35.00
JUMLAH HARGA BAHAN
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.14 90,000.00 12,150.00
Tukang batu L.02 0.23 100,000.00 22,500.00
Kepala tukang L.03 0.02 110,000.00 2,530.00
Mandor L.04 OH 0.01 115,000.00 805.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa galvanis 4” M 1.20
Perlengkapan % 35.00
JUMLAH HARGA BAHAN
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.04 90,000.00 3,240.00
Tukang batu L.02 0.06 100,000.00 6,000.00
Kepala tukang L.03 0.01 110,000.00 660.00
Mandor L.04 OH 0.00 115,000.00 230.00
JUMLAH TENAGA KERJA 10,130.00
B BAHAN
Pipa PVC 1/2” M 1.20 4,250.00 5,100.00
Perlengkapan % 35.00 4,250.00 1,487.50
JUMLAH HARGA BAHAN 6,587.50
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.04 90,000.00 3,240.00
Tukang batu L.02 0.06 100,000.00 6,000.00
Kepala tukang L.03 0.01 110,000.00 660.00
Mandor L.04 OH 0.00 115,000.00 230.00
JUMLAH TENAGA KERJA 10,130.00
B BAHAN
Pipa PVC 3/4” M 1.20 6,000.00 7,200.00
Perlengkapan % 35.00 6,000.00 2,100.00
JUMLAH HARGA BAHAN 9,300.00
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.04 90,000.00 3,240.00
Tukang batu L.02 0.06 100,000.00 6,000.00
Kepala tukang L.03 0.01 110,000.00 660.00
Mandor L.04 OH 0.00 115,000.00 230.00
JUMLAH TENAGA KERJA 10,130.00
B BAHAN
Pipa PVC 1” M 1.20 7,500.00 9,000.00
Perlengkapan % 35.00 7,500.00 2,625.00
JUMLAH HARGA BAHAN 11,625.00
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.05 90,000.00 4,860.00
Tukang batu L.02 0.09 100,000.00 9,000.00
Kepala tukang L.03 0.01 110,000.00 990.00
Mandor L.04 OH 0.00 115,000.00 345.00
JUMLAH TENAGA KERJA 15,195.00
B BAHAN
Pipa PVC 1 1/2” M 1.20 13,750.00 16,500.00
Perlengkapan % 35.00 13,750.00 4,812.50
JUMLAH HARGA BAHAN 21,312.50
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.05 90,000.00 4,860.00
Tukang batu L.02 0.09 100,000.00 9,000.00
Kepala tukang L.03 0.01 110,000.00 990.00
Mandor L.04 OH 0.00 115,000.00 345.00
JUMLAH TENAGA KERJA 15,195.00
B BAHAN
Pipa PVC 2” M 1.20 16,250.00 19,500.00
Perlengkapan % 35.00 16,250.00 5,687.50
JUMLAH HARGA BAHAN 25,187.50
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.08 90,000.00 7,290.00
Tukang batu L.02 0.14 100,000.00 13,500.00
Kepala tukang L.03 0.01 110,000.00 1,485.00
Mandor L.04 OH 0.00 115,000.00 460.00
JUMLAH TENAGA KERJA 0.00
B BAHAN
Pipa PVC 2 1/2” M 1.20 16,250.00 19,500.00
Perlengkapan % 35.00 16,250.00 5,687.50
JUMLAH HARGA BAHAN 0.00
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.08 90,000.00 7,290.00
Tukang batu L.02 0.14 100,000.00 13,500.00
Kepala tukang L.03 0.01 110,000.00 1,485.00
Mandor L.04 OH 0.00 115,000.00 460.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa PVC 3” M 1.20 0.00
Perlengkapan % 35.00 0.00 0.00
JUMLAH HARGA BAHAN
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.08 90,000.00 7,290.00
Tukang batu L.02 0.14 100,000.00 13,500.00
Kepala tukang L.03 0.01 110,000.00 1,485.00
Mandor L.04 OH 0.00 115,000.00 460.00
JUMLAH TENAGA KERJA 22,735.00
B BAHAN
Pipa PVC 4” M 1.20 45,312.50 54,375.00
Perlengkapan % 35.00 45,312.50 15,859.38
JUMLAH HARGA BAHAN 70,234.38
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.08 90,000.00 7,200.00
Tukang batu L.02 0.04 100,000.00 4,000.00
Kepala tukang L.03 0.00 110,000.00 440.00
Mandor L.04 OH 0.00 115,000.00 460.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa tanah Bh 1.60
Semen portland Kg 35.00
Pasir pasang M3 0.01
Pasir urug M3 0.01
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.06 90,000.00 5,400.00
Tukang batu L.02 0.03 100,000.00 3,000.00
Kepala tukang L.03 0.00 110,000.00 330.00
Mandor L.04 OH 0.00 115,000.00 345.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa tanah dia 15 Bh 1.60
Semen portland Kg 0.68
Pasir pasang M3 0.01
Pasir urug M3 0.01
JUMLAH HARGA BAHAN
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.14 90,000.00 12,600.00
Tukang batu L.02 0.07 100,000.00 7,000.00
Kepala tukang L.03 0.01 110,000.00 770.00
Mandor L.04 OH 0.01 115,000.00 805.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa tanah dia 15 Bh 1.10
Bata merah M3 0.03
Semen portland Kg 3.92
Pasir pasang M3 0.06
Pasir urug M3 0.02
JUMLAH HARGA BAHAN
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.38 90,000.00 34,200.00
Tukang batu L.02 0.19 100,000.00 19,000.00
Kepala tukang L.03 0.02 110,000.00 2,090.00
Mandor L.04 OH 0.02 115,000.00 2,185.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa tanah dia 15 Bh 1.10
Bata merah M3 0.55
Semen portland Kg 10.30
Pasir pasang M3 0.06
Pasir urug M3 0.07
JUMLAH HARGA BAHAN
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.100 90,000.00 9,000.00
Tukang kayu L.02 OH 0.020 100,000.00 2,000.00
Kepala tukang L.03 OH 0.025 110,000.00 2,750.00
Mandor L.04 OH 0.050 115,000.00 5,750.00
JUMLAH TENAGA KERJA 19,500.00
B BAHAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
TENAGA
Tukang kayu L.02 OH 0.6000 100,000.00 60,000.00
Kepala tukang L.03 OH 0.0600 110,000.00 6,600.00
JUMLAH TENAGA KERJA 66,600.00
B BAHAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
TENAGA
Laden Tukang kayu L.01 OH 1.8000 90,000.00 162,000.00
Tukang kayu L.02 OH 0.0400 100,000.00 4,000.00
Kepala tukang L.03 OH 0.0040 110,000.00 440.00
Mandor L.04 OH 0.0450 115,000.00 5,175.00
JUMLAH TENAGA KERJA 171,615.00
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 5.0000 90,000.00 450,000.00
Tukang kayu L.02 OH 15.0000 100,000.00 1,500,000.00
Kepala tukang L.03 OH 1.5000 110,000.00 165,000.00
Mandor L.04 OH 0.2500 115,000.00 28,750.00
JUMLAH TENAGA KERJA 2,143,750.00
B BAHAN
Paku Ulin Kg 5.00 24,000.00 120,000.00
Kayu Ulin m³ 1.10 7,500,000.00 8,250,000.00
JUMLAH HARGA BAHAN 8,370,000.00
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 5.0000 90,000.00 450,000.00
Tukang kayu L.02 OH 15.0000 100,000.00 1,500,000.00
Kepala tukang L.03 OH 1.5000 110,000.00 165,000.00
Mandor L.04 OH 0.2500 115,000.00 28,750.00
JUMLAH TENAGA KERJA 2,143,750.00
B BAHAN
Paku Kayu Kg 5.00 15,000.00 75,000.00
Kayu Kelas II m³ 1.10 3,750,000.00 4,125,000.00
JUMLAH HARGA BAHAN 4,200,000.00
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 8.0000 90,000.00 720,000.00
Tukang kayu L.02 OH 24.0000 100,000.00 2,400,000.00
Kepala tukang L.03 OH 2.4000 110,000.00 264,000.00
Mandor L.04 OH 0.4000 115,000.00 46,000.00
JUMLAH TENAGA KERJA 3,430,000.00
B BAHAN
Kayu Ulin m³ 1.20 7,500,000.00 9,000,000.00
JUMLAH HARGA BAHAN 9,000,000.00
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.2000 90,000.00 18,000.00
Tukang kayu L.02 OH 0.5000 100,000.00 50,000.00
Kepala tukang L.03 OH 0.0500 110,000.00 5,500.00
Mandor L.04 OH 0.0100 115,000.00 1,150.00
JUMLAH TENAGA KERJA x 75% 55,987.50
B BAHAN
Paku Ulin Kg 0.2000 24,000.00 4,800.00
Papan Ulin m³ 0.0250 7,500,000.00 187,500.00
JUMLAH HARGA BAHAN 192,300.00
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.2000 90,000.00 18,000.00
Tukang kayu L.02 OH 0.5000 100,000.00 50,000.00
Kepala tukang L.03 OH 0.0500 110,000.00 5,500.00
Mandor L.04 OH 0.0100 115,000.00 1,150.00
JUMLAH TENAGA KERJA x 75% 55,987.50
B BAHAN
Paku Kayu Kg 0.2000 15,000.00 3,000.00
Papan Kelas II m³ 0.0300 2,500,000.00 75,000.00
JUMLAH HARGA BAHAN 78,000.00
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 8.0000 90,000.00 720,000.00
Tukang kayu L.02 OH 24.0000 100,000.00 2,400,000.00
Kepala tukang L.03 OH 2.4000 110,000.00 264,000.00
Mandor L.04 OH 0.4000 115,000.00 46,000.00
JUMLAH TENAGA KERJA x 75% 2,572,500.00
B BAHAN
Paku Ulin Kg 6.00 24,000.00 144,000.00
Kayu Ulin m³ 1.25 7,500,000.00 9,375,000.00
JUMLAH HARGA BAHAN 9,519,000.00
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 8.0000 90,000.00 720,000.00
Tukang kayu L.02 OH 24.0000 100,000.00 2,400,000.00
Kepala tukang L.03 OH 2.4000 110,000.00 264,000.00
Mandor L.04 OH 0.4000 115,000.00 46,000.00
JUMLAH TENAGA KERJA x 75% 2,572,500.00
B BAHAN
Paku Kayu Kg 3.00 15,000.00 45,000.00
Kayu Kelas II m³ 1.25 3,750,000.00 4,687,500.00
JUMLAH HARGA BAHAN 4,732,500.00
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.6000 90,000.00 54,000.00
Tukang kayu L.02 OH 1.8000 100,000.00 180,000.00
Kepala tukang L.03 OH 0.1800 110,000.00 19,800.00
Mandor L.04 OH 0.0300 115,000.00 3,450.00
JUMLAH TENAGA KERJA x 75% 192,937.50
B BAHAN
Paku Ulin Kg 0.2000 24,000.00 4,800.00
Papan Ulin m³ 0.0300 7,500,000.00 225,000.00
JUMLAH HARGA BAHAN 229,800.00
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.6000 90,000.00 54,000.00
Tukang kayu L.02 OH 1.8000 100,000.00 180,000.00
Kepala tukang L.03 OH 0.1800 110,000.00 19,800.00
Mandor L.04 OH 0.0300 115,000.00 3,450.00
JUMLAH TENAGA KERJA x 75% 192,937.50
B BAHAN
Paku Kayu Kg 0.2000 15,000.00 3,000.00
Papan Kelas II m³ 0.0300 2,500,000.00 75,000.00
JUMLAH HARGA BAHAN 78,000.00
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.6000 90,000.00 54,000.00
Tukang kayu L.02 OH 1.8000 100,000.00 180,000.00
Kepala tukang L.03 OH 0.1800 110,000.00 19,800.00
Mandor L.04 OH 0.0300 115,000.00 3,450.00
JUMLAH TENAGA KERJA x 75% 192,937.50
B BAHAN
Paku Ulin Kg 0.2000 24,000.00 4,800.00
Papan Ulin m³ 0.0350 7,500,000.00 262,500.00
JUMLAH HARGA BAHAN 267,300.00
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.6000 90,000.00 54,000.00
Tukang kayu L.02 OH 1.8000 100,000.00 180,000.00
Kepala tukang L.03 OH 0.1800 110,000.00 19,800.00
Mandor L.04 OH 0.0300 115,000.00 3,450.00
JUMLAH TENAGA KERJA x 75% 192,937.50
B BAHAN
Paku Kayu Kg 0.2000 15,000.00 3,000.00
Papan Kelas II m³ 0.0350 2,500,000.00 87,500.00
JUMLAH HARGA BAHAN 90,500.00
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.0200 90,000.00 1,800.00
Mandor L.04 OH 0.0100 115,000.00 1,150.00
JUMLAH TENAGA KERJA 2,950.00
B BAHAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.0500 90,000.00 4,500.00
Mandor L.04 OH 0.0030 115,000.00 345.00
JUMLAH TENAGA KERJA 4,845.00
B BAHAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.0200 90,000.00 1,800.00
Mandor L.04 OH 0.0100 115,000.00 1,150.00
JUMLAH TENAGA KERJA 2,950.00
B BAHAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.0200 90,000.00 1,800.00
Tukang kayu L.02 OH 0.0100 100,000.00 1,000.00
Kepala tukang L.03 OH 0.0200 110,000.00 2,200.00
Mandor L.04 OH 0.0100 115,000.00 1,150.00
JUMLAH TENAGA KERJA 6,150.00
B BAHAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.2000 90,000.00 18,000.00
Tukang kayu L.02 OH 0.0600 100,000.00 6,000.00
Kepala tukang L.03 OH 0.0060 110,000.00 660.00
Mandor L.04 OH 0.0100 115,000.00 1,150.00
JUMLAH TENAGA KERJA 25,810.00
B BAHAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 4.0000 90,000.00 360,000.00
Tukang kayu L.02 OH 6.0000 100,000.00 600,000.00
Kepala tukang L.03 OH 0.6000 110,000.00 66,000.00
Mandor L.04 OH 0.2000 115,000.00 23,000.00
JUMLAH TENAGA KERJA 1,049,000.00
B BAHAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.1500 90,000.00 13,500.00
Tukang Batu L.02 OH 0.1500 100,000.00 15,000.00
Kepala tukang L.03 OH 0.1500 110,000.00 16,500.00
Mandor L.04 OH 0.0150 115,000.00 1,725.00
JUMLAH TENAGA KERJA 46,725.00
B BAHAN
Paving Stone bh 32.0000 3,000.00 96,000.00
JUMLAH HARGA BAHAN 96,000
C PERALATAN
A TENAGA
Pekerja L.01 OH 0.081 90,000.00
Tukang pipa L.02 OH 0.041 100,000.00
Mandor L.04 OH 0.008 115,000.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa PVC Ø 63 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel &
hari 0.006
handle crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)
Catatan:
Koefisien peralatan yang digunakan pada A.8.4.1 ini adalah seperti yang tercantum pada tabel. Apabila ada
tambahan peralatan yang digunakan, harus disesuaikan dengan spesifikasi dan gambar kerja.
A TENAGA
Pekerja L.01 OH 0.094 90,000.00
Tukang pipa L.02 OH 0.047 100,000.00
Mandor L.04 OH 0.009 115,000.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa PVC Ø 90 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel &
hari 0.008
handle crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.105 90,000.00
Tukang pipa L.02 OH 0.053 100,000.00
Mandor L.04 OH 0.011 115,000.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa PVC Ø 110 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel &
hari 0.010
handle crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.118 90,000.00
Tukang pipa L.02 OH 0.059 100,000.00
Mandor L.04 OH 0.012 115,000.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa PVC Ø 150 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel &
hari 0.012
handle crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.189 90,000.00
Tukang pipa L.02 OH 0.095 100,000.00
Mandor L.04 OH 0.019 115,000.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa PVC Ø 200 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel &
hari 0.024
handle crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.256 90,000.00
Tukang pipa L.02 OH 0.128 100,000.00
Mandor L.04 OH 0.026 115,000.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa PVC Ø 250 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel &
hari 0.034
handle crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)
A.8.4.1.7 Pemasangan 1 m pipa PVC Ø 300 mm
A TENAGA
Pekerja L.01 OH 0.294 90,000.00
Tukang pipa L.02 OH 0.147 100,000.00
Mandor L.04 OH 0.029 115,000.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa PVC Ø 300 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel &
hari 0.040
handle crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.544 90,000.00
Tukang pipa L.02 OH 0.272 100,000.00
Mandor L.04 OH 0.054 115,000.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa PVC Ø 400 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel &
hari 0.080
handle crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.669 90,000.00
Tukang pipa L.02 OH 0.335 100,000.00
Mandor L.04 OH 0.067 115,000.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa PVC Ø 450 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel &
hari 0.100
handle crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.809 90,000.00
Tukang pipa L.02 OH 0.405 100,000.00
Mandor L.04 OH 0.081 115,000.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa PVC Ø 500 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel &
hari 0.122
handle crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 1.618 90,000.00
Tukang pipa L.02 OH 0.809 100,000.00
Mandor L.04 OH 0.162 115,000.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa PVC Ø 800 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel &
hari 0.250
handle crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 1.691 90,000.00
Tukang pipa L.02 OH 0.846 100,000.00
Mandor L.04 OH 0.169 115,000.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa PVC Ø 900 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel &
hari 0.262
handle crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 1.895 90,000.00
Tukang pipa L.02 OH 0.948 100,000.00
Mandor L.04 OH 0.190 115,000.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa PVC Ø 1000 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel &
hari 0.294
handle crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 2.099 90,000.00
Tukang pipa L.02 OH 1.050 100,000.00
Mandor L.04 OH 0.210 115,000.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa PVC Ø 1100 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel &
hari 0.327
handle crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 2.303 90,000.00
Tukang pipa L.02 OH 1.152 100,000.00
Mandor L.04 OH 0.230 115,000.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa PVC Ø 1200 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel &
hari 0.359
handle crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.035 90,000.00
Tukang pipa L.02 OH 0.017 100,000.00
Mandor L.04 OH 0.003 115,000.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa HDPE Ø 63 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel &
hari 0.019
handle crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.040 90,000.00
Tukang pipa L.02 OH 0.020 100,000.00
Mandor L.04 OH 0.004 115,000.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa HDPE Ø 100 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel &
hari 0.019
handle crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.045 90,000.00
Tukang pipa L.02 OH 0.023 100,000.00
Mandor L.04 OH 0.005 115,000.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa HDPE Ø 125 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel &
hari 0.019
handle crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.062 90,000.00
Tukang pipa L.02 OH 0.031 100,000.00
Mandor L.04 OH 0.006 115,000.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa HDPE Ø 150 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel &
hari 0.019
handle crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.102 90,000.00
Tukang pipa L.02 OH 0.051 100,000.00
Mandor L.04 OH 0.010 115,000.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa HDPE Ø 200 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel &
hari 0.019
handle crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.133 90,000.00
Tukang pipa L.02 OH 0.067 100,000.00
Mandor L.04 OH 0.013 115,000.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa HDPE Ø 250 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel &
hari 0.042
handle crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.170 90,000.00
Tukang pipa L.02 OH 0.085 100,000.00
Mandor L.04 OH 0.017 115,000.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa HDPE Ø 300 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel &
hari 0.065
handle crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.290 90,000.00
Tukang pipa L.02 OH 0.145 100,000.00
Mandor L.04 OH 0.029 115,000.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa HDPE Ø 400 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel &
hari 0.152
handle crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.359 90,000.00
Tukang pipa L.02 OH 0.180 100,000.00
Mandor L.04 OH 0.036 115,000.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa HDPE Ø 450 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel &
hari 0.200
handle crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.433 90,000.00
Tukang pipa L.02 OH 0.216 100,000.00
Mandor L.04 OH 0.043 115,000.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa HDPE Ø 500 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel &
hari 0.251
handle crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.512 90,000.00
Tukang pipa L.02 OH 0.256 100,000.00
Mandor L.04 OH 0.051 115,000.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa HDPE Ø 500 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel &
hari 0.307
handle crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.893 90,000.00
Tukang pipa L.02 OH 0.446 100,000.00
Mandor L.04 OH 0.089 115,000.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa HDPE Ø 800 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel &
hari 0.573
handle crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 1.353 90,000.00
Tukang pipa L.02 OH 0.677 100,000.00
Mandor L.04 OH 0.135 115,000.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa HDPE Ø 900 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel &
hari 0.883
handle crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)
A.8.4.1.30 Pemasangan 1 m pipa HDPE Ø 1000 mm
A TENAGA
Pekerja L.01 OH 1.659 90,000.00
Tukang pipa L.02 OH 0.830 100,000.00
Mandor L.04 OH 0.166 115,000.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa HDPE Ø 1000 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel &
hari 1.093
handle crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 1.818 90,000.00
Tukang pipa L.02 OH 0.909 100,000.00
Mandor L.04 OH 0.182 115,000.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa HDPE Ø 1100 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel &
hari 1.205
handle crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 2.370 90,000.00
Tukang pipa L.02 OH 1.185 100,000.00
Mandor L.04 OH 0.237 115,000.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa HDPE Ø 1200 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel &
hari 1.584
handle crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.345 90,000.00
Tukang pipa L.02 OH 0.172 100,000.00
Mandor L.04 OH 0.034 115,000.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa GIP Ø 63 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel &
hari -
handle crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.448 90,000.00
Tukang pipa L.02 OH 0.224 100,000.00
Mandor L.04 OH 0.045 115,000.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa GIP Ø 125 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel &
hari -
handle crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.506 90,000.00
Tukang pipa L.02 OH 0.253 100,000.00
Mandor L.04 OH 0.051 115,000.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa GIP Ø 150 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel &
hari -
handle crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.796 90,000.00
Tukang pipa L.02 OH 0.398 100,000.00
Mandor L.04 OH 0.080 115,000.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa GIP Ø 200 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel &
hari -
handle crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.949 90,000.00
Tukang pipa L.02 OH 0.475 100,000.00
Mandor L.04 OH 0.095 115,000.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa GIP Ø 250 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel &
hari -
handle crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.958 90,000.00
Tukang pipa L.02 OH 0.479 100,000.00
Mandor L.04 OH 0.096 115,000.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa GIP Ø 300 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel &
hari -
handle crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 1.212 90,000.00
Tukang pipa L.02 OH 0.606 100,000.00
Mandor L.04 OH 0.121 115,000.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa GIP Ø 400 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel &
hari -
handle crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 1.353 90,000.00
Tukang pipa L.02 OH 0.676 100,000.00
Mandor L.04 OH 0.135 115,000.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa GIP Ø 450 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel &
hari -
handle crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 1.469 90,000.00
Tukang pipa L.02 OH 0.735 100,000.00
Mandor L.04 OH 0.147 115,000.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa GIP Ø 500 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel &
hari -
handle crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 1.327 90,000.00
Tukang pipa L.02 OH 0.664 100,000.00
Mandor L.04 OH 0.133 115,000.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa GIP Ø 600 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel &
hari -
handle crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 2.327 90,000.00
Tukang pipa L.02 OH 1.163 100,000.00
Mandor L.04 OH 0.233 115,000.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa GIP Ø 800 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel &
hari -
handle crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 2.623 90,000.00
Tukang pipa L.02 OH 1.312 100,000.00
Mandor L.04 OH 0.262 115,000.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa GIP Ø 900 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel &
hari -
handle crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 2.911 90,000.00
Tukang pipa L.02 OH 1.456 100,000.00
Mandor L.04 OH 0.291 115,000.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa GIP Ø 1000 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel &
hari -
handle crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 3.200 90,000.00
Tukang pipa L.02 OH 1.600 100,000.00
Mandor L.04 OH 0.320 115,000.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa GIP Ø 1100 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel &
hari -
handle crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 3.488 90,000.00
Tukang pipa L.02 OH 1.744 100,000.00
Mandor L.04 OH 0.349 115,000.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa GIP Ø 1200 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel &
hari -
handle crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.489 90,000.00
Tukang pipa L.02 OH 0.098 100,000.00
Mandor L.04 OH 0.049 115,000.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa DCI Ø 100 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel &
hari 0.380
handle crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.547 90,000.00
Tukang pipa L.02 OH 0.109 100,000.00
Mandor L.04 OH 0.055 115,000.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa DCI Ø 125 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel &
hari 0.380
handle crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.613 90,000.00
Tukang pipa L.02 OH 0.123 100,000.00
Mandor L.04 OH 0.061 115,000.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa DCI Ø 150 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel &
hari 0.380
handle crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.855 90,000.00
Tukang pipa L.02 OH 0.171 100,000.00
Mandor L.04 OH 0.085 115,000.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa DCI Ø 200 mm M 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel &
hari 0.380
handle crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)
A.8.4.1.53 Pemasangan 1 m pipa DCI Ø 250 mm
A TENAGA
Pekerja L.01 OH 0.951 90,000.00
Tukang pipa L.02 OH 0.190 100,000.00
Mandor L.04 OH 0.095 115,000.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa DCI Ø 250 mm M 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel &
hari 0.050
handle crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.973 90,000.00
Tukang pipa L.02 OH 0.195 100,000.00
Mandor L.04 OH 0.097 115,000.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa DCI Ø 300 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel &
hari 0.071
handle crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 1.545 90,000.00
Tukang pipa L.02 OH 0.309 100,000.00
Operator alat berat L.08 OH 0.093 192,500.00
Mandor L.04 OH 0.154 115,000.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa DCI Ø 400 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa excavator type
hari 0.023
225 kap 0,5 -1,0 m3
Sewa Tripot/Tackel &
hari 0.031
handle crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 1.813 90,000.00
Tukang pipa L.02 OH 0.363 100,000.00
Operator alat berat L.08 OH 0.143 192,500.00
Mandor L.04 OH 0.181 115,000.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa DCI Ø 450 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa excavator type
hari 0.029
225 kap 0,5 -1,0 m3
Sewa Tripot/Tackel &
hari 0.039
handle crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)
A.8.4.1.57 Pemasangan 1 m pipa DCI Ø 500 mm
A TENAGA
Pekerja L.01 OH 2.047 90,000.00
Tukang pipa L.02 OH 0.409 100,000.00
Operator alat berat L.08 OH 0.193 192,500.00
Mandor L.04 OH 0.205 115,000.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa DCI Ø 500 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa excavator type
hari 0.034
225 kap 0,5 -1,0 m3
Sewa Tripot/Tackel &
hari 0.045
handle crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 2.011 90,000.00
Tukang pipa L.02 OH 0.402 100,000.00
Operator alat berat L.08 OH 0.293 192,500.00
Mandor L.04 OH 0.201 115,000.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa DCI Ø 600 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa excavator type
hari 0.058
225 kap 0,5 -1,0 m3
Sewa Tripot/Tackel &
hari 0.077
handle crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 3.859 90,000.00
Tukang pipa L.02 OH 0.772 100,000.00
Operator alat berat L.08 OH 0.493 192,500.00
Mandor L.04 OH 0.386 115,000.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa DCI Ø 800 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa excavator type
hari 0.084
225 kap 0,5 -1,0 m3
Sewa Tripot/Tackel &
hari 0.225
handle crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 4.995 90,000.00
Tukang pipa L.02 OH 0.999 100,000.00
Operator alat berat L.08 OH 0.593 192,500.00
Mandor L.04 OH 0.499 115,000.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa DCI Ø 900 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa excavator type
hari 0.093
225 kap 0,5 -1,0 m3
Sewa Tripot/Tackel &
hari 0.248
handle crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 5.931 90,000.00
Tukang pipa L.02 OH 1.186 100,000.00
Operator alat berat L.08 OH 0.793 192,500.00
Mandor L.04 OH 0.693 115,000.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa DCI Ø 1000 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa excavator type
hari 0.112
225 kap 0,5 -1,0 m3
Sewa Tripot/Tackel &
hari 0.298
handle crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 6.949 90,000.00
Tukang pipa L.02 OH 1.390 100,000.00
Operator alat berat L.08 OH 0.793 192,500.00
Mandor L.04 OH 0.695 115,000.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa DCI Ø 1100 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa excavator type
hari 0.152
225 kap 0,5 -1,0 m3
Sewa Tripot/Tackel &
hari 0.304
handle crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 8.056 90,000.00
Tukang pipa L.02 OH 1.611 100,000.00
Operator alat berat L.08 OH 0.893 192,500.00
Mandor L.04 OH 0.806 115,000.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa DCI Ø 1200 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa excavator type
hari 0.180
225 kap 0,5 -1,0 m3
Sewa Tripot/Tackel &
hari 0.360
handle crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.499 90,000.00
Tukang pipa L.02 OH 0.100 100,000.00
Mandor L.04 OH 0.050 115,000.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa Baja Ø 63 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel &
hari 0.004
handle crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.579 90,000.00
Tukang pipa L.02 OH 0.116 100,000.00
Mandor L.04 OH 0.058 115,000.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa Baja Ø 100 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel &
hari 0.004
handle crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.648 90,000.00
Tukang pipa L.02 OH 0.130 100,000.00
Mandor L.04 OH 0.065 115,000.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa Baja Ø 125 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel &
hari 0.004
handle crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.708 90,000.00
Tukang pipa L.02 OH 0.142 100,000.00
Mandor L.04 OH 0.071 115,000.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa Baja Ø 150 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel &
hari 0.004
handle crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 1.113 90,000.00
Tukang pipa L.02 OH 0.223 100,000.00
Mandor L.04 OH 0.111 115,000.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa Baja Ø 200 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel &
hari 0.004
handle crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)
A.8.4.1.69 Pemasangan pipa baja Ø 250 mm
A TENAGA
Pekerja L.01 OH 1.325 90,000.00
Tukang pipa L.02 OH 0.265 100,000.00
Mandor L.04 OH 0.133 115,000.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa Baja Ø 250 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel &
hari 0.004
handle crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 1.415 90,000.00
Tukang pipa L.02 OH 0.283 100,000.00
Mandor L.04 OH 0.141 115,000.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa Baja Ø 300 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel &
hari 0.004
handle crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 2.366 90,000.00
Tukang pipa L.02 OH 0.473 100,000.00
Mandor L.04 OH 0.237 115,000.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa Baja Ø 400 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa excavator type
hari 0.027
225 kap 0,5 -1,0 m3
Sewa Tripot/Tackel &
hari 0.039
handle crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 2.231 90,000.00
Tukang pipa L.02 OH 0.446 100,000.00
Mandor L.04 OH 0.223 115,000.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa Baja Ø 450 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa excavator type
hari 0.026
225 kap 0,5 -1,0 m3
Sewa Tripot/Tackel &
hari 0.037
handle crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 2.432 90,000.00
Tukang pipa L.02 OH 0.486 100,000.00
Mandor L.04 OH 0.243 115,000.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa Baja Ø 500 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa excavator type
hari 0.029
225 kap 0,5 -1,0 m3
Sewa Tripot/Tackel &
hari 0.045
handle crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 2.208 90,000.00
Tukang pipa L.02 OH 0.442 100,000.00
Mandor L.04 OH 0.221 115,000.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa Baja Ø 600 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa excavator type
hari 0.027
225 kap 0,5 -1,0 m3
Sewa Tripot/Tackel &
hari 0.039
handle crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 3.897 90,000.00
Tukang pipa L.02 OH 0.779 100,000.00
Mandor L.04 OH 0.390 115,000.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa Baja Ø 800 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa excavator type
hari 0.046
225 kap 0,5 -1,0 m3
Sewa Tripot/Tackel &
hari 0.098
handle crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 4.403 90,000.00
Tukang pipa L.02 OH 0.081 100,000.00
Mandor L.04 OH 0.440 115,000.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa Baja Ø 900 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa excavator type
hari 0.052
225 kap 0,5 -1,0 m3
Sewa Tripot/Tackel &
hari 0.115
handle crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 4.895 90,000.00
Tukang pipa L.02 OH 0.979 100,000.00
Mandor L.04 OH 0.489 115,000.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa Baja Ø 1000 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa excavator type
hari 0.058
225 kap 0,5 -1,0 m3
Sewa Tripot/Tackel &
hari 0.133
handle crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 5.387 90,000.00
Tukang pipa L.02 OH 1.077 100,000.00
Mandor L.04 OH 0.539 115,000.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa Baja Ø 1100 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa excavator type
hari 0.064
225 kap 0,5 -1,0 m3
Sewa Tripot/Tackel &
hari 0.150
handle crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 5.897 90,000.00
Tukang pipa L.02 OH 1.176 100,000.00
Mandor L.04 OH 0.588 115,000.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa Baja Ø 1200 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa excavator type
hari 0.070
225 kap 0,5 -1,0 m3
Sewa Tripot/Tackel &
hari 0.167
handle crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)
Jumlah Harga (Rp.)
7,290.00
4,100.00
920.00
0.00 0.75
0.00
0.00
6.30
0.00
0.00
0.00
0.00
0.00
8,460.00
4,700.00
1,035.00
0.00
0.00
0.00
0.00
9,450.00
5,300.00
1,265.00
0.00
0.00
0.00
0.00
10,620.00
5,900.00
1,380.00
0.00
0.00
0.00
0.00
17,010.00
9,500.00
2,185.00
0.00
0.00
0.00
0.00
23,040.00
12,800.00
2,990.00
0.00
0.00
0.00
0.00
Jumlah Harga (Rp.)
26,460.00
14,700.00
3,335.00
0.00
0.00
0.00
0.00
48,960.00
27,200.00
6,210.00
0.00
0.00
0.00
0.00
60,210.00
33,500.00
7,705.00
0.00
0.00
0.00
0.00
72,810.00
40,500.00
9,315.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
145,620.00
80,900.00
18,630.00
0.00
0.00
0.00
0.00
152,190.00
84,600.00
19,435.00
0.00
0.00
0.00
0.00
170,550.00
94,800.00
21,850.00
0.00
0.00
0.00
0.00
188,910.00
105,000.00
24,150.00
0.00
0.00
0.00
0.00
207,270.00
115,200.00
26,450.00
0.00
0.00
0.00
0.00
3,150.00
1,700.00
345.00
0.00
0.00
0.00
0.00
3,600.00
2,000.00
460.00
0.00
0.00
0.00
4,050.00
2,300.00
575.00
0.00
0.00
0.00
5,580.00
3,100.00
690.00
0.00
0.00
0.00
9,180.00
5,100.00
1,150.00
0.00
0.00
0.00
11,970.00
6,700.00
1,495.00
0.00
0.00
0.00
15,300.00
8,500.00
1,955.00
0.00
0.00
0.00
26,100.00
14,500.00
3,335.00
0.00
0.00
0.00
32,310.00
18,000.00
4,140.00
0.00
0.00
0.00
38,970.00
21,600.00
4,945.00
0.00
0.00
0.00
46,080.00
25,600.00
5,865.00
0.00
0.00
0.00
80,370.00
44,600.00
10,235.00
0.00
0.00
0.00
121,770.00
67,700.00
15,525.00
0.00
0.00
0.00
Jumlah Harga (Rp.)
149,310.00
83,000.00
19,090.00
0.00
0.00
0.00
163,620.00
90,900.00
20,930.00
0.00
0.00
0.00
213,300.00
118,500.00
27,255.00
0.00
0.00
0.00
31,050.00
17,200.00
3,910.00
0.00
0.00
0.00
0.00
0.00
0.00
40,320.00
22,400.00
5,175.00
0.00
0.00
0.00
45,540.00
25,300.00
5,865.00
0.00
0.00
0.00
71,640.00
39,800.00
9,200.00
0.00
0.00
0.00
85,410.00
47,500.00
10,925.00
0.00
0.00
0.00
86,220.00
47,900.00
11,040.00
0.00
0.00
0.00
109,080.00
60,600.00
13,915.00
0.00
0.00
0.00
121,770.00
67,600.00
15,525.00
0.00
0.00
0.00
132,210.00
73,500.00
16,905.00
0.00
0.00
0.00
119,430.00
66,400.00
15,295.00
0.00
0.00
0.00
209,430.00
116,300.00
26,795.00
0.00
0.00
0.00
236,070.00
131,200.00
30,130.00
0.00
0.00
0.00
261,990.00
145,600.00
33,465.00
0.00
0.00
0.00
288,000.00
160,000.00
36,800.00
0.00
0.00
0.00
313,920.00
174,400.00
40,135.00
0.00
0.00
0.00
44,010.00
9,800.00
5,635.00
0.00
0.00
0.00
49,230.00
10,900.00
6,325.00
0.00
0.00
0.00
55,170.00
12,300.00
7,015.00
0.00
0.00
0.00
76,950.00
17,100.00
9,775.00
0.00
0.00
0.00
Jumlah Harga (Rp.)
85,590.00
19,000.00
10,925.00
0.00
0.00
0.00
87,570.00
19,500.00
11,155.00
0.00
0.00
0.00
139,050.00
30,900.00
17,902.50
17,710.00
0.00
0.00
0.00
163,170.00
36,300.00
27,527.50
20,815.00
0.00
0.00
0.00
Jumlah Harga (Rp.)
184,230.00
40,900.00
37,152.50
23,575.00
0.00
0.00
0.00
180,990.00
40,200.00
56,402.50
23,115.00
0.00
0.00
0.00
347,310.00
77,200.00
94,902.50
44,390.00
0.00
0.00
0.00
449,550.00
99,900.00
114,152.50
57,385.00
0.00
0.00
0.00
533,790.00
118,600.00
152,652.50
79,695.00
0.00
0.00
0.00
625,410.00
139,000.00
152,652.50
79,925.00
0.00
0.00
0.00
725,040.00
161,100.00
171,902.50
92,690.00
0.00
0.00
0.00
44,910.00
10,000.00
5,750.00
0.00
0.00
0.00
52,110.00
11,600.00
6,670.00
0.00
0.00
0.00
58,320.00
13,000.00
7,475.00
0.00
0.00
0.00
63,720.00
14,200.00
8,165.00
0.00
0.00
0.00
100,170.00
22,300.00
12,765.00
0.00
0.00
0.00
Jumlah Harga (Rp.)
119,250.00
26,500.00
15,295.00
0.00
0.00
0.00
127,350.00
28,300.00
16,215.00
0.00
0.00
0.00
212,940.00
47,300.00
27,255.00
0.00
0.00
0.00
200,790.00
44,600.00
25,645.00
0.00
0.00
0.00
218,880.00
48,600.00
27,945.00
0.00
0.00
0.00
198,720.00
44,200.00
25,415.00
0.00
0.00
0.00
350,730.00
77,900.00
44,850.00
0.00
0.00
0.00
396,270.00
8,100.00
50,600.00
0.00
0.00
0.00
440,550.00
97,900.00
56,235.00
0.00
0.00
0.00
484,830.00
107,700.00
61,985.00
0.00
0.00
0.00
530,730.00
117,600.00
67,620.00
0.00
0.00
0.00
Tabel – 17 Lingkup pekerjaan berdasarkan Sub Level 2
Jumlah Harga +
LEVEL KODE URAIAN PEKERJAAN SATUAN Jumlah Harga (Rp.) Overhead & Profit
10 % (Rp.)
Divisi 2 A. 2.2.1 Pekerjaan persiapan
A TENAGA
Pekerja L.01 OH 0.005
Tukang pipa L.02 OH 0.002
Mandor L.04 OH 0.001
JUMLAH TENAGA KERJA
B BAHAN
Pipa PVC Ø 63 mm bh 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa
T1/manual (gergaji) hari 0.003
/saw
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.014
Tukang pipa L.02 OH 0.007
Mandor L.04 OH 0.001
JUMLAH TENAGA KERJA
B BAHAN
Pipa PVC Ø 90 mm bh 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa
T1/manual (gergaji) hari 0.003
/saw
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.022
Tukang pipa L.02 OH 0.011
Mandor L.04 OH 0.002
JUMLAH TENAGA KERJA
B BAHAN
Pipa PVC Ø 110 mm bh 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa
T1/manual (gergaji) hari 0.003
/saw
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.031
Tukang pipa L.02 OH 0.015
Mandor L.04 OH 0.003
JUMLAH TENAGA KERJA
B BAHAN
Pipa PVC Ø 150 mm bh 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa
T1/manual (gergaji) hari 0.003
/saw
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.081
Tukang pipa L.02 OH 0.040
Mandor L.04 OH 0.008
JUMLAH TENAGA KERJA
B BAHAN
Pipa PVC Ø 200 mm bh 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa
T1/manual (gergaji) hari 0.017
/saw
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.128
Tukang pipa L.02 OH 0.064
Mandor L.04 OH 0.013
JUMLAH TENAGA KERJA
B BAHAN
Pipa PVC Ø 250 mm bh 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa
T1/manual (gergaji) hari 0.030
/saw
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.155
Tukang pipa L.02 OH 0.077
Mandor L.04 OH 0.015
JUMLAH TENAGA KERJA
B BAHAN
Pipa PVC Ø 300 mm bh 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa
T1/manual (gergaji) hari 0.037
/saw
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.331
Tukang pipa L.02 OH 0.166
Mandor L.04 OH 0.033
JUMLAH TENAGA KERJA
B BAHAN
Pipa PVC Ø 400 mm bh 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa
T1/manual (gergaji) hari 0.086
/saw
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.420
Tukang pipa L.02 OH 0.210
Mandor L.04 OH 0.042
JUMLAH TENAGA KERJA
B BAHAN
Pipa PVC Ø 450 mm bh 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa
T2/mekanik / cilinder hari 0.054
saw
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.518
Tukang pipa L.02 OH 0.259
Mandor L.04 OH 0.052
JUMLAH TENAGA KERJA
B BAHAN
Pipa PVC Ø 500 mm bh 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa
T2/mekanik / cilinder hari 0.069
saw
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.623
Tukang pipa L.02 OH 0.311
Mandor L.04 OH 0.062
JUMLAH TENAGA KERJA
B BAHAN
Pipa PVC Ø 600 mm bh 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa
T2/mekanik / cilinder hari 0.086
saw
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 1.089
Tukang pipa L.02 OH 0.545
Mandor L.04 OH 0.109
JUMLAH TENAGA KERJA
B BAHAN
Pipa PVC Ø 800 mm bh 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa
T2/mekanik / cilinder hari 0.160
saw
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 1.141
Tukang pipa L.02 OH 0.571
Mandor L.04 OH 0.114
JUMLAH TENAGA KERJA
B BAHAN
Pipa PVC Ø 900 mm bh 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa
T2/mekanik / cilinder hari 0.168
saw
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 1.285
Tukang pipa L.02 OH 0.643
Mandor L.04 OH 0.129
JUMLAH TENAGA KERJA
B BAHAN
Pipa PVC Ø 1000 mm bh 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa
T2/mekanik / cilinder hari 0.191
saw
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 1.429
Tukang pipa L.02 OH 0.715
Mandor L.04 OH 0.143
JUMLAH TENAGA KERJA
B BAHAN
Pipa PVC Ø 1100 mm bh 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa
T2/mekanik / cilinder hari 0.213
saw
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 1.573
Tukang pipa L.02 OH 0.787
Mandor L.04 OH 0.157
JUMLAH TENAGA KERJA
B BAHAN
Pipa PVC Ø 1200 mm bh 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa
T2/mekanik / cilinder hari 0.236
saw
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.002
Tukang pipa L.02 OH 0.001
Mandor L.04 OH 0.000
Operator L.08 OH 0.034
JUMLAH TENAGA KERJA
B BAHAN
Pipa HDPE Ø 63 mm bh 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa
T2/mekanik / cilinder hari 0.004
saw
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.006
Tukang pipa L.02 OH 0.003
Mandor L.04 OH 0.001
Operator L.08 OH 0.071
JUMLAH TENAGA KERJA
B BAHAN
Pipa HDPE Ø 100 mm bh 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa
T2/mekanik / cilinder hari 0.005
saw
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.009
Tukang pipa L.02 OH 0.005
Mandor L.04 OH 0.001
Operator L.08 OH 0.096
JUMLAH TENAGA KERJA
B BAHAN
Pipa HDPE Ø 125 mm bh 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa
T2/mekanik / cilinder hari 0.006
saw
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.016
Tukang pipa L.02 OH 0.008
Mandor L.04 OH 0.002
Operator L.08 OH 0.121
JUMLAH TENAGA KERJA
B BAHAN
Pipa HDPE Ø 150 mm bh 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa
T2/mekanik / cilinder hari 0.009
saw
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.044
Tukang pipa L.02 OH 0.022
Mandor L.04 OH 0.004
Operator L.08 OH 0.171
JUMLAH TENAGA KERJA
B BAHAN
Pipa HDPE Ø 200 mm bh 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa
T2/mekanik / cilinder hari 0.017
saw
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.067
Tukang pipa L.02 OH 0.033
Mandor L.04 OH 0.007
Operator L.08 OH 0.221
JUMLAH TENAGA KERJA
B BAHAN
Pipa HDPE Ø 250 mm bh 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa
T2/mekanik / cilinder hari 0.023
saw
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.090
Tukang pipa L.02 OH 0.045
Mandor L.04 OH 0.009
Operator L.08 OH 0.271
JUMLAH TENAGA KERJA
B BAHAN
Pipa HDPE Ø 300 mm bh 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa
T2/mekanik / cilinder hari 0.030
saw
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.177
Tukang pipa L.02 OH 0.088
Mandor L.04 OH 0.018
Operator L.08 OH 0.371
JUMLAH TENAGA KERJA
B BAHAN
Pipa HDPE Ø 400 mm bh 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa
T2/mekanik / cilinder hari 0.055
saw
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.225
Tukang pipa L.02 OH 0.113
Mandor L.04 OH 0.023
Operator L.08 OH 0.421
JUMLAH TENAGA KERJA
B BAHAN
Pipa HDPE Ø 450 mm bh 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa
T2/mekanik / cilinder hari 0.070
saw
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.277
Tukang pipa L.02 OH 0.139
Mandor L.04 OH 0.028
Operator L.08 OH 0.471
JUMLAH TENAGA KERJA
B BAHAN
Pipa HDPE Ø 500 mm bh 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa
T2/mekanik / cilinder hari 0.085
saw
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.333
Tukang pipa L.02 OH 0.167
Mandor L.04 OH 0.033
Operator L.08 OH 0.571
JUMLAH TENAGA KERJA
B BAHAN
Pipa HDPE Ø 600 mm bh 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa
T2/mekanik / cilinder hari 0.101
saw
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.601
Tukang pipa L.02 OH 0.301
Mandor L.04 OH 0.060
Operator L.08 OH 0.771
JUMLAH TENAGA KERJA
B BAHAN
Pipa HDPE Ø 800 mm bh 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa
T2/mekanik / cilinder hari 0.179
saw
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.913
Tukang pipa L.02 OH 0.456
Mandor L.04 OH 0.091
Operator L.08 OH 0.871
JUMLAH TENAGA KERJA
B BAHAN
Pipa HDPE Ø 900 mm bh 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa
T2/mekanik / cilinder hari 0.270
saw
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 1.125
Tukang pipa L.02 OH 0.562
Mandor L.04 OH 0.112
Operator L.08 OH 0.971
JUMLAH TENAGA KERJA
B BAHAN
Pipa HDPE Ø 1000 mm bh 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa
T2/mekanik / cilinder hari 0.332
saw
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 1.238
Tukang pipa L.02 OH 0.619
Mandor L.04 OH 0.124
Operator L.08 OH 1.071
JUMLAH TENAGA KERJA
B BAHAN
Pipa HDPE Ø 1100 mm bh 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa
T2/mekanik / cilinder hari 0.365
saw
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit 10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.019
Tukang pipa L.02 OH 0.010
Mandor L.04 OH 0.002
D Jumlah (A+B+C)
E Overhead & Profit 10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.058
Tukang pipa L.02 OH 0.029
Mandor L.04 OH 0.006
D Jumlah (A+B+C)
E Overhead & Profit 10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.092
Tukang pipa L.02 OH 0.046
Mandor L.04 OH 0.009
D Jumlah (A+B+C)
E Overhead & Profit 10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)
A.8.4.2.36 Pemotongan 1 buah pipa GIP Ø 150 mm
A TENAGA
Pekerja L.01 OH 0.131
Tukang pipa L.02 OH 0.066
Mandor L.04 OH 0.013
D Jumlah (A+B+C)
E Overhead & Profit 10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.340
Tukang pipa L.02 OH 0.170
Mandor L.04 OH 0.034
D Jumlah (A+B+C)
E Overhead & Profit 10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.475
Tukang pipa L.02 OH 0.237
Mandor L.04 OH 0.047
D Jumlah (A+B+C)
E Overhead & Profit 10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.504
Tukang pipa L.02 OH 0.252
Mandor L.04 OH 0.050
A TENAGA
Pekerja L.01 OH 0.738
Tukang pipa L.02 OH 0.369
Mandor L.04 OH 0.074
D Jumlah (A+B+C)
E Overhead & Profit 10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.848
Tukang pipa L.02 OH 0.424
Mandor L.04 OH 0.085
D Jumlah (A+B+C)
E Overhead & Profit 10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.941
Tukang pipa L.02 OH 0.471
Mandor L.04 OH 0.094
D Jumlah (A+B+C)
E Overhead & Profit 10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.864
Tukang pipa L.02 OH 0.432
Mandor L.04 OH 0.086
D Jumlah (A+B+C)
E Overhead & Profit 10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 1.567
Tukang pipa L.02 OH 0.783
Mandor L.04 OH 0.157
D Jumlah (A+B+C)
E Overhead & Profit 10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 1.770
Tukang pipa L.02 OH 0.885
Mandor L.04 OH 0.177
D Jumlah (A+B+C)
E Overhead & Profit 10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 1.974
Tukang pipa L.02 OH 0.987
Mandor L.04 OH 0.197
D Jumlah (A+B+C)
E Overhead & Profit 10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 2.178
Tukang pipa L.02 OH 1.089
Mandor L.04 OH 0.218
D Jumlah (A+B+C)
E Overhead & Profit 10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 2.382
Tukang pipa L.02 OH 1.191
Mandor L.04 OH 0.238
D Jumlah (A+B+C)
E Overhead & Profit 10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.071
Tukang pipa L.02 OH 0.014
Mandor L.04 OH 0.007
JUMLAH TENAGA KERJA
B BAHAN
Pipa DCI Ø 100 mm bh 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel &
hari 0.003
handle crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.112
Tukang pipa L.02 OH 0.022
Mandor L.04 OH 0.011
D Jumlah (A+B+C)
E Overhead & Profit 10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.159
Tukang pipa L.02 OH 0.032
Mandor L.04 OH 0.016
JUMLAH TENAGA KERJA
B BAHAN
Pipa DCI Ø 150 mm bh 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel &
hari 0.018
handle crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.366
Tukang pipa L.02 OH 0.073
Mandor L.04 OH 0.037
D Jumlah (A+B+C)
E Overhead & Profit 10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.476
Tukang pipa L.02 OH 0.095
Mandor L.04 OH 0.048
JUMLAH TENAGA KERJA
B BAHAN
Pipa DCI Ø 250 mm bh 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel &
hari 0.073
handle crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.512
Tukang pipa L.02 OH 0.102
Mandor L.04 OH 0.051
D Jumlah (A+B+C)
E Overhead & Profit 10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.941
Tukang pipa L.02 OH 0.188
Mandor L.04 OH 0.094
JUMLAH TENAGA KERJA
B BAHAN
Pipa DCI Ø 400 mm bh 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa
T2/mekanik / cilinder hari 0.158
saw
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 1.137
Tukang pipa L.02 OH 0.227
Mandor L.04 OH 0.114
D Jumlah (A+B+C)
E Overhead & Profit 10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 1.312
Tukang pipa L.02 OH 0.262
Mandor L.04 OH 0.131
D Jumlah (A+B+C)
E Overhead & Profit 10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 1.309
Tukang pipa L.02 OH 0.262
Mandor L.04 OH 0.131
D Jumlah (A+B+C)
E Overhead & Profit 10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit 10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 3.370
Tukang pipa L.02 OH 0.674
Mandor L.04 OH 0.337
D Jumlah (A+B+C)
E Overhead & Profit 10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 4.021
Tukang pipa L.02 OH 0.804
Mandor L.04 OH 0.402
D Jumlah (A+B+C)
E Overhead & Profit 10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 4.731
Tukang pipa L.02 OH 0.946
Mandor L.04 OH 0.473
D Jumlah (A+B+C)
E Overhead & Profit 10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)
A.8.4.2.63 Pemotongan 1 buah pipa DCI Ø 1200 mm
A TENAGA
Pekerja L.01 OH 5.502
Tukang pipa L.02 OH 1.100
Mandor L.04 OH 0.550
D Jumlah (A+B+C)
E Overhead & Profit 10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.028
Tukang pipa L.02 OH 0.006
Mandor L.04 OH 0.003
D Jumlah (A+B+C)
E Overhead & Profit 10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.085
Tukang pipa L.02 OH 0.017
Mandor L.04 OH 0.008
D Jumlah (A+B+C)
E Overhead & Profit 10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.133
Tukang pipa L.02 OH 0.027
Mandor L.04 OH 0.013
A TENAGA
Pekerja L.01 OH 0.184
Tukang pipa L.02 OH 0.037
Mandor L.04 OH 0.018
D Jumlah (A+B+C)
E Overhead & Profit 10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.476
Tukang pipa L.02 OH 0.095
Mandor L.04 OH 0.048
D Jumlah (A+B+C)
E Overhead & Profit 10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.663
Tukang pipa L.02 OH 0.133
Mandor L.04 OH 0.066
D Jumlah (A+B+C)
E Overhead & Profit 10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.745
Tukang pipa L.02 OH 0.149
Mandor L.04 OH 0.074
D Jumlah (A+B+C)
E Overhead & Profit 10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 1.440
Tukang pipa L.02 OH 0.288
Mandor L.04 OH 0.144
D Jumlah (A+B+C)
E Overhead & Profit 10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 1.399
Tukang pipa L.02 OH 0.280
Mandor L.04 OH 0.140
D Jumlah (A+B+C)
E Overhead & Profit 10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 1.558
Tukang pipa L.02 OH 0.312
Mandor L.04 OH 0.156
D Jumlah (A+B+C)
E Overhead & Profit 10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 1.437
Tukang pipa L.02 OH 0.287
Mandor L.04 OH 0.144
D Jumlah (A+B+C)
E Overhead & Profit 10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 2.624
Tukang pipa L.02 OH 0.525
Mandor L.04 OH 0.262
D Jumlah (A+B+C)
E Overhead & Profit 10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 2.971
Tukang pipa L.02 OH 0.594
Mandor L.04 OH 0.297
JUMLAH TENAGA KERJA
B BAHAN
Pipa Baja Ø 900 mm bh 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa
T2/mekanik / cilinder hari 0.183
saw
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 3.319
Tukang pipa L.02 OH 0.664
Mandor L.04 OH 0.332
D Jumlah (A+B+C)
E Overhead & Profit 10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 3.667
Tukang pipa L.02 OH 0.733
Mandor L.04 OH 0.367
D Jumlah (A+B+C)
E Overhead & Profit 10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 4.015
Tukang pipa L.02 OH 0.803
Mandor L.04 OH 0.402
D Jumlah (A+B+C)
E Overhead & Profit 10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)
Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 1.429
Tukang pipa L.02 OH 0.715
Mandor L.04 OH 0.143
D Jumlah (A+B+C)
E Overhead & Profit10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 1.714
Tukang pipa L.02 OH 0.857
Mandor L.04 OH 0.171
D Jumlah (A+B+C)
E Overhead & Profit10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 1.714
Tukang pipa L.02 OH 0.857
Mandor L.04 OH 0.171
D Jumlah (A+B+C)
E Overhead & Profit10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 2.000
Tukang pipa L.02 OH 1.000
Mandor L.04 OH 0.200
D Jumlah (A+B+C)
E Overhead & Profit10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 3.429
Tukang pipa L.02 OH 1.715
Mandor L.04 OH 0.343
D Jumlah (A+B+C)
E Overhead & Profit10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 3.429
Tukang pipa L.02 OH 1.715
Mandor L.04 OH 0.343
D Jumlah (A+B+C)
E Overhead & Profit10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 4.000
Tukang pipa L.02 OH 2.000
Mandor L.04 OH 0.400
D Jumlah (A+B+C)
E Overhead & Profit10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 1.421
Tukang pipa L.02 OH 0.711
Mandor L.04 OH 0.142
D Jumlah (A+B+C)
E Overhead & Profit10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 1.429
Tukang pipa L.02 OH 0.715
Mandor L.04 OH 0.143
D Jumlah (A+B+C)
E Overhead & Profit10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 1.786
Tukang pipa L.02 OH 0.893
Mandor L.04 OH 0.179
A TENAGA
Pekerja L.01 OH 1.714
Tukang pipa L.02 OH 0.857
Mandor L.04 OH 0.171
D Jumlah (A+B+C)
E Overhead & Profit10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 2.571
Tukang pipa L.02 OH 1.286
Mandor L.04 OH 0.257
D Jumlah (A+B+C)
E Overhead & Profit10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 3.000
Tukang pipa L.02 OH 1.500
Mandor L.04 OH 0.300
D Jumlah (A+B+C)
E Overhead & Profit10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 3.000
Tukang pipa L.02 OH 1.500
Mandor L.04 OH 0.300
D Jumlah (A+B+C)
E Overhead & Profit10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.106
Tukang pipa L.02 OH 0.053
Mandor L.04 OH 0.011
D Jumlah (A+B+C)
E Overhead & Profit10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.216
Tukang pipa L.02 OH 0.108
Mandor L.04 OH 0.022
D Jumlah (A+B+C)
E Overhead & Profit10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.326
Tukang pipa L.02 OH 0.163
Mandor L.04 OH 0.033
D Jumlah (A+B+C)
E Overhead & Profit10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.436
Tukang pipa L.02 OH 0.218
Mandor L.04 OH 0.044
JUMLAH TENAGA KERJA
B BAHAN
Tee Ø 300 mm bh 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel &
hari 0.500
handle crane 2 T
D Jumlah (A+B+C)
E Overhead & Profit10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.656
Tukang pipa L.02 OH 0.328
Mandor L.04 OH 0.066
D Jumlah (A+B+C)
E Overhead & Profit10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.766
Tukang pipa L.02 OH 0.383
Mandor L.04 OH 0.077
D Jumlah (A+B+C)
E Overhead & Profit10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.876
Tukang pipa L.02 OH 0.438
Mandor L.04 OH 0.088
D Jumlah (A+B+C)
E Overhead & Profit10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 1.096
Tukang pipa L.02 OH 0.548
Mandor L.04 OH 0.110
D Jumlah (A+B+C)
E Overhead & Profit10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 1.316
Tukang pipa L.02 OH 0.658
Mandor L.04 OH 0.132
D Jumlah (A+B+C)
E Overhead & Profit10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 1.536
Tukang pipa L.02 OH 0.768
Mandor L.04 OH 0.154
D Jumlah (A+B+C)
E Overhead & Profit10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 1.756
Tukang pipa L.02 OH 0.878
Mandor L.04 OH 0.176
D Jumlah (A+B+C)
E Overhead & Profit10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 1.976
Tukang pipa L.02 OH 0.988
Mandor L.04 OH 0.198
D Jumlah (A+B+C)
E Overhead & Profit10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 2.196
Tukang pipa L.02 OH 1.098
Mandor L.04 OH 0.220
D Jumlah (A+B+C)
E Overhead & Profit10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)
A.8.4.3.28 Pemasangan 1 buah Tee Ø 1200 mm
A TENAGA
Pekerja L.01 OH 2.416
Tukang pipa L.02 OH 1.208
Mandor L.04 OH 0.242
JUMLAH TENAGA KERJA
B BAHAN
Tee Ø 1200 mm bh 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel &
hari 0.450
handle crane 2 T
Mobile crane =< 3 ton hari 0.225
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)
Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 1.466
Tukang pipa L.02 OH 0.733
Mandor L.04 OH 0.147
JUMLAH TENAGA KERJA
B BAHAN
Pipa Ø 80 mm bh 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa
T2/mekanik / cilinder hari 0.606
saw
Sewa Pompa
hari 0.968
Submersible 3m3/h
Sewa Tripot/Tackel &
hari 0.865
handle crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 1.646
Tukang pipa L.02 OH 0.823
Mandor L.04 OH 0.165
JUMLAH TENAGA KERJA
B BAHAN
Pipa Ø 100 mm bh 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa
T2/mekanik / cilinder hari 0.650
saw
Sewa Pompa
hari 1.078
Submersible 3m3/h
Sewa Tripot/Tackel &
hari 0.911
handle crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 2.096
Tukang pipa L.02 OH 1.048
Mandor L.04 OH 0.210
Sewa Pompa
hari 1.353
Submersible 3m3/h
Sewa Tripot/Tackel &
hari 1.026
handle crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 2.546
Tukang pipa L.02 OH 1.273
Mandor L.04 OH 0.255
JUMLAH TENAGA KERJA
B BAHAN
Pipa Ø 200 mm bh 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa
T2/mekanik / cilinder hari 0.870
saw
Sewa Genset 1500 watt hari 0.579
Sewa Pompa
hari 1.628
Submersible 3m3/h
Sewa Tripot/Tackel &
hari 1.141
handle crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 2.996
Tukang pipa L.02 OH 1.498
Mandor L.04 OH 0.300
Sewa Pompa
hari 1.903
Submersible 3m3/h
Sewa Tripot/Tackel &
hari 1.256
handle crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 3.446
Tukang pipa L.02 OH 1.723
Mandor L.04 OH 0.345
JUMLAH TENAGA KERJA
B BAHAN
Pipa Ø 300 mm bh 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa
T2/mekanik / cilinder hari 1.090
saw
Sewa Pompa
hari 2.178
Submersible 3m3/h
Sewa Tripot/Tackel &
hari 1.371
handle crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 4.346
Tukang pipa L.02 OH 2.173
Mandor L.04 OH 0.435
Sewa Pompa
hari 2.728
Submersible 3m3/h
Sewa Tripot/Tackel &
hari 1.601
handle crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 4.796
Tukang pipa L.02 OH 2.398
Mandor L.04 OH 0.480
JUMLAH TENAGA KERJA
B BAHAN
Pipa Ø 450 mm bh 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa
T2/mekanik / cilinder hari 1.420
saw
Sewa Pompa
hari 3.003
Submersible 3m3/h
Sewa Tripot/Tackel &
hari 1.716
handle crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 5.246
Tukang pipa L.02 OH 2.623
Mandor L.04 OH 0.525
JUMLAH TENAGA KERJA
B BAHAN
Pipa Ø 500 mm bh 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa
T2/mekanik / cilinder hari 1.530
saw
Sewa Pompa
hari 3.278
Submersible 3m3/h
Sewa Tripot/Tackel &
hari 1.831
handle crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)
Sewa Pompa
hari 3.828
Submersible 3m3/h
Sewa Tripot/Tackel &
hari 2.061
handle crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 7.046
Tukang pipa L.02 OH 3.523
Mandor L.04 OH 0.705
JUMLAH TENAGA KERJA
B BAHAN
Pipa Ø 700 mm bh 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa
T2/mekanik / cilinder hari 1.970
saw
Sewa Pompa
hari 4.378
Submersible 3m3/h
Sewa Tripot/Tackel &
hari 2.291
handle crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)
A.8.4.4.12 Penyambungan 1 buah 1 buah pipa baru ke pipa yang ada Ø 800 mm
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)
A TENAGA
Pekerja L.01 OH 7.946
Tukang pipa L.02 OH 3.973
Mandor L.04 OH 0.795
JUMLAH TENAGA KERJA
B BAHAN
Pipa Ø 800 mm bh 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa
T2/mekanik / cilinder hari 2.190
saw
Sewa Pompa
hari 4.928
Submersible 3m3/h
Sewa Tripot/Tackel &
hari 2.521
handle crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)
Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.008
Mandor L.04 OH 0.001
JUMLAH TENAGA KERJA
B BAHAN
Air test (air bersih) m3 0.002
Bahan bakar liter 0.060
Oli liter 0.002
A TENAGA
Pekerja L.01 OH 0.008
Mandor L.04 OH 0.001
JUMLAH TENAGA KERJA
B BAHAN
Air test (air bersih) m3 0.004
Bahan bakar liter 0.060
Oli liter 0.002
A TENAGA
Pekerja L.01 OH 0.008
Mandor L.04 OH 0.001
JUMLAH TENAGA KERJA
B BAHAN
Air test (air bersih) m3 0.008
Bahan bakar liter 0.060
Oli liter 0.002
A TENAGA
Pekerja L.01 OH 0.008
Mandor L.04 OH 0.001
JUMLAH TENAGA KERJA
B BAHAN
Air test (air bersih) m3 0.018
Bahan bakar liter 0.060
Oli liter 0.002
A TENAGA
Pekerja L.01 OH 0.008
Mandor L.04 OH 0.001
JUMLAH TENAGA KERJA
B BAHAN
Air test (air bersih) m3 0.031
Bahan bakar liter 0.060
Oli liter 0.002
A TENAGA
Pekerja L.01 OH 0.008
Mandor L.04 OH 0.001
JUMLAH TENAGA KERJA
B BAHAN
Air test (air bersih) m3 0.049
Bahan bakar liter 0.060
Oli liter 0.002
A TENAGA
Pekerja L.01 OH 0.008
Mandor L.04 OH 0.001
JUMLAH TENAGA KERJA
B BAHAN
Air test (air bersih) m3 0.071
Bahan bakar liter 0.060
Oli liter 0.002
A TENAGA
Pekerja L.01 OH 0.008
Mandor L.04 OH 0.001
JUMLAH TENAGA KERJA
B BAHAN
Air test (air bersih) m3 0.126
Bahan bakar liter 0.060
Oli liter 0.002
A TENAGA
Pekerja L.01 OH 0.008
Mandor L.04 OH 0.001
JUMLAH TENAGA KERJA
B BAHAN
Air test (air bersih) m3 0.158
Bahan bakar liter 0.060
Oli liter 0.002
A TENAGA
Pekerja L.01 OH 0.008
Mandor L.04 OH 0.001
JUMLAH TENAGA KERJA
B BAHAN
Air test (air bersih) m3 0.283
Bahan bakar liter 0.060
Oli liter 0.002