You are on page 1of 520

B.

BAHAN UMUM
H

NO. NAMA BAHAN/BARANG KODE SATUAN DALAM KOTA

(1) (2) (3) (4) (5)


1 Air liter 75.00
2 Alat-alat kerja (3 set) M170 Set 50,000.00
3 Ampelas Lbr 5,000.00
4 Angker Baut Kecil Bh 2,500.00
5 Angker Baut Sedang Bh 3,000.00
6 Angker Baut Besar Bh 7,000.00
7 Asbes Gelombang Besar Bh 35,000.00
8 Asbes Gelombang Kecil Bh 37,500.00
9 Baja, baut-baut, Besi strip / Beugel 2" M163 Kg 16,500.00
10 Bak Cuci Piring Stainles 1 lubang Bh 203,000.00
11 Bak Cuci Piring Teraso Bh 170,000.00
12 Bak Cuci Tangan / Wastafel Keramik Bh / Set 275,000.00
13 Bak Mandi fiberglass 70x70x60 Bh 250,000.00
14 Bak Mandi Plastik Bh 250,000.00
15 Bak Mandi Porselin Bh 2,500,000.00
16 Bak reservoir fibre glass kap 12000 ltr Bh 1,250,000.00
17 Batako Bh 3,250.00
17 Batu Alam m2 240,000.00
18 Batu Bata Bh 875.00
19 Bensin / Premium M184 Ltr
20.a Bensin / Premium Non Subsidi M184 Ltr
20 Bubungan asbes gelombang besar Bh 37,500.00
21 Bubungan asbes gelombang kecil Bh 18,375.00
22 Bubungan genteng beton Bh 6,250.00
23 Bubungan genteng keramik Bh 9,000.00
24 Bubungan genteng kodok Bh 3,750.00
25 Bubungan multi color (model C) Bh 50,000.00
26 Bubungan sakura color (model C) Bh 27,500.00
27 Bubungan surya color (model C) Bh 30,000.00
28 Buis beton 1/2 dia.20 cm Bh 2,750,000.00
29 Cat Brown Besi Kg 45,000.00
30 Cat Kayu Dasar Kg 20,000.00
31 Cat Mengkilap Kg 50,000.00
32 Cat Manie Kg 50,000.00
33 Cat Plitur Kg 50,000.00
34 Cat Tembok Kg 18,000.00
35 Cat Vernis Kg 50,000.00
36 Closed Duduk Keramik Bh 3,500,000.00
37 Closed Jongkok Keramik Bh 250,000.00
38 Closed Jongkok Teraso Bh 120,000.00
39 Closed Mono Blok Lokal Bh 50,000.00
40 Dempul kembang Kg 20,000.00
41 Dempul Kayu Altex Kg 45,000.00
42 Engsel Lokal ( 3 x 5 Iron ) 4" Bh 25,000.00
(1) (2) (3) (4) (5)
43 Espagnolog Bh 95,000.00
44 Eternit ( Asbes ) 100 x 100 Lbr 150,000.00
45 Fiber Glass 1200 ltr (merk Grand) Bh 1,300,000.00
46 Fiber Glass 3000 ltr (merk Grand) Bh 3,500,000.00
47 Fiber Glass 1000 ltr (merk grand) Bh 1,100,000.00
48 Formika Lbr 110,000.00
49 Gemuk / grease Kg 5,000.00
50 Genteng Beton Bh 15,000.00
51 Genteng Flam Mantili Cat Air Bh 25,000.00
52 Genteng Flam Mantili Cat Minyak Bh 25,000.00
53 Genteng Kaca Bh 20,000.00
54 Genteng Keramik Bh 15,000.00
55 Genteng Kodok Bh 3,000.00
56 Genteng Metal Multi Color Lbr 50,000.00
57 Genteng Metal Surya Color Lbr 45,000.00
58 Genteng Metal Sakura Color Lbr 39,000.00
59 Genteng Press Bh 20,000.00
60 Grendel Pintu Bh 35,000.00
61 Hak Angin uk. Kecil Bh 10,000.00
62 ijuk Kg 10,000.00
63 Kaca Bening 3 mm M2 100,000.00
64 Kaca Bening 5 mm M2 180,000.00
65 Kaca Rayband 5 mm M2 230,000.00
66 Kaca Rayband 5 mm M2 230,000.00
66 Kapur padam Kg 2,000.00
67 Kolom Beton Pracetak 5cm btg 71,750.00
68 Kolom Beton Pracetak 8cm btg 138,375.00
69 Kawat beton (bendrat) Kg 20,000.00
70 Kawat Duri Rol 90,000.00
71 Kawat Harmonika M 37,500.00
72 Kawat Nyamuk / Kasa Besi M2 17,500.00
73 Kawat Nyamuk / Kasa Plastik M2 15,000.00
75 Kayu Bulat Btg 7,500.00
76 Kayu Dolken/ Galam dia. 8-10 cm pjg 4 m Btg 12,000.00
77 Kayu Klas II ( kamper, keruing/lanan, dll ) M3 3,750,000.00
78 Kayu Klas III ( Borneo /ky. rimba ) M3 3,500,000.00
79 Kayu Klas IV ( Sengon dll ) M3 3,400,000.00
80 Keramik 10/20 Dus 65,000.00
81 Keramik 20/20 Dus 62,500.00
82 Keramik 20/25 Dus 65,000.00
83 Keramik 30/30 Dus 65,000.00
84 Keramik 40/40 Dus 85,000.00
85 Keramik Mozaik Dus 85,000.00
(1) (2) (3) (4) (5)
86 Kran air 1/2" Bh 15,000.00
87 Kran air 3/4" Bh 25,000.00
88 Kuas Bh 12,000.00
86 Kunci Gembok Bh 25,000.00
87 Kunci tanam Bh 137,500.00
88 Lampu XL Philip 20 Watt Bj 50,000.00
89 Lem Kayu fox Kg 30,000.00
90 List Kayu Profil M 10,000.00
91 Marmer Bh 50,000.00
92 Melamin 2,4 mm Lbr 70,000.00
93 Minyak Cat Ltr 30,000.00
94 Minyak Pelumas / olie M185 Ltr
95 Minyak Tanah M065 Ltr
96 Multiplek 3 mm Lbr 55,000.00
97 Multiplek 12 mm Lbr 160,000.00
98 Nako 8 Daun ( Tanpa Kaca ) Set 55,000.00
99 Paku Asbes Kg 30,000.00
100 Paku Kait Kg 15,000.00
101 Paku Kayu Kg 15,000.00
102 Paku Plywood Kg 22,000.00
103 Paku Ulin M166 Kg 24,000.00
104 Paku Sekrup Bh 10,000.00
105 Paku Seng Kg 20,000.00
106 Paku Sirap Kg 20,000.00
107 Paku Sumbat Bh 500.00
108 Panel Beton Pracetak 5x40x240 cm lembar 100,000.00
109 Panel Beton Pracetak 8x40x240 cm lembar 168,750.00
110 Papan Bekisting M3 1,500,000.00
111 Papan Kayu Klas II ( Kamper/Keruing, Lanan dll) M3 2,500,000.00
112 Papan Kayu Klas III ( Borneo/Kayu Rimba dll ) M3 2,200,000.00
113 Papan Propil / Moulding Uk. 2/20 M3 2,600,000.00
114 Paving Stone Bj 3,000.00
115 Pipa Ledeng dia 1" - 4 m Btg 35,000.00
116 Pipa Ledeng dia 1/2" - 4 m Btg 17,000.00
117 Pipa Ledeng dia 2" - 4 m Btg 65,000.00
118 Pipa Ledeng dia 3/4" - 4 m Btg 24,000.00
119 Pipa Ledeng dia 4" - 4 m Btg 181,250.00
120 Pipa Galvanis dia 1" m 100,000.00
121 Pipa Galvanis dia 1 1/2" m 152,500.00
122 Pipa PVC dia 1 1/2" - 4 m Btg 55,000.00
123 Pipa PVC dia 1 " - 4 m Btg 30,000.00
124 Pipa PVC dia 1/2" - 4 m Btg 17,000.00
125 Pipa PVC dia 2" - 4 m Btg 65,000.00
(1) (2) (3) (4) (5)
126 Pipa PVC dia 3/4" - 4 m Btg 24,000.00
127 Pipa PVC dia 4" - 4 m Btg 280,000.00
128 Plamur Tembok Kg 50,000
129 Plin Ubin Abu - Abu 15/20 Bh 3,000
130 Plin Ubin Berwarna 15/20 Bh 3,500
131 Plin Ubin Teraso 10/20 Bh 2,500
132 Plywood 2,7 mm Lbr 55,000.00
133 Plywood 3,6 mm Lbr 67,500.00
134 Pompa Tangan Bh 250,000.00
135 Plywood 9 mm Lbr 112,500.00
136 Porselin 10/15 Bh
137 Porselin 15/15 Bh 731.71
136 Porselin 20/20 Bh 65,000.00
137 Porselin 30/30 Bh 70,000.00
138 Poulding Door M2 2,500,000.00
139 Rangka baja ringan + Penutup atap M2 200,000.00
140 Rangka metal hollow 20x40 pjg 4 m btg 16,400.00
141 Rangka metal hollow 40x40 pj. 4 m btg 22,550.00
142 Residu / Teer Kg 7,500.00
143 Rolling Door M2 850,000.00
144 Roster / Kerawang Bh 75,000.00
145 Schakelar Bh 5,000.00
146 Sealtape rol 4,000.00
147 Sekring kast lokal 1 group Bh 30,000.00
148 Sekring kast lokal 2 group Bh 46,000.00
149 Sekring kast lokal 3 group Bh 52,000.00
150 Sekrup Bh 55,000.00
151 Semen Warna kg 13,000.00
152 Semen Putih kg 3,125
153 Seng Bubungan / Jurai BJLS 25 L.40 CM M' 15,000.00
154 Seng Gelombang BJLS 20 Lbr 38,000.00
155 Seng Gelombang BJLS 25 Lbr 38,000.00
156 Seng Plat BJLS 20 Lbr 38,000.00
157 Seng Plat BJLS 25 Lbr 42,000.00
158 Solar M183 Ltr
159.a Solar Non Subsidi M183 Ltr
159 Stop Kontak + Instalasi Bh 200,000.00
160 Teakwood Pintu 3 x 7 Lbr 95,000.00
161 Teralis Besi M 2
275,000.00

(1) (2) (3) (4) (5)


162 Tiner 1 Kg ( Merk Super ) Ltr 25,000.00
163 Titik Lampu + Instalasi Bh 200,000.00
164 Ubin Abu - Abu 20/20 Bj 2,500.00
165 Ubin Berwarna 20/20 Bj 3,000.00
166 Ubin PC Wapel 20/20 Bh 3,000.00
167 Ubin Teraso 30/30 Bj 2,500.00
168 Urinuir Keramik Bh 450,000.00
169 Urinuir Teraso Bh 200,000.00
170 Vinyl 20 x 20 cm M2 125,000.00
172 Floor drain M 15,000.00

MUARA TEWEH
NO. URAIAN KODE SATUAN
DALAM KOTA
MUARA TEWEH

(1) (2) (3) (4)


1 Mandor L061 Orang 115,000
2 Mekanik Terlatih L071 Orang
3 Mekanik Semi Terlatih L072 Orang
4 Kepala Tukang Batu L073 Orang 110,000
5 Kepala Tukang Besi L073 Orang 110,000
6 Kepala Tukang Cat L073 Orang 110,000
7 Kepala Tukang Gali L073 Orang 110,000
8 Kepala Tukang Kayu L073 Orang 110,000
9 Laden Tukang Besi Orang 90,000
10 Laden Tukang Cat Orang 90,000
11 Laden Tukang Batu / Pekerja Orang 90,000
12 Laden Tukang Kayu Orang 90,000
13 Tukang Batu L079 Orang 100,000
14 Tukang Besi L079 Orang 100,000
15 Tukang Cat L079 Orang 100,000
16 Tukang Gali Tanah L079 Orang 100,000
17 Tukang Kayu L079 Orang 100,000
18 Tukang Listrik L079 Orang 100,000
19 Tukang Las Orang 100,000
20 Tukang Pancang Orang 100,000
21 Tukang Tebas Orang
22 Tukang Anyam Orang
23 Operator Terlatih L081 Orang 192,500
24 Operator Semi Terlatih L082 Orang 165,000
25 Pembantu Operator L083 Orang 115,000
26 Sopir Material / Truck L091 Orang 110,000
27 Sopir Personil L092 Orang 100,000
28 Pembantu Sopir L099 Orang 90,000
29 Pekerja/ Buruh Tak Terlatih L101 Orang
30 Pekerja/ Buruh Semi Terlatih L103 Orang
31 Pekerja/Buruh Terlatih L106 Orang 90,000
HARGA DASAR 0.2202

REGION I REGION II REGION III

{1,1*(5)} {1,2*(5)} {1,3*(5)}


(6) (7) (8)
82.50 90.00 98
55,000.00 60,000.00 65,000 38,500
5,500.00 6,000.00 6,500 1,000
2,750.00 3,000.00 3,250 2,000
3,300.00 3,600.00 3,900 2,500
7,700.00 8,400.00 9,100 3,000
38,500.00 42,000.00 45,500 17,000
41,250.00 45,000.00 48,750 18,000
18,150.00 19,800.00 21,450 15,000
223,300.00 243,600.00 263,900 132,500
187,000.00 204,000.00 221,000 124,000
302,500.00 330,000.00 357,500 140,000
275,000.00 300,000.00 325,000 227,500
275,000.00 300,000.00 325,000 250,000
2,750,000.00 3,000,000.00 3,250,000 450,000
1,375,000.00 1,500,000.00 1,625,000 650,000
3,575.00 3,900.00 4,225 2,200
264,000.00 288,000.00 312,000 500 0.294
962.50 1,050.00 1,138 500
2,250

41,250.00 45,000.00 48,750 25,000


20,212.50 22,050.00 23,888 14,700
6,875.00 7,500.00 8,125 4,700
9,900.00 10,800.00 11,700 5,900
4,125.00 4,500.00 4,875 6,700
55,000.00 60,000.00 65,000 6,700
30,250.00 33,000.00 35,750 6,700
33,000.00 36,000.00 39,000 6,700
3,025,000.00 3,300,000.00 3,575,000 80,000
49,500.00 54,000.00 58,500 21,250
22,000.00 24,000.00 26,000 7,250
55,000.00 60,000.00 65,000 22,500
55,000.00 60,000.00 65,000 10,750
55,000.00 60,000.00 65,000 22,000
19,800.00 21,600.00 23,400 7,500
55,000.00 60,000.00 65,000 10,000
3,850,000.00 4,200,000.00 4,550,000 1,225,000
275,000.00 300,000.00 325,000 112,500
132,000.00 144,000.00 156,000 55,000
55,000.00 60,000.00 65,000 64,700
22,000.00 24,000.00 26,000 7,250
49,500.00 54,000.00 58,500 10,000
27,500.00 30,000.00 32,500 6,000
-
-
(6) (7) (8) -
104,500.00 114,000.00 123,500 42,000
165,000.00 180,000.00 195,000 84,700
1,430,000.00 1,560,000.00 1,690,000 725,000
3,850,000.00 4,200,000.00 4,550,000 725,000
1,210,000.00 1,320,000.00 1,430,000 725,000
121,000.00 132,000.00 143,000 87,000
5,500.00 6,000.00 6,500 21,000
16,500.00 18,000.00 19,500 5,200
27,500.00 30,000.00 32,500 1,000
27,500.00 30,000.00 32,500 1,450
22,000.00 24,000.00 26,000 6,600
16,500.00 18,000.00 19,500 4,750
3,300.00 3,600.00 3,900 950
55,000.00 60,000.00 65,000 86,000
49,500.00 54,000.00 58,500 55,000
42,900.00 46,800.00 50,700 25,500
22,000.00 24,000.00 26,000 5,600
38,500.00 42,000.00 45,500 1,000
11,000.00 12,000.00 13,000 875
11,000.00 12,000.00 13,000 3,000
110,000.00 120,000.00 130,000 65,000
198,000.00 216,000.00 234,000 70,000
253,000.00 276,000.00 299,000 80,000
253,000.00 276,000.00 299,000 80,000
2,200.00 2,400.00 2,600 1,387
78,925.00 86,100.00 93,275 1,387
152,212.50 166,050.00 179,888 1,387
22,000.00 24,000.00 26,000 9,000
99,000.00 108,000.00 117,000 52,500
41,250.00 45,000.00 48,750 6,500
19,250.00 21,000.00 22,750 5,000
16,500.00 18,000.00 19,500 4,250
8,250.00 9,000.00 9,750 1,800
13,200.00 14,400.00 15,600 625,000
4,125,000.00 4,500,000.00 4,875,000 441,650
3,850,000.00 4,200,000.00 4,550,000 363,000
3,740,000.00 4,080,000.00 4,420,000 1,053
71,500.00 78,000.00 84,500 1,490
68,750.00 75,000.00 81,250
71,500.00 78,000.00 84,500 2,600
71,500.00 78,000.00 84,500 2,600
93,500.00 102,000.00 110,500 6,292
93,500.00 102,000.00 110,500 -
-
-
(6) (7) (8) 5,000
16,500.00 18,000.00 19,500 37,500
27,500.00 30,000.00 32,500 37,500
13,200.00 14,400.00 15,600 37,500
27,500.00 30,000.00 32,500 37,500
151,250.00 165,000.00 178,750 50,000
55,000.00 60,000.00 65,000 22,500
33,000.00 36,000.00 39,000 1,800
11,000.00 12,000.00 13,000 125,000
55,000.00 60,000.00 65,000 42,500
77,000.00 84,000.00 91,000 3,000
33,000.00 36,000.00 39,000 15,950
1,870
37,500
60,500.00 66,000.00 71,500 105,000
176,000.00 192,000.00 208,000 65,000
60,500.00 66,000.00 71,500 225
33,000.00 36,000.00 39,000 800
16,500.00 18,000.00 19,500 7,500
16,500.00 18,000.00 19,500 10,000
24,200.00 26,400.00 28,600 10,000
26,400.00 28,800.00 31,200 3,000
11,000.00 12,000.00 13,000 14,500
22,000.00 24,000.00 26,000 9,500
22,000.00 24,000.00 26,000 726
550.00 600.00 650 434,000
110,000.00 120,000.00 130,000 434,000
185,625.00 202,500.00 219,375 434,000
1,650,000.00 1,800,000.00 1,950,000 558,000
2,750,000.00 3,000,000.00 3,250,000 434,000
2,420,000.00 2,640,000.00 2,860,000 12,000
2,860,000.00 3,120,000.00 3,380,000 1,800
3,300.00 3,600.00 3,900 78,650
38,500.00 42,000.00 45,500 48,400
18,700.00 20,400.00 22,100 102,850
71,500.00 78,000.00 84,500 57,475
26,400.00 28,800.00 31,200 205,700
199,375.00 217,500.00 235,625 10,000
110,000.00 120,000.00 130,000 14,000
167,750.00 183,000.00 198,250 30,000
60,500.00 66,000.00 71,500 21,000
33,000.00 36,000.00 39,000 11,000
18,700.00 20,400.00 22,100 45,000
71,500.00 78,000.00 84,500 -
-
-
(6) (7) (8) 14,000
26,400.00 28,800.00 31,200 145,000
308,000.00 336,000.00 364,000 27,500
55,000.00 60,000.00 65,000 2,000
3,300.00 3,600.00 3,900 2,000
3,850.00 4,200.00 4,550 1,600
2,750.00 3,000.00 3,250 30,000
60,500.00 66,000.00 71,500 37,500
74,250.00 81,000.00 87,750 250,000
275,000.00 300,000.00 325,000 840
123,750.00 135,000.00 146,250
- - - 1,210
804.88 878.05 951 4,235
71,500.00 78,000.00 84,500 4,235
77,000.00 84,000.00 91,000 297,600 58,000.00
2,750,000.00 3,000,000.00 3,250,000 58,000.00
220,000.00 240,000.00 260,000 4,840
18,040.00 19,680.00 21,320 4,840
24,805.00 27,060.00 29,315 4,840
8,250.00 9,000.00 9,750 327,000
935,000.00 1,020,000.00 1,105,000 1,750
82,500.00 90,000.00 97,500 9,680
5,500.00 6,000.00 6,500 22,500
4,400.00 4,800.00 5,200 22,500
33,000.00 36,000.00 39,000 35,700
50,600.00 55,200.00 59,800 58,000
57,200.00 62,400.00 67,600 120
60,500.00 66,000.00 71,500 50,000
14,300.00 15,600.00 16,900 61,250
3,437.50 3,750.00 4,063 6,500
16,500.00 18,000.00 19,500 35,500
41,800.00 45,600.00 49,400 45,000
41,800.00 45,600.00 49,400 36,000
41,800.00 45,600.00 49,400 46,000
46,200.00 50,400.00 54,600 2,250

102,500
220,000.00 240,000.00 260,000 45,000
104,500.00 114,000.00 123,500 100,000
302,500.00 330,000.00 357,500 -
-
-
(6) (7) (8) 16,250
27,500.00 30,000.00 32,500 102,500
220,000.00 240,000.00 260,000 1,210
2,750.00 3,000.00 3,250 1,452
3,300.00 3,600.00 3,900 1,202
3,300.00 3,600.00 3,900 1,200
2,750.00 3,000.00 3,250 310,000
495,000.00 540,000.00 585,000 54,000
220,000.00 240,000.00 260,000 34,500
137,500.00 150,000.00 162,500
16,500.00 18,000.00 19,500

REGION I REGION II REGION III


TEWEH TENGAH
MONTALLAT TEWEH TIMUR GUNUNG PUREI
LAHEI
GUNUNG TIMANG
{1,1*(5)} {1,2*(5)} {1,3*(5)}
(6) (7) (8)
126,500 138,000 149,500
- - -
- - -
121,000 132,000 143,000
121,000 132,000 143,000
121,000 132,000 143,000
121,000 132,000 143,000
121,000 132,000 143,000
99,000 108,000 117,000
99,000 108,000 117,000
99,000 108,000 117,000
99,000 108,000 117,000
110,000 120,000 130,000
110,000 120,000 130,000
110,000 120,000 130,000
110,000 120,000 130,000
110,000 120,000 130,000
110,000 120,000 130,000
110,000 120,000 130,000
110,000 120,000 130,000
- - -
- - -
211,750 231,000 250,250
181,500 198,000 214,500
126,500 138,000 149,500
121,000 132,000 143,000
110,000 120,000 130,000
99,000 108,000 117,000
- - -
- - -
99,000 108,000 117,000
1
64,000.00 0.91
0.09
63,437.50 5437.5
NO. BAHAN KODE SATUAN DALAM KOTA TEWEH TENGAH TEWEH BARU
LOKAL MUARA TEWEH
20.00 14.00

A B C D E F G
1 Pasir Ayak untuk beton/ M 01a m3 100,000.00 100,000.00 100,000.00
Pasir Barito (pasir dan kerikil) 150,000.00 150,000.00 150,000.00
2 Pasir Pasang M 01b m3 100,000.00 100,000.00 100,000.00
150,000.00 150,000.00 150,000.00
3 Pasir Halus (untuk HRS) M 01c m3 100,000.00 100,000.00 100,000.00
150,000.00 150,000.00 150,000.00
4 Pasir Urug/Timbunan M 01c m3 100,000.00 100,000.00 100,000.00
(Pasir dan Kerikil) 150,000.00 150,000.00 150,000.00
5 Batu Gunung M 02 m3 200,000.00 200,000.00 200,000.00
(Granit/Andesit) 250,000.00 250,000.00 250,000.00
6 Batu Belah/ Kerakal M 06 m3 200,000.00 200,000.00 200,000.00
250,000.00 250,000.00 250,000.00
7 Kerikil Sungai/ Kerikil Gunung m3 150,000.00 150,000.00 150,000.00
200,000.00 200,000.00 200,000.00
8 Batu Pecah Tersaring m3 400,000.00 400,000.00 400,000.00
(Alat) (Produksi)(Granit/Andesit) 400,000.00 400,000.00 400,000.00
9 Debu Batu m3 200,000.00 200,000.00 200,000.00
(Granit/Andesit) 200,000.00 200,000.00 200,000.00
10 Batu Pecah 10 - 15 cm m3 200,000.00 200,000.00 200,000.00
( Manual) (Granit/Andesit) 200,000.00 200,000.00 200,000.00
11 Tanah Timbunan Biasa M 08 m3 40,000.00 40,000.00 40,000.00
40,000.00 40,000.00 40,000.00
12 Tanah Timbunan Pilihan M 09 m3 50,000.00 50,000.00 50,000.00
50,000.00 50,000.00 50,000.00
13 Aspal M 10 kg 12,800.00 12,800.00 12,800.00
12,800.00 12,800.00 12,800.00
14 Semen Portland M 12 Zak 85,000.00 85,000.00 85,000.00
( 1 zak = 50 kg) 85,000.00 85,000.00 85,000.00
15 Besi Beton polos M 14 kg 14,300.00 14,300.00 14,300.00
14,300.00 14,300.00 14,300.00
16 Besi Beton Ulir (profil) M 14 kg 14,700.00 14,700.00 14,700.00
14,700.00 14,700.00 14,700.00
17 Kerikil Galian Bukit M 16 m3 60,000.00 60,000.00 60,000.00
(Awcas)(Pasir dan Kerikil) 60,000.00 60,000.00 60,000.00
18 Kayu Ulin Balok Besar m3 7,500,000.00 7,500,000.00 7,500,000.00
(Panjang s/d 4 m) 7,500,000.00 7,500,000.00 7,500,000.00
19 Kayu Ulin Balok Besar m3 7,500,000.00 7,500,000.00 7,500,000.00
(Panjang di atas 4 m) 7,500,000.00 7,500,000.00 7,500,000.00
20 Kayu Ulin Balok Kecil m3 7,500,000.00 7,500,000.00 7,500,000.00
7,500,000.00 7,500,000.00 7,500,000.00
21 Papan Ulin m3 7,500,000.00 7,500,000.00 7,500,000.00
7,500,000.00 7,500,000.00 7,500,000.00
TEWEH SELATAN LAHEI LAHEI BARAT GNG TIMANG MONTALLAT TEWEH TIMUR GUNUNG PUREI

14.00 25.00 25.00 60.00 100.00 90.00 150.00

H I J K L M N
100,000.00 150,000.00 130,000.00 272,800 180,000.00 180,000.00 180,000.00
150,000.00 200,000.00 180,000.00 372,800.00 230,000.00 260,000.00 260,000.00
100,000.00 150,000.00 130,000.00 272,800 180,000.00 180,000.00 180,000.00
150,000.00 200,000.00 180,000.00 372,800.00 230,000.00 260,000.00 260,000.00
100,000.00 150,000.00 130,000.00 272,800 180,000.00 180,000.00 180,000.00
150,000.00 200,000.00 180,000.00 372,800.00 230,000.00 260,000.00 260,000.00
100,000.00 150,000.00 130,000.00 272,800 180,000.00 180,000.00 180,000.00
150,000.00 200,000.00 180,000.00 372,800.00 230,000.00 260,000.00 260,000.00
200,000.00 118,800.00 184,800.00 272,800 448,800.00 200,000.00 200,000.00
250,000.00 368,800.00 434,800.00 522,800.00 698,800.00 280,000.00 280,000.00
200,000.00 118,800.00 184,800.00 272,800 448,800.00 200,000.00 200,000.00
250,000.00 318,800.00 384,800.00 472,800.00 648,800.00 280,000.00 280,000.00
150,000.00 175,000.00 170,000.00 272,800 320,000.00 180,000.00 180,000.00
200,000.00 225,000.00 220,000.00 422,800.00 320,000.00 260,000.00 260,000.00
400,000.00 118,800.00 184,800.00 303,111 498,666.67 449,777.78 743,111.11
400,000.00 518,800.00 584,800.00 703,111.11 898,666.67 849,777.78 1,143,111.11
200,000.00 118,800.00 205,333.33 303,111 498,666.67 449,777.78 743,111.11
200,000.00 318,800.00 405,333.33 503,111.11 698,666.67 649,777.78 943,111.11
200,000.00 118,800.00 184,800.00 272,800 448,800.00 404,800.00 668,800.00
200,000.00 318,800.00 384,800.00 472,800.00 648,800.00 604,800.00 868,800.00
40,000.00 118,800.00 184,800.00 40,000 40,000.00 40,000.00 40,000.00
40,000.00 158,800.00 224,800.00 40,000.00 40,000.00 40,000.00 40,000.00
50,000.00 118,800.00 184,800.00 50,000 50,000.00 50,000.00 50,000.00
50,000.00 168,800.00 234,800.00 50,000.00 50,000.00 50,000.00 50,000.00
12,800.00 132.00 205.33 303 498.67 449.78 743.11
12,800.00 12,932.00 13,005.33 13,103.11 13,298.67 13,249.78 13,543.11
85,000.00 2,970.00 4,620.00 6,820 11,220.00 10,120.00 16,720.00
85,000.00 87,970.00 89,620.00 91,820.00 96,220.00 95,120.00 101,720.00
14,300.00 74.25 115.50 171 280.50 253.00 418.00
14,300.00 14,374.25 14,415.50 14,470.50 14,580.50 14,553.00 14,718.00
14,700.00 74.25 115.50 171 280.50 253.00 418.00
14,700.00 14,774.25 14,815.50 14,870.50 14,980.50 14,953.00 15,118.00
60,000.00 118,800.00 184,800.00 272,800 448,800.00 404,800.00 668,800.00
60,000.00 178,800.00 244,800.00 332,800.00 508,800.00 464,800.00 728,800.00
7,500,000.00 7,500,000.00 184,800.00 7,500,000.00 7,500,000.00 7,500,000.00 7,500,000.00
7,500,000.00 7,500,000.00 184,800.00 7,500,000.00 7,500,000.00 7,500,000.00 7,500,000.00
7,500,000.00 7,500,000.00 7,500,000.00 7,500,000.00 7,500,000.00 7,500,000.00 7,500,000.00
7,500,000.00 7,500,000.00 7,500,000.00 7,500,000.00 7,500,000.00 7,500,000.00 7,500,000.00
7,500,000.00 7,500,000.00 7,500,000.00 7,500,000.00 7,500,000.00 7,500,000.00 7,500,000.00
7,500,000.00 7,500,000.00 7,500,000.00 7,500,000.00 7,500,000.00 7,500,000.00 7,500,000.00
7,500,000.00 7,500,000.00 7,500,000.00 7,500,000.00 7,500,000.00 7,500,000.00 7,500,000.00
7,500,000.00 7,500,000.00 7,500,000.00 7,500,000.00 7,500,000.00 7,500,000.00 7,500,000.00
A.2.2.1 HARGA SATUAN PEKERJAAN PERSIAPAN

A. 2.2.1.1 Pembuatan 1 m2 pagar sementara dari kayu tinggi 2 meter

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.400 90,000.00 36,000.00
Tukang Kayu L.02 OH 0.200 100,000.00 20,000.00
Kepala Tukang L.03 OH 0.020 110,000.00 2,200.00
Mandor L.04 OH 0.020 115,000.00 2,300.00
JUMLAH TENAGA KERJA 60,500.00
B BAHAN
Dolken kayu Ø 8-
10/400 cm Batang 1.250 12,000.00 15,000.00
Semen portland Kg 5.000 1,700.00 8,500.00
Pasir beton m3 0.005 38,000.00 190.00
Koral beton m3 0.009 150,000.00 1,350.00
Kayu 5/7 m3 0.072 200,000.00 14,400.00
Paku biasa 2” – 5” Kg 0.060 3,750,000.00 225,000.00
Residu Liter 0.400 7,500.00 3,000.00
JUMLAH HARGA BAHAN 267,440.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 327,940.00


E Overhead & Profit 10 % 10 % x D 32,794.00
F Harga Satuan Pekerjaan (D+E) 360,734.00

A. 2.2.1.2 Pembuatan 1 m2 pagar sementara dari seng gelombang tinggi 2 meter

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.200 90,000.00 18,000.00
Tukang Kayu L.02 OH 0.400 100,000.00 40,000.00
Kepala Tukang L.03 OH 0.020 110,000.00 2,200.00
Mandor L.04 OH 0.020 115,000.00 2,300.00
JUMLAH TENAGA KERJA 62,500.00
B BAHAN
Dolken kayu Ø 8-
10/400 cm Batang 1.250 12,000.00 15,000.00
Semen portland Kg 2.500 1,700.00 4,250.00
Seng gelombang Lbr 1.200 38,000.00 45,600.00
Pasir beton m3 0.005 150,000.00 750.00
Koral beton m3 0.009 200,000.00 1,800.00
Kayu 5/7 m3 0.072 3,750,000.00 270,000.00
Paku biasa 2” – 5” Kg 0.060 15,000.00 900.00
Meni besi Liter 0.450 50,000.00 22,500.00
JUMLAH HARGA BAHAN 360,800.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 423,300.00


E Overhead & Profit 10 % 10 % x D 42,330.00
F Harga Satuan Pekerjaan (D+E) 465,630.00
A. 2.2.1.3. Pembuatan 1 m2 pagar sementara dari kawat duri tinggi 1,8 meter

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.200 90,000.00 18,000.00
Tukang Kayu L.02 OH 0.300 100,000.00 30,000.00
Kepala Tukang L.03 OH 0.020 110,000.00 2,200.00
Mandor L.04 OH 0.020 115,000.00 2,300.00
JUMLAH TENAGA KERJA 52,500.00
B BAHAN
Dolken kayu Ø 8-
10/400 cm Batang 1.000 12,000.00 12,000.00
Semen portland Kg 2.000 1,700.00 3,400.00
Kawat duri M’ 25.000 90,000.00 2,250,000.00
Pasir beton m3 0.005 150,000.00 750.00
Koral beton m3 0.009 200,000.00 1,800.00
Paku biasa 2” – 5” Kg 0.060 15,000.00 900.00
JUMLAH HARGA BAHAN 2,256,850.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 2,309,350.00


E Overhead & Profit 10 % 10 % x D 230,935.00
F Harga Satuan Pekerjaan (D+E) 2,540,285.00

A. 2.2.1.4. Pengukuran dan pemasangan 1 m’ Bouwplank

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.100 90,000.00 9,000.00
Tukang Kayu L.02 OH 0.100 100,000.00 10,000.00
Kepala Tukang L.03 OH 0.010 110,000.00 1,100.00
Mandor L.04 OH 0.005 115,000.00 575.00
JUMLAH TENAGA KERJA 20,675.00
B BAHAN
Kayu balok 5/7 m3 0.012 3,750,000.00 45,000.00
Paku 2”-3” Kg 0.020 15,000.00 300.00
Kayu papan 3/20 m3 0.007 2,500,000.00 17,500.00
JUMLAH HARGA BAHAN 62,800.00
C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A+B+C) 83,475.00


E Overhead & Profit 10 % 10 % x D 8,347.50
F Harga Satuan Pekerjaan (D+E) 91,822.50
A. 2.2.1.5. Pembuatan 1 m2 kantor sementara lantai plesteran

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 2.000 90,000.00 180,000.00
Tukang Kayu L.02 OH 2.000 100,000.00 200,000.00
Tukang batu L.02 OH 1.000 100,000.00 100,000.00
Kepala Tukang L.03 OH 0.300 110,000.00 33,000.00
Mandor L.04 OH 0.050 115,000.00 5,750.00
JUMLAH TENAGA KERJA 518,750.00
B BAHAN
Dolken kayu Ø 8-
10/400 cm Batang 1.250 12,000.00 15,000.00

Kayu m3 0.180 3,750,000.00 675,000.00


Paku biasa Kg 0.080 15,000.00 1,200.00
Besi strip Kg 1.100 16,500.00 18,150.00
Semen Portland Kg 35.000 1,700.00 59,500.00
Pasir pasang m3 0.150 150,000.00 22,500.00
Pasir beton m3 0.100 150,000.00 15,000.00
Koral beton m3 0.150 200,000.00 30,000.00
Bata merah Bh 30.000 875.00 26,250.00
Seng plat Lbr 0.250 38,000.00 9,500.00
Jendela naco Bh 0.200 250,000.00 50,000.00
Kaca polos m2 0.080 100,000.00 8,000.00
Kunci tanam Bh 0.150 137,500.00 20,625.00
Plywood 4mm Lbr 0.060 67,500.00 4,050.00
JUMLAH HARGA BAHAN 939,775.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 1,458,525.00


E Overhead & Profit 10 % 10 % x D 145,852.50
F Harga Satuan Pekerjaan (D+E) 1,604,377.50

A. 2.2.1.6. Pembuatan 1 m2 rumah jaga (konstruksi kayu )

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 1.000 90,000.00 90,000.00
Tukang Kayu L.02 OH 1.500 100,000.00 150,000.00
Kepala tukang L.03 0.150 110,000.00 16,500.00
Mandor L.04 OH 0.050 115,000.00 5,750.00
JUMLAH TENAGA KERJA 262,250.00
B BAHAN
Dolken kayu Ø 8-
10/400 cm Batang 3.000 12,000.00 36,000.00

Kayu m3 0.276 3,750,000.00 1,035,000.00


Paku biasa Kg 0.700 15,000.00 10,500.00
Seng gelombang Kg 1.500 38,000.00 57,000.00
JUMLAH HARGA BAHAN 1,138,500.00
C PERALATAN

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) 1,400,750.00
E Overhead & Profit 10 % 10 % x D 140,075.00
F Harga Satuan Pekerjaan (D+E) 1,540,825.00
A. 2.2.1.7. Pembuatan 1 m2 gudang semen dan peralatan

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 1.000 90,000.00 90,000.00
Tukang Kayu L.02 OH 2.000 100,000.00 200,000.00
Kepala Tukang L.03 OH 0.200 110,000.00 22,000.00
Mandor L.04 OH 0.050 115,000.00 5,750.00
JUMLAH TENAGA KERJA 317,750.00
B BAHAN
Dolken kayu Ø 8-
10/400 cm Batang 1.700 12,000.00 20,400.00

Kayu m3 0.210 3,750,000.00 787,500.00


Paku biasa Kg 0.300 15,000.00 4,500.00
Semen Portland Kg 10.500 1,700.00 17,850.00
Pasir beton m3 0.030 150,000.00 4,500.00
Koral beton m3 0.050 200,000.00 10,000.00
Seng gelombang Lbr 1.500 38,000.00 57,000.00
Seng plat Lbr 0.250 42,000.00 10,500.00
JUMLAH HARGA BAHAN 912,250.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 1,230,000.00


E Overhead & Profit 10 % 10 % x D 123,000.00
F Harga Satuan Pekerjaan (D+E) 1,353,000.00

A. 2.2.1.8. Pembuatan 1 m2 bedeng pekerja

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 1.000 90,000.00 90,000.00
Tukang Kayu L.02 OH 2.000 100,000.00 200,000.00
Kepala Tukang L.03 OH 0.200 110,000.00 22,000.00
Mandor L.04 OH 0.050 115,000.00 5,750.00
JUMLAH TENAGA KERJA 317,750.00
B BAHAN
Dolken kayu Ø 8-
10/400 cm Batang 1.250 12,000.00 15,000.00

Kayu m 3
0.186 3,750,000.00 697,500.00
Paku biasa Kg 0.300 15,000.00 4,500.00
Semen Portland Kg 18.000 1,700.00 30,600.00
Pasir beton m3 0.030 150,000.00 4,500.00
Koral beton m3 0.050 200,000.00 10,000.00
Seng gelombang Lbr 1.500 38,000.00 57,000.00
Plywood 4mm Lbr 1.350 67,500.00 91,125.00
JUMLAH HARGA BAHAN 910,225.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 1,227,975.00


E Overhead & Profit 10 % 10 % x D 122,797.50
F Harga Satuan Pekerjaan (D+E) 1,350,772.50
A. 2.2.1.9. Pembersihan 1 m2 lapangan dan perataan

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.100 90,000.00 9,000.00
Mandor L.04 OH 0.050 115,000.00 5,750.00
JUMLAH TENAGA KERJA 14,750.00
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 14,750.00


E Overhead & Profit 10 % 10 % x D 1,475.00
F Harga Satuan Pekerjaan (D+E) 16,225.00

A. 2.2.1.10. Pembuatan 1 m2 steger/perancah dari bambu

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 1.000 90,000.00 90,000.00
Tukang Kayu L.02 OH 2.000 100,000.00 200,000.00
Kepala Tukang L.03 OH 0.200 110,000.00 22,000.00
Mandor L.04 OH 0.050 115,000.00 5,750.00
JUMLAH TENAGA KERJA -
B BAHAN
Bambu diameter 6-
Batang 1.250 -
8/600 cm
Tali ijuk m3 0.186 -
JUMLAH HARGA BAHAN -
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) -
E Overhead & Profit 10 % 10 % x D -
F Harga Satuan Pekerjaan (D+E) -

A. 2.2.1.11. Pembuatan 1 buah kotak adukan ukuran 40cm x50cm x25cm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Tukang Kayu L.02 OH 0.300 100,000.00 30,000.00
Kepala Tukang L.03 OH 0.030 110,000.00 3,300.00
JUMLAH TENAGA KERJA 33,300.00
B BAHAN
Kayu papan kelas III m3 0.036 2,500,000.00 90,000.00
Kayu balok 5/7 kelas
m 3
3,500,000.00 -
III
Paku biasa kg 0.080 15,000.00 1,200.00
JUMLAH HARGA BAHAN 91,200.00
C PERALATAN

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) 124,500.00
E Overhead & Profit 10 % 10 % x D 12,450.00
F Harga Satuan Pekerjaan (D+E) 136,950.00
A. 2.2.1.12. Pembuatan 1 m2 jalan sementara

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 1.000 90,000.00 90,000.00
Mandor L.04 0.005 115,000.00 575.00
JUMLAH TENAGA KERJA 90,575.00
B BAHAN
Batu belah m3 0.150 250,000.00 37,500.00
Batu pecah m3 0.090 200,000.00 18,000.00
Pasir pasang m3 0.010 150,000.00 1,500.00
JUMLAH HARGA BAHAN 57,000.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 147,575.00


E Overhead & Profit 10 % 10 % x D 14,757.50
F Harga Satuan Pekerjaan (D+E) 162,332.50

A. 2.2.1.13. Pembongkaran 1 m3 beton bertulang

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 13.334 90,000.00 1,200,060.00
Mandor L.04 0.666 115,000.00 76,590.00
JUMLAH TENAGA KERJA 1,276,650.00
B BAHAN

JUMLAH HARGA BAHAN


C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 1,276,650.00


E Overhead & Profit 10 % 10 % x D 127,665.00
F Harga Satuan Pekerjaan (D+E) 1,404,315.00

A. 2.2.1.14. Pembongkaran 1 m3 dinding tembok bata

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 6.667 90,000.00 600,030.00
Mandor L.04 0.333 115,000.00 38,295.00
JUMLAH TENAGA KERJA 638,325.00
B BAHAN

JUMLAH HARGA BAHAN -


C PERALATAN

JUMLAH HARGA ALAT


-
D Jumlah (A+B+C) 638,325.00
E Overhead & Profit 10 % 10 % x D 63,832.50
F Harga Satuan Pekerjaan (D+E) 702,157.50
A. 2.2.1.15. Pemasangan 1 m2 pagar kawat jaring galvanis panjang 240 cm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 0.042 90,000.00 3,780.00
Tukang L.02 0.004 100,000.00 400.00
Kepala Tukang L.03 0.002 110,000.00 220.00
Mandor L.04 0.042 115,000.00 4,830.00
JUMLAH TENAGA KERJA 9,230.00
B BAHAN
Kawat jaring Lbr 0.143 37,500.00 5,377.50
JUMLAH HARGA BAHAN 5,377.50
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 14,607.50


E Overhead & Profit 10 % 10 % x D 1,460.75
F Harga Satuan Pekerjaan (D+E) 16,068.25

A.2.2.1.16. Pemasangan 1 m2 panel beton pracetak 5x50x213 cm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 0.375 90,000.00 33,750.00
Tukang L.02 0.125 100,000.00 12,500.00
Kepala Tukang L.03 0.012 110,000.00 1,320.00
Mandor L.04 0.019 115,000.00 2,185.00
JUMLAH TENAGA KERJA 49,755.00
B BAHAN
Panel beton pracetak Lbr 0.986 100,000.00 98,600.00

Kolom beton pracetak Batang 0.525 71,750.00 37,668.75


Semen PC Kg 45.000 1,700.00 76,500.00
Pasir beton m3 0.074 150,000.00 11,100.00
Koral m3 0.146 200,000.00 29,200.00
JUMLAH HARGA BAHAN 253,068.75
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 302,823.75


E Overhead & Profit 10 % 10 % x D 30,282.38
F Harga Satuan Pekerjaan (D+E) 333,106.13
A.2.3.1 HARGA SATUAN PEKERJAAN TANAH
A.2.3.1.1. Penggalian 1 m3 tanah biasa sedalam 1 m

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.75 90,000.00 67,500.00
Mandor L.04 OH 0.03 115,000.00 2,875.00
JUMLAH TENAGA KERJA 70,375.00
B BAHAN

JUMLAH HARGA BAHAN


C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 70,375.00


E Overhead & Profit 10 % 10 % x D 7,037.50
F Harga Satuan Pekerjaan (D+E) 77,412.50

A.2.3.1.2. Penggalian 1 m3 tanah biasa sedalam 2 m

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.90 90,000.00 81,000.00
Mandor L.04 OH 0.05 115,000.00 5,175.00
JUMLAH TENAGA KERJA 86,175.00
B BAHAN

JUMLAH HARGA BAHAN


C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 86,175.00


E Overhead & Profit 10 % x D 8,617.50
F Harga Satuan Pekerjaan (D+E) 94,792.50

A.2.3.1.3. Menggali 1 m3 tanah biasa sedalam 3 m

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 1.05 90,000.00 94,500.00
Mandor L.04 OH 0.07 115,000.00 7,705.00
JUMLAH TENAGA KERJA 102,205.00
B BAHAN

JUMLAH HARGA BAHAN


C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 102,205.00


E Overhead & Profit 10 % 10 % x D 10,220.50
F Harga Satuan Pekerjaan (D+E) 112,425.50

A.2.3.1.4. Menggali 1 m3 tanah keras sedalam 1 m

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 1.00 90,000.00 90,000.00
Mandor L.04 OH 0.03 115,000.00 3,680.00
JUMLAH TENAGA KERJA 93,680.00
B BAHAN

JUMLAH HARGA BAHAN


C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 93,680.00


E Overhead & Profit 10 % 10 % x D 9,368.00
F Harga Satuan Pekerjaan (D+E) 103,048.00
A.2.3.1.5. Menggali 1 m3 tanah cadas sedalam 1 m

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 1.50 90,000.00 135,000.00
Mandor L.04 OH 0.06 115,000.00 6,900.00
JUMLAH TENAGA KERJA 141,900.00
B BAHAN

JUMLAH HARGA BAHAN


C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 141,900.00


E Overhead & Profit 10 % 10 % x D 14,190.00
F Harga Satuan Pekerjaan (D+E) 156,090.00

A.2.3.1.6. Menggali 1 m3 tanah lumpur sedalam 1 m

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 1.20 90,000.00 108,000.00
Mandor L.04 OH 0.05 115,000.00 5,175.00
JUMLAH TENAGA KERJA 113,175.00
B BAHAN

JUMLAH HARGA BAHAN


C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 113,175.00


E Overhead & Profit 10 % 10 % x D 11,317.50
F Harga Satuan Pekerjaan (D+E) 124,492.50

A.2.3.1.7. Pengerjaan stripping 1 m2 tanah tebing setinggi 1 meter

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.05 90,000.00 4,500.00
Mandor L.04 OH 0.01 115,000.00 575.00
JUMLAH TENAGA KERJA 5,075.00
B BAHAN

JUMLAH HARGA BAHAN


C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 5,075.00


E Overhead & Profit 10 % 10 % x D 507.50
F Harga Satuan Pekerjaan (D+E) 5,582.50

A.2.3.1.8. Pembuangan 1 m3 tanah sejauh 30 meter

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.33 90,000.00 29,700.00
Mandor L.04 OH 0.01 115,000.00 1,150.00
JUMLAH TENAGA KERJA 30,850.00
B BAHAN

JUMLAH HARGA BAHAN


C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 30,850.00


E Overhead & Profit 10 % 10 % x D 3,085.00
F Harga Satuan Pekerjaan (D+E) 33,935.00
A.2.3.1.9. Pengurugan kembali 1 m3 galian tanah
Pengurugan kembali 1 m3 galian dihitung dari 1/3 kali dari koefisien pekerjaan galian

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.50 90,000.00 45,000.00
Mandor L.04 OH 0.05 115,000.00 5,750.00
JUMLAH TENAGA KERJA 50,750.00
B BAHAN

JUMLAH HARGA BAHAN


C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 50,750.00
E Overhead & Profit 10 % 10 % x D 5,075.00
F Harga Satuan Pekerjaan (D+E) 55,825.00

A.2.3.1.10. Pemadatan tanah 1 m3 tanah ( per 20 cm)

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.50 90,000.00 45,000.00
Mandor L.04 OH 0.05 115,000.00 5,750.00
JUMLAH TENAGA KERJA 50,750.00
B BAHAN

JUMLAH HARGA BAHAN


C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 50,750.00
E Overhead & Profit 10 % 10 % x D 5,075.00
F Harga Satuan Pekerjaan (D+E) 55,825.00

A.2.3.1.11. Pengurugan 1 m3 dengan pasir urug

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.30 90,000.00 27,000.00
Mandor L.04 OH 0.01 115,000.00 1,150.00
JUMLAH TENAGA KERJA 28,150.00
B BAHAN
Pasir urug 1.20 150,000.00 180,000.00
JUMLAH HARGA BAHAN 180,000.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 208,150.00
E Overhead & Profit 10 % 10 % x D 20,815.00
F Harga Satuan Pekerjaan (D+E) 228,965.00

A.2.3.1.12. Pemasangan 1 m3 lapisan pudel campuran 1KP:3PP:7TL

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.80 90,000.00 72,000.00
Tukang L.02 OH 0.40 100,000.00 40,000.00
Kepala Tukang L.03 OH 0.04 110,000.00 4,400.00
Mandor L.04 OH 0.08 115,000.00 9,200.00
JUMLAH TENAGA KERJA 125,600.00
B BAHAN
Kapur Padam m3 0.14 2,000.00 270.00
Pasir Pasang m3 0.40 150,000.00 60,000.00
Tanah Liat m3 0.95 40,000.00 37,920.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 125,600.00


E Overhead & Profit 10 % 10 % x D 12,560.00
F Harga Satuan Pekerjaan (D+E) 138,160.00
A.2.3.1.13. Pemasangan 1 m2 lapisan ijuk tebal 10 cm untuk bidang resapan

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.15 90,000.00 13,500.00
Mandor L.04 OH 0.02 115,000.00 1,725.00
JUMLAH TENAGA KERJA 15,225.00
B BAHAN
Ijuk m3 6.00 10,000.00 60,000.00
JUMLAH HARGA BAHAN 60,000.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 75,225.00
E Overhead & Profit 10 % x D 7,522.50
F Harga Satuan Pekerjaan (D+E) 82,747.50

A.2.3.1.14. Pengurugan 1 m3 sirtu padat

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.25 90,000.00 22,500.00
Mandor L.04 OH 0.03 115,000.00 2,875.00
JUMLAH TENAGA KERJA 25,375.00
B BAHAN
Sirtu m3 1.20 50,000.00 60,000.00
JUMLAH HARGA BAHAN 60,000.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 85,375.00


E Overhead & Profit 10 % 10 % x D 8,537.50
F Harga Satuan Pekerjaan (D+E) 93,912.50
A.3.2.1 HARGA SATUAN PEKERJAAN PONDASI
A.3.2.1.1. Pemasangan 1 m3 pondasi batu belah campuran 1SP : 3PP

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 1.50 90,000.00 135,000.00

Kepala Tukang L.03 OH 0.08 110,000.00 8,250.00

JUMLAH TENAGA KERJA 143,250.00


B BAHAN
Batu belah m3 1.20 250,000.00 300,000.00
Semen Portland Kg 202.00 1,700.00 343,400.00
Pasir Pasang m3 0.49 150,000.00 72,750.00
JUMLAH HARGA BAHAN 716,150.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 859,400.00


E Overhead & Profit 10 % 10 % x D
F Harga Satuan Pekerjaan (D+E) 859,400.00

A.3.2.1.2. Pemasangan 1 m3 pondasi batu belah campuran 1SP : 4PP

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 1.50 90,000.00 135,000.00
Tukang Batu L.02 OH 0.75 100,000.00 75,000.00
Kepala Tukang L.03 OH 0.08 110,000.00 8,250.00
Mandor L.04 OH 0.08 115,000.00 8,625.00
JUMLAH TENAGA KERJA 226,875.00
B BAHAN
Batu belah m3 1.20 250,000.00 300,000.00
Semen Portland Kg 163.00 1,700.00 277,100.00
Pasir Pasang m3 0.52 150,000.00 78,000.00
JUMLAH HARGA BAHAN 655,100.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 881,975.00
E Overhead & Profit 10 % 10 % x D 88,197.50
F Harga Satuan Pekerjaan (D+E) 970,172.50

A.3.2.1.3. Pemasangan 1 m3 pondasi batu belah campuran 1SP : 5PP

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 1.50 90,000.00 135,000.00
Tukang Batu L.02 OH 0.75 100,000.00 75,000.00
Kepala Tukang L.03 OH 0.08 110,000.00 8,250.00
Mandor L.04 OH 0.08 115,000.00 8,625.00
JUMLAH TENAGA KERJA 226,875.00
B BAHAN
Batu belah m3 1.20 250,000.00 300,000.00
Semen Portland Kg 136.00 1,700.00 231,200.00
Pasir Pasang m3 0.54 150,000.00 81,600.00
JUMLAH HARGA BAHAN 612,800.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 839,675.00
E Overhead & Profit 10 % 10 % x D 83,967.50
F Harga Satuan Pekerjaan (D+E) 923,642.50
A.3.2.1.4. Pemasangan 1 m3 pondasi batu belah campuran 1SP : 6PP

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 1.50 90,000.00 135,000.00
Tukang Batu L.02 OH 0.75 100,000.00 75,000.00
Kepala Tukang L.03 OH 0.08 110,000.00 8,250.00
Mandor L.04 OH 0.08 115,000.00 8,625.00
JUMLAH TENAGA KERJA 226,875.00
B BAHAN
Batu belah m3 1.20 250,000.00 300,000.00
Semen Portland Kg 117.00 1,700.00 198,900.00
Pasir Pasang m3 0.56 150,000.00 84,150.00
JUMLAH HARGA BAHAN 583,050.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 809,925.00
E Overhead & Profit 10 % 10 % x D 80,992.50
F Harga Satuan Pekerjaan (D+E) 890,917.50

A.3.2.1.5. Pemasangan 1 m3 pondasi batu belah campuran 1SP : 8PP

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 1.50 90,000.00 135,000.00
Tukang Batu L.02 OH 0.75 100,000.00 75,000.00
Kepala Tukang L.03 OH 0.08 110,000.00 8,250.00
Mandor L.04 OH 0.08 115,000.00 8,625.00
JUMLAH TENAGA KERJA 226,875.00
B BAHAN
Batu belah m3 1.20 250,000.00 300,000.00
Semen Portland Kg 91.00 1,700.00 154,700.00
Pasir Pasang m3 0.58 150,000.00 87,600.00
JUMLAH HARGA BAHAN 542,300.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 769,175.00


E Overhead & Profit 10 % 10 % x D 76,917.50
F Harga Satuan Pekerjaan (D+E) 846,092.50

A.3.2.1.6. Pemasangan 1 m3 pondasi batu belah campuran 1SP : 1KP : 2PP

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 1.50 90,000.00 135,000.00
Tukang Batu L.02 OH 0.75 100,000.00 75,000.00
Kepala Tukang L.03 OH 0.08 110,000.00 8,250.00
Mandor L.04 OH 0.08 115,000.00 8,625.00
JUMLAH TENAGA KERJA 226,875.00
B BAHAN
Batu belah m3 1.20 250,000.00 300,000.00
Kapur m3 0.17 2,000.00 340.00
Semen Portland Kg 0.17 1,700.00 289.00
Pasir Pasang m3 0.34 150,000.00 51,000.00
JUMLAH HARGA BAHAN 351,629.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 578,504.00


E Overhead & Profit 10 % 10 % x D 57,850.40
F Harga Satuan Pekerjaan (D+E) 636,354.40
A.3.2.1.7. Pemasangan 1 m3 pondasi batu belah campuran 1 SP : 3 KP : 10 PP

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 1.50 90,000.00 135,000.00
Tukang Batu L.02 OH 0.75 100,000.00 75,000.00
Kepala Tukang L.03 OH 0.08 110,000.00 8,250.00
Mandor L.04 OH 0.08 115,000.00 8,625.00
JUMLAH TENAGA KERJA 226,875.00
B BAHAN
Batu belah m3 1.20 250,000.00 300,000.00
Semen Portland Kg 61.00 1,700.00 103,700.00
Kapur m3 0.15 2,000.00 294.00
Pasir Pasang m3 0.49 150,000.00 73,800.00
JUMLAH HARGA BAHAN 477,794.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 704,669.00


E Overhead & Profit 10 % 10 % x D 70,466.90
F Harga Satuan Pekerjaan (D+E) 775,135.90

A.3.2.1.8.Pemasangan 1 m3 pondasi batu belah campuran ¼ SP : 1 KP : 4PP

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 1.50 90,000.00 135,000.00
Tukang Batu L.02 OH 0.75 100,000.00 75,000.00
Kepala Tukang L.03 OH 0.08 110,000.00 8,250.00
Mandor L.04 OH 0.08 115,000.00 8,625.00
JUMLAH TENAGA KERJA 226,875.00
B BAHAN
Batu belah m3 1.20 250,000.00 300,000.00
Semen Portland Kg 41.00 1,700.00 69,700.00
Kapur m3 0.13 2,000.00 262.00
Pasir Pasang m3 0.52 150,000.00 78,450.00
JUMLAH HARGA BAHAN 448,412.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 675,287.00


E Overhead & Profit 10 % 10 % x D 67,528.70
F Harga Satuan Pekerjaan (D+E) 742,815.70

A.3.2.1.9. Pemasangan 1 m3 batu kosong (anstamping)

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.78 90,000.00 70,200.00
Tukang Batu L.02 OH 0.39 100,000.00 39,000.00
Kepala Tukang L.03 OH 0.04 110,000.00 4,290.00
Mandor L.04 OH 0.04 115,000.00 4,485.00
JUMLAH TENAGA KERJA 117,975.00
B BAHAN
Batu belah m3 1.20 250,000.00 300,000.00
Pasir urug m3 0.43 150,000.00 64,800.00
JUMLAH HARGA BAHAN 364,800.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 482,775.00


E Overhead & Profit 10 % 10 % x D 48,277.50
F Harga Satuan Pekerjaan (D+E) 531,052.50
A.3.2.1.10. Pemasangan 1 m3 pondasi siklop, 60% beton campuran 1SP : 2 PB : 3 Kr dan 40% batu belah

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 3.40 90,000.00 306,000.00
Tukang Batu L.02 OH 0.85 100,000.00 85,000.00
Kepala Tukang L.03 OH 0.09 110,000.00 9,350.00
Mandor L.04 OH 0.17 115,000.00 19,550.00
JUMLAH TENAGA KERJA 419,900.00
B BAHAN
Batu belah m3 0.48 250,000.00 120,000.00
Semen Portland Kg 194.00 1,700.00 329,800.00
Pasir Beton m3 0.31 150,000.00 46,800.00
Kerikil m3 0.47 200,000.00 93,600.00
Besi beton Kg 126.00 14,300.00 1,801,800.00
Kawat beton Kg 1.80 20,000.00 36,000.00
JUMLAH HARGA BAHAN 2,428,000.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 2,847,900.00


E Overhead & Profit 10 % 10 % x D 284,790.00
F Harga Satuan Pekerjaan (D+E) 3,132,690.00

A.3.2.1.11. Pemasangan 1 m3 pondasi sumuran, diameter 100 cm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 2.40 90,000.00 216,000.00
Tukang Batu L.02 OH 0.80 100,000.00 80,000.00
Kepala Tukang L.03 OH 0.08 110,000.00 8,800.00
Mandor L.04 OH 0.12 115,000.00 13,685.00
JUMLAH TENAGA KERJA 318,485.00
B BAHAN
Batu belah m3 0.45 250,000.00 112,500.00
Semen Portland Kg 194.00 1,700.00 329,800.00
Pasir Beton m3 0.31 150,000.00 46,800.00
Kerikil m3 0.47 200,000.00 93,600.00
JUMLAH HARGA BAHAN 582,700.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 901,185.00


E Overhead & Profit 10 % 10 % x D 90,118.50
F Harga Satuan Pekerjaan (D+E) 991,303.50
A.4.1.1 HARGA SATUAN PEKERJAAN BETON
A.4.1.1.1 Membuat 1 m3 beton mutu f’c = 7,4 MPa (K 100), slump (12 ±2) cm, w/c = 0,87

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 1.65 90,000.00 148,500.00
Tukang Batu L.02 OH 0.28 100,000.00 27,500.00
Kepala Tukang L.03 OH 0.03 110,000.00 3,080.00
Mandor L.04 OH 0.08 115,000.00 9,545.00
JUMLAH TENAGA KERJA 188,625.00
B BAHAN
Semen Portland kg 247.00 1,700.00 419,900.00
Pasir Beton kg 869.00 107.14 93,107.14
Kerikil(Maks 30mm) kg 999.00 148.15 148,000.00
Air Liter 215.00 75.00 16,125.00
JUMLAH HARGA BAHAN 677,132.14
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 865,757.14


E Overhead & Profit 10 % 10 % x D 86,575.71
F Harga Satuan Pekerjaan (D+E) 952,332.86
A.4.1.1.2 Membuat 1 m3 beton mutu f’c = 9,8 MPa (K 125), slump (12 ± 2) cm, w/c = 0,78

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 1.65 90,000.00 148,500.00
Tukang Batu L.02 OH 0.28 100,000.00 27,500.00
Kepala Tukang L.03 OH 0.03 110,000.00 3,080.00
Mandor L.04 OH 0.08 115,000.00 9,545.00
JUMLAH TENAGA KERJA 188,625.00
B BAHAN
Semen Portland kg 276.00 1,700.00 469,200.00
Pasir Beton kg 828.00 107.14 88,714.29
Kerikil(Maks 30mm) kg 1,012.00 148.15 149,925.93
Air Liter 215.00 75.00 16,125.00
JUMLAH HARGA BAHAN 723,965.21
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 912,590.21


E Overhead & Profit 10 % 10 % x D 91,259.02
F Harga Satuan Pekerjaan (D+E) 1,003,849.23
A.4.1.1.3 Membuat 1 m3 beton mutu f’c = 12,2 MPa (K 150), slump (12 ±2) cm, w/c = 0,72

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 1.65 90,000.00 148,500.00
Tukang Batu L.02 OH 0.28 100,000.00 27,500.00
Kepala Tukang L.03 OH 0.03 110,000.00 3,080.00
Mandor L.04 OH 0.08 115,000.00 9,545.00
JUMLAH TENAGA KERJA 188,625.00
B BAHAN
Semen Portland kg 299.00 1,700.00 508,300.00
Pasir Beton kg 799.00 107.14 85,607.14
Kerikil(Maks 30mm) kg 1,017.00 148.15 150,666.67
Air Liter 215.00 75.00 16,125.00
JUMLAH HARGA BAHAN 760,698.81
C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A+B+C) 949,323.81


E Overhead & Profit 10 % 10 % x D 94,932.38
F Harga Satuan Pekerjaan (D+E) 1,044,256.19
CATATAN
Bobot isi pasir = 1.400 kg/m3, Bobot isi kerikil = 1.350 kg/m3, Buckling factor pasir = 20 %
A.A.4.1.1.4 Membuat 1 m3 lantai kerja beton mutu f’c = 7,4 MPa (K 100), slump (3-6) cm, w/c = 0,87

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 1.20 90,000.00 108,000.00
Tukang Batu L.02 OH 0.20 100,000.00 20,000.00
Kepala Tukang L.03 OH 0.02 110,000.00 2,200.00
Mandor L.04 OH 0.06 115,000.00 6,900.00
JUMLAH TENAGA KERJA 137,100.00
B BAHAN
Semen Portland kg 230.00 1,700.00 391,000.00
Pasir Beton kg 893.00 107.14 95,678.57
Kerikil(Maks 30mm) kg 1,027.00 148.15 152,148.15
Air Liter 200.00 75.00 15,000.00
JUMLAH HARGA BAHAN 653,826.72
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 790,926.72
E Overhead & Profit 10 % 10 % x D 79,092.67
F Harga Satuan Pekerjaan (D+E) 870,019.39

A. A.4.1.1.5. Membuat 1 m3 beton mutu f’c = 14,5 MPa (K 175), slump (12 ± 2) cm, w/c = 0,66

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 1.65 90,000.00 148,500.00
Tukang Batu L.02 OH 0.28 100,000.00 27,500.00
Kepala Tukang L.03 OH 0.03 110,000.00 3,080.00
Mandor L.04 OH 0.08 115,000.00 9,545.00
JUMLAH TENAGA KERJA 188,625.00
B BAHAN
Semen Portland kg 326.00 1,700.00 554,200.00
Pasir Beton kg 760.00 107.14 81,428.57
Kerikil(Maks 30mm) kg 1,029.00 148.15 152,444.44
Air Liter 215.00 75.00 16,125.00
JUMLAH HARGA BAHAN 804,198.02
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 992,823.02


E Overhead & Profit 10 % 10 % x D 99,282.30
F Harga Satuan Pekerjaan (D+E) 1,092,105.32
A. A.4.1.1.6 Membuat 1 m3 beton mutu f’c = 16,9 MPa (K 200), slump (12 ±2) cm, w/c = 0,61

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 1.65 90,000.00 148,500.00
Tukang Batu L.02 OH 0.28 100,000.00 27,500.00
Kepala Tukang L.03 OH 0.03 110,000.00 3,080.00
Mandor L.04 OH 0.08 115,000.00 9,545.00
JUMLAH TENAGA KERJA 188,625.00
B BAHAN
Semen Portland kg 352.00 1,700.00 598,400.00
Pasir Beton kg 731.00 107.14 78,321.43
Kerikil(Maks 30mm) kg 1,031.00 148.15 152,740.74
Air Liter 215.00 75.00 16,125.00
JUMLAH HARGA BAHAN 845,587.17
C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A+B+C) 1,034,212.17


E Overhead & Profit 10 % 10 % x D 103,421.22
F Harga Satuan Pekerjaan (D+E) 1,137,633.39
A.4.1.1.7. Membuat 1 m3 beton mutu f’c = 19,3 MPa (K 225), slump (12 ±2) cm, w/c = 0,58

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 1.65 90,000.00 148,500.00
Tukang Batu L.02 OH 0.28 100,000.00 27,500.00
Kepala Tukang L.03 OH 0.03 110,000.00 3,080.00
Mandor L.04 OH 0.08 115,000.00 9,545.00
JUMLAH TENAGA KERJA 188,625.00
B BAHAN
Semen Portland kg 371.00 1,700.00 630,700.00
Pasir Beton kg 698.00 107.14 74,785.71
Kerikil (Maks 30mm) kg 1,047.00 148.15 155,111.11
Air Liter 215.00 75.00 16,125.00
JUMLAH HARGA BAHAN 876,721.83
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 1,065,346.83


E Overhead & Profit 10 % 10 % x D 106,534.68
F Harga Satuan Pekerjaan (D+E) 1,171,881.51
A.4.1.1.8. Membuat 1 m3 beton mutu f’c = 21,7 MPa (K 250), slump (12 ± 2) cm, w/c = 0,56

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 1.65 90,000.00 148,500.00
Tukang Batu L.02 OH 0.28 100,000.00 27,500.00
Kepala Tukang L.03 OH 0.03 110,000.00 3,080.00
Mandor L.04 OH 0.08 115,000.00 9,545.00
JUMLAH TENAGA KERJA 188,625.00
B BAHAN
Semen Portland kg 384.00 1,700.00 652,800.00
Pasir Beton kg 692.00 107.14 74,142.86
Kerikil(Maks 30mm) kg 1,039.00 148.15 153,925.93
Air Liter 215.00 75.00 16,125.00
JUMLAH HARGA BAHAN 896,993.78
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 1,085,618.78


E Overhead & Profit 10 % 10 % x D 108,561.88
F Harga Satuan Pekerjaan (D+E) 1,194,180.66
A.4.1.1.9. Membuat 1 m3 beton mutu f’c = 24,0 MPa (K 275), slump (12 ±2) cm, w/c = 0,53

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 1.65 90,000.00 148,500.00
Tukang Batu L.02 OH 0.28 100,000.00 27,500.00
Kepala Tukang L.03 OH 0.03 110,000.00 3,080.00
Mandor L.04 OH 0.08 115,000.00 9,545.00
JUMLAH TENAGA KERJA 188,625.00
B BAHAN
Semen Portland kg 406.00 1,700.00 690,200.00
Pasir Beton kg 684.00 107.14 73,285.71
Kerikil (Maks 30mm) kg 1,026.00 148.15 152,000.00
Air Liter 215.00 75.00 16,125.00
JUMLAH HARGA BAHAN 931,610.71
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 1,120,235.71
E Overhead & Profit 10 % 10 % x D 112,023.57
F Harga Satuan Pekerjaan (D+E) 1,232,259.29
A.4.1.1.10. Membuat 1 m3 beton mutu f’c = 26,4 MPa (K 300), slump (12 ±2) cm, w/c = 0,52

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 1.65 90,000.00 148,500.00
Tukang Batu L.02 OH 0.28 100,000.00 27,500.00
Kepala Tukang L.03 OH 0.03 110,000.00 3,080.00
Mandor L.04 OH 0.08 115,000.00 9,545.00
JUMLAH TENAGA KERJA 188,625.00
B BAHAN
Semen Portland kg 413.00 1,700.00 702,100.00
Pasir Beton kg 681.00 107.14 72,964.29
Kerikil (Maks 30mm) kg 1,021.00 148.15 151,259.26
Air Liter 215.00 75.00 16,125.00
JUMLAH HARGA BAHAN 942,448.54
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 1,131,073.54


E Overhead & Profit 10 % 10 % x D 113,107.35
F Harga Satuan Pekerjaan (D+E) 1,244,180.90
A.4.1.1.11. Membuat 1 m3 beton mutu f’c = 28,8 MPa (K 325), slump (12 ±2) cm, w/c = 0,49

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 2.10 90,000.00 189,000.00
Tukang Batu L.02 OH 0.35 100,000.00 35,000.00
Kepala Tukang L.03 OH 0.04 110,000.00 3,850.00
Mandor L.04 OH 0.11 115,000.00 12,075.00
JUMLAH TENAGA KERJA 239,925.00
B BAHAN
Semen Portland kg 439.00 1,700.00 746,300.00
Pasir Beton kg 670.00 107.14 71,785.71
Kerikil (Maks 30mm) kg 1,006.00 148.15 149,037.04
Air Liter 215.00 75.00 16,125.00
JUMLAH HARGA BAHAN 983,247.75
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 1,223,172.75


E Overhead & Profit 10 % 10 % x D 122,317.28
F Harga Satuan Pekerjaan (D+E) 1,345,490.03
A.4.1.1.12. Membuat 1 m3 beton mutu f’c = 31,2 MPa (K 350), slump (12 ± 2) cm, w/c = 0,48

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 2.10 90,000.00 189,000.00
Tukang Batu L.02 OH 0.35 100,000.00 35,000.00
Kepala Tukang L.03 OH 0.04 110,000.00 3,850.00
Mandor L.04 OH 0.11 115,000.00 12,075.00
JUMLAH TENAGA KERJA 239,925.00
B BAHAN
Semen Portland kg 448.00 1,700.00 761,600.00
Pasir Beton kg 667.00 107.14 71,464.29
Kerikil (Maks 30mm) kg 1,000.00 148.15 148,148.15
Air Liter 215.00 75.00 16,125.00
JUMLAH HARGA BAHAN 997,337.43
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 1,237,262.43
E Overhead & Profit 10 % 10 % x D 123,726.24
F Harga Satuan Pekerjaan (D+E) 1,360,988.68
A.4.1.1.13 Membuat 1 m3 beton kedap air dengan strorox – 100

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 2.10 90,000.00 189,000.00
Tukang Batu L.02 OH 0.35 100,000.00 35,000.00
Kepala Tukang L.03 OH 0.04 110,000.00 3,850.00
Mandor L.04 OH 0.11 115,000.00 12,075.00
JUMLAH TENAGA KERJA 0.00
B BAHAN
Semen Portland kg 400.00 1,700.00 680,000.00
Pasir Beton m3 0.48 150,000.00 72,000.00
Kerikil (2cm/3cm) m3 0.80 200,000.00 160,000.00
Strorox – 100 kg 1.20
JUMLAH HARGA BAHAN 0.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 0.00


E Overhead & Profit 10 % 10 % x D 0.00
F Harga Satuan Pekerjaan (D+E) 0.00
A.4.1.1.14 Pemasangan 1 m’ PVC Waterstop lebar 150 mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.06 90,000.00 5,400.00
Tukang Batu/Pipa L.02 OH 0.03 100,000.00 3,000.00
Kepala Tukang L.03 OH 0.00 110,000.00 330.00
Mandor L.04 OH 0.00 115,000.00 345.00
JUMLAH TENAGA KERJA 0.00
B BAHAN

Waterstop lebar 150 mm m 1.05

JUMLAH HARGA BAHAN


C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 0.00


E Overhead & Profit 10 % 10 % x D 0.00
F Harga Satuan Pekerjaan (D+E) 0.00
A.4.1.1.15 Pemasangan 1 m’ PVC Waterstop lebar 200 mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.07 90,000.00 6,300.00
Tukang Batu/Pipa L.02 OH 0.04 100,000.00 3,500.00
Kepala Tukang L.03 OH 0.00 110,000.00 440.00
Mandor L.04 OH 0.01 115,000.00 805.00
JUMLAH TENAGA KERJA
B BAHAN

Waterstop lebar 200 mm m 1.05

JUMLAH HARGA BAHAN


C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 0.00


E Overhead & Profit 10 % 10 % x D 0.00
F Harga Satuan Pekerjaan (D+E) 0.00
A.4.1.1.16 Membuat 1 m’ PVC Waterstop lebar 230 mm – 320 mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.08 90,000.00 7,200.00
Tukang Batu L.02 OH 0.04 100,000.00 4,000.00
Kepala Tukang L.03 OH 0.00 110,000.00 440.00
Mandor L.04 OH 0.00 115,000.00 460.00
JUMLAH TENAGA KERJA
B BAHAN
Waterstop lebar 230 mm
m 1.05
- 320 mm
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 0.00


E Overhead & Profit 10 % 10 % x D 0.00
F Harga Satuan Pekerjaan (D+E) 0.00
A.4.1.1.17.a Pembesian 10 kg dengan besi polos

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.07 90,000.00 6,300.00
Tukang Besi L.02 OH 0.07 100,000.00 7,000.00
Kepala Tukang L.03 OH 0.01 110,000.00 770.00
Mandor L.04 OH 0.00 115,000.00 460.00
JUMLAH TENAGA KERJA 14,530.00
B BAHAN
Besi beton (polos/ulir) kg 10.50 14,300.00 150,150.00
Kawat beton kg 0.15 20,000.00 3,000.00
JUMLAH HARGA BAHAN 153,150.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 167,680.00


1kg 16,768.00
E Overhead & Profit 10 % 10 % x D 1,676.80
F Harga Satuan Pekerjaan (D+E) 18,444.80
A.4.1.1.17.b Pembesian 10 kg dengan besi Ulir

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.07 90,000.00 6,300.00
Tukang Besi L.02 OH 0.07 100,000.00 7,000.00
Kepala Tukang L.03 OH 0.01 110,000.00 770.00
Mandor L.04 OH 0.00 115,000.00 460.00
JUMLAH TENAGA KERJA 14,530.00
B BAHAN
Besi beton (polos/ulir) kg 10.50 14,700.00 154,350.00
Kawat beton kg 0.15 20,000.00 3,000.00
JUMLAH HARGA BAHAN 157,350.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 171,880.00


1kg 17,188.00
E Overhead & Profit 10 % 10 % x D 1,718.80
F Harga Satuan Pekerjaan (D+E) 18,906.80
A.4.1.1.18 Pemasangan 10 kg kabel presstressed polos/strands

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.05 90,000.00 4,500.00
Tukang Besi L.02 OH 0.05 100,000.00 5,000.00
Kepala Tukang L.03 OH 0.01 110,000.00 550.00
Mandor L.04 OH 0.00 115,000.00 345.00
JUMLAH TENAGA KERJA 10,395.00
B BAHAN
Besi beton (polos/ulir) kg 10.50 14,300.00 150,150.00
Kawat beton kg 0.10 20,000.00 2,000.00
JUMLAH HARGA BAHAN 152,150.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 162,545.00


E Overhead & Profit 10 % 10 % x D 16,254.50
F Harga Satuan Pekerjaan (D+E) 178,799.50
A.4.1.1.19 Pemasangan 10 kg jaring kawat baja (wiremesh)

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.03 90,000.00 2,250.00
Tukang Besi L.02 OH 0.03 100,000.00 2,500.00
Kepala Tukang L.03 OH 0.03 110,000.00 2,750.00
Mandor L.04 OH 0.00 115,000.00 115.00
JUMLAH TENAGA KERJA 0.00
B BAHAN
Jaring kawat baja dilas kg 10.20 0.00
Kawat beton kg 0.05 20,000.00 1,000.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 0.00


E Overhead & Profit 10 % 10 % x D 0.00
F Harga Satuan Pekerjaan (D+E) 0.00
A.4.1.1.20 Pemasangan 1 m2 bekisting untuk pondasi

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.52 90,000.00 46,800.00
Tukang Kayu L.02 OH 0.26 100,000.00 26,000.00
Kepala Tukang L.03 OH 0.03 110,000.00 2,860.00
Mandor L.04 OH 0.03 115,000.00 2,990.00
JUMLAH TENAGA KERJA 78,650.00
B BAHAN
Kayu kelas III m3 0.04 3,500,000.00 140,000.00
Paku 5 – 10 cm kg 0.30 15,000.00 4,500.00
Minyak bekisting Liter 0.10 0.00
JUMLAH HARGA BAHAN 144,500.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 223,150.00


E Overhead & Profit 10 % 10 % x D 22,315.00
F Harga Satuan Pekerjaan (D+E) 245,465.00
A.4.1.1.21 Pemasangan 1 m2 bekisting untuk sloof

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.52 90,000.00 46,800.00
Tukang Kayu L.02 OH 0.26 100,000.00 26,000.00
Kepala Tukang L.03 OH 0.03 110,000.00 2,860.00
Mandor L.04 OH 0.03 115,000.00 2,990.00
JUMLAH TENAGA KERJA 78,650.00
B BAHAN
Kayu kelas III m3 0.05 3,500,000.00 157,500.00
Paku 5 cm – 10 cm kg 0.30 15,000.00 4,500.00
Minyak bekisting Liter 0.10 0.00
JUMLAH HARGA BAHAN 162,000.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 240,650.00


E Overhead & Profit 10 % 10 % x D 24,065.00
F Harga Satuan Pekerjaan (D+E) 264,715.00
A.4.1.1.22 Pemasangan 1 m2 bekisting untuk kolom

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.66 90,000.00 59,400.00
Tukang Kayu L.02 OH 0.33 100,000.00 33,000.00
Kepala Tukang L.03 OH 0.03 110,000.00 3,630.00
Mandor L.04 OH 0.03 115,000.00 3,795.00
JUMLAH TENAGA KERJA 99,825.00
B BAHAN
Kayu kelas III m3 0.04 3,500,000.00 140,000.00
Paku 5 cm – 12 cm kg 0.40 15,000.00 6,000.00
Minyak bekisting Liter 0.20 0.00
Balok kayu kelas II m3 0.02 3,750,000.00 56,250.00
Plywood tebal 9 mm Lbr 0.35 112,500.00 39,375.00
Dolken kayu Ø 8–10
Batang 2.00 12,000.00 24,000.00
panj 4m
JUMLAH HARGA BAHAN 265,625.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 365,450.00


E Overhead & Profit 10 % 10 % x D 36,545.00
F Harga Satuan Pekerjaan (D+E) 401,995.00
A.4.1.1.23 Pemasangan 1 m2 bekisting untuk balok

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.66 90,000.00 59,400.00
Tukang Kayu L.02 OH 0.33 100,000.00 33,000.00
Kepala Tukang L.03 OH 0.03 110,000.00 3,630.00
Mandor L.04 OH 0.03 115,000.00 3,795.00
JUMLAH TENAGA KERJA 99,825.00
B BAHAN
Kayu kelas III m3 0.04 3,500,000.00 140,000.00
Paku 5 cm – 12 cm kg 0.40 15,000.00 6,000.00
Minyak bekisting Liter 0.20 0.00
Balok kayu kelas II m3 0.02 3,750,000.00 67,500.00
Plywood tebal 9 mm Lbr 0.35 112,500.00 39,375.00
Dolken kayu galam, 8–
Batang 2.00 12,000.00 24,000.00
10 cm panj 4 m
JUMLAH HARGA BAHAN 276,875.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 376,700.00
E Overhead & Profit 10 % 10 % x D 37,670.00
F Harga Satuan Pekerjaan (D+E) 414,370.00
A.4.1.1.24 Pemasangan 1 m2 bekisting untuk lantai

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.66 90,000.00 59,400.00
Tukang Kayu L.02 OH 0.33 100,000.00 33,000.00
Kepala Tukang L.03 OH 0.03 110,000.00 3,630.00
Mandor L.04 OH 0.03 115,000.00 3,795.00
JUMLAH TENAGA KERJA 99,825.00
B BAHAN
Kayu kelas III m3 0.04 3,500,000.00 140,000.00
Paku 5 cm – 12 cm kg 0.40 15,000.00 6,000.00
Minyak bekisting Liter 0.20 0.00
Balok kayu kelas II m3 0.02 3,750,000.00 56,250.00
Plywood tebal 9 mm Lbr 0.35 112,500.00 39,375.00
Dolken kayu galam, 8–
Batang 6.00 12,000.00 72,000.00
10 cm panj 4 m
JUMLAH HARGA BAHAN 313,625.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 413,450.00
E Overhead & Profit 10 % 10 % x D 41,345.00
F Harga Satuan Pekerjaan (D+E) 454,795.00
A.4.1.1.25 Pemasangan 1 m2 bekisting untuk dinding

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.66 90,000.00 59,400.00
Tukang Kayu L.02 OH 0.33 100,000.00 33,000.00
Kepala Tukang L.03 OH 0.03 110,000.00 3,630.00
Mandor L.04 OH 0.03 115,000.00 3,795.00
JUMLAH TENAGA KERJA 99,825.00
B BAHAN
Kayu kelas III m3 0.03 3,500,000.00 105,000.00
Paku 5 cm – 12 cm kg 0.40 15,000.00 6,000.00
Minyak bekisting Liter 0.20 0.00
Balok kayu kelas II m3 0.02 3,750,000.00 75,000.00
Plywood tebal 9 mm Lbr 0.35 112,500.00 39,375.00
Dolken kayu Ø 8–10
Batang 3.00 12,000.00 36,000.00
panj 4m
Penjaga jarak
Buah 4.00
bekisting/spacer
JUMLAH HARGA BAHAN 261,375.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 361,200.00
E Overhead & Profit 10 % 10 % x D 36,120.00
F Harga Satuan Pekerjaan (D+E) 397,320.00
A.4.1.1.26 Pemasangan 1 m2 bekisting untuk tangga

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.66 90,000.00 59,400.00
Tukang Kayu L.02 OH 0.33 100,000.00 33,000.00
Kepala Tukang L.03 OH 0.03 110,000.00 3,630.00
Mandor L.04 OH 0.03 115,000.00 3,795.00
JUMLAH TENAGA KERJA 99,825.00
B BAHAN
Kayu kelas III m3 0.03 3,500,000.00 105,000.00
Paku 5 cm – 12 cm kg 0.40 15,000.00 6,000.00
Minyak bekisting Liter 0.15 0.00
Balok kayu kelas II m3 0.02 3,750,000.00 56,250.00
Plywood tebal 9 mm Lbr 0.35 112,500.00 39,375.00
Dolken kayu Ø 8–10
Batang 2.00 12,000.00 24,000.00
panj 4m
JUMLAH HARGA BAHAN 230,625.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 330,450.00
E Overhead & Profit 10 % 10 % x D 33,045.00
F Harga Satuan Pekerjaan (D+E) 363,495.00
A.4.1.1.27 Pemasangan 1 m2 jembatan untuk pengecoran beton

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.15 90,000.00 13,500.00
Tukang Kayu L.02 OH 0.05 100,000.00 5,000.00
Kepala Tukang L.03 OH 0.01 110,000.00 550.00
Mandor L.04 OH 0.01 115,000.00 920.00
JUMLAH TENAGA KERJA 19,970.00
B BAHAN
Kayu kelas III (papan) m3 0.03 2,420,000.00 63,888.00
Paku 5 cm – 12 cm kg 0.60 15,000.00 9,000.00
Dolken kayu Ø 8–10
Batang 0.50 12,000.00 6,000.00
panj 4m
JUMLAH HARGA BAHAN 78,888.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 98,858.00


E Overhead & Profit 10 % 10 % x D 9,885.80
F Harga Satuan Pekerjaan (D+E) 108,743.80
A.4.1.1.28 Membuat 1 m3 pondasi beton bertulang (150 kg besi + bekisting)

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 5.30 90,000.00 477,000.00
Tukang batu L.02 OH 0.28 100,000.00 27,500.00
Tukang kayu L.02 OH 1.30 100,000.00 130,000.00
Tukang besi L.02 OH 1.05 100,000.00 105,000.00
Kepala tukang L.03 OH 0.26 110,000.00 28,820.00
Mandor L.04 OH 0.27 115,000.00 30,475.00
JUMLAH TENAGA KERJA 798,795.00
B BAHAN
Kayu kelas III m3 0.20 3,500,000.00 700,000.00
Paku 5 cm – 12 cm kg 1.50 15,000.00 22,500.00
Minyak bekisting Liter 0.40 0.00
Besi beton polos kg 157.50 14,300.00 2,252,250.00
Kawat beton kg 2.25 20,000.00 45,000.00
Semen Portland kg 336.00 1,700.00 571,200.00
Pasir Beton m3 0.54 150,000.00 81,000.00
Kerikil m3 0.81 200,000.00 162,000.00
JUMLAH HARGA BAHAN 3,833,950.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 4,632,745.00


E Overhead & Profit (Contoh 15%) 10 % x D 463,274.50
F Harga Satuan Pekerjaan (D+E) 5,096,019.50
A.4.1.1.29 Membuat 1 m3 sloof beton bertulang (200 kg besi + bekisting)

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 5.65 90,000.00 508,500.00
Tukang batu L.02 OH 0.28 100,000.00 27,500.00
Tukang kayu L.02 OH 1.56 100,000.00 156,000.00
Tukang besi L.02 OH 1.40 100,000.00 140,000.00
Kepala tukang L.03 OH 0.32 110,000.00 35,530.00
Mandor L.04 OH 0.28 115,000.00 32,545.00
JUMLAH TENAGA KERJA 900,075.00
B BAHAN
Kayu kelas III m3 0.27 3,500,000.00 945,000.00
Paku 5 cm – 12 cm kg 2.00 15,000.00 30,000.00
Minyak bekisting Liter 0.60 0.00
Besi beton polos kg 210.00 14,300.00 3,003,000.00
Kawat beton kg 3.00 20,000.00 60,000.00
Semen Portland kg 336.00 1,700.00 571,200.00
Pasir Beton m3 0.54 150,000.00 81,000.00
Kerikil m3 0.81 200,000.00 162,000.00
JUMLAH HARGA BAHAN 4,852,200.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 5,752,275.00
E Overhead & Profit (Contoh 15%) 10 % x D 575,227.50
F Harga Satuan Pekerjaan (D+E) 6,327,502.50
A.4.1.1.30 Membuat 1 m3 kolom beton bertulang (300 kg besi + bekisting)

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 7.05 90,000.00 634,500.00
Tukang batu L.02 OH 0.28 100,000.00 27,500.00
Tukang kayu L.02 OH 1.65 100,000.00 165,000.00
Tukang besi L.02 OH 2.10 100,000.00 210,000.00
Kepala tukang L.03 OH 0.40 110,000.00 44,330.00
Mandor L.04 OH 0.35 115,000.00 40,595.00
JUMLAH TENAGA KERJA 1,121,925.00
B BAHAN
Kayu kelas III m3 0.40 3,500,000.00 1,400,000.00
Paku 5 cm – 12cm kg 4.00 15,000.00 60,000.00
Minyak bekisting Liter 2.00 0.00
Besi beton polos kg 315.00 14,300.00 4,504,500.00
Kawat beton kg 4.50 20,000.00 90,000.00
Semen Portland kg 336.00 1,700.00 571,200.00
Pasir Beton m3 0.54 150,000.00 81,000.00
Kerikil m3 0.81 200,000.00 162,000.00
Kayu kelas II balok M3 0.15 3,750,000.00 562,500.00
Plywood 9 mm Lbr 3.50 112,500.00 393,750.00
Dolken kayu Ø (8-10)
Batang 20.00 12,000.00 240,000.00
cm, panj 4 m
JUMLAH HARGA BAHAN 8,064,950.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 9,186,875.00
E Overhead & Profit (Contoh 15%) 10 % x D 918,687.50
F Harga Satuan Pekerjaan (D+E) 10,105,562.50
A.4.1.1.31 Membuat 1 m3 balok beton bertulang (200 kg besi + bekisting)

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 6.35 90,000.00 571,500.00
Tukang batu L.02 OH 0.28 100,000.00 27,500.00
Tukang kayu L.02 OH 1.65 100,000.00 165,000.00
Tukang besi L.02 OH 1.40 100,000.00 140,000.00
Kepala tukang L.03 OH 0.33 110,000.00 36,630.00
Mandor L.04 OH 0.32 115,000.00 36,570.00
JUMLAH TENAGA KERJA 977,200.00
B BAHAN
Kayu kelas III m3 0.32 3,500,000.00 1,120,000.00
Paku 5 cm – 12 cm kg 3.20 15,000.00 48,000.00
Minyak bekisting Liter 1.60 0.00
Besi beton polos kg 210.00 14,300.00 3,003,000.00
Kawat beton kg 3.00 20,000.00 60,000.00
Semen Portland kg 336.00 1,700.00 571,200.00
Pasir Beton m3 0.54 150,000.00 81,000.00
Kerikil m3 0.81 200,000.00 162,000.00
Kayu kelas II balok m3 0.14 3,750,000.00 525,000.00
Plywood 9 mm Lembar 2.80 112,500.00 315,000.00
Dolken kayu Ø (8-10)
Batang 16.00 12,000.00 192,000.00
cm, panj 4 m
JUMLAH HARGA BAHAN 6,077,200.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 7,054,400.00


E Overhead & Profit (Contoh 15%) 10 % x D 705,440.00
F Harga Satuan Pekerjaan (D+E) 7,759,840.00
A.4.1.1.32 Membuat 1 m3 kolom beton bertulang (150 kg besi + bekisting)

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 5.30 90,000.00 477,000.00
Tukang batu L.02 OH 0.28 100,000.00 27,500.00
Tukang kayu L.02 OH 1.30 100,000.00 130,000.00
Tukang besi L.02 OH 1.05 100,000.00 105,000.00
Kepala tukang L.03 OH 0.27 110,000.00 29,150.00
Mandor L.04 OH 0.27 115,000.00 30,475.00
JUMLAH TENAGA KERJA 799,125.00
B BAHAN
Kayu kelas III m3 0.32 3,500,000.00 1,120,000.00
Paku 5 cm – 12 cm kg 3.20 15,000.00 48,000.00
Minyak bekisting Liter 1.60 0.00
Besi beton polos kg 157.50 14,300.00 2,252,250.00
Kawat beton kg 2.25 20,000.00 45,000.00
Semen Portland kg 336.00 1,700.00 571,200.00
Pasir Beton m3 0.54 150,000.00 81,000.00
Kerikil m3 0.81 200,000.00 162,000.00
Kayu kelas II balok m3 0.12 3,750,000.00 450,000.00
Plywood 9 mm Lembar 2.80 112,500.00 315,000.00
Dolken kayu Ø (8-10) cm, Batang 32.00
panjang 4 m 12,000.00 384,000.00

JUMLAH HARGA BAHAN 5,428,450.00


C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 6,227,575.00


E Overhead & Profit (Contoh 15%) 10 % x D 622,757.50
F Harga Satuan Pekerjaan (D+E) 6,850,332.50

A.4.1.1.33 Membuat 1 m3 dinding beton bertulang (150 kg besi + bekisting)

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 5.30 90,000.00 477,000.00
Tukang batu L.02 OH 0.28 100,000.00 27,500.00
Tukang kayu L.02 OH 1.30 100,000.00 130,000.00
Tukang besi L.02 OH 1.05 100,000.00 105,000.00
Kepala tukang L.03 OH 0.26 110,000.00 28,820.00
Mandor L.04 OH 0.27 115,000.00 30,475.00
JUMLAH TENAGA KERJA 798,795.00
B BAHAN
Kayu kelas III m3 0.24 3,500,000.00 840,000.00
Paku 5 cm – 12 cm kg 3.20 15,000.00 48,000.00
Minyak bekisting Liter 1.60 0.00
Besi beton polos kg 157.50 14,300.00 2,252,250.00
Kawat beton kg 2.25 20,000.00 45,000.00
Semen Portland kg 336.00 1,700.00 571,200.00
Pasir Beton m3 0.54 150,000.00 81,000.00
Kerikil m3 0.81 200,000.00 162,000.00
Kayu kelas II balok m3 0.16 3,750,000.00 600,000.00
Plywood 9 mm Lembar 2.80 112,500.00 315,000.00
Dolken kayu Ø(8-10)
Batang 24.00 12,000.00 288,000.00
cm, panjang 4 m
JUMLAH HARGA BAHAN 5,202,450.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 6,001,245.00


E Overhead & Profit (Contoh 15%) 10 % x D 600,124.50
F Harga Satuan Pekerjaan (D+E) 6,601,369.50
A.4.1.1.34 Membuat 1 m3 dinding beton bertulang (200 kg besi + bekisting)

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 5.65 90,000.00 508,500.00
Tukang batu L.02 OH 0.28 100,000.00 27,500.00
Tukang kayu L.02 OH 1.56 100,000.00 156,000.00
Tukang besi L.02 OH 1.40 100,000.00 140,000.00
Kepala tukang L.03 OH 0.32 110,000.00 35,530.00
Mandor L.04 OH 0.28 115,000.00 32,545.00
JUMLAH TENAGA KERJA 900,075.00
B BAHAN
Kayu kelas III m3 0.25 3,500,000.00 875,000.00
Paku 5 cm – 12 cm kg 3.00 15,000.00 45,000.00
Minyak bekisting Liter 1.20 0.00
Besi beton polos kg 210.00 14,300.00 3,003,000.00
Kawat beton kg 3.00 20,000.00 60,000.00
Semen Portland kg 336.00 1,700.00 571,200.00
Pasir Beton m3 0.54 150,000.00 81,000.00
Kerikil m3 0.81 200,000.00 162,000.00
Kayu kelas II balok m3 0.11 3,750,000.00 393,750.00
Plywood 9 mm Lembar 2.50 112,500.00 281,250.00
Dolken kayu Ø(8-10)
Batang 14.00 12,000.00 168,000.00
cm, panj 4 m
JUMLAH HARGA BAHAN 5,640,200.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 6,540,275.00


E Overhead & Profit (Contoh 15%) 10 % x D 654,027.50
F Harga Satuan Pekerjaan (D+E) 7,194,302.50

A.4.1.1.35 Membuat 1 m’ kolom praktis beton bertulang (11 x 11) cm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.18 90,000.00 16,200.00
Tukang batu L.02 OH 0.02 100,000.00 2,000.00
Tukang kayu L.02 OH 0.02 100,000.00 2,000.00
Tukang besi L.02 OH 0.02 100,000.00 2,000.00
Kepala tukang L.03 OH 0.01 110,000.00 660.00
Mandor L.04 OH 0.01 115,000.00 1,035.00
JUMLAH TENAGA KERJA 23,895.00
B BAHAN
Kayu kelas III m3 0.00 3,500,000.00 7,000.00
Paku 5 cm – 12 cm kg 0.01 15,000.00 150.00
Minyak bekisting Liter 0.00
Besi beton polos kg 3.00 14,300.00 42,900.00
Kawat beton kg 0.45 20,000.00 9,000.00
Semen Portland kg 4.00 1,700.00 6,800.00
Pasir Beton m3 0.01 150,000.00 900.00
Kerikil m3 0.01 200,000.00 1,800.00
JUMLAH HARGA BAHAN 68,550.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 92,445.00


E Overhead & Profit (Contoh 15%) 10 % x D 9,244.50
F Harga Satuan Pekerjaan (D+E) 101,689.50
A.4.1.1.36 Membuat 1 m’ ring balok beton bertulang (10 x 15) cm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.30 90,000.00 26,730.00
Tukang batu L.02 OH 0.03 100,000.00 3,300.00
Tukang kayu L.02 OH 0.03 100,000.00 3,300.00
Tukang besi L.02 OH 0.03 100,000.00 3,300.00
Kepala tukang L.03 OH 0.01 110,000.00 1,100.00
Mandor L.04 OH 0.02 115,000.00 1,725.00
JUMLAH TENAGA KERJA 39,455.00
B BAHAN
Kayu kelas III m3 0.00 3,500,000.00 10,500.00
Paku 5 cm – 12 cm kg 0.02 15,000.00 300.00
Minyak bekisting Liter 0.00
Besi beton polos kg 3.60 14,300.00 51,480.00
Kawat beton kg 0.05 20,000.00 1,000.00
Semen Portland kg 5.50 1,700.00 9,350.00
Pasir Beton m3 0.01 150,000.00 1,350.00
Kerikil m3 0.02 200,000.00 3,000.00
JUMLAH HARGA BAHAN 76,980.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 116,435.00


E Overhead & Profit (Contoh 15%) 10 % x D 11,643.50
F Harga Satuan Pekerjaan (D+E) 128,078.50
A.4.1.2 HARGA SATUAN PEKERJAAN BETON PRACETAK

A.4.1.2.1. Pembuatan 1 m2 lahan produksi tebal 8cm beton f’c 14,5 Mpa (K 175) slump (12 ± 2) cm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.13 90,000.00 11,880.00
Tukang batu L.02 OH 0.02 100,000.00 2,200.00
Kepala tukang L.03 OH 0.00 110,000.00 220.00
Mandor L.04 OH 0.01 115,000.00 805.00
JUMLAH TENAGA KERJA 15,105.00
B BAHAN
Semen PC Kg 26.08 1,700.00 44,336.00
Pasir beton Kg 60.80 107.14 6,514.29
Kerikil (maks 30mm) Kg 82.32 148.15 12,195.56
Air L 17.20 75.00 1,290.00
JUMLAH HARGA BAHAN 64,335.84
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 79,440.84


E Overhead & Profit10 % 10 % x D 7,944.08
F Harga Satuan Pekerjaan (D+E) 87,384.93

A.4.1.2.2. Pembuatan 1 m2 lahan produksi tebal 10 cm beton f’c 14,5 Mpa (K 175) slump (12 ± 2) cm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.17 90,000.00 14,850.00
Tukang batu L.02 OH 0.03 100,000.00 2,800.00
Kepala tukang L.03 OH 0.00 110,000.00 330.00
Mandor L.04 OH 0.01 115,000.00 920.00
JUMLAH TENAGA KERJA 18,900.00
B BAHAN
Semen PC Kg 32.60 1,700.00 55,420.00
Pasir beton Kg 76.00 107.14 8,142.86
Kerikil (maks 30mm) Kg 102.90 148.15 15,244.44
Air L 21.50 75.00 1,612.50
JUMLAH HARGA BAHAN 80,419.80
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 99,319.80


E Overhead & Profit10 % 10 % x D 9,931.98
F Harga Satuan Pekerjaan (D+E) 109,251.78

A.4.1.2.3. Pembuatan 1 m2 lahan produksi tebal 12 cm beton f’c 14,5 Mpa (K 175) slump (12 ± 2) cm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.20 90,000.00 17,820.00
Tukang batu L.02 OH 0.03 100,000.00 3,300.00
Kepala tukang L.03 OH 0.00 110,000.00 330.00
Mandor L.04 OH 0.01 115,000.00 1,150.00
JUMLAH TENAGA KERJA 22,600.00
B BAHAN
Semen PC Kg 32.12 1,700.00 54,604.00
Pasir beton Kg 91.20 107.14 9,771.43
Kerikil (maks 30mm) Kg 123.48 148.15 18,293.33
Air L 25.80 75.00 1,935.00
JUMLAH HARGA BAHAN 84,603.76
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 107,203.76


E Overhead & Profit10 % 10 % x D 10,720.38
F Harga Satuan Pekerjaan (D+E) 117,924.14
A.4.1.2.4. Pembuatan 1 m2 lahan produksi tebal 15 cm beton f’c 14,5 Mpa (K 175) slump (12 ± 2) cm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.25 90,000.00 22,320.00
Tukang batu L.02 OH 0.04 100,000.00 4,100.00
Kepala tukang L.03 OH 0.00 110,000.00 440.00
Mandor L.04 OH 0.01 115,000.00 1,495.00
JUMLAH TENAGA KERJA 28,355.00
B BAHAN
Semen PC Kg 48.90 1,700.00 83,130.00
Pasir beton Kg 114.00 107.14 12,214.29
Kerikil (maks 30mm) Kg 154.35 148.15 22,866.67
Air L 32.25 75.00 2,418.75
JUMLAH HARGA BAHAN 120,629.70
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 148,984.70


E Overhead & Profit10 % 10 % x D 14,898.47
F Harga Satuan Pekerjaan (D+E) 163,883.17

A.4.1.2.5. Pembuatan 1 m2 bekisting untuk plat beton pracetak ( 5 kali pakai)

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.01 90,000.00 630.00
Tukang batu L.02 OH 0.08 100,000.00 7,600.00
Kepala tukang L.03 OH 0.01 110,000.00 880.00
Mandor L.04 OH 0.00 115,000.00 115.00
JUMLAH TENAGA KERJA 9,225.00
B BAHAN
Lantai kerja tebal 10 cm m3 0.08
Besi hollow 50.50.3 Kg 9.39
Kayu kaso 5/7 m3 0.01
Phenol film 12mm Lbr 0.08
Minyak bekisting L 0.20
Dinabolt dia 12mm
Bh 3.88
(10-15cm)
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 0.00


E Overhead & Profit10 % 10 % x D 0.00
F Harga Satuan Pekerjaan (D+E) 0.00

A.4.1.2.6. Pembuatan 1 m2 bekisting untuk balok beton pracetak ( 10-12 kali pakai)

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.00 90,000.00 360.00
Tukang batu L.02 OH 0.04 100,000.00 3,800.00
Kepala tukang L.03 OH 0.00 110,000.00 440.00
Mandor L.04 OH 0.00 115,000.00 115.00
JUMLAH TENAGA KERJA 4,715.00
B BAHAN
Kayu kaso 5/7 m3 0.01
Phenol film 12mm Lbr 0.04
Minyak bekisting L 0.20
Dinabolt dia 12mm
Bh 0.69
(10-15cm)
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 0.00


E Overhead & Profit10 % 10 % x D 0.00
F Harga Satuan Pekerjaan (D+E) 0.00

A.4.1.2.7. Pembuatan 1 m2 bekisting untuk kolom beton pracetak (10-12 kali pakai)

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.00 90,000.00 360.00
Tukang batu L.02 OH 0.04 100,000.00 3,800.00
Kepala tukang L.03 OH 0.00 110,000.00 440.00
Mandor L.04 OH 0.00 115,000.00 115.00
JUMLAH TENAGA KERJA
B BAHAN
Kayu kaso 5/7 m3 0.00
Phenol film 12mm Lbr 0.05
Minyak bekisting L 0.20
Paku 5-7cm Kg 0.05
Dinabolt dia 12mm
Bh 0.69
(10-15cm)
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 0.00


E Overhead & Profit10 % 10 % x D 0.00
F Harga Satuan Pekerjaan (D+E) 0.00

A.4.1.2.8. Pemasangan dan membuka bekisting 1 buah komponen plat beton pracetak

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.05
Tukang kayu OH 0.02
Mandor L.04 OH 0.01
JUMLAH TENAGA KERJA
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 0.00
E Overhead & Profit10 % 10 % x D 0.00
F Harga Satuan Pekerjaan (D+E) 0.00

A.4.1.2.9. Pemasangan dan membuka bekisting 1 buah komponen balok beton pracetak

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.09
Tukang kayu OH 0.03
Mandor L.04 OH 0.01
JUMLAH TENAGA KERJA
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 0.00
E Overhead & Profit10 % 10 % x D 0.00
F Harga Satuan Pekerjaan (D+E) 0.00
A.4.1.2.10. Pemasangan dan membuka bekisting 1 buah komponen Kolom beton pracetak

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.07
Tukang kayu OH 0.02
Mandor L.04 OH 0.01
JUMLAH TENAGA KERJA
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 0.00


E Overhead & Profit10 % 10 % x D 0.00
F Harga Satuan Pekerjaan (D+E) 0.00

A.4.1.2.11. Penuangan/menebar beton untuk 1 buah komponen plat pracetak

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.06
Tukang batu L.02 OH 0.24
Tukang vibrator L.02 OH 0.13
Kepala Tukang L.03 OH 0.03
Mandor L.04 OH 0.07
JUMLAH TENAGA KERJA
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 0.00


E Overhead & Profit10 % 10 % x D 0.00
F Harga Satuan Pekerjaan (D+E) 0.00

A.4.1.2.12. Penuangan/menebar beton untuk 1 buah komponen balok pracetak

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.07
Tukang batu L.02 OH 0.24
Tukang vibrator L.02 OH 0.14
Kepala Tukang L.03 OH 0.04
Mandor L.04 OH 0.07
JUMLAH TENAGA KERJA
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 0.00


E Overhead & Profit10 % 10 % x D 0.00
F Harga Satuan Pekerjaan (D+E) 0.00
A.4.1.2.13. Penuangan/menebar beton untuk 1 buah komponen kolom pracetak

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.06
Tukang batu L.02 OH 0.21
Tukang vibrator L.02 OH 0.12
Kepala Tukang L.03 OH 0.03
Mandor L.04 OH 0.07
JUMLAH TENAGA KERJA
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 0.00


E Overhead & Profit10 % 10 % x D 0.00
F Harga Satuan Pekerjaan (D+E) 0.00

A.4.1.2.14. Mendirikan 1 buah komponen plat pracetak

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.07
Tukang batu L.02 OH 0.07
Tukang erection L.02 OH 0.13
Kepala Tukang L.03 OH 0.07
Mandor L.04 OH 0.07
JUMLAH TENAGA KERJA
B BAHAN
Solar L 6.68
JUMLAH HARGA BAHAN
C PERALATAN
Sewa crane UH 0.07
Sewa pipe support UH 1.10
JUMLAH HARGA ALAT

D Jumlah (A+B+C) 0.00


E Overhead & Profit10 % 10 % x D 0.00
F Harga Satuan Pekerjaan (D+E) 0.00

A.4.1.2.15. Mendirikan 1 buah komponen balok pracetak

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.06
Tukang batu L.02 OH 0.06
Tukang erection L.02 OH 0.12
Operator crane OH 0.06
Pembantu operator
OH 0.06
crane
Kepala Tukang L.03 OH 0.06
Mandor L.04 OH 0.06
JUMLAH TENAGA KERJA
B BAHAN
Solar L 6.11
JUMLAH HARGA BAHAN
C PERALATAN
Sewa crane UH 0.06
Sewa chaffolding UH 1.10
JUMLAH HARGA ALAT

D Jumlah (A+B+C) 0.00


E Overhead & Profit10 % 10 % x D 0.00
F Harga Satuan Pekerjaan (D+E) 0.00
A.4.1.2.16. Mendirikan 1 buah komponen kolom pracetak

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.08
Tukang batu L.02 OH 0.08
Tukang erection L.02 OH 0.17
Operator crane OH 0.08
Pembantu operator
OH 0.08
crane
Kepala Tukang L.03 OH 0.08
Mandor L.04 OH 0.08
JUMLAH TENAGA KERJA
B BAHAN
Solar L 8.28
JUMLAH HARGA BAHAN
C PERALATAN
Sewa crane UH 0.08
Sewa pipe support UH 2.20
JUMLAH HARGA ALAT

D Jumlah (A+B+C) 0.00


E Overhead & Profit10 % 10 % x D 0.00
F Harga Satuan Pekerjaan (D+E) 0.00

A.4.1.2.17. Melangsir 1 buah komponen plat pracetak ( ± 20 m)

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.02
Tukang batu L.02 OH 0.04
Operator crane OH 0.02
Pembantu operator
OH 0.02
crane
JUMLAH TENAGA KERJA
B BAHAN
Solar L 1.90
JUMLAH HARGA BAHAN
C PERALATAN
Sewa crane UH 0.02
JUMLAH HARGA ALAT

D Jumlah (A+B+C) 0.00


E Overhead & Profit10 % 10 % x D 0.00
F Harga Satuan Pekerjaan (D+E) 0.00

A.4.1.2.18. Melangsir 1 buah komponen balok pracetak ( ± 20 m)

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.02
Tukang batu L.02 OH 0.04
Operator crane OH 0.02
Pembantu operator
OH 0.02
crane
JUMLAH TENAGA KERJA
B BAHAN
Solar L 1.90
JUMLAH HARGA BAHAN
C PERALATAN
Sewa crane UH 0.02
JUMLAH HARGA ALAT

D Jumlah (A+B+C) 0.00


E Overhead & Profit10 % 10 % x D 0.00
F Harga Satuan Pekerjaan (D+E) 0.00
A.4.1.2.19. Melangsir 1 buah komponen kolom pracetak ( ± 20 m)

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.02
Tukang batu L.02 OH 0.04
Operator crane OH 0.02
Pembantu operator
OH 0.02
crane
JUMLAH TENAGA KERJA
B BAHAN
Solar L 1.90
JUMLAH HARGA BAHAN
C PERALATAN
Sewa crane UH 0.02
JUMLAH HARGA ALAT

D Jumlah (A+B+C) 0.00


E Overhead & Profit10 % 10 % x D 0.00
F Harga Satuan Pekerjaan (D+E) 0.00

A.4.1.2.20. Bahan 1 m3 grouting campuran

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
JUMLAH TENAGA KERJA
B BAHAN
Semen grout Kg 1,200.00
Screening Kg 650.00
Air L 350.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 0.00


E Overhead & Profit10 % 10 % x D 0.00
F Harga Satuan Pekerjaan (D+E) 0.00

A.4.1.2.21. Bahan 1 m3 grouting tidak campuran

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
JUMLAH TENAGA KERJA
B BAHAN
Semen grout Kg 1,850.00
Air L 400.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 0.00
E Overhead & Profit10 % 10 % x D 0.00
F Harga Satuan Pekerjaan (D+E) 0.00

A.4.1.2.22. Upah melakukan 1 titik grouting pada join pracetak

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Tukang batu L.02 OH 0.37
Kepal tukang L.03 OH 0.07
Mandor L.04 OH 0.04
JUMLAH TENAGA KERJA
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 0.00


E Overhead & Profit10 % 10 % x D 0.00
F Harga Satuan Pekerjaan (D+E) 0.00
A.4.1.2.23. Pemasangan 1 titik Bekisting join pracetak

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja 0.15
Tukang kayu L.02 OH 0.15
Kepala tukang L.03 OH 0.02
Mandor L.04 OH 0.01
JUMLAH TENAGA KERJA
B BAHAN
Kayu kaso 5/7 m3 0.01
Papan cor m3 0.00
Paku 5-7cm Kg 0.26
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 0.00
E Overhead & Profit 10 % x D 0.00
F Harga Satuan Pekerjaan (D+E) 0.00

A.4.1.2.24. Upah 1 titik Join dengan Sling

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja 0.22
Tukang kayu L.02 OH 0.22
Tukang besi L.02 OH 0.22
Mandor L.04 OH 0.01
JUMLAH TENAGA KERJA
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 0.00


E Overhead & Profit10 % 10 % x D 0.00
F Harga Satuan Pekerjaan (D+E) 0.00
A.4.2.1 HARGA SATUAN PEKERJAAN BESI DAN ALUMUNIUM

A.4.2.1.1. Pemasangan 1 kg besi profil

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.06 90,000.00 5,400.00
Tukang Las Konstruksi L.03 OH 0.06 100,000.00 6,000.00
Kepala tukang L.03 OH 0.01 110,000.00 660.00
Mandor L.04 OH 0.00 115,000.00 345.00
JUMLAH TENAGA KERJA 12,405.00
B BAHAN
Besi Profil Kg 1.15 0.00
JUMLAH HARGA BAHAN 0.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 12,405.00


E Overhead & Profit10 % 10 % x D 1,240.50
F Harga Satuan Pekerjaan (D+E) 13,645.50

A.4.2.1.2. Pemasangan 1 kg rangka kuda-kuda baja IWF

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.06 90,000.00 5,400.00
Tukang Las Konstruksi L.03 OH 0.06 100,000.00 6,000.00
Kepala tukang L.03 OH 0.01 110,000.00 660.00
Mandor L.04 OH 0.00 115,000.00 345.00
JUMLAH TENAGA KERJA
B BAHAN
Besi Baja IWF Kg 1.15
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 0.00


E Overhead & Profit10 % 10 % x D 0.00
F Harga Satuan Pekerjaan (D+E) 0.00

A.4.2.1.3. Pengerjaan 100 kg pekerjaan perakitan

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.10 90,000.00 9,000.00
Tukang Besi Konstruksi L.03 OH 0.10 100,000.00 10,000.00
Kepala tukang L.03 OH 0.00 110,000.00 110.00
Mandor L.04 OH 0.01 115,000.00 575.00
JUMLAH TENAGA KERJA
B BAHAN
Solar Liter 1.00
Minyak pelumas Liter 0.10
JUMLAH HARGA BAHAN
C PERALATAN
1.  Sewa alat Jam 0.80
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 0.00
E Overhead & Profit10 % 10 % x D 0.00
F Harga Satuan Pekerjaan (D+E) 0.00
A.4.2.1.4. Pembuatan 1 m2 pintu besi plat baja tebal 2 mm rangkap, rangka baja siku

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 1.05 90,000.00 94,500.00
Tukang Las Biasa L.03 OH 1.05 100,000.00 105,000.00
Kepala tukang L.03 OH 0.11 110,000.00 11,550.00
Mandor L.04 OH 0.05 115,000.00 5,980.00
JUMLAH TENAGA KERJA
B BAHAN
Besi siku L 30.30.3 Kg 15.00
Besi plat baja Kg 32.80
Kawat las Kg 0.05
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 0.00


E Overhead & Profit10 % 10 % x D 0.00
F Harga Satuan Pekerjaan (D+E) 0.00

A.4.2.1.5. Pengerjaan 10 cm pengelasan dengan las listrik

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.04 90,000.00 3,600.00
Tukang Besi Konstruksi L.03 OH 0.02 100,000.00 2,000.00
Kepala tukang L.03 OH 0.00 110,000.00 220.00
Mandor L.04 OH 0.00 115,000.00 230.00
JUMLAH TENAGA KERJA
B BAHAN
Kawat las listrik Kg 0.40
Solar Liter 0.30
Minyak pelumas Liter 0.04
JUMLAH HARGA BAHAN
C PERALATAN
Sewa alat Jam 0.17
JUMLAH HARGA ALAT

D Jumlah (A+B+C) 0.00


E Overhead & Profit10 % 10 % x D 0.00
F Harga Satuan Pekerjaan (D+E) 0.00

A.4.2.1.6. Pembuatan 1 m2 rangka jendela besi scuare tube (25 x 5) cm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.65 90,000.00 58,500.00
Tukang Las Biasa L.03 OH 0.65 100,000.00 65,000.00
Kepala tukang L.03 OH 0.07 110,000.00 7,150.00
Mandor L.04 OH 0.03 115,000.00 3,680.00
JUMLAH TENAGA KERJA
B BAHAN
Besi scuare tube m 4.76
Besi lis kaca (1 x 1) cm m 4.52
Pengelasan cm 20.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A+B+C) 0.00


E Overhead & Profit10 % 10 % x D 0.00
F Harga Satuan Pekerjaan (D+E) 0.00
A.4.2.1.7. Pemasangan 1 m2 pintu rolling door besi

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 1.20 90,000.00 108,000.00
Tukang Las Biasa L.03 OH 1.20 100,000.00 120,000.00
Kepala tukang L.03 OH 0.12 110,000.00 13,200.00
Mandor L.04 OH 0.01 115,000.00 690.00
JUMLAH TENAGA KERJA
B BAHAN
Pintu gulung besi m2 1.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 0.00


E Overhead & Profit10 % 10 % x D 0.00
F Harga Satuan Pekerjaan (D+E) 0.00

A.4.2.1.8. Pemasangan 1 m2 pintu lipat (folding door) bahan plastik/PVC

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.44 90,000.00 39,600.00
Tukang L.03 OH 0.44 100,000.00 44,000.00
Kepala tukang L.03 OH 0.04 110,000.00 4,840.00
Mandor L.04 OH 0.02 115,000.00 2,530.00
JUMLAH TENAGA KERJA
B BAHAN
Pintu lipat m2 1.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 0.00


E Overhead & Profit10 % 10 % x D 0.00
F Harga Satuan Pekerjaan (D+E) 0.00

A.4.2.1.9. Pemasangan 1 m2 sunscreen alluminium

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.08 90,000.00 7,200.00
Tukang L.03 OH 0.80 100,000.00 80,000.00
Kepala tukang L.03 OH 0.08 110,000.00 8,800.00
Mandor L.04 OH 0.00 115,000.00 460.00
JUMLAH TENAGA KERJA
B BAHAN
Sunscreen alluminium m2 1.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 0.00


E Overhead & Profit10 % 10 % x D 0.00
F Harga Satuan Pekerjaan (D+E) 0.00
A.4.2.1.10. Pemasangan 1 m2 rolling door alluminium

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 1.00 90,000.00 90,000.00
Tukang Khusus Alumunium L.03 OH 1.00 100,000.00 100,000.00
Kepala tukang L.03 OH 0.10 110,000.00 11,000.00
Mandor L.04 OH 0.05 115,000.00 5,750.00
JUMLAH TENAGA KERJA
B BAHAN
Rolling dor alluminium m2 1.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 0.00


E Overhead & Profit10 % 10 % x D 0.00
F Harga Satuan Pekerjaan (D+E) 0.00

A.4.2.1.11. Pemasangan 1 m kusen pintu alluminium

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.04 90,000.00 3,870.00
Tukang Khusus Alumunium L.03 OH 0.04 100,000.00 4,300.00
Kepala tukang L.03 OH 0.00 110,000.00 473.00
Mandor L.04 OH 0.00 115,000.00 241.50
JUMLAH TENAGA KERJA
B BAHAN
Profil alluminium m 1.10
Skrup fixer buah 2.00
Sealant Tube 0.06
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 0.00


E Overhead & Profit10 % 10 % x D 0.00
F Harga Satuan Pekerjaan (D+E) 0.00

A.4.2.1.12. Pemasangan 1 m2 pintu alluminium strip lebar 8 cm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.09 90,000.00 7,650.00

Tukang Khusus Allumunium L.03 OH 0.09 100,000.00 8,500.00

Kepala tukang L.03 OH 0.01 110,000.00 935.00


Mandor L.04 OH 0.00 115,000.00 483.00
JUMLAH TENAGA KERJA
B BAHAN
Profil alluminium m 4.40
Alluminium strip m 14.60
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 0.00
E Overhead & Profit10 % 10 % x D 0.00
F Harga Satuan Pekerjaan (D+E) 0.00
A.4.2.1.13. Pemasangan 1 m2 pintu kaca rangka alluminium

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.09 90,000.00 7,650.00
Tukang Allumunium/Kaca L.03 OH 0.09 100,000.00 8,500.00
Kepala tukang L.03 OH 0.01 110,000.00 990.00
Mandor L.04 OH 0.01 115,000.00 575.00
JUMLAH TENAGA KERJA
B BAHAN
Pintu alluminium m 4.40
Profil kaca m 4.50
Sealant Tube 0.27
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 0.00


E Overhead & Profit10 % 10 % x D 0.00
F Harga Satuan Pekerjaan (D+E) 0.00

A.4.2.1.14.Pemasangan 1 m2 venetions blinds dan Vertical blinds

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.35 90,000.00 31,500.00
Tukang L.03 OH 0.35 100,000.00 35,000.00
Kepala tukang L.03 OH 0.04 110,000.00 3,850.00
Mandor L.04 OH 0.02 115,000.00 2,070.00
JUMLAH TENAGA KERJA
B BAHAN
Venetions blinds dan
m2 1.00
vertical blinds (tirai)
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 0.00


E Overhead & Profit10 % 10 % x D 0.00
F Harga Satuan Pekerjaan (D+E) 0.00

A.4.2.1.15. Pemasangan 1 m2 terali besi strip (2 x 3) mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 1.67 90,000.00 150,300.00
Tukang Las L.03 OH 0.17 100,000.00 16,700.00
Kepala tukang L.03 OH 0.17 110,000.00 18,370.00
Mandor L.04 OH 0.08 115,000.00 9,545.00
JUMLAH TENAGA KERJA 194,915.00
B BAHAN
Besi strip kg 6.18 16,500.00 101,920.50
Pengelasan cm 27.08 500.00 13,540.00
JUMLAH HARGA BAHAN 115,460.50
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 310,375.50
E Overhead & Profit10 % 10 % x D 31,037.55
F Harga Satuan Pekerjaan (D+E) 341,413.05
A.4.2.1.16. Pemasangan 1 m2 kawat nyamuk

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.10 90,000.00 9,000.00
Tukang L.03 OH 0.10 100,000.00 10,000.00
Kepala tukang L.03 OH 0.01 110,000.00 1,100.00
Mandor L.04 OH 0.01 115,000.00 575.00
JUMLAH TENAGA KERJA
B BAHAN
Kawat nyamuk m2 1.10
Pengelasan cm 11.11
Baja strip (0,2 x 2) cm kg 1.72
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 0.00


E Overhead & Profit10 % 10 % x D 0.00
F Harga Satuan Pekerjaan (D+E) 0.00

A.4.2.1.17. Pemasangan 1 m2 jendela nako & tralis

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.20 90,000.00 18,000.00
Tukang L.03 OH 0.20 100,000.00 20,000.00
Kepala tukang L.03 OH 0.02 110,000.00 2,200.00
Mandor L.04 OH 0.00 115,000.00 115.00
JUMLAH TENAGA KERJA
B BAHAN
Jendela nako
m2 1.10
(rangka + kaca 5 mm)
Paku skrup
buah 10.00
1 cm – 2,5 cm
Besi strip m 7.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 0.00


E Overhead & Profit10 % 10 % x D 0.00
F Harga Satuan Pekerjaan (D+E) 0.00

A.4.2.1.18. Pemasangan 1 m’ talang datar/ jurai seng bjls 28 lebar 90 cm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.20 90,000.00 18,000.00
Tukang L.03 OH 0.20 100,000.00 20,000.00
Kepala tukang L.03 OH 0.02 110,000.00 2,200.00
Mandor L.04 OH 0.00 115,000.00 115.00
JUMLAH TENAGA KERJA 40,315.00
B BAHAN
Seng plat m 1.05 42,000.00 44,100.00
Paku 1 cm - 2,5 cm kg 0.02 15,000.00 225.00
Papan kayu kelas II atau III m3 0.02 3,750,000.00 71,250.00
JUMLAH HARGA BAHAN 115,575.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 155,890.00


E Overhead & Profit10 % 10 % x D 15,589.00
F Harga Satuan Pekerjaan (D+E) 171,479.00
A.4.2.1.19 Pemasangan 1 m talang ½ lingkaran D-15 cm, seng plat bjls 30 lebar 45 cm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.15 90,000.00 13,500.00
Tukang L.03 OH 0.30 100,000.00 30,000.00
Kepala tukang L.03 OH 0.03 110,000.00 3,300.00
Mandor L.04 OH 0.01 115,000.00 920.00
JUMLAH TENAGA KERJA 47,720.00
B BAHAN
Seng plat m 1.05 42,000.00 44,100.00
Paku 1 cm – 2,5 cm kg 0.01 15,000.00 150.00
Besi strip kg 0.50 16,500.00 8,250.00
JUMLAH HARGA BAHAN 52,500.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 96,600.00


E Overhead & Profit10 % 10 % x D 9,660.00
F Harga Satuan Pekerjaan (D+E) 106,260.00

A.4.2.1.20.Pemasangan 1 m2 rangka besi hollow 1x40.40.2mm, modul 60 x 120 cm, dinding partisi

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.25 90,000.00 22,500.00
Tukang Besi L.02 OH 0.25 100,000.00 25,000.00
Kepala Tukang L.03 OH 0.03 110,000.00 2,750.00
Mandor L.04 OH 0.01 115,000.00 1,495.00
JUMLAH TENAGA KERJA 51,745.00
B BAHAN
Rangka metal hollow
m' 3.50 5,637.50 19,731.25
40.40.2 mm
Assesoris (perkuatan, las
Ls 3.50 5,637.50 19,731.25
dll)
JUMLAH HARGA BAHAN 39,462.50
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 91,207.50


E Overhead & Profit10 % 10 % x D 9,120.75
F Harga Satuan Pekerjaan (D+E) 100,328.25

A.4.2.1.21. Pemasangan 1 m2 rangka besi hollow 1x40.40.2mm, modul 60 x 60 cm, plafon

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.35 90,000.00 31,500.00
Tukang Besi L.02 OH 0.35 100,000.00 35,000.00
Kepala Tukang L.03 OH 0.04 110,000.00 3,850.00
Mandor L.04 OH 0.02 115,000.00 2,070.00
JUMLAH TENAGA KERJA 72,420.00
B BAHAN
Rangka metal hollow
m' 4.00 5,637.50 22,550.00
40.40.2 mm
Assesoris (perkuatan, las
Ls 4.00 5,637.50 22,550.00
dll)
JUMLAH HARGA BAHAN 45,100.00
C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A+B+C) 117,520.00


E Overhead & Profit10 % 10 % x D 11,752.00
F Harga Satuan Pekerjaan (D+E) 129,272.00
A.4.4.1 HARGA SATUAN PEKERJAAN PASANGAN DINDING

A. 4.4.1.1. Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1SP : 2PP

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.60 90,000.00 54,000.00
Tukang Batu L.02 OH 0.20 100,000.00 20,000.00
Kepala Tukang L.03 OH 0.02 110,000.00 2,200.00
Mandor L.04 OH 0.03 115,000.00 3,450.00
JUMLAH TENAGA KERJA 79,650.00
B BAHAN
Bata merah bh 140.00 875.00 122,500.00
Semen Portland Kg 43.50 1,700.00 73,950.00
Pasir Pasang m3 0.08 150,000.00 12,000.00
JUMLAH HARGA BAHAN 208,450.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 288,100.00


E Overhead & Profit 10 % 10 % x D 28,810.00
F Harga Satuan Pekerjaan (D+E) 316,910.00

A. 4.4.1.2. Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1SP : 3PP

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.60 90,000.00 54,000.00
Tukang Batu L.02 OH 0.20 100,000.00 20,000.00
Kepala Tukang L.03 OH 0.02 110,000.00 2,200.00
Mandor L.04 OH 0.03 115,000.00 3,450.00
JUMLAH TENAGA KERJA 79,650.00
B BAHAN
Bata merah bh 140.00 875.00 122,500.00
Semen Portland Kg 32.95 1,700.00 56,015.00
Pasir Pasang m3 0.09 150,000.00 13,650.00
JUMLAH HARGA BAHAN 192,165.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 271,815.00


E Overhead & Profit 10 % 10 % x D 27,181.50
F Harga Satuan Pekerjaan (D+E) 298,996.50

A. 4.4.1.3. Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1SP : 4PP

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.60 90,000.00 54,000.00
Tukang Batu L.02 OH 0.20 100,000.00 20,000.00
Kepala Tukang L.03 OH 0.02 110,000.00 2,200.00
Mandor L.04 OH 0.03 115,000.00 3,450.00
JUMLAH TENAGA KERJA 79,650.00
B BAHAN
Bata merah bh 140.00 875.00 122,500.00
Semen Portland Kg 26.55 1,700.00 45,135.00
Pasir Pasang m3 0.09 150,000.00 13,950.00
JUMLAH HARGA BAHAN 181,585.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 261,235.00


E Overhead & Profit 10 % 10 % x D 26,123.50
F Harga Satuan Pekerjaan (D+E) 287,358.50
A. 4.4.1.4. Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1SP : 5PP

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.60 90,000.00 54,000.00
Tukang Batu L.02 OH 0.20 100,000.00 20,000.00
Kepala Tukang L.03 OH 0.02 110,000.00 2,200.00
Mandor L.04 OH 0.03 115,000.00 3,450.00
JUMLAH TENAGA KERJA 79,650.00
B BAHAN
Bata merah bh 140.00 875.00 122,500.00
Semen Portland Kg 22.20 1,700.00 37,740.00
Pasir Pasang m3 0.10 150,000.00 15,300.00
JUMLAH HARGA BAHAN 175,540.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 255,190.00


E Overhead & Profit 10 % 10 % x D 25,519.00
F Harga Satuan Pekerjaan (D+E) 280,709.00

A. 4.4.1.5 Pemasangan 1m2 Dinding Bata Merah (5x11x22) cm tebal 1 batu campuran 1SP : 6PP

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.60 90,000.00 54,000.00
Tukang Batu L.02 OH 0.20 100,000.00 20,000.00
Kepala Tukang L.03 OH 0.02 110,000.00 2,200.00
Mandor L.04 OH 0.03 115,000.00 3,450.00
JUMLAH TENAGA KERJA 79,650.00
B BAHAN
Bata merah bh 140.00 875.00 122,500.00
Semen Portland Kg 18.50 1,700.00 31,450.00
Pasir Pasang m3 0.12 150,000.00 18,300.00
JUMLAH HARGA BAHAN 172,250.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 251,900.00


E Overhead & Profit 10 % 10 % x D 25,190.00
F Harga Satuan Pekerjaan (D+E) 277,090.00

A. 4.4.1.6 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1SP : 3KP : 10PP

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.60 90,000.00 54,000.00
Tukang Batu L.02 OH 0.20 100,000.00 20,000.00
Kepala Tukang L.03 OH 0.02 110,000.00 2,200.00
Mandor L.04 OH 0.03 115,000.00 3,450.00
JUMLAH TENAGA KERJA 79,650.00
B BAHAN
Bata merah bh 140.00 875.00 122,500.00
Semen Portland Kg 10.08 1,700.00 17,136.00
Kapur Padam m3 0.03 2,000.00 55.00
Pasir Pasang m3 0.09 150,000.00 13,875.00
JUMLAH HARGA BAHAN 153,566.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 233,216.00


E Overhead & Profit 10 % 10 % x D 23,321.60
F Harga Satuan Pekerjaan (D+E) 256,537.60
A. 4.4.1.7 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP : 2PP

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.30 90,000.00 27,000.00
Tukang Batu L.02 OH 0.10 100,000.00 10,000.00
Kepala Tukang L.03 OH 0.01 110,000.00 1,100.00
Mandor L.04 OH 0.02 115,000.00 1,725.00
JUMLAH TENAGA KERJA 39,825.00
B BAHAN
Bata merah bh 70.00 875.00 61,250.00
Semen Portland Kg 18.95 1,700.00 32,215.00
Pasir Pasang m3 0.04 150,000.00 5,700.00
JUMLAH HARGA BAHAN 99,165.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 138,990.00


E Overhead & Profit 10 % 10 % x D 13,899.00
F Harga Satuan Pekerjaan (D+E) 152,889.00

A. 4.4.1.8 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP : 3PP

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.30 90,000.00 27,000.00
Tukang Batu L.02 OH 0.10 100,000.00 10,000.00
Kepala Tukang L.03 OH 0.01 110,000.00 1,100.00
Mandor L.04 OH 0.02 115,000.00 1,725.00
JUMLAH TENAGA KERJA 39,825.00
B BAHAN
Bata merah bh 70.00 875.00 61,250.00
Semen Portland Kg 14.37 1,700.00 24,429.00
Pasir Pasang m3 0.04 150,000.00 6,000.00
JUMLAH HARGA BAHAN 91,679.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 131,504.00


E Overhead & Profit 10 % 10 % x D 13,150.40
F Harga Satuan Pekerjaan (D+E) 144,654.40

A.4.4.1.9 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP :4PP

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.30 90,000.00 27,000.00
Tukang Batu L.02 OH 0.10 100,000.00 10,000.00
Kepala Tukang L.03 OH 0.01 110,000.00 1,100.00
Mandor L.04 OH 0.02 115,000.00 1,725.00
JUMLAH TENAGA KERJA 39,825.00
B BAHAN
Bata merah bh 70.00 875.00 61,250.00
Semen Portland Kg 11.50 1,700.00 19,550.00
Pasir Pasang m3 0.04 150,000.00 6,450.00
JUMLAH HARGA BAHAN 87,250.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 127,075.00


E Overhead & Profit 10 % 10 % x D 12,707.50
F Harga Satuan Pekerjaan (D+E) 139,782.50
A. 4.4.1.10 Pemasangan 1m2 dinding bata merah (5x11x22)cm tebal ½ batu campuran 1SP :5PP

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.30 90,000.00 27,000.00
Tukang Batu L.02 OH 0.10 100,000.00 10,000.00
Kepala Tukang L.03 OH 0.01 110,000.00 1,100.00
Mandor L.04 OH 0.02 115,000.00 1,725.00
JUMLAH TENAGA KERJA 39,825.00
B BAHAN
Bata merah bh 70.00 875.00 61,250.00
Semen Portland Kg 9.68 1,700.00 16,456.00
Pasir Pasang m3 0.05 150,000.00 6,750.00
JUMLAH HARGA BAHAN 84,456.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 124,281.00


E Overhead & Profit 10 % 10 % x D 12,428.10
F Harga Satuan Pekerjaan (D+E) 136,709.10

A. 4.4.1.11 Pemasangan 1m2 dinding bata merah (5x11x22)cm tebal ½ batu campuran 1SP : 6PP

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.30 90,000.00 27,000.00
Tukang Batu L.02 OH 0.10 100,000.00 10,000.00
Kepala Tukang L.03 OH 0.01 110,000.00 1,100.00
Mandor L.04 OH 0.02 115,000.00 1,725.00
JUMLAH TENAGA KERJA 39,825.00
B BAHAN
Bata merah bh 70.00 875.00 61,250.00
Semen Portlandd Kg 8.32 1,700.00 14,144.00
Pasir Pasang m3 0.05 150,000.00 7,350.00
JUMLAH HARGA BAHAN 82,744.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 122,569.00


E Overhead & Profit 10 % 10 % x D 12,256.90
F Harga Satuan Pekerjaan (D+E) 134,825.90

A. 4.4.1.12 Pemasangan 1m2 dinding bata merah (5x11x22)cm tebal ½ batu campuran 1SP :8PP

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.30 90,000.00 27,000.00
Tukang Batu L.02 OH 0.10 100,000.00 10,000.00
Kepala Tukang L.03 OH 0.01 110,000.00 1,100.00
Mandor L.04 OH 0.02 115,000.00 1,725.00
JUMLAH TENAGA KERJA 39,825.00
B BAHAN
Bata merah bh 70.00 875.00 61,250.00
Semen Portlandd Kg 6.50 1,700.00 11,050.00
Pasir Pasang m3 0.05 150,000.00 7,500.00
JUMLAH HARGA BAHAN 79,800.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 119,625.00


E Overhead & Profit 10 % 10 % x D 11,962.50
F Harga Satuan Pekerjaan (D+E) 131,587.50
A. 4.4.1.13 Pemasangan 1m2 dinding bata merah (5x11x22)cm tebal ½ batu campuran 1SP : 3KP :10PP

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.30 90,000.00 27,000.00
Tukang Batu L.02 OH 0.10 100,000.00 10,000.00
Kepala Tukang L.03 OH 0.01 110,000.00 1,100.00
Mandor L.04 OH 0.02 115,000.00 1,725.00
JUMLAH TENAGA KERJA 39,825.00
B BAHAN
Bata merah bh 70.00 875.00 61,250.00
Semen Portland Kg 4.50 1,700.00 7,650.00
Kapur Padam m3 0.02 2,000.00 30.00
Pasir Pasang m3 0.05 150,000.00 7,500.00
JUMLAH HARGA BAHAN 76,430.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 116,255.00


E Overhead & Profit 10 % 10 % x D 11,625.50
F Harga Satuan Pekerjaan (D+E) 127,880.50

A. 4.4.1.14 Pemasangan 1m2 dinding bata merah (5x11x22)cm tebal ½ batu campuran 1SM : 1KP :1PP

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.30 90,000.00 27,000.00
Tukang Batu L.02 OH 0.10 100,000.00 10,000.00
Kepala Tukang L.03 OH 0.01 110,000.00 1,100.00
Mandor L.04 OH 0.02 115,000.00 1,725.00
JUMLAH TENAGA KERJA 39,825.00
B BAHAN
Bata merah bh 70.00 875.00 61,250.00
Semen Merah Kg 0.02 13,000.00 234.00
Kapur Padam m3 0.02 2,000.00 36.00
Pasir Pasang m3 0.02 150,000.00 2,700.00
JUMLAH HARGA BAHAN 64,220.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 104,045.00


E Overhead & Profit 10 % 10 % x D 10,404.50
F Harga Satuan Pekerjaan (D+E) 114,449.50

A. 4.4.1.15 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SM : 1KP :2PP

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.30 90,000.00 27,000.00
Tukang Batu L.02 OH 0.10 100,000.00 10,000.00
Kepala Tukang L.03 OH 0.01 110,000.00 1,100.00
Mandor L.04 OH 0.02 115,000.00 1,725.00
JUMLAH TENAGA KERJA 39,825.00
B BAHAN
Bata merah bh 70.00 875.00 61,250.00
Semen Merah Kg 0.01 13,000.00 182.00
Kapur Padam m3 0.01 2,000.00 28.00
Pasir Pasang m3 0.03 150,000.00 4,200.00
JUMLAH HARGA BAHAN 65,660.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 105,485.00


E Overhead & Profit 10 % 10 % x D 10,548.50
F Harga Satuan Pekerjaan (D+E) 116,033.50
A. 4.4.1.16 Pemasangan 1m2 dinding conblock HB20 campuran 1SP : 3PP

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.35 90,000.00 31,500.00
Tukang Batu L.02 OH 0.15 100,000.00 15,000.00
Kepala Tukang L.03 OH 0.02 110,000.00 1,650.00
Mandor L.04 OH 0.02 115,000.00 2,070.00
JUMLAH TENAGA KERJA 50,220.00
B BAHAN
HB-20 bh 12.50 3,250.00 40,625.00
Semen Portland Kg 30.32 1,700.00 51,544.00
Pasir Pasang m3 0.73 150,000.00 109,200.00
Besi angker diameter 8 Kg 0.28 16,500.00 4,620.00
JUMLAH HARGA BAHAN 205,989.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 256,209.00


E Overhead & Profit 10 % 10 % x D 25,620.90
F Harga Satuan Pekerjaan (D+E) 281,829.90

A. 4.4.1.17 Pemasangan 1m2 dinding conblock HB20 campuran 1SP :4PP

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.35 90,000.00 31,500.00
Tukang Batu L.02 OH 0.15 100,000.00 15,000.00
Kepala Tukang L.03 OH 0.02 110,000.00 1,650.00
Mandor L.04 OH 0.02 115,000.00 2,070.00
JUMLAH TENAGA KERJA 50,220.00
B BAHAN
HB-20 bh 12.50 3,250.00 40,625.00
Semen Portland Kg 24.26 1,700.00 41,242.00
Pasir Pasang m3 0.77 150,000.00 115,800.00
Besi angker dia 8 Kg 0.28 16,500.00 4,620.00
JUMLAH HARGA BAHAN 202,287.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 252,507.00


E Overhead & Profit 10 % 10 % x D 25,250.70
F Harga Satuan Pekerjaan (D+E) 277,757.70

A. 4.4.1.18 Pemasangan 1m2 dinding conblock HB15 campuran 1SP :3PP

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.32 90,000.00 28,800.00
Tukang Batu L.02 OH 0.12 100,000.00 12,000.00
Kepala Tukang L.03 OH 0.01 110,000.00 1,320.00
Mandor L.04 OH 0.02 115,000.00 1,840.00
JUMLAH TENAGA KERJA 43,960.00
B BAHAN
HB-15 bh 12.50 3,250.00 40,625.00
Semen Portland Kg 22.74 1,700.00 38,658.00
Pasir Pasang m3 0.55 150,000.00 82,500.00
Besi angker dia 8 Kg 0.28 16,500.00 4,620.00
JUMLAH HARGA BAHAN 166,403.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 210,363.00


E Overhead & Profit 10 % 10 % x D 21,036.30
F Harga Satuan Pekerjaan (D+E) 231,399.30
A. 4.4.1.19 Pemasangan 1 cm2 dinding conblock HB15 campuran 1SP :4PP

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.32 90,000.00 28,800.00
Tukang Batu L.02 OH 0.12 100,000.00 12,000.00
Kepala Tukang L.03 OH 0.01 110,000.00 1,320.00
Mandor L.04 OH 0.02 115,000.00 1,840.00
JUMLAH TENAGA KERJA 43,960.00
B BAHAN
HB-15 bh 12.50 3,250.00 40,625.00
Semen Portland Kg 18.20 1,700.00 30,940.00
Pasir Pasang m3 0.58 150,000.00 87,300.00
Besi angker dia 8 Kg 0.28 16,500.00 4,620.00
JUMLAH HARGA BAHAN 163,485.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 207,445.00


E Overhead & Profit 10 % 10 % x D 20,744.50
F Harga Satuan Pekerjaan (D+E) 228,189.50

A. 4.4.1.20 Pemasangan 1 cm2 dinding conblock HB10 campuran 1SP :3PP

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.30 90,000.00 27,000.00
Tukang Batu L.02 OH 0.10 100,000.00 10,000.00
Kepala Tukang L.03 OH 0.01 110,000.00 1,100.00
Mandor L.04 OH 0.02 115,000.00 1,725.00
JUMLAH TENAGA KERJA 39,825.00
B BAHAN
HB-10 bh 12.50 3,250.00 40,625.00
Semen Portland Kg 15.16 1,700.00 25,772.00
Pasir Pasang m3 0.36 150,000.00 54,600.00
Besi angker dia 8 Kg 0.28 16,500.00 4,620.00
JUMLAH HARGA BAHAN 125,617.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 165,442.00


E Overhead & Profit 10 % 10 % x D 16,544.20
F Harga Satuan Pekerjaan (D+E) 181,986.20

A. 4.4.1.21 Pemasangan 1 cm2 dinding conblock HB10 campuran 1SP :4PP

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.30 90,000.00 27,000.00
Tukang Batu L.02 OH 0.10 100,000.00 10,000.00
Kepala Tukang L.03 OH 0.01 110,000.00 1,100.00
Mandor L.04 OH 0.02 115,000.00 1,725.00
JUMLAH TENAGA KERJA 39,825.00
B BAHAN
HB-10 bh 12.50 3,250.00 40,625.00
Semen Portland Kg 12.13 1,700.00 20,621.00
Pasir Pasang m3 0.39 150,000.00 58,200.00
Besi angker dia 8 Kg 0.28 16,500.00 4,620.00
JUMLAH HARGA BAHAN 124,066.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 163,891.00


E Overhead & Profit 10 % 10 % x D 16,389.10
F Harga Satuan Pekerjaan (D+E) 180,280.10
A. 4.4.1.22 Pemasangan 1 cm2 dinding terawang (rooster) 12x11x24 campuran 1SP :3PP

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.30 90,000.00 27,000.00
Tukang Batu L.02 OH 0.10 100,000.00 10,000.00
Kepala Tukang L.03 OH 0.01 110,000.00 1,100.00
Mandor L.04 OH 0.02 115,000.00 1,725.00
JUMLAH TENAGA KERJA 39,825.00
B BAHAN
Bata rooster bh 30.00 75,000.00 2,250,000.00
Semen Portland Kg 11.00 1,700.00 18,700.00
Pasir Pasang m3 0.04 150,000.00 5,250.00
JUMLAH HARGA BAHAN 2,273,950.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 2,313,775.00


E Overhead & Profit 10 % 10 % x D 231,377.50
F Harga Satuan Pekerjaan (D+E) 2,545,152.50

A. 4.4.1.23 Pemasangan 1 cm2 dinding terawang (rooster) 12x11x24 campuran 1SP :4PP

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.30 90,000.00 27,000.00
Tukang Batu L.02 OH 0.10 100,000.00 10,000.00
Kepala Tukang L.03 OH 0.01 110,000.00 1,100.00
Mandor L.04 OH 0.02 115,000.00 1,725.00
JUMLAH TENAGA KERJA 39,825.00
B BAHAN
Bata berongga bh 30.00 75,000.00 2,250,000.00
Semen Portland Kg 11.00 1,700.00 18,700.00
Pasir Pasang m3 0.04 150,000.00 5,250.00
JUMLAH HARGA BAHAN 2,273,950.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 2,313,775.00


E Overhead & Profit 10 % 10 % x D 231,377.50
F Harga Satuan Pekerjaan (D+E) 2,545,152.50

A. 4.4.1.24 Pemasangan 1 cm2 dinding bata berongga ekspose 12x11x24 campuran 1SP :3PP

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.30 90,000.00 27,000.00
Tukang Batu L.02 OH 0.15 100,000.00 15,000.00
Kepala Tukang L.03 OH 0.02 110,000.00 1,650.00
Mandor L.04 OH 0.02 115,000.00 1,725.00
JUMLAH TENAGA KERJA 45,375.00
B BAHAN
Bata rooster bh 70.00 75,000.00 5,250,000.00
Semen Portland Kg 14.00 1,700.00 23,800.00
Pasir Pasang m3 0.03 150,000.00 4,800.00
JUMLAH HARGA BAHAN 5,278,600.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 5,323,975.00


E Overhead & Profit 10 % 10 % x D 532,397.50
F Harga Satuan Pekerjaan (D+E) 5,856,372.50
A.4.4.2 HARGA SATUAN PEKERJAAN PLESTERAN

A.4.4.2.1. Pemasangan 1 m2 plesteran 1SP : 1PP tebal 15 mm.

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.30 90,000.00 27,000.00
Tukang Batu L.03 OH 0.15 100,000.00 15,000.00
Kepala Tukang L.03 OH 0.02 110,000.00 1,650.00
Mandor L.04 OH 0.02 115,000.00 1,725.00
JUMLAH TENAGA KERJA 45,375.00
B BAHAN
1.    PC Kg 15.50 1,700.00 26,356.80
2.    PP m3 0.02 150,000.00 2,400.00
JUMLAH HARGA BAHAN 28,756.80
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 139,887.60


E Overhead & Profit 10 % 10 % x D 13,988.76
F Harga Satuan Pekerjaan (D+E) 153,876.36

A.4.4.2.2. Pemasangan 1 m2 plesteran 1SP : 2PP tebal 15 mm.

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.30 90,000.00 27,000.00
Tukang Batu L.03 OH 0.15 100,000.00 15,000.00
Kepala Tukang L.03 OH 0.02 110,000.00 1,650.00
Mandor L.04 OH 0.02 115,000.00 1,725.00
JUMLAH TENAGA KERJA 45,375.00
B BAHAN
1.     PC Kg 10.22 1,700.00 17,380.80
2.     PP m3 0.02 150,000.00 3,000.00
JUMLAH HARGA BAHAN 20,380.80
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 65,755.80


E Overhead & Profit 10 % 10 % x D 6,575.58
F Harga Satuan Pekerjaan (D+E) 72,331.38

A.4.4.2.3. Pemasangan 1 m2 plesteran 1SP : 3PP tebal 15mm.

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.30 90,000.00 27,000.00
Tukang Batu L.03 OH 0.15 100,000.00 15,000.00
Kepala Tukang L.03 OH 0.02 110,000.00 1,650.00
Mandor L.04 OH 0.02 115,000.00 1,725.00
JUMLAH TENAGA KERJA 45,375.00
B BAHAN
1.     PC Kg 7.78 1,700.00 13,219.20
2.     PP m3 0.02 150,000.00 3,450.00
JUMLAH HARGA BAHAN 16,669.20
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 62,044.20


E Overhead & Profit 10 % 10 % x D 6,204.42
F Harga Satuan Pekerjaan (D+E) 68,248.62
A.4.4.2.4. Pemasangan 1 m2 plesteran 1SP : 4PP tebal 15 mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.30 90,000.00 27,000.00
Tukang Batu L.03 OH 0.15 100,000.00 15,000.00
Kepala Tukang L.03 OH 0.02 110,000.00 1,650.00
Mandor L.04 OH 0.02 115,000.00 1,725.00
JUMLAH TENAGA KERJA 45,375.00
B BAHAN
1.     PC Kg 6.24 1,700.00 10,608.00
2.     PP m3 0.02 150,000.00 3,600.00
JUMLAH HARGA BAHAN 14,208.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 59,583.00


E Overhead & Profit 10 % 10 % x D 5,958.30
F Harga Satuan Pekerjaan (D+E) 65,541.30

A.4.4.2.5. Pemasangan 1 m2 plesteran 1SP : 5PP tebal 15 mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.30 90,000.00 27,000.00
Tukang Batu L.03 OH 0.15 100,000.00 15,000.00
Kepala Tukang L.03 OH 0.02 110,000.00 1,650.00
Mandor L.04 OH 0.02 115,000.00 1,725.00
JUMLAH TENAGA KERJA 45,375.00
B BAHAN
1.     PC Kg 5.18 1,700.00 8,812.80
2.     PP m3 0.03 150,000.00 3,900.00
JUMLAH HARGA BAHAN 12,712.80
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 58,087.80


E Overhead & Profit 10 % 10 % x D 5,808.78
F Harga Satuan Pekerjaan (D+E) 63,896.58

A.4.4.2.6. Pemasangan 1 m2 plesteran 1SP : 6PP tebal 15 mm.

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.30 90,000.00 27,000.00
Tukang Batu L.03 OH 0.15 100,000.00 15,000.00
Kepala Tukang L.03 OH 0.02 110,000.00 1,650.00
Mandor L.04 OH 0.02 115,000.00 1,725.00
JUMLAH TENAGA KERJA 45,375.00
B BAHAN
1.     PC Kg 4.42 1,700.00 7,507.20
2.     PP m3 0.03 150,000.00 4,050.00
JUMLAH HARGA BAHAN 11,557.20
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 56,932.20


E Overhead & Profit 10 % 10 % x D 5,693.22
F Harga Satuan Pekerjaan (D+E) 62,625.42
A.4.4.2.7. Pemasangan 1 m2 plesteran 1SP : 7PP tebal 15 mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.30 90,000.00 27,000.00
Tukang Batu L.03 OH 0.15 100,000.00 15,000.00
Kepala Tukang L.03 OH 0.02 110,000.00 1,650.00
Mandor L.04 OH 0.02 115,000.00 1,725.00
JUMLAH TENAGA KERJA 45,375.00
B BAHAN
1.     PC Kg 3.94 1,700.00 6,691.20
2.     PP m3 0.03 150,000.00 4,200.00
JUMLAH HARGA BAHAN 10,891.20
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 56,266.20


E Overhead & Profit 10 % 10 % x D 5,626.62
F Harga Satuan Pekerjaan (D+E) 61,892.82

A.4.4.2.8. Pemasangan 1 m2 plesteran 1SP : 8PP tebal 15 mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.30 90,000.00 27,000.00
Tukang Batu L.03 OH 0.15 100,000.00 15,000.00
Kepala Tukang L.03 OH 0.02 110,000.00 1,650.00
Mandor L.04 OH 0.02 115,000.00 1,725.00
JUMLAH TENAGA KERJA 45,375.00
B BAHAN
1.     PC Kg 3.46 1,700.00 5,875.20
2.     PP m3 0.03 150,000.00 4,350.00
JUMLAH HARGA BAHAN 10,225.20
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 55,600.20


E Overhead & Profit 10 % 10 % x D 5,560.02
F Harga Satuan Pekerjaan (D+E) 61,160.22

A.4.4.2.9. Pemasangan 1 m2 plesteran 1SP : 1/2KP : 3PP tebal 15 mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.36 90,000.00 32,400.00
Tukang Batu L.03 OH 0.12 100,000.00 12,000.00
Kepala Tukang L.03 OH 0.01 110,000.00 1,320.00
Mandor L.04 OH 0.02 115,000.00 2,070.00
JUMLAH TENAGA KERJA 47,790.00
B BAHAN
1.     PC Kg 5.76 1,700.00 9,792.00
2.     KP m3 0.00 200,000.00 600.00
3.     PP m3 0.01 150,000.00 1,950.00
JUMLAH HARGA BAHAN 12,342.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 60,132.00


E Overhead & Profit 10 % 10 % x D 6,013.20
F Harga Satuan Pekerjaan (D+E) 66,145.20
A.4.4.2.10. Pemasangan 1 m2 plesteran 1SP : 2KP : 8PP tebal 15 mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.36 90,000.00 32,400.00
Tukang Batu L.03 OH 0.12 100,000.00 12,000.00
Kepala Tukang L.03 OH 0.01 110,000.00 1,320.00
Mandor L.04 OH 0.02 115,000.00 2,070.00
JUMLAH TENAGA KERJA 47,790.00
B BAHAN
1.     PC Kg 3.00 1,700.00 5,100.00
2.     KP m3 0.01 200,000.00 1,000.00
3.     PP m3 0.02 150,000.00 3,000.00
JUMLAH HARGA BAHAN 9,100.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 56,890.00


E Overhead & Profit 10 % 10 % x D 5,689.00
F Harga Satuan Pekerjaan (D+E) 62,579.00

A.4.4.2.11. Pemasangan 1 m2 plesteran 1SM : 1KP : 1PP tebal 15 mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.36 90,000.00 32,400.00
Tukang Batu L.03 OH 0.12 100,000.00 12,000.00
Kepala Tukang L.03 OH 0.01 110,000.00 1,320.00
Mandor L.04 OH 0.02 115,000.00 2,070.00
JUMLAH TENAGA KERJA 47,790.00
B BAHAN
1.     SM m3 0.01 1,700.00 15.30
2.     KP m3 0.01 200,000.00 1,800.00
3.     PP m3 0.01 150,000.00 1,350.00
JUMLAH HARGA BAHAN 3,165.30
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 50,955.30


E Overhead & Profit 10 % 10 % x D 5,095.53
F Harga Satuan Pekerjaan (D+E) 56,050.83

A.4.4.2.12. Pemasangan 1 m2 plesteran 1SM : 1KP : 2PP tebal 15 mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.36 90,000.00 32,400.00
Tukang Batu L.03 OH 0.12 100,000.00 12,000.00
Kepala Tukang L.03 OH 0.01 110,000.00 1,320.00
Mandor L.04 OH 0.02 115,000.00 2,070.00
JUMLAH TENAGA KERJA 47,790.00
B BAHAN
1.     SM m3 0.01 1,700.00 11.90
2.     KP m3 0.01 200,000.00 1,400.00
3.     PP m3 0.02 150,000.00 2,250.00
JUMLAH HARGA BAHAN 3,661.90
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 51,451.90


E Overhead & Profit 10 % 10 % x D 5,145.19
F Harga Satuan Pekerjaan (D+E) 56,597.09
A.4.4.2.13. Pemasangan 1 m2 plesteran 1SP : 1PP tebal 20 mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.40 90,000.00 36,000.00
Tukang Batu L.03 OH 0.20 100,000.00 20,000.00
Kepala Tukang L.03 OH 0.02 110,000.00 2,200.00
Mandor L.04 OH 0.02 115,000.00 2,530.00
JUMLAH TENAGA KERJA 60,730.00
B BAHAN
1.     PC Kg 13.63 1,700.00 23,174.40
2.     PP m3 0.03 150,000.00 4,050.00
JUMLAH HARGA BAHAN 27,224.40
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 87,954.40


E Overhead & Profit 10 % 10 % x D 8,795.44
F Harga Satuan Pekerjaan (D+E) 96,749.84

A.4.4.2.14. Pemasangan 1 m2 plesteran 1SP : 3PP tebal 20 mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.26 90,000.00 23,400.00
Tukang Batu L.03 OH 0.20 100,000.00 20,000.00
Kepala Tukang L.03 OH 0.02 110,000.00 2,200.00
Mandor L.04 OH 0.01 115,000.00 1,495.00
JUMLAH TENAGA KERJA 47,095.00
B BAHAN
1.     PC Kg 10.37 1,700.00 17,625.60
2.     PP m3 0.03 150,000.00 4,650.00
JUMLAH HARGA BAHAN 22,275.60
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 69,370.60


E Overhead & Profit 10 % 10 % x D 6,937.06
F Harga Satuan Pekerjaan (D+E) 76,307.66

A.4.4.2.15. Pemasangan 1 m2 plesteran 1SP : 4PP tebal 20 mm.

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.40 90,000.00 36,000.00
Tukang Batu L.03 OH 0.20 100,000.00 20,000.00
Kepala Tukang L.03 OH 0.02 110,000.00 2,200.00
Mandor L.04 OH 0.02 115,000.00 2,530.00
JUMLAH TENAGA KERJA 60,730.00
B BAHAN
1.     PC Kg 8.32 1,700.00 14,144.00
2.     PP m3 0.03 150,000.00 4,800.00
JUMLAH HARGA BAHAN 18,944.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 79,674.00


E Overhead & Profit 10 % 10 % x D 7,967.40
F Harga Satuan Pekerjaan (D+E) 87,641.40
A.4.4.2.16. Pemasangan 1 m2 plesteran 1SP : 5PP tebal 20 mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.40 90,000.00 36,000.00
Tukang Batu L.03 OH 0.20 100,000.00 20,000.00
Kepala Tukang L.03 OH 0.02 110,000.00 2,200.00
Mandor L.04 OH 0.02 115,000.00 2,530.00
JUMLAH TENAGA KERJA 60,730.00
B BAHAN
1.     PC Kg 6.91 1,700.00 11,750.40
2.     PP m3 0.04 150,000.00 5,250.00
JUMLAH HARGA BAHAN 17,000.40
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 77,730.40


E Overhead & Profit 10 % 10 % x D 7,773.04
F Harga Satuan Pekerjaan (D+E) 85,503.44

A.4.4.2.17. Pemasangan 1 m2 plesteran 1SP : 6PP tebal 20 mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.40 90,000.00 36,000.00
Tukang Batu L.03 OH 0.20 100,000.00 20,000.00
Kepala Tukang L.03 OH 0.02 110,000.00 2,200.00
Mandor L.04 OH 0.02 115,000.00 2,530.00
JUMLAH TENAGA KERJA 60,730.00
B BAHAN
1.     PC Kg 5.89 1,700.00 10,009.60
2.     PP m3 0.04 150,000.00 5,400.00
JUMLAH HARGA BAHAN 15,409.60
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 76,139.60


E Overhead & Profit 10 % 10 % x D 7,613.96
F Harga Satuan Pekerjaan (D+E) 83,753.56

A.4.4.2.18. Pemasangan 1 m2 plesteran 1SM : 1KP : 2PP tebal 20 mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.44 90,000.00 39,600.00
Tukang Batu L.03 OH 0.22 100,000.00 22,000.00
Kepala Tukang L.03 OH 0.02 110,000.00 2,420.00
Mandor L.04 OH 0.02 115,000.00 2,530.00
JUMLAH TENAGA KERJA 66,550.00
B BAHAN
1.     SM m3 0.01 1,700.00 15.30
2.     KP m3 0.01 200,000.00 1,800.00
3.     PP m3 0.02 150,000.00 2,700.00
JUMLAH HARGA BAHAN 4,515.30
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 71,065.30


E Overhead & Profit 10 % 10 % x D 7,106.53
F Harga Satuan Pekerjaan (D+E) 78,171.83
A.4.4.2.19. Pemasangan 1 m2 berapen 1SP : 5PP tebal 15 mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.15 90,000.00 13,500.00
Tukang Batu L.03 OH 0.08 100,000.00 7,500.00
Kepala Tukang L.03 OH 0.01 110,000.00 880.00
Mandor L.04 OH 0.01 115,000.00 920.00
JUMLAH TENAGA KERJA 22,800.00
B BAHAN
PC Kg 5.18 1,700.00 8,812.80
PP m3 0.03 150,000.00 3,900.00
JUMLAH HARGA BAHAN 12,712.80
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 35,512.80


E Overhead & Profit 10 % 10 % x D 3,551.28
F Harga Satuan Pekerjaan (D+E) 39,064.08

A.4.4.2.20. Pemasangan 1 m’ plesteran skoning 1SP : 3PP lebar 10 cm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.08 90,000.00 7,200.00
Tukang Batu L.03 OH 0.40 100,000.00 40,000.00
Kepala Tukang L.03 OH 0.04 110,000.00 4,400.00
Mandor L.04 OH 0.00 115,000.00 460.00
JUMLAH TENAGA KERJA 52,060.00
B BAHAN
Semen PC Kg 0.50 1,700.00 850.00
Pasir pasang m3 0.01 150,000.00 1,950.00
JUMLAH HARGA BAHAN 2,800.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 54,860.00


E Overhead & Profit 10 % 10 % x D 5,486.00
F Harga Satuan Pekerjaan (D+E) 60,346.00

A.4.4.2.21. Pemasangan 1 m2 plesteran granit 1SP : 2 granit tebal 1cm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.45 90,000.00
Tukang Batu L.03 OH 0.23 100,000.00
Kepala Tukang L.03 OH 0.02 110,000.00
Mandor L.04 OH 0.02 115,000.00
JUMLAH TENAGA KERJA
B BAHAN
Semen PC Kg 10.00
Batu granit Kg 15.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 0.00


E Overhead & Profit 10 % 10 % x D 0.00
F Harga Satuan Pekerjaan (D+E) 0.00
A.4.4.2.22. Pemasangan 1 m2 plesteran traso 1SP : 2 traso tebal 1cm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.45 90,000.00
Tukang Batu L.03 OH 0.23 100,000.00
Kepala Tukang L.03 OH 0.02 110,000.00
Mandor L.04 OH 0.02 115,000.00
JUMLAH TENAGA KERJA
B BAHAN
Semen PC Kg 10.00
Batu traso Kg 15.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 0.00


E Overhead & Profit 10 % 10 % x D 0.00
F Harga Satuan Pekerjaan (D+E) 0.00

A.4.4.2.23. Pemasangan 1 m2 plesteran ciprat 1SP : 2PP

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.30 90,000.00 27,000.00
Tukang Batu L.03 OH 0.10 100,000.00 10,000.00
Kepala Tukang L.03 OH 0.01 110,000.00 1,100.00
Mandor L.04 OH 0.02 115,000.00 1,725.00
JUMLAH TENAGA KERJA 39,825.00
B BAHAN
Semen PC Kg 4.32 1,700.00 7,344.00
Pasir pasang Kg 0.01 150,000.00 900.00
JUMLAH HARGA BAHAN 8,244.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 48,069.00


E Overhead & Profit 10 % 10 % x D 4,806.90
F Harga Satuan Pekerjaan (D+E) 52,875.90

A.4.4.2.24 Pemasangan 1 m2 finishing siar pasangan bata merah

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.15 90,000.00 13,500.00
Tukang Batu L.03 OH 0.08 100,000.00 7,500.00
Kepala Tukang L.03 OH 0.01 110,000.00 880.00
Mandor L.04 OH 0.01 115,000.00 920.00
JUMLAH TENAGA KERJA 22,800.00
B BAHAN
Semen PC Kg 3.11 1,700.00 5,283.60
JUMLAH HARGA BAHAN 5,283.60
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 28,083.60


E Overhead & Profit 10 % 10 % x D 2,808.36
F Harga Satuan Pekerjaan (D+E) 30,891.96
A.4.4.2.25. Pemasangan 1 m2 finishing siar pasangan conblock ekspose

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.07 90,000.00 6,300.00
Tukang Batu L.03 OH 0.04 100,000.00 3,500.00
Kepala Tukang L.03 OH 0.00 110,000.00 440.00
Mandor L.04 OH 0.00 115,000.00 460.00
JUMLAH TENAGA KERJA 10,700.00
B BAHAN
Semen PC Kg 1.60 1,700.00 2,720.00
JUMLAH HARGA BAHAN 2,720.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 13,420.00


E Overhead & Profit 10 % 10 % x D 1,342.00
F Harga Satuan Pekerjaan (D+E) 14,762.00

A.4.4.2.26. Pemasangan 1 m2 finishing siar pasangan batu kali, campuran 1SP : 2PP.

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.30 90,000.00 27,000.00
Tukang Batu L.03 OH 0.15 100,000.00 15,000.00
Kepala Tukang L.03 OH 0.02 110,000.00 1,650.00
Mandor L.04 OH 0.02 115,000.00 1,725.00
JUMLAH TENAGA KERJA 45,375.00
B BAHAN
Semen PC Kg 6.34 1,700.00 10,778.00
Pasir pasang m3 0.01 150,000.00 1,800.00
JUMLAH HARGA BAHAN 12,578.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 57,953.00


E Overhead & Profit 10 % 10 % x D 5,795.30
F Harga Satuan Pekerjaan (D+E) 63,748.30

A.4.4.2.27. Pemasangan 1 m2 acian.

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.20 90,000.00 18,000.00
Tukang Batu L.03 OH 0.10 100,000.00 10,000.00
Kepala Tukang L.03 OH 0.01 110,000.00 1,100.00
Mandor L.04 OH 0.01 115,000.00 1,150.00
JUMLAH TENAGA KERJA 30,250.00
B BAHAN
Semen PC Kg 3.25 1,700.00 5,525.00
JUMLAH HARGA BAHAN 5,525.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 35,775.00


E Overhead & Profit 10 % 10 % x D 3,577.50
F Harga Satuan Pekerjaan (D+E) 39,352.50
A.4.4.3 HARGA SATUAN PEKERJAAN PENUTUP LANTAI DAN PENUTUP DINDING

A.4.4.3.1.Pemasangan 1m2 lantai ubin PC abu-abu ukuran 40cm x40cm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.25 90,000.00 22,500.00
Tukang Batu L.02 OH 0.13 100,000.00 12,500.00
Kepala tukang L.03 OH 0.01 110,000.00 1,430.00
Mandor L.04 OH 0.01 115,000.00 1,495.00
JUMLAH TENAGA KERJA 37,925.00
B BAHAN
Ubin abu-abu Bh 6.63 12,820.51 85,000.00
Semen Portland kg 9.80 1,700.00 16,660.00
Pasir pasang M3 0.05 150,000.00 6,750.00
JUMLAH HARGA BAHAN 108,410.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 146,335.00


E Overhead & Profit 10 % 10 % x D 14,633.50
F Harga Satuan Pekerjaan (D+E) 160,968.50

A.4.4.3.2.Pemasangan 1m2 lantai ubin PC abu-abu ukuran 30cm x30 cm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.25 90,000.00 22,500.00
Tukang Batu L.02 OH 0.13 100,000.00 12,500.00
Kepala tukang L.03 OH 0.01 110,000.00 1,430.00
Mandor L.04 OH 0.01 115,000.00 1,495.00
JUMLAH TENAGA KERJA 37,925.00
B BAHAN
Ubin abu-abu Bh 11.87 5,475.99 65,000.00
Semen Portland kg 10.00 1,700.00 17,000.00
Pasir pasang M3 0.05 150,000.00 6,750.00
JUMLAH HARGA BAHAN 88,750.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 126,675.00


E Overhead & Profit 10 % 10 % x D 12,667.50
F Harga Satuan Pekerjaan (D+E) 139,342.50

A.4.4.3.3. Pemasangan 1m2 lantai ubin PC abu-abu ukuran 20cm x20 cm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.27 90,000.00 24,300.00
Tukang Batu L.02 OH 0.14 100,000.00 13,500.00
Kepala tukang L.03 OH 0.01 110,000.00 1,540.00
Mandor L.04 OH 0.01 115,000.00 1,610.00
JUMLAH TENAGA KERJA 40,950.00
B BAHAN
Ubin abu-abu Bh 26.50 2,500.00 66,250.00
Semen Portland kg 10.40 1,700.00 17,680.00
Pasir pasang M3 0.05 150,000.00 6,750.00
JUMLAH HARGA BAHAN 90,680.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 131,630.00


E Overhead & Profit 10 % 10 % x D 13,163.00
F Harga Satuan Pekerjaan (D+E) 144,793.00
A.4.4.3.4.Pemasangan 1m2 lantai ubin warna ukuran 40cm x40 cm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.25 90,000.00 22,500.00
Tukang Batu L.02 OH 0.13 100,000.00 12,500.00
Kepala tukang L.03 OH 0.01 110,000.00 1,430.00
Mandor L.04 OH 0.01 115,000.00 1,495.00
JUMLAH TENAGA KERJA 37,925.00
B BAHAN
Ubin warna Bh 6.63 12,820.51 85,000.00
Semen Portland kg 9.80 1,700.00 16,660.00
Semen warna Kg 1.30 13,000.00 16,900.00
Pasir pasang M3 0.05 150,000.00 6,750.00
JUMLAH HARGA BAHAN 125,310.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 163,235.00


E Overhead & Profit 10 % 10 % x D 16,323.50
F Harga Satuan Pekerjaan (D+E) 179,558.50

A.4.4.3.5.Pemasangan 1m2 lantai ubin warna ukuran 30cm x30cm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.26 90,000.00 23,400.00
Tukang Batu L.02 OH 0.13 100,000.00 13,000.00
Kepala tukang L.03 OH 0.01 110,000.00 1,430.00
Mandor L.04 OH 0.01 115,000.00 1,495.00
JUMLAH TENAGA KERJA 39,325.00
B BAHAN
Ubin warna Bh 11.87 5,475.99 65,000.00
Semen Portland kg 10.00 1,700.00 17,000.00
Semen warna Kg 1.50 13,000.00 19,500.00
Pasir pasang M3 0.05 150,000.00 6,750.00
JUMLAH HARGA BAHAN 108,250.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 147,575.00


E Overhead & Profit 10 % 10 % x D 14,757.50
F Harga Satuan Pekerjaan (D+E) 162,332.50

A.4.4.3.6.Pemasangan 1m2 lantai ubin warna ukuran 20cm x20cm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.27 90,000.00 24,300.00
Tukang Batu L.02 OH 0.14 100,000.00 13,500.00
Kepala tukang L.03 OH 0.01 110,000.00 1,540.00
Mandor L.04 OH 0.01 115,000.00 1,610.00
JUMLAH TENAGA KERJA 40,950.00
B BAHAN
Ubin warna Bh 26.50 3,000.00 79,500.00
Semen Portland kg 10.40 1,700.00 17,680.00
Semen warna Kg 1.62 13,000.00 21,060.00
Pasir pasang M3 0.05 150,000.00 6,750.00
JUMLAH HARGA BAHAN 124,990.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 165,940.00


E Overhead & Profit 10 % 10 % x D 16,594.00
F Harga Satuan Pekerjaan (D+E) 182,534.00
A.4.4.3.7.Pemasangan 1m2 lantai ubin teraso ukuran 40cm x40cm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.25 90,000.00 22,500.00
Tukang Batu L.02 OH 0.13 100,000.00 12,500.00
Kepala tukang L.03 OH 0.01 110,000.00 1,430.00
Mandor L.04 OH 0.01 115,000.00 1,495.00
JUMLAH TENAGA KERJA
B BAHAN
Ubin teraso Bh 6.63 0.00
Semen Portland kg 9.80 1,700.00 16,660.00
Semen warna Kg 1.30 13,000.00 16,900.00
Pasir pasang M3 0.05 150,000.00 6,750.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 0.00


E Overhead & Profit 10 % 10 % x D 0.00
F Harga Satuan Pekerjaan (D+E) 0.00

A.4.4.3.8. Pemasangan 1m2 lantai ubin teraso ukuran 30cm x30cm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.26 90,000.00 23,400.00
Tukang Batu L.02 OH 0.13 100,000.00 13,000.00
Kepala tukang L.03 OH 0.01 110,000.00 1,430.00
Mandor L.04 OH 0.01 115,000.00 1,495.00
JUMLAH TENAGA KERJA 39,325.00
B BAHAN
Ubin teraso Bh 11.87 2,500.00 29,675.00
Semen Portland kg 10.00 1,700.00 17,000.00
Semen warna Kg 1.50 13,000.00 19,500.00
Pasir pasang M3 0.05 150,000.00 6,750.00
JUMLAH HARGA BAHAN 72,925.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 112,250.00


E Overhead & Profit 10 % 10 % x D 11,225.00
F Harga Satuan Pekerjaan (D+E) 123,475.00

A.4.4.3.9.Pemasangan 1m2 lantai ubin granit ukuran 40cm x40cm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.25 90,000.00 22,500.00
Tukang Batu L.02 OH 0.13 100,000.00 12,500.00
Kepala tukang L.03 OH 0.01 110,000.00 1,430.00
Mandor L.04 OH 0.01 115,000.00 1,495.00
JUMLAH TENAGA KERJA
B BAHAN
Ubin granit Bh 6.63
Semen Portland kg 9.80 1,700.00
Semen warna Kg 1.30 13,000.00
Pasir pasang M3 0.05 150,000.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 0.00


E Overhead & Profit 10 % 10 % x D 0.00
F Harga Satuan Pekerjaan (D+E) 0.00
A.4.4.3.10.Pemasangan 1m2 lantai ubin granit ukuran 30cm x30cm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.26 90,000.00 23,400.00
Tukang Batu L.02 OH 0.13 100,000.00 13,000.00
Kepala tukang L.03 OH 0.01 110,000.00 1,430.00
Mandor L.04 OH 0.01 115,000.00 1,495.00
JUMLAH TENAGA KERJA
B BAHAN
Ubin granit Bh 11.87
Semen Portland kg 10.00 1,700.00
Semen warna Kg 1.50 13,000.00
Pasir pasang M3 0.05 150,000.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 0.00


E Overhead & Profit 10 % 10 % x D 0.00
F Harga Satuan Pekerjaan (D+E) 0.00

A.4.4.3.11.Pemasangan 1m2 lantai ubin teralux marmer ukuran 40cm x40cm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.25 90,000.00 22,500.00
Tukang Batu L.02 OH 0.13 100,000.00 12,500.00
Kepala tukang L.03 OH 0.01 110,000.00 1,430.00
Mandor L.04 OH 0.01 115,000.00 1,495.00
JUMLAH TENAGA KERJA
B BAHAN
Ubin teralux Bh 6.63
Semen Portland kg 9.80 1,700.00
Semen warna Kg 1.30 13,000.00
Pasir pasang M3 0.05 150,000.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 0.00


E Overhead & Profit 10 % 10 % x D 0.00
F Harga Satuan Pekerjaan (D+E) 0.00

A.4.4.3.12.Pemasangan 1m2 lantai ubin teralux ukuran 30cm x30cm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.26 90,000.00 23,400.00
Tukang Batu L.02 OH 0.13 100,000.00 13,000.00
Kepala tukang L.03 OH 0.01 110,000.00 1,430.00
Mandor L.04 OH 0.01 115,000.00 1,495.00
JUMLAH TENAGA KERJA
B BAHAN
Ubin teralux Bh 11.87
Semen Portland kg 10.00 1,700.00
Semen warna Kg 1.50 13,000.00
Pasir pasang M3 0.05 150,000.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 0.00


E Overhead & Profit 10 % 10 % x D 0.00
F Harga Satuan Pekerjaan (D+E) 0.00
A.4.4.3.13.Pemasangan 1m2 lantai ubin teralux marmer ukuran 60cm x60cm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.24 90,000.00 21,600.00
Tukang Batu L.02 OH 0.12 100,000.00 12,000.00
Kepala tukang L.03 OH 0.01 110,000.00 1,320.00
Mandor L.04 OH 0.01 115,000.00 1,380.00
JUMLAH TENAGA KERJA
B BAHAN
Ubin teralux marmer Bh 3.10
Semen Portland kg 9.60 1,700.00
Semen warna Kg 1.50 13,000.00
Pasir pasang M3 0.05 150,000.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 0.00


E Overhead & Profit 10 % 10 % x D 0.00
F Harga Satuan Pekerjaan (D+E) 0.00

A.4.4.3.14.Pemasangan 1m2 lantai ubin teralux marmer ukuran 40cm x40cm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.25 90,000.00 22,500.00
Tukang Batu L.02 OH 0.13 100,000.00 12,500.00
Kepala tukang L.03 OH 0.01 110,000.00 1,430.00
Mandor L.04 OH 0.01 115,000.00 1,495.00
JUMLAH TENAGA KERJA
B BAHAN
Ubin teralux marmer Bh 6.63
Semen Portland kg 9.80 1,700.00
Semen warna Kg 1.30 13,000.00
Pasir pasang M3 0.05 150,000.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 0.00


E Overhead & Profit 10 % 10 % x D 0.00
F Harga Satuan Pekerjaan (D+E) 0.00

A.4.4.3.15.Pemasangan 1m2 lantai ubin teralux marmer ukuran 30cm x30cm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.26 90,000.00 23,400.00
Tukang Batu L.02 OH 0.13 100,000.00 13,000.00
Kepala tukang L.03 OH 0.01 110,000.00 1,430.00
Mandor L.04 OH 0.01 115,000.00 1,495.00
JUMLAH TENAGA KERJA
B BAHAN
Ubin teralux marmer Bh 11.87
Semen Portland kg 10.00 1,700.00
Semen warna Kg 1.50 13,000.00
Pasir pasang M3 0.05 150,000.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 0.00


E Overhead & Profit 10 % 10 % x D 0.00
F Harga Satuan Pekerjaan (D+E) 0.00
A.4.4.3.16.Pemasangan 1 m’ plint ubin Pc abu-abu ukuran 15cm x 20cm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.09 90,000.00 8,100.00
Tukang Batu L.02 OH 0.09 100,000.00 9,000.00
Kepala tukang L.03 OH 0.01 110,000.00 990.00
Mandor L.04 OH 0.01 115,000.00 575.00
JUMLAH TENAGA KERJA
B BAHAN
Plint ubin PC Bh 5.30
Semen Portlandd kg 1.65
Pasir pasang M3 0.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 0.00


E Overhead & Profit 10 % 10 % x D 0.00
F Harga Satuan Pekerjaan (D+E) 0.00

A.4.4.3.17.Pemasangan 1 m’ plint ubin Pc abu-abu ukuran 10cm x 30cm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.09 90,000.00 8,100.00
Tukang Batu L.02 OH 0.09 100,000.00 9,000.00
Kepala tukang L.03 OH 0.01 110,000.00 990.00
Mandor L.04 OH 0.01 115,000.00 575.00
JUMLAH TENAGA KERJA
B BAHAN
Plint ubin PC Bh 3.53
Semen Portlandd kg 1.24
Pasir pasang M3 0.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 0.00


E Overhead & Profit 10 % 10 % x D 0.00
F Harga Satuan Pekerjaan (D+E) 0.00

A.4.4.3.18.Pemasangan 1 m’ plint ubin Pc abu-abu ukuran 10cm x 40cm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.09 90,000.00 8,100.00
Tukang Batu L.02 OH 0.09 100,000.00 9,000.00
Kepala tukang L.03 OH 0.01 110,000.00 990.00
Mandor L.04 OH 0.01 115,000.00 575.00
JUMLAH TENAGA KERJA
B BAHAN
Plint ubin PC Bh 2.65
Semen Portland kg 1.24
Pasir pasang M3 0.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 0.00


E Overhead & Profit 10 % 10 % x D 0.00
F Harga Satuan Pekerjaan (D+E) 0.00
A.4.4.3.19.Pemasangan 1 m’ plint ubin warna ukuran 10cm x 20cm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.09 90,000.00 8,100.00
Tukang Batu L.02 OH 0.09 100,000.00 9,000.00
Kepala tukang L.03 OH 0.01 110,000.00 990.00
Mandor L.04 OH 0.01 115,000.00 575.00
JUMLAH TENAGA KERJA
B BAHAN
Plint ubin warna Bh 2.65
Semen Portland kg 1.14 1,700.00
Semen warna Kg 0.10 13,000.00
Pasir pasang M3 0.00 150,000.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 0.00


E Overhead & Profit 10 % 10 % x D 0.00
F Harga Satuan Pekerjaan (D+E) 0.00

A.4.4.3.20.Pemasangan 1 m’ plint ubin warna ukuran 10cm x 30cm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.09 90,000.00 8,100.00
Tukang Batu L.02 OH 0.09 100,000.00 9,000.00
Kepala tukang L.03 OH 0.01 110,000.00 990.00
Mandor L.04 OH 0.01 115,000.00 575.00
JUMLAH TENAGA KERJA
B BAHAN
Plint ubin warna Bh 3.53
Semen Portland kg 1.14 1,700.00
Semen warna Kg 0.10 13,000.00
Pasir pasang M3 0.00 150,000.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 0.00


E Overhead & Profit 10 % 10 % x D 0.00
F Harga Satuan Pekerjaan (D+E) 0.00

A.4.4.3.21.Pemasangan 1 m’ plint ubin warna ukuran 10cm x 40cm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.09 90,000.00 8,100.00
Tukang Batu L.02 OH 0.09 100,000.00 9,000.00
Kepala tukang L.03 OH 0.01 110,000.00 990.00
Mandor L.04 OH 0.01 115,000.00 575.00
JUMLAH TENAGA KERJA
B BAHAN
Plint ubin warna Bh 2.65
Semen Portland kg 1.14 1,700.00
Semen warna Kg 0.10 13,000.00
Pasir pasang M3 0.00 150,000.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 0.00


E Overhead & Profit 10 % 10 % x D 0.00
F Harga Satuan Pekerjaan (D+E) 0.00
A.4.4.3.22.Pemasangan 1 m’ plint ubin teraso ukuran 10cm x 30cm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.09 90,000.00 8,100.00
Tukang Batu L.02 OH 0.09 100,000.00 9,000.00
Kepala tukang L.03 OH 0.01 110,000.00 990.00
Mandor L.04 OH 0.01 115,000.00 575.00
JUMLAH TENAGA KERJA
B BAHAN
Plint ubin teraso Bh 3.53
Semen Portland kg 1.14 1,700.00
Semen warna Kg 0.10 13,000.00
Pasir pasang M3 0.00 150,000.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 0.00


E Overhead & Profit 10 % 10 % x D 0.00
F Harga Satuan Pekerjaan (D+E) 0.00

A.4.4.3.23.Pemasangan 1 m’ plint ubin teraso ukuran 10cm x 40cm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.09 90,000.00 8,100.00
Tukang Batu L.02 OH 0.09 100,000.00 9,000.00
Kepala tukang L.03 OH 0.01 110,000.00 990.00
Mandor L.04 OH 0.01 115,000.00 575.00
JUMLAH TENAGA KERJA
B BAHAN
Plint ubin teraso Bh 2.65
Semen Portland kg 1.14 1,700.00
Semen warna Kg 0.10 13,000.00
Pasir pasang M3 0.00 150,000.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 0.00


E Overhead & Profit 10 % 10 % x D 0.00
F Harga Satuan Pekerjaan (D+E) 0.00

A.4.4.3.24.Pemasangan 1 m’ plint ubin granit ukuran 10cm x 40cm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.09 90,000.00 8,100.00
Tukang Batu L.02 OH 0.09 100,000.00 9,000.00
Kepala tukang L.03 OH 0.01 110,000.00 990.00
Mandor L.04 OH 0.01 115,000.00 575.00
JUMLAH TENAGA KERJA
B BAHAN
Plint ubin granit Bh 2.65
Semen Portland kg 1.14 1,700.00
Semen warna Kg 0.10 13,000.00
Pasir pasang M3 0.00 150,000.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 0.00


E Overhead & Profit 10 % 10 % x D 0.00
F Harga Satuan Pekerjaan (D+E) 0.00
A.4.4.3.25.Pemasangan 1 m’ plint ubin granit ukuran 10cm x 30cm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.09 90,000.00 8,100.00
Tukang Batu L.02 OH 0.09 100,000.00 9,000.00
Kepala tukang L.03 OH 0.01 110,000.00 990.00
Mandor L.04 OH 0.01 115,000.00 575.00
JUMLAH TENAGA KERJA
B BAHAN
Plint ubin granit Bh 3.53
Semen Portland kg 1.14 1,700.00
Semen warna Kg 0.10 13,000.00
Pasir pasang M3 0.00 150,000.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 0.00


E Overhead & Profit 10 % 10 % x D 0.00
F Harga Satuan Pekerjaan (D+E) 0.00

A.4.4.3.26.Pemasangan 1 m’ plint ubin teralux kerang ukuran 10cm x 40cm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.09 90,000.00 8,100.00
Tukang Batu L.02 OH 0.09 100,000.00 9,000.00
Kepala tukang L.03 OH 0.01 110,000.00 990.00
Mandor L.04 OH 0.01 115,000.00 575.00
JUMLAH TENAGA KERJA
B BAHAN
Plint teralux kerang Bh 2.63
Semen Portland kg 1.14 1,700.00
Semen warna Kg 0.10 13,000.00
Pasir pasang M3 0.00 150,000.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 0.00


E Overhead & Profit 10 % 10 % x D 0.00
F Harga Satuan Pekerjaan (D+E) 0.00

A.4.4.3.27.Pemasangan 1 m’ plint ubin teralux kerang ukuran 10cm x 30cm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.09 90,000.00 8,100.00
Tukang Batu L.02 OH 0.09 100,000.00 9,000.00
Kepala tukang L.03 OH 0.01 110,000.00 990.00
Mandor L.04 OH 0.01 115,000.00 575.00
JUMLAH TENAGA KERJA
B BAHAN
Plint teralux kerang Bh 3.53
Semen Portland kg 1.14 1,700.00
Semen warna Kg 0.10 13,000.00
Pasir pasang M3 0.00 150,000.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 0.00


E Overhead & Profit 10 % 10 % x D 0.00
F Harga Satuan Pekerjaan (D+E) 0.00
A.4.4.3.28.Pemasangan 1 m’ plint ubin teralux marmer ukuran 10cm x 60cm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.09 90,000.00 8,100.00
Tukang Batu L.02 OH 0.09 100,000.00 9,000.00
Kepala tukang L.03 OH 0.01 110,000.00 990.00
Mandor L.04 OH 0.01 115,000.00 575.00
JUMLAH TENAGA KERJA
B BAHAN
Plint teralux marmer Bh 1.70
Semen Portland kg 1.14 1,700.00
Semen warna Kg 0.10 13,000.00
Pasir pasang M3 0.00 150,000.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 0.00


E Overhead & Profit 10 % 10 % x D 0.00
F Harga Satuan Pekerjaan (D+E) 0.00

A.4.4.3.29.Pemasangan 1 m’ plint ubin teralux marmer ukuran 10cm x 40cm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.09 90,000.00 8,100.00
Tukang Batu L.02 OH 0.09 100,000.00 9,000.00
Kepala tukang L.03 OH 0.01 110,000.00 990.00
Mandor L.04 OH 0.01 115,000.00 575.00
JUMLAH TENAGA KERJA
B BAHAN
Plint teralux marmer Bh 2.65
Semen Portland kg 1.14 1,700.00
Semen warna Kg 0.10 13,000.00
Pasir pasang M3 0.00 150,000.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 0.00


E Overhead & Profit 10 % 10 % x D 0.00
F Harga Satuan Pekerjaan (D+E) 0.00

A.4.4.3.30.Pemasangan 1 m’ plint ubin teralux marmer ukuran 10cm x 30cm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.09 90,000.00 8,100.00
Tukang Batu L.02 OH 0.09 100,000.00 9,000.00
Kepala tukang L.03 OH 0.01 110,000.00 990.00
Mandor L.04 OH 0.01 115,000.00 575.00
JUMLAH TENAGA KERJA
B BAHAN
Plint teralux marmer Bh 3.53
Semen Portland kg 1.14 1,700.00
Semen warna Kg 0.10 13,000.00
Pasir pasang M3 0.00 150,000.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 0.00


E Overhead & Profit 10 % 10 % x D 0.00
F Harga Satuan Pekerjaan (D+E) 0.00
A.4.4.3.31.Pemasangan 1m2 lantai teraso cor di tempat, tebal 3cm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.36 90,000.00 32,400.00
Tukang Batu L.02 OH 0.18 100,000.00 18,000.00
Kepala tukang L.03 OH 0.02 110,000.00 1,980.00
Mandor L.04 OH 0.02 115,000.00 2,070.00
JUMLAH TENAGA KERJA
B BAHAN
Teraso cor M3 0.036
Semen warna Kg 0.10 13,000.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 0.00


E Overhead & Profit 10 % 10 % x D 0.00
F Harga Satuan Pekerjaan (D+E) 0.00

A.4.4.3.32.Pemasangan 1m2 lantai keramik artistik 10cm x 20cm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.70 90,000.00 63,000.00
Tukang Batu L.02 OH 0.35 100,000.00 35,000.00
Kepala tukang L.03 OH 0.04 110,000.00 3,850.00
Mandor L.04 OH 0.04 115,000.00 4,025.00
JUMLAH TENAGA KERJA
B BAHAN
Ubin keramik Bh 53.00
Semen Portland Kg 8.19 1,700.00
Pasir pasang M3 0.05 13,000.00
Semen warna Kg 2.75 150,000.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 0.00


E Overhead & Profit 10 % 10 % x D 0.00
F Harga Satuan Pekerjaan (D+E) 0.00

A.4.4.3.33.Pemasangan 1m2 lantai keramik artistik 10cm x 10cm atau 5cm x 20cm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.70 90,000.00 63,000.00
Tukang Batu L.02 OH 0.35 100,000.00 35,000.00
Kepala tukang L.03 OH 0.04 110,000.00 3,850.00
Mandor L.04 OH 0.04 115,000.00 4,025.00
JUMLAH TENAGA KERJA
B BAHAN
Ubin keramik Bh 106.00
Semen Portland Kg 8.19 1,700.00
Pasir pasang M3 0.05 13,000.00
Semen warna Kg 3.20 150,000.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 0.00


E Overhead & Profit 10 % 10 % x D 0.00
F Harga Satuan Pekerjaan (D+E) 0.00
A.4.4.3.34.Pemasangan 1m2 lantai keramik ukuran 33cm x 33cm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.70 90,000.00 63,000.00
Tukang Batu L.02 OH 0.35 100,000.00 35,000.00
Kepala tukang L.03 OH 0.04 110,000.00 3,850.00
Mandor L.04 OH 0.04 115,000.00 4,025.00
JUMLAH TENAGA KERJA
B BAHAN
Ubin keramik Bh 10.00
Semen Portlandd Kg 8.19 1,700.00
Pasir pasang M3 0.05 13,000.00
Semen warna Kg 1.62 150,000.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 0.00


E Overhead & Profit 10 % 10 % x D 0.00
F Harga Satuan Pekerjaan (D+E) 0.00

A.4.4.3.35.Pemasangan 1m2 lantai keramik ukuran 30cm x 30cm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.70 90,000.00 63,000.00
Tukang Batu L.02 OH 0.35 100,000.00 35,000.00
Kepala tukang L.03 OH 0.04 110,000.00 3,850.00
Mandor L.04 OH 0.04 115,000.00 4,025.00
JUMLAH TENAGA KERJA
B BAHAN
Ubin keramik Bh 11.87
Semen Portland Kg 10.00 1,700.00
Pasir pasang M3 0.05 13,000.00
Semen warna Kg 1.50 150,000.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 0.00


E Overhead & Profit 10 % 10 % x D 0.00
F Harga Satuan Pekerjaan (D+E) 0.00

A.4.4.3.36.Pemasangan 1m2 lantai keramik ukuran 20cm x 20cm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.70 90,000.00 63,000.00
Tukang Batu L.02 OH 0.35 100,000.00 35,000.00
Kepala tukang L.03 OH 0.04 110,000.00 3,850.00
Mandor L.04 OH 0.04 115,000.00 4,025.00
JUMLAH TENAGA KERJA
B BAHAN
Ubin keramik Bh 26.50
Semen Portland Kg 10.40 1,700.00
Pasir pasang M3 0.05 13,000.00
Semen warna Kg 1.62 150,000.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 0.00


E Overhead & Profit 10 % 10 % x D 0.00
F Harga Satuan Pekerjaan (D+E) 0.00
A.4.4.3.37.Pemasangan 1m2 lantai keramik ukuran 10cm x 33cm untuk variasi/border

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 1.05 90,000.00 94,500.00
Tukang Batu L.02 OH 0.53 100,000.00 52,500.00
Kepala tukang L.03 OH 0.05 110,000.00 5,830.00
Mandor L.04 OH 0.05 115,000.00 6,095.00
JUMLAH TENAGA KERJA
B BAHAN
Ubin keramik Bh 33.00
Semen Portland Kg 9.80 1,700.00
Pasir pasang M3 0.05 13,000.00
Semen warna Kg 4.37 150,000.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 0.00


E Overhead & Profit 10 % 10 % x D 0.00
F Harga Satuan Pekerjaan (D+E) 0.00

A.4.4.3.38.Pemasangan 1m2 lantai keramik mozaik ukuran 30cm x 30cm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.70 90,000.00 63,000.00
Tukang Batu L.02 OH 0.35 100,000.00 35,000.00
Kepala tukang L.03 OH 0.04 110,000.00 3,850.00
Mandor L.04 OH 0.04 115,000.00 4,025.00
JUMLAH TENAGA KERJA
B BAHAN
Ubin keramik Bh 11.87
Semen Portland Kg 14.15 1,700.00
Pasir pasang M3 0.04 13,000.00
Semen warna Kg 2.00 150,000.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 0.00


E Overhead & Profit 10 % 10 % x D 0.00
F Harga Satuan Pekerjaan (D+E) 0.00

A.4.4.3.39.Pemasangan 1 m’ plint keramik ukuran 10cm x 20cm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.09 90,000.00 8,100.00
Tukang Batu L.02 OH 0.09 100,000.00 9,000.00
Kepala tukang L.03 OH 0.04 110,000.00 3,850.00
Mandor L.04 OH 0.01 115,000.00 575.00
JUMLAH TENAGA KERJA
B BAHAN
Plint keramik Bh 5.30
Semen Portland Kg 1.14 1,700.00
Pasir pasang M3 0.00 13,000.00
Semen warna Kg 0.03 150,000.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 0.00


E Overhead & Profit 10 % 10 % x D 0.00
F Harga Satuan Pekerjaan (D+E) 0.00
A.4.4.3.40.Pemasangan 1 m’ plint keramik ukuran 10cm x 10cm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.09 90,000.00 8,100.00
Tukang Batu L.02 OH 0.09 100,000.00 9,000.00
Kepala tukang L.03 OH 0.04 110,000.00 3,850.00
Mandor L.04 OH 0.01 115,000.00 575.00
JUMLAH TENAGA KERJA
B BAHAN
Plint keramik Bh 10.60
Semen Portlandd Kg 1.14 1,700.00
Pasir pasang M3 0.00 13,000.00
Semen warna Kg 0.05 150,000.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 0.00


E Overhead & Profit 10 % 10 % x D 0.00
F Harga Satuan Pekerjaan (D+E) 0.00

A.4.4.3.41.Pemasangan 1 m’ plint keramik ukuran 5cm x 20cm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.09 90,000.00 8,100.00
Tukang Batu L.02 OH 0.09 100,000.00 9,000.00
Kepala tukang L.03 OH 0.04 110,000.00 3,850.00
Mandor L.04 OH 0.01 115,000.00 575.00
JUMLAH TENAGA KERJA
B BAHAN
Plint keramik Bh 5.30
Semen Portlandd Kg 0.57 1,700.00
Pasir pasang M3 0.00 13,000.00
Semen warna Kg 0.01 150,000.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 0.00


E Overhead & Profit 10 % 10 % x D 0.00
F Harga Satuan Pekerjaan (D+E) 0.00

A.4.4.3.42.Pemasangan 1 m’ plint internal cove artistik 5cm x 5cm x 20cm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.75 90,000.00 67,500.00
Tukang Batu L.02 OH 0.75 100,000.00 75,000.00
Kepala tukang L.03 OH 0.08 110,000.00 8,250.00
Mandor L.04 OH 0.04 115,000.00 4,370.00
JUMLAH TENAGA KERJA
B BAHAN
Internal cove Bh 5.30
Semen Portland Kg 1.14 1,700.00
Pasir pasang M3 0.00 13,000.00
Semen warna Kg 0.10 150,000.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 0.00


E Overhead & Profit 10 % 10 % x D 0.00
F Harga Satuan Pekerjaan (D+E) 0.00
A.4.4.3.43.Pemasangan 1 m2 lantai marmer ukuran 100cm x 100cm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.70 90,000.00 63,000.00
Tukang Batu L.02 OH 0.35 100,000.00 35,000.00
Kepala tukang L.03 OH 0.04 110,000.00 3,850.00
Mandor L.04 OH 0.04 115,000.00 4,025.00
JUMLAH TENAGA KERJA
B BAHAN
Marmer Bh 1.06
Semen Portland Kg 8.19 1,700.00
Pasir pasang M3 0.05 13,000.00
Semen warna Kg 0.65 150,000.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 0.00


E Overhead & Profit 10 % 10 % x D 0.00
F Harga Satuan Pekerjaan (D+E) 0.00

A.4.4.3.44.Pemasangan 1 m2 lantai karpet

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.17 90,000.00 15,300.00
Tukang Kayu L.02 OH 0.17 100,000.00 17,000.00
Kepala tukang L.03 OH 0.02 110,000.00 1,870.00
Mandor L.04 OH 0.01 115,000.00 1,035.00
JUMLAH TENAGA KERJA
B BAHAN
Karpet m2 1.05
Lem Kg 0.35
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 0.00


E Overhead & Profit 10 % 10 % x D 0.00
F Harga Satuan Pekerjaan (D+E) 0.00

A.4.4.3.45.Pemasangan 1 m2 underlayer (pelapis bawah karpet)

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.12 90,000.00 10,800.00
Tukang Kayu L.02 OH 0.12 100,000.00 12,000.00
Kepala tukang L.03 OH 0.01 110,000.00 1,320.00
Mandor L.04 OH 0.01 115,000.00 690.00
JUMLAH TENAGA KERJA
B BAHAN
Underlayer m2 1.05
Lem Kg 0.35
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A+B+C) 0.00


E Overhead & Profit 10 % 10 % x D 0.00
F Harga Satuan Pekerjaan (D+E) 0.00
A.4.4.3.46.Pemasangan 1 m2 lantai parquet kayu

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.70 90,000.00 63,000.00
Tukang Kayu L.02 OH 0.35 100,000.00 35,000.00
Kepala tukang L.03 OH 0.04 110,000.00 3,850.00
Mandor L.04 OH 0.04 115,000.00 4,025.00
JUMLAH TENAGA KERJA
B BAHAN
Parquet m2 1.05
Lem Kg 0.60
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 0.00


E Overhead & Profit 10 % 10 % x D 0.00
F Harga Satuan Pekerjaan (D+E) 0.00

A.4.4.3.47.Pemasangan 1 m2 lantai kayu gymfloor

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.70 90,000.00 63,000.00
Tukang Kayu L.02 OH 0.35 100,000.00 35,000.00
Kepala tukang L.03 OH 0.04 110,000.00 3,850.00
Mandor L.04 OH 0.04 115,000.00 4,025.00
JUMLAH TENAGA KERJA
B BAHAN
Parquet m2 1.05
Lem Kg 0.60
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 0.00


E Overhead & Profit 10 % 10 % x D 0.00
F Harga Satuan Pekerjaan (D+E) 0.00

A.4.4.3.48.Pemasangan 1 m2 dinding porslen 11cm x 11cm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 1.00 90,000.00 90,000.00
Tukang Batu L.02 OH 0.50 100,000.00 50,000.00
Kepala tukang L.03 OH 0.05 110,000.00 5,500.00
Mandor L.04 OH 0.05 115,000.00 5,750.00
JUMLAH TENAGA KERJA
B BAHAN
Porslen Bh 86.00
Semen Portland Kg 9.30 1,700.00
Pasir pasang M3 0.02 13,000.00
Semen warna Kg 1.50 150,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A+B+C) 0.00


E Overhead & Profit 10 % 10 % x D 0.00
F Harga Satuan Pekerjaan (D+E) 0.00
A.4.4.3.49.Pemasangan 1 m2 dinding porslen 10cm x 20cm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.90 90,000.00 81,000.00
Tukang Batu L.02 OH 0.45 100,000.00 45,000.00
Kepala tukang L.03 OH 0.05 110,000.00 4,950.00
Mandor L.04 OH 0.05 115,000.00 5,175.00
JUMLAH TENAGA KERJA
B BAHAN
Porslen Bh 53.00
Semen Portland Kg 9.30 1,700.00
Pasir Pasang M3 0.02 13,000.00
Semen warna Kg 2.75 150,000.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 0.00


E Overhead & Profit 10 % 10 % x D 0.00
F Harga Satuan Pekerjaan (D+E) 0.00

A.4.4.3.50.Pemasangan 1 m2 dinding porslen 20cm x 20cm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.90 90,000.00 81,000.00
Tukang Batu L.02 OH 0.45 100,000.00 45,000.00
Kepala tukang L.03 OH 0.05 110,000.00 4,950.00
Mandor L.04 OH 0.05 115,000.00 5,175.00
JUMLAH TENAGA KERJA
B BAHAN
Porslen Bh 26.00
Semen Portlandd Kg 9.30 1,700.00
Pasir Pasang M3 0.02 13,000.00
Semen warna Kg 1.94 150,000.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 0.00


E Overhead & Profit 10 % 10 % x D 0.00
F Harga Satuan Pekerjaan (D+E) 0.00

A.4.4.3.51.Pemasangan 1 m2 dinding keramik artistik 10cm x 20cm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.90 90,000.00 81,000.00
Tukang Batu L.02 OH 0.45 100,000.00 45,000.00
Kepala tukang L.03 OH 0.05 110,000.00 4,950.00
Mandor L.04 OH 0.05 115,000.00 5,175.00
JUMLAH TENAGA KERJA
B BAHAN
Keramik artistik Bh 53.00
Semen Portland Kg 9.30 1,700.00
Pasir Pasang M3 0.02 13,000.00
Semen warna Kg 2.75 150,000.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 0.00


E Overhead & Profit 10 % 10 % x D 0.00
F Harga Satuan Pekerjaan (D+E) 0.00
A.4.4.3.52.Pemasangan 1 m2 dinding keramik artistik 5cm x 20cm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.90 90,000.00 81,000.00
Tukang Batu L.02 OH 0.45 100,000.00 45,000.00
Kepala tukang L.03 OH 0.05 110,000.00 4,950.00
Mandor L.04 OH 0.05 115,000.00 5,175.00
JUMLAH TENAGA KERJA
B BAHAN
Keramik artistik Bh 106.00
Semen Portland Kg 9.30 1,700.00
Pasir Pasang M3 0.02 13,000.00
Semen warna Kg 2.90 150,000.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 0.00


E Overhead & Profit 10 % 10 % x D 0.00
F Harga Satuan Pekerjaan (D+E) 0.00

A.4.4.3.53.Pemasangan 1 m2 dinding keramik 10cm x 20cm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.90 90,000.00 81,000.00
Tukang Batu L.02 OH 0.45 100,000.00 45,000.00
Kepala tukang L.03 OH 0.05 110,000.00 4,950.00
Mandor L.04 OH 0.05 115,000.00 5,175.00
JUMLAH TENAGA KERJA
B BAHAN
Keramik artistik Bh 53.00
Semen Portland Kg 9.30 1,700.00
Pasir Pasang M3 0.02 13,000.00
Semen warna Kg 2.75 150,000.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 0.00


E Overhead & Profit 10 % 10 % x D 0.00
F Harga Satuan Pekerjaan (D+E) 0.00

A.4.4.3.54.Pemasangan 1 m2 dinding keramik 20cm x 20cm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.90 90,000.00 81,000.00
Tukang Batu L.02 OH 0.45 100,000.00 45,000.00
Kepala tukang L.03 OH 0.05 110,000.00 4,950.00
Mandor L.04 OH 0.05 115,000.00 5,175.00
JUMLAH TENAGA KERJA
B BAHAN
Keramik artistik Bh 26.50
Semen Portland Kg 9.30 1,700.00
Pasir Pasang M3 0.02 13,000.00
Semen warna Kg 1.94 150,000.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 0.00


E Overhead & Profit 10 % 10 % x D 0.00
F Harga Satuan Pekerjaan (D+E) 0.00
A.4.4.3.55.Pemasangan 1 m2 dinding marmer 100cm x 100cm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 1.30 90,000.00 117,000.00
Tukang Batu L.02 OH 0.65 100,000.00 65,000.00
Kepala tukang L.03 OH 0.07 110,000.00 7,150.00
Mandor L.04 OH 0.07 115,000.00 7,475.00
JUMLAH TENAGA KERJA
B BAHAN
Marmer Bh 1.06
Semen Portland Kg 12.44 1,700.00
Pasir Pasang M3 0.03 13,000.00
Semen warna Kg 0.65 150,000.00
Paku 12cm Bh 3.03
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 0.00


E Overhead & Profit 10 % 10 % x D 0.00
F Harga Satuan Pekerjaan (D+E) 0.00

A.4.4.3.56.Pemasangan 1 m2 dinding bata pelapis 3cm x 7cm x 24cm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 1.00 90,000.00 90,000.00
Tukang Batu L.02 OH 0.50 100,000.00 50,000.00
Kepala tukang L.03 OH 0.05 110,000.00 5,500.00
Mandor L.04 OH 0.05 115,000.00 5,750.00
JUMLAH TENAGA KERJA
B BAHAN
Bata pelapis Bh 63.00
Semen Portland Kg 12.44 1,700.00
Pasir Pasang M3 0.03 13,000.00
Semen warna Kg 2.75 150,000.00
JUMLAH HARGA BAHAN 0.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 0.00


E Overhead & Profit 10 % 10 % x D 0.00
F Harga Satuan Pekerjaan (D+E) 0.00

A.4.4.3.57.Pemasangan 1 m2 dinding batu paras

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.70 90,000.00 63,000.00
Tukang Batu L.02 OH 0.35 100,000.00 35,000.00
Kepala tukang L.03 OH 0.04 110,000.00 3,850.00
Mandor L.04 OH 0.04 115,000.00 4,025.00
JUMLAH TENAGA KERJA
B BAHAN
Batu paras Bh 1.10
Semen Portland Kg 11.75 1,700.00
Pasir Pasang M3 0.04 13,000.00
JUMLAH HARGA BAHAN 0.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 0.00


E Overhead & Profit 10 % 10 % x D 0.00
F Harga Satuan Pekerjaan (D+E) 0.00
A.4.4.3.58.Pemasangan 1 m2 dinding batu tempel hitam

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.70 90,000.00 63,000.00
Tukang Batu L.02 OH 0.35 100,000.00 35,000.00
Kepala tukang L.03 OH 0.04 110,000.00 3,850.00
Mandor L.04 OH 0.04 115,000.00 4,025.00
JUMLAH TENAGA KERJA 105,875.00
B BAHAN
Batu tempel hitam Bh 1.10 240,000.00 264,000.00
Semen Portland Kg 11.75 1,700.00 19,975.00
Pasir Pasang M3 0.04 13,000.00 455.00
JUMLAH HARGA BAHAN 284,430.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 390,305.00


E Overhead & Profit 10 % 10 % x D 39,030.50
F Harga Satuan Pekerjaan (D+E) 429,335.50

A.4.4.3.59.Pemasangan 1 m2 lantai vynil ukuran 30cm x 30cm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.15 90,000.00 13,500.00
Tukang Batu L.02 OH 0.15 100,000.00 15,000.00
Kepala tukang L.03 OH 0.02 110,000.00 1,650.00
Mandor L.04 OH 0.01 115,000.00 920.00
JUMLAH TENAGA KERJA
B BAHAN
Vynil Bh 11.87
Lem Kg 0.35
JUMLAH HARGA BAHAN 0.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 0.00


E Overhead & Profit 10 % 10 % x D 0.00
F Harga Satuan Pekerjaan (D+E) 0.00

A.4.4.3.60.Pemasangan 1 m2 wallpaper lebar 50 cm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.35 90,000.00 31,500.00
Tukang Batu L.02 OH 0.18 100,000.00 17,500.00
Kepala tukang L.03 OH 0.02 110,000.00 1,870.00
Mandor L.04 OH 0.00 115,000.00 230.00
JUMLAH TENAGA KERJA
B BAHAN
Wallpaper m 2.20
Lem Kg 0.25
JUMLAH HARGA BAHAN 0.00
C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A+B+C) 0.00


E Overhead & Profit 10 % 10 % x D 0.00
F Harga Satuan Pekerjaan (D+E) 0.00
A.4.4.3.61.Pemasangan 1m2 floor harderner

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.12 90,000.00 10,800.00
Tukang Batu L.02 OH 0.12 100,000.00 12,000.00
Kepala tukang L.03 OH 0.01 110,000.00 1,320.00
Mandor L.04 OH 0.01 115,000.00 690.00
JUMLAH TENAGA KERJA
B BAHAN
Floor harderner Kg 5.00
JUMLAH HARGA BAHAN 0.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 0.00


E Overhead & Profit 10 % 10 % x D 0.00
F Harga Satuan Pekerjaan (D+E) 0.00

A.4.4.3.62.Pemasangan 1 m’ plint vynil 15cm x 30cm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.08 90,000.00 7,200.00
Tukang Batu L.02 OH 0.08 100,000.00 8,000.00
Kepala tukang L.03 OH 0.01 110,000.00 880.00
Mandor L.04 OH 0.00 115,000.00 460.00
JUMLAH TENAGA KERJA
B BAHAN
Vynil Bh 1.76
Lem Kg 0.08
JUMLAH HARGA BAHAN 0.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 0.00


E Overhead & Profit 10 % 10 % x D 0.00
F Harga Satuan Pekerjaan (D+E) 0.00

A.4.4.3.63. Pemasangan 1 m’ plint kayu tebal 2 cm lebar 10 cm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.12 90,000.00 10,800.00
Tukang Batu L.02 OH 0.12 100,000.00 12,000.00
Kepala tukang L.03 OH 0.01 110,000.00 1,320.00
Mandor L.04 OH 0.01 115,000.00 690.00
JUMLAH TENAGA KERJA 24,810.00
B BAHAN
Papan kayu kelas 1 M3 0.00 7,500,000.00 22,500.00
Paku/skrup 5cm Kg 0.05 24,000.00 1,200.00
JUMLAH HARGA BAHAN 23,700.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 48,510.00
E Overhead & Profit 10 % 10 % x D 4,851.00
F Harga Satuan Pekerjaan (D+E) 53,361.00
A.4.5.1 SATUAN PEKERJAAN LANGIT-LANGIT (PLAFOND)

A.4.5.1.1. Pemasangan 1 m2 langit-langit asbes semen, tebal 4 mm, 5 mm, dan 6 mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.03 90,000.00 2,700.00
Tukang kayu L.02 OH 0.07 100,000.00 7,000.00
Kepala tukang L.03 OH 0.01 110,000.00 770.00
Mandor L.04 OH 0.00 115,000.00 460.00
JUMLAH TENAGA KERJA 0.00
B BAHAN
Asbes semen m2 1.10
Paku tripleks kg 0.01 22,000.00 220.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 0.00


E Overhead & Profit10 % 10 % x D 0.00
F Harga Satuan Pekerjaan (D+E) 0.00

A.4.5.1.2. Pemasangan 1 m2 langit-langit akustik ukuran (30 x 30) cm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.12 90,000.00 10,800.00
Tukang kayu L.02 OH 0.12 100,000.00 12,000.00
Kepala tukang L.03 OH 0.01 110,000.00 1,320.00
Mandor L.04 OH 0.01 115,000.00 690.00
JUMLAH TENAGA KERJA
B BAHAN
Akustik Lembar 12.00
Paku tripleks kg 0.05 22,000.00 1,100.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 0.00


E Overhead & Profit10 % 10 % x D 0.00
F Harga Satuan Pekerjaan (D+E) 0.00

A.4.5.1.3. Pemasangan 1 m2 langit-langit akustik ukuran (30 x 60) cm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.12 90,000.00 10,800.00
Tukang kayu L.02 OH 0.12 100,000.00 12,000.00
Kepala tukang L.03 OH 0.01 110,000.00 1,320.00
Mandor L.04 OH 0.01 115,000.00 690.00
JUMLAH TENAGA KERJA
B BAHAN
Akustik Lembar 5.80
Paku tripleks kg 0.05 22,000.00 1,100.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A+B+C) 0.00


E Overhead & Profit10 % 10 % x D 0.00
F Harga Satuan Pekerjaan (D+E) 0.00
A.4.5.1.4. Pemasangan 1 m2 langit-langit akustik ukuran (60 x 120) cm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.10 90,000.00 9,000.00
Tukang kayu L.02 OH 0.10 100,000.00 10,000.00
Kepala tukang L.03 OH 0.01 110,000.00 1,100.00
Mandor L.04 OH 0.01 115,000.00 575.00
JUMLAH TENAGA KERJA
B BAHAN
Akustik Lembar 1.50
Paku tripleks kg 0.05 22,000.00 1,100.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 0.00


E Overhead & Profit10 % 10 % x D 0.00
F Harga Satuan Pekerjaan (D+E) 0.00

A.4.5.1.5. Pemasangan 1 m2 langit-langit tripleks ukuran (120 x 240) cm, tebal 3 mm, 4 mm & 6 mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.10000 90,000.00 9,000.00
Tukang kayu L.02 OH 0.10000 100,000.00 10,000.00
Kepala tukang L.03 OH 0.01000 110,000.00 1,100.00
Mandor L.04 OH 0.00500 115,000.00 575.00
JUMLAH TENAGA KERJA 20,675.00
B BAHAN
Tripleks Lembar 0.3750 67,500.00 25,312.50
Paku tripleks kg 0.0300 22,000.00 660.00
JUMLAH HARGA BAHAN 25,972.50
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 46,647.50


E Overhead & Profit10 % 10 % x D 4,664.75
F Harga Satuan Pekerjaan (D+E) 51,312.25

A.4.5.1.6. Pemasangan 1 m2 langit-langit lambrisering kayu, tebal 9 mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.80 90,000.00 72,000.00
Tukang kayu L.02 OH 0.80 100,000.00 80,000.00
Kepala tukang L.03 OH 0.08 110,000.00 8,800.00
Mandor L.04 OH 0.04 115,000.00 4,600.00
JUMLAH TENAGA KERJA 165,400.00
B BAHAN
Kayu papan m3 0.02 2,500,000.00 37,500.00
Paku tripleks kg 0.01 22,000.00 220.00
JUMLAH HARGA BAHAN 37,720.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 203,120.00
E Overhead & Profit10 % 10 % x D 20,312.00
F Harga Satuan Pekerjaan (D+E) 223,432.00
A.4.5.1.7. Pemasangan 1 m2 langit-langit gypsum board ukuran (120x240x9) mm, tebal 9 mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.10 90,000.00 9,000.00
Tukang kayu L.02 OH 0.05 100,000.00 5,000.00
Kepala tukang L.03 OH 0.01 110,000.00 550.00
Mandor L.04 OH 0.01 115,000.00 575.00
JUMLAH TENAGA KERJA
B BAHAN
Gypsum board Lembar 0.36
Paku skrup kg 0.11
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 0.00


E Overhead & Profit10 % 10 % x D 0.00
F Harga Satuan Pekerjaan (D+E) 0.00

A.4.5.1.8. Pemasangan 1 m2 langit-langit akustik ukuran (60 x 120) cm berikut rangka alluminium

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.50 90,000.00 45,000.00
Tukang Besi L.02 OH 0.50 100,000.00 50,000.00
Kepala tukang L.03 OH 0.05 110,000.00 5,500.00
Mandor L.04 OH 0.03 115,000.00 2,875.00
JUMLAH TENAGA KERJA
B BAHAN
Profil Allum"T" m 3.60
Kawat dia 4 mm kg 0.15
Ramset Buah 1.05
Akustik 60 x 120 Lembar 1.50
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 0.00


E Overhead & Profit10 % 10 % x D 0.00
F Harga Satuan Pekerjaan (D+E) 0.00

A.4.5.1.9. Pemasangan 1 m’ list langit-langit kayu profil

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.05 90,000.00 4,500.00
Tukang Kayu L.02 OH 0.05 100,000.00 5,000.00
Kepala tukang L.03 OH 0.01 110,000.00 550.00
Mandor L.04 OH 0.00 115,000.00 345.00
JUMLAH TENAGA KERJA 10,395.00
B BAHAN
List kayu profil m 1.05 10,000.00 10,500.00
Paku kg 0.01 15,000.00 150.00
JUMLAH HARGA BAHAN 10,650.00
C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A+B+C) 21,045.00


E Overhead & Profit10 % 10 % x D 2,104.50
F Harga Satuan Pekerjaan (D+E) 23,149.50

A.4.5.1.10 Pemasangan 1 m2 Rangka langit-langit besi hollow 40.40


Lihat pada kelompok Pekerjaan Besi dan Alumunium ( A.9.21)
A.4.5.2. HARGA SATUAN PEKERJAAN PENUTUP ATAP

A.4.5.2.1. Pemasangan 1 m2 atap genteng palentong kecil

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.15 90,000.00 13,500.00
Tukang Kayu L.03 OH 0.08 100,000.00 7,500.00
Kepala tukang L.11 OH 0.01 110,000.00 825.00
Mandor L.15 OH 0.01 115,000.00 920.00
JUMLAH TENAGA KERJA
B BAHAN
Genteng palentong Bh 25.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 0.00


E Overhead & Profit 10 % 10 % x D 0.00
F Harga Satuan Pekerjaan (D+E) 0.00

A.4.5.2.2. Pemasangan 1 m2 atap genteng kodok glazuur

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.15 90,000.00 13,500.00
Tukang Kayu L.03 OH 0.08 100,000.00 7,500.00
Kepala tukang L.11 OH 0.01 110,000.00 880.00
Mandor L.15 OH 0.01 115,000.00 920.00
JUMLAH TENAGA KERJA 22,800.00
B BAHAN
Genteng kodok Bh 25.00 3,000.00 75,000.00
JUMLAH HARGA BAHAN 75,000.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 97,800.00


E Overhead & Profit 10 % 10 % x D 9,780.00
F Harga Satuan Pekerjaan (D+E) 107,580.00

A.4.5.2.3. Pemasangan 1 m2 atap genteng palentong besar/super

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.15 90,000.00 13,500.00
Tukang Kayu L.03 OH 0.08 100,000.00 7,500.00
Kepala tukang L.11 OH 0.01 110,000.00 880.00
Mandor L.15 OH 0.01 115,000.00 920.00
JUMLAH TENAGA KERJA
B BAHAN
Genteng kodok Bh 12.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 0.00


E Overhead & Profit 10 % 10 % x D 0.00
F Harga Satuan Pekerjaan (D+E) 0.00
A.4.5.2.4. Pemasangan 1 m’ bubung genteng palentong

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.40 90,000.00 36,000.00
Tukang Kayu L.03 OH 0.20 100,000.00 20,000.00
Kepala tukang L.11 OH 0.02 110,000.00 2,200.00
Mandor L.15 OH 0.00 115,000.00 230.00
JUMLAH TENAGA KERJA 58,430.00
B BAHAN
Genteng bubung Bh 5.00 3,750.00 18,750.00
Semen Portland Kg 8.00 1,700.00 13,600.00
Pasir pasang M3 0.03 150,000.00 4,800.00
JUMLAH HARGA BAHAN 37,150.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 95,580.00


E Overhead & Profit 10 % 10 % x D 9,558.00
F Harga Satuan Pekerjaan (D+E) 105,138.00

A.4.5.2.5. Pemasangan 1 m’ bubung genteng kodok glazuur

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.40 90,000.00 36,000.00
Tukang Kayu L.03 OH 0.20 100,000.00 20,000.00
Kepala tukang L.11 OH 0.02 110,000.00 2,200.00
Mandor L.15 OH 0.00 115,000.00 230.00
JUMLAH TENAGA KERJA
B BAHAN
Genteng bubung Bh 5.00
Semen Portland Kg 8.00
Pasir pasang M3 0.03
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 0.00


E Overhead & Profit 10 % 10 % x D 0.00
F Harga Satuan Pekerjaan (D+E) 0.00

A.4.5.2.6. Pemasangan 1 m’ bubung genteng palentong besar

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.40 90,000.00 36,000.00
Tukang Kayu L.03 OH 0.20 100,000.00 20,000.00
Kepala tukang L.11 OH 0.02 110,000.00 2,200.00
Mandor L.15 OH 0.00 115,000.00 230.00
JUMLAH TENAGA KERJA
B BAHAN
Genteng bubung Bh 4.00
Semen Portland Kg 8.00
Pasir pasang M3 0.03
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 0.00


E Overhead & Profit 10 % 10 % x D 0.00
F Harga Satuan Pekerjaan (D+E) 0.00
A.4.5.2.7. Pemasangan 1 m2 roof light fibreglass 90x180

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.14 90,000.00 12,600.00
Tukang Kayu L.03 OH 0.07 100,000.00 6,700.00
Kepala tukang L.11 OH 0.01 110,000.00 770.00
Mandor L.15 OH 0.01 115,000.00 805.00
JUMLAH TENAGA KERJA
B BAHAN
Rooflight 90x180 Lbr 0.60
Paku biasa ½”-1” Kg 0.05
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 0.00


E Overhead & Profit 10 % 10 % x D 0.00
F Harga Satuan Pekerjaan (D+E) 0.00

A.4.5.2.8. Pemasangan 1 m2 atap asbes gelombang 0,92mx2,5m x 5mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.14 90,000.00 12,600.00
Tukang Kayu L.03 OH 0.08 100,000.00 7,500.00
Kepala tukang L.11 OH 0.01 110,000.00 880.00
Mandor L.15 OH 0.01 115,000.00 920.00
JUMLAH TENAGA KERJA
B BAHAN
Asbes gel 92x250 Lbr 0.50
Paku pancing 6x23 Kg 0.12
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 0.00


E Overhead & Profit 10 % 10 % x D 0.00
F Harga Satuan Pekerjaan (D+E) 0.00

A.4.5.2.9. Pemasangan 1 m2 atap asbes gelombang 0,92mx2,25m x 5mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.14 90,000.00 12,600.00
Tukang Kayu L.03 OH 0.08 100,000.00 7,500.00
Kepala tukang L.11 OH 0.01 110,000.00 880.00
Mandor L.15 OH 0.01 115,000.00 920.00
JUMLAH TENAGA KERJA
B BAHAN
Asbes gel 92x250 Lbr 0.60
Paku pancing 6x23 Kg 0.12
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 0.00


E Overhead & Profit 10 % 10 % x D 0.00
F Harga Satuan Pekerjaan (D+E) 0.00
A.4.5.2.10. Pemasangan 1 m2 atap asbes gelombang 0,92mx2,00m x 5mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.14 90,000.00 12,600.00
Tukang Kayu L.03 OH 0.07 100,000.00 7,000.00
Kepala tukang L.11 OH 0.01 110,000.00 770.00
Mandor L.15 OH 0.01 115,000.00 805.00
JUMLAH TENAGA KERJA
B BAHAN
Asbes gel 92x250 Lbr 0.60
Paku pancing 6x23 Kg 0.12
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 0.00


E Overhead & Profit 10 % 10 % x D 0.00
F Harga Satuan Pekerjaan (D+E) 0.00

A.4.5.2.11. Pemasangan 1 m2 atap asbes gelombang 0,92mx1.80m x 5mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.14 90,000.00 12,600.00
Tukang Kayu L.03 OH 0.07 100,000.00 7,000.00
Kepala tukang L.11 OH 0.01 110,000.00 770.00
Mandor L.15 OH 0.01 115,000.00 805.00
JUMLAH TENAGA KERJA
B BAHAN
Asbes gel 92x250 Lbr 0.75
Paku pancing 6x23 Kg 0.12
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 0.00


E Overhead & Profit 10 % 10 % x D 0.00
F Harga Satuan Pekerjaan (D+E) 0.00

A.4.5.2.12. Pemasangan 1 m2 atap asbes gelombang 1.05mx3.00m x 4mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.14 90,000.00 12,600.00
Tukang Kayu L.03 OH 0.07 100,000.00 7,000.00
Kepala tukang L.11 OH 0.01 110,000.00 770.00
Mandor L.15 OH 0.01 115,000.00 805.00
JUMLAH TENAGA KERJA
B BAHAN
Asbes gel 92x250 Lbr 0.35
Paku pancing 6x23 Kg 0.12
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 0.00


E Overhead & Profit 10 % 10 % x D 0.00
F Harga Satuan Pekerjaan (D+E) 0.00
A.4.5.2.13. Pemasangan 1 m2 atap asbes gelombang 1.05mx2.70m x 4mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.14 90,000.00 12,600.00
Tukang Kayu L.03 OH 0.07 100,000.00 7,000.00
Kepala tukang L.11 OH 0.01 110,000.00 770.00
Mandor L.15 OH 0.01 115,000.00 805.00
JUMLAH TENAGA KERJA
B BAHAN
Asbes gel 92x250 Lbr 0.42
Paku pancing 6x23 Kg 0.12
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 0.00


E Overhead & Profit 10 % 10 % x D 0.00
F Harga Satuan Pekerjaan (D+E) 0.00

A.4.5.2.14. Pemasangan 1 m2 atap asbes gelombang 1.05mx2.40m x 4mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.14 90,000.00 12,600.00
Tukang Kayu L.03 OH 0.07 100,000.00 7,000.00
Kepala tukang L.11 OH 0.01 110,000.00 770.00
Mandor L.15 OH 0.01 115,000.00 805.00
JUMLAH TENAGA KERJA
B BAHAN
Asbes gel 92x250 Lbr 0.44
Paku pancing 6x23 Kg 0.12
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 0.00


E Overhead & Profit 10 % 10 % x D 0.00
F Harga Satuan Pekerjaan (D+E) 0.00

A.4.5.2.15. Pemasangan 1 m2 atap asbes gelombang 1.05mx2.10m x 4mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.14 90,000.00 12,600.00
Tukang Kayu L.03 OH 0.07 100,000.00 7,000.00
Kepala tukang L.11 OH 0.01 110,000.00 770.00
Mandor L.15 OH 0.01 115,000.00 805.00
JUMLAH TENAGA KERJA
B BAHAN
Asbes gel 92x250 Lbr 0.51
Paku pancing 6x23 Kg 0.12
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 0.00


E Overhead & Profit 10 % 10 % x D 0.00
F Harga Satuan Pekerjaan (D+E) 0.00
A.4.5.2.16. Pemasangan 1 m2 atap asbes gelombang 1.05mx1.50m x 4mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.14 90,000.00 12,600.00
Tukang Kayu L.03 OH 0.07 100,000.00 7,000.00
Kepala tukang L.11 OH 0.01 110,000.00 770.00
Mandor L.15 OH 0.01 115,000.00 805.00
JUMLAH TENAGA KERJA
B BAHAN
Asbes gel 92x250 Lbr 0.80
Paku pancing 6x23 Kg 0.12
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 0.00


E Overhead & Profit 10 % 10 % x D 0.00
F Harga Satuan Pekerjaan (D+E) 0.00

A.4.5.2.17. Pemasangan 1 m2 atap asbes gelombang 1.08mx3.00m x 6mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.14 90,000.00 12,600.00
Tukang Kayu L.03 OH 0.07 100,000.00 7,000.00
Kepala tukang L.11 OH 0.01 110,000.00 770.00
Mandor L.15 OH 0.01 115,000.00 805.00
JUMLAH TENAGA KERJA
B BAHAN
Asbes gel 92x250 Lbr 0.37
Paku pancing 6x23 Kg 0.12
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 0.00


E Overhead & Profit 10 % 10 % x D 0.00
F Harga Satuan Pekerjaan (D+E) 0.00

A.4.5.2.18. Pemasangan 1 m2 atap asbes gelombang 1.08mx2.70m x 6mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.14 90,000.00 12,600.00
Tukang Kayu L.03 OH 0.07 100,000.00 7,000.00
Kepala tukang L.11 OH 0.01 110,000.00 770.00
Mandor L.15 OH 0.01 115,000.00 805.00
JUMLAH TENAGA KERJA
B BAHAN
Asbes gel 92x250 Lbr 0.38
Paku pancing 6x23 Kg 0.12
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 0.00


E Overhead & Profit 10 % 10 % x D 0.00
F Harga Satuan Pekerjaan (D+E) 0.00
A.4.5.2.19. Pemasangan 1 m2 atap asbes gelombang 1.08mx2.40m x 6mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.14 90,000.00 12,600.00
Tukang Kayu L.03 OH 0.07 100,000.00 7,000.00
Kepala tukang L.11 OH 0.01 110,000.00 770.00
Mandor L.15 OH 0.01 115,000.00 805.00
JUMLAH TENAGA KERJA
B BAHAN
Asbes gel 92x250 Lbr 0.46
Paku pancing 6x23 Kg 0.12
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 0.00


E Overhead & Profit 10 % 10 % x D 0.00
F Harga Satuan Pekerjaan (D+E) 0.00

A.4.5.2.20. Pemasangan 1 m2 atap asbes gelombang 1.08mx2.10m x 6mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.14 90,000.00 12,600.00
Tukang Kayu L.03 OH 0.07 100,000.00 7,000.00
Kepala tukang L.11 OH 0.01 110,000.00 770.00
Mandor L.15 OH 0.01 115,000.00 805.00
JUMLAH TENAGA KERJA
B BAHAN
Asbes gel 92x250 Lbr 0.49
Paku pancing 6x23 Kg 0.12
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 0.00


E Overhead & Profit 10 % 10 % x D 0.00
F Harga Satuan Pekerjaan (D+E) 0.00

A.4.5.2.21. Pemasangan 1 m2 atap asbes gelombang 1.08mx1.80m x 6mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.14 90,000.00 12,600.00
Tukang Kayu L.03 OH 0.07 100,000.00 7,000.00
Kepala tukang L.11 OH 0.01 110,000.00 770.00
Mandor L.15 OH 0.01 115,000.00 805.00
JUMLAH TENAGA KERJA
B BAHAN
Asbes gel 92x250 Lbr 0.57
Paku pancing 6x23 Kg 0.12
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 0.00


E Overhead & Profit 10 % 10 % x D 0.00
F Harga Satuan Pekerjaan (D+E) 0.00
A.4.5.2.22. Pemasangan 1 m’ bubung stel gelombang 0,92m

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.08 90,000.00 7,560.00
Tukang Kayu L.03 OH 0.13 100,000.00 12,500.00
Kepala tukang L.11 OH 0.01 110,000.00 1,430.00
Mandor L.15 OH 0.00 115,000.00 460.00
JUMLAH TENAGA KERJA
B BAHAN
Bubung stel gel. Lbr 2.40
Paku skrup 3,5” Bh 6.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 0.00


E Overhead & Profit 10 % 10 % x D 0.00
F Harga Satuan Pekerjaan (D+E) 0.00

A.4.5.2.23. Pemasangan 1 m’ bubung stel gelombang 1,05m

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.08 90,000.00 7,560.00
Tukang Kayu L.03 OH 0.13 100,000.00 12,500.00
Kepala tukang L.11 OH 0.01 110,000.00 1,430.00
Mandor L.15 OH 0.00 115,000.00 460.00
JUMLAH TENAGA KERJA
B BAHAN
Bubung stel gel. Lbr 2.10
Paku skrup 3,5” Bh 6.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 0.00


E Overhead & Profit 10 % 10 % x D 0.00
F Harga Satuan Pekerjaan (D+E) 0.00

A.4.5.2.24. Pemasangan 1 m’ bubung stel gelombang 1,08m

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.08 90,000.00 7,560.00
Tukang Kayu L.03 OH 0.13 100,000.00 12,500.00
Kepala tukang L.11 OH 0.01 110,000.00 1,430.00
Mandor L.15 OH 0.00 115,000.00 460.00
JUMLAH TENAGA KERJA
B BAHAN
Bubung stel gel. Lbr 2.05
Paku skrup 3,5” Bh 6.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 0.00


E Overhead & Profit 10 % 10 % x D 0.00
F Harga Satuan Pekerjaan (D+E) 0.00
A.4.5.2.25. Pemasangan 1 m’ nok paten 0,92m

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.08 90,000.00 7,560.00
Tukang Kayu L.03 OH 0.13 100,000.00 12,500.00
Kepala tukang L.11 OH 0.01 110,000.00 1,430.00
Mandor L.15 OH 0.00 115,000.00 460.00
JUMLAH TENAGA KERJA
B BAHAN
Nok paten 92cm Lbr 1.20
Paku skrup 3,5” Bh 6.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 0.00


E Overhead & Profit 10 % 10 % x D 0.00
F Harga Satuan Pekerjaan (D+E) 0.00

A.4.5.2.26. Pemasangan 1 m’ nok paten 1,05m

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.08 90,000.00 7,560.00
Tukang Kayu L.03 OH 0.13 100,000.00 12,500.00
Kepala tukang L.11 OH 0.01 110,000.00 1,430.00
Mandor L.15 OH 0.00 115,000.00 460.00
JUMLAH TENAGA KERJA
B BAHAN
Nok paten 92cm Lbr 1.20
Paku skrup 3,5” Bh 6.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 0.00


E Overhead & Profit 10 % 10 % x D 0.00
F Harga Satuan Pekerjaan (D+E) 0.00

A.4.5.2.27. Pemasangan 1 m’ nok paten 1,08m

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.08 90,000.00 7,560.00
Tukang Kayu L.03 OH 0.13 100,000.00 12,500.00
Kepala tukang L.11 OH 0.01 110,000.00 1,430.00
Mandor L.15 OH 0.00 115,000.00 460.00
JUMLAH TENAGA KERJA
B BAHAN
Nok paten 92cm Lbr 1.20
Paku skrup 3,5” Bh 6.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 0.00


E Overhead & Profit 10 % 10 % x D 0.00
F Harga Satuan Pekerjaan (D+E) 0.00
A.4.5.2.28. Pemasangan 1 m’ nok stel rata 0,92m

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.10 90,000.00 9,000.00
Tukang Kayu L.03 OH 0.15 100,000.00 15,000.00
Kepala tukang L.11 OH 0.01 110,000.00 1,430.00
Mandor L.15 OH 0.00 115,000.00 460.00
JUMLAH TENAGA KERJA
B BAHAN
Nok paten 92cm Lbr 1.10
Paku skrup 3,5” Bh 6.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 0.00


E Overhead & Profit 10 % 10 % x D 0.00
F Harga Satuan Pekerjaan (D+E) 0.00

A.4.5.2.29. Pemasangan 1 m’ nok stel rata 1,05m

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.08 90,000.00 7,560.00
Tukang Kayu L.03 OH 0.13 100,000.00 12,500.00
Kepala tukang L.11 OH 0.01 110,000.00 1,430.00
Mandor L.15 OH 0.00 115,000.00 460.00
JUMLAH TENAGA KERJA
B BAHAN
Nok paten 92cm Lbr 1.10
Paku skrup 3,5” Bh 6.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 0.00


E Overhead & Profit 10 % 10 % x D 0.00
F Harga Satuan Pekerjaan (D+E) 0.00

A.4.5.2.30. Pemasangan 1 m2 genteng beton

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.20 90,000.00 18,000.00
Tukang Kayu L.03 OH 0.10 100,000.00 10,000.00
Kepala tukang L.11 OH 0.01 110,000.00 1,100.00
Mandor L.15 OH 0.01 115,000.00 1,150.00
JUMLAH TENAGA KERJA
B BAHAN
Genteng beton Bh 11.00
Paku biasa 2”-5” Kg 0.03
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 0.00


E Overhead & Profit 10 % 10 % x D 0.00
F Harga Satuan Pekerjaan (D+E) 0.00
A.4.5.2.31. Pemasangan 1 m2 genteng aspal

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.20 90,000.00 18,000.00
Tukang Kayu L.03 OH 0.30 100,000.00 30,000.00
Kepala tukang L.11 OH 0.00 110,000.00 330.00
Mandor L.15 OH 0.01 115,000.00 1,150.00
JUMLAH TENAGA KERJA
B BAHAN
Genteng aspal Bh 6.90
Plywood 6mm Lbr 0.35
Paku biasa ½”-1” Kg 0.03
Plastic aerator Bh 0.50
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 0.00


E Overhead & Profit 10 % 10 % x D 0.00
F Harga Satuan Pekerjaan (D+E) 0.00

A.4.5.2.32. Pemasangan 1 m2 genteng metal

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.20 90,000.00 18,000.00
Tukang Kayu L.03 OH 0.10 100,000.00 10,000.00
Kepala tukang L.11 OH 0.01 110,000.00 1,100.00
Mandor L.15 OH 0.00 115,000.00 115.00
JUMLAH TENAGA KERJA 29,215.00
B BAHAN
Genteng metal Bh 1.02 39,000.00 39,780.00
Paku biasa ½”-1” Kg 0.20 15,000.00 3,000.00
JUMLAH HARGA BAHAN 42,780.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 71,995.00


E Overhead & Profit 10 % 10 % x D 7,199.50
F Harga Satuan Pekerjaan (D+E) 79,194.50

A.4.5.2.33. Pemasangan 1 m2 atap sirap kayu

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.17 90,000.00 14,940.00
Tukang Kayu L.03 OH 0.25 100,000.00 25,000.00
Kepala tukang L.11 OH 0.03 110,000.00 2,750.00
Mandor L.15 OH 0.01 115,000.00 920.00
JUMLAH TENAGA KERJA
B BAHAN
Sirap kayu Bh 30.00
Paku biasa ½”-1” Kg 0.20 15,000.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 0.00


E Overhead & Profit 10 % 10 % x D 0.00
F Harga Satuan Pekerjaan (D+E) 0.00
A.4.5.2.34. Pemasangan 1 m’ nok genteng beton

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.40 90,000.00 36,000.00
Tukang Kayu L.03 OH 0.20 100,000.00 20,000.00
Kepala tukang L.11 OH 0.02 110,000.00 2,200.00
Mandor L.15 OH 0.02 115,000.00 2,300.00
JUMLAH TENAGA KERJA 60,500.00
B BAHAN
Nok genteng beton Bh 3.50 6,250.00 21,875.00
Paku biasa ½”-1” Kg 0.05 15,000.00 750.00
Semen PC Kg 10.80 1,700.00 18,360.00
Pasir pasang M3 0.03 150,000.00 4,800.00
Semen warna Kg 1.00 13,000.00 13,000.00
JUMLAH HARGA BAHAN 58,785.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 119,285.00


E Overhead & Profit 10 % 10 % x D 11,928.50
F Harga Satuan Pekerjaan (D+E) 131,213.50

A.4.5.2.35. Pemasangan 1 m’ nok genteng aspal

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.13 90,000.00 11,250.00
Tukang Kayu L.03 OH 0.25 100,000.00 25,000.00
Kepala tukang L.11 OH 0.03 110,000.00 2,750.00
Mandor L.15 OH 0.01 115,000.00 690.00
JUMLAH TENAGA KERJA
B BAHAN
Nok genteng aspal Bh 2.00
Paku biasa ½”-1” Kg 0.05 15,000.00 750.00
Kayu balok borneo M3 0.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 0.00


E Overhead & Profit 10 % 10 % x D 0.00
F Harga Satuan Pekerjaan (D+E) 0.00

A.4.5.2.36. Pemasangan 1 m’ nok genteng metal

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.25 90,000.00 22,500.00
Tukang Kayu L.03 OH 0.15 100,000.00 15,000.00
Kepala tukang L.11 OH 0.02 110,000.00 1,650.00
Mandor L.15 OH 0.01 115,000.00 1,495.00
JUMLAH TENAGA KERJA 40,645.00
B BAHAN
Nok genteng metal Bh 1.10 27,500.00 30,250.00
Paku biasa ½”-1” Kg 0.05 15,000.00 750.00
JUMLAH HARGA BAHAN 31,000.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 71,645.00


E Overhead & Profit 10 % 10 % x D 7,164.50
F Harga Satuan Pekerjaan (D+E) 78,809.50
A.4.5.2.37. Pemasangan 1 m’ nok sirap

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.13 90,000.00 11,250.00
Tukang Kayu L.03 OH 0.25 100,000.00 25,000.00
Kepala tukang L.11 OH 0.03 110,000.00 2,750.00
Mandor L.15 OH 0.01 115,000.00 690.00
JUMLAH TENAGA KERJA
B BAHAN
Seng plat 3 x 6” Lbr 0.40
Paku biasa ½”-1” Kg 0.05
Paku biasa 2”-5” Kg 0.05
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 0.00


E Overhead & Profit 10 % 10 % x D 0.00
F Harga Satuan Pekerjaan (D+E) 0.00

A.4.5.2.38. Pemasangan 1 m2 atap seng gelombang

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.12000 90,000.00 10,800.00
Tukang Kayu L.03 OH 0.06000 100,000.00 6,000.00
Kepala tukang L.11 OH 0.00600 110,000.00 660.00
Mandor L.15 OH 0.00600 115,000.00 690.00
JUMLAH TENAGA KERJA 18,150.00
B BAHAN
Seng gel 3”x6” Lbr 0.7000 38,000.00 26,600.00
Paku biasa ½”-1” Kg 0.0200 15,000.00 300.00
JUMLAH HARGA BAHAN 26,900.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 45,050.00


E Overhead & Profit 10 % 10 % x D 4,505.00
F Harga Satuan Pekerjaan (D+E) 49,555.00

A.4.5.2.39. Pemasangan 1 m’nok atap seng

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.15 90,000.00 13,500.00
Tukang Kayu L.03 OH 0.07 100,000.00 7,000.00
Kepala tukang L.11 OH 0.01 110,000.00 770.00
Mandor L.15 OH 0.01 115,000.00 690.00
JUMLAH TENAGA KERJA 21,960.00
B BAHAN
Seng plat 3”x6”bjls28 Lbr 0.30 15,000.00 4,500.00
Paku biasa ½”-1” Kg 0.04 15,000.00 600.00
JUMLAH HARGA BAHAN 5,100.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 27,060.00


E Overhead & Profit 10 % 10 % x D 2,706.00
F Harga Satuan Pekerjaan (D+E) 29,766.00
A.4.5.2.40. Pemasangan 1 m2 atap alumunium

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.15 90,000.00 13,500.00
Tukang Kayu L.03 OH 0.75 100,000.00 75,000.00
Kepala tukang L.11 OH 0.08 110,000.00 8,800.00
Mandor L.15 OH 0.01 115,000.00 690.00
JUMLAH TENAGA KERJA
B BAHAN
Almn gel tbl 0,55 Lbr 1.05
Paku hak panj 15cm Kg 0.02
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 0.00


E Overhead & Profit 10 % 10 % x D 0.00
F Harga Satuan Pekerjaan (D+E) 0.00

A.4.5.2.41. Pemasangan 1 m’ nok alumunium

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.10 90,000.00 9,000.00
Tukang Kayu L.03 OH 1.00 100,000.00 100,000.00
Kepala tukang L.11 OH 0.10 110,000.00 11,000.00
Mandor L.15 OH 0.05 115,000.00 5,750.00
JUMLAH TENAGA KERJA
B BAHAN
Nok standar 40x18 Bh 1.20
Paku hak panj 15cm Kg 0.04
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 0.00


E Overhead & Profit 10 % 10 % x D 0.00
F Harga Satuan Pekerjaan (D+E) 0.00

A.4.5.2.42. Pemasangan 1 m2 alumunium foil/sisalation

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.15 90,000.00 13,500.00
Tukang Kayu L.03 OH 0.05 100,000.00 5,000.00
Kepala tukang L.11 OH 0.01 110,000.00 550.00
Mandor L.15 OH 0.01 115,000.00 920.00
JUMLAH TENAGA KERJA
B BAHAN
Alumunium foil M2 1.05
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 0.00


E Overhead & Profit 10 % 10 % x D 0.00
F Harga Satuan Pekerjaan (D+E) 0.00
A.4.6.1 HARGA SATUAN PEKERJAAN KAYU

A.4.6.1.1. Pembuatan dan pemasangan 1 m3 kusen pintu dan kusen jendela, kayu kelas I

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 7.00 90,000.00 630,000.00
Tukang kayu L.03 OH 21.00 100,000.00 2,100,000.00
Kepala tukang L.03 OH 2.10 110,000.00 231,000.00
Mandor L.04 OH 0.35 115,000.00 40,250.00
JUMLAH TENAGA KERJA 3,001,250.00
B BAHAN
Balok kayu m3 1.10 7,500,000.00 8,250,000.00
Paku 10 cm Kg 1.25 24,000.00 30,000.00
Lem kayu Kg 1.00 30,000.00 30,000.00
JUMLAH HARGA BAHAN 8,310,000.00
C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A+B+C) 11,311,250.00


E Overhead & Profit10 % 10 % x D 1,131,125.00
F Harga Satuan Pekerjaan (D+E) 12,442,375.00

A.4.6.1.2.a Pembuatan dan pemasangan 1 m3 kusen pintu dan kusen jendela, kayu kelas II

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 6.00 90,000.00 540,000.00
Tukang kayu L.03 OH 18.00 100,000.00 1,800,000.00
Kepala tukang L.03 OH 1.80 110,000.00 198,000.00
Mandor L.04 OH 0.30 115,000.00 34,500.00
JUMLAH TENAGA KERJA 2,572,500.00
B BAHAN
Balok kayu m3 1.20 3,750,000.00 4,500,000.00
Paku 10 cm Kg 1.25 15,000.00 18,750.00
Lem kayu Kg 1.00 30,000.00 30,000.00
JUMLAH HARGA BAHAN 4,548,750.00
C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A+B+C) 7,121,250.00


E Overhead & Profit10 % 10 % x D 712,125.00
F Harga Satuan Pekerjaan (D+E) 7,833,375.00

A.4.6.1.2.b Pembuatan dan pemasangan 1 m3 kusen pintu dan kusen jendela, kayu kelas III

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 6.00 90,000.00 540,000.00
Tukang kayu L.03 OH 18.00 100,000.00 1,800,000.00
Kepala tukang L.03 OH 1.80 110,000.00 198,000.00
Mandor L.04 OH 0.30 115,000.00 34,500.00
JUMLAH TENAGA KERJA 2,572,500.00
B BAHAN
Balok kayu m3 1.20 3,500,000.00 4,200,000.00
Paku 10 cm Kg 1.25 15,000.00 18,750.00
Lem kayu Kg 1.00 30,000.00 30,000.00
JUMLAH HARGA BAHAN 4,248,750.00
C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A+B+C) 6,821,250.00


E Overhead & Profit10 % 10 % x D 682,125.00
F Harga Satuan Pekerjaan (D+E) 7,503,375.00
A.4.6.1.3. Pembuatan dan pemasangan 1 m2 pintu klamp standar, kayu kelas II

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.35 90,000.00 31,500.00
Tukang kayu L.03 OH 1.05 100,000.00 105,000.00
Kepala tukang L.03 OH 0.11 110,000.00 11,550.00
Mandor L.04 OH 0.02 115,000.00 2,070.00
JUMLAH TENAGA KERJA 150,120.00
B BAHAN
Papan kayu m3 0.04 2,500,000.00 100,000.00
Paku 5 – 7 cm Kg 0.05 15,000.00 750.00
JUMLAH HARGA BAHAN 100,750.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 250,870.00


E Overhead & Profit10 % 10 % x D 25,087.00
F Harga Satuan Pekerjaan (D+E) 275,957.00

A.4.6.1.4. Pembuatan dan pemasangan 1 m2 pintu klamp sederhana, kayu kelas III

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.35 90,000.00 31,500.00
Tukang kayu L.03 OH 1.05 100,000.00 105,000.00
Kepala tukang L.03 OH 0.11 110,000.00 11,550.00
Mandor L.04 OH 0.02 115,000.00 2,070.00
JUMLAH TENAGA KERJA 150,120.00
B BAHAN
Papan kayu m3 0.04 2,200,000.00 88,000.00
Paku 5 – 7 cm Kg 0.05 15,000.00 750.00
JUMLAH HARGA BAHAN 88,750.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 238,870.00


E Overhead & Profit10 % 10 % x D 23,887.00
F Harga Satuan Pekerjaan (D+E) 262,757.00

A.4.6.1.5.a Pembuatan dan pemasangan 1 m2 daun pintu panel, kayu kelas I

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 1.00 90,000.00 90,000.00
Tukang kayu L.03 OH 3.00 100,000.00 300,000.00
Kepala tukang L.03 OH 0.30 110,000.00 33,000.00
Mandor L.04 OH 0.05 115,000.00 5,750.00
JUMLAH TENAGA KERJA 428,750.00
B BAHAN
Papan kayu m3 0.04 7,500,000.00 300,000.00
Lem kayu Kg 0.50 30,000.00 15,000.00
JUMLAH HARGA BAHAN 315,000.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 743,750.00
E Overhead & Profit10 % 10 % x D 74,375.00
F Harga Satuan Pekerjaan (D+E) 818,125.00
A.4.6.1.5.b Pembuatan dan pemasangan 1 m2 daun pintu panel, kayu kelas II

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 1.00 90,000.00 90,000.00
Tukang kayu L.03 OH 3.00 100,000.00 300,000.00
Kepala tukang L.03 OH 0.30 110,000.00 33,000.00
Mandor L.04 OH 0.05 115,000.00 5,750.00
JUMLAH TENAGA KERJA 428,750.00
B BAHAN
Papan kayu m3 0.04 2,500,000.00 100,000.00
Lem kayu Kg 0.50 30,000.00 15,000.00
JUMLAH HARGA BAHAN 115,000.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 543,750.00


E Overhead & Profit10 % 10 % x D 54,375.00
F Harga Satuan Pekerjaan (D+E) 598,125.00

A.4.6.1.6.a Pembuatan dan pemasangan 1 m2 pintu dan jendela kaca, kayu kelas I

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.80 90,000.00 72,000.00
Tukang kayu L.03 OH 2.40 100,000.00 240,000.00
Kepala tukang L.03 OH 0.24 110,000.00 26,400.00
Mandor L.04 OH 0.04 115,000.00 4,600.00
JUMLAH TENAGA KERJA 343,000.00
B BAHAN
Papan kayu m3 0.02 7,500,000.00 180,000.00
Lem kayu Kg 0.30 30,000.00 9,000.00
JUMLAH HARGA BAHAN 189,000.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 532,000.00


E Overhead & Profit10 % 10 % x D 53,200.00
F Harga Satuan Pekerjaan (D+E) 585,200.00

A.4.6.1.6.b Pembuatan dan pemasangan 1 m2 pintu dan jendela kaca, kayu kelas II

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.80 90,000.00 72,000.00
Tukang kayu L.03 OH 2.40 100,000.00 240,000.00
Kepala tukang L.03 OH 0.24 110,000.00 26,400.00
Mandor L.04 OH 0.04 115,000.00 4,600.00
JUMLAH TENAGA KERJA 343,000.00
B BAHAN
Papan kayu m3 0.02 2,500,000.00 60,000.00
Lem kayu Kg 0.30 30,000.00 9,000.00
JUMLAH HARGA BAHAN 69,000.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 412,000.00
E Overhead & Profit10 % 10 % x D 41,200.00
F Harga Satuan Pekerjaan (D+E) 453,200.00
A.4.6.1.7.a Pembuatan dan pemasangan 1 m2 pintu dan jendela jalusi kayu kelas I

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 1.00 90,000.00 90,000.00
Tukang kayu L.03 OH 3.00 100,000.00 300,000.00
Kepala tukang L.03 OH 0.30 110,000.00 33,000.00
Mandor L.04 OH 0.05 115,000.00 5,750.00
JUMLAH TENAGA KERJA 428,750.00
B BAHAN
Papan kayu m3 0.06 7,500,000.00 480,000.00
Lem kayu Kg 0.50 30,000.00 15,000.00
JUMLAH HARGA BAHAN 495,000.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 923,750.00
E Overhead & Profit10 % 10 % x D 92,375.00
F Harga Satuan Pekerjaan (D+E) 1,016,125.00

A.4.6.1.7.b Pembuatan dan pemasangan 1 m2 pintu dan jendela jalusi kayu kelas II

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 1.00 90,000.00 90,000.00
Tukang kayu L.03 OH 3.00 100,000.00 300,000.00
Kepala tukang L.03 OH 0.30 110,000.00 33,000.00
Mandor L.04 OH 0.05 115,000.00 5,750.00
JUMLAH TENAGA KERJA 428,750.00
B BAHAN
Papan kayu m3 0.06 2,500,000.00 160,000.00
Lem kayu Kg 0.50 30,000.00 15,000.00
JUMLAH HARGA BAHAN 175,000.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 603,750.00
E Overhead & Profit10 % 10 % x D 60,375.00
F Harga Satuan Pekerjaan (D+E) 664,125.00

A.4.6.1.8. Pembuatan 1 m2 daun pintu plywood rangkap, rangka kayu kelas II tertutup (lebar sampai 90 cm)

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.70 90,000.00 63,000.00
Tukang kayu L.03 OH 2.10 100,000.00 210,000.00
Kepala tukang L.03 OH 0.21 110,000.00 23,100.00
Mandor L.04 OH 0.04 115,000.00 4,025.00
JUMLAH TENAGA KERJA 300,125.00
B BAHAN
Papan kayu m3 0.03 2,500,000.00 62,500.00
Paku 1 cm – 2,5 cm kg 0.03 15,000.00 450.00
Lem kayu kg 0.50 30,000.00 15,000.00
Plywood tebal 4 mm
Lembar 1.00 67,500.00 15,000.00
Ukuran (90 x 220) cm
JUMLAH HARGA BAHAN 92,950.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 393,075.00
E Overhead & Profit10 % 10 % x D 39,307.50
F Harga Satuan Pekerjaan (D+E) 432,382.50
A.4.6.1.9.a Pembuatan 1 m2 pintu plywood rangkap, rangka expose kayu kelas I

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.80 90,000.00 72,000.00
Tukang kayu L.03 OH 2.40 100,000.00 240,000.00
Kepala tukang L.03 OH 0.24 110,000.00 26,400.00
Mandor L.04 OH 0.04 115,000.00 4,600.00
JUMLAH TENAGA KERJA 343,000.00
B BAHAN
Papan kayu m3 0.03 7,500,000.00 192,000.00
Paku 1 cm – 2,5 cm kg 0.03 24,000.00 720.00
Lem kayu kg 0.50 30,000.00 15,000.00
Plywood 4 mm
Lembar 1.00 67,500.00 67,500.00
(90 x 220) cm
JUMLAH HARGA BAHAN 275,220.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 618,220.00


E Overhead & Profit10 % 10 % x D 61,822.00
F Harga Satuan Pekerjaan (D+E) 680,042.00

A.4.6.1.9.b Pembuatan 1 m2 pintu plywood rangkap, rangka expose kayu kelas II

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.80 90,000.00 72,000.00
Tukang kayu L.03 OH 2.40 100,000.00 240,000.00
Kepala tukang L.03 OH 0.24 110,000.00 26,400.00
Mandor L.04 OH 0.04 115,000.00 4,600.00
JUMLAH TENAGA KERJA 343,000.00
B BAHAN
Papan kayu m3 0.03 2,500,000.00 64,000.00
Paku 1 cm – 2,5 cm kg 0.03 15,000.00 450.00
Lem kayu kg 0.50 30,000.00 15,000.00
Plywood 4 mm
Lembar 1.00 67,500.00 67,500.00
(90 x 220) cm
JUMLAH HARGA BAHAN 146,950.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 489,950.00


E Overhead & Profit10 % 10 % x D 48,995.00
F Harga Satuan Pekerjaan (D+E) 538,945.00

A.4.6.1.10.a Pemasangan 1 m2 jalusi kusen, kayu kelas I

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.67 90,000.00 60,300.00
Tukang kayu L.03 OH 2.00 100,000.00 200,000.00
Kepala tukang L.03 OH 0.20 110,000.00 22,000.00
Mandor L.04 OH 0.34 115,000.00 38,525.00
JUMLAH TENAGA KERJA 320,825.00
B BAHAN
Papan kayu m3 0.06 7,500,000.00 450,000.00
Paku 1 – 2,5 cm kg 0.15 24,000.00 3,600.00
JUMLAH HARGA BAHAN 453,600.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 774,425.00


E Overhead & Profit10 % 10 % x D 77,442.50
F Harga Satuan Pekerjaan (D+E) 851,867.50
A.4.6.1.10.b Pemasangan 1 m2 jalusi kusen, kayu kelas II

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.67 90,000.00 60,300.00
Tukang kayu L.03 OH 2.00 100,000.00 200,000.00
Kepala tukang L.03 OH 0.20 110,000.00 22,000.00
Mandor L.04 OH 0.34 115,000.00 38,525.00
JUMLAH TENAGA KERJA 320,825.00
B BAHAN
Papan kayu m3 0.06 2,500,000.00 150,000.00
Paku 1 – 2,5 cm kg 0.15 15,000.00 2,250.00
JUMLAH HARGA BAHAN 152,250.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 473,075.00


E Overhead & Profit10 % 10 % x D 47,307.50
F Harga Satuan Pekerjaan (D+E) 520,382.50

A.4.6.1.11. Pemasangan 1 m2 teakwood rangkap, rangka expose kayu kelas I

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.80 90,000.00 72,000.00
Tukang kayu L.03 OH 2.40 100,000.00 240,000.00
Kepala tukang L.03 OH 0.24 110,000.00 26,400.00
Mandor L.04 OH 0.04 115,000.00 4,600.00
JUMLAH TENAGA KERJA
B BAHAN
Papan kayu m3 0.03
Paku 1 – 2,5 cm kg 0.03
Lem kayu kg 0.30
Teakwood 4 mm
Lembar 1.00
90 x 220 cm
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)

A.4.6.1.12. Pemasangan 1 m2 teakwood rangkap lapis formika, rangka expose kayu kelas II

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
1. Pekerja L.01 OH 0.85 90,000.00 76,500.00
2. Tukang kayu L.03 OH 2.55 100,000.00 255,000.00
3. Kepala tukang L.03 OH 0.26 110,000.00 28,050.00
4. Mandor L.04 OH 0.04 115,000.00 4,945.00
JUMLAH TENAGA KERJA
B BAHAN
Papan kayu m3 0.03
Paku 1 – 2,5 cm kg 0.03
Lem kayu kg 0.80
Teakwood 4 mm
Lembar 1.00
90 x 220 cm
Formika Lembar 0.50
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)
A.4.6.1.13.a Pemasangan 1 m3 konstruksi kuda-kuda konvensional, kayu kelas I, II dan III bentang 6 meter

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 4.00 90,000.00 360,000.00
Tukang kayu L.03 OH 12.00 100,000.00 1,200,000.00
Kepala tukang L.03 OH 1.20 110,000.00 132,000.00
Mandor L.04 OH 0.20 115,000.00 23,000.00
JUMLAH TENAGA KERJA 1,715,000.00
B BAHAN
Balok kayu m3 1.10 7,500,000.00 8,250,000.00
Besi strip tebal 5mm kg 15.00 16,500.00 247,500.00
Paku 12 cm kg 5.60 24,000.00 134,400.00
JUMLAH HARGA BAHAN 8,631,900.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 8,631,900.00


E Overhead & Profit10 % 10 % x D 863,190.00
F Harga Satuan Pekerjaan (D+E) 9,495,090.00

A.4.6.1.13.b Pemasangan 1 m3 konstruksi kuda-kuda konvensional, kayu kelas II bentang 6 meter

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 4.00 90,000.00 360,000.00
Tukang kayu L.03 OH 12.00 100,000.00 1,200,000.00
Kepala tukang L.03 OH 1.20 110,000.00 132,000.00
Mandor L.04 OH 0.20 115,000.00 23,000.00
JUMLAH TENAGA KERJA 1,715,000.00
B BAHAN
Balok kayu m3 1.10 3,750,000.00 4,125,000.00
Besi strip tebal 5mm kg 15.00 16,500.00 247,500.00
Paku 12 cm kg 5.60 15,000.00 84,000.00
JUMLAH HARGA BAHAN 4,456,500.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 4,456,500.00


E Overhead & Profit10 % 10 % x D 445,650.00
F Harga Satuan Pekerjaan (D+E) 4,902,150.00

A.4.6.1.13.a Pemasangan 1 m3 konstruksi kuda-kuda konvensional, kayu kelas III bentang 6 meter

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 4.00 90,000.00 360,000.00
Tukang kayu L.03 OH 12.00 100,000.00 1,200,000.00
Kepala tukang L.03 OH 1.20 110,000.00 132,000.00
Mandor L.04 OH 0.20 115,000.00 23,000.00
JUMLAH TENAGA KERJA 1,715,000.00
B BAHAN
Balok kayu m3 1.10 3,500,000.00 3,850,000.00
Besi strip tebal 5mm kg 15.00 16,500.00 247,500.00
Paku 12 cm kg 5.60 15,000.00 84,000.00
JUMLAH HARGA BAHAN 4,181,500.00
C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A+B+C) 4,181,500.00


E Overhead & Profit10 % 10 % x D 418,150.00
F Harga Satuan Pekerjaan (D+E) 4,599,650.00
A.4.6.1.14. Pemasangan 1 m3 konstruksi kuda-kuda expose, kayu kelas I

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 6.70 90,000.00 603,000.00
Tukang kayu L.03 OH 20.10 100,000.00 2,010,000.00
Kepala tukang L.03 OH 2.01 110,000.00 221,100.00
Mandor L.04 OH 0.34 115,000.00 38,525.00
JUMLAH TENAGA KERJA 2,872,625.00
B BAHAN
Balok kayu m3 1.20 7,500,000.00 9,000,000.00
Besi strip tebal 5mm kg 15.00 16,500.00 247,500.00
Paku 12 cm kg 5.60 24,000.00 134,400.00
JUMLAH HARGA BAHAN 9,381,900.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 12,254,525.00


E Overhead & Profit10 % 10 % x D 1,225,452.50
F Harga Satuan Pekerjaan (D+E) 13,479,977.50

A.4.6.1.15. Pemasangan 1 m3 konstruksi gordeng, kayu kelas II

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 6.70 90,000.00 603,000.00
Tukang kayu L.03 OH 20.10 100,000.00 2,010,000.00
Kepala tukang L.03 OH 2.01 110,000.00 221,100.00
Mandor L.04 OH 0.34 115,000.00 38,525.00
JUMLAH TENAGA KERJA 2,872,625.00
B BAHAN
Balok kayu m3 1.10 3,750,000.00 4,125,000.00
Besi strip tebal 5 mm kg 15.00 16,500.00 247,500.00
Paku 12 cm kg 3.00 15,000.00 45,000.00
JUMLAH HARGA BAHAN 4,417,500.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 7,290,125.00


E Overhead & Profit10 % 10 % x D 729,012.50
F Harga Satuan Pekerjaan (D+E) 8,019,137.50

A.4.6.1.16. Pemasangan 1 m2 rangka atap genteng keramik, kayu kelas II

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.10 90,000.00 9,000.00
Tukang kayu L.03 OH 0.10 100,000.00 10,000.00
Kepala tukang L.03 OH 0.01 110,000.00 1,100.00
Mandor L.04 OH 0.01 115,000.00 575.00
JUMLAH TENAGA KERJA 20,675.00
B BAHAN
1. Kaso-kaso 5 x 7cm m3 0.01 3,750,000.00 52,500.00
2. Reng 2 x 3 cm m3 0.04 3,750,000.00 135,000.00
3. Paku 5 dan 10 cm kg 0.25 15,000.00 3,750.00
JUMLAH HARGA BAHAN 191,250.00
C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A+B+C) 211,925.00


E Overhead & Profit10 % 10 % x D 21,192.50
F Harga Satuan Pekerjaan (D+E) 233,117.50
A.4.6.1.17. Pemasangan 1 m2 rangka atap genteng beton, kayu kelas II

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.10 90,000.00 9,000.00
Tukang kayu L.03 OH 0.10 100,000.00 10,000.00
Kepala tukang L.03 OH 0.01 110,000.00 1,100.00
Mandor L.04 OH 0.01 115,000.00 575.00
JUMLAH TENAGA KERJA 20,675.00
B BAHAN
Kaso-kaso 5 x 7cm m3 0.01 3,750,000.00 52,500.00
Reng (3 x 4) cm m3 0.06 3,750,000.00 213,750.00
Paku 5 dan 10 cm kg 0.25 15,000.00 3,750.00
JUMLAH HARGA BAHAN 270,000.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 290,675.00


E Overhead & Profit10 % 10 % x D 29,067.50
F Harga Satuan Pekerjaan (D+E) 319,742.50

A.4.6.1.18. Pemasangan 1 m2 rangka atap sirap, kayu kelas II

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.12 90,000.00 10,800.00
Tukang kayu L.03 OH 0.12 100,000.00 12,000.00
Kepala tukang L.03 OH 0.01 110,000.00 1,320.00
Mandor L.04 OH 0.01 115,000.00 690.00
JUMLAH TENAGA KERJA 24,810.00
B BAHAN
Kayu kelas II m3 0.0140 3,750,000.00 52,500.00
Paku 5 - 10 cm m3 0.06 15,000.00 855.00
JUMLAH HARGA BAHAN 53,355.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 78,165.00


E Overhead & Profit10 % 10 % x D 7,816.50
F Harga Satuan Pekerjaan (D+E) 85,981.50

A.4.6.1.19.a Pemasangan 1 m2 rangka langit-langit (50 x 100) cm, kayu kelas II

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.15 90,000.00 13,500.00
Tukang kayu L.03 OH 0.30 100,000.00 30,000.00
Kepala tukang L.03 OH 0.03 110,000.00 3,300.00
Mandor L.04 OH 0.08 115,000.00 8,625.00
JUMLAH TENAGA KERJA 55,425.00
B BAHAN
Kaso-kaso 5 x 7cm m3 0.02 3,750,000.00 57,750.00
Paku 7 cm – 10 cm kg 0.20 15,000.00 3,000.00
JUMLAH HARGA BAHAN 60,750.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 116,175.00
E Overhead & Profit10 % 10 % x D 11,617.50
F Harga Satuan Pekerjaan (D+E) 127,792.50
A.4.6.1.19.b Pemasangan 1 m2 rangka langit-langit (50 x 100) cm, kayu kelas III

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.15 90,000.00 13,500.00
Tukang kayu L.03 OH 0.30 100,000.00 30,000.00
Kepala tukang L.03 OH 0.03 110,000.00 3,300.00
Mandor L.04 OH 0.08 115,000.00 8,625.00
JUMLAH TENAGA KERJA 55,425.00
B BAHAN
Kaso-kaso 5 x 7cm m3 0.02 3,500,000.00 53,900.00
Paku 7 cm – 10 cm kg 0.20 15,000.00 3,000.00
JUMLAH HARGA BAHAN 56,900.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 112,325.00


E Overhead & Profit10 % 10 % x D 11,232.50
F Harga Satuan Pekerjaan (D+E) 123,557.50

A.4.6.1.20.a Pemasangan 1 m2 rangka langit-langit (60 x 60) cm, kayu kelas II

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.20 90,000.00 18,000.00
Tukang kayu L.03 OH 0.30 100,000.00 30,000.00
Kepala tukang L.03 OH 0.03 110,000.00 3,300.00
Mandor L.04 OH 0.01 115,000.00 1,150.00
JUMLAH TENAGA KERJA 52,450.00
B BAHAN
Kaso-kaso 5 x 7cm m3 0.02 3,750,000.00 57,750.00
Paku 7 – 10 cm kg 0.25 15,000.00 3,750.00
JUMLAH HARGA BAHAN 61,500.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 113,950.00


E Overhead & Profit10 % 10 % x D 11,395.00
F Harga Satuan Pekerjaan (D+E) 125,345.00

A.4.6.1.20.b Pemasangan 1 m2 rangka langit-langit (60 x 60) cm, kayu kelas III

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.20 90,000.00 18,000.00
Tukang kayu L.03 OH 0.30 100,000.00 30,000.00
Kepala tukang L.03 OH 0.03 110,000.00 3,300.00
Mandor L.04 OH 0.01 115,000.00 1,150.00
JUMLAH TENAGA KERJA 52,450.00
B BAHAN
Kaso-kaso 5 x 7cm m3 0.02 3,500,000.00 53,900.00
Paku 7 – 10 cm kg 0.25 15,000.00 3,750.00
JUMLAH HARGA BAHAN 57,650.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 110,100.00
E Overhead & Profit10 % 10 % x D 11,010.00
F Harga Satuan Pekerjaan (D+E) 121,110.00
A.4.6.1.21.a Pemasangan 1 m’ lisplank ukuran (3 x 20) cm, kayu kelas I

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.10 90,000.00 9,000.00
Tukang kayu L.03 OH 0.20 100,000.00 20,000.00
Kepala tukang L.03 OH 0.02 110,000.00 2,200.00
Mandor L.04 OH 0.01 115,000.00 575.00
JUMLAH TENAGA KERJA 31,775.00
B BAHAN
Papan kayu m3 0.01 7,500,000.00 81,000.00
Paku 5 dan 7 cm kg 0.10 24,000.00 2,400.00
JUMLAH HARGA BAHAN 83,400.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 115,175.00


E Overhead & Profit10 % 10 % x D 11,517.50
F Harga Satuan Pekerjaan (D+E) 126,692.50

A.4.6.1.21.b Pemasangan 1 m’ lisplank ukuran (3 x 20) cm, kayu kelas II

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.10 90,000.00 9,000.00
Tukang kayu L.03 OH 0.20 100,000.00 20,000.00
Kepala tukang L.03 OH 0.02 110,000.00 2,200.00
Mandor L.04 OH 0.01 115,000.00 575.00
JUMLAH TENAGA KERJA 31,775.00
B BAHAN
Papan kayu m3 0.01 2,500,000.00 27,000.00
Paku 5 dan 7 cm kg 0.10 15,000.00 1,500.00
JUMLAH HARGA BAHAN 28,500.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 60,275.00


E Overhead & Profit10 % 10 % x D 6,027.50
F Harga Satuan Pekerjaan (D+E) 66,302.50

A.4.6.1.22.a Pemasangan 1 m’ lisplank ukuran (3 x 30) cm, kayu kelas I

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.10 90,000.00 9,000.00
Tukang kayu L.03 OH 0.20 100,000.00 20,000.00
Kepala tukang L.03 OH 0.02 110,000.00 2,200.00
Mandor L.04 OH 0.01 115,000.00 575.00
JUMLAH TENAGA KERJA 31,775.00
B BAHAN
Papan kayu m3 0.01 7,500,000.00 82,500.00
Paku 5 dan 7 cm kg 0.05 24,000.00 1,200.00
JUMLAH HARGA BAHAN 83,700.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 115,475.00
E Overhead & Profit10 % 10 % x D 11,547.50
F Harga Satuan Pekerjaan (D+E) 127,022.50
A.4.6.1.22.b Pemasangan 1 m’ lisplank ukuran (3 x 30) cm, kayu kelas II

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.10 90,000.00 9,000.00
Tukang kayu L.03 OH 0.20 100,000.00 20,000.00
Kepala tukang L.03 OH 0.02 110,000.00 2,200.00
Mandor L.04 OH 0.01 115,000.00 575.00
JUMLAH TENAGA KERJA 31,775.00
B BAHAN
Papan kayu m3 0.01 2,500,000.00 27,500.00
Paku 5 dan 7 cm kg 0.05 15,000.00 750.00
JUMLAH HARGA BAHAN 28,250.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 60,025.00


E Overhead & Profit10 % 10 % x D 6,002.50
F Harga Satuan Pekerjaan (D+E) 66,027.50

A.4.6.1.23.a Pemasangan 1 m2 rangka dinding pemisah (60 x 120) cm kayu kelas II

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.15 90,000.00 13,500.00
Tukang kayu L.03 OH 0.45 100,000.00 45,000.00
Kepala tukang L.03 OH 0.05 110,000.00 4,950.00
Mandor L.04 OH 0.01 115,000.00 920.00
JUMLAH TENAGA KERJA 64,370.00
B BAHAN
Balok kayu m3 0.03 3,750,000.00 105,000.00
Paku 5 dan 7 cm kg 0.15 15,000.00 2,250.00
JUMLAH HARGA BAHAN 107,250.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 171,620.00
E Overhead & Profit10 % 10 % x D 17,162.00
F Harga Satuan Pekerjaan (D+E) 188,782.00

A.4.6.1.23.b Pemasangan 1 m2 rangka dinding pemisah (60 x 120) cm kayu kelas III

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.15 90,000.00 13,500.00
Tukang kayu L.03 OH 0.45 100,000.00 45,000.00
Kepala tukang L.03 OH 0.05 110,000.00 4,950.00
Mandor L.04 OH 0.01 115,000.00 920.00
JUMLAH TENAGA KERJA 64,370.00
B BAHAN
Balok kayu m3 0.03 3,500,000.00 98,000.00
Paku 5 dan 7 cm kg 0.15 15,000.00 2,250.00
JUMLAH HARGA BAHAN 100,250.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 164,620.00
E Overhead & Profit10 % 10 % x D 16,462.00
F Harga Satuan Pekerjaan (D+E) 181,082.00
A.4.6.1.24. Pemasangan 1 m2 dinding pemisah teakwood rangkap, rangka kayu kelas II

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.15 90,000.00 13,500.00
Tukang kayu L.03 OH 0.45 100,000.00 45,000.00
Kepala tukang L.03 OH 0.05 110,000.00 4,950.00
Mandor L.04 OH 0.01 115,000.00 920.00
JUMLAH TENAGA KERJA
B BAHAN
Balok kayu, 6 x 12 m3 0.03
Paku 5 dan 10 kg 0.15
Teakwood 4 mm,
Lembar 0.86
120 x 240
Lem kayu kg 0.56

JUMLAH HARGA BAHAN


C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)

A.4.6.1.25. Pemasangan 1 m2 dinding pemisah plywood rangkap, rangka kayu kelas II

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.20 90,000.00 18,000.00
Tukang kayu L.03 OH 0.60 100,000.00 60,000.00
Kepala tukang L.03 OH 0.06 110,000.00 6,600.00
Mandor L.04 OH 0.01 115,000.00 1,150.00
JUMLAH TENAGA KERJA 85,750.00
B BAHAN
Balok kayu, 6x12 m3 0.03 3,750,000.00 105,000.00
Paku 5 dan 10 kg 0.15 15,000.00 2,250.00
Plywood 4 mm,
Lembar 0.86 67,500.00 58,050.00
120 x 240
Lem kayu kg 0.56 30,000.00 16,800.00
JUMLAH HARGA BAHAN 182,100.00
C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A+B+C) 267,850.00


E Overhead & Profit10 % 10 % x D 26,785.00
F Harga Satuan Pekerjaan (D+E) 294,635.00

A.4.6.1.26. Pemasangan 1 m2 dinding lambrisering dari papan kayu kelas I

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.60 90,000.00 54,000.00
Tukang kayu L.03 OH 1.80 100,000.00 180,000.00
Kepala tukang L.03 OH 0.18 110,000.00 19,800.00
Mandor L.04 OH 0.03 115,000.00 3,450.00
JUMLAH TENAGA KERJA 257,250.00
B BAHAN
Papan kayu m3 0.01 7,500,000.00 52,500.00
Paku 5 dan 10 kg 0.10 24,000.00 2,400.00
Paku skrup 10 cm kg 0.15 10,000.00 1,500.00
JUMLAH HARGA BAHAN 56,400.00
C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A+B+C) 313,650.00


E Overhead & Profit10 % 10 % x D 31,365.00
F Harga Satuan Pekerjaan (D+E) 345,015.00
A.4.6.1.27. Pemasangan 1 m2 dinding lambrisering dari plywood ukuran (120 x 240) cm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.03 90,000.00 2,250.00
Tukang kayu L.03 OH 0.08 100,000.00 7,500.00
Kepala tukang L.03 OH 0.01 110,000.00 880.00
Mandor L.04 OH 0.00 115,000.00 115.00
JUMLAH TENAGA KERJA 10,745.00
B BAHAN
Plywood 4 mm m3 0.40 67,500.00 27,000.00
Paku 1 dan 2,5 kg 0.05 15,000.00 750.00
JUMLAH HARGA BAHAN 27,750.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 38,495.00


E Overhead & Profit10 % 10 % x D 3,849.50
F Harga Satuan Pekerjaan (D+E) 42,344.50

A.4.6.1.28. Pemasangan 1 m2 dinding bilik, rangka kayu kelas III atau IV

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.10 90,000.00 9,000.00
Tukang kayu L.03 OH 0.05 100,000.00 5,000.00
Kepala tukang L.03 OH 0.01 110,000.00 550.00
Mandor L.04 OH 0.01 115,000.00 575.00
JUMLAH TENAGA KERJA
B BAHAN
Bilik bambu m2 1.50
Kaso-kaso 5 x 7 m3 0.01
Paku kg 0.01
List kayu 2/4 m3 0.00

JUMLAH HARGA BAHAN


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)
A.4.6.2 HARGA SATUAN PEKERJAAN KUNCI DAN KACA

A.4.6.2.1. Pemasangan 1 buah kunci tanam antik

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA KERJA
Pekerja L.01 OH 0.06 90,000.00 5,400.00
Tukang kayu L.02 OH 0.60 100,000.00 60,000.00
Kepala tukang L.03 OH 0.06 110,000.00 6,600.00
Mandor L.04 OH 0.00 115,000.00 345.00
JUMLAH TENAGA KERJA 0.00
B BAHAN
Kunci tanam antik Bh 1.00 0.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 0.00


E Overhead & Profit 10 % 10 % x D 0.00
F Harga Satuan Pekerjaan (D+E) 0.00

A.4.6.2.2. Pemasangan 1 buah kunci tanam biasa

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA KERJA
Pekerja L.01 OH 0.01 90,000.00 900.00
Tukang kayu L.02 OH 0.50 100,000.00 50,000.00
Kepala tukang L.03 OH 0.05 110,000.00 5,500.00
Mandor L.04 OH 0.01 115,000.00 575.00
JUMLAH TENAGA KERJA 56,975.00
B BAHAN
Kunci tanam biasa Bh 1.00 137,500.00 137,500.00
JUMLAH HARGA BAHAN 137,500.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 194,475.00


E Overhead & Profit 10 % 10 % x D 19,447.50
F Harga Satuan Pekerjaan (D+E) 213,922.50

A.4.6.2.3. Pemasangan 1 buah kunci kamar mandi

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA KERJA
Pekerja L.01 OH 0.01 90,000.00 450.00
Tukang kayu L.02 OH 0.50 100,000.00 50,000.00
Kepala tukang L.03 OH 0.05 110,000.00 5,500.00
Mandor L.04 OH 0.00 115,000.00 345.00
JUMLAH TENAGA KERJA
B BAHAN
Kunci tanam KM Bh 1.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 0.00


E Overhead & Profit 10 % 10 % x D 0.00
F Harga Satuan Pekerjaan (D+E) 0.00
A.4.6.2.4. Pemasangan 1 buah kunci silinder

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA KERJA
Pekerja L.01 OH 0.01 90,000.00 450.00
Tukang kayu L.02 OH 0.50 100,000.00 50,000.00
Kepala tukang L.03 OH 0.05 110,000.00 5,500.00
Mandor L.04 OH 0.00 115,000.00 345.00
JUMLAH TENAGA KERJA
B BAHAN
Kunci silinder Bh 1.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 0.00


E Overhead & Profit 10 % 10 % x D 0.00
F Harga Satuan Pekerjaan (D+E) 0.00

A.4.6.2.5. Pemasangan 1 buah engsel pintu

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.02 90,000.00 1,350.00
Tukang kayu L.02 OH 0.15 100,000.00 15,000.00
Kepala tukang L.03 OH 0.02 110,000.00 1,650.00
Mandor L.04 OH 0.00 115,000.00 92.00
JUMLAH TENAGA KERJA 18,092.00
B BAHAN
Engsel pintu Bh 1.00 25,000.00 25,000.00
JUMLAH HARGA BAHAN 25,000.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 43,092.00


E Overhead & Profit 10 % 10 % x D 4,309.20
F Harga Satuan Pekerjaan (D+E) 47,401.20

A.4.6.2.6. Pemasangan 1 buah engsel jendela kupu-kupu

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.01 90,000.00 900.00
Tukang kayu L.02 OH 0.10 100,000.00 10,000.00
Kepala tukang L.03 OH 0.01 110,000.00 1,100.00
Mandor L.04 OH 0.00 115,000.00 57.50
JUMLAH TENAGA KERJA 12,057.50
B BAHAN
Engsel kupu-kupu Bh 1.00 0.00
JUMLAH HARGA BAHAN 0.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 12,057.50


E Overhead & Profit 10 % 10 % x D 1,205.75
F Harga Satuan Pekerjaan (D+E) 13,263.25
A.4.6.2.7. Pemasangan 1 buah engsel angin

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.10 90,000.00 9,000.00
Tukang kayu L.02 0.20 100,000.00 20,000.00
Kepala tukang L.03 0.02 110,000.00 2,200.00
Mandor L.04 OH 0.00 115,000.00 57.50
JUMLAH TENAGA KERJA 0.00
B BAHAN
Engsel angin Bh 1.00 10,000.00 0.00
JUMLAH HARGA BAHAN 0.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 0.00


E Overhead & Profit 10 % 10 % x D 0.00
F Harga Satuan Pekerjaan (D+E) 0.00

A.4.6.2.8. Pemasangan 1 buah spring knip

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.02 90,000.00 1,350.00
Tukang kayu L.02 0.15 100,000.00 15,000.00
Kepala tukang L.03 0.02 110,000.00 1,650.00
Mandor L.04 OH 0.01 115,000.00 920.00
JUMLAH TENAGA KERJA
B BAHAN
Spring knip Bh 1.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 0.00


E Overhead & Profit 10 % 10 % x D 0.00
F Harga Satuan Pekerjaan (D+E) 0.00

A.4.6.2.9. Pemasangan 1 buah kait angin

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.02 90,000.00 1,350.00
Tukang kayu L.02 0.15 100,000.00 15,000.00
Kepala tukang L.03 0.02 110,000.00 1,650.00
Mandor L.04 OH 0.01 115,000.00 920.00
JUMLAH TENAGA KERJA 18,920.00
B BAHAN
Kait angin Bh 1.00 10,000.00 10,000.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 18,920.00


E Overhead & Profit 10 % 10 % x D 1,892.00
F Harga Satuan Pekerjaan (D+E) 20,812.00
A.4.6.2.10. Pemasangan 1 buah door closer

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.05 90,000.00 4,500.00
Tukang kayu L.02 0.50 100,000.00 50,000.00
Kepala tukang L.03 0.05 110,000.00 5,500.00
Mandor L.04 OH 0.00 115,000.00 345.00
JUMLAH TENAGA KERJA
B BAHAN
Door closer set 1.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 0.00


E Overhead & Profit 10 % 10 % x D 0.00
F Harga Satuan Pekerjaan (D+E) 0.00

A.4.6.2.11. Pemasangan 1 buah kunci slot

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.02 90,000.00 1,800.00
Tukang kayu L.02 0.20 100,000.00 20,000.00
Kepala tukang L.03 0.02 110,000.00 2,200.00
Mandor L.04 OH 0.00 115,000.00 115.00
JUMLAH TENAGA KERJA
B BAHAN
Kunci slot Bh 1.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 0.00


E Overhead & Profit 10 % 10 % x D 0.00
F Harga Satuan Pekerjaan (D+E) 0.00

A.4.6.2.12. Pemasangan 1 buah Door holder

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.05 90,000.00 4,500.00
Tukang kayu L.02 0.50 100,000.00 50,000.00
Kepala tukang L.03 0.05 110,000.00 5,500.00
Mandor L.04 OH 0.00 115,000.00 345.00
JUMLAH TENAGA KERJA
B BAHAN
Door holder Bh 1.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 0.00


E Overhead & Profit 10 % 10 % x D 0.00
F Harga Satuan Pekerjaan (D+E) 0.00
A.4.6.2.13. Pemasangan 1 buah door stop

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.01 90,000.00 900.00
Tukang kayu L.02 0.10 100,000.00 10,000.00
Kepala tukang L.03 0.01 110,000.00 1,100.00
Mandor L.04 OH 0.01 115,000.00 575.00
JUMLAH TENAGA KERJA
B BAHAN
Door stop Bh 1.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 0.00


E Overhead & Profit 10 % 10 % x D 0.00
F Harga Satuan Pekerjaan (D+E) 0.00

A.4.6.2.14. Pemasangan 1 buah Rel pintu sorong

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.06 90,000.00 5,400.00
Tukang kayu L.02 0.60 100,000.00 60,000.00
Kepala tukang L.03 0.06 110,000.00 6,600.00
Mandor L.04 OH 0.00 115,000.00 345.00
JUMLAH TENAGA KERJA
B BAHAN
Rel pintu sorong Set 1.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 0.00


E Overhead & Profit 10 % 10 % x D 0.00
F Harga Satuan Pekerjaan (D+E) 0.00

A.4.6.2.15. Pemasangan 1 buah kunci lemari

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.03 90,000.00 2,250.00
Tukang kayu L.02 0.25 100,000.00 25,000.00
Kepala tukang L.03 0.03 110,000.00 2,750.00
Mandor L.04 OH 0.00 115,000.00 149.50
JUMLAH TENAGA KERJA
B BAHAN
Kunci lemari Set 1.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 0.00


E Overhead & Profit 10 % 10 % x D 0.00
F Harga Satuan Pekerjaan (D+E) 0.00
A.4.6.2.16. Pemasangan 1 m2 kaca tebal 3 mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.02 90,000.00 1,350.00
Tukang kayu L.02 0.15 100,000.00 15,000.00
Kepala tukang L.03 0.02 110,000.00 1,650.00
Mandor L.04 OH 0.00 115,000.00 92.00
JUMLAH TENAGA KERJA 18,092.00
B BAHAN
Kaca tebal 3mm m2 1.10 100,000.00 110,000.00
Sealant Kg 0.05 0.00
JUMLAH HARGA BAHAN 110,000.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 128,092.00


E Overhead & Profit 10 % 10 % x D 12,809.20
F Harga Satuan Pekerjaan (D+E) 140,901.20

A.4.6.2.17. Pemasangan 1 m2 kaca tebal 5 mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.02 90,000.00 1,350.00
Tukang kayu L.02 OH 0.15 100,000.00 15,000.00
Kepala tukang L.03 OH 0.02 110,000.00 1,650.00
Mandor L.04 OH 0.00 115,000.00 92.00
JUMLAH TENAGA KERJA
B BAHAN
Kaca tebal 5 mm m2 1.10 180,000.00 198,000.00
Sealant Kg 0.05 0.00
JUMLAH HARGA BAHAN 198,000.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 198,000.00


E Overhead & Profit 10 % 10 % x D 19,800.00
F Harga Satuan Pekerjaan (D+E) 217,800.00

A.4.6.2.18. Pemasangan 1 m2 kaca tebal 8 mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.02 90,000.00 1,530.00
Tukang kayu L.02 OH 0.17 100,000.00 17,000.00
Kepala tukang L.03 OH 0.02 110,000.00 1,870.00
Mandor L.04 OH 0.00 115,000.00 103.50
JUMLAH TENAGA KERJA
B BAHAN
Kaca tebal 8 mm m2 1.10
SEalant Kg 0.07
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 0.00
E Overhead & Profit 10 % 10 % x D 0.00
F Harga Satuan Pekerjaan (D+E) 0.00
A.4.6.2.19. Pemasangan 1 m2 kaca buram tebal 12 mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.03 90,000.00 2,250.00
Tukang kayu L.02 OH 0.25 100,000.00 25,000.00
Kepala tukang L.03 OH 0.03 110,000.00 2,750.00
Mandor L.04 OH 0.00 115,000.00 149.50
JUMLAH TENAGA KERJA
B BAHAN
Kaca buram 12 mm m2 1.10
SEalant Kg 0.07
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 0.00


E Overhead & Profit 10 % 10 % x D 0.00
F Harga Satuan Pekerjaan (D+E) 0.00

A.4.6.2.20. Pemasangan 1 m2 kaca cermin tebal 5 mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.02 90,000.00 1,350.00
Tukang kayu L.02 OH 0.15 100,000.00 15,000.00
Kepala tukang L.03 OH 0.02 110,000.00 1,650.00
Mandor L.04 OH 0.01 115,000.00 920.00
JUMLAH TENAGA KERJA
B BAHAN
Kaca cermin 5 mm m2 1.10
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 0.00


E Overhead & Profit 10 % 10 % x D 0.00
F Harga Satuan Pekerjaan (D+E) 0.00

A.4.6.2.21. Pemasangan 1 m2 kaca cermin tebal 8 mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.02 90,000.00 1,530.00
Tukang kayu L.02 OH 0.17 100,000.00 17,000.00
Kepala tukang L.03 OH 0.02 110,000.00 1,870.00
Mandor L.04 OH 0.01 115,000.00 1,035.00
JUMLAH TENAGA KERJA
B BAHAN
Kaca cermin 8 mm m2 1.10
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 0.00


E Overhead & Profit 10 % 10 % x D 0.00
F Harga Satuan Pekerjaan (D+E) 0.00
A.4.6.2.22. Pemasangan 1 m2 kaca wireglassed tebal 5 mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.02 90,000.00 1,350.00
Tukang kayu L.02 OH 0.15 100,000.00 15,000.00
Kepala tukang L.03 OH 0.02 110,000.00 1,650.00
Mandor L.04 OH 0.01 115,000.00 920.00
JUMLAH TENAGA KERJA
B BAHAN
Kaca wireglassed 5 mm m2 1.10
JUMLAH HARGA BAHAN

C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 0.00


E Overhead & Profit 10 % 10 % x D 0.00
F Harga Satuan Pekerjaan (D+E) 0.00

A.4.6.2.23. Pemasangan 1 m2 kaca patri tebal 5 mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.08 90,000.00 6,750.00
Tukang kayu L.02 OH 0.15 100,000.00 15,000.00
Kepala tukang L.03 OH 0.02 110,000.00 1,650.00
Mandor L.04 OH 0.00 115,000.00 460.00
JUMLAH TENAGA KERJA
B BAHAN
Kaca patri 5mm m2 1.10
Sealant Kg 0.05
JUMLAH HARGA BAHAN

C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 0.00


E Overhead & Profit 10 % 10 % x D 0.00
F Harga Satuan Pekerjaan (D+E) 0.00
A.4.7.1 HARGA SATUAN PEKERJAAN PENGECATAN

A.4.7.1.1. 1 m2 Pengikisan/pengerokan permukaan cat lama

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.15 90,000.00 13,500.00
Mandor L.04 OH 0.00 115,000.00 345.00
JUMLAH TENAGA KERJA
B BAHAN
Soda api Kg 0.05
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 0.00


E Overhead & Profit10 % 10 % x D 0.00
F Harga Satuan Pekerjaan (D+E) 0.00

A.4.7.1.2. 1 m2 Pencucian bidang permukaan tembok yang pernah dicat

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.15 90,000.00 13,500.00
Mandor L.04 OH 0.00 115,000.00 345.00
JUMLAH TENAGA KERJA 13,845.00
B BAHAN
Sabun Kg 0.05 15,000.00 750.00
JUMLAH HARGA BAHAN 750.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 14,595.00


E Overhead & Profit10 % 10 % x D 1,459.50
F Harga Satuan Pekerjaan (D+E) 16,054.50

A.4.7.1.3. 1 m2 Pengerokan karat pada permukaan baja cara manual

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.15 90,000.00 13,500.00
Mandor L.04 OH 0.01 115,000.00 920.00
JUMLAH TENAGA KERJA 14,420.00
B BAHAN
Sabun Kg 0.05 15,000.00 750.00
JUMLAH HARGA BAHAN 750.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 15,170.00


E Overhead & Profit10 % 10 % x D 1,517.00
F Harga Satuan Pekerjaan (D+E) 16,687.00
A.4.7.1.4. 1 m2 Pengecatan bidang kayu baru (1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup)

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.07 90,000.00 6,300.00
Tukang cat L.02 OH 0.01 100,000.00 900.00
Kepala tukang L.03 OH 0.01 110,000.00 660.00
Mandor L.04 OH 0.00 115,000.00 345.00
JUMLAH TENAGA KERJA 8,205.00
B BAHAN
Cat menie Kg 0.20 50,000.00 10,000.00
Plamuur Kg 0.15 50,000.00 7,500.00
Cat dasar Kg 0.17 20,000.00 3,400.00
Cat penutup Kg 0.26 50,000.00 13,000.00
Kuas Bh 0.01 12,000.00 120.00
Pengencer Kg 0.03 25,000.00 750.00
Ampelas Lbr 0.20 5,000.00 1,000.00
JUMLAH HARGA BAHAN 35,770.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 43,975.00


E Overhead & Profit10 % 10 % x D 4,397.50
F Harga Satuan Pekerjaan (D+E) 48,372.50

A.4.7.1.5. Pengecatan 1 m2 bidang kayu baru (1 lapis plamuur, 1 lapis cat dasar, 3 lapis cat penutup)

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.07 90,000.00 6,300.00
Tukang cat L.02 OH 0.11 100,000.00 10,500.00
Kepala tukang L.03 OH 0.00 110,000.00 440.00
Mandor L.04 OH 0.00 115,000.00 345.00
JUMLAH TENAGA KERJA 17,585.00
B BAHAN
Cat menie Kg 0.20 50,000.00 10,000.00
Plamuur Kg 0.15 50,000.00 7,500.00
Cat dasar Kg 0.17 20,000.00 3,400.00
Cat penutup Kg 0.35 50,000.00 17,500.00
Kuas Bh 0.01 12,000.00 120.00
Pengencer Kg 0.03 25,000.00 750.00
Ampelas Lbr 0.20 5,000.00 1,000.00
JUMLAH HARGA BAHAN 40,270.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 57,855.00


E Overhead & Profit10 % 10 % x D 5,785.50
F Harga Satuan Pekerjaan (D+E) 63,640.50

A.4.7.1.6. Pelaburan 1 m2 bidang kayu dengan teak oil

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.04 90,000.00 3,600.00
Tukang cat L.02 OH 0.06 100,000.00 6,300.00
Kepala tukang L.03 OH 0.06 110,000.00 6,930.00
Mandor L.04 OH 0.00 115,000.00 345.00
JUMLAH TENAGA KERJA 0.00
B BAHAN
Teak oil L 0.36
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 0.00


E Overhead & Profit10 % 10 % x D 0.00
F Harga Satuan Pekerjaan (D+E) 0.00
A.4.7.1.7. Pelaburan 1 m2 bidang kayu dengan politur

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.04 90,000.00 3,600.00
Tukang cat L.02 OH 0.06 100,000.00 6,000.00
Kepala tukang L.03 OH 0.02 110,000.00 1,760.00
Mandor L.04 OH 0.00 115,000.00 345.00
JUMLAH TENAGA KERJA 11,705.00
B BAHAN
Politur L 0.15 50,000.00 7,500.00
Politur jadi L 0.37 0.00 0.00
Ampelas Lbr 2.00 5,000.00 10,000.00
JUMLAH HARGA BAHAN 17,500.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 29,205.00


E Overhead & Profit10 % 10 % x D 2,920.50
F Harga Satuan Pekerjaan (D+E) 32,125.50

A.4.7.1.8. Pelaburan 1 m2 bidang kayu dengan cat residu dan ter

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.10 90,000.00 9,000.00
Mandor L.04 OH 0.01 115,000.00 690.00
JUMLAH TENAGA KERJA 9,690.00
B BAHAN
Residu atau ter L 0.35 7,500.00 2,625.00
JUMLAH HARGA BAHAN 2,625.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 12,315.00


E Overhead & Profit10 % 10 % x D 1,231.50
F Harga Satuan Pekerjaan (D+E) 13,546.50

A.4.7.1.9. Pelaburan 1 m2 bidang kayu dengan vernis

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.16 90,000.00 14,400.00
Tukang cat L.02 OH 0.16 100,000.00 16,000.00
Kepala tukang L.03 OH 0.02 110,000.00 1,760.00
Mandor L.04 OH 0.00 115,000.00 345.00
JUMLAH TENAGA KERJA 32,505.00
B BAHAN
Vernis L 0.15 50,000.00 7,500.00
Dempul Kg 0.05 20,000.00 1,000.00
Ampelas Lbr 0.10 5,000.00 500.00
JUMLAH HARGA BAHAN 9,000.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 41,505.00


E Overhead & Profit10 % 10 % x D 4,150.50
F Harga Satuan Pekerjaan (D+E) 45,655.50
A.4.7.1.10. Pengecatan 1 m2 tembok baru ( 1lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup)

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.02 90,000.00 1,800.00
Tukang cat L.02 OH 0.06 100,000.00 6,300.00
Kepala tukang L.03 OH 0.01 110,000.00 693.00
Mandor L.04 OH 0.00 115,000.00 345.00
JUMLAH TENAGA KERJA 9,138.00
B BAHAN
Plamuur Kg 0.10 50,000.00 5,000.00
Cat dasar Kg 0.10 20,000.00 2,000.00
Cat penutup Kg 0.26 18,000.00 4,680.00
JUMLAH HARGA BAHAN 11,680.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 20,818.00


E Overhead & Profit10 % 10 % x D 2,081.80
F Harga Satuan Pekerjaan (D+E) 22,899.80

A.4.7.1.11. Pengecatan 1 m2 tembok lama ( 1 lapis cat dasar, 2 lapis cat penutup)

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.03 90,000.00 2,520.00
Tukang cat L.02 OH 0.04 100,000.00 4,200.00
Kepala tukang L.03 OH 0.00 110,000.00 462.00
Mandor L.04 OH 0.00 115,000.00 345.00
JUMLAH TENAGA KERJA 7,527.00
B BAHAN
Cat dasar Kg 0.12 20,000.00 2,400.00
Cat penutup Kg 0.18 18,000.00 3,240.00
JUMLAH HARGA BAHAN 5,640.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 13,167.00


E Overhead & Profit10 % 10 % x D 1,316.70
F Harga Satuan Pekerjaan (D+E) 14,483.70

A.4.7.1.12. Pelaburan 1 m2 tembok dengan kalkarium

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.03 90,000.00 2,520.00
Tukang cat L.02 OH 0.04 100,000.00 4,200.00
Kepala tukang L.03 OH 0.00 110,000.00 462.00
Mandor L.04 OH 0.00 115,000.00 345.00
JUMLAH TENAGA KERJA
B BAHAN
Kalkarium Kg 0.10
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 0.00
E Overhead & Profit10 % 10 % x D 0.00
F Harga Satuan Pekerjaan (D+E) 0.00
A.4.7.1.13. Pelaburan 1 m2 tembok dengan kapur sirih

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.15 90,000.00 13,500.00
Tukang cat L.02 OH 0.00 100,000.00 100.00
Kepala tukang L.03 OH 0.00 110,000.00 11.00
Mandor L.04 OH 0.00 115,000.00 287.50
JUMLAH TENAGA KERJA 13,898.50
B BAHAN
Kapur sirih Kg 0.15
Ampelas Lbr 0.10
Alang-alang Ikat 0.25
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 13,898.50


E Overhead & Profit10 % 10 % x D 1,389.85
F Harga Satuan Pekerjaan (D+E) 15,288.35

A.4.7.1.14. Pelaburan 1 m2 tembok lama dengan kapur sirih (pemeliharaan)

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.04 90,000.00 3,600.00
Tukang cat L.02 OH 0.01 100,000.00 500.00
Kepala tukang L.03 OH 0.00 110,000.00 55.00
Mandor L.04 OH 0.00 115,000.00 287.50
JUMLAH TENAGA KERJA
B BAHAN
Kapur sirih Kg 0.30
Ampelas Lbr 0.20
Alang-alang Ikat 0.25
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 0.00


E Overhead & Profit10 % 10 % x D 0.00
F Harga Satuan Pekerjaan (D+E) 0.00

A.4.7.1.15. Pemasangan 1 m2 wallpaper

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.02 90,000.00 1,800.00
Tukang cat L.02 OH 0.20 100,000.00 20,000.00
Kepala tukang L.03 OH 0.02 110,000.00 2,200.00
Mandor L.04 OH 0.00 115,000.00 287.50
JUMLAH TENAGA KERJA
B BAHAN
Wall paper m2 1.20
Lem Kg 0.20
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A+B+C) 0.00


E Overhead & Profit10 % 10 % x D 0.00
F Harga Satuan Pekerjaan (D+E) 0.00
A.4.7.1.16. Pengecatan 1 m2 permukaan baja dengan menie besi

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.02 90,000.00 1,800.00
Tukang cat L.02 OH 0.20 100,000.00 20,000.00
Kepala tukang L.03 OH 0.02 110,000.00 2,200.00
Mandor L.04 OH 0.00 115,000.00 287.50
JUMLAH TENAGA KERJA 24,287.50
B BAHAN
Menie besi Kg 0.10 50,000.00 5,000.00
Kwas Bh 0.01 12,000.00 120.00
JUMLAH HARGA BAHAN 5,120.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 29,407.50


E Overhead & Profit10 % 10 % x D 2,940.75
F Harga Satuan Pekerjaan (D+E) 32,348.25

A.4.7.1.17. Pengecatan 1 m2 permukaan baja dengan menie besi dengan perancah

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.25 90,000.00 22,500.00
Tukang cat L.02 OH 0.23 100,000.00 22,500.00
Kepala tukang L.02 OH 0.02 110,000.00 2,475.00
Mandor L.04 OH 0.01 115,000.00 862.50
JUMLAH TENAGA KERJA 48,337.50
B BAHAN
Menie besi Kg 0.10 50,000.00 5,000.00
Pengencer L 0.01 25,000.00 250.00
Kwas Bh 0.01 12,000.00 120.00
Perancah kayu m3 0.00 12,000.00 24.00
JUMLAH HARGA BAHAN 5,394.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 53,731.50


E Overhead & Profit10 % 10 % x D 5,373.15
F Harga Satuan Pekerjaan (D+E) 59,104.65

A.4.7.1.18. Pengecatan 1 m2 permukaan baja galvanis secara manual 4 lapis

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.25 90,000.00 22,500.00
Tukang cat L.02 OH 0.25 100,000.00 25,000.00
Kepala tukang L.03 OH 0.03 110,000.00 2,750.00
Mandor L.04 OH 0.00 115,000.00 149.50
JUMLAH TENAGA KERJA
B BAHAN
Menie A Kg 0.10
Menie B Kg 0.10
Cat Kg 0.08
Kwas Bh 0.01 12,000.00
Pengencer L 0.01 25,000.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 0.00


E Overhead & Profit10 % 10 % x D 0.00
F Harga Satuan Pekerjaan (D+E) 0.00
A.4.7.1.19. Pengecatan 1 m2 permukaan baja galvanis secara manual sistem 1 lapis cat mutakhir

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.06 90,000.00 5,400.00
Tukang cat L.02 OH 0.06 100,000.00 6,000.00
Kepala tukang L.03 OH 0.01 110,000.00 1,320.00
Mandor L.04 OH 0.00 115,000.00 345.00
JUMLAH TENAGA KERJA
B BAHAN
Cat Kg 0.30
Kwas Bh 0.01
Pengencer L 0.01
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 0.00


E Overhead & Profit10 % 10 % x D 0.00
F Harga Satuan Pekerjaan (D+E) 0.00

A.4.7.1.20. Pengecatan 1 m2 permukaan baja galvanis secara manual sistem 3 lapis

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.40 90,000.00 36,000.00
Tukang cat L.02 OH 0.80 100,000.00 80,000.00
Kepala tukang L.03 OH 0.08 110,000.00 8,800.00
Mandor L.04 OH 0.02 115,000.00 2,300.00
JUMLAH TENAGA KERJA
B BAHAN
Cat dasar Kg 0.11
Cat antara Kg 0.17
Cat penutup Kg 0.08
Kwas Bh 0.01
Pengencer L 0.01
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 0.00


E Overhead & Profit10 % 10 % x D 0.00
F Harga Satuan Pekerjaan (D+E) 0.00

A.4.7.1.21. Pengecatan 1 m2 permukaan baja galvanis secara semprot sistem 3 lapis cat mutakhir

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.40 90,000.00 36,000.00
Tukang cat L.02 OH 0.70 100,000.00 70,000.00
Kepala tukang L.03 OH 0.07 110,000.00 7,700.00
Mandor L.04 OH 0.02 115,000.00 2,300.00
JUMLAH TENAGA KERJA
B BAHAN
Cat dasar Kg 0.30
Pengencer L 0.01
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 0.00


E Overhead & Profit10 % 10 % x D 0.00
F Harga Satuan Pekerjaan (D+E) 0.00
A.5.1.1 HARGA SATUAN PEKERJAAN SANITASI DALAM GEDUNG

A.5.1.1.1. Pemasangan 1 buah closet duduk/monoblock

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 3.30 90,000.00 297,000.00
Tukang batu L.02 1.10 100,000.00 110,000.00
Kepala tukang L.03 0.01 110,000.00 1,100.00
Mandor L.04 OH 0.16 115,000.00 18,400.00
JUMLAH TENAGA KERJA 426,500.00
B BAHAN
Closet duduk Unit 1.00 3,500,000.00 3,500,000.00
Perlengkapan Ls 6%xClosed 210,000.00 210,000.00
JUMLAH HARGA BAHAN 3,710,000.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 4,136,500.00


E Overhead & Profit 10 % 10 % x D 413,650.00
F Harga Satuan Pekerjaan (D+E) 4,550,150.00

A.5.1.1 2. Pemasangan 1 buah closet jongkok porslen

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

TENAGA
Pekerja L.01 OH 1.00 90,000.00 90,000.00
Tukang batu L.02 1.50 100,000.00 150,000.00
Kepala tukang L.03 0.15 110,000.00 16,500.00
Mandor L.04 OH 0.16 115,000.00 18,400.00
JUMLAH TENAGA KERJA 274,900.00
B BAHAN
Closet jongkok Unit 1.00 250,000.00 250,000.00
Semen Portland Kg 6.00 1,700.00 10,200.00
Pasir pasang M3 0.01 150,000.00 1,500.00
JUMLAH HARGA BAHAN 261,700.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 536,600.00


E Overhead & Profit 10 % 10 % x D 53,660.00
F Harga Satuan Pekerjaan (D+E) 590,260.00

A.5.1.1 3. Pemasangan 1 buah closet jongkok teraso

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 1.00 90,000.00 90,000.00
Tukang batu L.02 1.50 100,000.00 150,000.00
Kepala tukang L.03 0.15 110,000.00 16,500.00
Mandor L.04 OH 0.05 115,000.00 5,750.00
JUMLAH TENAGA KERJA 262,250.00
B BAHAN
Closet jongkok Unit 1.00 120,000.00 120,000.00
Semen Portland Kg 6.00 1,700.00 10,200.00
Pasir pasang M3 0.01 150,000.00 1,500.00
Bata merah Bh 7.00 875.00 6,125.00
JUMLAH HARGA BAHAN 137,825.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 400,075.00


E Overhead & Profit 10 % 10 % x D 40,007.50
F Harga Satuan Pekerjaan (D+E) 440,082.50
A.5.1.1 4. Pemasangan 1 buah urinoir

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 1.00 90,000.00 90,000.00
Tukang batu L.02 1.00 100,000.00 100,000.00
Kepala tukang L.03 0.10 110,000.00 11,000.00
Mandor L.04 OH 0.05 115,000.00 5,750.00
JUMLAH TENAGA KERJA 206,750.00
B BAHAN
Urinoir Unit 1.00 450,000.00 450,000.00
Semen Portland Kg 6.00 1,700.00 10,200.00
Pasir pasang M3 0.01 150,000.00 1,500.00
Perlengkapan % 30.00 450,000.00 135,000.00
JUMLAH HARGA BAHAN 596,700.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 803,450.00


E Overhead & Profit 10 % 10 % x D 80,345.00
F Harga Satuan Pekerjaan (D+E) 883,795.00

A.5.1.1 5. Pemasangan 1 buah wastafel

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 1.20 90,000.00 108,000.00
Tukang batu L.02 1.45 100,000.00 145,000.00
Kepala tukang L.03 0.15 110,000.00 16,500.00
Mandor L.04 OH 0.06 115,000.00 6,900.00
JUMLAH TENAGA KERJA 276,400.00
B BAHAN
Wastafel Unit 1.20 275,000.00 330,000.00
Semen Portland Kg 6.00 1,700.00 10,200.00
Pasir pasang M3 0.01 150,000.00 1,500.00
Perlengkapan % 12.00 275,000.00 33,000.00
JUMLAH HARGA BAHAN 374,700.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 651,100.00


E Overhead & Profit 10 % 10 % x D 65,110.00
F Harga Satuan Pekerjaan (D+E) 716,210.00

A.5.1.1 6. Pemasangan 1 buah bathcuip porselen

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.08 90,000.00 6,750.00
Tukang batu L.02 0.75 100,000.00 75,000.00
Kepala tukang L.03 0.08 110,000.00 8,250.00
Mandor L.04 OH 0.00 115,000.00 345.00
JUMLAH TENAGA KERJA
B BAHAN
Bathcuip Unit 1.00
Perlengkapan % 20.00 0.00 0.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 0.00


E Overhead & Profit 10 % 10 % x D 0.00
F Harga Satuan Pekerjaan (D+E) 0.00
A.5.1.1 7. Pemasangan 1 buah bak fibreglass vol 1 m3

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 3.00 90,000.00 270,000.00
Tukang batu L.02 4.50 100,000.00 450,000.00
Kepala tukang L.03 0.05 110,000.00 5,500.00
Mandor L.04 OH 0.90 115,000.00 103,500.00
JUMLAH TENAGA KERJA 829,000.00
B BAHAN
Bak fibreglass Unit 1.00 250,000.00 250,000.00
Perlengkapan Ls 12%xbak 30,000.00 30,000.00
JUMLAH HARGA BAHAN 280,000.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 1,109,000.00


E Overhead & Profit 10 % 10 % x D 110,900.00
F Harga Satuan Pekerjaan (D+E) 1,219,900.00

A.5.1.1 8. Pemasangan 1 buah bak mandi batu bata vol 0,30 m 3

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 6.00 90,000.00 540,000.00
Tukang batu L.02 3.00 100,000.00 300,000.00
Kepala tukang L.03 0.30 110,000.00 33,000.00
Mandor L.04 OH 0.03 115,000.00 3,450.00
JUMLAH TENAGA KERJA 876,450.00
B BAHAN
Bata merah M3 150.00 875.00 131,250.00
Semen portland Kg 120.00 1,700.00 204,000.00
Pasir pasang M3 0.30 150,000.00 45,000.00
Porselen 11x11 bh 360.00 731.71 263,414.63
Semen warna Kg 6.00 13,000.00 78,000.00
JUMLAH HARGA BAHAN 721,664.63
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 925,664.63


E Overhead & Profit 10 % 10 % x D 92,566.46
F Harga Satuan Pekerjaan (D+E) 1,018,231.10

A.5.1.1 9. Pemasangan 1 buah bak mandi teraso vol 0,30 m 3

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 3.00 90,000.00 270,000.00
Tukang batu L.02 4.50 100,000.00 450,000.00
Kepala tukang L.03 0.05 110,000.00 5,500.00
Mandor L.04 OH 0.90 115,000.00 103,500.00
JUMLAH TENAGA KERJA 829,000.00
B BAHAN
Bak fibreglass Unit 1.00 250,000.00 250,000.00
Perlengkapan Ls 12%xbak 30,000.00 30,000.00
JUMLAH HARGA BAHAN 280,000.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 1,109,000.00


E Overhead & Profit 10 % 10 % x D 110,900.00
F Harga Satuan Pekerjaan (D+E) 1,219,900.00
A.5.1.1 10. Pemasangan 1 buah bak air fibreglass vol 1 m3

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.30 90,000.00 27,000.00
Tukang batu L.02 0.45 100,000.00 45,000.00
Kepala tukang L.03 0.05 110,000.00 4,950.00
Mandor L.04 OH 0.02 115,000.00 1,725.00
JUMLAH TENAGA KERJA 78,675.00
B BAHAN
Bak air fibreglass Unit 1.00 50,000.00 50,000.00
Perlengkapan % 12.00 6,000.00 6,000.00
JUMLAH HARGA BAHAN 56,000.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 134,675.00


E Overhead & Profit 10 % 10 % x D 13,467.50
F Harga Satuan Pekerjaan (D+E) 148,142.50

A.5.1.1 11. Pemasangan 1 buah bak beton volume 1 m3

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 3.50 90,000.00 315,000.00
Tukang batu L.02 4.50 100,000.00 450,000.00
Kepala tukang L.03 0.05 110,000.00 5,500.00
Mandor L.04 OH 0.02 115,000.00 2,070.00
JUMLAH TENAGA KERJA
B BAHAN
Beton 1:2:3 M3 0.90 677,132.14 609,418.93
Baja tulangan Kg 180.00 0.00
Kayu bekisting M2 8.00 0.00
Ubin porselen Bh 500.00 0.00
Perlengkapan % 10.00 0.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 0.00


E Overhead & Profit 10 % 10 % x D 0.00
F Harga Satuan Pekerjaan (D+E) 0.00

A.5.1.1 12. Pemasangan 1 buah bak cuci piring stainlessteel

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.03 90,000.00 2,700.00
Tukang batu L.02 0.30 100,000.00 30,000.00
Kepala tukang L.03 0.03 110,000.00 3,300.00
Mandor L.04 OH 0.02 115,000.00 1,725.00
JUMLAH TENAGA KERJA 37,725.00
B BAHAN
Bak cuci piring Unit 1.00 203,000.00 203,000.00
Waterdrain Bh 1.00 7,000.00 7,000.00
JUMLAH HARGA BAHAN 210,000.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 247,725.00


E Overhead & Profit 10 % 10 % x D 24,772.50
F Harga Satuan Pekerjaan (D+E) 272,497.50
A.5.1.1 13. Pemasangan 1 buah bak cuci piring teraso

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.05 90,000.00 4,500.00
Tukang batu L.02 0.50 100,000.00 50,000.00
Kepala tukang L.03 0.05 110,000.00 5,500.00
Mandor L.04 OH 0.03 115,000.00 2,875.00
JUMLAH TENAGA KERJA 62,875.00
B BAHAN
Bak cuci piring Unit 1.00 170,000.00 170,000.00
Waterdrain Bh 1.00 7,000.00 7,000.00
Semen portland Kg 20.00 1,700.00 34,000.00
Pasir pasang M3 0.05 150,000.00 7,500.00
JUMLAH HARGA BAHAN 218,500.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 388,500.00


E Overhead & Profit 10 % 10 % x D 38,850.00
F Harga Satuan Pekerjaan (D+E) 427,350.00

A.5.1.1 14. Pemasangan 1 buah floor drain

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.01 90,000.00 900.00
Tukang batu L.02 0.10 100,000.00 10,000.00
Kepala tukang L.03 0.01 110,000.00 1,100.00
Mandor L.04 OH 0.01 115,000.00 575.00
JUMLAH TENAGA KERJA 12,575.00
B BAHAN
Floor drain Unit 1.00 15,000.00 16,500.00
JUMLAH HARGA BAHAN 16,500.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 29,075.00


E Overhead & Profit 10 % 10 % x D 2,907.50
F Harga Satuan Pekerjaan (D+E) 31,982.50

A.5.1.1 15. Pemasangan 1 buah bak kontrol pasangan bata 30x30 tinggi 35 cm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 2.16 90,000.00 194,400.00
Tukang batu L.02 0.72 100,000.00 72,000.00
Kepala tukang L.03 0.07 110,000.00 7,920.00
Mandor L.04 OH 0.01 115,000.00 1,265.00
JUMLAH TENAGA KERJA 275,585.00
B BAHAN
Bata merah bh 40.00 875.00 35,000.00
Semen portland Kg 44.00 1,700.00 74,800.00
Pasir pasang M3 0.07 150,000.00 10,500.00
Pasir beton M3 0.06 150,000.00 9,000.00
Kerikil M3 0.07 200,000.00 14,000.00
Baja tulangan Kg 1.60 14,300.00 22,880.00
JUMLAH HARGA BAHAN 166,180.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 176,680.00


E Overhead & Profit 10 % 10 % x D 17,668.00
F Harga Satuan Pekerjaan (D+E) 194,348.00
A.5.1.1 16. Pemasangan 1 buah bak kontrol pasangan bata 45cm x45cm tinggi 50 cm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 3.20 90,000.00 288,000.00
Tukang batu L.02 1.15 100,000.00 115,000.00
Kepala tukang L.03 0.01 110,000.00 1,210.00
Mandor L.04 OH 0.02 115,000.00 1,840.00
JUMLAH TENAGA KERJA 406,050.00
B BAHAN
Bata merah bh 70.00 875.00 61,250.00
Semen portland Kg 77.00 1,700.00 130,900.00
Pasir pasang M3 0.13 150,000.00 19,500.00
Pasir beton M3 0.09 150,000.00 13,500.00
Kerikil M3 0.02 200,000.00 4,000.00
Baja tulangan Kg 2.60 14,300.00 37,180.00
JUMLAH HARGA BAHAN 266,330.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 285,830.00


E Overhead & Profit 10 % 10 % x D 28,583.00
F Harga Satuan Pekerjaan (D+E) 314,413.00

A.5.1.1 17. Pemasangan 1 buah bak kontrol pasangan bata 60cm x60cm tinggi 65 cm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 3.20 90,000.00 288,000.00
Tukang batu L.02 1.15 100,000.00 115,000.00
Kepala tukang L.03 0.01 110,000.00 1,210.00
Mandor L.04 OH 0.02 115,000.00 1,840.00
JUMLAH TENAGA KERJA 406,050.00
B BAHAN
Bata merah bh 123.00 875.00 107,625.00
Semen portland Kg 114.00 1,700.00 193,800.00
Pasir pasang M3 0.18 150,000.00 27,600.00
Pasir beton M3 0.12 150,000.00 18,000.00
Kerikil M3 0.03 200,000.00 6,600.00
Baja tulangan Kg 4.85 14,300.00 69,355.00
JUMLAH HARGA BAHAN 422,980.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 450,580.00


E Overhead & Profit 10 % 10 % x D 45,058.00
F Harga Satuan Pekerjaan (D+E) 495,638.00

A.5.1.1 18. Pemasangan 1 m’ pipa galvanis diameter ½”

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.05 90,000.00 4,860.00
Tukang batu L.02 0.09 100,000.00 9,000.00
Kepala tukang L.03 0.01 110,000.00 990.00
Mandor L.04 OH 0.03 115,000.00 3,105.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa galvanis ½” M 1.20
Perlengkapan Ls 35%xpipa 0.00 0.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 0.00


E Overhead & Profit 10 % 10 % x D 0.00
F Harga Satuan Pekerjaan (D+E) 0.00
A.5.1.1 19. Pemasangan 1 buah kran diameter ½” atau 3/4”

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA KERJA
Pekerja L.01 OH 0.01 90,000.00 900.00
Tukang batu L.02 0.40 100,000.00 40,000.00
Kepala tukang L.03 0.04 110,000.00 4,400.00
Mandor L.04 OH 0.01 115,000.00 575.00
JUMLAH TENAGA KERJA 45,875.00
B BAHAN
Kran air M 1.00 15,000.00 15,000.00
Sealtape Buah 0.03 4,000.00 100.00
JUMLAH HARGA BAHAN 15,100.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 60,975.00


E Overhead & Profit 10 % 10 % x D 6,097.50
F Harga Satuan Pekerjaan (D+E) 67,072.50

A.5.1.1 20. Pemasangan 1 m’ pipa galvanis diameter 3/4”

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.05 90,000.00 4,860.00
Tukang batu L.02 0.09 100,000.00 9,000.00
Kepala tukang L.03 0.01 110,000.00 990.00
Mandor L.04 OH 0.03 115,000.00 3,105.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa galvanis 3/4” M 1.20 0.00
Perlengkapan % 35.00 0.00 0.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 0.00


E Overhead & Profit 10 % 10 % x D 0.00
F Harga Satuan Pekerjaan (D+E) 0.00

A.5.1.1 21. Pemasangan 1 m’ pipa galvanis diameter 1”

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.05 90,000.00 4,860.00
Tukang batu L.02 0.09 100,000.00 9,000.00
Kepala tukang L.03 0.01 110,000.00 990.00
Mandor L.04 OH 0.03 115,000.00 3,105.00
JUMLAH TENAGA KERJA 17,955.00
B BAHAN
Pipa galvanis 1” M 1.20 100,000.00 120,000.00
Perlengkapan % 35.00 100,000.00 35,000.00
JUMLAH HARGA BAHAN 155,000.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 172,955.00
E Overhead & Profit 10 % 10 % x D 17,295.50
F Harga Satuan Pekerjaan (D+E) 190,250.50
A.5.1.1 22. Pemasangan 1 m’ pipa galvanis diameter 1 ½”

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.11 90,000.00 9,720.00
Tukang batu L.02 0.18 100,000.00 18,000.00
Kepala tukang L.03 0.02 110,000.00 1,980.00
Mandor L.04 OH 0.01 115,000.00 575.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa galvanis 11/2” M 1.20 152,500.00 183,000.00
Perlengkapan % 35.00 152,500.00 53,375.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 0.00


E Overhead & Profit 10 % 10 % x D 0.00
F Harga Satuan Pekerjaan (D+E) 0.00

A.5.1.1 23. Pemasangan 1 m’ pipa galvanis diameter 3”

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.14 90,000.00 12,150.00
Tukang batu L.02 0.23 100,000.00 22,500.00
Kepala tukang L.03 0.02 110,000.00 2,530.00
Mandor L.04 OH 0.01 115,000.00 805.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa galvanis 3” M 1.20
Perlengkapan % 35.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 0.00


E Overhead & Profit 10 % 10 % x D 0.00
F Harga Satuan Pekerjaan (D+E) 0.00

A.5.1.1 24. Pemasangan 1 m’ pipa galvanis diameter 4”

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.14 90,000.00 12,150.00
Tukang batu L.02 0.23 100,000.00 22,500.00
Kepala tukang L.03 0.02 110,000.00 2,530.00
Mandor L.04 OH 0.01 115,000.00 805.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa galvanis 4” M 1.20
Perlengkapan % 35.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 0.00
E Overhead & Profit 10 % 10 % x D 0.00
F Harga Satuan Pekerjaan (D+E) 0.00
A.5.1.1 25. Pemasangan 1 m’ pipa PVC tipe AW diameter 1/2”

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.04 90,000.00 3,240.00
Tukang batu L.02 0.06 100,000.00 6,000.00
Kepala tukang L.03 0.01 110,000.00 660.00
Mandor L.04 OH 0.00 115,000.00 230.00
JUMLAH TENAGA KERJA 10,130.00
B BAHAN
Pipa PVC 1/2” M 1.20 4,250.00 5,100.00
Perlengkapan % 35.00 4,250.00 1,487.50
JUMLAH HARGA BAHAN 6,587.50
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 16,717.50


E Overhead & Profit 10 % 10 % x D 1,671.75
F Harga Satuan Pekerjaan (D+E) 18,389.25

A.5.1.1 26. Pemasangan 1 m’ pipa PVC tipe AW diameter 3/4”

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.04 90,000.00 3,240.00
Tukang batu L.02 0.06 100,000.00 6,000.00
Kepala tukang L.03 0.01 110,000.00 660.00
Mandor L.04 OH 0.00 115,000.00 230.00
JUMLAH TENAGA KERJA 10,130.00
B BAHAN
Pipa PVC 3/4” M 1.20 6,000.00 7,200.00
Perlengkapan % 35.00 6,000.00 2,100.00
JUMLAH HARGA BAHAN 9,300.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 19,430.00


E Overhead & Profit 10 % 10 % x D 1,943.00
F Harga Satuan Pekerjaan (D+E) 21,373.00

A.5.1.1 27. Pemasangan 1 m’ pipa PVC tipe AW diameter 1”

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.04 90,000.00 3,240.00
Tukang batu L.02 0.06 100,000.00 6,000.00
Kepala tukang L.03 0.01 110,000.00 660.00
Mandor L.04 OH 0.00 115,000.00 230.00
JUMLAH TENAGA KERJA 10,130.00
B BAHAN
Pipa PVC 1” M 1.20 7,500.00 9,000.00
Perlengkapan % 35.00 7,500.00 2,625.00
JUMLAH HARGA BAHAN 11,625.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 21,755.00
E Overhead & Profit 10 % 10 % x D 2,175.50
F Harga Satuan Pekerjaan (D+E) 23,930.50
A.5.1.1 28. Pemasangan 1 m’ pipa PVC tipe AW diameter 1 1/2”

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.05 90,000.00 4,860.00
Tukang batu L.02 0.09 100,000.00 9,000.00
Kepala tukang L.03 0.01 110,000.00 990.00
Mandor L.04 OH 0.00 115,000.00 345.00
JUMLAH TENAGA KERJA 15,195.00
B BAHAN
Pipa PVC 1 1/2” M 1.20 13,750.00 16,500.00
Perlengkapan % 35.00 13,750.00 4,812.50
JUMLAH HARGA BAHAN 21,312.50
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 36,507.50


E Overhead & Profit 10 % 10 % x D 3,650.75
F Harga Satuan Pekerjaan (D+E) 40,158.25

A.5.1.1 29. Pemasangan 1 m’ pipa PVC tipe AW diameter 2”

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.05 90,000.00 4,860.00
Tukang batu L.02 0.09 100,000.00 9,000.00
Kepala tukang L.03 0.01 110,000.00 990.00
Mandor L.04 OH 0.00 115,000.00 345.00
JUMLAH TENAGA KERJA 15,195.00
B BAHAN
Pipa PVC 2” M 1.20 16,250.00 19,500.00
Perlengkapan % 35.00 16,250.00 5,687.50
JUMLAH HARGA BAHAN 25,187.50
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 40,382.50


E Overhead & Profit 10 % 10 % x D 4,038.25
F Harga Satuan Pekerjaan (D+E) 44,420.75

A.5.1.1 30. Pemasangan 1 m’ pipa PVC tipe AW diameter 2 1/2”

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.08 90,000.00 7,290.00
Tukang batu L.02 0.14 100,000.00 13,500.00
Kepala tukang L.03 0.01 110,000.00 1,485.00
Mandor L.04 OH 0.00 115,000.00 460.00
JUMLAH TENAGA KERJA 0.00
B BAHAN
Pipa PVC 2 1/2” M 1.20 16,250.00 19,500.00
Perlengkapan % 35.00 16,250.00 5,687.50
JUMLAH HARGA BAHAN 0.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 0.00
E Overhead & Profit 10 % 10 % x D 0.00
F Harga Satuan Pekerjaan (D+E) 0.00
A.5.1.1 31. Pemasangan 1 m’ pipa PVC tipe AW diameter 3”

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.08 90,000.00 7,290.00
Tukang batu L.02 0.14 100,000.00 13,500.00
Kepala tukang L.03 0.01 110,000.00 1,485.00
Mandor L.04 OH 0.00 115,000.00 460.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa PVC 3” M 1.20 0.00
Perlengkapan % 35.00 0.00 0.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 0.00


E Overhead & Profit 10 % 10 % x D 0.00
F Harga Satuan Pekerjaan (D+E) 0.00

A.5.1.1 32. Pemasangan 1 m’ pipa PVC tipe AW diameter 4”

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.08 90,000.00 7,290.00
Tukang batu L.02 0.14 100,000.00 13,500.00
Kepala tukang L.03 0.01 110,000.00 1,485.00
Mandor L.04 OH 0.00 115,000.00 460.00
JUMLAH TENAGA KERJA 22,735.00
B BAHAN
Pipa PVC 4” M 1.20 45,312.50 54,375.00
Perlengkapan % 35.00 45,312.50 15,859.38
JUMLAH HARGA BAHAN 70,234.38
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 92,969.38


E Overhead & Profit 10 % 10 % x D 9,296.94
F Harga Satuan Pekerjaan (D+E) 102,266.31

A.5.1.1 33. Pemasangan 1 m’ pipa air limbah jenis pipa tanah Ǿ 20 cm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.08 90,000.00 7,200.00
Tukang batu L.02 0.04 100,000.00 4,000.00
Kepala tukang L.03 0.00 110,000.00 440.00
Mandor L.04 OH 0.00 115,000.00 460.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa tanah Bh 1.60
Semen portland Kg 35.00
Pasir pasang M3 0.01
Pasir urug M3 0.01
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A+B+C) 0.00


E Overhead & Profit 10 % 10 % x D 0.00
F Harga Satuan Pekerjaan (D+E) 0.00
A.5.1.1 34. Pemasangan 1 m’ pipa air limbah jenis pipa tanah diameter 15 cm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.06 90,000.00 5,400.00
Tukang batu L.02 0.03 100,000.00 3,000.00
Kepala tukang L.03 0.00 110,000.00 330.00
Mandor L.04 OH 0.00 115,000.00 345.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa tanah dia 15 Bh 1.60
Semen portland Kg 0.68
Pasir pasang M3 0.01
Pasir urug M3 0.01
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 0.00


E Overhead & Profit 10 % 10 % x D 0.00
F Harga Satuan Pekerjaan (D+E) 0.00

A.5.1.1 35. Pemasangan 1 m’ pipa beton diameter 15 – 20 cm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.14 90,000.00 12,600.00
Tukang batu L.02 0.07 100,000.00 7,000.00
Kepala tukang L.03 0.01 110,000.00 770.00
Mandor L.04 OH 0.01 115,000.00 805.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa tanah dia 15 Bh 1.10
Bata merah M3 0.03
Semen portland Kg 3.92
Pasir pasang M3 0.06
Pasir urug M3 0.02
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 0.00


E Overhead & Profit 10 % 10 % x D 0.00
F Harga Satuan Pekerjaan (D+E) 0.00

A.5.1.1.36. Pemasangan 1 m’ pipa beton diameter 30 – 100 cm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.38 90,000.00 34,200.00
Tukang batu L.02 0.19 100,000.00 19,000.00
Kepala tukang L.03 0.02 110,000.00 2,090.00
Mandor L.04 OH 0.02 115,000.00 2,185.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa tanah dia 15 Bh 1.10
Bata merah M3 0.55
Semen portland Kg 10.30
Pasir pasang M3 0.06
Pasir urug M3 0.07
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 0.00


E Overhead & Profit 10 % 10 % x D 0.00
F Harga Satuan Pekerjaan (D+E) 0.00
BOW

BOW E.1 Sebuah tiang dilancipkan

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.100 90,000.00 9,000.00
Tukang kayu L.02 OH 0.020 100,000.00 2,000.00
Kepala tukang L.03 OH 0.025 110,000.00 2,750.00
Mandor L.04 OH 0.050 115,000.00 5,750.00
JUMLAH TENAGA KERJA 19,500.00
B BAHAN

JUMLAH HARGA BAHAN


C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 19,500.00


E Overhead & Profit 10 % 10 % x D 1,950.00
F Harga Satuan Pekerjaan (D+E) 21,450.00

BOW E.4 Membuat pen dan lubang pada balok pemikul

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

TENAGA
Tukang kayu L.02 OH 0.6000 100,000.00 60,000.00
Kepala tukang L.03 OH 0.0600 110,000.00 6,600.00
JUMLAH TENAGA KERJA 66,600.00
B BAHAN

JUMLAH HARGA BAHAN


C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 66,600.00


E Overhead & Profit 10 % 10 % x D 6,660.00
F Harga Satuan Pekerjaan (D+E) 73,260.00

BOW E.13 1 m' Tiang pancang ( dihitung panjang masuk tanah )

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

TENAGA
Laden Tukang kayu L.01 OH 1.8000 90,000.00 162,000.00
Tukang kayu L.02 OH 0.0400 100,000.00 4,000.00
Kepala tukang L.03 OH 0.0040 110,000.00 440.00
Mandor L.04 OH 0.0450 115,000.00 5,175.00
JUMLAH TENAGA KERJA 171,615.00
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 171,615.00


E Overhead & Profit 10 % 10 % x D 17,161.50
F Harga Satuan Pekerjaan (D+E) 188,776.50
BOW F.1.a 1 m³ Rangka Bawah Kayu Kelas I (Pekerjaan Kasar)

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 5.0000 90,000.00 450,000.00
Tukang kayu L.02 OH 15.0000 100,000.00 1,500,000.00
Kepala tukang L.03 OH 1.5000 110,000.00 165,000.00
Mandor L.04 OH 0.2500 115,000.00 28,750.00
JUMLAH TENAGA KERJA 2,143,750.00
B BAHAN
Paku Ulin Kg 5.00 24,000.00 120,000.00
Kayu Ulin m³ 1.10 7,500,000.00 8,250,000.00
JUMLAH HARGA BAHAN 8,370,000.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 10,513,750.00


E Overhead & Profit 10 % 10 % x D 1,051,375.00
F Harga Satuan Pekerjaan (D+E) 11,565,125.00

BOW F.1.b 1 m³ Rangka Bawah Kayu Kelas II (Pekerjaan Kasar)

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 5.0000 90,000.00 450,000.00
Tukang kayu L.02 OH 15.0000 100,000.00 1,500,000.00
Kepala tukang L.03 OH 1.5000 110,000.00 165,000.00
Mandor L.04 OH 0.2500 115,000.00 28,750.00
JUMLAH TENAGA KERJA 2,143,750.00
B BAHAN
Paku Kayu Kg 5.00 15,000.00 75,000.00
Kayu Kelas II m³ 1.10 3,750,000.00 4,125,000.00
JUMLAH HARGA BAHAN 4,200,000.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 6,343,750.00


E Overhead & Profit 10 % 10 % x D 634,375.00
F Harga Satuan Pekerjaan (D+E) 6,978,125.00

BOW F.2 1 m³ Sandaran Jembatan dan balok pemikul Kayu Kelas I

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 8.0000 90,000.00 720,000.00
Tukang kayu L.02 OH 24.0000 100,000.00 2,400,000.00
Kepala tukang L.03 OH 2.4000 110,000.00 264,000.00
Mandor L.04 OH 0.4000 115,000.00 46,000.00
JUMLAH TENAGA KERJA 3,430,000.00
B BAHAN
Kayu Ulin m³ 1.20 7,500,000.00 9,000,000.00
JUMLAH HARGA BAHAN 9,000,000.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 12,430,000.00


E Overhead & Profit 10 % 10 % x D 1,243,000.00
F Harga Satuan Pekerjaan (D+E) 13,673,000.00
BOW F.8.a 1 m² Mengerjakan Dinding papan Ulin 2 cm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.2000 90,000.00 18,000.00
Tukang kayu L.02 OH 0.5000 100,000.00 50,000.00
Kepala tukang L.03 OH 0.0500 110,000.00 5,500.00
Mandor L.04 OH 0.0100 115,000.00 1,150.00
JUMLAH TENAGA KERJA x 75% 55,987.50
B BAHAN
Paku Ulin Kg 0.2000 24,000.00 4,800.00
Papan Ulin m³ 0.0250 7,500,000.00 187,500.00
JUMLAH HARGA BAHAN 192,300.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 248,287.50


E Overhead & Profit 10 % 10 % x D 24,828.75
F Harga Satuan Pekerjaan (D+E) 273,116.25

BOW F.8.b 1 m² Mengerjakan Dinding papan Lanan 2 cm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.2000 90,000.00 18,000.00
Tukang kayu L.02 OH 0.5000 100,000.00 50,000.00
Kepala tukang L.03 OH 0.0500 110,000.00 5,500.00
Mandor L.04 OH 0.0100 115,000.00 1,150.00
JUMLAH TENAGA KERJA x 75% 55,987.50
B BAHAN
Paku Kayu Kg 0.2000 15,000.00 3,000.00
Papan Kelas II m³ 0.0300 2,500,000.00 75,000.00
JUMLAH HARGA BAHAN 78,000.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 133,987.50


E Overhead & Profit 10 % 10 % x D 13,398.75
F Harga Satuan Pekerjaan (D+E) 147,386.25

BOW F.22.a 1 m³ Mengerjakan Rangka Badan Kayu Ulin

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 8.0000 90,000.00 720,000.00
Tukang kayu L.02 OH 24.0000 100,000.00 2,400,000.00
Kepala tukang L.03 OH 2.4000 110,000.00 264,000.00
Mandor L.04 OH 0.4000 115,000.00 46,000.00
JUMLAH TENAGA KERJA x 75% 2,572,500.00
B BAHAN
Paku Ulin Kg 6.00 24,000.00 144,000.00
Kayu Ulin m³ 1.25 7,500,000.00 9,375,000.00
JUMLAH HARGA BAHAN 9,519,000.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 12,091,500.00


E Overhead & Profit 10 % 10 % x D 1,209,150.00
F Harga Satuan Pekerjaan (D+E) 13,300,650.00
BOW F.22.b 1 m³ Mengerjakan Rangka Badan Kayu Lanan

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 8.0000 90,000.00 720,000.00
Tukang kayu L.02 OH 24.0000 100,000.00 2,400,000.00
Kepala tukang L.03 OH 2.4000 110,000.00 264,000.00
Mandor L.04 OH 0.4000 115,000.00 46,000.00
JUMLAH TENAGA KERJA x 75% 2,572,500.00
B BAHAN
Paku Kayu Kg 3.00 15,000.00 45,000.00
Kayu Kelas II m³ 1.25 3,750,000.00 4,687,500.00
JUMLAH HARGA BAHAN 4,732,500.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 7,305,000.00


E Overhead & Profit 10 % 10 % x D 730,500.00
F Harga Satuan Pekerjaan (D+E) 8,035,500.00

BOW F.38.a 1 m² Mengerjakan Lantai papan Ulin 2 cm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.6000 90,000.00 54,000.00
Tukang kayu L.02 OH 1.8000 100,000.00 180,000.00
Kepala tukang L.03 OH 0.1800 110,000.00 19,800.00
Mandor L.04 OH 0.0300 115,000.00 3,450.00
JUMLAH TENAGA KERJA x 75% 192,937.50
B BAHAN
Paku Ulin Kg 0.2000 24,000.00 4,800.00
Papan Ulin m³ 0.0300 7,500,000.00 225,000.00
JUMLAH HARGA BAHAN 229,800.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 422,737.50


E Overhead & Profit 10 % 10 % x D 42,273.75
F Harga Satuan Pekerjaan (D+E) 465,011.25

BOW F.38.b 1 m² Mengerjakan Lantai papan Lanan 2 cm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.6000 90,000.00 54,000.00
Tukang kayu L.02 OH 1.8000 100,000.00 180,000.00
Kepala tukang L.03 OH 0.1800 110,000.00 19,800.00
Mandor L.04 OH 0.0300 115,000.00 3,450.00
JUMLAH TENAGA KERJA x 75% 192,937.50
B BAHAN
Paku Kayu Kg 0.2000 15,000.00 3,000.00
Papan Kelas II m³ 0.0300 2,500,000.00 75,000.00
JUMLAH HARGA BAHAN 78,000.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 270,937.50


E Overhead & Profit 10 % 10 % x D 27,093.75
F Harga Satuan Pekerjaan (D+E) 298,031.25
BOW F.38.c 1 m² Mengerjakan Lantai papan Ulin 2,5 cm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.6000 90,000.00 54,000.00
Tukang kayu L.02 OH 1.8000 100,000.00 180,000.00
Kepala tukang L.03 OH 0.1800 110,000.00 19,800.00
Mandor L.04 OH 0.0300 115,000.00 3,450.00
JUMLAH TENAGA KERJA x 75% 192,937.50
B BAHAN
Paku Ulin Kg 0.2000 24,000.00 4,800.00
Papan Ulin m³ 0.0350 7,500,000.00 262,500.00
JUMLAH HARGA BAHAN 267,300.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 460,237.50


E Overhead & Profit 10 % 10 % x D 46,023.75
F Harga Satuan Pekerjaan (D+E) 506,261.25

BOW F.38.d 1 m² Mengerjakan Lantai papan Lanan 2,5 cm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.6000 90,000.00 54,000.00
Tukang kayu L.02 OH 1.8000 100,000.00 180,000.00
Kepala tukang L.03 OH 0.1800 110,000.00 19,800.00
Mandor L.04 OH 0.0300 115,000.00 3,450.00
JUMLAH TENAGA KERJA x 75% 192,937.50
B BAHAN
Paku Kayu Kg 0.2000 15,000.00 3,000.00
Papan Kelas II m³ 0.0350 2,500,000.00 87,500.00
JUMLAH HARGA BAHAN 90,500.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 283,437.50


E Overhead & Profit 10 % 10 % x D 28,343.75
F Harga Satuan Pekerjaan (D+E) 311,781.25

BOW L.5 1 m² Membongkar Lantai Tegel

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.0200 90,000.00 1,800.00
Mandor L.04 OH 0.0100 115,000.00 1,150.00
JUMLAH TENAGA KERJA 2,950.00
B BAHAN

JUMLAH HARGA BAHAN 0.00


C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 2,950.00


E Overhead & Profit 10 % 10 % x D 295.00
F Harga Satuan Pekerjaan (D+E) 3,245.00
BOW L.6 1 m² Mengupas Plesteran

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.0500 90,000.00 4,500.00
Mandor L.04 OH 0.0030 115,000.00 345.00
JUMLAH TENAGA KERJA 4,845.00
B BAHAN

JUMLAH HARGA BAHAN 0.00


C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 4,845.00


E Overhead & Profit 10 % 10 % x D 484.50
F Harga Satuan Pekerjaan (D+E) 5,329.50

BOW L.7 1 m² Menurunkan Atap bahan tidak dipakai lagi

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.0200 90,000.00 1,800.00
Mandor L.04 OH 0.0100 115,000.00 1,150.00
JUMLAH TENAGA KERJA 2,950.00
B BAHAN

JUMLAH HARGA BAHAN 0.00


C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 2,950.00


E Overhead & Profit 10 % 10 % x D 295.00
F Harga Satuan Pekerjaan (D+E) 3,245.00

BOW L.9 1 m² Menurunkan Atap bahan dipakai 60%

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.0200 90,000.00 1,800.00
Tukang kayu L.02 OH 0.0100 100,000.00 1,000.00
Kepala tukang L.03 OH 0.0200 110,000.00 2,200.00
Mandor L.04 OH 0.0100 115,000.00 1,150.00
JUMLAH TENAGA KERJA 6,150.00
B BAHAN

JUMLAH HARGA BAHAN -


C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A+B+C) 6,150.00


E Overhead & Profit 10 % 10 % x D 615.00
F Harga Satuan Pekerjaan (D+E) 6,765.00
BOW L.11 1 m² Membongkar dinding, lantai, plafond kayu

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.2000 90,000.00 18,000.00
Tukang kayu L.02 OH 0.0600 100,000.00 6,000.00
Kepala tukang L.03 OH 0.0060 110,000.00 660.00
Mandor L.04 OH 0.0100 115,000.00 1,150.00
JUMLAH TENAGA KERJA 25,810.00
B BAHAN

JUMLAH HARGA BAHAN -


C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 25,810.00


E Overhead & Profit 10 % 10 % x D 2,581.00
F Harga Satuan Pekerjaan (D+E) 28,391.00

BOW L.12 1 m³ Membongkar Kuda-kuda, rangka badan, gelagar dll

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 4.0000 90,000.00 360,000.00
Tukang kayu L.02 OH 6.0000 100,000.00 600,000.00
Kepala tukang L.03 OH 0.6000 110,000.00 66,000.00
Mandor L.04 OH 0.2000 115,000.00 23,000.00
JUMLAH TENAGA KERJA 1,049,000.00
B BAHAN

JUMLAH HARGA BAHAN -


C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 1,049,000.00


E Overhead & Profit 10 % 10 % x D 104,900.00
F Harga Satuan Pekerjaan (D+E) 1,153,900.00

BOW SUP.VI.a 1 m² Pasangan Paving Stone

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.1500 90,000.00 13,500.00
Tukang Batu L.02 OH 0.1500 100,000.00 15,000.00
Kepala tukang L.03 OH 0.1500 110,000.00 16,500.00
Mandor L.04 OH 0.0150 115,000.00 1,725.00
JUMLAH TENAGA KERJA 46,725.00
B BAHAN
Paving Stone bh 32.0000 3,000.00 96,000.00
JUMLAH HARGA BAHAN 96,000
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 142,725.00


E Overhead & Profit 10 % 10 % x D 14,272.50
F Harga Satuan Pekerjaan (D+E) 156,997.50
A.8.4.1 HARGA SATUAN PEKERJAAN PEMASANGAN PIPA

A.8.4.1.1 Pemasangan 1 m pipa PVC Ø 63 mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)

A TENAGA
Pekerja L.01 OH 0.081 90,000.00
Tukang pipa L.02 OH 0.041 100,000.00
Mandor L.04 OH 0.008 115,000.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa PVC Ø 63 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel &
hari 0.006
handle crane 2 T
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)

Catatan:
Koefisien peralatan yang digunakan pada A.8.4.1 ini adalah seperti yang tercantum pada tabel. Apabila ada
tambahan peralatan yang digunakan, harus disesuaikan dengan spesifikasi dan gambar kerja.

A.8.4.1.2 Pemasangan 1 m pipa PVC Ø 90 mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)

A TENAGA
Pekerja L.01 OH 0.094 90,000.00
Tukang pipa L.02 OH 0.047 100,000.00
Mandor L.04 OH 0.009 115,000.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa PVC Ø 90 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel &
hari 0.008
handle crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.1.3 Pemasangan 1 m pipa PVC Ø 110 mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)

A TENAGA
Pekerja L.01 OH 0.105 90,000.00
Tukang pipa L.02 OH 0.053 100,000.00
Mandor L.04 OH 0.011 115,000.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa PVC Ø 110 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel &
hari 0.010
handle crane 2 T
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.1.4 Pemasangan 1 m pipa PVC Ø 150 mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)

A TENAGA
Pekerja L.01 OH 0.118 90,000.00
Tukang pipa L.02 OH 0.059 100,000.00
Mandor L.04 OH 0.012 115,000.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa PVC Ø 150 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel &
hari 0.012
handle crane 2 T
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.1.5 Pemasngan 1 m pipa PVC Ø 200 mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)

A TENAGA
Pekerja L.01 OH 0.189 90,000.00
Tukang pipa L.02 OH 0.095 100,000.00
Mandor L.04 OH 0.019 115,000.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa PVC Ø 200 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel &
hari 0.024
handle crane 2 T
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.1.6 Pemasangan 1 m pipa PVC Ø 250 mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)

A TENAGA
Pekerja L.01 OH 0.256 90,000.00
Tukang pipa L.02 OH 0.128 100,000.00
Mandor L.04 OH 0.026 115,000.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa PVC Ø 250 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel &
hari 0.034
handle crane 2 T
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)
A.8.4.1.7 Pemasangan 1 m pipa PVC Ø 300 mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)

A TENAGA
Pekerja L.01 OH 0.294 90,000.00
Tukang pipa L.02 OH 0.147 100,000.00
Mandor L.04 OH 0.029 115,000.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa PVC Ø 300 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel &
hari 0.040
handle crane 2 T
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.1.8 Pemasangan 1 m pipa PVC Ø 400 mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)

A TENAGA
Pekerja L.01 OH 0.544 90,000.00
Tukang pipa L.02 OH 0.272 100,000.00
Mandor L.04 OH 0.054 115,000.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa PVC Ø 400 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel &
hari 0.080
handle crane 2 T
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.1.9 Pemasangan 1 m pipa PVC Ø 450 mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)

A TENAGA
Pekerja L.01 OH 0.669 90,000.00
Tukang pipa L.02 OH 0.335 100,000.00
Mandor L.04 OH 0.067 115,000.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa PVC Ø 450 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel &
hari 0.100
handle crane 2 T
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.1.10 Pemasangan 1 m pipa PVC Ø 500 mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)

A TENAGA
Pekerja L.01 OH 0.809 90,000.00
Tukang pipa L.02 OH 0.405 100,000.00
Mandor L.04 OH 0.081 115,000.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa PVC Ø 500 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel &
hari 0.122
handle crane 2 T
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.1.11 Pemasangan 1 m pipa PVC Ø 600 mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)


A TENAGA
Pekerja L.01 OH 0.957 90,000.00
Tukang pipa L.02 OH 0.479 100,000.00
Mandor L.04 OH 0.096 115,000.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa PVC Ø 600 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel &
hari 0.145
handle crane 2 T
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.1.12 Pemasangan 1 m pipa PVC Ø 800 mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)

A TENAGA
Pekerja L.01 OH 1.618 90,000.00
Tukang pipa L.02 OH 0.809 100,000.00
Mandor L.04 OH 0.162 115,000.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa PVC Ø 800 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel &
hari 0.250
handle crane 2 T
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.1.13 Pemasangan 1 m pipa PVC Ø 900 mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)

A TENAGA
Pekerja L.01 OH 1.691 90,000.00
Tukang pipa L.02 OH 0.846 100,000.00
Mandor L.04 OH 0.169 115,000.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa PVC Ø 900 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel &
hari 0.262
handle crane 2 T
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.1.14 Pemasangan 1 m pipa PVC Ø 1000 mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)

A TENAGA
Pekerja L.01 OH 1.895 90,000.00
Tukang pipa L.02 OH 0.948 100,000.00
Mandor L.04 OH 0.190 115,000.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa PVC Ø 1000 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel &
hari 0.294
handle crane 2 T
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.1.15 Pemasangan 1 m pipa PVC Ø 1100 mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)

A TENAGA
Pekerja L.01 OH 2.099 90,000.00
Tukang pipa L.02 OH 1.050 100,000.00
Mandor L.04 OH 0.210 115,000.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa PVC Ø 1100 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel &
hari 0.327
handle crane 2 T
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.1.16 Pemasangan 1 m pipa PVC Ø 1200 mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)

A TENAGA
Pekerja L.01 OH 2.303 90,000.00
Tukang pipa L.02 OH 1.152 100,000.00
Mandor L.04 OH 0.230 115,000.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa PVC Ø 1200 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel &
hari 0.359
handle crane 2 T
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.1.17 Pemasangan 1 m pipa HDPE Ø 63 mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)

A TENAGA
Pekerja L.01 OH 0.035 90,000.00
Tukang pipa L.02 OH 0.017 100,000.00
Mandor L.04 OH 0.003 115,000.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa HDPE Ø 63 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel &
hari 0.019
handle crane 2 T
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.1.18 Pemasangan 1 m pipa HDPE Ø 100 mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)

A TENAGA
Pekerja L.01 OH 0.040 90,000.00
Tukang pipa L.02 OH 0.020 100,000.00
Mandor L.04 OH 0.004 115,000.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa HDPE Ø 100 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel &
hari 0.019
handle crane 2 T
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.1.19 Pemasangan 1 m pipa HDPE Ø 125 mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)

A TENAGA
Pekerja L.01 OH 0.045 90,000.00
Tukang pipa L.02 OH 0.023 100,000.00
Mandor L.04 OH 0.005 115,000.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa HDPE Ø 125 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel &
hari 0.019
handle crane 2 T
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.1.20 Pemasangan 1 m pipa HDPE Ø 150 mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)

A TENAGA
Pekerja L.01 OH 0.062 90,000.00
Tukang pipa L.02 OH 0.031 100,000.00
Mandor L.04 OH 0.006 115,000.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa HDPE Ø 150 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel &
hari 0.019
handle crane 2 T
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.1.21 Pemasangan 1 m pipa HDPE Ø 200 mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)

A TENAGA
Pekerja L.01 OH 0.102 90,000.00
Tukang pipa L.02 OH 0.051 100,000.00
Mandor L.04 OH 0.010 115,000.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa HDPE Ø 200 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel &
hari 0.019
handle crane 2 T
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.1.22 Pemasangan 1 m pipa HDPE Ø 250 mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)

A TENAGA
Pekerja L.01 OH 0.133 90,000.00
Tukang pipa L.02 OH 0.067 100,000.00
Mandor L.04 OH 0.013 115,000.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa HDPE Ø 250 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel &
hari 0.042
handle crane 2 T
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.1.23 Pemasangan 1 m pipa HDPE Ø 300 mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)

A TENAGA
Pekerja L.01 OH 0.170 90,000.00
Tukang pipa L.02 OH 0.085 100,000.00
Mandor L.04 OH 0.017 115,000.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa HDPE Ø 300 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel &
hari 0.065
handle crane 2 T
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.1.24 Pemasangan 1 m pipa HDPE Ø 400 mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)

A TENAGA
Pekerja L.01 OH 0.290 90,000.00
Tukang pipa L.02 OH 0.145 100,000.00
Mandor L.04 OH 0.029 115,000.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa HDPE Ø 400 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel &
hari 0.152
handle crane 2 T
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.1.25 Pemasangan 1 m pipa HDPE Ø 450 mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)

A TENAGA
Pekerja L.01 OH 0.359 90,000.00
Tukang pipa L.02 OH 0.180 100,000.00
Mandor L.04 OH 0.036 115,000.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa HDPE Ø 450 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel &
hari 0.200
handle crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.1.26 Pemasangan 1 m pipa HDPE Ø 500 mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)

A TENAGA
Pekerja L.01 OH 0.433 90,000.00
Tukang pipa L.02 OH 0.216 100,000.00
Mandor L.04 OH 0.043 115,000.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa HDPE Ø 500 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel &
hari 0.251
handle crane 2 T
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.1.27 Pemasangan 1 m pipa HDPE Ø 600 mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)

A TENAGA
Pekerja L.01 OH 0.512 90,000.00
Tukang pipa L.02 OH 0.256 100,000.00
Mandor L.04 OH 0.051 115,000.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa HDPE Ø 500 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel &
hari 0.307
handle crane 2 T
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.1.28 Pemasangan 1 m pipa HDPE Ø 800 mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)

A TENAGA
Pekerja L.01 OH 0.893 90,000.00
Tukang pipa L.02 OH 0.446 100,000.00
Mandor L.04 OH 0.089 115,000.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa HDPE Ø 800 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel &
hari 0.573
handle crane 2 T
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.1.29 Pemasangan 1 m pipa HDPE Ø 900 mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)

A TENAGA
Pekerja L.01 OH 1.353 90,000.00
Tukang pipa L.02 OH 0.677 100,000.00
Mandor L.04 OH 0.135 115,000.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa HDPE Ø 900 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel &
hari 0.883
handle crane 2 T
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)
A.8.4.1.30 Pemasangan 1 m pipa HDPE Ø 1000 mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)

A TENAGA
Pekerja L.01 OH 1.659 90,000.00
Tukang pipa L.02 OH 0.830 100,000.00
Mandor L.04 OH 0.166 115,000.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa HDPE Ø 1000 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel &
hari 1.093
handle crane 2 T
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.1.31 Pemasangan 1 m pipa HDPE Ø 1100 mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)

A TENAGA
Pekerja L.01 OH 1.818 90,000.00
Tukang pipa L.02 OH 0.909 100,000.00
Mandor L.04 OH 0.182 115,000.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa HDPE Ø 1100 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel &
hari 1.205
handle crane 2 T
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.1.32 Pemasangan 1 m pipa HDPE Ø 1200 mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)

A TENAGA
Pekerja L.01 OH 2.370 90,000.00
Tukang pipa L.02 OH 1.185 100,000.00
Mandor L.04 OH 0.237 115,000.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa HDPE Ø 1200 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel &
hari 1.584
handle crane 2 T
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.1.33 Pemasangan 1 m pipa GIP Ø 63 mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)

A TENAGA
Pekerja L.01 OH 0.345 90,000.00
Tukang pipa L.02 OH 0.172 100,000.00
Mandor L.04 OH 0.034 115,000.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa GIP Ø 63 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel &
hari -
handle crane 2 T
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.1.34 Pemasangan 1 m pipa GIP Ø 100 mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)


A TENAGA
Pekerja L.01 OH 0.400 90,000.00
Tukang pipa L.02 OH 0.200 100,000.00
Mandor L.04 OH 0.040 115,000.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa GIP Ø 100 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel &
hari -
handle crane 2 T
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.1.35 Pemasangan 1 m pipa GIP Ø 125 mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)

A TENAGA
Pekerja L.01 OH 0.448 90,000.00
Tukang pipa L.02 OH 0.224 100,000.00
Mandor L.04 OH 0.045 115,000.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa GIP Ø 125 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel &
hari -
handle crane 2 T
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.1.36 Pemasangan 1 m pipa GIP Ø 150 mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)

A TENAGA
Pekerja L.01 OH 0.506 90,000.00
Tukang pipa L.02 OH 0.253 100,000.00
Mandor L.04 OH 0.051 115,000.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa GIP Ø 150 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel &
hari -
handle crane 2 T
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.1.37 Pemasangan 1 m pipa GIP Ø 200 mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)

A TENAGA
Pekerja L.01 OH 0.796 90,000.00
Tukang pipa L.02 OH 0.398 100,000.00
Mandor L.04 OH 0.080 115,000.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa GIP Ø 200 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel &
hari -
handle crane 2 T
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.1.38 Pemasangan 1 m pipa GIP Ø 250 mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)

A TENAGA
Pekerja L.01 OH 0.949 90,000.00
Tukang pipa L.02 OH 0.475 100,000.00
Mandor L.04 OH 0.095 115,000.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa GIP Ø 250 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel &
hari -
handle crane 2 T
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.1.39 Pemasangan 1 m pipa GIP Ø 300 mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)

A TENAGA
Pekerja L.01 OH 0.958 90,000.00
Tukang pipa L.02 OH 0.479 100,000.00
Mandor L.04 OH 0.096 115,000.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa GIP Ø 300 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel &
hari -
handle crane 2 T
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.1.40 Pemasangan 1 m pipa GIP Ø 400 mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)

A TENAGA
Pekerja L.01 OH 1.212 90,000.00
Tukang pipa L.02 OH 0.606 100,000.00
Mandor L.04 OH 0.121 115,000.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa GIP Ø 400 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel &
hari -
handle crane 2 T
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.1.41 Pemasangan 1 m pipa GIP Ø 450 mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)

A TENAGA
Pekerja L.01 OH 1.353 90,000.00
Tukang pipa L.02 OH 0.676 100,000.00
Mandor L.04 OH 0.135 115,000.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa GIP Ø 450 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel &
hari -
handle crane 2 T
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.1.42 Pemasangan 1 m pipa GIP Ø 500 mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)

A TENAGA
Pekerja L.01 OH 1.469 90,000.00
Tukang pipa L.02 OH 0.735 100,000.00
Mandor L.04 OH 0.147 115,000.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa GIP Ø 500 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel &
hari -
handle crane 2 T
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.1.43 Pemasangan 1 m pipa GIP Ø 600 mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)

A TENAGA
Pekerja L.01 OH 1.327 90,000.00
Tukang pipa L.02 OH 0.664 100,000.00
Mandor L.04 OH 0.133 115,000.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa GIP Ø 600 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel &
hari -
handle crane 2 T
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.1.44 Pemasangan 1 m pipa GIP Ø 800 mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)

A TENAGA
Pekerja L.01 OH 2.327 90,000.00
Tukang pipa L.02 OH 1.163 100,000.00
Mandor L.04 OH 0.233 115,000.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa GIP Ø 800 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel &
hari -
handle crane 2 T
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.1.45 Pemasangan 1 m pipa GIP Ø 900 mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)

A TENAGA
Pekerja L.01 OH 2.623 90,000.00
Tukang pipa L.02 OH 1.312 100,000.00
Mandor L.04 OH 0.262 115,000.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa GIP Ø 900 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel &
hari -
handle crane 2 T
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.1.46 Pemasangan 1 m pipa GIP Ø 1000 mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)

A TENAGA
Pekerja L.01 OH 2.911 90,000.00
Tukang pipa L.02 OH 1.456 100,000.00
Mandor L.04 OH 0.291 115,000.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa GIP Ø 1000 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel &
hari -
handle crane 2 T
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.1.47 Pemasangan 1 m pipa GIP Ø 1100 mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)

A TENAGA
Pekerja L.01 OH 3.200 90,000.00
Tukang pipa L.02 OH 1.600 100,000.00
Mandor L.04 OH 0.320 115,000.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa GIP Ø 1100 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel &
hari -
handle crane 2 T
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.1.48 Pemasangan 1 m pipa GIP Ø 1200 mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)

A TENAGA
Pekerja L.01 OH 3.488 90,000.00
Tukang pipa L.02 OH 1.744 100,000.00
Mandor L.04 OH 0.349 115,000.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa GIP Ø 1200 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel &
hari -
handle crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.1.49 Pemasangan 1 m pipa DCI Ø 100 mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)

A TENAGA
Pekerja L.01 OH 0.489 90,000.00
Tukang pipa L.02 OH 0.098 100,000.00
Mandor L.04 OH 0.049 115,000.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa DCI Ø 100 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel &
hari 0.380
handle crane 2 T
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.1.50 Pemasangan 1 m pipa DCI Ø 125 mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)

A TENAGA
Pekerja L.01 OH 0.547 90,000.00
Tukang pipa L.02 OH 0.109 100,000.00
Mandor L.04 OH 0.055 115,000.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa DCI Ø 125 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel &
hari 0.380
handle crane 2 T
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.1.51 Pemasangan 1 m pipa DCI Ø 150 mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)

A TENAGA
Pekerja L.01 OH 0.613 90,000.00
Tukang pipa L.02 OH 0.123 100,000.00
Mandor L.04 OH 0.061 115,000.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa DCI Ø 150 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel &
hari 0.380
handle crane 2 T
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.1.52 Pemasangan 1 m pipa DCI Ø 200 mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)

A TENAGA
Pekerja L.01 OH 0.855 90,000.00
Tukang pipa L.02 OH 0.171 100,000.00
Mandor L.04 OH 0.085 115,000.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa DCI Ø 200 mm M 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel &
hari 0.380
handle crane 2 T
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)
A.8.4.1.53 Pemasangan 1 m pipa DCI Ø 250 mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)

A TENAGA
Pekerja L.01 OH 0.951 90,000.00
Tukang pipa L.02 OH 0.190 100,000.00
Mandor L.04 OH 0.095 115,000.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa DCI Ø 250 mm M 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel &
hari 0.050
handle crane 2 T
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.1.54 Pemasangan 1 m pipa DCI Ø 300 mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)

A TENAGA
Pekerja L.01 OH 0.973 90,000.00
Tukang pipa L.02 OH 0.195 100,000.00
Mandor L.04 OH 0.097 115,000.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa DCI Ø 300 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel &
hari 0.071
handle crane 2 T
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.1.55 Pemasangan 1 m pipa DCI Ø 400 mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)

A TENAGA
Pekerja L.01 OH 1.545 90,000.00
Tukang pipa L.02 OH 0.309 100,000.00
Operator alat berat L.08 OH 0.093 192,500.00
Mandor L.04 OH 0.154 115,000.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa DCI Ø 400 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa excavator type
hari 0.023
225 kap 0,5 -1,0 m3
Sewa Tripot/Tackel &
hari 0.031
handle crane 2 T
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.1.56 Pemasangan 1 m pipa DCI Ø 450 mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)

A TENAGA
Pekerja L.01 OH 1.813 90,000.00
Tukang pipa L.02 OH 0.363 100,000.00
Operator alat berat L.08 OH 0.143 192,500.00
Mandor L.04 OH 0.181 115,000.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa DCI Ø 450 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa excavator type
hari 0.029
225 kap 0,5 -1,0 m3
Sewa Tripot/Tackel &
hari 0.039
handle crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)
A.8.4.1.57 Pemasangan 1 m pipa DCI Ø 500 mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)

A TENAGA
Pekerja L.01 OH 2.047 90,000.00
Tukang pipa L.02 OH 0.409 100,000.00
Operator alat berat L.08 OH 0.193 192,500.00
Mandor L.04 OH 0.205 115,000.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa DCI Ø 500 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa excavator type
hari 0.034
225 kap 0,5 -1,0 m3
Sewa Tripot/Tackel &
hari 0.045
handle crane 2 T
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.1.58 Pemasangan pipa 1 m DCI Ø 600 mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)

A TENAGA
Pekerja L.01 OH 2.011 90,000.00
Tukang pipa L.02 OH 0.402 100,000.00
Operator alat berat L.08 OH 0.293 192,500.00
Mandor L.04 OH 0.201 115,000.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa DCI Ø 600 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa excavator type
hari 0.058
225 kap 0,5 -1,0 m3
Sewa Tripot/Tackel &
hari 0.077
handle crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.1.59 Pemasangan 1 m pipa DCI Ø800 mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)

A TENAGA
Pekerja L.01 OH 3.859 90,000.00
Tukang pipa L.02 OH 0.772 100,000.00
Operator alat berat L.08 OH 0.493 192,500.00
Mandor L.04 OH 0.386 115,000.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa DCI Ø 800 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa excavator type
hari 0.084
225 kap 0,5 -1,0 m3
Sewa Tripot/Tackel &
hari 0.225
handle crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.1.60 Pemasangan 1 m pipa DCI Ø900 mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)

A TENAGA
Pekerja L.01 OH 4.995 90,000.00
Tukang pipa L.02 OH 0.999 100,000.00
Operator alat berat L.08 OH 0.593 192,500.00
Mandor L.04 OH 0.499 115,000.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa DCI Ø 900 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa excavator type
hari 0.093
225 kap 0,5 -1,0 m3
Sewa Tripot/Tackel &
hari 0.248
handle crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.1.61 Pemasangan 1 m pipa DCI Ø1000 mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)

A TENAGA
Pekerja L.01 OH 5.931 90,000.00
Tukang pipa L.02 OH 1.186 100,000.00
Operator alat berat L.08 OH 0.793 192,500.00
Mandor L.04 OH 0.693 115,000.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa DCI Ø 1000 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa excavator type
hari 0.112
225 kap 0,5 -1,0 m3
Sewa Tripot/Tackel &
hari 0.298
handle crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.1.62 Pemasangan 1 m pipa DCI Ø1100 mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)

A TENAGA
Pekerja L.01 OH 6.949 90,000.00
Tukang pipa L.02 OH 1.390 100,000.00
Operator alat berat L.08 OH 0.793 192,500.00
Mandor L.04 OH 0.695 115,000.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa DCI Ø 1100 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa excavator type
hari 0.152
225 kap 0,5 -1,0 m3
Sewa Tripot/Tackel &
hari 0.304
handle crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.1.63 Pemasangan 1 m pipa DCI Ø1200 mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)

A TENAGA
Pekerja L.01 OH 8.056 90,000.00
Tukang pipa L.02 OH 1.611 100,000.00
Operator alat berat L.08 OH 0.893 192,500.00
Mandor L.04 OH 0.806 115,000.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa DCI Ø 1200 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa excavator type
hari 0.180
225 kap 0,5 -1,0 m3
Sewa Tripot/Tackel &
hari 0.360
handle crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.1.64 Pemasangan 1 m pipa baja Ø 63 mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)

A TENAGA
Pekerja L.01 OH 0.499 90,000.00
Tukang pipa L.02 OH 0.100 100,000.00
Mandor L.04 OH 0.050 115,000.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa Baja Ø 63 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel &
hari 0.004
handle crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.1.65 Pemasangan 1 m pipa baja Ø 100 mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)

A TENAGA
Pekerja L.01 OH 0.579 90,000.00
Tukang pipa L.02 OH 0.116 100,000.00
Mandor L.04 OH 0.058 115,000.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa Baja Ø 100 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel &
hari 0.004
handle crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.1.66 Pemasangan 1 m pipa baja Ø 125 mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)

A TENAGA
Pekerja L.01 OH 0.648 90,000.00
Tukang pipa L.02 OH 0.130 100,000.00
Mandor L.04 OH 0.065 115,000.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa Baja Ø 125 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel &
hari 0.004
handle crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.1.67 Pemasangan 1 m pipa baja Ø 150 mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)

A TENAGA
Pekerja L.01 OH 0.708 90,000.00
Tukang pipa L.02 OH 0.142 100,000.00
Mandor L.04 OH 0.071 115,000.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa Baja Ø 150 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel &
hari 0.004
handle crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.1.68 Pemasangan 1 m pipa baja Ø 200 mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)

A TENAGA
Pekerja L.01 OH 1.113 90,000.00
Tukang pipa L.02 OH 0.223 100,000.00
Mandor L.04 OH 0.111 115,000.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa Baja Ø 200 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel &
hari 0.004
handle crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)
A.8.4.1.69 Pemasangan pipa baja Ø 250 mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)

A TENAGA
Pekerja L.01 OH 1.325 90,000.00
Tukang pipa L.02 OH 0.265 100,000.00
Mandor L.04 OH 0.133 115,000.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa Baja Ø 250 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel &
hari 0.004
handle crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.1.70 Pemasangan 1 m pipa baja Ø 300 mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)

A TENAGA
Pekerja L.01 OH 1.415 90,000.00
Tukang pipa L.02 OH 0.283 100,000.00
Mandor L.04 OH 0.141 115,000.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa Baja Ø 300 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel &
hari 0.004
handle crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.1.71 Pemasangan 1 m pipa baja Ø 400 mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)

A TENAGA
Pekerja L.01 OH 2.366 90,000.00
Tukang pipa L.02 OH 0.473 100,000.00
Mandor L.04 OH 0.237 115,000.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa Baja Ø 400 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa excavator type
hari 0.027
225 kap 0,5 -1,0 m3
Sewa Tripot/Tackel &
hari 0.039
handle crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.1.72 Pemasangan 1 m pipa baja Ø 450 mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)

A TENAGA
Pekerja L.01 OH 2.231 90,000.00
Tukang pipa L.02 OH 0.446 100,000.00
Mandor L.04 OH 0.223 115,000.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa Baja Ø 450 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa excavator type
hari 0.026
225 kap 0,5 -1,0 m3
Sewa Tripot/Tackel &
hari 0.037
handle crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.1.73 Pemasangan 1 m pipa baja Ø 500 mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)

A TENAGA
Pekerja L.01 OH 2.432 90,000.00
Tukang pipa L.02 OH 0.486 100,000.00
Mandor L.04 OH 0.243 115,000.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa Baja Ø 500 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa excavator type
hari 0.029
225 kap 0,5 -1,0 m3
Sewa Tripot/Tackel &
hari 0.045
handle crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.1.74 Pemasangan 1 m pipa baja Ø 600 mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)

A TENAGA
Pekerja L.01 OH 2.208 90,000.00
Tukang pipa L.02 OH 0.442 100,000.00
Mandor L.04 OH 0.221 115,000.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa Baja Ø 600 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa excavator type
hari 0.027
225 kap 0,5 -1,0 m3
Sewa Tripot/Tackel &
hari 0.039
handle crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.1.75 Pemasangan 1 m pipa baja Ø 800 mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)

A TENAGA
Pekerja L.01 OH 3.897 90,000.00
Tukang pipa L.02 OH 0.779 100,000.00
Mandor L.04 OH 0.390 115,000.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa Baja Ø 800 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa excavator type
hari 0.046
225 kap 0,5 -1,0 m3
Sewa Tripot/Tackel &
hari 0.098
handle crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.1.76 Pemasangan 1 m pipa baja Ø 900 mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)

A TENAGA
Pekerja L.01 OH 4.403 90,000.00
Tukang pipa L.02 OH 0.081 100,000.00
Mandor L.04 OH 0.440 115,000.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa Baja Ø 900 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa excavator type
hari 0.052
225 kap 0,5 -1,0 m3
Sewa Tripot/Tackel &
hari 0.115
handle crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.1.77 Pemasangan 1 m pipa baja Ø 1000 mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)

A TENAGA
Pekerja L.01 OH 4.895 90,000.00
Tukang pipa L.02 OH 0.979 100,000.00
Mandor L.04 OH 0.489 115,000.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa Baja Ø 1000 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa excavator type
hari 0.058
225 kap 0,5 -1,0 m3
Sewa Tripot/Tackel &
hari 0.133
handle crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.1.78 Pemasangan 1 m pipa baja Ø 1100 mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)

A TENAGA
Pekerja L.01 OH 5.387 90,000.00
Tukang pipa L.02 OH 1.077 100,000.00
Mandor L.04 OH 0.539 115,000.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa Baja Ø 1100 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa excavator type
hari 0.064
225 kap 0,5 -1,0 m3
Sewa Tripot/Tackel &
hari 0.150
handle crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.1.79 Pemasangan 1 m pipa baja Ø 1200 mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)

A TENAGA
Pekerja L.01 OH 5.897 90,000.00
Tukang pipa L.02 OH 1.176 100,000.00
Mandor L.04 OH 0.588 115,000.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa Baja Ø 1200 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa excavator type
hari 0.070
225 kap 0,5 -1,0 m3
Sewa Tripot/Tackel &
hari 0.167
handle crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)
Jumlah Harga (Rp.)

7,290.00
4,100.00
920.00
0.00 0.75

0.00
0.00
6.30

0.00

0.00

0.00
0.00
0.00

cantum pada tabel. Apabila ada


n gambar kerja.

Jumlah Harga (Rp.)

8,460.00
4,700.00
1,035.00
0.00
0.00
0.00
0.00

Jumlah Harga (Rp.)

9,450.00
5,300.00
1,265.00
0.00

0.00
0.00
0.00

Jumlah Harga (Rp.)

10,620.00
5,900.00
1,380.00
0.00

0.00
0.00
0.00

Jumlah Harga (Rp.)

17,010.00
9,500.00
2,185.00
0.00

0.00
0.00
0.00

Jumlah Harga (Rp.)

23,040.00
12,800.00
2,990.00
0.00

0.00
0.00
0.00
Jumlah Harga (Rp.)

26,460.00
14,700.00
3,335.00
0.00

0.00
0.00
0.00

Jumlah Harga (Rp.)

48,960.00
27,200.00
6,210.00
0.00

0.00
0.00
0.00

Jumlah Harga (Rp.)


Jumlah Harga (Rp.)

60,210.00
33,500.00
7,705.00
0.00

0.00
0.00
0.00

Jumlah Harga (Rp.)

72,810.00
40,500.00
9,315.00
0.00

0.00
0.00
0.00

Jumlah Harga (Rp.)


86,130.00
47,900.00
11,040.00
0.00

0.00
0.00
0.00

Jumlah Harga (Rp.)

145,620.00
80,900.00
18,630.00
0.00

0.00
0.00
0.00

Jumlah Harga (Rp.)

152,190.00
84,600.00
19,435.00
0.00

0.00
0.00
0.00

Jumlah Harga (Rp.)

170,550.00
94,800.00
21,850.00
0.00

0.00
0.00
0.00

Jumlah Harga (Rp.)

188,910.00
105,000.00
24,150.00
0.00

0.00
0.00
0.00

Jumlah Harga (Rp.)

207,270.00
115,200.00
26,450.00
0.00

0.00
0.00
0.00

Jumlah Harga (Rp.)

3,150.00
1,700.00
345.00
0.00
0.00
0.00
0.00

Jumlah Harga (Rp.)

3,600.00
2,000.00
460.00

0.00
0.00
0.00

Jumlah Harga (Rp.)

4,050.00
2,300.00
575.00
0.00
0.00
0.00

Jumlah Harga (Rp.)

5,580.00
3,100.00
690.00

0.00
0.00
0.00

Jumlah Harga (Rp.)

9,180.00
5,100.00
1,150.00
0.00
0.00
0.00

Jumlah Harga (Rp.)

11,970.00
6,700.00
1,495.00

0.00
0.00
0.00

Jumlah Harga (Rp.)

15,300.00
8,500.00
1,955.00
0.00
0.00
0.00

Jumlah Harga (Rp.)

26,100.00
14,500.00
3,335.00

0.00
0.00
0.00

Jumlah Harga (Rp.)

32,310.00
18,000.00
4,140.00
0.00
0.00
0.00

Jumlah Harga (Rp.)

38,970.00
21,600.00
4,945.00

0.00
0.00
0.00

Jumlah Harga (Rp.)

46,080.00
25,600.00
5,865.00

0.00
0.00
0.00

Jumlah Harga (Rp.)

80,370.00
44,600.00
10,235.00

0.00
0.00
0.00

Jumlah Harga (Rp.)

121,770.00
67,700.00
15,525.00

0.00
0.00
0.00
Jumlah Harga (Rp.)

149,310.00
83,000.00
19,090.00

0.00
0.00
0.00

Jumlah Harga (Rp.)

163,620.00
90,900.00
20,930.00

0.00
0.00
0.00

Jumlah Harga (Rp.)


Jumlah Harga (Rp.)

213,300.00
118,500.00
27,255.00

0.00
0.00
0.00

Jumlah Harga (Rp.)

31,050.00
17,200.00
3,910.00

0.00
0.00
0.00

Jumlah Harga (Rp.)


36,000.00
20,000.00
4,600.00

0.00
0.00
0.00

Jumlah Harga (Rp.)

40,320.00
22,400.00
5,175.00

0.00
0.00
0.00

Jumlah Harga (Rp.)

45,540.00
25,300.00
5,865.00

0.00
0.00
0.00

Jumlah Harga (Rp.)

71,640.00
39,800.00
9,200.00

0.00
0.00
0.00

Jumlah Harga (Rp.)

85,410.00
47,500.00
10,925.00
0.00
0.00
0.00

Jumlah Harga (Rp.)

86,220.00
47,900.00
11,040.00

0.00
0.00
0.00

Jumlah Harga (Rp.)

109,080.00
60,600.00
13,915.00
0.00
0.00
0.00

Jumlah Harga (Rp.)

121,770.00
67,600.00
15,525.00

0.00
0.00
0.00

Jumlah Harga (Rp.)

132,210.00
73,500.00
16,905.00
0.00
0.00
0.00

Jumlah Harga (Rp.)

119,430.00
66,400.00
15,295.00

0.00
0.00
0.00

Jumlah Harga (Rp.)

209,430.00
116,300.00
26,795.00
0.00
0.00
0.00

Jumlah Harga (Rp.)

236,070.00
131,200.00
30,130.00

0.00
0.00
0.00

Jumlah Harga (Rp.)

261,990.00
145,600.00
33,465.00
0.00
0.00
0.00

Jumlah Harga (Rp.)

288,000.00
160,000.00
36,800.00

0.00
0.00
0.00

Jumlah Harga (Rp.)

313,920.00
174,400.00
40,135.00
0.00
0.00
0.00

Jumlah Harga (Rp.)

44,010.00
9,800.00
5,635.00

0.00
0.00
0.00

Jumlah Harga (Rp.)

49,230.00
10,900.00
6,325.00

0.00
0.00
0.00

Jumlah Harga (Rp.)

55,170.00
12,300.00
7,015.00

0.00
0.00
0.00

Jumlah Harga (Rp.)

76,950.00
17,100.00
9,775.00

0.00
0.00
0.00
Jumlah Harga (Rp.)

85,590.00
19,000.00
10,925.00

0.00
0.00
0.00

Jumlah Harga (Rp.)

87,570.00
19,500.00
11,155.00

0.00
0.00
0.00

Jumlah Harga (Rp.)


Jumlah Harga (Rp.)

139,050.00
30,900.00
17,902.50
17,710.00

0.00
0.00
0.00

Jumlah Harga (Rp.)

163,170.00
36,300.00
27,527.50
20,815.00

0.00
0.00
0.00
Jumlah Harga (Rp.)

184,230.00
40,900.00
37,152.50
23,575.00

0.00
0.00
0.00

Jumlah Harga (Rp.)

180,990.00
40,200.00
56,402.50
23,115.00
0.00
0.00
0.00

Jumlah Harga (Rp.)

347,310.00
77,200.00
94,902.50
44,390.00

0.00
0.00
0.00

Jumlah Harga (Rp.)

449,550.00
99,900.00
114,152.50
57,385.00
0.00
0.00
0.00

Jumlah Harga (Rp.)

533,790.00
118,600.00
152,652.50
79,695.00

0.00
0.00
0.00

Jumlah Harga (Rp.)

625,410.00
139,000.00
152,652.50
79,925.00
0.00
0.00
0.00

Jumlah Harga (Rp.)

725,040.00
161,100.00
171,902.50
92,690.00

0.00
0.00
0.00

Jumlah Harga (Rp.)

44,910.00
10,000.00
5,750.00
0.00
0.00
0.00

Jumlah Harga (Rp.)

52,110.00
11,600.00
6,670.00

0.00
0.00
0.00

Jumlah Harga (Rp.)

58,320.00
13,000.00
7,475.00
0.00
0.00
0.00

Jumlah Harga (Rp.)

63,720.00
14,200.00
8,165.00

0.00
0.00
0.00

Jumlah Harga (Rp.)

100,170.00
22,300.00
12,765.00

0.00
0.00
0.00
Jumlah Harga (Rp.)

119,250.00
26,500.00
15,295.00

0.00
0.00
0.00

Jumlah Harga (Rp.)

127,350.00
28,300.00
16,215.00

0.00
0.00
0.00

Jumlah Harga (Rp.)


Jumlah Harga (Rp.)

212,940.00
47,300.00
27,255.00

0.00
0.00
0.00

Jumlah Harga (Rp.)

200,790.00
44,600.00
25,645.00

0.00
0.00
0.00

Jumlah Harga (Rp.)


Jumlah Harga (Rp.)

218,880.00
48,600.00
27,945.00

0.00
0.00
0.00

Jumlah Harga (Rp.)

198,720.00
44,200.00
25,415.00

0.00
0.00
0.00

Jumlah Harga (Rp.)


Jumlah Harga (Rp.)

350,730.00
77,900.00
44,850.00

0.00
0.00
0.00

Jumlah Harga (Rp.)

396,270.00
8,100.00
50,600.00

0.00
0.00
0.00

Jumlah Harga (Rp.)


Jumlah Harga (Rp.)

440,550.00
97,900.00
56,235.00

0.00
0.00
0.00

Jumlah Harga (Rp.)

484,830.00
107,700.00
61,985.00

0.00
0.00
0.00

Jumlah Harga (Rp.)


Jumlah Harga (Rp.)

530,730.00
117,600.00
67,620.00

0.00
0.00
0.00
Tabel – 17 Lingkup pekerjaan berdasarkan Sub Level 2
Jumlah Harga +
LEVEL KODE URAIAN PEKERJAAN SATUAN Jumlah Harga (Rp.) Overhead & Profit
10 % (Rp.)
Divisi 2 A. 2.2.1 Pekerjaan persiapan

A. 2.2.1.1 Pembuatan 1 m2 pagar sementara dari kayu 1 m² 327,940.00 360,734.00


A. 2.2.1.2 Pembuatan 1 m2 pagar sementara dari seng gelombang 1 m² 423,300.00 465,630.00
A. 2.2.1.3 Pembuatan 1 m2 pagar sementara dari kawat duri tinggi 1,8 m 1 m² 2,309,350.00 2,540,285.00
A. 2.2.1.4 Pengukuran dan pemasangan 1 m' Bouwplank 1 m² 83,475.00 91,822.50
A. 2.2.1.5 Pembuatan 1 m2 kantor sementara 1 m² 1,458,525.00 1,604,377.50
A. 2.2.1.6 Pembuatan 1 m2 rumah jaga (konstruksi kayu) 1 m² 1,400,750.00 1,540,825.00
A. 2.2.1.7 Pembuatan 1 m2 gudang 1 m² 1,230,000.00 1,353,000.00
A. 2.2.1.8 Pembuatan 1 m² bedeng pekerja 1 m² 1,227,975.00 1,350,772.50
A. 2.2.1.9 Pembersihan 1m² lapangan dan perataan 1 m² 14,750.00 16,225.00
A. 2.2.1.10 Pembuatan 1 m² perancah dari bambu 1 m² - -
A. 2.2.1.11 Pembuatan 1 m² bak adukan 1 m² 124,500.00 136,950.00
A. 2.2.1.12 Pembuatan 1 m2 jalan sementara 1 m² 147,575.00 162,332.50
A. 2.2.1.13 Pembongkaran 1 m3 beton bertulang 1 m² 1,276,650.00 1,404,315.00
A. 2.2.1.14 Pembongkaran 1 m2 dinding tembok bata 1 m² 638,325.00 702,157.50
A. 2.2.1.15 Pemasangan 1 m2 kawat jaring galvanis 1 m² 14,607.50 16,068.25
A. 2.2.1.16 Pemasangan 1 m2 pagar beton pracetak 1 m² 302,823.75 333,106.13
Divisi 2 A.2.3.1 Pekerjaan tanah

A.2.3.1.1 Penggalian tanah biasa sedalam 1 m 1 m³ 70,375.00 77,412.50


A.2.3.1.2 Penggalian tanah biasa sedalam 2 m 1 m³ 86,175.00 94,792.50
A.2.3.1.3 Penggalian tanah biasa sedalam 3 m 1 m³ 102,205.00 112,425.50
A.2.3.1.4 Penggalian tanah keras sedalam 1 m 1 m³ 93,680.00 103,048.00
A.2.3.1.5 Penggalian tanah cadas sedalam 1 m 1 m³ 141,900.00 156,090.00
A.2.3.1.6 Penggalian tanah lumpur sedalam 1 m 1 m³ 113,175.00 124,492.50
A.2.3.1.7 Pengerjaan stripping setinggi 1 m 1 m³ 5,075.00 5,582.50
A.2.3.1.8 Pembuangan tanah sejauh 30m 1 m³ 30,850.00 33,935.00
A.2.3.1.9 Pengurugan kembali galian 1 m³ 50,750.00 55,825.00
A.2.3.1.10 Pemadatan tanah per 20 cm 1 m³ 50,750.00 55,825.00
A.2.3.1.11 Pengurugan dengan pasir urug 1 m³ 208,150.00 228,965.00
A.2.3.1.12 Pemasangan lapisan pudel 1:3:7 1 m³ 125,600.00 138,160.00
A.2.3.1.13 Pemasangan lapisan ijuk 1 m³ 75,225.00 82,747.50
A.2.3.1.14 Pengurugan dengan sirtu padat 1 m³ 85,375.00 93,912.50
Divisi 3 A.3.2.1 Pekerjaan pondasi

A.3.2.1.1 Pemasangan pondasi batu belah 1PC:3PP 1 m³ 859,400.00 859,400.00


A.3.2.1.2 Pemasangan pondasi batu belah 1PC:4PP 1 m³ 881,975.00 970,172.50
A.3.2.1.3 Pemasangan pondasi batu belah 1PC:5PP 1 m³ 839,675.00 923,642.50
A.3.2.1.4 Pemasangan pondasi batu belah 1PC:6PP 1 m³ 809,925.00 890,917.50
A.3.2.1.5 Pemasangan pondasi batu belah 1PC:8PP 1 m³ 769,175.00 846,092.50
A.3.2.1.6 Pemasangan pondasi batu belah 1KP:1SM:2 PP 1 m³ 578,504.00 636,354.40
A.3.2.1.7 Pemasangan pondasi batu belah 1PC:3KP:10 PP 1 m³ 704,669.00 775,135.90
A.3.2.1.8 Pemasangan pondasi batu belah 1/4PC:1KP:4 PP 1 m³ 675,287.00 742,815.70
A.3.2.1.9 Pemasangan batu kosong (aanstamping) 1 m³ 482,775.00 531,052.50
A.3.2.1.10 Pemasangan pondasi siklop 60% beton 40 % Batu belah 1 m³ 2,847,900.00 3,132,690.00
A.3.2.1.11 Pemasangan pondasi sumuran Ø 100cm 1 m³ 901,185.00 991,303.50
Divisi 4 A.4.1.1 Pekerjaan beton

A.4.1.1.1 Pembuatan 1 m3 beton mutu fc 7,4 MPa (K100) 1 m³ 865,757.14 952,332.86


A.4.1.1.2 Pembuatan 1 m3 beton mutu fc 9,8 MPa (K125) 1 m³ 912,590.21 1,003,849.23
A.4.1.1.3 Pembuatan 1 m3 beton mutu fc 12,2 MPa (K150) 1 m³ 949,323.81 1,044,256.19
A.4.1.1.4 Pembuatan 1 m3 lantai kerja beton mutu fc 7,4 MPa 1 m³ 790,926.72 870,019.39
A.4.1.1.5 Pembuatan 1 m3 beton mutu fc 14,5 MPa (K175) 1 m³ 992,823.02 1,092,105.32
A.4.1.1.6 Pembuatan 1 m3 beton mutu fc 16,9 MPa (K200) 1 m³ 1,034,212.17 1,137,633.39
A.4.1.1.7 Pembuatan 1 m3 beton mutu fc 19,3 MPa (K225) 1 m³ 1,065,346.83 1,171,881.51
A.4.1.1.8 Pembuatan 1 m3 beton mutu fc 21,7 MPa (K250) 1 m³ 1,085,618.78 1,194,180.66
A.4.1.1.9 Pembuatan 1 m3 beton mutu fc 24 MPa (K275) 1 m³ 1,120,235.71 1,232,259.29
A.4.1.1.10 Pembuatan 1 m3 beton mutu fc 26,4 MPa (K300) 1 m³ 1,131,073.54 1,244,180.90
A.4.1.1.11 Pembuatan 1 m3 beton mutu fc 28,8 MPa (K325) 1 m³ 1,223,172.75 1,345,490.03
A.4.1.1.12 Pembuatan 1 m3 beton mutu fc 31,2 MPa (K350) 1 m³ 1,237,262.43 1,360,988.68
A.4.1.1.13 Pembuatan 1 m3 beton kedap air dengan strorox 100 1 m³ - -
A.4.1.1.14 Pemasangan 1 m' PVC Waterstop lebar 150mm 1 m' - -
A.4.1.1.15 Pemasangan 1 m' PVC Waterstop lebar 200mm 1 m' - -
A.4.1.1.16 Pemasangan 1 m' PVC Waterstop lebar 230-320mm 1 m' - -
A.4.1.1.17.a Pembesian 10 Kg dengan besi polos 1 kg 16,768.00 18,444.80
A.4.1.1.17.b Pembesian 10 Kg dengan besi ulir 1 kg 17,188.00 18,906.80
A.4.1.1.18 Pemasangan 10 kg kabel presstressed polos/strands 10 kg 162,545.00 178,799.50
A.4.1.1.19 Pemasangan 10 kg Jaring kawat baja (wiremesh) 10 kg - -
A.4.1.1.20 Pemasangan 1 m2 bekisting untuk pondasi 1 m² 223,150.00 245,465.00
A.4.1.1.21 Pemasangan 1 m2 bekisting untuk sloof 1 m² 240,650.00 264,715.00
A.4.1.1.22 Pemasangan 1 m2 bekisting untuk kolom 1 m² 365,450.00 401,995.00
A.4.1.1.23 Pemasangan 1 m2 bekisting untuk balok 1 m² 376,700.00 414,370.00
A.4.1.1.24 Pemasangan 1 m2 bekisting untuk lantai 1 m² 413,450.00 454,795.00
A.4.1.1.25 Pemasangan 1 m2 bekisting untuk dinding 1 m² 361,200.00 397,320.00
A.4.1.1.26 Pemasangan 1 m2 bekisting untuk tangga 1 m² 330,450.00 363,495.00
A.4.1.1.27 Pemasangan 1 m2 jembatan pengecoran beton 1 m² 98,858.00 108,743.80
A.4.1.1.28 Pembuatan 1 m3 pondasi beton bertulang (150 kg besi) 1 m³ 4,632,745.00 5,096,019.50
A.4.1.1.29 Pembuatan 1 m3 sloof beton bertulang (200 kg besi) 1 m³ 5,752,275.00 6,327,502.50
A.4.1.1.30 Pembuatan 1 m3 kolom beton bertulang (300 kg besi) 1 m³ 9,186,875.00 10,105,562.50
A.4.1.1.31 Pembuatan 1 m3 balok beton bertulang (200 kg besi) 1 m³ 7,054,400.00 7,759,840.00
A.4.1.1.32 Pembuatan 1 m3 plat beton bertulang (150 kg besi) 1 m³ 6,227,575.00 6,850,332.50
A.4.1.1.33 Pembuatan 1 m3 dinding beton bertulang (150 kg besi) 1 m³ 6,001,245.00 6,601,369.50
A.4.1.1.34 Pembuatan 1 m3 dinding beton bertulang (200 kg besi) 1 m³ 6,540,275.00 7,194,302.50
A.4.1.1.35 Pembuatan 1 m2 kolom praktis beton bertulang (11x11) 1 m² 92,445.00 101,689.50
A.4.1.1.36 Pembuatan 1 m2 ring balok beton bertulang (10x15) 1 m² 116,435.00 128,078.50
Divisi 4 A.4.1.2 Pekerjaan beton pracetak
A.4.1.2.1 Pembuatan 1 m2 lahan produksi tebal 8 cm beton f’c 14,5 Mpa 1 m² 79,440.84 87,384.93
A.4.1.2.2 Pembuatan 1 m2 lahan produksi tebal 10 cm beton f’c 14,5 Mpa 1 m² 99,319.80 109,251.78
A.4.1.2.3 Pembuatan 1 m2 lahan produksi tebal 12 cm beton f’c 14,5 Mpa 1 m² 107,203.76 117,924.14
A.4.1.2.4 Pembuatan 1 m2 lahan produksi tebal 15 cm beton f’c 14,5 Mpa 1 m² 148,984.70 163,883.17
A.4.1.2.5 Pembuatan 1 m2 bekisting untuk plat beton pracetak 1 m² - -
A.4.1.2.6 Pembuatan 1 m2 bekisting untuk balok beton pracetak 1 m² - -
A.4.1.2.7 Pembuatan 1 m2 bekisting untuk kolom beton pracetak 1 m² -
A.4.1.2.8 Pemasangan dan membuka bekisting 1 buah untuk plat beton pracetak 1 bh - -
A.4.1.2.9 Pemasangan dan membuka bekisting 1 buah untuk balok beton pracetak 1 bh - -
A.4.1.2.10 Pemasangan dan membuka bekisting 1 buah untuk kolom beton pracetak 1 bh - -
A.4.1.2.11 Penuangan/menebar beton untuk 1 buah plat beton pracetak 1 bh - -
A.4.1.2.12 Penuangan/menebar beton untuk 1 buah balok beton pracetak 1 bh - -
A.4.1.2.13 Penuangan/menebar beton untuk 1 buah kolom beton pracetak 1 bh - -
A.4.1.2.14 Mendirikan 1 buah komponen plat beton pracetak 1 bh - -
A.4.1.2.15 Mendirikan 1 buah komponen balok beton pracetak 1 bh - -
A.4.1.2.16 Mendirikan 1 buah komponen kolom beton pracetak 1 bh - -
A.4.1.2.17 Melangsir 1 buah komponen plat beton pracetak (± 20 m) 1 bh - -
A.4.1.2.18 Melangsir 1 buah komponen balok beton pracetak (± 20 m) 1 bh - -
A.4.1.2.19 Melangsir 1 buah komponen kolom beton pracetak (± 20m) 1 bh - -
A.4.1.2.20 Bahan 1 m3 grouting campuran 1 m³ - -
A.4.1.2.21 Bahan 1 m3 grouting tidak campuran 1 m³ - -
A.4.1.2.22 Upah melakukan grouting 1 titik pada join pracetak 1 ttk - -
A.4.1.2.23 Pemasangan 1 titik bekisting join pracetak 1 ttk - -
A.4.1.2.24 Upah 1 titik join dengan sling 1 ttk - -
Divisi 4 A.4.2.1 Pekerjaan Besi & Alumunium

A.4.2.1.1 Pemasangan baja profil 1 kg 12,405.00 13,645.50


A.4.2.1.2 Pemasangan rangka kuda-kuda baja IWF 1 kg - -
A.4.2.1.3 Pengerjaan perakitan baja 100 kg - -
A.4.2.1.4 Pembuatan pintu plat baja tebal 2 mm rangkap 1 m² - -
A.4.2.1.5 Pengerjaan pengelasan dengan las listrik 10 cm - -
A.4.2.1.6 Pembuatan rangka jendela squaretube 25x5 cm 1 m² - -
A.4.2.1.7 Pemasangan pintu rolling door besi 1 m² - -
A.4.2.1.8 Pemasangan pintu folding door 1 m² - -
A.4.2.1.9 Pemasangan sunscreen aluminium 1 m² - -
A.4.2.1.10 Pemasangan pintu rolling door Aluminium 1 m² - -
A.4.2.1.11 Pemasangan 1 m kusen Aluminium 1m' - -
A.4.2.1.12 Pemasangan 1 m² pintu Aluminium strip 1 m² - -
A.4.2.1.13 Pemasangan 1 m² pintu kaca rangka Aluminium 1 m² - -
A.4.2.1.14 Pemasangan 1 m² venetions blinds dan verical blinds 1 m² - -
A.4.2.1.15 Pemasangan 1 m² terali besi strip (2x3) mm 1 m² 310,375.50 341,413.05
A.4.2.1.16 Pemasangan 1 m² kawat nyamuk 1 m² - -
A.4.2.1.17 Pemasangan 1 m² jendela nako dan tralis 1 m² - -
A.4.2.1.18 Pemasangan 1 m' talang datar/jurai seng lebar 90 cm 1m 155,890.00 171,479.00
A.4.2.1.19 Pemasangan 1 m' talang 1/2 lingkaran d-15 cm seng plat lebar 45 cm 1m 96,600.00 106,260.00
A.4.2.1.20 Pemasangan 1 m² rangka besi hollow, dinding partisi 1 m² 91,207.50 100,328.25
A.4.2.1.21 Pemasangan 1 m² rangka besi hollow modul 60x60 cm, untuk plafond 1 m² 117,520.00 129,272.00
Divisi 4 A.4.4.1 Pekerjaan Dinding Pasangan
A.4.4.1.1 Pemasangan dinding bata merah 1 batu camp. 1PC:2PP 1 m² 288,100.00 316,910.00
A.4.4.1.2 Pemasangan dinding bata merah 1 batu camp. 1PC:3PP 1 m² 271,815.00 298,996.50
A.4.4.1.3 Pemasangan dinding bata merah 1 batu camp. 1PC:4PP 1 m² 261,235.00 287,358.50
A.4.4.1.4 Pemasangan dinding bata merah 1 batu camp. 1PC:5PP 1 m² 255,190.00 280,709.00
A.4.4.1.5 Pemasangan dinding bata merah 1 batu camp. 1PC:6PP 1 m² 251,900.00 277,090.00
A.4.4.1.6 Pemasangan dinding bata merah 1 batu 1PC:3KP: 2PP 1 m² 233,216.00 256,537.60
A.4.4.1.7 Pemasangan dinding bata merah 1/2 batu camp. 1PC:2PP 1 m² 138,990.00 152,889.00
A.4.4.1.8 Pemasangan dinding bata merah 1/2 batu camp. 1PC:3PP 1 m² 131,504.00 144,654.40
A.4.4.1.9 Pemasangan dinding bata merah 1/2 batu camp. 1PC:4PP 1 m² 127,075.00 139,782.50
A.4.4.1.10 Pemasangan dinding bata merah 1/2 batu camp. 1PC:5PP 1 m² 124,281.00 136,709.10
A.4.4.1.11 Pemasangan dinding bata merah 1/2 batu camp. 1PC:6PP 1 m² 122,569.00 134,825.90
A.4.4.1.12 Pemasangan dinding bata merah 1/2 batu 1PC:8PP 1 m² 119,625.00 131,587.50
A.4.4.1.13 Pemasangan dinding bata merah 1/2 batu 1PC:3KP: 10PP 1 m² 116,255.00 127,880.50
A.4.4.1.14 Pemasangan dinding bata merah 1/2 batu 1KP:1SM:1PP 1 m² 104,045.00 114,449.50
A.4.4.1.15 Pemasangan dinding bata merah 1/2 batu 1KP:1SM:2PP 1 m² 105,485.00 116,033.50
A.4.4.1.16 Pemasangan dinding HB20 camp. 1PC:3PP 1 m² 256,209.00 281,829.90
A.4.4.1.17 Pemasangan dinding HB20 camp. 1PC:4PP 1 m² 252,507.00 277,757.70
A.4.4.1.18 Pemasangan dinding HB15 camp. 1PC:3PP 1 m² 210,363.00 231,399.30
A.4.4.1.19 Pemasangan dinding HB15 camp. 1PC:4PP 1 m² 207,445.00 228,189.50
A.4.4.1.20 Pemasangan dinding HB10 camp. 1PC:3PP 1 m² 165,442.00 181,986.20
A.4.4.1.21 Pemasangan dinding HB10 camp. 1PC:4PP 1 m² 163,891.00 180,280.10
A.4.4.1.22 Pemasangan dinding terawang (roster) camp. 1PC:3PP 1 m² 2,313,775.00 2,545,152.50
A.4.4.1.23 Pemasangan dinding terawang (roster) camp. 1PC:4PP 1 m² 2,313,775.00 2,545,152.50
A.4.4.1.24 Pemasangan dinding bata berongga camp. 1PC:3PP 1 m² 5,323,975.00 5,856,372.50
Divisi 4 A.4.4.2 Pekerjaan Plesteran
A.4.4.2.1 Pemasangan plesteran 1PC:1PP tebal 15 mm 1 m² 139,887.60 153,876.36
A.4.4.2.2 Pemasangan plesteran 1PC:2PP tebal 15 mm 1 m² 65,755.80 72,331.38
A.4.4.2.3 Pemasangan plesteran 1PC:3PP tebal 15 mm 1 m² 62,044.20 68,248.62
A.4.4.2.4 Pemasangan plesteran 1PC:4PP tebal 15 mm 1 m² 59,583.00 65,541.30
A.4.4.2.5 Pemasangan plesteran 1PC:5PP tebal 15 mm 1 m² 58,087.80 63,896.58
A.4.4.2.6 Pemasangan plesteran 1PC:6PP tebal 15 mm 1 m² 56,932.20 62,625.42
A.4.4.2.7 Pemasangan plesteran 1PC:7PP tebal 15 mm 1 m² 56,266.20 61,892.82
A.4.4.2.8 Pemasangan plesteran 1PC:8PP tebal 15 mm 1 m² 55,600.20 61,160.22
A.4.4.2.9 Pemasangan plesteran 1PC:1/2KP:3PP tebal 15 mm 1 m² 60,132.00 66,145.20
A.4.4.2.10 Pemasangan plesteran 1PC:2KP:8PP tebal 15 mm 1 m² 56,890.00 62,579.00
A.4.4.2.11 Pemasangan plesteran 1SM:1KP:1PP tebal 15 mm 1 m² 50,955.30 56,050.83
A.4.4.2.12 Pemasangan plesteran 1SM:1KP:2PP tebal 15 mm 1 m² 51,451.90 56,597.09
A.4.4.2.13 Pemasangan plesteran 1PC:2PP tebal 20 mm 1 m² 87,954.40 96,749.84
A.4.4.2.14 Pemasangan plesteran 1PC:3PP tebal 20 mm 1 m² 69,370.60 76,307.66
A.4.4.2.15 Pemasangan plesteran 1PC:4PP tebal 20 mm 1 m² 79,674.00 87,641.40
A.4.4.2.16 Pemasangan plesteran 1PC:5PP tebal 20 mm 1 m² 77,730.40 85,503.44
A.4.4.2.17 Pemasangan plesteran 1PC:6PP tebal 20 mm 1 m² 76,139.60 83,753.56
A.4.4.2.18 Pemasangan plesteran 1SM:1KP:2PP tebal 20 mm 1 m² 71,065.30 78,171.83
A.4.4.2.19 Pemasangan berapen 1PC:5PP tebal 15 mm 1 m² 35,512.80 39,064.08
A.4.4.2.20 Pemasangan plesteran skoning 1PC:2PP lebar 10 cm 1 m² 54,860.00 60,346.00
A.4.4.2.21 Pemasangan plesteran granit 1PC:2 Granit tebal 10 mm 1 m² - -
A.4.4.2.22 Pemasangan plesteran teraso 1PC:2 Teraso tebal 10 mm 1 m² - -
A.4.4.2.23 Pemasangan plesteran ciprat 1PC:2PP 1 m² 48,069.00 52,875.90
A.4.4.2.24 Pemasangan finishing siar pasangan bata 1 m² 28,083.60 30,891.96
A.4.4.2.25 Pemasangan finishing siar pas. conblock 1 m² 13,420.00 14,762.00
A.4.4.2.26 Pemasangan finishing siar pas. batu belah 1 m² 57,953.00 63,748.30
A.4.4.2.27 Pemasangan acian 1 m² 35,775.00 39,352.50
Divisi 4 A.4.4.3 Pekerjaan penutup lantai & penutup dinding

A.4.4.3.1 Pemasangan 1 m2 lantai ubin PC abu-abu 40x40 1 m² 146,335.00 160,968.50


A.4.4.3.2 Pemasangan 1 m2 lantai ubin PC abu-abu 30x30 1 m² 126,675.00 139,342.50
A.4.4.3.3 Pemasangan 1 m2 lantai ubin PC abu-abu 20x20 1 m² 131,630.00 144,793.00
A.4.4.3.4 Pemasangan 1 m2 lantai ubin warna 40x40 1 m² 163,235.00 179,558.50
A.4.4.3.5 Pemasangan 1 m2 lantai ubin warna 30x30 1 m² 147,575.00 162,332.50
A.4.4.3.6 Pemasangan 1 m2 lantai ubin warna 20x20 1 m² 165,940.00 182,534.00
A.4.4.3.7 Pemasangan 1 m2 lantai ubin teraso 40x40 1 m² - -
A.4.4.3.8 Pemasangan 1 m2 lantai ubin teraso 30x30 1 m² 112,250.00 123,475.00
A.4.4.3.9 Pemasangan 1 m2 lantai ubin granit 40x40 1 m² - -
A.4.4.3.10 Pemasangan 1 m2 lantai ubin granit 30x30 1 m² - -
A.4.4.3.11 Pemasangan 1 m2 lantai ubin teralux 40x40 1 m² - -
A.4.4.3.12 Pemasangan 1 m2 lantai ubin teralux 30x30 1 m² - -
A.4.4.3.13 Pemasangan 1 m2 lantai ubin teralux marmer 60x60 1 m² - -
A.4.4.3.14 Pemasangan 1 m2 lantai ubin teralux marmer 40x40 1 m² - -
A.4.4.3.15 Pemasangan 1 m2 lantai ubin teralux marmer 30x30 1 m² - -
A.4.4.3.16 Pemasangan 1 m Plint ubin PC abu-abu 15x20
2
1 m² - -
A.4.4.3.17 Pemasangan 1 m2 Plint ubin PC abu-abu 10x30 1 m² - -
A.4.4.3.18 Pemasangan 1 m2 plint ubin PC abu-abu 10x40 1 m² - -
A.4.4.3.19 Pemasangan 1 m2 plint ubin warna 10x20 1 m² - -
A.4.4.3.20 Pemasangan 1 m2 plint ubin warna 10x30 1 m² - -
A.4.4.3.21 Pemasangan 1 m2 plint ubin warna 10x40 1 m² - -
A.4.4.3.22 Pemasangan 1 m2 plint ubin teraso 10x30 1 m² - -
A.4.4.3.23 Pemasangan 1 m2 plint ubin teraso 10x40 1 m² - -
A.4.4.3.24 Pemasangan 1 m2 plint ubin granit 10x40 1 m² - -
A.4.4.3.25 Pemasangan 1 m2 plint ubin granit 10x30 1 m² - -
A.4.4.3.26 Pemasangan 1 m2 plint ubin teralux kerang 10x40 1 m² - -
A.4.4.3.27 Pemasangan 1 m2 plint ubin teralux kerang 10x30 1 m² - -
A.4.4.3.28 Pemasangan 1 m2 plint ubin teralux marmer 10x60 1 m² - -
A.4.4.3.29 Pemasangan 1 m2 plint ubin teralux marmer 10x40 1 m² - -
A.4.4.3.30 Pemasangan 1 m2 plint ubin teralux marmer 10x30 1 m² - -
A.4.4.3.31 Pemasangan 1 m2 lantai teraso cor ditempat tebal 3 cm 1 m² - -
A.4.4.3.32 Pemasangan 1 m2 lantai keramik artistik 10x20 1 m² - -
A.4.4.3.33 Pemasangan 1 m2 lantai keramik artistik 10x20 atau 5x20 1 m² - -
A.4.4.3.34 Pemasangan 1 m2 lantai keramik 33x33 1 m² - -
A.4.4.3.35 Pemasangan 1 m2 lantai keramik 30x30 1 m² - -
A.4.4.3.36 Pemasangan 1 m2 lantai keramik 20x20 1 m² - -
A.4.4.3.37 Pemasangan 1 m2 lantai keramik 10x33 variasi/border 1 m² - -
A.4.4.3.38 Pemasangan 1 m2 lantai mozaik 30x30 1PC:3PP 1 m² - -
A.4.4.3.39 Pemasangan 1 m2 plint keramik 10x20 1 m² - -
A.4.4.3.40 Pemasangan 1 m2 plint keramik 10x10 1 m² - -
A.4.4.3.41 Pemasangan 1 m2 plint keramik 5x20 1 m² - -
A.4.4.3.42 Pemasangan 1 m2 plint internal cove artistik 5x5x20 1 m² - -
A.4.4.3.43 Pemasangan 1 m2 lantai marmer 100x100 1 m² - -
A.4.4.3.44 Pemasangan 1 m2 lantai karpet 1 m² - -
A.4.4.3.45 Pemasangan 1 m2 underlayer (lapisan bawah karpet) 1 m² - -
A.4.4.3.46 Pemasangan 1 m2 lantai parquet 1 m² - -
A.4.4.3.47 Pemasangan 1 m2 lantai kayu gymfloor 1 m² - -
A.4.4.3.48 Pemasangan 1 m2 dinding porslen 11x11 1 m² - -
A.4.4.3.49 Pemasangan 1 m2 dinding porslen 10x20 1 m² - -
A.4.4.3.50 Pemasangan 1 m2 dinding porslen 20x20 1 m² - -
A.4.4.3.51 Pemasangan 1 m2 dinding keramik artistik 10x20 1 m² - -
A.4.4.3.52 Pemasangan 1 m2 dinding keramik artistik 5x20 1 m² - -
A.4.4.3.53 Pemasangan 1 m2 dinding keramik 10x20 1 m² - -
A.4.4.3.54 Pemasangan 1 m2 dinding keramik 20x20 1 m² - -
A.4.4.3.55 Pemasangan 1 m2 dinding marmer 100x100 1 m² - -
A.4.4.3.56 Pemasangan 1 m2 dinding bata pelapis 3x7x24 1 m² - -
A.4.4.3.57 Pemasangan 1 m2 dinding batu paras 1 m² - -
A.4.4.3.58 Pemasangan 1 m2 dinding batu temple hitam 1 m² 390,305.00 429,335.50
A.4.4.3.59 Pemasangan 1 m2 lantai vinyl 30x30 1 m² - -
A.4.4.3.60 Pemasangan 1 m2 wallpaper lebar 50cm 1 m² - -
A.4.4.3.61 Pemasangan 1 m2 Floor harderner 1 m² - -
A.4.4.3.62 Pemasangan 1 m2 plinti vinyl karet 15x30 1 m² - -
A.4.4.3.63 Pemasangan 1 m plint kayu 2x10 1 m' 48,510.00 53,361.00
Divisi 4 A.4.5.1 Pekerjaan Plafond

A.4.5.1.1 Pemasangan langit-langit asbes semen 4,5,6 mm 1 m² - -


A.4.5.1.2 Pemasangan langit-langit akustik 30x30 1 m² - -
A.4.5.1.3 Pemasangan langit-langit akustik 30x60 1 m² - -
A.4.5.1.4 Pemasangan langit-langit akustik 60x120 1 m² - -
A.4.5.1.5 Pemasangan langit-langit tripleks 3,4,6 mm 1 m² 46,647.50 51,312.25
A.4.5.1.6 Pemasangan langit-langit lambrisering kayu 1 m² 203,120.00 223,432.00
A.4.5.1.7 Pemasangan langit-langit gypsum board tebal 9 mm 1 m² - -
A.4.5.1.8 Pemasangan langit-langit akustik berikut rangka almn 1 m² - -
A.4.5.1.9 Pemasangan list langit-langit kayu profil 1 m² 21,045.00 23,149.50
Divisi 4 A.4.5.2 Pekerjaan Penutup atap

A.4.5.2.1 Pemasangan 1 m2 atap genteng palentong kecil 1 m² - -


A.4.5.2.2 Pemasangan 1 m2 atap genteng kodok glazuur 1 m² 97,800.00 107,580.00
A.4.5.2.3 Pemasangan 1 m2 atap genteng palentong besar/super 1 m² - -
A.4.5.2.4 Pemasangan 1 m2 bubung genteng palentong kecil 1 m² 95,580.00 105,138.00
A.4.5.2.5 Pemasangan 1 m2 bubung genteng kodok glazuur 1 m² - -
A.4.5.2.6 Pemasangan 1 m2 bubung genteng palentong besar 1 m² - -
A.4.5.2.7 Pemasangan 1 m2 rooflight fiberglass 90x180 1 m² - -
A.4.5.2.8 Pemasangan 1 m2 atap asbes gelombang 92x250 tebal 5 mm 1 m² - -
A.4.5.2.9 Pemasangan 1 m2 atap asbes gelombang 92x225 tebal 5 mm 1 m² - -
A.4.5.2.10 Pemasangan 1 m2 atap asbes gelombang 92x200 tebal 5 mm 1 m² - -
A.4.5.2.11 Pemasangan 1 m2 atap asbes gelombang 92x180 tebal 5 mm 1 m² - -
A.4.5.2.12 Pemasangan 1 m2 atap asbes gelombang 105x300 tebal 5 mm 1 m² - -
A.4.5.2.13 Pemasangan 1 m2 atap asbes gelombang 105x270 tebal 5 mm 1 m² - -
A.4.5.2.14 Pemasangan 1 m2 atap asbes gelombang 105x240 tebal 5 mm 1 m² - -
A.4.5.2.15 Pemasangan 1 m2 atap asbes gelombang 105x210 tebal 5 mm 1 m² - -
A.4.5.2.16 Pemasangan 1 m2 atap asbes gelombang 105x150 tebal 5 mm 1 m² - -
A.4.5.2.17 Pemasangan 1 m2 atap asbes gelombang 108x300 tebal 5 mm 1 m² - -
A.4.5.2.18 Pemasangan 1 m2 atap asbes gelombang 108x270 tebal 6 mm 1 m² - -
A.4.5.2.19 Pemasangan 1 m2 atap asbes gelombang 108x240 tebal 6 mm 1 m² - -
A.4.5.2.20 Pemasangan 1 m2 atap asbes gelombang 108x210 tebal 5 mm 1 m² - -
A.4.5.2.21 Pemasangan 1 m2 atap asbes gelombang 108x180 tebal 6 mm 1 m² - -
A.4.5.2.22 Pemasangan 1 m2 bubung stel gelombang 92 cm 1 m² - -
A.4.5.2.23 Pemasangan 1 m2 nok stel gelombang 105 cm 1 m² - -
A.4.5.2.24 Pemasangan 1 m nok stel gelombang 108 cm 1 m² - -
A.4.5.2.25 Pemasangan 1 m2 nok paten 92 cm 1 m² - -
A.4.5.2.26 Pemasangan 1 m2 nok paten 105 cm 1 m² - -
A.4.5.2.27 Pemasangan 1 m2 nok paten 108 cm 1 m² - -
A.4.5.2.28 Pemasangan 1 m2 nokstel rata 92 cm 1 m² - -
A.4.5.2.29 Pemasangan 1 m2 nokstel rata 105 cm 1 m² - -
A.4.5.2.30 Pemasangan 1 m2 atap genteng beton 1 m² - -
A.4.5.2.31 Pemasangan 1 m2 atap genteng aspal 1 m² - -
A.4.5.2.32 Pemasangan 1 m2 atap genteng metal 1 m² 71,995.00 79,194.50
A.4.5.2.33 Pemasangan 1 m2 atap sirap kayu 1 m² - -
A.4.5.2.34 Pemasangan 1 m2 nok genteng beton 1 m² 119,285.00 131,213.50
A.4.5.2.35 Pemasangan 1 m2 nok genteng aspal 1 m² - -
A.4.5.2.36 Pemasangan 1 m2 nok genteng metal 1 m² 71,645.00 78,809.50
A.4.5.2.37 Pemasangan 1 m2 nok atap sirap 1 m² - -
A.4.5.2.38 Pemasangan 1 m2 atap seng gelombang 1 m² 45,050.00 49,555.00
A.4.5.2.39 Pemasangan 1 m2 nok atap seng 1 m² 27,060.00 29,766.00
A.4.5.2.40 Pemasangan 1 m2 atap alumunium gelombang 1 m² - -
A.4.5.2.41 Pemasangan 1 m2 nok atap alumunium gelombang 1 m² - -
A.4.5.2.42 Pemasangan 1 m2 lapisan Alumunium Foil 1 m² - -
Divisi 4 A.4.6.1 Pekerjaan Kayu

A.4.6.1.1 Pembuatan & pemasangan kusen kayu kelas I 1 m³ 11,311,250.00 12,442,375.00


A.4.6.1.2.a Pembuatan & pemasangan kusen kayu kelas II 1 m³ 7,121,250.00 7,833,375.00
A.4.6.1.2.b Pembuatan & pemasangan kusen kayu kelas III 1 m³ 6,821,250.00 7,503,375.00
A.4.6.1.3 Pembuatan & pemasangan kayu klam kayu kelas II 1 m² 250,870.00 275,957.00
A.4.6.1.4 Pembuatan & pemasangan pintu klam kayu kelas III 1 m² 238,870.00 262,757.00
A.4.6.1.5.a Pembuatan & pemasangan pintu panel kayu kelas I 1 m² 743,750.00 818,125.00
A.4.6.1.5.b Pembuatan & pemasangan pintu panel kayu kelas II 1 m² 543,750.00 598,125.00
A.4.6.1.6.a Pembuatan & pemasangan pintu/jendela kaca kayu kelas I 1 m² 532,000.00 585,200.00
A.4.6.1.6.b Pembuatan & pemasangan pintu/jendela kaca kayu kelas II 1 m² 412,000.00 453,200.00
A.4.6.1.7.a Pembuatan & pemasangan pintu/jendela jalusi kayu kelas I 1 m² 923,750.00 1,016,125.00
A.4.6.1.7.b Pembuatan & pemasangan pintu/jendela jalusi kayu kelas II 1 m² 603,750.00 664,125.00
A.4.6.1.8 Pembuatan & pemasangan pintu plywood rangkap 1 m² 393,075.00 432,382.50
A.4.6.1.9.a Pembuatan & pemasangan pintu plywood rangka ekspose kayu kelas I 1 m² 618,220.00 680,042.00
A.4.6.1.9.b Pembuatan & pemasangan pintu plywood rangka ekspose kayu kelas II 1 m² 489,950.00 538,945.00
A.4.6.1.10.a Pembuatan & pemasangan jalusi kusen kayu kelas I 1 m² 774,425.00 851,867.50
A.4.6.1.10.b Pembuatan & pemasangan jalusi kusen kayu kelas II 1 m² 473,075.00 520,382.50
A.4.6.1.11 Pembuatan & pemasangan pintu teakwood rangka ekspose kayu kelas I 1 m² - -
A.4.6.1.12 Pembuatan & Pemasangan pintu lapis formika rangka ekspose kayu kelas II 1 m² - -
A.4.6.1.13.a Pemasangan kuda-kuda konvensional kayu kelas I 1 m² 8,631,900.00 9,495,090.00
A.4.6.1.13.b Pemasangan kuda-kuda konvensional kayu kelas II 1 m² 4,456,500.00 4,902,150.00
A.4.6.1.13.c Pemasangan kuda-kuda konvensional kayu kelas III 1 m² 4,181,500.00 4,599,650.00
A.4.6.1.14 Pemasangan kuda-kuda ekpose kayu kelas I 1 m² 12,254,525.00 13,479,977.50
A.4.6.1.15 Pemasangan konstruksi gordeng kayu kelas II 1 m² 7,290,125.00 8,019,137.50
A.4.6.1.16 Pemasangan rangka atap genteng keramik kayu kelas II 1 m² 211,925.00 233,117.50
A.4.6.1.17 Pemasangan rangka atap genteng beton kayu kelas II 1 m² 290,675.00 319,742.50
A.4.6.1.18 Pemasangan rangka atap sirap kayu kelas II 1 m² 78,165.00 85,981.50
A.4.6.1.19.a Pemasangan rangka langit-langit 50x100 kayu kelas II 1 m² 116,175.00 127,792.50
A.4.6.1.19.b Pemasangan rangka langit-langit 50x100 kayu kelas III 1 m² 112,325.00 123,557.50
A.4.6.1.20.a Pemasangan rangka langit-langit 60x60 kayu kelas II 1 m² 113,950.00 125,345.00
A.4.6.1.20.b Pemasangan rangka langit-langit 60x60 kayu kelas III 1 m² 110,100.00 121,110.00
A.4.6.1.21.a Pemasangan listplank 3x20 kayu kelas I 1 m² 115,175.00 126,692.50
A.4.6.1.21.b Pemasangan listplank 3x20 kayu kelas II 1 m² 60,275.00 66,302.50
A.4.6.1.22.a Pemasangan listplank 3/30 kayu kelas I 1 m² 115,475.00 127,022.50
A.4.6.1.22.b Pemasangan listplank 3/30 kayu kelas II 1 m² 60,025.00 66,027.50
A.4.6.1.23.a Pemasangan rangka dinding pemisah kayu kelas II 1 m² 171,620.00 188,782.00
A.4.6.1.23.b Pemasangan rangka dinding pemisah kayu kelas III 1 m² 164,620.00 181,082.00
A.4.6.1.24 Pemasangan dinding pemisah teakwood double kayu kelas II 1 m² - -
A.4.6.1.25 Pemasangan dinding pemisah plywood rangkap kayu kelas II 1 m² 267,850.00 294,635.00
A.4.6.1.26 Pemasangan dinding lambrisering kayu kelas I 1 m² 313,650.00 345,015.00
A.4.6.1.27 Pemasangan dinding lambrisering dari plywood 1 m² 38,495.00 42,344.50
A.4.6.1.28 Pemasangan dinding bilik rangka kayu kelas III 1 m² - -
Divisi 4 A.4.6.2 Pekerjaan Kunci & kaca
A.4.6.2.1 Pemasangan 1 buah kunci tanam antik 1 bh - -
A.4.6.2.2 Pemasangan 1 buah kunci tanam biasa 1 bh 194,475.00 213,922.50
A.4.6.2.3 Pemasangan 1 buah kunci tanam Kamar Mandi 1 bh - -
A.4.6.2.4 Pemasangan 1 buah kunci tanam silinder 1 bh - -
A.4.6.2.5 Pemasangan 1 buah engsel pintu 1 bh 43,092.00 47,401.20
A.4.6.2.6 Pemasangan 1 buah engsel jendela kupu-kupu 1 bh 12,057.50 13,263.25
A.4.6.2.7 Pemasangan 1 buah engsel angin 1 bh - -
A.4.6.2.8 Pemasangan 1 buah spring knip 1 bh - -
A.4.6.2.9 Pemasangan 1 buah kait angin 1 bh 18,920.00 20,812.00
A.4.6.2.10 Pemasangan 1 buah door closer 1 bh - -
A.4.6.2.11 Pemasangan 1 buah kunci slot 1 bh - -
A.4.6.2.12 Pemasangan 1 buah door holder 1 bh - -
A.4.6.2.13 Pemasangan 1 buah doorstop 1 bh - -
A.4.6.2.14 Pemasangan 1 buah rel pintu dorong 1 bh - -
A.4.6.2.15 Pemasangan 1 buah kunci lemari 1 bh - -
A.4.6.2.16 Pemasangan 1 m2 kaca polos tebal 3 mm 1 m² 128,092.00 140,901.20
A.4.6.2.17 Pemasangan 1 m2 kaca polos tebal 5 mm 1 m² 198,000.00 217,800.00
A.4.6.2.18 Pemasangan 1 m2 kaca polos tebal 8 mm 1 m² - -
A.4.6.2.19 Pemasangan 1 m2 kaca polos tebal 12 mm 1 m² - -
A.4.6.2.20 Pemasangan 1 m2 kaca cermin tebal 5 mm 1 m² - -
A.4.6.2.21 Pemasangan 1 m2 kaca cermin tebal 8 mm 1 m² - -
A.4.6.2.22 Pemasangan 1 m2 kaca “Wiremesh glass” tebal 5 mm 1 m² - -
A.4.6.2.23 Pemasangan 1 m2 kaca patri tebal 5 mm 1 m² - -
Divisi 4 A.4.7.1 Pekerjaan Pengecatan

A.4.7.1.1 Pengikisan/pengerokan 1 m2 permukaan cat tembok lama 1 m² - -


A.4.7.1.2 Pencucian 1 m2 permukaan dinding lama 1 m² 14,595.00 16,054.50
A.4.7.1.3 Pengerokan 1 m2 karat atau cat lama permukaan baja 1 m² 15,170.00 16,687.00
A.4.7.1.4 Pengecatan bidang kayu baru 1 lapis cat dasar 2 lapis penutup 1 m² 43,975.00 48,372.50
A.4.7.1.5 Pengecatan bidang kayu baru, 1 lapis cata dasar, 3 lapis penutup 1 m² 57,855.00 63,640.50
A.4.7.1.6 Pelaburan bidang kayu dgn teak oil 1 m² - -
A.4.7.1.7 Pelaburan 1 m2 bidang kayu dengan politur 1 m² 29,205.00 32,125.50
A.4.7.1.8 Pelaburan 1 m2 bidang kayu dengan residu atau ter 1 m² 12,315.00 13,546.50
A.4.7.1.9 Pelaburan 1 m2 bidang kayu dengan vernis 1 m² 41,505.00 45,655.50
A.4.7.1.10 Pengecatan 1 m2 tembok baru 1 m² 20,818.00 22,899.80
A.4.7.1.11 Pengecatan tembok lama 1 m² 13,167.00 14,483.70
A.4.7.1.12 Pelaburan 1 m2 tembok dengan kalkarium 1 m² - -
A.4.7.1.13 Pelaburan 1 m2 tembok baru dengan kapur 1 m² 13,898.50 15,288.35
A.4.7.1.14 Pelaburan 1 m2 tembok lama dengan kapur 1 m² - -
A.4.7.1.15 Pemasangan wall paper 1 m² - -
A.4.7.1.16 Pengecatan 1 m2 permukaan baja dengan Menie 1 m² 29,407.50 32,348.25
A.4.7.1.17 Pengecatan 1 m2 permukaan baja dengan Menie besi dengan perancah 1 m² 53,731.50 59,104.65
A.4.7.1.18 Pengecatan 1 m2 permukaan baja galvani cara manual 4 lapis 1 m² - -
A.4.7.1.19 Pengecatan 1 m2 permukaan baja galvani cara manual 1 lapis 1 m² - -
A.4.7.1.20 Pengecatan 1 m2 permukaan baja galvani cara manual 3 lapis 1 m² - -
A.4.7.1.21 Pengecatan 1 m2 permukaan baja galvani semprot 1 lapis 1 m² - -
Divisi 5 A.5.1.1 Pekerjaan Sanitasi Gedung

A.5.1.1.1 Pemasangan 1 buah closet duduk/monoblock 1 bh 4,136,500.00 4,550,150.00


A.5.1.1.2 Pemasangan 1 buah closet jongkok porslen 1 bh 536,600.00 590,260.00
A.5.1.1.3 Pemasangan 1 buah closet jongkok teraso 1 bh 400,075.00 440,082.50
A.5.1.1.4 Pemasangan 1 buah urinoir 1 bh 803,450.00 883,795.00
A.5.1.1.5 Pemasangan 1 buah wastafel 1 bh 651,100.00 716,210.00
A.5.1.1.6 Pemasangan 1 buah bathcuip poselen 1 bh - -
A.5.1.1.7 Pemasangan 1 buah bak mandi fiberglass vol 1 m3 1 bh 1,109,000.00 1,219,900.00
A.5.1.1.8 Pemasangan 1 buah bak mandi pas. batu bata vol 0,3 m3 1 bh 925,664.63 1,018,231.10
A.5.1.1.9 Pemasangan 1 buah bak mandi teraso vol. 0,30 m 1 bh 1,109,000.00 1,219,900.00
A.5.1.1.10 Pemasangan 1 buah bak fibreglass vol 1 m3 1 bh 134,675.00 148,142.50
A.5.1.1.11 Pemasangan 1 buah bak beton vol 1 m3 1 bh - -
A.5.1.1.12 Pemasangan 1 bh bak cuci piring stainlessteel 1 bh 247,725.00 272,497.50
A.5.1.1.13 Pemasangan 1 bh bak cuci piring teraso 1 bh 388,500.00 427,350.00
A.5.1.1.14 Pemasangan 1 bh floor drain 1 bh 29,075.00 31,982.50
A.5.1.1.15 Pemasangan 1 buah pak kontrol pasangan bata 30x30 1 bh 176,680.00 194,348.00
A.5.1.1.16 Pemasangan 1 buah pak kontrol pasangan bata 45x45 1 bh 285,830.00 314,413.00
A.5.1.1.17 Pemasangan 1 buah pak control pasangan bata 60x60 1 bh 450,580.00 495,638.00
A.5.1.1.18 Pemasangan 1 m’ pipa galvanis diameter ½” 1 m' - -
A.5.1.1.19 Pemasangan 1 buah kran diameter ½” atau 3/4” 1 bh 60,975.00 67,072.50
A.5.1.1.20 Pemasangan 1 m’ pipa galvanis diameter 3/4” 1 m' - -
A.5.1.1.21 Pemasangan 1 m’ pipa galvanis diameter 1” 1 m' 172,955.00 190,250.50
A.5.1.1.22 Pemasangan 1 m’ pipa galvanis diameter 1 ½” 1 m' - -
A.5.1.1.23 Pemasangan 1 m’ pipa galvanis diameter 3” 1 m' - -
A.5.1.1.24 Pemasangan 1 m’ pipa galvanis diameter 4” 1 m' - -
A.5.1.1.25 Pemasangan 1 m’ pipa PVC tipe AW diameter 1/2” 1 m' 16,717.50 18,389.25
A.5.1.1.26 Pemasangan 1 m’ pipa PVC tipe AW diameter 3/4” 1 m' 19,430.00 21,373.00
A.5.1.1.27 Pemasangan 1 m’ pipa PVC tipe AW diameter 1” 1 m' 21,755.00 23,930.50
A.5.1.1.28 Pemasangan 1 m’ pipa PVC tipe AW diameter 11/2” 1 m' 36,507.50 40,158.25
A.5.1.1.29 Pemasangan 1 m’ pipa PVC tipe AW diameter 2” 1 m' 40,382.50 44,420.75
A.5.1.1.30 Pemasangan 1 m’ pipa PVC tipe AW diameter 21/2” 1 m' - -
A.5.1.1.31 Pemasangan 1 m’ pipa PVC tipe AW diameter 3” 1 m' - -
A.5.1.1.32 Pemasangan 1 m’ pipa PVC tipe AW diameter 4” 1 m' 92,969.38 102,266.31
A.5.1.1.33 Pemasangan 1 m’ pipa air limbah jenis pipa tanah Ǿ 20 cm 1 m' - -
A.5.1.1.34 Pemasangan 1 m’ pipa air limbah jenis pipa tanah diameter 15 cm 1 m' - -
A.5.1.1.35 Pemasangan 1 m’ pipa beton diameter 15 – 20 cm 1 m' - -
A.5.1.1.36 Pemasangan 1 m’ pipa beton diameter 30 – 100 cm 1 m' - -
Divisi 8 A.8.4.1 Pekerjaan Pemasangan Pipa
A.8.4.1.1 Pemasangan 1 m pipa PVC Ø 63 mm 1 m' - -
A.8.4.1.2 Pemasangan 1 m pipa PVC Ø 90 mm 1 m' - -
A.8.4.1.3 Pemasangan 1 m pipa PVC Ø 110 mm 1 m' - -
A.8.4.1.4 Pemasangan 1 m pipa PVC Ø 150 mm 1 m' - -
A.8.4.1.5 Pemasangan 1 m pipa PVC Ø 200 mm 1 m' - -
A.8.4.1.6 Pemasangan 1 m pipa PVC Ø 250 mm 1 m' - -
A.8.4.1.7 Pemasangan 1 m pipa PVC Ø 300 mm 1 m' - -
A.8.4.1.8 Pemasangan 1 m pipa PVC Ø 400 mm 1 m' - -
A.8.4.1.9 Pemasangan 1 m pipa PVC Ø 450 mm 1 m' - -
A.8.4.1.10 Pemasangan 1 m pipa PVC Ø 500 mm 1 m' - -
A.8.4.1.11 Pemasangan 1 m pipa PVC Ø 600 mm 1 m' - -
A.8.4.1.12 Pemasangan 1 m pipa PVC Ø 800 mm 1 m' - -
A.8.4.1.13 Pemasangan 1 m pipa PVC Ø 900 mm 1 m' - -
A.8.4.1.14 Pemasangan 1 m pipa PVC Ø 1000 mm 1 m' - -
A.8.4.1.15 Pemasangan 1 m pipa PVC Ø 1100 mm 1 m' - -
A.8.4.1.16 Pemasangan 1 m pipa PVC Ø 1200 mm 1 m' - -
A.8.4.1.17 Pemasangan 1 m pipa HDPE Ø 63 mm 1 m' - -
A.8.4.1.18 Pemasangan 1 m pipa HDPE Ø 100 mm 1 m' - -
A.8.4.1.19 Pemasangan 1 m pipa HDPE Ø 125 mm 1 m' - -
A.8.4.1.20 Pemasangan 1 m pipa HDPE Ø 150 mm 1 m' - -
A.8.4.1.21 Pemasangan 1 m pipa HDPE Ø 200 mm 1 m' - -
A.8.4.1.22 Pemasangan 1 m pipa HDPE Ø 250 mm 1 m' - -
A.8.4.1.23 Pemasangan 1 m pipa HDPE Ø 300 mm 1 m' - -
A.8.4.1.24 Pemasangan 1 m pipa HDPE Ø 400 mm 1 m' - -
A.8.4.1.25 Pemasangan 1 m pipa HDPE Ø 450 mm 1 m' - -
A.8.4.1.26 Pemasangan 1 m pipa HDPE Ø 500 mm 1 m' - -
A.8.4.1.27 Pemasangan 1 m pipa HDPE Ø 600 mm 1 m' - -
A.8.4.1.28 Pemasangan 1 m pipa HDPE Ø 800 mm 1 m' - -
A.8.4.1.29 Pemasangan 1 m pipa HDPE Ø 900 mm 1 m' - -
A.8.4.1.30 Pemasangan 1 m pipa HDPE Ø 1000 mm 1 m' - -
A.8.4.1.31 Pemasangan 1 m pipa HDPE Ø 1100 mm 1 m' - -
A.8.4.1.32 Pemasangan 1 m pipa HDPE Ø 1200 mm 1 m' - -
A.8.4.1.33 Pemasangan 1 m pipa GIP Ø 63 mm 1 m' - -
A.8.4.1.34 Pemasangan 1 m pipa GIP Ø 100 mm 1 m' - -
A.8.4.1.35 Pemasangan 1 m pipa GIP Ø 125 mm 1 m' - -
A.8.4.1.36 Pemasangan 1 m pipa GIP Ø 150 mm 1 m' - -
A.8.4.1.37 Pemasangan 1 m pipa GIP Ø 200 mm 1 m' - -
A.8.4.1.38 Pemasangan 1 m pipa GIP Ø 250 mm 1 m' - -
A.8.4.1.39 Pemasangan 1 m pipa GIP Ø 300 mm 1 m' - -
A.8.4.1.40 Pemasangan 1 m pipa GIP Ø 400 mm 1 m' - -
A.8.4.1.41 Pemasangan 1 m pipa GIP Ø 450 mm 1 m' - -
A.8.4.1.42 Pemasangan 1 m pipa GIP Ø 500 mm 1 m' - -
A.8.4.1.43 Pemasangan 1 m pipa GIP Ø 600 mm 1 m' - -
A.8.4.1.44 Pemasangan 1 m pipa GIP Ø 800 mm 1 m' - -
A.8.4.1.45 Pemasangan 1 m pipa GIP Ø 900 mm 1 m' - -
A.8.4.1.46 Pemasangan 1 m pipa GIP Ø 1000 mm 1 m' - -
A.8.4.1.47 Pemasangan 1 m pipa GIP Ø 1100 mm 1 m' - -
A.8.4.1.48 Pemasangan 1 m pipa GIP Ø 1200 mm 1 m' - -
A.8.4.1.49 Pemasangan 1 m pipa DCI Ø 100 mm 1 m' - -
A.8.4.1.50 Pemasangan 1 m pipa DCI Ø 125 mm 1 m' - -
A.8.4.1.51 Pemasangan 1 m pipa DCI Ø 150 mm 1 m' - -
A.8.4.1.52 Pemasangan 1 m pipa DCI Ø 200 mm 1 m' - -
A.8.4.1.53 Pemasangan 1 m pipa DCI Ø 250 mm 1 m' - -
A.8.4.1.54 Pemasangan 1 m pipa DCI Ø 300 mm 1 m' - -
A.8.4.1.55 Pemasangan 1 m pipa DCI Ø 400 mm 1 m' - -
A.8.4.1.56 Pemasangan 1 m pipa DCI Ø 450 mm 1 m' - -
A.8.4.1.57 Pemasangan 1 m pipa DCI Ø 500 mm 1 m' - -
A.8.4.1.58 Pemasangan 1 m pipa DCI Ø 600 mm 1 m' - -
A.8.4.1.59 Pemasangan 1 m pipa DCI Ø 800 mm 1 m' - -
A.8.4.1.60 Pemasangan 1 m pipa DCI Ø 900 mm 1 m' - -
A.8.4.1.61 Pemasangan 1 m pipa DCI Ø1000 mm 1 m' - -
A.8.4.1.62 Pemasangan 1 m pipa DCI Ø1100 mm 1 m' - -
A.8.4.1.63 Pemasangan 1 m pipa DCI Ø1200 mm 1 m' - -
A.8.4.1.64 Pemasangan 1 m pipa baja Ø 63 mm 1 m' - -
A.8.4.1.65 Pemasangan 1 m pipa baja Ø 100 mm 1 m' - -
A.8.4.1.66 Pemasangan 1 m pipa baja Ø 125 mm 1 m' - -
A.8.4.1.67 Pemasangan 1 m pipa baja Ø 150 mm 1 m' - -
A.8.4.1.68 Pemasangan 1 m pipa baja Ø 200 mm 1 m' - -
A.8.4.1.69 Pemasangan 1 m pipa baja Ø 250 mm 1 m' - -
A.8.4.1.70 Pemasangan 1 m pipa baja Ø 300 mm 1 m' - -
A.8.4.1.71 Pemasangan 1 m pipa baja Ø 400 mm 1 m' - -
A.8.4.1.72 Pemasangan 1 m pipa baja Ø 450 mm 1 m' - -
A.8.4.1.73 Pemasangan 1 m pipa baja Ø 500 mm 1 m' - -
A.8.4.1.74 Pemasangan 1 m pipa baja Ø 600 mm 1 m' - -
A.8.4.1.75 Pemasangan 1 m pipa baja Ø 800 mm 1 m' - -
A.8.4.1.76 Pemasangan 1 m pipa baja Ø 900 mm 1 m' - -
A.8.4.1.77 Pemasangan 1 m pipa baja Ø 1000 mm 1 m' - -
A.8.4.1.78 Pemasangan 1 m pipa baja Ø 1100 mm 1 m' - -
A.8.4.1.79 Pemasangan 1 m pipa baja Ø 1200 mm 1 m' - -
Divisi 8 A.8.4.2 Pemotongan Pipa
A.8.4.2.1 Pemotongan 1 buah pipa PVC Ø 63 mm 1 bh
A.8.4.2.2 Pemotongan 1 buah pipa PVC Ø 90 mm 1 bh
A.8.4.2.3 Pemotongan 1 buah pipa PVC Ø 110 mm 1 bh
A.8.4.2.4 Pemotongan 1 buah pipa PVC Ø 150 mm 1 bh
A.8.4.2.5 Pemotongan 1 buah pipa PVC Ø 200 mm 1 bh
A.8.4.2.6 Pemotongan 1 buah pipa PVC Ø 250 mm 1 bh
A.8.4.2.7 Pemotongan 1 buah pipa PVC Ø 300 mm 1 bh
A.8.4.2.8 Pemotongan 1 buah pipa PVC Ø 400 mm 1 bh
A.8.4.2.9 Pemotongan 1 buah pipa PVC Ø 450 mm 1 bh
A.8.4.2.10 Pemotongan 1 buah pipa PVC Ø 500 mm 1 bh
A.8.4.2.11 Pemotongan 1 buah pipa PVC Ø 600 mm 1 bh
A.8.4.2.12 Pemotongan 1 buah pipa PVC Ø 800 mm 1 bh
A.8.4.2.13 Pemotongan 1 buah pipa PVC Ø 900 mm 1 bh
A.8.4.2.14 Pemotongan 1 buah pipa PVC Ø 1000 mm 1 bh
A.8.4.2.15 Pemotongan 1 buah pipa PVC Ø 1100 mm 1 bh
A.8.4.2.16 Pemotongan 1 buah pipa PVC Ø 1200 mm 1 bh
A.8.4.2.17 Pemotongan 1 buah pipa HDPE Ø 63 mm 1 bh
A.8.4.2.18 Pemotongan 1 buah pipa HDPE Ø 100 mm 1 bh
A.8.4.2.19 Pemotongan 1 buah pipa HDPE Ø 125 mm 1 bh
A.8.4.2.20 Pemotongan 1 buah pipa HDPE Ø 150 mm 1 bh
A.8.4.2.21 Pemotongan 1 buah pipa HDPE Ø 200 mm 1 bh
A.8.4.2.22 Pemotongan 1 buah pipa HDPE Ø 250 mm 1 bh
A.8.4.2.23 Pemotongan 1 buah pipa HDPE Ø 300 mm 1 bh
A.8.4.2.24 Pemotongan 1 buah pipa HDPE Ø 400 mm 1 bh
A.8.4.2.25 Pemotongan 1 buah pipa HDPE Ø 450 mm 1 bh
A.8.4.2.26 Pemotongan 1 buah pipa HDPE Ø 500 mm 1 bh
A.8.4.2.27 Pemotongan 1 buah pipa HDPE Ø 600 mm 1 bh
A.8.4.2.28 Pemotongan 1 buah pipa HDPE Ø 800 mm 1 bh
A.8.4.2.29 Pemotongan 1 buah pipa HDPE Ø 900 mm 1 bh
A.8.4.2.30 Pemotongan 1 buah pipa HDPE Ø 1000 mm 1 bh
A.8.4.2.31 Pemotongan 1 buah pipa HDPE Ø 1100 mm 1 bh
A.8.4.2.32 Pemotongan 1 buah pipa HDPE Ø 1200 mm 1 bh
A.8.4.2.33 Pemotongan 1 buah pipa GIP Ø 63 mm 1 bh
A.8.4.2.34 Pemotongan 1 buah pipa GIP Ø 100 mm 1 bh
A.8.4.2.35 Pemotongan 1 buah pipa GIP Ø 125 mm 1 bh
A.8.4.2.36 Pemotongan 1 buah pipa GIP Ø 150 mm 1 bh
A.8.4.2.37 Pemotongan 1 buah pipa GIP Ø 200 mm 1 bh
A.8.4.2.38 Pemotongan 1 buah pipa GIP Ø 250 mm 1 bh
A.8.4.2.39 Pemotongan 1 buah pipa GIP Ø 300 mm 1 bh
A.8.4.2.40 Pemotongan 1 buah pipa GIP Ø 400 mm 1 bh
A.8.4.2.41 Pemotongan 1 buah pipa GIP Ø 450 mm 1 bh
A.8.4.2.42 Pemotongan 1 buah pipa GIP Ø 500 mm 1 bh
A.8.4.2.43 Pemotongan 1 buah pipa GIP Ø 600 mm 1 bh
A.8.4.2.44 Pemotongan 1 buah pipa GIP Ø 800 mm 1 bh
A.8.4.2.45 Pemotongan 1 buah pipa GIP Ø 900 mm 1 bh
A.8.4.2.46 Pemotongan 1 buah pipa GIP Ø 1000 mm 1 bh
A.8.4.2.47 Pemotongan 1 buah pipa GIP Ø 1100 mm 1 bh
A.8.4.2.48 Pemotongan 1 buah pipa GIP Ø 1200 mm 1 bh
A.8.4.2.49 Pemotongan 1 buah pipa DCI Ø 100 mm 1 bh
A.8.4.2.50 Pemotongan 1 buah pipa DCI Ø 125 mm 1 bh
A.8.4.2.51 Pemotongan 1 buah pipa DCI Ø 150 mm 1 bh
A.8.4.2.52 Pemotongan 1 buah pipa DCI Ø 200 mm 1 bh
A.8.4.2.53 Pemotongan 1 buah pipa DCI Ø 250 mm 1 bh
A.8.4.2.54 Pemotongan 1 buah pipa DCI Ø 300 mm 1 bh
A.8.4.2.55 Pemotongan 1 buah pipa DCI Ø 400 mm 1 bh
A.8.4.2.56 Pemotongan 1 buah pipa DCI Ø 450 mm 1 bh
A.8.4.2.57 Pemotongan 1 buah pipa DCI Ø 500 mm 1 bh
A.8.4.2.58 Pemotongan 1 buah pipa DCI Ø 600 mm 1 bh
A.8.4.2.59 Pemotongan 1 buah pipa DCI Ø 800 mm 1 bh
A.8.4.2.60 Pemotongan 1 buah pipa DCI Ø 900 mm 1 bh
A.8.4.2.61 Pemotongan 1 buah pipa DCI Ø 1000 mm 1 bh
A.8.4.2.62 Pemotongan 1 buah pipa DCI Ø 1100 mm 1 bh
A.8.4.2.63 Pemotongan 1 buah pipa DCI Ø 1200 mm 1 bh
A.8.4.2.64 Pemotongan 1 buah pipa baja Ø 63 mm 1 bh
A.8.4.2.65 Pemotongan 1 buah pipa baja Ø 100 mm 1 bh
A.8.4.2.66 Pemotongan 1 buah pipa baja Ø 125 mm 1 bh
A.8.4.2.67 Pemotongan 1 buah pipa baja Ø 150 mm 1 bh
A.8.4.2.68 Pemotongan 1 buah pipa baja Ø 200 mm 1 bh
A.8.4.2.69 Pemotongan 1 buah pipa baja Ø 250 mm 1 bh
A.8.4.2.70 Pemotongan 1 buah pipa baja Ø 300 mm 1 bh
A.8.4.2.71 Pemotongan 1 buah pipa baja Ø 400 mm 1 bh
A.8.4.2.72 Pemotongan 1 buah pipa baja Ø 450 mm 1 bh
A.8.4.2.73 Pemotongan 1 buah pipa baja Ø 500 mm 1 bh
A.8.4.2.74 Pemotongan 1 buah pipa baja Ø 600 mm 1 bh
A.8.4.2.75 Pemotongan 1 buah pipa baja Ø 800 mm 1 bh
A.8.4.2.76 Pemotongan 1 buah pipa baja Ø 900 mm 1 bh
A.8.4.2.77 77    Pemotongan 1 buah pipa baja Ø 1000 mm 1 bh
A.8.4.2.78 78    Pemotongan 1 buah pipa baja Ø 1100 mm 1 bh
A.8.4.2.79 79    Pemotongan 1 buah pipa baja Ø 1200 mm 1 bh
Divisi 8 A.8.4.3 Pemasangan Aksesoris Pipa

A.8.4.3.1 Pemasangan 1 buah Valve Ø 150 mm 1 bh


A.8.4.3.2 Pemasangan 1 buah Valve Ø 200 mm 1 bh
A.8.4.3.3 Pemasangan 1 buah Valve Ø 250 mm 1 bh
A.8.4.3.4 Pemasangan 1 buah Valve Ø 300 mm 1 bh
A.8.4.3.5 Pemasangan 1 buah Valve Ø 400 mm 1 bh
A.8.4.3.6 Pemasangan 1 buah Valve Ø 450 mm 1 bh
A.8.4.3.7 Pemasangan 1 buah Valve Ø 500 mm 1 bh
A.8.4.3.8 Pemasangan 1 buah Valve Ø 600 mm 1 bh
A.8.4.3.9 Pemasangan 1 buah Valve Ø 700 mm 1 bh
A.8.4.3.10 Pemasangan 1 buah Valve Ø 800 mm 1 bh
A.8.4.3.11 Pemasangan 1 buah Valve Ø 900 mm 1 bh
A.8.4.3.12 Pemasangan 1 buah Valve Ø 1000 mm 1 bh
A.8.4.3.13 Pemasangan 1 buah Valve Ø 1100 mm 1 bh
A.8.4.3.14 Pemasangan 1 buah Valve Ø 1200 mm 1 bh
A.8.4.3.15 Pemasangan 1 buah Tee Ø 150 mm 1 bh
A.8.4.3.16 Pemasangan 1 buah Tee Ø 200 mm 1 bh
A.8.4.3.17 Pemasangan 1 buah Tee Ø 250 mm 1 bh
A.8.4.3.18 Pemasangan 1 buah Tee Ø 300 mm 1 bh
A.8.4.3.19 Pemasangan 1 buah Tee Ø 400 mm 1 bh
A.8.4.3.20 Pemasangan 1 buah Tee Ø 450 mm 1 bh
A.8.4.3.21 Pemasangan 1 buah Tee Ø 500 mm 1 bh
A.8.4.3.22 Pemasangan 1 buah Tee Ø 600 mm 1 bh
A.8.4.3.23 Pemasangan 1 buah Tee Ø 700 mm 1 bh
A.8.4.3.24 Pemasangan 1 buah Tee Ø 800 mm 1 bh
A.8.4.3.25 Pemasangan 1 buah Tee Ø 900 mm 1 bh
A.8.4.3.26 Pemasangan 1 buah Tee Ø 1000 mm 1 bh
A.8.4.3.27 Pemasangan 1 buah Tee Ø 1100 mm 1 bh
A.8.4.3.28 Pemasangan 1 buah Tee Ø 1200 mm 1 bh
Divisi 8 A.8.4.4 Penyambungan Pipa
A.8.4.4.1 Penyambungan 1 buah pipa baru ke pipa yang ada Ø 80 mm 1 bh
A.8.4.4.2 Penyambungan 1 buah pipa baru ke pipa yang ada Ø 100 mm 1 bh
A.8.4.4.3 Penyambungan 1 buah pipa baru ke pipa yang ada Ø 150 mm 1 bh
A.8.4.4.4 Penyambungan 1 buah pipa baru ke pipa yang ada Ø 200 mm 1 bh
A.8.4.4.5 Penyambungan 1 buah pipa baru ke pipa yang ada Ø 250 mm 1 bh
A.8.4.4.6 Penyambungan 1 buah pipa baru ke pipa yang ada Ø 300 mm 1 bh
A.8.4.4.7 Penyambungan 1 buah pipa baru ke pipa yang ada Ø 400 mm 1 bh
A.8.4.4.8 Penyambungan 1 buah pipa baru ke pipa yang ada Ø 450 mm 1 bh
A.8.4.4.9 Penyambungan 1 buah pipa baru ke pipa yang ada Ø 500 mm 1 bh
A.8.4.4.10 Penyambungan 1 buah pipa baru ke pipa yang ada Ø 600 mm 1 bh
A.8.4.4.11 Penyambungan 1 buah pipa baru ke pipa yang ada Ø 700 mm 1 bh
A.8.4.4.12 Penyambungan 1 buah pipa baru ke pipa yang ada Ø 800 mm 1 bh
Divisi 8 A.8.4.5 Pengetesan Pipa

A.8.4.5.1 Pengetesan 1 m pipa Ø 50 mm 1 m'


A.8.4.5.2 Pengetesan 1 m pipa Ø 75 mm 1 m'
A.8.4.5.3 Pengetesan 1 m pipa Ø 100 mm 1 m'
A.8.4.5.4 Pengetesan 1 m pipa Ø 150 mm 1 m'
A.8.4.5.5 Pengetesan 1 m pipa Ø 200 mm 1 m'
A.8.4.5.6 Pengetesan 1 m ppipa Ø 250 mm 1 m'
A.8.4.5.7 Pengetesan 1 m pipa Ø 300 mm 1 m'
A.8.4.5.8 Pengetesan 1 m pipa Ø 400 mm 1 m'
A.8.4.5.9 Pengetesan 1 m pipa Ø 500 mm 1 m'
A.8.4.5.10 Pengetesan 1 m pipa Ø 600 mm 1 m'
BOW BOW

BOW E.1 Sebuah tiang dilancipkan 1 bh 19,500.00 21,450.00


BOW E.4 Membuat pen dan lubang pada balok pemikul 1 bh 66,600.00 73,260.00
BOW E.13 Tiang pancang ( dihitung panjang masuk tanah ) 1 m' 171,615.00 188,776.50
BOW F.1.a Rangka Bawah Kayu Kelas I (Pekerjaan Kasar) 1 m³ 10,513,750.00 11,565,125.00
BOW F.1.b Rangka Bawah Kayu Kelas II (Pekerjaan Kasar) 1 m³ 6,343,750.00 6,978,125.00
BOW F.2 Sandaran Jembatan dan balok pemikul Kayu Kelas I 1 m³ 12,430,000.00 13,673,000.00
BOW F.8.a Mengerjakan Dinding papan Ulin 2 cm 1 m² 248,287.50 273,116.25
BOW F.8.b Mengerjakan Dinding papan Lanan 2 cm 1 m² 133,987.50 147,386.25
BOW F.22.a Mengerjakan Rangka Badan Kayu Ulin 1 m³ 12,091,500.00 13,300,650.00
BOW F.22.b Mengerjakan Rangka Badan Kayu Lanan 1 m³ 7,305,000.00 8,035,500.00
BOW F.38.a Mengerjakan Lantai papan Ulin 2 cm 1 m² 422,737.50 465,011.25
BOW F.38.b Mengerjakan Lantai papan Lanan 2 cm 1 m² 270,937.50 298,031.25
BOW F.38.c Mengerjakan Lantai papan Ulin 2,5 cm 1 m² 460,237.50 506,261.25
BOW F.38.d Mengerjakan Lantai papan Lanan 2,5 cm 1 m² 283,437.50 311,781.25
BOW L.5 Membongkar Lantai Tegel 1 m² 2,950.00 3,245.00
BOW L.6 Mengupas Plesteran 1 m² 4,845.00 5,329.50
BOW L.7 Menurunkan Atap bahan tidak dipakai lagi 1 m² 2,950.00 3,245.00
BOW L.9 Menurunkan Atap bahan dipakai 60% 1 m² 6,150.00 6,765.00
BOW L.11 Membongkar dinding, lantai, plafond kayu 1 m² 25,810.00 28,391.00
BOW L.12 Membongkar Kuda-kuda, rangka badan, gelagar dll 1 m³ 1,049,000.00 1,153,900.00
BOW SUP.VI.a Pasangan Paving Stone 1 m² 142,725.00 156,997.50
A.8.4.2 HARGA SATUAN PEKERJAAN PEMOTONGAN PIPA

A.8.4.2.1 Pemotongan 1 buah pipa PVC Ø 63 mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)

A TENAGA
Pekerja L.01 OH 0.005
Tukang pipa L.02 OH 0.002
Mandor L.04 OH 0.001
JUMLAH TENAGA KERJA
B BAHAN
Pipa PVC Ø 63 mm bh 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa
T1/manual (gergaji) hari 0.003
/saw
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.2.2 Pemotongan 1 m pipa PVC Ø 90 mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)

A TENAGA
Pekerja L.01 OH 0.014
Tukang pipa L.02 OH 0.007
Mandor L.04 OH 0.001
JUMLAH TENAGA KERJA
B BAHAN
Pipa PVC Ø 90 mm bh 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa
T1/manual (gergaji) hari 0.003
/saw
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.2.3 Pemotongan 1 buah pipa PVC Ø 110 mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)

A TENAGA
Pekerja L.01 OH 0.022
Tukang pipa L.02 OH 0.011
Mandor L.04 OH 0.002
JUMLAH TENAGA KERJA
B BAHAN
Pipa PVC Ø 110 mm bh 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa
T1/manual (gergaji) hari 0.003
/saw
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.2.4 Pemotongan 1 buah pipa PVC Ø 150 mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)

A TENAGA
Pekerja L.01 OH 0.031
Tukang pipa L.02 OH 0.015
Mandor L.04 OH 0.003
JUMLAH TENAGA KERJA
B BAHAN
Pipa PVC Ø 150 mm bh 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa
T1/manual (gergaji) hari 0.003
/saw
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.2.5 Pemotongan 1 buah pipa PVC Ø 200 mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)

A TENAGA
Pekerja L.01 OH 0.081
Tukang pipa L.02 OH 0.040
Mandor L.04 OH 0.008
JUMLAH TENAGA KERJA
B BAHAN
Pipa PVC Ø 200 mm bh 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa
T1/manual (gergaji) hari 0.017
/saw
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.2.6 Pemotongan 1 buah pipa PVC Ø 250 mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)

A TENAGA
Pekerja L.01 OH 0.128
Tukang pipa L.02 OH 0.064
Mandor L.04 OH 0.013
JUMLAH TENAGA KERJA
B BAHAN
Pipa PVC Ø 250 mm bh 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa
T1/manual (gergaji) hari 0.030
/saw
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.2.7 Pemotongan 1 buah pipa PVC Ø 300 mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)

A TENAGA
Pekerja L.01 OH 0.155
Tukang pipa L.02 OH 0.077
Mandor L.04 OH 0.015
JUMLAH TENAGA KERJA
B BAHAN
Pipa PVC Ø 300 mm bh 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa
T1/manual (gergaji) hari 0.037
/saw
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.2.8 Pemotongan 1 buah pipa PVC Ø 400 mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)

A TENAGA
Pekerja L.01 OH 0.331
Tukang pipa L.02 OH 0.166
Mandor L.04 OH 0.033
JUMLAH TENAGA KERJA
B BAHAN
Pipa PVC Ø 400 mm bh 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa
T1/manual (gergaji) hari 0.086
/saw
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.2.9 Pemotongan 1 buah pipa PVC Ø 450 mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)

A TENAGA
Pekerja L.01 OH 0.420
Tukang pipa L.02 OH 0.210
Mandor L.04 OH 0.042
JUMLAH TENAGA KERJA
B BAHAN
Pipa PVC Ø 450 mm bh 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa
T2/mekanik / cilinder hari 0.054
saw
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.2.10 Pemotongan 1 buah pipa PVC Ø 500 mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)

A TENAGA
Pekerja L.01 OH 0.518
Tukang pipa L.02 OH 0.259
Mandor L.04 OH 0.052
JUMLAH TENAGA KERJA
B BAHAN
Pipa PVC Ø 500 mm bh 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa
T2/mekanik / cilinder hari 0.069
saw
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.2.11 Pemotongan 1 buah pipa PVC Ø 600 mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)

A TENAGA
Pekerja L.01 OH 0.623
Tukang pipa L.02 OH 0.311
Mandor L.04 OH 0.062
JUMLAH TENAGA KERJA
B BAHAN
Pipa PVC Ø 600 mm bh 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa
T2/mekanik / cilinder hari 0.086
saw
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.2.12 Pemotongan 1 buah pipa PVC Ø 800 mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)

A TENAGA
Pekerja L.01 OH 1.089
Tukang pipa L.02 OH 0.545
Mandor L.04 OH 0.109
JUMLAH TENAGA KERJA
B BAHAN
Pipa PVC Ø 800 mm bh 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa
T2/mekanik / cilinder hari 0.160
saw
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.2.13 Pemotongan 1 buah pipa PVC Ø 900 mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)

A TENAGA
Pekerja L.01 OH 1.141
Tukang pipa L.02 OH 0.571
Mandor L.04 OH 0.114
JUMLAH TENAGA KERJA
B BAHAN
Pipa PVC Ø 900 mm bh 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa
T2/mekanik / cilinder hari 0.168
saw
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.2.14 Pemotongan 1 buah pipa PVC Ø 1000 mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)

A TENAGA
Pekerja L.01 OH 1.285
Tukang pipa L.02 OH 0.643
Mandor L.04 OH 0.129
JUMLAH TENAGA KERJA
B BAHAN
Pipa PVC Ø 1000 mm bh 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa
T2/mekanik / cilinder hari 0.191
saw
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.2.15 Pemotongan 1 buah pipa PVC Ø 1100 mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)

A TENAGA
Pekerja L.01 OH 1.429
Tukang pipa L.02 OH 0.715
Mandor L.04 OH 0.143
JUMLAH TENAGA KERJA
B BAHAN
Pipa PVC Ø 1100 mm bh 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa
T2/mekanik / cilinder hari 0.213
saw
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.2.16 Pemotongan 1 buah pipa PVC Ø 1200 mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)

A TENAGA
Pekerja L.01 OH 1.573
Tukang pipa L.02 OH 0.787
Mandor L.04 OH 0.157
JUMLAH TENAGA KERJA
B BAHAN
Pipa PVC Ø 1200 mm bh 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa
T2/mekanik / cilinder hari 0.236
saw
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.2.17 Pemotongan 1 buah pipa HDPE Ø 63 mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)

A TENAGA
Pekerja L.01 OH 0.002
Tukang pipa L.02 OH 0.001
Mandor L.04 OH 0.000
Operator L.08 OH 0.034
JUMLAH TENAGA KERJA
B BAHAN
Pipa HDPE Ø 63 mm bh 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa
T2/mekanik / cilinder hari 0.004
saw
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.2.18 Pemotongan 1 buah pipa HDPE Ø 100 mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)

A TENAGA
Pekerja L.01 OH 0.006
Tukang pipa L.02 OH 0.003
Mandor L.04 OH 0.001
Operator L.08 OH 0.071
JUMLAH TENAGA KERJA
B BAHAN
Pipa HDPE Ø 100 mm bh 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa
T2/mekanik / cilinder hari 0.005
saw
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.2.19 Pemotongan 1 buah pipa HDPE Ø 125 mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)

A TENAGA
Pekerja L.01 OH 0.009
Tukang pipa L.02 OH 0.005
Mandor L.04 OH 0.001
Operator L.08 OH 0.096
JUMLAH TENAGA KERJA
B BAHAN
Pipa HDPE Ø 125 mm bh 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa
T2/mekanik / cilinder hari 0.006
saw
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.2.20 Pemotongan 1 buah pipa HDPE Ø 150 mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)

A TENAGA
Pekerja L.01 OH 0.016
Tukang pipa L.02 OH 0.008
Mandor L.04 OH 0.002
Operator L.08 OH 0.121
JUMLAH TENAGA KERJA
B BAHAN
Pipa HDPE Ø 150 mm bh 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa
T2/mekanik / cilinder hari 0.009
saw
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.2.21 Pemotongan 1 buah pipa HDPE Ø 200 mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)

A TENAGA
Pekerja L.01 OH 0.044
Tukang pipa L.02 OH 0.022
Mandor L.04 OH 0.004
Operator L.08 OH 0.171
JUMLAH TENAGA KERJA
B BAHAN
Pipa HDPE Ø 200 mm bh 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa
T2/mekanik / cilinder hari 0.017
saw
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.2.22 Pemotongan 1 buah pipaHDPE Ø 250 mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)

A TENAGA
Pekerja L.01 OH 0.067
Tukang pipa L.02 OH 0.033
Mandor L.04 OH 0.007
Operator L.08 OH 0.221
JUMLAH TENAGA KERJA
B BAHAN
Pipa HDPE Ø 250 mm bh 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa
T2/mekanik / cilinder hari 0.023
saw
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.2.23 Pemotongan 1 buah pipa HDPE Ø 300 mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)

A TENAGA
Pekerja L.01 OH 0.090
Tukang pipa L.02 OH 0.045
Mandor L.04 OH 0.009
Operator L.08 OH 0.271
JUMLAH TENAGA KERJA
B BAHAN
Pipa HDPE Ø 300 mm bh 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa
T2/mekanik / cilinder hari 0.030
saw
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.2.24 Pemotongan 1 buah pipa HDPE Ø 400 mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)

A TENAGA
Pekerja L.01 OH 0.177
Tukang pipa L.02 OH 0.088
Mandor L.04 OH 0.018
Operator L.08 OH 0.371
JUMLAH TENAGA KERJA
B BAHAN
Pipa HDPE Ø 400 mm bh 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa
T2/mekanik / cilinder hari 0.055
saw
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.2.25 Pemotongan 1 buah pipa HDPE Ø 450 mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)

A TENAGA
Pekerja L.01 OH 0.225
Tukang pipa L.02 OH 0.113
Mandor L.04 OH 0.023
Operator L.08 OH 0.421
JUMLAH TENAGA KERJA
B BAHAN
Pipa HDPE Ø 450 mm bh 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa
T2/mekanik / cilinder hari 0.070
saw
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.2.26 Pemotongan 1 buah pipa HDPE Ø 500 mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)

A TENAGA
Pekerja L.01 OH 0.277
Tukang pipa L.02 OH 0.139
Mandor L.04 OH 0.028
Operator L.08 OH 0.471
JUMLAH TENAGA KERJA
B BAHAN
Pipa HDPE Ø 500 mm bh 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa
T2/mekanik / cilinder hari 0.085
saw
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.2.27 Pemotongan 1 buah pipa HDPE Ø 600 mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)

A TENAGA
Pekerja L.01 OH 0.333
Tukang pipa L.02 OH 0.167
Mandor L.04 OH 0.033
Operator L.08 OH 0.571
JUMLAH TENAGA KERJA
B BAHAN
Pipa HDPE Ø 600 mm bh 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa
T2/mekanik / cilinder hari 0.101
saw
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.2.28 Pemotongan 1 buah pipa HDPE Ø 800 mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)

A TENAGA
Pekerja L.01 OH 0.601
Tukang pipa L.02 OH 0.301
Mandor L.04 OH 0.060
Operator L.08 OH 0.771
JUMLAH TENAGA KERJA
B BAHAN
Pipa HDPE Ø 800 mm bh 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa
T2/mekanik / cilinder hari 0.179
saw
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.2.29 Pemotongan 1 buah pipa HDPE Ø 900 mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)

A TENAGA
Pekerja L.01 OH 0.913
Tukang pipa L.02 OH 0.456
Mandor L.04 OH 0.091
Operator L.08 OH 0.871
JUMLAH TENAGA KERJA
B BAHAN
Pipa HDPE Ø 900 mm bh 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa
T2/mekanik / cilinder hari 0.270
saw
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.2.30 Pemotongan 1 buah pipa HDPE Ø 1000 mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)

A TENAGA
Pekerja L.01 OH 1.125
Tukang pipa L.02 OH 0.562
Mandor L.04 OH 0.112
Operator L.08 OH 0.971
JUMLAH TENAGA KERJA
B BAHAN
Pipa HDPE Ø 1000 mm bh 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa
T2/mekanik / cilinder hari 0.332
saw
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.2.31 Pemotongan 1 buah pipa HDPE Ø 1100 mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)

A TENAGA
Pekerja L.01 OH 1.238
Tukang pipa L.02 OH 0.619
Mandor L.04 OH 0.124
Operator L.08 OH 1.071
JUMLAH TENAGA KERJA
B BAHAN
Pipa HDPE Ø 1100 mm bh 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa
T2/mekanik / cilinder hari 0.365
saw
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.2.32 Pemotongan 1 buah pipa HDPE Ø 1200 mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)


A TENAGA
Pekerja L.01 OH 1.619
Tukang pipa L.02 OH 0.809
Mandor L.04 OH 0.162
Operator L.08 OH 1.171
JUMLAH TENAGA KERJA
B BAHAN
Pipa HDPE Ø 1200 mm bh 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa
T2/mekanik / cilinder hari 0.477
saw
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.2.33 Pemotongan 1 buah pipa GIP Ø 63 mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)

A TENAGA
Pekerja L.01 OH 0.019
Tukang pipa L.02 OH 0.010
Mandor L.04 OH 0.002

JUMLAH TENAGA KERJA


B BAHAN
Pipa GIP Ø 63 mm bh 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa
T2/mekanik / cilinder hari -
saw
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.2.34 Pemotongan 1 buah pipa GIP Ø 100 mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)

A TENAGA
Pekerja L.01 OH 0.058
Tukang pipa L.02 OH 0.029
Mandor L.04 OH 0.006

JUMLAH TENAGA KERJA


B BAHAN
Pipa GIP Ø 100 mm bh 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa
T2/mekanik / cilinder hari -
saw
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.2.35 Pemotongan 1 buah pipa GIP Ø 125 mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)

A TENAGA
Pekerja L.01 OH 0.092
Tukang pipa L.02 OH 0.046
Mandor L.04 OH 0.009

JUMLAH TENAGA KERJA


B BAHAN
Pipa GIP Ø 125 mm bh 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa
T2/mekanik / cilinder hari -
saw
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)
A.8.4.2.36 Pemotongan 1 buah pipa GIP Ø 150 mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)

A TENAGA
Pekerja L.01 OH 0.131
Tukang pipa L.02 OH 0.066
Mandor L.04 OH 0.013

JUMLAH TENAGA KERJA


B BAHAN
Pipa GIP Ø 150 mm bh 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa
T2/mekanik / cilinder hari -
saw
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.2.37 Pemotongan 1 buah pipa GIP Ø 200 mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)

A TENAGA
Pekerja L.01 OH 0.340
Tukang pipa L.02 OH 0.170
Mandor L.04 OH 0.034

JUMLAH TENAGA KERJA


B BAHAN
Pipa GIP Ø 200 mm bh 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa
T2/mekanik / cilinder hari -
saw
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.2.38 Pemotongan 1 buah pipa GIP Ø 250 mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)

A TENAGA
Pekerja L.01 OH 0.475
Tukang pipa L.02 OH 0.237
Mandor L.04 OH 0.047

JUMLAH TENAGA KERJA


B BAHAN
Pipa GIP Ø 250 mm bh 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa
T2/mekanik / cilinder hari -
saw
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.2.39 Pemotongan 1 buah pipa GIP Ø 300 mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)

A TENAGA
Pekerja L.01 OH 0.504
Tukang pipa L.02 OH 0.252
Mandor L.04 OH 0.050

JUMLAH TENAGA KERJA


B BAHAN
Pipa GIP Ø 300 mm bh 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa
T2/mekanik / cilinder hari -
saw
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.2.40 Pemotongan 1 buah pipa GIP Ø 400 mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)

A TENAGA
Pekerja L.01 OH 0.738
Tukang pipa L.02 OH 0.369
Mandor L.04 OH 0.074

JUMLAH TENAGA KERJA


B BAHAN
Pipa GIP Ø 400 mm bh 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa
T2/mekanik / cilinder hari -
saw
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.2.41 Pemotongan 1 buah pipa GIP Ø 450 mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)

A TENAGA
Pekerja L.01 OH 0.848
Tukang pipa L.02 OH 0.424
Mandor L.04 OH 0.085

JUMLAH TENAGA KERJA


B BAHAN
Pipa GIP Ø 450 mm bh 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa
T2/mekanik / cilinder hari -
saw
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.2.42 Pemotongan 1 buah pipa GIP Ø 500 mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)

A TENAGA
Pekerja L.01 OH 0.941
Tukang pipa L.02 OH 0.471
Mandor L.04 OH 0.094

JUMLAH TENAGA KERJA


B BAHAN
Pipa GIP Ø 500 mm bh 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa
T2/mekanik / cilinder hari -
saw
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.2.43 Pemotongan1 buah pipa GIP Ø 600 mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)

A TENAGA
Pekerja L.01 OH 0.864
Tukang pipa L.02 OH 0.432
Mandor L.04 OH 0.086

JUMLAH TENAGA KERJA


B BAHAN
Pipa GIP Ø 600 mm bh 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa
T2/mekanik / cilinder hari -
saw
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.2.44 Pemotongan 1 buah pipa GIP Ø 800 mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)

A TENAGA
Pekerja L.01 OH 1.567
Tukang pipa L.02 OH 0.783
Mandor L.04 OH 0.157

JUMLAH TENAGA KERJA


B BAHAN
Pipa GIP Ø 800 mm bh 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa
T2/mekanik / cilinder hari -
saw
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.2.45 Pemotongan 1 buah pipa GIP Ø 900 mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)

A TENAGA
Pekerja L.01 OH 1.770
Tukang pipa L.02 OH 0.885
Mandor L.04 OH 0.177

JUMLAH TENAGA KERJA


B BAHAN
Pipa GIP Ø 900 mm bh 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa
T2/mekanik / cilinder hari -
saw
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.2.46 Pemotongan 1 buah pipa GIP Ø 1000 mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)

A TENAGA
Pekerja L.01 OH 1.974
Tukang pipa L.02 OH 0.987
Mandor L.04 OH 0.197

JUMLAH TENAGA KERJA


B BAHAN
Pipa GIP Ø 1000 mm bh 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa
T2/mekanik / cilinder hari -
saw
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.2.47 Pemotongan 1 buah pipa GIP Ø 1100 mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)

A TENAGA
Pekerja L.01 OH 2.178
Tukang pipa L.02 OH 1.089
Mandor L.04 OH 0.218

JUMLAH TENAGA KERJA


B BAHAN
Pipa GIP Ø 1100 mm bh 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa
T2/mekanik / cilinder hari -
saw
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.2.48 Pemotongan 1 buah pipa GIP Ø 1200 mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)

A TENAGA
Pekerja L.01 OH 2.382
Tukang pipa L.02 OH 1.191
Mandor L.04 OH 0.238

JUMLAH TENAGA KERJA


B BAHAN
Pipa GIP Ø 1200 mm bh 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa
T2/mekanik / cilinder hari -
saw
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.2.49 Pemotongan 1 buah pipa DCI Ø 100 mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)

A TENAGA
Pekerja L.01 OH 0.071
Tukang pipa L.02 OH 0.014
Mandor L.04 OH 0.007
JUMLAH TENAGA KERJA
B BAHAN
Pipa DCI Ø 100 mm bh 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel &
hari 0.003
handle crane 2 T
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.2.50 Pemotongan 1 buah pipa DCI Ø 125 mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)

A TENAGA
Pekerja L.01 OH 0.112
Tukang pipa L.02 OH 0.022
Mandor L.04 OH 0.011

JUMLAH TENAGA KERJA


B BAHAN
Pipa DCI Ø 125 mm bh 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel &
hari 0.010
handle crane 2 T
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.2.51 Pemotongan 1 buah pipa DCI Ø 150 mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)

A TENAGA
Pekerja L.01 OH 0.159
Tukang pipa L.02 OH 0.032
Mandor L.04 OH 0.016
JUMLAH TENAGA KERJA
B BAHAN
Pipa DCI Ø 150 mm bh 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel &
hari 0.018
handle crane 2 T
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.2.52 Pemotongan 1 buah pipa DCI Ø 200 mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)

A TENAGA
Pekerja L.01 OH 0.366
Tukang pipa L.02 OH 0.073
Mandor L.04 OH 0.037

JUMLAH TENAGA KERJA


B BAHAN
Pipa DCI Ø 200 mm bh 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel &
hari 0.054
handle crane 2 T
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.2.53 Pemotongan 1 buah pipa DCI Ø 250 mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)

A TENAGA
Pekerja L.01 OH 0.476
Tukang pipa L.02 OH 0.095
Mandor L.04 OH 0.048
JUMLAH TENAGA KERJA
B BAHAN
Pipa DCI Ø 250 mm bh 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel &
hari 0.073
handle crane 2 T
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.2.54 Pemotongan 1 buah pipa DCI Ø 300 mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)

A TENAGA
Pekerja L.01 OH 0.512
Tukang pipa L.02 OH 0.102
Mandor L.04 OH 0.051

JUMLAH TENAGA KERJA


B BAHAN
Pipa DCI Ø 300 mm bh 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel &
hari 0.079
handle crane 2 T
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.2.55 Pemotongan 1 buah pipa DCI Ø 400 mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)

A TENAGA
Pekerja L.01 OH 0.941
Tukang pipa L.02 OH 0.188
Mandor L.04 OH 0.094
JUMLAH TENAGA KERJA
B BAHAN
Pipa DCI Ø 400 mm bh 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa
T2/mekanik / cilinder hari 0.158
saw
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.2.56 Pemotongan 1 buah pipa DCI Ø 450 mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)

A TENAGA
Pekerja L.01 OH 1.137
Tukang pipa L.02 OH 0.227
Mandor L.04 OH 0.114

JUMLAH TENAGA KERJA


B BAHAN
Pipa DCI Ø 450 mm bh 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa
T2/mekanik / cilinder hari 0.176
saw
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.2.57 Pemotongan 1 buah pipa DCI Ø 500 mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)

A TENAGA
Pekerja L.01 OH 1.312
Tukang pipa L.02 OH 0.262
Mandor L.04 OH 0.131

JUMLAH TENAGA KERJA


B BAHAN
Pipa DCI Ø 500 mm bh 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa
T2/mekanik / cilinder hari 0.192
saw
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.2.58 Pemotongan 1 buah pipa DCI Ø 600 mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)

A TENAGA
Pekerja L.01 OH 1.309
Tukang pipa L.02 OH 0.262
Mandor L.04 OH 0.131

JUMLAH TENAGA KERJA


B BAHAN
Pipa DCI Ø 600 mm bh 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa
T2/mekanik / cilinder hari 0.192
saw
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.2.59 Pemotongan 1 buah pipa DCI Ø 800 mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)


A TENAGA
Pekerja L.01 OH 2.598
Tukang pipa L.02 OH 0.520
Mandor L.04 OH 0.260

JUMLAH TENAGA KERJA


B BAHAN
Pipa DCI Ø 800 mm bh 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa
T2/mekanik / cilinder hari 0.310
saw
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.2.60 Pemotongan 1 buah pipa DCI Ø 900 mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)

A TENAGA
Pekerja L.01 OH 3.370
Tukang pipa L.02 OH 0.674
Mandor L.04 OH 0.337

JUMLAH TENAGA KERJA


B BAHAN
Pipa DCI Ø 900 mm bh 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa
T2/mekanik / cilinder hari 0.381
saw
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.2.61 Pemotongan 1 buah pipa DCI Ø 1000 mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)

A TENAGA
Pekerja L.01 OH 4.021
Tukang pipa L.02 OH 0.804
Mandor L.04 OH 0.402

JUMLAH TENAGA KERJA


B BAHAN
Pipa DCI Ø 1000 mm bh 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa
T2/mekanik / cilinder hari 0.441
saw
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.2.62 Pemotongan 1 buah pipa DCI Ø 1100 mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)

A TENAGA
Pekerja L.01 OH 4.731
Tukang pipa L.02 OH 0.946
Mandor L.04 OH 0.473

JUMLAH TENAGA KERJA


B BAHAN
Pipa DCI Ø 1100 mm bh 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa
T2/mekanik / cilinder hari 0.506
saw
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)
A.8.4.2.63 Pemotongan 1 buah pipa DCI Ø 1200 mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)

A TENAGA
Pekerja L.01 OH 5.502
Tukang pipa L.02 OH 1.100
Mandor L.04 OH 0.550

JUMLAH TENAGA KERJA


B BAHAN
Pipa DCI Ø 1200 mm bh 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa
T2/mekanik / cilinder hari 0.576
saw
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.2.64 Pemotongan 1 buah pipa baja Ø 63 mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)

A TENAGA
Pekerja L.01 OH 0.028
Tukang pipa L.02 OH 0.006
Mandor L.04 OH 0.003

JUMLAH TENAGA KERJA


B BAHAN
Pipa Baja Ø 63 mm bh 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa
T2/mekanik / cilinder hari 0.037
saw
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.2.65 Pemotongan 1 buah pipa baja Ø 100 mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)

A TENAGA
Pekerja L.01 OH 0.085
Tukang pipa L.02 OH 0.017
Mandor L.04 OH 0.008

JUMLAH TENAGA KERJA


B BAHAN
Pipa Baja Ø 100 mm bh 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa
T2/mekanik / cilinder hari 0.040
saw
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.2.66 Pemotongan 1 buah pipa baja Ø 125 mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)

A TENAGA
Pekerja L.01 OH 0.133
Tukang pipa L.02 OH 0.027
Mandor L.04 OH 0.013

JUMLAH TENAGA KERJA


B BAHAN
Pipa Baja Ø 125 mm bh 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa
T2/mekanik / cilinder hari 0.042
saw
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.2.67 Pemotongan 1 buah pipa baja Ø 150 mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)

A TENAGA
Pekerja L.01 OH 0.184
Tukang pipa L.02 OH 0.037
Mandor L.04 OH 0.018

JUMLAH TENAGA KERJA


B BAHAN
Pipa Baja Ø 150 mm bh 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa
T2/mekanik / cilinder hari 0.045
saw
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.2.68 Pemotongan 1 buah pipa baja Ø 200 mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)

A TENAGA
Pekerja L.01 OH 0.476
Tukang pipa L.02 OH 0.095
Mandor L.04 OH 0.048

JUMLAH TENAGA KERJA


B BAHAN
Pipa Baja Ø 200 mm bh 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa
T2/mekanik / cilinder hari 0.060
saw
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.2.69 Pemotongan 1 buah pipa baja Ø 250 mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)

A TENAGA
Pekerja L.01 OH 0.663
Tukang pipa L.02 OH 0.133
Mandor L.04 OH 0.066

JUMLAH TENAGA KERJA


B BAHAN
Pipa Baja Ø 250 mm bh 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa
T2/mekanik / cilinder hari 0.068
saw
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.2.70 Pemotongan 1 buah pipa baja Ø 300 mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)

A TENAGA
Pekerja L.01 OH 0.745
Tukang pipa L.02 OH 0.149
Mandor L.04 OH 0.074

JUMLAH TENAGA KERJA


B BAHAN
Pipa Baja Ø 300 mm bh 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa
T2/mekanik / cilinder hari 0.072
saw
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.2.71 Pemotongan 1 buah pipa baja Ø 400 mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)

A TENAGA
Pekerja L.01 OH 1.440
Tukang pipa L.02 OH 0.288
Mandor L.04 OH 0.144

JUMLAH TENAGA KERJA


B BAHAN
Pipa Baja Ø 400 mm bh 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa
T2/mekanik / cilinder hari 0.105
saw
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.2.72 Pemotongan 1 buah pipa baja Ø 450 mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)

A TENAGA
Pekerja L.01 OH 1.399
Tukang pipa L.02 OH 0.280
Mandor L.04 OH 0.140

JUMLAH TENAGA KERJA


B BAHAN
Pipa Baja Ø 450 mm bh 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa
T2/mekanik / cilinder hari 0.107
saw
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.2.73 Pemotongan 1 buah pipa baja Ø 500 mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)

A TENAGA
Pekerja L.01 OH 1.558
Tukang pipa L.02 OH 0.312
Mandor L.04 OH 0.156

JUMLAH TENAGA KERJA


B BAHAN
Pipa Baja Ø 500 mm bh 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa
T2/mekanik / cilinder hari 0.107
saw
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.2.74 Pemotongan 1 buah pipa baja Ø 600 mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)

A TENAGA
Pekerja L.01 OH 1.437
Tukang pipa L.02 OH 0.287
Mandor L.04 OH 0.144

JUMLAH TENAGA KERJA


B BAHAN
Pipa Baja Ø 600 mm bh 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa
T2/mekanik / cilinder hari 0.113
saw
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.2.75 Pemotongan 1 buah pipa baja Ø 800 mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)

A TENAGA
Pekerja L.01 OH 2.624
Tukang pipa L.02 OH 0.525
Mandor L.04 OH 0.262

JUMLAH TENAGA KERJA


B BAHAN
Pipa Baja Ø 800 mm bh 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa
T2/mekanik / cilinder hari 0.166
saw
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.2.76 Pemotongan 1 buah pipa baja Ø 900 mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)

A TENAGA
Pekerja L.01 OH 2.971
Tukang pipa L.02 OH 0.594
Mandor L.04 OH 0.297
JUMLAH TENAGA KERJA
B BAHAN
Pipa Baja Ø 900 mm bh 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa
T2/mekanik / cilinder hari 0.183
saw
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.2.77 Pemotongan 1 buah pipa baja Ø 1000 mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)

A TENAGA
Pekerja L.01 OH 3.319
Tukang pipa L.02 OH 0.664
Mandor L.04 OH 0.332

JUMLAH TENAGA KERJA


B BAHAN
Pipa Baja Ø 1000 mm bh 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa
T2/mekanik / cilinder hari 0.201
saw
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.2.78 Pemotongan 1 buah pipa baja Ø 1100 mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)

A TENAGA
Pekerja L.01 OH 3.667
Tukang pipa L.02 OH 0.733
Mandor L.04 OH 0.367

JUMLAH TENAGA KERJA


B BAHAN
Pipa Baja Ø 1100 mm bh 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa
T2/mekanik / cilinder hari 0.218
saw
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.2.79 Pemotongan 1 buah pipa baja Ø 1200 mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)

A TENAGA
Pekerja L.01 OH 4.015
Tukang pipa L.02 OH 0.803
Mandor L.04 OH 0.402

JUMLAH TENAGA KERJA


B BAHAN
Pipa Baja Ø 1100 mm bh 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa
T2/mekanik / cilinder hari 0.236
saw
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)
Jumlah Harga (Rp.)

Jumlah Harga (Rp.)


Jumlah Harga (Rp.)

Jumlah Harga (Rp.)


Jumlah Harga (Rp.)

Jumlah Harga (Rp.)


Jumlah Harga (Rp.)

Jumlah Harga (Rp.)


Jumlah Harga (Rp.)

Jumlah Harga (Rp.)


Jumlah Harga (Rp.)

Jumlah Harga (Rp.)


Jumlah Harga (Rp.)

Jumlah Harga (Rp.)


Jumlah Harga (Rp.)

Jumlah Harga (Rp.)


Jumlah Harga (Rp.)

Jumlah Harga (Rp.)


Jumlah Harga (Rp.)

Jumlah Harga (Rp.)


Jumlah Harga (Rp.)

Jumlah Harga (Rp.)


Jumlah Harga (Rp.)

Jumlah Harga (Rp.)


Jumlah Harga (Rp.)

Jumlah Harga (Rp.)


Jumlah Harga (Rp.)

Jumlah Harga (Rp.)


Jumlah Harga (Rp.)

Jumlah Harga (Rp.)


Jumlah Harga (Rp.)

Jumlah Harga (Rp.)


Jumlah Harga (Rp.)

Jumlah Harga (Rp.)


Jumlah Harga (Rp.)

Jumlah Harga (Rp.)


Jumlah Harga (Rp.)

Jumlah Harga (Rp.)


Jumlah Harga (Rp.)

Jumlah Harga (Rp.)


Jumlah Harga (Rp.)

Jumlah Harga (Rp.)


Jumlah Harga (Rp.)

Jumlah Harga (Rp.)


Jumlah Harga (Rp.)

Jumlah Harga (Rp.)


Jumlah Harga (Rp.)

Jumlah Harga (Rp.)


Jumlah Harga (Rp.)

Jumlah Harga (Rp.)


Jumlah Harga (Rp.)

Jumlah Harga (Rp.)


Jumlah Harga (Rp.)

Jumlah Harga (Rp.)


Jumlah Harga (Rp.)

Jumlah Harga (Rp.)


Jumlah Harga (Rp.)

Jumlah Harga (Rp.)


Jumlah Harga (Rp.)

Jumlah Harga (Rp.)


Jumlah Harga (Rp.)

Jumlah Harga (Rp.)


Jumlah Harga (Rp.)

Jumlah Harga (Rp.)


Jumlah Harga (Rp.)

Jumlah Harga (Rp.)


Jumlah Harga (Rp.)

Jumlah Harga (Rp.)


Jumlah Harga (Rp.)

Jumlah Harga (Rp.)


Jumlah Harga (Rp.)

Jumlah Harga (Rp.)


Jumlah Harga (Rp.)

Jumlah Harga (Rp.)


Jumlah Harga (Rp.)

Jumlah Harga (Rp.)


Jumlah Harga (Rp.)

Jumlah Harga (Rp.)


Jumlah Harga (Rp.)

Jumlah Harga (Rp.)


Jumlah Harga (Rp.)
A.8.4.3 HARGA SATUAN PEKERJAAN PEMASANGAN AKSESORIS PIPA

A.8.4.3.1 Pemasangan 1 buah Valve Ø 150 mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)

A TENAGA
Pekerja L.01 OH 1.429
Tukang pipa L.02 OH 0.715
Mandor L.04 OH 0.143

JUMLAH TENAGA KERJA


B BAHAN
Valve Ø 150 mm bh 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel &
hari 0.100
handle crane 2 T
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.3.2 Pemasangan 1 buah Valve Ø 200 mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)

A TENAGA
Pekerja L.01 OH 1.714
Tukang pipa L.02 OH 0.857
Mandor L.04 OH 0.171

JUMLAH TENAGA KERJA


B BAHAN
Valve Ø 200 mm bh 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel &
hari 0.300
handle crane 2 T
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.3.3 Pemasangan 1 buah Valve Ø 250 mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)

A TENAGA
Pekerja L.01 OH 1.714
Tukang pipa L.02 OH 0.857
Mandor L.04 OH 0.171

JUMLAH TENAGA KERJA


B BAHAN
Valve Ø 250 mm bh 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel &
hari 0.400
handle crane 2 T
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.3.4 Pemasangan 1 buah Valve Ø 300 mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)

A TENAGA
Pekerja L.01 OH 2.000
Tukang pipa L.02 OH 1.000
Mandor L.04 OH 0.200

JUMLAH TENAGA KERJA


B BAHAN
Valve Ø 300 mm bh 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel &
hari 0.500
handle crane 2 T
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.3.5 Pemasangan 1 buah Valve Ø 400 mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)

A TENAGA
Pekerja L.01 OH 3.429
Tukang pipa L.02 OH 1.715
Mandor L.04 OH 0.343

JUMLAH TENAGA KERJA


B BAHAN
Valve Ø 400 mm bh 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel &
hari 1.000
handle crane 2 T
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.3.6 Pemasangan 1 buah Valve Ø 450 mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)

A TENAGA
Pekerja L.01 OH 3.429
Tukang pipa L.02 OH 1.715
Mandor L.04 OH 0.343

JUMLAH TENAGA KERJA


B BAHAN
Valve Ø 450 mm bh 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel &
hari 1.000
handle crane 2 T
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.3.7 Pemasangan 1 buah Valve Ø 500 mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)

A TENAGA
Pekerja L.01 OH 4.000
Tukang pipa L.02 OH 2.000
Mandor L.04 OH 0.400

JUMLAH TENAGA KERJA


B BAHAN
Valve Ø 500 mm bh 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel &
hari 1.000
handle crane 2 T
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.3.8 Pemasangan 1 buah Valve Ø 600 mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)

A TENAGA
Pekerja L.01 OH 1.421
Tukang pipa L.02 OH 0.711
Mandor L.04 OH 0.142

JUMLAH TENAGA KERJA


B BAHAN
Valve Ø 600 mm bh 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel &
hari 0.600
handle crane 2 T
Mobile crane =< 3 ton hari 0.300
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.3.9 Pemasangan 1 buah Valve Ø 700 mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)

A TENAGA
Pekerja L.01 OH 1.429
Tukang pipa L.02 OH 0.715
Mandor L.04 OH 0.143

JUMLAH TENAGA KERJA


B BAHAN
Valve Ø 700 mm bh 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel &
hari 0.500
handle crane 2 T
Mobile crane =< 3 ton hari 0.500
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.3.10 Pemasangan 1 buah Valve Ø 800 mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)

A TENAGA
Pekerja L.01 OH 1.786
Tukang pipa L.02 OH 0.893
Mandor L.04 OH 0.179

JUMLAH TENAGA KERJA


B BAHAN
Valve Ø 800 mm bh 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel &
hari 0.500
handle crane 2 T
Mobile crane =< 3 ton hari 0.500
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.3.11 Pemasangan 1 buah Valve Ø 900 mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)

A TENAGA
Pekerja L.01 OH 1.714
Tukang pipa L.02 OH 0.857
Mandor L.04 OH 0.171

JUMLAH TENAGA KERJA


B BAHAN
Valve Ø 900 mm bh 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel &
hari 0.750
handle crane 2 T
Mobile crane =< 3 ton hari 0.750
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.3.12 Pemasangan 1 buah Valve Ø 1000 mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)

A TENAGA
Pekerja L.01 OH 2.571
Tukang pipa L.02 OH 1.286
Mandor L.04 OH 0.257

JUMLAH TENAGA KERJA


B BAHAN
Valve Ø 1000 mm bh 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel &
hari 1.000
handle crane 2 T
Mobile crane =< 3 ton hari 1.000
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.3.13 Pemasangan 1 buah Valve Ø 1100 mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)

A TENAGA
Pekerja L.01 OH 3.000
Tukang pipa L.02 OH 1.500
Mandor L.04 OH 0.300

JUMLAH TENAGA KERJA


B BAHAN
Valve Ø 1100 mm bh 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel &
hari 1.000
handle crane 2 T
Mobile crane =< 3 ton hari 1.000
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.3.14 Pemasangan 1 buah Valve Ø 1200 mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)

A TENAGA
Pekerja L.01 OH 3.000
Tukang pipa L.02 OH 1.500
Mandor L.04 OH 0.300

JUMLAH TENAGA KERJA


B BAHAN
Valve Ø 1200 mm bh 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel &
hari 1.000
handle crane 2 T
Mobile crane =< 3 ton hari 1.000
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.3.15 Pemasangan 1 buah Tee Ø 150 mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)

A TENAGA
Pekerja L.01 OH 0.106
Tukang pipa L.02 OH 0.053
Mandor L.04 OH 0.011

JUMLAH TENAGA KERJA


B BAHAN
Tee Ø 150 mm bh 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel &
hari 0.028
handle crane 2 T

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.3.16 Pemasangan 1 buah Tee Ø 200 mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)

A TENAGA
Pekerja L.01 OH 0.216
Tukang pipa L.02 OH 0.108
Mandor L.04 OH 0.022

JUMLAH TENAGA KERJA


B BAHAN
Tee Ø 200 mm bh 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel &
hari 0.029
handle crane 2 T

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.3.17 Pemasangan 1 buah Tee Ø 250 mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)

A TENAGA
Pekerja L.01 OH 0.326
Tukang pipa L.02 OH 0.163
Mandor L.04 OH 0.033

JUMLAH TENAGA KERJA


B BAHAN
Tee Ø 250 mm bh 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel &
hari 0.039
handle crane 2 T

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.3.18 Pemasangan 1 buah Tee Ø 300 mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)

A TENAGA
Pekerja L.01 OH 0.436
Tukang pipa L.02 OH 0.218
Mandor L.04 OH 0.044
JUMLAH TENAGA KERJA
B BAHAN
Tee Ø 300 mm bh 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel &
hari 0.500
handle crane 2 T

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.3.19 Pemasangan 1 buah Tee Ø 400 mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)

A TENAGA
Pekerja L.01 OH 0.656
Tukang pipa L.02 OH 0.328
Mandor L.04 OH 0.066

JUMLAH TENAGA KERJA


B BAHAN
Tee Ø 400 mm bh 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel &
hari 0.500
handle crane 2 T

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.3.20 Pemasangan 1 buah Tee Ø 450 mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)

A TENAGA
Pekerja L.01 OH 0.766
Tukang pipa L.02 OH 0.383
Mandor L.04 OH 0.077

JUMLAH TENAGA KERJA


B BAHAN
Tee Ø 450 mm bh 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel &
hari 0.500
handle crane 2 T

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.3.21 Pemasangan 1 buah Tee Ø 500 mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)

A TENAGA
Pekerja L.01 OH 0.876
Tukang pipa L.02 OH 0.438
Mandor L.04 OH 0.088

JUMLAH TENAGA KERJA


B BAHAN
Tee Ø 500 mm bh 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel &
hari 0.600
handle crane 2 T

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.3.22 Pemasangan 1 buah Tee Ø 600 mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)

A TENAGA
Pekerja L.01 OH 1.096
Tukang pipa L.02 OH 0.548
Mandor L.04 OH 0.110

JUMLAH TENAGA KERJA


B BAHAN
Tee Ø 600 mm bh 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel &
hari 0.193
handle crane 2 T
Mobile crane =< 3 ton hari 0.096
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.3.23 Pemasangan 1 buah Tee Ø 700 mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)

A TENAGA
Pekerja L.01 OH 1.316
Tukang pipa L.02 OH 0.658
Mandor L.04 OH 0.132

JUMLAH TENAGA KERJA


B BAHAN
Tee Ø 700 mm bh 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel &
hari 0.225
handle crane 2 T
Mobile crane =< 3 ton hari 0.113
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.3.24 Pemasangan 1 buah Tee Ø 800 mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)

A TENAGA
Pekerja L.01 OH 1.536
Tukang pipa L.02 OH 0.768
Mandor L.04 OH 0.154

JUMLAH TENAGA KERJA


B BAHAN
Tee Ø 800 mm bh 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel &
hari 0.257
handle crane 2 T
Mobile crane =< 3 ton hari 0.129
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.3.25 Pemasangan 1 buah Tee Ø 900 mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)

A TENAGA
Pekerja L.01 OH 1.756
Tukang pipa L.02 OH 0.878
Mandor L.04 OH 0.176

JUMLAH TENAGA KERJA


B BAHAN
Tee Ø 900 mm bh 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel &
hari 0.321
handle crane 2 T
Mobile crane =< 3 ton hari 0.161
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.3.26 Pemasangan 1 buah Tee Ø 1000 mm


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)

A TENAGA
Pekerja L.01 OH 1.976
Tukang pipa L.02 OH 0.988
Mandor L.04 OH 0.198

JUMLAH TENAGA KERJA


B BAHAN
Tee Ø 1000 mm bh 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel &
hari 0.366
handle crane 2 T
Mobile crane =< 3 ton hari 0.183
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.3.27 Pemasangan 1 buah Tee Ø 1100 mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)

A TENAGA
Pekerja L.01 OH 2.196
Tukang pipa L.02 OH 1.098
Mandor L.04 OH 0.220

JUMLAH TENAGA KERJA


B BAHAN
Tee Ø 1100 mm bh 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel &
hari 0.386
handle crane 2 T
Mobile crane =< 3 ton hari 0.193
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)
A.8.4.3.28 Pemasangan 1 buah Tee Ø 1200 mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)

A TENAGA
Pekerja L.01 OH 2.416
Tukang pipa L.02 OH 1.208
Mandor L.04 OH 0.242
JUMLAH TENAGA KERJA
B BAHAN
Tee Ø 1200 mm bh 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel &
hari 0.450
handle crane 2 T
Mobile crane =< 3 ton hari 0.225
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)
Jumlah Harga (Rp.)

Jumlah Harga (Rp.)


Jumlah Harga (Rp.)

Jumlah Harga (Rp.)


Jumlah Harga (Rp.)

Jumlah Harga (Rp.)


Jumlah Harga (Rp.)

Jumlah Harga (Rp.)


Jumlah Harga (Rp.)

Jumlah Harga (Rp.)


Jumlah Harga (Rp.)

Jumlah Harga (Rp.)


Jumlah Harga (Rp.)

Jumlah Harga (Rp.)


Jumlah Harga (Rp.)

Jumlah Harga (Rp.)


Jumlah Harga (Rp.)

Jumlah Harga (Rp.)


Jumlah Harga (Rp.)

Jumlah Harga (Rp.)


Jumlah Harga (Rp.)

Jumlah Harga (Rp.)


Jumlah Harga (Rp.)

Jumlah Harga (Rp.)


Jumlah Harga (Rp.)

Jumlah Harga (Rp.)


Jumlah Harga (Rp.)

Jumlah Harga (Rp.)


Jumlah Harga (Rp.)
A.8.4.4 HARGA SATUAN PEKERJAAN PENYAMBUNGAN PIPA BARU KE PIPA LAMA

A.8.4.4.1 Penyambungan 1 buah pipa baru ke pipa yang ada Ø 80 mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)

A TENAGA
Pekerja L.01 OH 1.466
Tukang pipa L.02 OH 0.733
Mandor L.04 OH 0.147
JUMLAH TENAGA KERJA
B BAHAN
Pipa Ø 80 mm bh 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa
T2/mekanik / cilinder hari 0.606
saw

Sewa Genset 1500 watt hari 0.075

Sewa Pompa
hari 0.968
Submersible 3m3/h
Sewa Tripot/Tackel &
hari 0.865
handle crane 2 T
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.4.2 Penyambungan 1 buah pipa baru ke pipa yang ada Ø 100 mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)

A TENAGA
Pekerja L.01 OH 1.646
Tukang pipa L.02 OH 0.823
Mandor L.04 OH 0.165
JUMLAH TENAGA KERJA
B BAHAN
Pipa Ø 100 mm bh 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa
T2/mekanik / cilinder hari 0.650
saw

Sewa Genset 1500 watt hari 0.159

Sewa Pompa
hari 1.078
Submersible 3m3/h
Sewa Tripot/Tackel &
hari 0.911
handle crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.4.3 Penyambungan 1 buah pipa baru ke pipa yang ada Ø 150 mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)

A TENAGA
Pekerja L.01 OH 2.096
Tukang pipa L.02 OH 1.048
Mandor L.04 OH 0.210

JUMLAH TENAGA KERJA


B BAHAN
Pipa Ø 150 mm bh 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa
T2/mekanik / cilinder hari 0.760
saw

Sewa Genset 1500 watt hari 0.369

Sewa Pompa
hari 1.353
Submersible 3m3/h
Sewa Tripot/Tackel &
hari 1.026
handle crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.4.4 Penyambungan 1 buah pipa baru ke pipa yang ada Ø 200 mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)

A TENAGA
Pekerja L.01 OH 2.546
Tukang pipa L.02 OH 1.273
Mandor L.04 OH 0.255
JUMLAH TENAGA KERJA
B BAHAN
Pipa Ø 200 mm bh 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa
T2/mekanik / cilinder hari 0.870
saw
Sewa Genset 1500 watt hari 0.579

Sewa Pompa
hari 1.628
Submersible 3m3/h
Sewa Tripot/Tackel &
hari 1.141
handle crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.4.5 Penyambungan 1 buah pipa baru ke pipa yang ada Ø 250 mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)

A TENAGA
Pekerja L.01 OH 2.996
Tukang pipa L.02 OH 1.498
Mandor L.04 OH 0.300

JUMLAH TENAGA KERJA


B BAHAN
Pipa Ø 250 mm bh 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa
T2/mekanik / cilinder hari 0.980
saw

Sewa Genset 1500 watt hari 0.789

Sewa Pompa
hari 1.903
Submersible 3m3/h
Sewa Tripot/Tackel &
hari 1.256
handle crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.4.6 Penyambungan 1 buah pipa baru ke pipa yang ada Ø 300 mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)

A TENAGA
Pekerja L.01 OH 3.446
Tukang pipa L.02 OH 1.723
Mandor L.04 OH 0.345
JUMLAH TENAGA KERJA
B BAHAN
Pipa Ø 300 mm bh 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa
T2/mekanik / cilinder hari 1.090
saw

Sewa Genset 1500 watt hari 0.999

Sewa Pompa
hari 2.178
Submersible 3m3/h
Sewa Tripot/Tackel &
hari 1.371
handle crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.4.7 Penyambungan 1 buah pipa baru ke pipa yang ada Ø 400 mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)

A TENAGA
Pekerja L.01 OH 4.346
Tukang pipa L.02 OH 2.173
Mandor L.04 OH 0.435

JUMLAH TENAGA KERJA


B BAHAN
Pipa Ø 400 mm bh 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa
T2/mekanik / cilinder hari 1.310
saw

Sewa Genset 1500 watt hari 1.419

Sewa Pompa
hari 2.728
Submersible 3m3/h
Sewa Tripot/Tackel &
hari 1.601
handle crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.4.8 Penyambungan 1 buah pipa baru ke pipa yang ada Ø 450 mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)

A TENAGA
Pekerja L.01 OH 4.796
Tukang pipa L.02 OH 2.398
Mandor L.04 OH 0.480
JUMLAH TENAGA KERJA
B BAHAN
Pipa Ø 450 mm bh 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa
T2/mekanik / cilinder hari 1.420
saw

Sewa Genset 1500 watt hari 1.629

Sewa Pompa
hari 3.003
Submersible 3m3/h
Sewa Tripot/Tackel &
hari 1.716
handle crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.4.9 Penyambungan 1 buah pipa baru ke pipa yang ada Ø 500 mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)

A TENAGA
Pekerja L.01 OH 5.246
Tukang pipa L.02 OH 2.623
Mandor L.04 OH 0.525
JUMLAH TENAGA KERJA
B BAHAN
Pipa Ø 500 mm bh 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa
T2/mekanik / cilinder hari 1.530
saw

Sewa Genset 1500 watt hari 1.839

Sewa Pompa
hari 3.278
Submersible 3m3/h
Sewa Tripot/Tackel &
hari 1.831
handle crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.4.10 Penyambungan 1 buah pipa baru ke pipa yang ada Ø 600 mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)


A TENAGA
Pekerja L.01 OH 6.146
Tukang pipa L.02 OH 3.073
Mandor L.04 OH 0.615
JUMLAH TENAGA KERJA
B BAHAN
Pipa Ø 600 mm bh 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa
T2/mekanik / cilinder hari 1.750
saw

Sewa Genset 1500 watt hari 2.259

Sewa Pompa
hari 3.828
Submersible 3m3/h
Sewa Tripot/Tackel &
hari 2.061
handle crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.4.11 Penyambungan 1 buah pipa baru ke pipa yang ada Ø 700 mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)

A TENAGA
Pekerja L.01 OH 7.046
Tukang pipa L.02 OH 3.523
Mandor L.04 OH 0.705
JUMLAH TENAGA KERJA
B BAHAN
Pipa Ø 700 mm bh 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa
T2/mekanik / cilinder hari 1.970
saw

Sewa Genset 1500 watt hari 2.679

Sewa Pompa
hari 4.378
Submersible 3m3/h
Sewa Tripot/Tackel &
hari 2.291
handle crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.4.12 Penyambungan 1 buah 1 buah pipa baru ke pipa yang ada Ø 800 mm
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)

A TENAGA
Pekerja L.01 OH 7.946
Tukang pipa L.02 OH 3.973
Mandor L.04 OH 0.795
JUMLAH TENAGA KERJA
B BAHAN
Pipa Ø 800 mm bh 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa
T2/mekanik / cilinder hari 2.190
saw

Sewa Genset 1500 watt hari 3.099

Sewa Pompa
hari 4.928
Submersible 3m3/h
Sewa Tripot/Tackel &
hari 2.521
handle crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)
Jumlah Harga (Rp.)

Jumlah Harga (Rp.)


Jumlah Harga (Rp.)

Jumlah Harga (Rp.)


Jumlah Harga (Rp.)

Jumlah Harga (Rp.)


Jumlah Harga (Rp.)

Jumlah Harga (Rp.)


Jumlah Harga (Rp.)

Jumlah Harga (Rp.)


Jumlah Harga (Rp.)
Jumlah Harga (Rp.)
A.8.4.5 HARGA SATUAN PEKERJAAN PENGETESAN PIPA

A.8.4.5.1 Pengetesan 1 m pipa Ø 50 mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)

A TENAGA
Pekerja L.01 OH 0.008
Mandor L.04 OH 0.001
JUMLAH TENAGA KERJA
B BAHAN
Air test (air bersih) m3 0.002
Bahan bakar liter 0.060
Oli liter 0.002

JUMLAH HARGA BAHAN


C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C)
E Overhead & Profit 10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.5.2 Pengetesan 1 m pipa Ø 75 mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)

A TENAGA
Pekerja L.01 OH 0.008
Mandor L.04 OH 0.001
JUMLAH TENAGA KERJA
B BAHAN
Air test (air bersih) m3 0.004
Bahan bakar liter 0.060
Oli liter 0.002

JUMLAH HARGA BAHAN


C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C)
E Overhead & Profit 10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.5.3 Pengetesan 1 m pipa Ø 100 mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)

A TENAGA
Pekerja L.01 OH 0.008
Mandor L.04 OH 0.001
JUMLAH TENAGA KERJA
B BAHAN
Air test (air bersih) m3 0.008
Bahan bakar liter 0.060
Oli liter 0.002

JUMLAH HARGA BAHAN


C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C)
E Overhead & Profit 10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.5.4 Pengetesan 1 m pipa Ø 150 mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)

A TENAGA
Pekerja L.01 OH 0.008
Mandor L.04 OH 0.001
JUMLAH TENAGA KERJA
B BAHAN
Air test (air bersih) m3 0.018
Bahan bakar liter 0.060
Oli liter 0.002

JUMLAH HARGA BAHAN


C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C)
E Overhead & Profit 10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.5.5 Pengetesan 1 m pipa Ø 200 mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)

A TENAGA
Pekerja L.01 OH 0.008
Mandor L.04 OH 0.001
JUMLAH TENAGA KERJA
B BAHAN
Air test (air bersih) m3 0.031
Bahan bakar liter 0.060
Oli liter 0.002

JUMLAH HARGA BAHAN


C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C)
E Overhead & Profit 10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.5.6 Pengetesan 1 m pipa Ø 250 mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)

A TENAGA
Pekerja L.01 OH 0.008
Mandor L.04 OH 0.001
JUMLAH TENAGA KERJA
B BAHAN
Air test (air bersih) m3 0.049
Bahan bakar liter 0.060
Oli liter 0.002

JUMLAH HARGA BAHAN


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.5.7 Pengetesan 1 m pipa Ø 300 mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)

A TENAGA
Pekerja L.01 OH 0.008
Mandor L.04 OH 0.001
JUMLAH TENAGA KERJA
B BAHAN
Air test (air bersih) m3 0.071
Bahan bakar liter 0.060
Oli liter 0.002

JUMLAH HARGA BAHAN


C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C)
E Overhead & Profit 10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.5.8 Pengetesan 1 m pipa Ø 400 mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)

A TENAGA
Pekerja L.01 OH 0.008
Mandor L.04 OH 0.001
JUMLAH TENAGA KERJA
B BAHAN
Air test (air bersih) m3 0.126
Bahan bakar liter 0.060
Oli liter 0.002

JUMLAH HARGA BAHAN


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.5.9 Pengetesan 1 m pipa Ø 500 mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)

A TENAGA
Pekerja L.01 OH 0.008
Mandor L.04 OH 0.001
JUMLAH TENAGA KERJA
B BAHAN
Air test (air bersih) m3 0.158
Bahan bakar liter 0.060
Oli liter 0.002

JUMLAH HARGA BAHAN


C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C)
E Overhead & Profit 10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.5.10 Pengetesan 1 m pipa Ø 600 mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)

A TENAGA
Pekerja L.01 OH 0.008
Mandor L.04 OH 0.001
JUMLAH TENAGA KERJA
B BAHAN
Air test (air bersih) m3 0.283
Bahan bakar liter 0.060
Oli liter 0.002

JUMLAH HARGA BAHAN


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10 % 10 % x D
F Harga Satuan Pekerjaan (D+E)
Jumlah Harga (Rp.)

Jumlah Harga (Rp.)


Jumlah Harga (Rp.)

Jumlah Harga (Rp.)


Jumlah Harga (Rp.)

Jumlah Harga (Rp.)


Jumlah Harga (Rp.)

Jumlah Harga (Rp.)


Jumlah Harga (Rp.)

Jumlah Harga (Rp.)

You might also like