You are on page 1of 6

2nd TEST

FULL FORM

WPS - WORK PERMIT SYSTEM

UMC – UNIT MATERIAL CODE

ZSS – ZERO SPEED SWITCH

EOL – ENGINE ON LOAD

SLI - SELF LOAD INDICATOR

FILL IN THE BLANKS

1 – safety communication released through ORANGE stripper in case of lost time injury
.

2 – A connector is a device for attaching to ANCHORAGE & LANYARD .

3 – Minimum breaking strength of lifeline 2000 kg .

4 – The lifeline should be minimum 12 mm diameter wire rope .

5 – The lifeline should be anchored between two posts not more than 6 m apart.

6 - Rungs spacing should not be over 300 m on center of rung .

7 – A lifeline which allow free travel without slack rope belts locks instantly when a
fall begin is called RECTRACTABLE LIFELINE .

DEFINE AND EXPLAIN

1 – Write the safety devices used in conveyor belt .

Ans – Pull cord

- Belt Sway switch

- Belt Snap switch

- Zero speed switch

- Hold back

- Deck plate .
2 – Write the Elements of fall arrest system .

Ans – Anchorage

- Connector

- Lifeline

- Lanyard

- Full body harness .

3 - Write safety device used in welding operation .

Ans – SFU - Switch fuse circuit

- Wes guard

- Double earthing

- GFCI - Ground fault circuit interrupters

- RCCB - Residual current circuit breaker

- ELCD - Earth leakage circuit device

- ELPD - Earth leakage protected device .

4 – White the hazards of welding and gas cutting .

Welding Gas cutting

1 – Eye injury ( Radiation UV ) 1 – Burn injury

2 – Burn injury 2 – Fire and explosion

3 – Fire and explosion 3 – Toxic fumes

4 – Toxic fumes 4 – Bursting of cylinder

5 – Electrocution , flash back 5 – Fall of cylinder


5 – write the name of scaffolding components .

Ans – Sole plate Bracing

Base plate Platform board

Screw base jack Ladder

Standard / Upright Toe board

Ledgers / Horizental member Clamp / coupler

Transom pipe .

6 – write factor to be considered while load is handled manually .

Ans - Body posture

- Center of gravity

- Proper method of handling

- Stable material

- Proper communication .

7 – write procedure of JCC .

Ans - It is a 4 steps process :-

- Line manager / Supervisor preparation .

- Off the job review .

- On the job review .

- Final review and logging in SEMS .

8 – what are the hazards of conveyor system .

Ans - Injury due to entanglement of clothing body parts etc .

- Falling material from height .

- Falling from height ( gallery ) .


- Snapping of belt joint .

- The worker must be aware of 6 direction hazard in the working area

- inadequate illumination .

9 – write about the right of protective person with respect of positive

isolation .

Ans - He can ask for trial to ensure that correct isolation has been done .

- He can refer the energy source document to ensure that correct

isolators are put in safe condition .

- He can refer to authorization list to ensure that competent person

is giving isolation .

10 – write 5 ( general rule ) or elements rule to positive isolation .

Ans - Isolation locks shall not have duplicate keys .

- No locks shall be used for any other purpose than for which it is

meant .

- Never attempt to bypass an isolator when isolation lock is attached

- Isolator must be locked in “ safe “ position .

- Never attach a lock to another lock .

11 – Write safety gas cylinder storage .

Ans - Never jerk the filled or empty cylinder without identified .

- Keep the leakage cylinder on the free air .

- Don’t keep the cylinder at the close room .


- Don’t keep the cylinder at the direct sunlight .

- Fire extinguisher must be kept .

- Don’t roll the cylinder while taking one place to another .

- Always keep cylinder in vertical position .

- Use first in first out .

- Don’t open the cylinder capes .

- Don’t keep the leakage cylinder near the flammable area .

12 – Write discarding criteria of a sling .

Ans - Loop formation . - Flat areas

- Loose wire . - Node

- bird cage . - Crushed rope

- kinks . - Wire break

- thinning of rope . - Popped core .

DEFINE-

1 - Protected person

Ans - Those who will attach their personal lock to an isolator or a

group isolation box for doing job on equipment .

2 - Central agency

Ans - The agency is hire for special work for a specific time .
3 - Control stop isolation

Ans - It is used for daily routine task / job .

- It is used for short duration job ( < 30 minute ) .

- No permit is required .

- Locking is to be used .

4 - Isolated planner

Ans - They are responsible for preparing and maintaining the isolation

Procedure for complex isolation and energy source isolation .

5 - Scaffolding

Ans - It is a temporary platform which provides support to both men

and material for working place .

6 - Welding

Ans - It is the process of binding two parents material permanently

with the help of pillar material under high temperature and high

current .

OR

Welding is a process of joining two or more parts by the


application of heat and pressure such joint are permanent in
nature .