The document provides requirements for installing a biochemistry analyzer, including needing a flat, sturdy table or ground that can support 100-200kg and is at least 30-40cm from the wall. The installation area should be away from direct sunshine and have a stable voltage of 220V +/- 10% or 110V +/- 10% with an UPS or regulator over 2000VA if the voltage is unstable. Additional requirements include proper grounding, temperature control between 10-30 degrees, humidity between 35-85%RH and at least 50cm from water sources, and waste disposal tubes that meet specified dimensions.
The document provides requirements for installing a biochemistry analyzer, including needing a flat, sturdy table or ground that can support 100-200kg and is at least 30-40cm from the wall. The installation area should be away from direct sunshine and have a stable voltage of 220V +/- 10% or 110V +/- 10% with an UPS or regulator over 2000VA if the voltage is unstable. Additional requirements include proper grounding, temperature control between 10-30 degrees, humidity between 35-85%RH and at least 50cm from water sources, and waste disposal tubes that meet specified dimensions.
The document provides requirements for installing a biochemistry analyzer, including needing a flat, sturdy table or ground that can support 100-200kg and is at least 30-40cm from the wall. The installation area should be away from direct sunshine and have a stable voltage of 220V +/- 10% or 110V +/- 10% with an UPS or regulator over 2000VA if the voltage is unstable. Additional requirements include proper grounding, temperature control between 10-30 degrees, humidity between 35-85%RH and at least 50cm from water sources, and waste disposal tubes that meet specified dimensions.
No. Item Requirement Yes √ No X 1 Ground /Table Flat table & Ground which can bear at least 100-200KGs, the distance to the wall shall larger than 30-40CM. 2 Sunshine Keep away from the sunshine light 3 Voltage AC220V +/- 10%,AC110V +/- 10% 4 UPS/Regulator If the local voltage is not stable, please use regulator or UPS >2000VA. 5 Grounding N-G〈 5V,L-G 220V 6 External Grounding If the local circuit has no grounding or not meet the requirement, please add external grounding from the grounding holder on the back panel of machine. Requirement: N-G〈 5V,L-G 220V 7 Temperature 10-30 degrees 8 Humidity 35---85%RH, 50CM distance from the water source. 9 Waste barrel The waste barrel shall lower than the water OUT of machine, keep the waste tube straight, length less than 1m is better, the tube can’t go inside the barrel more than 15cm. The fat waste tube shall be just in the bottleneck. 10 Pipeline drainage The waste pipeline shall lower than the water OUT of machine, keep the waste tube straight, length less than 1m is better, the tube can’t go inside the pipleline more than 15cm. The diameter of pipeline>50MM. 11 Water IN Distilled water or Deionized water. 12 PC COM port original RS232 Port, COM External RS232 by PCI, PCI USB converter to RS232 (install the driver firstly) USB 12 Windows From windows XP to Win10, Fully version of OFFICE 13 PC Hardware CPU>1.6GHZ, Memory> 4GB. Rigid Disk> 80GB。 14 Reagent Fully auto biochemistry reagent with control &calibrator.
Engineer: Installation date:
Note: If the installation checks not pass, it may cause instrument defaulty.