You are on page 1of 8

State Oil Company of the Republic of Azerbaijan (SOCAR)

“Azneft” PU announces the open procurement tender No. 11394AM-22 in


accordance with the principles of
“Two Envelopes” and “Closed Envelopes” in order to meet the demand for 350 atm well drilling equipment
for new casing construction of Guneshli 25 and 27 wells

Documents to be submitted for participation in the competition:


 Application letter for participation in the competition;
 Bank document on payment of the participation fee;
 Bid
I.  Application for participation in the competition (signed and sealed) and the bank document on payment for
participation fee should be submitted in Azerbaijani or Russian languages no later than 04.11.2022, 17:30 by Baku
time, to the address of the Purchasing organization specified in the notice.
The copies of the required documents (except the bid) may be sent to the e-mail address of the contact person specified
in the notice. In this case, the originals of the documents shall be submitted to the Purchasing Organization until the last
day of submission of the bids.
The deadline for submission of the bids:
 Separately for each lot, bids must be submitted to the coordinator of the procurement group of “Azneft” PU by
11.11.2022, Baku time, with one original and 1 copy.
The bids must be prepared and submitted separately, consisting of financial and technical proposals. On the day of the
opening of the competition envelopes, technical proposals will be accepted separately and the financial proposal will
be accepted in separate envelopes.
The bids will be opened in two stages. In other words, the technical proposals will be evaluated first after each of the
financial and technical proposals is received in a separate sealed envelope. Financial proposals will be retained by the
Procuring Entity during the technical proposals review. Upon completion of the technical evaluation, the bidders will
II. be invited to the appropriate time by the bidding organization, the bidders who submitted the bidding proposals that do
not meet the technical requirements will be returned unopened, and successful bidders' proposals will be announced.
Bidders' proposals, which submitted the technical and financial proposals in the same envelope, will not be
accepted.
 The power of attorney must be presented by the Bidder's representatives submitting or withdrawing the proposal, and
must be present on the identity document
 Bidders must be at the Purchasing Organization 30 minute before bid.
 Bidder must note name, surename and duty of his representative who will represent him in the bid.
 Late bids shall be rejected.
 Any changing about representative willn’t accepted.
The acquisition of the aninvitation to bid and participation fee:
1. Those wishing to acquirean invitation to bid in Azerbaijani or Russian languages can obtain it from the contact
person in electronic or print form after paying 236 Azerbaijani manat (VAT included) or an equivalent amount in any
other freely convertible currency to the below-mentioned account, till the date specified in the paragraph I of the
notice, on any business day of the week from 09:30 a.m. to 05:30 p.m.
2. Account number:AZN
Azərbaycan Beynəlxalq Bankı ASC,
AZ38IBAZ38010019449306332120,
VÖEN: 9900003871,
Müştəri xidməti Departamenti,
Kod: 805250,
Müxbir hesab: AZ03NABZ01350100000000002944,
VÖEN: 9900001881,
SWIFT BIK: İBAZAZ2Х
3. Account number: USD
Intermediary Bank:Deutsche Bank Trust Company Americas,New York
S.W.I.F.T: BKTRUS33
ACC # USD 04-164-504
Beneficiary Bank: The International Bank of Azerbaijan Republic Customer Service Department
SWIFT: İBAZAZ2X
Nizami str., 67
Phone: (+99450) 493-68-23
III. Beneficiary: State Oil Company of Azerbaijan Republic
TAX İD: 9900003871
Account \ IBAN AZ28IBAZ38110018409306332120 USD
4. Account number: EUR
Intermediary Bank:Commerzbank AG, Frankfurt am Main
S.W.I.F.T: COBADEFF
ACC # 400 88 660 3001
Beneficiary Bank: The International Bank of Azerbaijan Republic " Customer Service Department
SWIFT: İBAZAZ2X
Beneficiary: State Oil Company of Azerbaijan Republic
TAX İD: 9900003871
Account No: AZ08IBAZ38110019789306332120 EUR
5. Account number: GBP
Beneficiary Bank: The International Bank of Azerbaijan Republic Customer Service Department
SWIFT: İBAZAZ2X
Nizami str., 67
Phone: (+99450) 493-68-23
Beneficiary: State Oil Company of Azerbaijan Republic
TAX İD: 9900003871
Account No: AZ23IBAZ38110018269306332120
The participation fee is not refundable in any case.
6. The full number of the contest number, lot number and the claimant company must be indicated in the payment
order.

IV. The execution date of the Contract:


It is required to fulfill the conditions of the purchase contract within 270 calendar days.
V.
Bid bond (bank guarantee):
I Bank guarantee to secure the bid in amount of 11000 AZN must be submitted in a separate envelope. If the guarantee
is not provided, the commercial offer will be returned without opening.

2
II. The original bank guarantee must be submitted in a sealed envelope on the date of commercial envelope opening.
Otherwise, the procurement authority reserves the right to reject such an offer.
III. Persons wishing to participate in the procurement tender must notify the coordinator in advance and receive
portability, although it is advisable to provide other types of guarantees (such as letters of credit, securities,
invoices, transfer of funds to a special account, deposits and other financial assets).
IV. The amount of the advance payment will be at least equal to the prepayment amount. Up to 30% advance payment
is envisaged by the Purchasing Organization for the current purchase transaction . It should be noted that bank
guarantees issued by foreign (non-resident) banks, regardless of the country of registration of the bidding company,
must be provided through the International Bank of Azerbaijan (IBA). Otherwise, the bidder's proposal will not be
accepted. Bank guarantees provided by local banks are not required to be issued through the IBA. Issuance of bank
guarantees through the IBA applies only to the guarantee of advance payment and the contract performance
guarantee.
V. Performance bank guarantee is required in the amount of 5 (five) percent of the contract price.
VI. The financial institution that gives bank guarantee (or other type of bond), shall be acceptable in Azerbaijan
Republic and/or international financial operations. The Purchasing Organization reserves the right to not accept non
reliable bank guarantees (bonds).
VII. The Procuring entity is expected to pay up to 30% of the advance payment on the current procurement transaction.

The address of the purchasing organization:


AZ1000
Baku
Sabail district
Neftchilar ave. 73
Administration building of PU “Azneft”,
VI. Contact person:
Elchin Jabrayilov
Procurement and Supply Department, expert
corporate phone number: +99412 521 00 00 – 41 094 (internal)
corporate mobile number: +99450 844 10 94

corporate e-mail address: elchin.jabrayilov@socar.az


The notice , information about the subject of procurement and application form to obtain tan invitation to bid are
VII. placed at the internet site:
www.socar.az (http://www.socar.az/socar/az/company/procurement-supply-chain-management/procurement-notices )

Time, place and the opening date of bids:


VIII
“Technical Bids” will be open on 11.11.2022 by Baku timeat the address of the Purchasing Organization specified in
. paragraph VI of the notice.

An information about contracts awards:


An information about the final results of the competition can be obtained from the following web link:
IX.
http://www.socar.az/socar/az/company/procurement-supply-chain-management/contract-awards

3
The procurement group of the PU “Azneft”, SOCAR

(In the firm blank of the applicant)


Application form for participation in open competition and for acquisition of ITB-
Invitation to Bid (Set of Basic Conditions)

___________ city “__”_______2022

___________No.

Attn.: _______________,

SOCAR's Azneft Production Union


Mr. Jalair Samadov, Head of Procurement Group,

Hereby we,[full name of the applicant consignor (Contractor) is specified ]confirm the intent of
participation in an open competition number 11394AM-22 announced by SOCAR PU “Azneft”,,
for purchasing of 350 atm well drilling equipment for new casing construction of Guneshli 25 and
27 wells

At the same time, we confirm the absence of any cancellation or bankruptcy procedures, activity
interruption in relation to [ full name of the applicant consignor (Contractor) is specified ] or any situation
making it’sparticipationimpossible.
We kindly ask You to send the soft copy of an invitation to bid to the following e-mail
address:____________________.
(name, surenmae, duty) will represent our company in the bid.

The contact information for propmtly responding the queries relating the documents submitted
by us and other issues:
 Contact person: _______________________________
 Position of the contact person: ____________________
 Phone number: ________________________________
 Fax: ________________________________________
 E-mail address: ________________________________
Appendix:
7. Original of the bank document on payment of the participation fee – __ pages.
________________________________ _______________________
(name, surname, patronymic of the responsible person) (signature of responsible person)

_________________________________

4
(position of responsible person)

THE LIST OF PURCASING GOODS

The list, description and technical requirements of the well completion equipment required for
the completion and development of Guneshli wells 25 and 27, which will be drilled in 2022 in the
Gunashli field operated by Azneft PU “28 May” OGPD, are shown in Table 1.

The well completion equipment to be procured was selected taking into account the geo-
physical characteristics of the formation, technical and technological parameters of the well, and
the operating environment given in the table below.

Well Information

1 Field Gunashli

2 Enviroment Offshore conditions

3 Air temperature -5 ° C - + 44 ° C

Layers General Information

1 Pay zone Submerged Lay Set (QA)

2 Depth ~ 3800 mtr

3 Collector Type Terrigenous / porous

4 Formation pressure ~ 478 atm

5 Formation temperature 72 ° C

6 Formation fluid type Gas condensate (density 0.762 g / cm3)

7 Maximum expected CO2 \ H2S \ O2 CO2 1.26% \ H2S 0% \ O2 0%

6 Drilling fluid at payzone Oil-based solution 1.6 - 1.8 g / cm3

Well and Pipeline Construction Information

1 Well type Exploitation well

2 Well profile and maximum zenith angle Inclined, J-shaped, deviation 1200mtr, angle 15-17deg

3 Productuion Casing Combined

5
9 5 \ 8 ”(40ppf) - and 7” (29ppf) suspension strap

4 Production Tubing Combined Q125 brand

2 7 \ 8 ”8.6ppf TMK PF x 4 1 \ 2” 17ppf TMK PF

Stand
No Description UOM QYT
ard

Shut-off valve with erosion-resistant flow couplings - 4 1 \ 2 ”17ppf TMK


PF threaded NKB safety valve
Outer diameter: ≤ 8.6 ”(9 5/8” will be used inside the 40ppf belt)
Inner diameter: ≥ 2.5 ”
Control method: hydraulic, with a special control pipe from the wellhead
Working pressure: 350atm
APİ

PCS
1 Operating temperature: 70 ° C 3
14A
Connection type: coupling (box x pin)
Thread size and type: 4 1 \ 2 ”17ppf TMK UP (or if there is an analogue, it
must be provided with appropriate conductors)
Material: Steel alloy (1.26% CO2 resistant)
Strength limit: ≥110000psi
Depth to be installed: 70 - 130 meters
The hydraulic bypass valve will be released with a 4 ½ ”NKB PCS
Activation method: by applying pressure to the hydraulic, annular space APİ
Activation pressure: ≥60-70atm
19AC
Working pressure: 350atm
2 Connection type: coupling (box x pin) 3
Thread size and type: 4 1/2 ”17ppf TMK UP (or if there is an analogue, it
must be provided with appropriate conductors) APİ
Inner diameter: ≥ 2.5 ” 11D1
Material; Steel alloy (1.26% CO2 resistant)
Strength limit: ≥110000psi

6
Packer - 9 5/8 ”x 4 ½” hydraulic type, removable service pack (must be PCS
equipped with NKB-compliant conductors if required)
Working pressure: 350atm
Operating temperature: 80 ° C APİ
Activation method: hydraulic, by creating excess pressure inside the pipe
19AC
Reliability level set by the manufacturer: V1 or V0
3 Outer diameter: ≤ 8.6 ”(9 5/8” will be used inside the 40ppf belt) 3
Inner diameter: ≥ 2.4 ”
Sealing element material: HNBR and higher APİ
Thread combination (top): TMK UP PF 4 1/2 "17ppf box 11D1
Thread combination (bottom): TMK UP PF 4 1/2 "17ppf pin (or analog)
should be provided with appropriate conductors, if any)
Material: Steel alloy (1.26% CO2 resistant)
Strength limit: ≥110000psi
Nippel set (No-Go type Landing Nipple), with spare parts (spare kit for lock PCS
mandrel and prong)
Activation method: by means of wing technique
Activation tool: a special set of "locks" and "plugs" APİ
Working pressure: 350atm 19AC
Working temp: 80 ° C
4 Connection type: coupling (box x pin) 3
Thread size and type: 2 7/8 ”8.6ppf TMK UP (or if there is an analogue, it
must be provided with appropriate conductors) APİ
Internal profile and size: RN type, 2.125 ” 14L
Outer diameter: XD≤ 3.9 "
Material: Steel alloy (1.26% CO2 resistant)
Strength limit: ≥110000psi

Cut-out shoe valve, ball catcher sub PCS


Working pressure: 350atm
Activation method: by means of a metal sphere
Maximum diameter of the metal sphere: 1.9 ”
Connection type: coupling (box x pin)
APİ
5 Thread size and type: 2 7/8 ”8.6ppf TMK UP (or analog with appropriate 3
conductor) 19AC
Inner diameter (with saddle): ≤ 1.3 ”
Internal diameter (after saddle cutting): ≥ 2.1 ”
Material: Steel alloy (1.26% CO2 resistant)
Strength limit: ≥110000psi

Pipeline, 4 1/2 ”x 2 7/8” PCS


Working pressure: 350atm
Outer diameter: ≤ 5.5 ”
Inner diameter: ≥ 2.2 ”
APİ
6 Connection type: coupling (box x pin) 2
Thread size and type: 4 1 \ 2 ”17ppf TMK UP box x 2 7/8” 8.6ppf TMK UP 5CT
pin (or provided with appropriate conductors if analog)
Material: Steel alloy
Strength limit: ≥110000psi

7
Control pipe (for shut-off valve)
Production method: without welding (show)
Working pressure: 350atm and above
Diameter: 1/4 ”
ASTM

meters
Wall thickness: minimum 0.06 ”
7 440
Joint type: High pressure fittings (Packer / Swagelok fittings or analog with A312
metal-to-metal sealant)
Material: SS 316L steel or better stainless steel)
Length: minimum 220 mtr / drum
Supply form: drum
Valve, Needle valve 1/4 ”NPT FxF, 10000psi (UN2NS-1M or analogue),
for use in the control line of the shut-off valve API

PCS
8
Working pressure: ≥420atm 4
6D
Working environment: sea conditions, outdoors
Body material: SS-316L
Connecting fittings ¼ ”NPT, fitting adapters (PARKER or analog) to
connect the control pipe to the wellhead equipment (wellhead hanger
packer, quadrant and valve) and to the wellhead equipment (shut-off
valve)

A bunch includes the following: APİ6A


9 1 NPT male connector, 316SS, 1/4 "A-Lok x 1/8" MNPT (4MSC2N)

set
10 ASME
1 NPT male connector, 316SS, 1/4 "A-Lok x 1/4" MNPT (4MSC4N)
1 NPT male connector, 316SS, 1/4 "A-Lok x 1/2" MNPT (4MSC8N) B31.1
1 NPT female connector, 316SS, 1/4 "A-Lok x 1/8" MNPT (4FSC2N)
1 NPT female connector, 316SS, 1/4 "A-Lok x 1/4" MNPT (4FSC4N)
1 NPT female connector, 316SS, 1/4 "A-Lok x 1/2" MNPT (4FSC8N)
1 piece 1/4 "ferrule set (minimum 6pcs of front & back) (4ALOK-316SS-
SET)
Linear joints, for extension of 1/4 ”control pipe (Spir Star / Packer or
analogue)

A bunch includes the following: APİ6A


10 1 unit union connector, 316SS, 1/4 "A-Lok MNPT (4SC4) set 10
1 nipple adapter, 316SS, 1/2 ”MNPT x 1/4” MNPT (HNM8-NM4) ASME
1 nipple-adapter, 316SS, 1/4 ”MNPT x 1/4” MNPT (HNM4-NM4) B31.1
1 bushing adapter, 316SS, 1/4 ”FNPT x 1/2” MNPT (HNF4-NM8)
1 bushing adapter, 316SS, 1/2 ”FNPT x 1/4” MNPT (HNF8-NM4)
S

You might also like