Professional Documents
Culture Documents
No DESCRIPTION
1
Supply & Installation, Duct Split Units & Split Units connecting, testing,
commissioning and balancing, complete with copper pipe, drain piping to nearest drain
point, control, thermostat, panels, insulation, supports, wires and wiring, anti vibration,
fittings and all necessary accessories; forming and making good all holes, chases and
the like as Drawings and Specification . Ambient Temperature ( 115 °F )
GROUND FLOOR
Cooling
Location Area Qty. Amount Total
Capacity
1-1 PERP . KITCHEN 29 M² SU- 2.9 TR 1
1-2 BED ROOM 37.95 M² SU-3.8 TR 1
1-3 WOMEN MAJLIS 58.3 M² SU- 5.8 TR 1
1-4 MAJLIS 78.6 M² SU-7.86 TR 1
1-5 HALL 31.2 M² SU- 3.1 TR 1
FRIST FLOOR