You are on page 1of 7

Name: Bilal Siddiqui

Section: B SSUET/QR/114
Roll No: 2020F-BSE-060

LAB NO. 02
OBJECTIVE:
To define the replication in ARENA and plot different characteristics of entities queue and resources.

THEORY:
Replication:
When simulation replications are run, a replication output directory is created, and a replication status report will be
generated.

TASK 1:
Plot at least one characteristic of queue, entities, and resources.

CE-409: Simulation and Modeling 1


Name: Bilal Siddiqui
Section: B SSUET/QR/114
Roll No: 2020F-BSE-060

Performance Measure Where to look in R1 R2 R3 R4 R5


ARENA reports
Total Production Entity.NumberOut 145 146 153 154 160

Average Delay in queue Queue.Waiting Time- 4.1429 2.8531 2.4781 3.3623 3.0194
Average
Maximum Delay in Queue.Waiting Time- 16.0068 13.3107 19.4195 15.2324 21.2396
queue Maximum Value
Average Time in system Entity.TotalTime- 7.5681 6.1973 5.6901 6.7067 7.6738
Average
Maximum Time in Entity.TotalTime- 19.5632 17.0424 22.4057 18.7327 31.2685
system Maximum Value
Time-average num. of Queue.Number Waiting- 0.8142 0.5629 0.5208 0.7097 0.6528
parts in queue Average
Maximum number of Queue.Number Waiting- 5.0000 5.0000 6.0000 5.0000 6.0000
parts in queue Max Value
Machine Utilization Resource.Utilization 0.70 0.6598 0.6681 0.6969 0.6884

TASK 2:
Make 5 replications of simulation run fill the PMT for each .

Performance Measure Where to look in R1 R2 R3 R4 R5


ARENA reports
Total Production Entity.NumberOut 148 146 153 154 160

Average Delay in queue Queue.Waiting Time- 4.0708 2.8531 2.4781 3.3623 3.0194
Average
Maximum Delay in Queue.Waiting Time- 16.0068 13.3107 19.4195 15.2324 21.2396
queue Maximum Value
Average Time in system Entity.TotalTime- 7.5681 6.1973 5.6901 6.7067 7.6738
Average

CE-409: Simulation and Modeling 2


Name: Bilal Siddiqui
Section: B SSUET/QR/114
Roll No: 2020F-BSE-060

Maximum Time in Entity.TotalTime- 19.5632 17.0424 22.4057 18.7327 31.2685


system Maximum Value
Time-average num. of Queue.Number Waiting- 0.8142 0.5629 0.5208 0.7097 0.6528
parts in queue Average
Maximum number of Queue.Number Waiting- 5.0000 5.0000 6.0000 5.0000 6.0000
parts in queue Max Value
Machine Utilization Resource.Utilization 0.70 0.6598 0.6681 0.6969 0.6884

TASK 3:
Change Arrivals from 5 to 7.5 run the model for 5 replications and fill PMT.

Performance Measure Where to look in R1 R2 R3 R4 R5


ARENA reports
Total Production Entity.NumberOut 219 221 224 225 229

Average Delay in queue Queue.Waiting Time- 75.8563 95.0473 100.53 98.0262 115.45
Average
Maximum Delay in Queue.Waiting Time- 151.47 180.70 191.06 209.05 225.29
queue Maximum Value
Average Time in system Entity.TotalTime- 78.8706 97.9869 39.1385 100.83 118.23
Average
Maximum Time in Entity.TotalTime- 153.81 181.38 191.93 211.06 226.93
system Maximum Value
Time-average num. of Queue.Number Waiting- 30.4732 36.6354 39.1385 40.9055 48.4971
parts in queue Average

CE-409: Simulation and Modeling 3


Name: Bilal Siddiqui
Section: B SSUET/QR/114
Roll No: 2020F-BSE-060

Maximum number of Queue.Number Waiting- 74.0000 70.0000 77.0000 75.0000 88.0000


parts in queue Max Value
Machine Utilization Resource.Utilization 0.9978 0.9979 1.0000 0.9986 1.0000

TASK 4:
Change the length of model to 720min.inter arrival time back to 5 and fill the PMT.

CE-409: Simulation and Modeling 4


Name: Bilal Siddiqui
Section: B SSUET/QR/114
Roll No: 2020F-BSE-060

Performance Measure Where to look in R1 R2 R3 R4 R5


ARENA reports
Total Production Entity.NumberOut 145 144 148 150 156

Average Delay in queue Queue.Waiting Time- 4.1429 2.8884 2.5330 3.4645 3.0758
Average
Maximum Delay in Queue.Waiting Time- 16.0068 13.3107 19.4195 15.2324 21.2396
queue Maximum Value
Average Time in system Entity.TotalTime- 7.6592 6.221 5.7767 6.8080 6.27
Average
Maximum Time in Entity.TotalTime- 19.5632 17.0424 22.4057 18.7327 24.8696
system Maximum Value
Time-average num. of Queue.Number Waiting- 0.8343 0.5777 0.5246 0.7218 0.6707
parts in queue Average
Maximum number of Queue.Number Waiting- 5.0000 5.0000 6.0000 5.0000 6.0000
parts in queue Max Value
Machine Utilization Resource.Utilization 0.7081 0.6728 0.6645 0.6966 0.6921

TASK 5:
Suppose that machine need to be setup for 2 min before processing each part. Change the delay type and run
length to 1440 min and fill PMT.

CE-409: Simulation and Modeling 5


Name: Bilal Siddiqui
Section: B SSUET/QR/114
Roll No: 2020F-BSE-060

Performance Measure Where to look in R1 R2 R3 R4 R5


ARENA reports
Total Production Entity.NumberOut 261 280 308 297 320

Average Delay in queue Queue.Waiting Time- 22.6192 20.5853 26.1626 48.5842 68.9632
Average
Maximum Delay in Queue.Waiting Time- 62.5481 71.9805 53.8709 103.24 115.60
queue Maximum Value
Average Time in system Entity.TotalTime- 2.0000 2.0000 2.0000 2.0000 2.0000
Average
Maximum Time in Entity.TotalTime- 2.0000 2.0000 2.0000 2.0000 2.0000
system Maximum Value
Time-average num. of Queue.Number Waiting- 11.2691 10.3982 13.3163 25.4859 36.4105
parts in queue Average

CE-409: Simulation and Modeling 6


Name: Bilal Siddiqui
Section: B SSUET/QR/114
Roll No: 2020F-BSE-060

Maximum number of Queue.Number Waiting- 32.0000 36.0000 27.0000 53.0000 60.0000


parts in queue Max Value
Machine Utilization Resource.Utilization 0.9549 0.9831 0.9999 0.9812 0.9961

CE-409: Simulation and Modeling 7