ARCHITECT / ENGINEER PROJECT / LOCATION OWNER NO. REVISIONS DATE BY SHEET CONTENT SHEET NO.
SATURN
STRUCTURAL ENGINEERS SATURN
STRUCTURAL ENGINEERS
NayPyiTaw, Myanmar. TEL. 09 7877 16995
saturnstructuralengineers@gmail.com CHECKED DRAWN FILE NAME PROJECT CODE.
APPROVED DATE
GENERAL NOTES
GENERAL
1.1. General notes and typical structural details shall apply to all drawings unless otherwise shown or noted. Recommendations on Maximum Aggregate Size 7. Bars noted as continuous shall have a minimum splice length of 48 Bar Diameter, but not less than 12 in. Basic Compression Development Length... Ldc(in.) Basic Development Length fro Hooked Bars... Ldh(in.)
1.2. Features of construction shown are typical and shall apply generally throughout for similar conditions. modify 8. Reinforcing bars shall be spliced only as indicated on the drawings. psi psi
typical details as required to meet special conditions. Structural Elements Max. Aggregate Size (in.) 9. Any welding to be performed must have prior written approval of the Engineer. 00 si si psi 00 psi psi psi
600 . 0p 0p 00 600 No. 00 00 00
f y= Bar No 30
0
40
0
50 & Up f y= Bar 30 40 50 & Up
1.3. The contractor shall examine the drawings and shall notify the engineer/architect of any discrepancies he may Footings 1 in. 10. Welding of reinforcing steel is not permitted unless otherwise shown on the drawing. Welding of reinforcing
find before proceeding with the work, or during construction. steel shall conform to AWS D1.4-79 "AWS Structural Welding Code" of the American Welding Society. #10 8 8 8 #10 8.2 7.1 6.4
1.4. It shall be the contractor's responsibility to provide adequate shoring and bracing for the structure for all loads Slabs, Beams, Columns & Others 3/4 in. Reinforcing steel which is welded shall conform to ASTM A706. Reinforcing steel not conforming to ASTM A706
that may be imposed during construction. may be used if material properties of the reinforcing steel conform to AWS D1.4-79. #12 11 9 9 #12 11 9.5 8.5
Curbs & Mass, Concrete/ Slab on Grade 1 in.
1.5. All materials and workmanship shall conform to the latest applicable standard or specifications. all works shall 11. Anchor bolts, Dowels and other embedded items are to be securely tied in place before concrete is poured. #16 14 12 11 #16 13.7 11.9 10.6
conform with the best practice prevailing in the various trades. 1.1 Inform Architect/Engineers of other miscellaneous concrete structural elements not shown above to determine 12. Typical Hoops & Supplementary Tie Detail
1.6. All construction and workmanship shall be subject to inspections, examination and testing by the their respective compressive strength.
#18 16 14 14 #18 16.4 14.2 12.7
Engineer/Architect. the Engineer/Architect shall have the right to reject defective materials and workmanship 6db ³3'' 6db ³3''
6db ³3'' #22 19 17 16 #22 19.2 16.6 14.8
or require its correction.
1.7. Unless specifically detailed elsewhere, the contractor shall follow typical details as shown in these drawings. 2. REINFORCING STEEL 90°
D db D db
#25 22 19 18 #25 22 19 17
1.8. The contractor will be responsible for the coordination of work among the various trades as necessary to avoid a. Reinforcing Steel shall conform to ASTM A615 Grade or Others equivalent. 135° 135°
conflicts and to ensure the installation of all works with the available space. b. Longitudinal reinforcing steel yield strength shall be at least 60000 psi, and minimum tensile strength shall be at least
1.9. Do not scale drawings and called-out dimensions. Standard code requirements shall govern over unscaled 90000 psi. NOTES:
Seismic Hoops Details Consecutive Crosstie Details Ldh = (table value) x applicable factors .... but not less than 8db OR 6 in.
drawings. c. Transverse reinforcing steel yield strength shall be at least 40000 psi, and minimum tensile strength shall be at least Alternate 90° & 135° Ends
1.10. Special notes and dimensions indicated on the structural drawing shall be coordinated with the architectural 70000 psi. ye = epoxy coating factor; 1.0 for uncoated or zinc-coated reinforcement and 1.2 for epoxy-coated
NOTES: reinforcement.
drawings. Architectural drawings shall be used to define detail configuration, elevations, opening joints, slopes, d. All reinforcing bars shall be deformed bars unless otherwise specified in drawings. For #16 and smaller: D = 4 db
etc. e. All reinforcing bars shall be clean of Rust, Grease or other materials likely to impair bond. l = lightweight-concrete factor .... 0.75
For #18 through #25: D = 6 db yc = cover factor; 0.7 for either 90° OR 180° #36 and smaller hooked bars with side cover ³2.5'', otherwise
1.11. Modification of section and sizes of structural members shall not be allowed unless otherwise approved by the f. All reinforcing bars shall accurately and securely placed before pouring of
structural engineer. concrete or applying mortar or grout. 13. Typical Standard Hook Details 1.0
1.12. Contractor to provide required test result to client. These testing shall be conducted by accredited agency.
1.13. In case structural members specified are not available, submit to client engineer available list of members for CONSTRUCTION Ldh db Ldh db 16. Typical Lap Splice Details
approval before purchasing. 1. SETTING OUT
MIN: db
The setting out and the elevations of the different components of the structure shall be approved by the engineer Vertical OFFSET =

D
LAP LENGTH MAX: db+1/8''

12db
prior to the start of any construction work.
DESIGN CRITERIA 4db ³221'' db
1.LOADS
2. REINFORCED CONCRETE 90° Hook 180° Hook
1.1 Dead Loads
Unit weight of concrete 150 lb/ft3 a. CONCRETE MIXING & PLACING Critical section MIN: 12 db
Unit weight of soil 115 lb/ft3 MAX: 15 db
4.5'' Thk. brick wall plus plaster 70 psf 1. Design of concrete mix shall meet design concrete strength under Item 1 of MATERIALS. For #25 and smaller: D = 6 db
9'' Thk. brick wall plus plaster 125 psf 2. Concrete shall be deposited, vibrated and cured in accordance with the published specifications. For #29 through #36: D = 8 db
Floor finish 25 psf 3. For concrete deposited against the ground, lean concrete with a minimum thickness of 3 in. shall be laid first For #43 and #57: D = 10 db c. CONCRETE COVER TO REINFORCEMENT
before installing the reinforcement. The lean concrete shall not be considered in measuring the structural depth Clear concrete covering over reinforcing bars shall be as follows:
1.2 Live Loads of concrete section. Column to Ties 1.5 in.
Average 50 psf 4. The contractor shall submit to the engineer for approval, the pouring sequences for all concreting work. 14. Typical Seismic Hoops, Stirrups and Cross Tie: Configuration and Arrangement Beam to Stirrups 1.5 in.
Water tanks 200 psf 5. The contractor shall notify the engineer 48 Hours prior to the pouring of any structural concrete, so an inspection Footing 3 in.
can be made on all forms and reinforcing. Detail B
1.3 Wind Loads 6. Prepare and submit concrete mix design including aggregate gradation, water and cement contents, and Detail A Detail C d. CONSTRUCTION JOINTS
Wind speed 80 mph cylinder strength strength test result for review. Concrete mix design shall be tested at 7, 14, and 28 Days Detail C
Detail A 1. The position and form of any Construction Joint shall be as shown on Drawings OR as agreed with the
Exposure category C curing period. The test shall follow the requirement of ASTM or BS standards.
Engineer
Topographic factor 1.0 7. Use of admixtures is permitted to produce proper slump and workability, but subject to the Engineer's Approval.
Addition of water to concrete at job site is not allowed. 2. All surface of Construction Joints shall be roughened to 41 in. Amplitude.
3. All Construction Joints shall be cleaned to remove dust, chips, or other foreign materials prior to placing
1.4 Seismic Loads 8 For concrete slab, all reinforcement shall have a minimum clear cover of 34 in. from top and bottom of slab. Overlapping Hoops Stirrups with Seismic Hooks + Detail A Detail B Detail C
of adjacent concrete.
0.2s Spectral acceleration 0.8 Temperature bars shall be generally placed near the face in tension and shall not be less than 0.0018bh. Cross tie
1s Spectral acceleration 0.5 9. For two or more layers of reinforcing bars, use separators spaced @ 3ft and in no case shall be less than 2 Detail A Detail A
Risk category II separators. Clear distance between layers should not be less than 1.5 in. e. FALSEWORK
Detail A Detail A Detail A All Falsework shall be designed by the Contractor subject to the approval by the Engineer.
Site soil class D 10. For reinforced concrete columns and beams, all reinforcement shall have a minimum clear concrete cover of Detail A
Seismic Design Category, SDC D 1.5in. For foundation elements, bottom and side clear concrete cover shall be at least 3in. and top side shall Detail A Detail A
have at least 1.5in. clear cover. f. FORMWORK
2.DESIGN CODE AND REFERENCE 11. Location of all construction or cold joints must be approved by the Engineer/Architect. 1. Forms shall be provided for all concrete indicated unless specified otherwise. Forms shall be set true to line
The following Building and Design Codes shall govern the design fabrication and construction of the project. 12. Pipes or Ducts exceeding one third the slab or wall thickness shall not be placed in structural concrete unless and grade and maintained so as to ensure competent work within the allowable tolerances specified and shall
specifically detailed. Pipes may pass through structural concrete in sleeves but shall not be embedded therein. Two Overlapping Hoops Three Overlapping Hoops Four Overlapping Hoops
be mortar tight.
ASCE 7-16, Minimum Design Loads for Buildings and Other Structures, ASCE Standard, American Society of Civil 13. Reinforcing bars, anchor bolts, and other inserts shall be secured in placed before pouring concrete. Bar 2. Forms and their supports shall be designed so as not to damaged previously placed structure.
placement and supports shall be in accordance with the recommended ACI Practice. NOTES: 3. No construction load shall be supported on, nor any shoring removed from any part of structure under
Engineers, Reston, VA, 2016.
14. All inserts, anchor bolts, etc., to be embedded in the concrete shall be hot dip galvanized unless noted otherwise. Hooks and Bends detail are as specified in "Item 12, Typical Hoops and Supplementary Tie Detail" construction except when that portion of the structure in combination with the remaining forming and shoring
MNBC 2020, Myanmar Engineering Council, Myanmar National Building Code, 2020. 15. In general, the latest edition of the manual of standard practice for detailing concrete structures, ACI 315-18, system has gained sufficient strength and to support safely its weight and additional imposed loads.
shall be adhered to, unless shown otherwise. 15. Tension and Compression Development for Rebar Splice and Anchorage 4. Forms shall be removed in such manner as not to impair Safety and Serviceability of the Structure.
ACI 318-19, ACI Committee 318, Building Code Requirements for Structural Concrete, (ACI 318-19) Basic Tension Development Length Ratio... Ld/db 5. Shoring for Beams/Slabs should be removed after 14 Days of Casting.
Recommendations for Cambers
and Commentary, American Concrete Institute, Farmington Hills, MI (2019). 6. Schedule of stripping of Forms and Shores.
Structural Elements Minimum Camber psi 3000 psi 3750 psi 4000 psi 5000 psi
00
AISC 360-16, Specifications for Structural Steel Buildings, American Institute of Steel Construction, 600
fy= No. REMOVAL OF FORMS & SHORING
Chicago, IL, 2016. R.C Beams 1
4 in. for every 15ft span Bar Bottom Top Bottom Top Bottom Top Bottom Top
Bar Bar Bar Bar Bar Bar Bar Bar
Cantilever R.C Beams 3
in. for every 10ft span Clear Span MIN. Time Period

Case 1 & 2
4 #10 to #18 43.8 57.0 39.2 50.9 37.9 49.3 33.9 44.1 Structural Elements
Between Supports (Days)
MATERIALS 1
R.C Slabs 8 in. for every 10ft shorter span #20 to #57 54.8 71.2 49.0 63.7 47.4 61.7 42.4 55.2 _
1. CONCRETE Foundation 1
Unless indicated otherwise on plans, the concrete strength shall be as follows.

Other Case
#10 to #18 65.7 85.4 58.8 76.4 56.9 74.0 50.9 66.2
Wall, Column, Beams, Girder Sides & _
b. BAR BENDING, SPLICING AND PLACING 3
#20 to #57 82.2 106.8 73.5 95.6 71.1 92.6 63.6 82.8 Slab-on-Grade
Structural Elements 28 Day Cylindrical Strength (Psi) Max. Slumn (in.)
1. The contractor shall submit to the engineer for approval all shop drawings indicating the bending, cutting, Under 9 Ft 7
Slab, Stairs and Slab on Grade 3000 Psi 3 in. splicing and installation of all reinforcing bars. NOTES:
Joist, Beam & Girder Soffit 9 Ft to 18 Ft 14
2. Bars shall be bent cold, bars partially embedded in concrete shall not be field bent unless permitted by the Ld = (table value) x ye/l x db .... but not less than 12 in.
Cast-in-place Girders, Beams, ye = coating factor .... 1.2 Over 18 Ft 21
3000 Psi 4 in. Engineer.
Footings and Column l = lightweight-concrete factor .... 0.75
3. Bar splicing not indicated on drawings shall be subject to the approval of Engineer.
Case 1. Clear spacing of bars being developed or spliced not less than db, clear cover not less 9 Ft to 18 Ft 7
Other Structural Elements 3000 Psi 4 in. 4. Welded splices, if approved by the Engineer, shall develop in tension at least 1.25Fy of the specified yield Floor Slabs
strength of the reinforcing bars. than db, and stirrups or ties not less than the ACI Code minimum, throughout Ld. Over 18 Ft 10
For Non-Structural Members 2500 Psi 4 in. 5. Lapped splices shall be staggered where possible. In SMRF Frame Members, attention shall be given that Case 2. Clear spacing of bars being developed or spliced not less than 2db and clear cover not
reinforcing bar splices are away from potential plastic hinge regions. less than db. NOTE:
Lean Concrete 1500 Psi 3 in.
6. Splice of reinforcement shall be made only required or permitted on design drawings OR as allowed by the ACI In case of unusual construction loads, strength calculation shall be performed for the removal of shoring in
Code OR as authorized by the Engineer. order that adequate strength of the slab is assured. If the floor slab has not gained adequate strength,
treatments shall be done as necessary.
1 GENERAL NOTES
S1A S1A

ARCHITECT / ENGINEER PROJECT / LOCATION OWNER NO. REVISIONS DATE BY SHEET CONTENT SHEET NO.
SATURN
STRUCTURAL ENGINEERS GENERAL NOTES S 1A
STRUCTURAL ENGINEERS
NayPyiTaw, Myanmar. TEL. 09 7877 16995
saturnstructuralengineers@gmail.com CHECKED DRAWN FILE NAME PROJECT CODE.
APPROVED DATE
GENERAL NOTES
g. Protection and Curing of Concrete 6. No footing shall rest on FILL.
Concrete surfaces shall be protected from harmful effects of Sun, Wind and Running water and shall be kept 7. Minimum concrete protection for reinforcement shall be 3in. for concrete deposited against the ground.
damp for at least 7-Days as per recommended curing practices. 8. Contractor to provide for De-Watering of excavations from either surface water, ground water or seepage. SYMBOLS
9. Contractor shall provide for design and installation of all cribbing, sheathing and shoring required to safely retain the
3. STRUCTURAL STEEL earth banks.
10. All excavations shall be properly backfilled. Do not place backfill behind retaining walls before walls have attained full
1. All Structural Mill Sections and Built-up Plate Sections shall be constructed in accordance with AISC design strength. Contractor shall brace or protect all building and pit walls below grade from lateral loads until N
"Specification for Design, Fabrication and Erection of Structural Steel for Buildings". attaching floors are completely in place and have attained full strength. Contractor shall provide for design, permits
2. Steel Plates, Shapes, Bars and Metal fabrications are ASTM A36 unless noted otherwise. and installation of such bracing.
3. Schedule of Bolts, Nuts, and Washers 11. Footings shall be placed and estimated according to depths shown on drawings. Should soil encountered at these
depths not be approved by the Foundation Engineer, footing elevations will be altered as required. NORTH ARROW
12. Footing backfill and utility trench backfill within building area shall be mechanically compacted in layers, in
BOLTS TYPE/ GRADE NUTS WASHERS
accordance with soil report. Flooding will not be permitted.
ASTM A307 GRADE A ASTM A563 ASTM F436

ASTM A325 TYPE 2 ASTM A563 ASTM F436

ASTM A490 TYPE 2 ASTM A563 ASTM F436

4. Hole Size for Bolts INDICATION OF ELEVATION

Hole Dimensions
BOLT DIAMETER STANDARD OVERSIZE SHORT-SLOT LONG-SLOT
(in.) (Dia.) (Dia.) (Width x Length) (Width x Length)
1/2 9/16 5/8 9
16
11
x 16 9
16 x 1 41
5/8 11/16 13/16 11 7 11 LIMIT OF DIMENSION
16 x 8 16 x 1 169
3/4 13/16 15/16 13
x1 13
x 1 87
16 16
ABBREVIATIONS
7/8 15/16 1 161 15
16 x 1 81 15
16 x 2 163
1 1 81 1 41 1 81 x 1 165 1 81 x 2 21
> 1 81 d + 81 d + 165 (d+ 81) x (d+ 83) (d+ 81) x 2.5d Bot Bottom
SECTION IN EARTH
Conc Concrete
5. Unfinished bolts shall conform to ASTM A307 Grade A. High-strength bolts shall conform to ASTM A325 OR
ASTM A490. Use two bolts minimum unless noted otherwise. C TO C Center to Center Span
6. All high-strength bolts A325 OR A490 shall be slip critical (A325-SC or A490-SC Class A) unless noted
otherwise. The installation of high-strength bolts shall conform to the latest edition of AISC Specification for CONT Continuous
Structural Joint Using ASTM A325 OR A490 Bolts. Where non slip critical bolts are specified, these bolts shall
only be tightened to a snug-tight condition.
D Bend Diameter
SECTION IN GRAVEL BED
7. Bolt holes shall be 161 in. larger in diameter than the diameter of the bolt used for slip critical connections Dia Bolt Hole Diameter
construction OR short slotted holes for non-slip critical connections as noted, unless otherwise specified.
8. Electrodes for Welding: ASTM 233 E-70XX Series, comply with AWS D1.1 Code Requirements. db Reinforcing Bar Diameter
9. Flame cutting and welding shall be done in acceptance with "Standard Code for Welding in Building of the
American Welding Society". DISCONT Discontinuous
10. All butt welds shall be full penetration and shall be properly back-chipped or gouged. Backup plates shall be
provided as required. Lc Clear Span (Length)
11. Grind all exposed welds smooth, except fillet welds. SECTION IN CONCRETE
12. Weld lengths called for on PLANs are the net effective length required. Fillet weld sizes are the width of the Ld Tension Development Length
horizontal or vertical leg. Where length of weld is not shown, it shall be full length of joint. Welding electrodes
to be E70XX unless noted otherwise.
Ldc Compression Development Length
13. All level welds are full penetration, unless noted otherwise. Size all fillet welds per AWS where not shown Ldh Hook Development Length
with weld size, provide Min. weld size to develop tension or shear capacity of the smaller member of the
pieces being connected (163 in. Min.) Max Maximum LEVEL DROP
14. The Contractor shall provide Min. 83 in. concrete cover around all steel members/components (WF, TS, Plates,
Min Minimum
Bolts, etc.) adjacent to soil.
15. Welded Connections between members of Moment Frames shall be tested by Non-Destructive Method. R Radius
16. Apply paint for all fabrications. Shop painting for structural steel shall be Rust-Inhibitive Primer with Min.
D.F.T. 2.0 Mils. Thk Thick
17. Touch-up painting: Apply paint to exposed areas in manner satisfactory to the Engineer with same material as
shop paint. TYP Typical IDENTIFICATION SYMBOL
18. Comply with AISC Code and Specifications for bearing, adequacy of temporary connections and alignment.
19. Contractor shall furnish complete Erection Drawings for the proper identification and assembly of all building 2 MAIN TITLE TARGET
components. These drawings will show anchor bolts setting, primary, secondary, and roof framing, and 1S6 1S6
necessary installation details. Submit shop drawings for approval before fabrication.
20. Fabricator shall submit Shop Drawings for approval by the Engineer and the Owner prior to fabrication. DWG. No. WHERE DWG. No. WHERE
DET IS TAKEN DET IS SHOWN
4. FOOTINGS

1. The assumed soil bearing capacity shall be 2000 lb-per-square-foot at 5 ft from Natural Grade Line to Bottom
of Footing.
2. Footings shall rest on 6 in. thick gravel base course compacted to 95% maximum density.
3. Backfill shall be placed in 6 in. layers and each layer shall be compacted to a minimum of 95% maximum
density, shall be free from detrimental amounts of Organic Material. No rock or similar irreducible material
with a maximum dimension greater than 12 in. be buried or placed in fills.
4. All excavations, backfilling and compaction shall be inspected and approved by the Contracting Officer.
5. The Contractor shall verify the actual soil condition before construction or after footing excavation is done, to check the
geotechnical reports recommended bearing capacity, if any.

1 GENERAL NOTES
S1B S1B

ARCHITECT / ENGINEER PROJECT / LOCATION OWNER NO. REVISIONS DATE BY SHEET CONTENT SHEET NO.
SATURN
STRUCTURAL ENGINEERS SATURN GENERAL NOTES S 1B
STRUCTURAL ENGINEERS
NayPyiTaw, Myanmar. TEL. 09 7877 16995
saturnstructuralengineers@gmail.com CHECKED DRAWN FILE NAME PROJECT CODE.
APPROVED DATE
1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6
4' 9' 9' 9' 4' 4' 9' 9' 9' 4' 4' 9' 9' 9' 4'

G G G
4' C12x16 C12x16 C12x16 C12x12 4' C12x16 C12x16 C12x16 C12x12 4' C12x12 C12x12 C12x12 C12x12
F F F
10" 10" 10" 10" 10" 10"

10' 10' 10'

C12x12 C12x12 C12x12 C12x12 C12x12 C12x12 C12x12 C12x12 C12x12 C12x12 C12x12 C12x12
E E E

9' 9' 9'

C16x12 C16x12 C12x12 C16x12 C16x12 C12x12 C16x12 C16x12 C12x12


D D D
10" 10" 10" 10" 10" 10"

11' 11' 11'

H H H
C14x14 C12x12 C12x12 C12x12 C14x14 C12x12 C12x12 C12x12 C14x14 C12x12 C12x12 C12x12
C C C

60° 60° 60°


13' 13' 13'
60° 60° 60°
C12x12 C12x12 C12x12
60° 60° 60°
H H H
R7'-1087" C12x12 C12x12 R7'-1087" C12x12 C12x12 R7'-1087" C12x12 C12x12
B B B
4'-6" C12x12 C14x14 4'-6" C12x12 C14x14 4'-6" C12x12 C14x14
C10x10 C10x10 C10x10 C10x10
A A A

1 COLUMN LAYOUT PLAN ELE 07 2 COLUMN LAYOUT PLAN ELE 18 3 COLUMN LAYOUT PLAN ELE 26
S2A S2A S2A S2A S2A S2A

ARCHITECT / ENGINEER PROJECT / LOCATION OWNER NO. REVISIONS DATE BY SHEET CONTENT SHEET NO.
SATURN
STRUCTURAL ENGINEERS SATURN COLUMN LAYOUT PLAN @ ELE 07, 18, 26 S 2A
STRUCTURAL ENGINEERS
NayPyiTaw, Myanmar. TEL. 09 7877 16995
saturnstructuralengineers@gmail.com CHECKED DRAWN FILE NAME PROJECT CODE.
APPROVED DATE
1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6
4' 9' 9' 9' 4' 4' 9' 9' 9' 4' 4' 9' 9' 9' 4'

G G G
4' C12x12 C12x12 W10x26 4' C12x12 C12x12 4' C12x12 C12x12
F F F

10' 10' 10'

C12x12 C12x12 W10x26 C12x12 C12x12 W10x26 C12x12 C12x12


E E E

9' 9' 9'

W10x26 W10x26
D D D

11' 11' 11'

H H H
C14x14 C12x12 W10x26 C14x14 C12x12 C14x14 C12x12
C C C

60° 60° 60°


13' 13' 13'
60° 60° 60°
C12x12 C12x12 C12x12
60° 60° 60°
H H H
R7'-1087" R7'-1087" R7'-1087"
B B B
4'-6" C12x12 C14x14 4'-6" C12x12 C14x14 4'-6" C12x12 C14x14
A A A

1 COLUMN LAYOUT PLAN ELE 27-6 2 COLUMN LAYOUT PLAN ELE 29-6 3 COLUMN LAYOUT PLAN ELE 31-7
S2B S2B S2B S2B S2B S2B

ARCHITECT / ENGINEER PROJECT / LOCATION OWNER NO. REVISIONS DATE BY SHEET CONTENT SHEET NO.
SATURN
STRUCTURAL ENGINEERS SATURN COLUMN LAYOUT PLAN @ ELE 27-6, 29-6, 31-7 S 2B
STRUCTURAL ENGINEERS
NayPyiTaw, Myanmar. TEL. 09 7877 16995
saturnstructuralengineers@gmail.com CHECKED DRAWN FILE NAME PROJECT CODE.
APPROVED DATE
1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6
4' 9' 9' 9' 4' 4' 9' 9' 9' 4' 4' 9' 9' 9' 4'

G G G
4' W8x21 W8x21 4' W8x21 W8x21 4'
F F F
B10x12 B10x12 B10x12
10" 10" 10"

B10x12

B10x12

B10x12

B10x12
10' 10' 10'
B10x10

W8x21 W8x21 W8x21 W8x21 B10x12 B10x12 B10x12


E E E
B10x14
B10x10

B10x12

B10x12

B10x14
9' 9' 9'

B10x12
B10x12
B12x16 B12x16 B10x12 B10x14
D D D
10" 10"

B10x12

B10x12

B10x12

B10x12
11' 11' 11'

H H H
C14x14 C12x12
B10x12 B10x12 B10x12
C C C

B1
x1

2x1
B12

4
60° 60° 60°

B10x14

B10x14

B10x14
13' 13' 13'
60° 60° 60°
C12x12
60° 60° 60°
H H H

B1
R7'-1087" R7'-1087" R7'-1087"

2x1
B10x12 B10x12

4
B B B

B10x12

B10x12

B10x12
4'-6" C12x12 C14x14 4'-6" 4'-6" B12x14
B10x12 B10x12
A A A

1 COLUMN LAYOUT PLAN ELE 33-4 2 COLUMN LAYOUT PLAN ELE 33-10 3 BEAM LAYOUT PLAN ELE 07
S2C S2C S2C S2C S3A S3A

ARCHITECT / ENGINEER PROJECT / LOCATION OWNER NO. REVISIONS DATE BY SHEET CONTENT SHEET NO.
SATURN COLUMN LAYOUT PLAN @ ELE 33-4, 33-10
STRUCTURAL ENGINEERS SATURN S 2C/3A
STRUCTURAL ENGINEERS BEAM LAYOUT PLAN @ ELE 07
NayPyiTaw, Myanmar. TEL. 09 7877 16995
saturnstructuralengineers@gmail.com CHECKED DRAWN FILE NAME PROJECT CODE.
APPROVED DATE
1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6
4' 9' 9' 9' 4' 4' 9' 9' 9' 4' 4' 9' 9' 9' 4'

G G G
B10x16 B10x16
B12x16

B12x16

B12x16
4' 4' 4'
F F F
B10x12 B10x12 B10x12 B10x12 B10x12 B10x12
10" 10" 10"
B10x12

B10x12

B10x12

B10x12

B10x12

B10x12

B10x12

B10x12
10' 10' 10'

B10x12 B10x12 B10x12 B10x12 B10x12 B10x12


E E E
B10x14 B10x14
B10x12

B10x12

B10x12

B10x12

B10x12

B10x12

B10x12
B10x14

B10x14
9' 9' 9'

B10x14 B12x16 B12x16 B10x12 B10x14 B10x12


D D D
10" 10" 10" 10"
B10x12

B10x12

B10x12

B10x12

B10x12

B10x12

B10x12
11' 11' 11'

H H H
B10x12 B10x12 B10x12 B10x12 B10x12 B10x12
C C C
x14

x14
B1
2x1
B12

B12
4

60° 60° 60°


B10x14

B10x14

B10x14

B10x14

B10x14
13' 13' 13'
60° 60° 60°
60° 60° 60°
H H H
B1

B1

R7'-1087" R7'-1087" R7'-1087"


2x1

2x

B10x12 B10x12 B10x12 B10x12


14
4

B B B
B10x14

B10x14

B10x14

4'-6" B12x14 4'-6" B12x14 4'-6"


B10x14 B10x14
A A A

1 BEAM LAYOUT PLAN ELE 18 2 BEAM LAYOUT PLAN ELE 26 3 BEAM LAYOUT PLAN ELE 27-6
S3B S3B S3B S3B S3B S3B

ARCHITECT / ENGINEER PROJECT / LOCATION OWNER NO. REVISIONS DATE BY SHEET CONTENT SHEET NO.
SATURN
STRUCTURAL ENGINEERS SATURN BEAM LAYOUT PLAN @ ELE 18, 26, 27-6 S 3B
STRUCTURAL ENGINEERS
NayPyiTaw, Myanmar. TEL. 09 7877 16995
saturnstructuralengineers@gmail.com CHECKED DRAWN FILE NAME PROJECT CODE.
APPROVED DATE
1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6
4' 9' 9' 9' 4' 4' 9' 9' 9' 4' 4' 9' 9' 9' 4'

G G G
4' 4' 4'
F F F
B10x12

B10x12

B10x12
10' 10' 10'

B10x12
E W8x21
E E

W6x16

C6x13
9' 9' 9'

W8x21
D D D

11' 11' 11'

H H H B10x1
2
C C C

2x1
B10

B10x12
60° 60° 60°
13' 13' 13'
60° 60° 60°
60° 60° 60°
H H H

B1
R7'-1087" R7'-1087" R7'-1087"

0x1
2
B B B
4'-6" 4'-6" 4'-6" B10x12
A A A

1 BEAM LAYOUT PLAN ELE 29-6 2 BEAM LAYOUT PLAN ELE 31-7 3 BEAM LAYOUT PLAN ELE 33-4
S3C S3C S3C S3C S3C S3C

ARCHITECT / ENGINEER PROJECT / LOCATION OWNER NO. REVISIONS DATE BY SHEET CONTENT SHEET NO.
SATURN
STRUCTURAL ENGINEERS SATURN BEAM LAYOUT PLAN @ ELE 29-6, 31-7, 33-4 S 3C
STRUCTURAL ENGINEERS
NayPyiTaw, Myanmar. TEL. 09 7877 16995
saturnstructuralengineers@gmail.com CHECKED DRAWN FILE NAME PROJECT CODE.
APPROVED DATE
1 2 3 4 5 6 1 2 3 4 5 6
4'-0 9'-0 9'-0 9'-0 4'-0
4' 9' 9' 9' 4'
1 2 3 4 5 6
G G
h = 6'' (-3 ) h = 6'' (-3 ) 4'-0 9'-0 9'-0 9'-0 4'-0

4'-0
4'
1S3 1S3
F F F
B10x12 B10x12 B10x12
10" 10" 10"
h = 4'' h = 4'' h = 4''

B10x12

B10x12

B10x12

B10x12
10'-0

10'-0
10'
2S6 2S6 2S6

B10x12 B10x12 B10x12


E E E

h = 4'' h = 4'' h = 4''


h = 4'' (-3 ) h = 4''

B10x12

B10x12

B10x12
9'-0

9'-0
9'
1S1 2S5 2S5 2S5 1S2
B10x12
D D D
10" 10" 10" 10"

h = 4'' h = 4'' h = 4''

B10x12

B10x12

B10x12
11'-0

11'-0
11'
2S4 2S4 2S4
H
B10x12 B10x12 B10x12
C C C
h = 4''

x14
2S2

B12
h = 4'' h = 4''
60°

B10x14
13'-0

13'-0
13'
STAIRWELL 2S3 2S3
60°
60°
H

B1
R7'-1087"

2x1
B10x12 B10x12

4
B B B

4'-6"
5'-0

5'-0
h = 4'' (-3 ) 2S1 h = 4'' (-3 ) 2S1 B12x14
A A A

1 FLOOR SLAB LAYOUT PLAN (ELE 18) 2 ROOF TRUSS FRAMING PLAN 3 ROOF BEAM FRAMING PLAN (ELE 26)
S4 S4 S4 S4 S4 S4

ARCHITECT / ENGINEER PROJECT / LOCATION OWNER NO. REVISIONS DATE BY SHEET CONTENT SHEET NO.
SATURN FLOOR SLAB LAYOUT PLAN (ELE 18)
STRUCTURAL ENGINEERS SATURN ROOF TRUSS FRAMING PLAN S 04
STRUCTURAL ENGINEERS ROOF BEAM FRAMING PLAN (ELE 26)
NayPyiTaw, Myanmar. TEL. 09 7877 16995
saturnstructuralengineers@gmail.com CHECKED DRAWN FILE NAME PROJECT CODE.
APPROVED DATE
1 2 3 4 5 6 1 2 3 4 5 6

4'-0 9'-0 9'-0 9'-0 4'-0 4'-0 9'-0 9'-0 9'-0 4'-0

CC5"-1/16"-3/4"-2 1/4
CC5"-1/16"-3/4"-2 1/4
+43-9(LEV-11) +43-9(LEV-11) CC5"-1/16"-3/4"-2 1/4 CC5"-1/16"-3/4"-2 1/4
CC5"-1/16"-3/4"-2 1/4 HSS5X2-1/2X1/8

3'-11

3'-11
CC5"-1/16"-3/4"-2 1/4 CC5"-1/16"-3/4"-2 1/4

+39-10(LEV-10) +39-10(LEV-10) CC5"-1/16"-3/4"-2 1/4 CC5"-1/16"-3/4"-2 1/4


CC5"-1/16"-3/4"-2 1/4 CC5"-1/16"-3/4"-2 1/4
HSS5X2-1/2X1/8

4'-3

4'-3
HSS5X2-1/2X1/8
+35-7(LEV-09) +35-7(LEV-09)
CC5"-1/16"-3/4"-2 1/4

1'-9 1'-9 6

1'-9 1'-9 6
+35-1(LEV-08) +35-1(LEV-08) CC5"-1/16"-3/4"-2 1/4
CC5"-1/16"-3/4"-2 1/4
+33-4(LEV-07) +33-4(LEV-07)
CC5"-1/16"-3/4"-2 1/4
+31-7(LEV06) +31-7(LEV06) CC5"-1/16"-3/4"-2 1/4
C6X10.5 C6X10.5

2'-1

2'-1
CC5"-1/16"-3/4"-2 1/4
+29-6(LEV-05) +29-6(LEV-05) L3X3X1/4
W6X16

1'-6 2'-0

1'-6 2'-0
CC5"-1/16"-3/4"-2 1/4
CC5"-1/16"-3/4"-2 1/4
+27-6(LEV-04) +27-6(LEV-04)
L3X3X3/8
+26(LEV-03) +26(LEV-03) CC5"-1/16"-3/4"-2 1/4
CC5"-1/16"-3/4"-2 1/4
CC5"-1/16"-3/4"-2 1/4
W6X16
43'-9

43'-9
L3X3X1/4

8'-0

8'-0
CC5"-1/16"-3/4"-2 1/4
L3X3X1/4

+18(LEV-02) +18(LEV-02)

11'-0

11'-0
+7(LEV-01) +7(LEV-01)

7'-0

7'-0
+0(BASE) +0(BASE)

35'-0 35'-0

1 ELEVATION ON GRID A ELEVATION ON GRID B


S5A S5A S5A S5A

ARCHITECT / ENGINEER PROJECT / LOCATION OWNER NO. REVISIONS DATE BY SHEET CONTENT SHEET NO.
SATURN
STRUCTURAL ENGINEERS SATURN ELEVATION ON GRID A B S 5A
STRUCTURAL ENGINEERS
NayPyiTaw, Myanmar. TEL. 09 7877 16995
saturnstructuralengineers@gmail.com CHECKED DRAWN FILE NAME PROJECT CODE.
APPROVED DATE
1 2 3 4 5 6 1 2 3 4 5 6

4'-0 9'-0 9'-0 9'-0 4'-0


4'-0 9'-0 9'-0 9'-0 4'-0

HSS5X2-1/2X1/8
CC5"-1/16"-3/4"-2 1/4
CC5"-1/16"-3/4"-2 1/4 HSS5X2-1/2X1/8
CC5"-1/16"-3/4"-2 1/4 CC5"-1/16"-3/4"-2 1/4
+43-9(LEV-11) CC5"-1/16"-3/4"-2 1/4 CC5"-1/16"-3/4"-2 1/4 +43-9(LEV-11) HSS5X2-1/2X1/8 HSS5X2-1/2X1/8
CC5"-1/16"-3/4"-2 1/4 CC5"-1/16"-3/4"-2 1/4 CC5"-1/16"-3/4"-2 1/4
CC5"-1/16"-3/4"-2 1/4

3'-11

3'-11
CC5"-1/16"-3/4"-2 1/4 CC5"-1/16"-3/4"-2 1/4 CC5"-1/16"-3/4"-2 1/4 CC5"-1/16"-3/4"-2 1/4
CC5"-1/16"-3/4"-2 1/4 CC5"-1/16"-3/4"-2 1/4 CC5"-1/16"-3/4"-2 1/4
C6X10.5
+39-10(LEV-10) HSS5X2-1/2X1/8 +39-10(LEV-10) CC5"-1/16"-3/4"-2 1/4 CC5"-1/16"-3/4"-2 1/4
CC5"-1/16"-3/4"-2 1/4
CC5"-1/16"-3/4"-2 1/4
CC5"-1/16"-3/4"-2 1/4 CC5"-1/16"-3/4"-2 1/4 CC5"-1/16"-3/4"-2 1/4

4'-3

4'-3
CC5"-1/16"-3/4"-2 1/4
HSS5X2-1/2X1/8 CC5"-1/16"-3/4"-2 1/4 CC5"-1/16"-3/4"-2 1/4
+35-7(LEV-09) CC5"-1/16"-3/4"-2 1/4 +35-7(LEV-09)
CC5"-1/16"-3/4"-2 1/4 CC5"-1/16"-3/4"-2 1/4 CC5"-1/16"-3/4"-2 1/4
CC5"-1/16"-3/4"-2 1/4
CC5"-1/16"-3/4"-2 1/4 L4X4X3/8

1'-9 1'-9 6

1'-9 1'-9 6
+35-1(LEV-08) +35-1(LEV-08)
W6X16
CC5"-1/16"-3/4"-2 1/4 W6X16
CC5"-1/16"-3/4"-2 1/4 CC5"-1/16"-3/4"-2 1/4
+33-4(LEV-07) +33-4(LEV-07)
CC5"-1/16"-3/4"-2 1/4
CC5"-1/16"-3/4"-2 1/4
C6X10.5 CC5"-1/16"-3/4"-2 1/4
+31-7(LEV06) +31-7(LEV06) CC5"-1/16"-3/4"-2 1/4
CC5"-1/16"-3/4"-2 1/4 W6X16

2'-1

2'-1
CC5"-1/16"-3/4"-2 1/4 L3X3X1/4
CC5"-1/16"-3/4"-2 1/4 W6X16
+29-6(LEV-05) L3X3X1/4 +29-6(LEV-05)
CC5"-1/16"-3/4"-2 1/4

1'-6 2'-0

1'-6 2'-0
W6X16 L3X3X1/4 HSS5X2-1/2X1/8 CC5"-1/16"-3/4"-2 1/4
CC5"-1/16"-3/4"-2 1/4
+27-6(LEV-04) CC5"-1/16"-3/4"-2 1/4 +27-6(LEV-04) CC5"-1/16"-3/4"-2 1/4
CC5"-1/16"-3/4"-2 1/4 CC5"-1/16"-3/4"-2 1/4
W8X21 CC5"-1/16"-3/4"-2 1/4
+26(LEV-03) W10X26 +26(LEV-03) W8X21 CC5"-1/16"-3/4"-2 1/4
CC5"-1/16"-3/4"-2 1/4 CC5"-1/16"-3/4"-2 1/4 C6X13
CC5"-1/16"-3/4"-2 1/4 W6X16
CC5"-1/16"-3/4"-2 1/4 CC5"-1/16"-3/4"-2 1/4 W8X21 W6X16
HSS4X2X1/8 HSS5X2-1/2X1/8
L3X3X3/8 HSS5X2-1/2X1/8 L3X3X3/8 W8X21
L3X3X3/8
43'-9

43'-9
CC5"-1/16"-3/4"-2 1/4 HSS4X2X1/8 L3X3X1/4

8'-0

8'-0
L3X3X1/4 CC5"-1/16"-3/4"-2 1/4 L3X3X1/4 L3X3X1/4 W6X16
L3X3X1/4 CC5"-1/16"-3/4"-2 1/4 CC5"-1/16"-3/4"-2 1/4 CC5"-1/16"-3/4"-2 1/4
L3X3X3/8 L3X3X1/4 L3X3X1/4
CC5"-1/16"-3/4"-2 1/4 CC5"-1/16"-3/4"-2 1/4 CC5"-1/16"-3/4"-2 1/4
CC5"-1/16"-3/4"-2 1/4 W6X16
+18(LEV-02) HSS5X2-1/2X1/8 +18(LEV-02)

11'-0

11'-0
+7(LEV-01) +7(LEV-01)

7'-0

7'-0
+0(BASE) +0(BASE)

35'-0 35'-0

1 ELEVATION ON GRID C ELEVATION ON GRID D


S5B S5B S5B S5B

ARCHITECT / ENGINEER PROJECT / LOCATION OWNER NO. REVISIONS DATE BY SHEET CONTENT SHEET NO.
SATURN
STRUCTURAL ENGINEERS SATURN ELEVATION ON GRID C D S 5B
STRUCTURAL ENGINEERS
NayPyiTaw, Myanmar. TEL. 09 7877 16995
saturnstructuralengineers@gmail.com CHECKED DRAWN FILE NAME PROJECT CODE.
APPROVED DATE
1 2 3 4 5 6 1 2 3 4 5 6

4'-0 9'-0 9'-0 9'-0 4'-0 4'-0 9'-0 9'-0 9'-0 4'-0

HSS5X2-1/2X1/8 HSS5X2-1/2X1/8
CC5"-1/16"-3/4"-2 1/4 CC5"-1/16"-3/4"-2 1/4
+43-9(LEV-11) +43-9(LEV-11)
CC5"-1/16"-3/4"-2 1/4 L3X3X3/8 HSS5X2-1/2X1/8 HSS5X2-1/2X1/8

3'-11

3'-11
L3X3X3/8 CC5"-1/16"-3/4"-2 1/4
CC5"-1/16"-3/4"-2 1/4 CC5"-1/16"-3/4"-2 1/4
CC5"-1/16"-3/4"-2 1/4 CC5"-1/16"-3/4"-2 1/4
L3X3X3/8 L3X3X3/8
+39-10(LEV-10) CC5"-1/16"-3/4"-2 1/4 CC5"-1/16"-3/4"-2 1/4 +39-10(LEV-10)
CC5"-1/16"-3/4"-2 1/4 CC5"-1/16"-3/4"-2 1/4
CC5"-1/16"-3/4"-2 1/4 CC5"-1/16"-3/4"-2 1/4

4'-3

4'-3
CC5"-1/16"-3/4"-2 1/4 CC5"-1/16"-3/4"-2 1/4
CC5"-1/16"-3/4"-2 1/4 CC5"-1/16"-3/4"-2 1/4
+35-7(LEV-09) W6X16 +35-7(LEV-09)
CC5"-1/16"-3/4"-2 1/4 CC5"-1/16"-3/4"-2 1/4 CC5"-1/16"-3/4"-2 1/4 CC5"-1/16"-3/4"-2 1/4
CC5"-1/16"-3/4"-2 1/4 CC5"-1/16"-3/4"-2 1/4 W8X21 CC5"-1/16"-3/4"-2 1/4

1'-9 1'-9 6

1'-9 1'-9 6
+35-1(LEV-08) CC5"-1/16"-3/4"-2 1/4 +35-1(LEV-08)
W8X21 CC5"-1/16"-3/4"-2 1/4 L3X3X3/8
CC5"-1/16"-3/4"-2 1/4 CC5"-1/16"-3/4"-2 1/4 CC5"-1/16"-3/4"-2 1/4
+33-4(LEV-07) L3X3X3/8 W6X16 +33-4(LEV-07) L3X3X3/8
CC5"-1/16"-3/4"-2 1/4 W8X21 CC5"-1/16"-3/4"-2 1/4 CC5"-1/16"-3/4"-2 1/4
L3X3X3/8 W8X21
+31-7(LEV06) CC5"-1/16"-3/4"-2 1/4 L3X3X1/4 +31-7(LEV06) CC5"-1/16"-3/4"-2 1/4 CC5"-1/16"-3/4"-2 1/4
L3X3X3/8 W8X21

2'-1

2'-1
CC5"-1/16"-3/4"-2 1/4 CC5"-1/16"-3/4"-2 1/4
W8X21 L3X3X3/8 W6X16
+29-6(LEV-05) +29-6(LEV-05) CC5"-1/16"-3/4"-2 1/4
L3X3X3/8 CC5"-1/16"-3/4"-2 1/4 L3X3X3/8 L3X3X1/4

1'-6 2'-0

1'-6 2'-0
W6X16
CC5"-1/16"-3/4"-2 1/4 W6X16
L3X3X1/4 CC5"-1/16"-3/4"-2 1/4 CC5"-1/16"-3/4"-2 1/4
+27-6(LEV-04) +27-6(LEV-04)
CC5"-1/16"-3/4"-2 1/4 W8X21 L3X3X3/8
CC5"-1/16"-3/4"-2 1/4 CC5"-1/16"-3/4"-2 1/4
+26(LEV-03) L3X3X3/8 W6X16 C6X13 +26(LEV-03) L3X3X3/8 HSS4X2X1/8
CC5"-1/16"-3/4"-2 1/4 W10X26
W8X21 W8X21 CC5"-1/16"-3/4"-2 1/4
L3X3X3/8 CC5"-1/16"-3/4"-2 1/4
W6X16 L3X3X1/4 CC5"-1/16"-3/4"-2 1/4
L4X4X3/8
L3X3X1/4 CC5"-1/16"-3/4"-2 1/4 CC5"-1/16"-3/4"-2 1/4 L3X3X1/4
HSS5X2-1/2X1/8
43'-9

43'-9
8'-0

8'-0
L3X3X1/4 HSS5X2-1/2X1/8 W6X16 L3X3X1/4
W6X16 L3X3X3/8
HSS5X2-1/2X1/8 W10X26
L3X3X3/8
HSS4X2X1/8
+18(LEV-02) +18(LEV-02)

11'-0

11'-0
+7(LEV-01) +7(LEV-01)

7'-0

7'-0
+0(BASE) +0(BASE)

35'-0 35'-0

1 ELEVATION ON GRID E ELEVATION ON GRID F


S5C S5C S5C S5C

ARCHITECT / ENGINEER PROJECT / LOCATION OWNER NO. REVISIONS DATE BY SHEET CONTENT SHEET NO.
SATURN
STRUCTURAL ENGINEERS SATURN ELEVATION ON GRID E F S 5C
STRUCTURAL ENGINEERS
NayPyiTaw, Myanmar. TEL. 09 7877 16995
saturnstructuralengineers@gmail.com CHECKED DRAWN FILE NAME PROJECT CODE.
APPROVED DATE
A B C D E F G

5'-0 13'-0 11'-0 9'-0 10'-0 4'-0


1 2 3 4 5 6

4'-0 9'-0 9'-0 9'-0 4'-0

+43-9(LEV-11) +43-9(LEV-11)

3'-11

3'-11
CC5"-1/16"-3/4"-2 1/4 CC5"-1/16"-3/4"-2 1/4
CC5"-1/16"-3/4"-2 1/4 CC5"-1/16"-3/4"-2 1/4 CC5"-1/16"-3/4"-2 1/4
+39-10(LEV-10) +39-10(LEV-10) HSS5X2-1/2X1/8
CC5"-1/16"-3/4"-2 1/4 CC5"-1/16"-3/4"-2 1/4 CC5"-1/16"-3/4"-2 1/4

4'-3

4'-3
CC5"-1/16"-3/4"-2 1/4 CC5"-1/16"-3/4"-2 1/4 CC5"-1/16"-3/4"-2 1/4
+35-7(LEV-09) +35-7(LEV-09)
CC5"-1/16"-3/4"-2 1/4 CC5"-1/16"-3/4"-2 1/4

1'-9 1'-9 6

1'-9 1'-9 6
+35-1(LEV-08) CC5"-1/16"-3/4"-2 1/4 CC5"-1/16"-3/4"-2 1/4 +35-1(LEV-08) HSS5X2-1/2X1/8 HSS5X2-1/2X1/8
CC5"-1/16"-3/4"-2 1/4 CC5"-1/16"-3/4"-2 1/4
+33-4(LEV-07) CC5"-1/16"-3/4"-2 1/4 +33-4(LEV-07)
CC5"-1/16"-3/4"-2 1/4
CC5"-1/16"-3/4"-2 1/4 CC5"-1/16"-3/4"-2 1/4
+31-7(LEV06) +31-7(LEV06) CC5"-1/16"-3/4"-2 1/4
CC5"-1/16"-3/4"-2 1/4 CC5"-1/16"-3/4"-2 1/4

2'-1

2'-1
L3X3X1/4 L3X3X1/4
+29-6(LEV-05) CC5"-1/16"-3/4"-2 1/4 CC5"-1/16"-3/4"-2 1/4 +29-6(LEV-05) CC5"-1/16"-3/4"-2 1/4 CC5"-1/16"-3/4"-2 1/4

/4
X1
1'-6 2'-0

1'-6 2'-0
L3X3X1/4 L3X3X1/4

X3
CC5"-1/16"-3/4"-2 1/4 CC5"-1/16"-3/4"-2 1/4

L3

L3
+27-6(LEV-04) +27-6(LEV-04) L3X3X1/4

X3
a34 L3X3X1/4 a31 L3X3X1/4

X
4

1/
+26(LEV-03) +26(LEV-03)
43'-9

43'-9
L3X3X1/4 L3X3X1/4

8'-0

8'-0
L3X3X1/4

+18(LEV-02) +18(LEV-02)

11'-0

11'-0
+7(LEV-01) +7(LEV-01)

7'-0

7'-0
+0(BASE) +0(BASE)

35'-0 52'-0

1 ELEVATION ON GRID G ELEVATION ON GRID 1


S5D S5D S5D S5D

ARCHITECT / ENGINEER PROJECT / LOCATION OWNER NO. REVISIONS DATE BY SHEET CONTENT SHEET NO.
SATURN
STRUCTURAL ENGINEERS SATURN ELEVATION ON GRID G 1 S 5D
STRUCTURAL ENGINEERS
NayPyiTaw, Myanmar. TEL. 09 7877 16995
saturnstructuralengineers@gmail.com CHECKED DRAWN FILE NAME PROJECT CODE.
APPROVED DATE
A B C D E F G A B C D E F G

5'-0 13'-0 11'-0 9'-0 10'-0 4'-0 5'-0 13'-0 11'-0 9'-0 10'-0 4'-0

CC5"-1/16"-3/4"-2 1/4 CC5"-1/16"-3/4"-2 1/4


+43-9(LEV-11) HSS5X2-1/2X1/8 +43-9(LEV-11) HSS5X2-1/2X1/8
CC5"-1/16"-3/4"-2 1/4 CC5"-1/16"-3/4"-2 1/4

3'-11

3'-11
CC5"-1/16"-3/4"-2 1/4 CC5"-1/16"-3/4"-2 1/4
CC5"-1/16"-3/4"-2 1/4 CC5"-1/16"-3/4"-2 1/4
+39-10(LEV-10) CC5"-1/16"-3/4"-2 1/4 HSS5X2-1/2X1/8 +39-10(LEV-10) CC5"-1/16"-3/4"-2 1/4 HSS5X2-1/2X1/8
CC5"-1/16"-3/4"-2 1/4 W8X21 HSS5X2-1/2X1/8 CC5"-1/16"-3/4"-2 1/4 W8X21 HSS5X2-1/2X1/8
HSS5X2-1/2X1/8 HSS5X2-1/2X1/8

4'-3

4'-3
CC5"-1/16"-3/4"-2 1/4 CC5"-1/16"-3/4"-2 1/4
+35-7(LEV-09) CC5"-1/16"-3/4"-2 1/4 L3X3X1/4 +35-7(LEV-09) CC5"-1/16"-3/4"-2 1/4 L3X3X1/4
CC5"-1/16"-3/4"-2 1/4 CC5"-1/16"-3/4"-2 1/4 CC5"-1/16"-3/4"-2 1/4 CC5"-1/16"-3/4"-2 1/4

1'-9 1'-9 6

1'-9 1'-9 6
+35-1(LEV-08) CC5"-1/16"-3/4"-2 1/4 HSS5X2-1/2X1/8 CC5"-1/16"-3/4"-2 1/4 +35-1(LEV-08) CC5"-1/16"-3/4"-2 1/4 HSS5X2-1/2X1/8 CC5"-1/16"-3/4"-2 1/4
CC5"-1/16"-3/4"-2 1/4 W8X21 CC5"-1/16"-3/4"-2 1/4 W8X21
+33-4(LEV-07) CC5"-1/16"-3/4"-2 1/4 CC5"-1/16"-3/4"-2 1/4 +33-4(LEV-07) CC5"-1/16"-3/4"-2 1/4 CC5"-1/16"-3/4"-2 1/4
W8X21 CC5"-1/16"-3/4"-2 1/4 W8X21 CC5"-1/16"-3/4"-2 1/4
+31-7(LEV06) CC5"-1/16"-3/4"-2 1/4 +31-7(LEV06) CC5"-1/16"-3/4"-2 1/4

2'-1

2'-1
+29-6(LEV-05) +29-6(LEV-05)

1'-6 2'-0

1'-6 2'-0
L3X3X1/4 L3X3X1/4

W
+27-6(LEV-04) W8X21 +27-6(LEV-04) W8X21

6X

6X
16

16
+26(LEV-03) +26(LEV-03)

HSS5X2-1/2X1/8 HSS5X2-1/2X1/8
CC5"-1/16"-3/4"-2 1/4 L3X3X1/4 CC5"-1/16"-3/4"-2 1/4 L3X3X1/4
43'-9

43'-9
8'-0

8'-0
L3X3X1/4 L3X3X1/4
L3X3X1/4 W6X16 L3X3X1/4 L3X3X1/4 W6X16 L3X3X1/4
HSS5X2-1/2X1/8 HSS5X2-1/2X1/8
CC5"-1/16"-3/4"-2 1/4 CC5"-1/16"-3/4"-2 1/4

+18(LEV-02) +18(LEV-02)

11'-0

11'-0
+7(LEV-01) +7(LEV-01)

7'-0

7'-0
+0(BASE) +0(BASE)

52'-0 52'-0

1 ELEVATION ON GRID ELEVATION ON GRID


S5E S5E S5E S5E

ARCHITECT / ENGINEER PROJECT / LOCATION OWNER NO. REVISIONS DATE BY SHEET CONTENT SHEET NO.
SATURN
STRUCTURAL ENGINEERS SATURN ELEVATION ON GRID S 5E
STRUCTURAL ENGINEERS
NayPyiTaw, Myanmar. TEL. 09 7877 16995
saturnstructuralengineers@gmail.com CHECKED DRAWN FILE NAME PROJECT CODE.
APPROVED DATE
A B C D E F G A B C D E F G

5'-0 13'-0 11'-0 9'-0 10'-0 4'-0 5'-0 13'-0 11'-0 9'-0 10'-0 4'-0

HSS5X3X1/8 CC5"-1/16"-3/4"-2 1/4


HSS5X3X1/8 CC5"-1/16"-3/4"-2 1/4 HSS5X2-1/2X1/8 CC5"-1/16"-3/4"-2 1/4
CC5"-1/16"-3/4"-2 1/4 CC5"-1/16"-3/4"-2 1/4 W6X16 L3X3X3/8
+43-9(LEV-11) +43-9(LEV-11)
CC5"-1/16"-3/4"-2 1/4 CC5"-1/16"-3/4"-2 1/4 L3X3X3/8 CC5"-1/16"-3/4"-2 1/4
HSS5X2-1/2X1/8 HSS5X3X1/8 CC5"-1/16"-3/4"-2 1/4

3'-11

3'-11
CC5"-1/16"-3/4"-2 1/4
CC5"-1/16"-3/4"-2 1/4 HSS5X2-1/2X1/8 HSS5X3X1/8 CC5"-1/16"-3/4"-2 1/4 CC5"-1/16"-3/4"-2 1/4
W6X16 CC5"-1/16"-3/4"-2 1/4 L3X3X3/8 W6X16 HSS4X2X1/8
+39-10(LEV-10) +39-10(LEV-10)
CC5"-1/16"-3/4"-2 1/4 CC5"-1/16"-3/4"-2 1/4 HSS5X3X1/8
HSS5X2-1/2X1/8 CC5"-1/16"-3/4"-2 1/4 L4X4X3/8 HSS5X3X1/8

4'-3

4'-3
CC5"-1/16"-3/4"-2 1/4 CC5"-1/16"-3/4"-2 1/4 CC5"-1/16"-3/4"-2 1/4 CC5"-1/16"-3/4"-2 1/4
+35-7(LEV-09) +35-7(LEV-09)
CC5"-1/16"-3/4"-2 1/4 HSS4X2X1/8 CC5"-1/16"-3/4"-2 1/4
L3X3X1/4 CC5"-1/16"-3/4"-2 1/4

1'-9 1'-9 6

1'-9 1'-9 6
+35-1(LEV-08) +35-1(LEV-08) CC5"-1/16"-3/4"-2 1/4 W6X16 CC5"-1/16"-3/4"-2 1/4
W8X21 L3X3X3/8 CC5"-1/16"-3/4"-2 1/4 HSS4X2X1/8
CC5"-1/16"-3/4"-2 1/4
+33-4(LEV-07) +33-4(LEV-07) HSS4X2X1/8 CC5"-1/16"-3/4"-2 1/4
CC5"-1/16"-3/4"-2 1/4 L4X4X3/8
CC5"-1/16"-3/4"-2 1/4 CC5"-1/16"-3/4"-2 1/4
+31-7(LEV06) +31-7(LEV06) CC5"-1/16"-3/4"-2 1/4 W6X16
L3X3X3/8 CC5"-1/16"-3/4"-2 1/4

2'-1

2'-1
L3X3X1/4 W6X16
W6X16
+29-6(LEV-05) W8X21 W8X21 +29-6(LEV-05)
W6X16 L3X3X3/8

1'-6 2'-0

1'-6 2'-0
W8X21 W6X16
L3X3X3/8 HSS4X2X1/8 L4X4X3/8 HSS4X2X1/8
+27-6(LEV-04) CC5"-1/16"-3/4"-2 1/4 W6X16 CC5"-1/16"-3/4"-2 1/4 +27-6(LEV-04) L3X3X1/4 CC5"-1/16"-3/4"-2 1/4 CC5"-1/16"-3/4"-2 1/4 W8X21
W6X16
L3X3X3/8 W6X16 L3X3X3/8 L3X3X3/8 L3X3X3/8
+26(LEV-03) +26(LEV-03) HSS5X2-1/2X1/8
L4X4X3/8 W6X16 W8X21
W6X16 HSS5X2-1/2X1/8 W6X16 W6X16 W6X16
W6X16 L3X3X3/8 W8X21 W6X16 L3X3X3/8
CC5"-1/16"-3/4"-2 1/4 L3X3X1/4 L3X3X1/4 L3X3X1/4
CC5"-1/16"-3/4"-2 1/4 HSS5X2-1/2X1/8
43'-9

43'-9
8'-0

8'-0
L3X3X3/8 L3X3X1/4
HSS4X2X1/8 W8X21 L3X3X1/4
CC5"- /16"-3/4"-2 1/4
1
L3X3X3/8
HSS4X2X1/8 W8X21 CC5"-1/16"-3/4"-2 1/4
CC5"-1/16"-3/4"-2 1/4
+18(LEV-02) +18(LEV-02)

11'-0

11'-0
+7(LEV-01) +7(LEV-01)

7'-0

7'-0
+0(BASE) +0(BASE)

52'-0
52'-0

1 ELEVATION ON GRID ELEVATION ON GRID 5


S5F S5F S5F S5F

ARCHITECT / ENGINEER PROJECT / LOCATION OWNER NO. REVISIONS DATE BY SHEET CONTENT SHEET NO.
SATURN
STRUCTURAL ENGINEERS SATURN ELEVATION ON GRID 5 S 5F
STRUCTURAL ENGINEERS
NayPyiTaw, Myanmar. TEL. 09 7877 16995
saturnstructuralengineers@gmail.com CHECKED DRAWN FILE NAME PROJECT CODE.
APPROVED DATE
A B C D E F G

5'-0 13'-0 11'-0 9'-0 10'-0 4'-0

+43-9(LEV-11)

3'-11
+39-10(LEV-10)
HSS5X2-1/2X1/8 HSS5X2-1/2X1/8

4'-3
L3X3X1/4 CC5"-1/16"-3/4"-2 1/4
+35-7(LEV-09) CC5"-1/16"-3/4"-2 1/4 CC5"-1/16"-3/4"-2 1/4
CC5"-1/16"-3/4"-2 1/4
HSS5X3X1/8 HSS5X3X1/8

1'-9 1'-9 6
+35-1(LEV-08) HSS5X3X1/8 HSS5X3X1/8
CC5"-1/16"-3/4"-2 1/4
+33-4(LEV-07) CC5"-1/16"-3/4"-2 1/4
CC5"-1/16"-3/4"-2 1/4
CC5"-1/16"-3/4"-2 1/4
CC5"-1/16"-3/4"-2 1/4
+31-7(LEV06) CC5"-1/16"-3/4"-2 1/4
CC5"-1/16"-3/4"-2 1/4

2'-1
CC5"-1/16"-3/4"-2 1/4
W6X16
+29-6(LEV-05)

1'-6 2'-0
C6X13
+27-6(LEV-04) L3X3X1/4 CC5"-1/16"-3/4"-2 1/4
L3X3X1/4
CC5"-1/16"-3/4"-2 1/4 W8X21
+26(LEV-03) L3X3X1/4
L3X3X1/4 L3X3X1/4
CC5"-1/16"-3/4"-2 1/4 CC5"-1/16"-3/4"-2 1/4 L3X3X1/4
W6X16
W8X21
43'-9

8'-0
L3X3X1/4 L3X3X1/4
L3X3X1/4
L3X3X1/4

+18(LEV-02)

11'-0
+7(LEV-01)

7'-0
+0(BASE)

52'-0

1 ELEVATION ON GRID 6
S5G S5G

ARCHITECT / ENGINEER PROJECT / LOCATION OWNER NO. REVISIONS DATE BY SHEET CONTENT SHEET NO.
SATURN
STRUCTURAL ENGINEERS SATURN ELEVATION ON GRID 6 S 5G
STRUCTURAL ENGINEERS
NayPyiTaw, Myanmar. TEL. 09 7877 16995
saturnstructuralengineers@gmail.com CHECKED DRAWN FILE NAME PROJECT CODE.
APPROVED DATE
Standard L1/3 OR L2/3 L1/3 OR L2/3 L2/3 OR L3/3 L2/3 OR L3/3 Ld Ld Ld Ld
L1/4 ³1.3Ld h h
hook Greater Greater Greater Greater Depression Depression

45°
L1/8 L1/8 L2/8 L2/8 2h ³6in.
L1 L2 Ln L Ld
Ld

1A SECTION 1C SLAB DROP WITHIN PANEL 1D SLAB DROP AT BEAM SUPPORT


S6 S6 S6 S6 S6 S6

X-DIRECTION Y-DIRECTION
MARK THICKNESS CONT EDGE MID SPAN DISCONT EDGE CONT EDGE MID SPAN DISCONT EDGE REMARK
L1 L2 Ln L (in.) TOP BARS BOT BARS TOP BARS TOP BARS BOT BARS TOP BARS
1S1 4'' #12 @8'' #12 @8'' #12 @8'' _ #12 @8'' #12 @8'' Drop (3 in.)
Bottom bars shall be spliced Top bars shall be spliced within Top & Bottom bars shall not be Rebar splice within overhang 1S2 4'' #12 @8'' #12 @8'' #12 @8'' _ #12 @8'' #12 @8'' _
within middle third of the span. middle third of the span. spliced within a distance of 2 times portion is prohibited.
1S3 6'' #12 @8'' #12 @8'' #12 @8'' #12 @8'' #12 @8'' #12 @8'' Drop (3 in.)
beam depth from face of supports. 2 SLAB SCHEDULE
2S1 4'' #12 @8'' #12 @8'' #12 @8'' #12 @8'' #12 @8'' #12 @8'' Drop (3 in.)
_ S6 S6
1B LAP SPLICE DETAIL 2S2 4'' #12 @8'' #12 @8'' #12 @8'' #12 @8'' #12 @8'' #12 @8''
S6 S6 2S3 4'' #12 @8'' #12 @8'' #12 @8'' #12 @8'' #12 @8'' _ _
2S4 4'' #12 @8'' #12 @8'' #12 @8'' #12 @8'' #12 @8'' _ _
1 TYPICAL SLAB SECTION DETAIL
2S5 4'' #12 @8'' #12 @8'' _ #12 @8'' #12 @8'' _ _
S6 S6
2S6 4'' #12 @8'' #12 @8'' #12 @8'' #12 @8'' #12 @8'' #12 @8'' _
1 2 3 4 5 6
4' 9' 9' 9' 4' Standard Hooks Standard Hooks

G Standard Hooks
#12 @4''

#12 @4''

4' #12 @8'' #12 @8'' L6

F Alternative Bars
10" 10" 10" L5/3 Cutoff
#12 @8''

#12 @8''

#12 @8''

10' L5 Top Bars: #12 @8'' Top Bars: #12 @8''


(Alternative Bars Cutoff) (Alternative Bars Cutoff)
#12 @8'' #12 @8'' #12 @8'' L5/3 Standard Hooks

E
#12 @8''

#12 @8''

#12 @8''

#12 @8''

#12 @8''
L4/3

9' L4
#12 @8'' #12 @8'' #12 @8'' #12 @8''
L4/3

D
10" 10"
L3/3
#12 @8''

#12 @8''

#12 @8''

11' L3
3''(TYP)
#12 @8'' #12 @8'' #12 @8''
H
3''(TYP)
C Top Bars: #12 @8'' Standard Hooks
#12 @8''

(Alternative Bars Cutoff)


L2/3
#12 @8''

#12 @8''

60° Bottom Bars: #12 @8''


13' #12 @8'' #12 @8'' #12 @8'' L2 3''(TYP) (Both Way)
60°
60°
H L2/3 Top Bars: #12 @8''
R7'-1087" Standard Hooks Standard Hooks
#12 @8''

#12 @8''

(Alternative Bars Cutoff)


B
3''(TYP)
4'-6" #12 @8'' #12 @8'' L1

A
L3/3 L4/3 L4/4
L3 L4

3A PLAN 3B TOP BARS TOP LAYER ARRANGEMENT 3C TOP BARS BOT LAYER ARRANGEMENT 3D BOTTOM BARS ARRANGEMENT
S6 S6 S6 S6 S6 S6 S6 S6
3 SLAB REINFORCEMENT DETAIL
S6 S6

ARCHITECT / ENGINEER PROJECT / LOCATION OWNER NO. REVISIONS DATE BY SHEET CONTENT SHEET NO.
SATURN TYPICAL SLAB SECTION DETAIL
STRUCTURAL ENGINEERS SATURN SLAB SCHEDULE S 06
STRUCTURAL ENGINEERS SLAB REINFORCEMENT DETAIL
NayPyiTaw, Myanmar. TEL. 09 7877 16995
saturnstructuralengineers@gmail.com CHECKED DRAWN FILE NAME PROJECT CODE.
APPROVED DATE
C TO C SPAN C TO C SPAN 1.3Ld 1.3Ld
L1/4 L1/3 OR L2/3 L1/3 OR L2/3 L2/3 OR L3/3
Top of Depressed Top of Depressed
Greater Greater Greater
Girder/Beam Girder/Beam
2''(TYP) 2''(TYP) 2''(TYP) 2''(TYP) 2''(TYP) 2''(TYP)
2''(TYP) 2''(TYP)
d h

L1/8 Hoops @ s0 within "2h" L1/8 L2/8 Hoops @ s0 within "2h" Stirrups @ s L2/8 Girder/Beam Girder/Beam Girder/Beam Girder/Beam
L1 L2 Ld

Ld
1A AT COLUMN SUPPORT 1C TYP DETAILS OF DEPRESSED GIRDERS/BEAMS
S7 S7 S7 S7

L/4 L/4 CLEAR SPAN Lc CLEAR SPAN Lc


Lc/2
2''(TYP) 2''(TYP) 2''(TYP) 2''(TYP) 2''(TYP) 2''(TYP)
> 2h
d h

h
L/8 Hoops @ s0 within "2h" Stirrups @ s Hoops @ s0 within "2h" L/8
L
Top bars shall be spliced within Bottom bars shall be spliced
middle third of the beam span > 2h within middle third of the beam
NOTE:
(either 50% or 100%), and shall Lc/2 span (either 50% or 100%), and
1. Either Class A or Class B Lap Splice are permitted.
1B AT GIRDER SUPPORT be enclosed with closed stirrups shall be enclosed with closed
2. Lap Splices are prohibited within a distance of 2h from face of supports for both top as well as bottom rebars. Top & Bottom bars shall not be
spaced at d/4 or 4in. whichever is stirrups spaced at d/4 or 4in.
3. If splicing 2 bars of different diameters, use the lap length of the larger bars. S7 S7 spliced within 2h from face of
smaller. whichever is smaller.
4. Hoops shall be provided at a spacing "s0" within a distance "2h" from face of column and along the lap supports.
splices. For the remaining portion of the span, stirrups having seismic hooks shall be provided at a spacing "s".
1 TYPICAL BEAM SECTION DETAIL
5. Hoops spacing "s0" shall not be greater than "d/4" "4in." "8db(long;)" "24db(tran;). Stirrup spacing "s" shall
not be greater than d/2. S7 S7
1D SPLICE LOCATION FOR BEAM REBARS
6. Minimum clear distance between bars in layers shall be 1 in. S7 S7
7. Bottom reinforcement at the joint face shall be at least 50% of top steel at that joint.
8. Reinforcement at any section along the beam span shall be at least greater of 25% of top steel at the joint 2 BEAM SCHEDULE
face. S7 S7

B10x10 B10x12 B10x14 B12x14 B12x16 B10x10 B10x12 B10x14 B12x14 B12x16

10'' 12'' 12''


LEVEL 01

LEVEL 06
10'' 10'' 10''

10'' 12'' 14'' 14'' 16'' 12''

LONG: 2 #16 (TOP) 3 #16 (TOP) 3 #16 (TOP) 3 #16 (TOP) 3 #16 (TOP) LONG: 2 #16 (TOP)
2 #16 (BOT) 2 #16 (BOT) 2 #16 (BOT) 3 #16 (BOT) 2 #16 (BOT) 2 #16 (BOT)

TRAN: #10 @3'' (within 2h) #10 @3'' (within 2h) #10 @3'' (within 2h) #10 @3'' (within 2h) #10 @3'' (within 2h) TRAN: #10 @3'' (within 2h)
#10 @6'' (beyond 2h) #10 @6'' (beyond 2h) #10 @6'' (beyond 2h) #10 @6'' (beyond 2h) #10 @6'' (beyond 2h) #10 @6'' (beyond 2h)

10'' 12'' 12''


LEVEL 02

LEVEL 07
10'' 10'' 10''

10'' 12'' 14'' 14'' 16'' 12''

LONG: 2 #16 (TOP) 3 #16 (TOP) 3 #16 (TOP) 3 #16 (TOP) 3 #18 (TOP) LONG: 2 #16 (TOP)
2 #16 (BOT) 2 #16 (BOT) 2 #16 (BOT) 3 #16 (BOT) 2 #18 (BOT) 2 #16 (BOT)

TRAN: #10 @3'' (within 2h) #10 @3'' (within 2h) #10 @3'' (within 2h) #10 @3'' (within 2h) #10 @3'' (within 2h) TRAN: #10 @3'' (within 2h)
#10 @6'' (beyond 2h) #10 @6'' (beyond 2h) #10 @6'' (beyond 2h) #10 @6'' (beyond 2h) #10 @6'' (beyond 2h) #10 @6'' (beyond 2h)

10'' 12''
LEVEL 03

10''

12'' 14'' 14''

LONG: 2 #16 (TOP) 2 #16 (TOP) 3 #16 (TOP)


2 #16 (BOT) 2 #16 (BOT) 3 #16 (BOT)

TRAN: #10 @3'' (within 2h) #10 @3'' (within 2h) #10 @3'' (within 2h)
#10 @6'' (beyond 2h) #10 @6'' (beyond 2h) #10 @6'' (beyond 2h)

ARCHITECT / ENGINEER PROJECT / LOCATION OWNER NO. REVISIONS DATE BY SHEET CONTENT SHEET NO.
SATURN TYPICAL BEAM SECTION DETAIL
STRUCTURAL ENGINEERS SATURN S 07
STRUCTURAL ENGINEERS BEAM SCHEDULE
NayPyiTaw, Myanmar. TEL. 09 7877 16995
saturnstructuralengineers@gmail.com CHECKED DRAWN FILE NAME PROJECT CODE.
APPROVED DATE
12db 12db
³9'' ³9''
ROOF

Hoops & Ties @ "s0" Within L0 L0

C10x10 C12x12 C14x14 C12x16 C16x12

Lu Hoops & Ties @ "s" Between

LEV06 (+31-7)-to-LEV07
L0 14''
12''
For Column Offset ³ 3'',
Hoops & Ties @ "s0" Within L0 Offset Bend is NOT PERMITTED. 14''

(+33-4)
12''
L0
2''(TYP) ³ 3'' LEVEL03,04,05,06,....
LONG: 8 #16 8 #16

1.3Ld
TRAN: #10 @3'' (within Lo) #10 @3'' (within Lo)
L0 #10 @6'' (beyond Lo) #10 @6'' (beyond Lo)
> L0

LEV03(+26)-to-LEV06
14''
Hoops & Ties Spaced @ s0 12''
Along the Splice Length
1.3Ld

Lu
CLASS B 14''

(+31-7)
12''
TENSION LAP
SPLICE Offset Bend 1:6 Max
6''
LONG: 8 #16 8 #16
> L0

Extra Ties Within 6in. of


L Offset
0 TRAN: #10 @3'' (within Lo) #10 @3'' (within Lo)
2''(TYP) LEVEL02 #10 @6'' (beyond Lo) #10 @6'' (beyond Lo)

LEV02(+18)-to-LEV03
14''
L0 12'' 16''
Hoops & Ties @ "s0" Within L0
12'' 14'' 12''

(+26)
Lu Hoops & Ties @ "s" Between LONG: 8 #16 8 #16 10 #16
L0
TRAN: #10 @3'' (within Lo) #10 @3'' (within Lo) #10 @3'' (within Lo)
#10 @6'' (beyond Lo) #10 @6'' (beyond Lo) 2 #10 @6'' (beyond Lo)
Hoops & Ties @ "s0" Within L0

BASE(0)-to-LEV02 (+18)
12''
L0 14''
12'' 16''
2''(TYP) LEVEL01 10''

14'' 16''
1'-6'' 10'' 12'' 12''
Hoops & Ties @ "s0" Within Joint L0 NATURAL GROUND LINE
(TYP)
Hoops & Ties @ "s" Between LONG: 8 #16 8 #16 8 #16 10 #16 10 #16
L0
Lu TRAN: #10 @3'' (within Lo) #10 @3'' (within Lo) #10 @3'' (within Lo) #10 @3'' (within Lo) #10 @3'' (within Lo)
#10 @6'' (beyond Lo) #10 @6'' (beyond Lo) #10 @6'' (beyond Lo) 2 #10 @6'' (beyond Lo) 2 #10 @6'' (beyond Lo)
Hoops & Ties @ "s0" Within L0
L0 3'' Thk. Lean Conc;
2''(TYP)

BASE

NOTES:
12db 12db
1. Column Bars shall be spliced at story Mid-Height using CLASS B TENSION LAP SPLICE.
³9'' ³9'' 6'' Thk. Gravel Bed
2. Lap Splices are prohibited within end regions "L0" defined by the larger of Column Cross-Section Dimensions h1, h2, Lu/6 OR 2 COLUMN SCHEDULE
Addt'l Hoops & ties @ s0 18in. S8 S8
3. If splicing 2 bars of different diameters, use the lap length of the larger bars.
4. Hoops shall be provided at a spacing "s0" within "L0" and along the lap splice length. For the remaining portion of the span,
Hoops OR Ties shall be provided at a spacing "s".
1 TYPICAL COLUMN SECTION DETAIL 5. Hoops spacing "s0" shall not be greater "h1/4" "h2/4" "6db(long;)" "6in." and "s" shall not be greater than "6db(long;)" "6in.".
S8 S8 6. For column offset 3in. or more between adjacent stories, Offset Bend is not allowed. Upper column reinforcement shall be
developed within the lower column for the greater of 1.3Ld OR (L0 plus Joint Depth).

ARCHITECT / ENGINEER PROJECT / LOCATION OWNER NO. REVISIONS DATE BY SHEET CONTENT SHEET NO.
SATURN TYPICAL COLUMN SECTION DETAIL
STRUCTURAL ENGINEERS S 08
STRUCTURAL ENGINEERS COLUMN SCHEDULE
NayPyiTaw, Myanmar. TEL. 09 7877 16995
saturnstructuralengineers@gmail.com CHECKED DRAWN FILE NAME PROJECT CODE.
APPROVED DATE
1 2 3 4 5 6

2'-6"

2'-6"
4' 9' 9' 9' 4'

#16@10'' (T)

#16@10'' (T)

#16@10'' (T)

#16@10'' (T)
G 5' 5'
4' F3 F3 F3 F3 6" 10" 6"

2'-6"

2'-6"
#16@6'' (T) #16@10'' (T)
F
10" 10" 10"
1' 1' 11" 1'-6"
12' 6'-11"
10'
Top Steel Arrangement Top Steel Arrangement

2'-6"

2'-6"
#16@10'' (B)
#16@6'' (B)

#16@6'' (B)

#16@6'' (B)
9'
F1 F1 F1 5' 5'
6" 10" 6"

2'-6"

2'-6"
D #16@6'' (B) #16@6'' (B)
10" 10"

1' 1' 11" 1'-6"


12' 6'-11"
11'
Bottom Steel Arrangement Bottom Steel Arrangement
F1 F1 F1 F1
H
C
F E A B
10' 4'-6"
F1
60°
13' C12X16 C12X12 C10X10 C12X12
16''
60°
60° F1 #16@6'' #16@10''
F2 H F2 a b a a
R7'-1087" 6"
#16@10''
6" 6"
#16@10''
1'
F1
B 14'' 12''
4'-6"
#16@6'' #16@10'' #16@6'' #16@6''
A 3' #16@6'' 3' #16@6''
a b a a

Reinforcement Details along Longitudinal Section Reinforcement Details along Longitudinal Section

A
1 FOUNDATION LAYOUT PLAN
S9 S9

C12X16 C12X12 C10X10

#16@6'' (B)
C12X12
2'-6"

#16@6'' #16@10'' #16@6'' #16@10'' #16@10'' #16@10''


#16@6'' (B)

3" clear (side) 3" clear (side)


5' 1.5'' clear (top) 1.5'' clear (top)
14'' 14'' 12''
2'-6"

3" clear (side) 3'' clear (bot;) 3'' clear (bot;)


#16@6'' #16@6'' #16@6'' #16@10'' #16@6'' #16@6''
12''
5' 5' 5'
3'' clear (bot;)
#16@6'' #16@6'' Section a-a Section b-b Section a-a
2'-6" 2'-6"
5'
5' Reinforcement Details along Transverse Section Reinforcement Details along Transverse Section
Bottom Steel Arrangement Reinforcement Details along Longitudinal Section

2A F1 DETAIL 2C F3 DETAIL 2B F2 DETAIL


S9 S9 S9 S9 S9 S9

2 COLUMN FOOTINGS DETAIL


S9 S9

ARCHITECT / ENGINEER PROJECT / LOCATION OWNER NO. REVISIONS DATE BY SHEET CONTENT SHEET NO.
SATURN FOUNDATION LAYOUT PLAN
STRUCTURAL ENGINEERS SATURN S 09
STRUCTURAL ENGINEERS COLUMN FOOTINGS DETAIL
NayPyiTaw, Myanmar. TEL. 09 7877 16995
saturnstructuralengineers@gmail.com CHECKED DRAWN FILE NAME PROJECT CODE.
APPROVED DATE

You might also like