You are on page 1of 9

Marites Corp.

Operation: Car Container Sub-Assembly Engineer:


Present Method: Chart #:

Operations 1 Trial 1 Trial 2 Trial 3 Trial 4 Trial 5 Average


Load 4 4 3 3 4 3.6
Lock 3 6 5 4 5 4.6
Inserting Nozzle 5 6 7 8 7 6.6
Flip 7 6 7 6 6 6.4
Metal Attachment 10 13 12 12 12 11.8
Screw 19 18 18 18 18 18.2
Lock 9 10 9 9 9 9.2
Flip 7 6 8 8 8 7.4
Unload 5 5 5 6 6 5.4
Ravelo, Ortega, Tabelino, Deguitt, Belena, Navarro
Marites Corp.

Operation: Car Hood Sub-Assembly Engineer:


Present Method: Chart #:

Operation 2 Trial 1 Trial 2 Trial 3 Trial 4 Trial 5 Average


Load To First Fixture 5.13 5.9 5.89 5.01 5.74 5.534
Attach Foam 1 (Big) 6.73 6.41 6.48 6.22 6.97 6.562
Flip 3.43 5.08 3.97 4.86 4.3 4.328
Attach Foam 2 (Small) 4.5 3.9 3.29 4.42 3.44 3.91
Load To Second Fixtur 7.49 7.76 7.35 7.13 6.58 7.262
Attach Sub-Assembly 12.55 12.3 13.39 12.56 12.6 12.68
Load To Third Fixture 3.91 4 4.63 3.57 3.27 3.876
Attach Washer 12.4 15.4 14.29 14.12 14.1 14.062
Lock 9.87 10.04 8.97 9.16 10.86 9.78
Unload 2.15 1.98 2.57 2.12 3.12 2.388
Ravelo, Ortega, Tabelino, Deguit, Belina, Navarro
SCREW METAL ATTACHMENT
NOZZLE FUEL CONTAINER

LOCK

FLIP

LOCK

FLIP

UNLOAD/STORAGE

FINISH GOODS
WASHER SUB-ASSEMBLY Foam (Small)
Foam (Big) Plastic Car Hood

Lock

Flip

Lock

Flip
Unload/Storage

Finish goods

You might also like