Main Pressure Unloading Circuit

Training Solutions
RV-1 set-up test pressure at 800psi
to adjust maximum motor torque,
then re-adjust to 2200 PSI, Adjust
UV-1 to 2000 PSI, manifold and Unloading valve, allows the pump
these valves prevent back flow of to discharge at low pressure to
pressure to pump tank. Circulation cooling the pump.
Restriction causes swash plate to
rock into low flow position.

One Company … Unlimited Solutions 1


Lube Pump Motor
Pressure switch may need re adjustment if low viscosity or
synthetic fluids are used

Training Solutions
Set up RV-2 to 400 PSI, if
additional flow is needed rv-2
should be re-adjusted.

One Company … Unlimited Solutions 2


Rotating Head Motor – Rotate Left

Training Solutions
One Company … Unlimited Solutions 3
Rotating Head and Shot Pin

Training Solutions
One Company … Unlimited Solutions 4
Rotating Head and Shot Pin

Training Solutions
One Company … Unlimited Solutions 5
Rotating Head Motor – Rotate Right

Training Solutions
One Company … Unlimited Solutions 6
Link Tilt - Mousehole

Link Tilt Cylinder

CV1 must open and CB1 3.250” Dia. X 10.3” Stroke


holds set pressure while 1.380” Dia. Rod

Training Solutions
relieving excess pressure

Pilot from path


V1 will pilot open
CV2

Solenoid must pilot CA6 to open


and LA6 to closed

One Company … Unlimited Solutions 7


Link Tilt - Drilldown

Link Tilt Cylinder


3.250” Dia. X 10.3” Stroke
1.380” Dia. Rod

Training Solutions
CV2 must open and CB2
Pilot from path holds set pressure while
V2 will pilot open relieving excess pressure
CV1

Solenoid must pilot CB6 to open


and LB6 to closed

One Company … Unlimited Solutions 8


Link Tilt – Counter Balance

Link Tilt Cylinder


3.250” Dia. X 10.3” Stroke
1.380” Dia. Rod

Training Solutions
CV2 must open and CB2
holds set pressure while
relieving excess pressure
by pilot pressure on port 2.

One Company … Unlimited Solutions 9


Link Tilt - Float

Link Tilt Cylinder


3.250” Dia. X 10.3” Stroke
1.380” Dia. Rod

Training Solutions
Float solenoid
SV8 path B8 will
pilot open CV1
and CV2

One Company … Unlimited Solutions 10


Shot Pin Engage and Clamp
PLC will jog rotation motor for
ten seconds so Ring Gear
will align Ring Gear hole with
Shot pin. Jogg timer will lsat
10 second then quit whether
Shot Pin has passed through

Training Solutions
hole or not. 400 PSI

After Shot Pin bypass the


Path B closes port pressure at CV5 port 3 opens
3 of LC5, push check valve to allow Back up
Shot Pin to Ring Clamp to grip pipe.
Gear T-10A relief at
400 PSI until Shot
pin goes through
Ring Gear, then
Shot Pin bypasses
T-10A, 2000psi.

One Company … Unlimited Solutions 11


Unclamp and Shot Pin Disengage

Path A must first pilot CV5 port

Training Solutions
4 to lock CV5 closed,
continued path to AR5 reduces
pressure to 500 psi for clamp
release. While B path flow
retracts shot pin.

Bypass from Shot Pin


retract will not open CV5
due to port 4 lock. LC5
must be open to allow
clamp side to drain

One Company … Unlimited Solutions 12


IBOP Actuator Cylinder - Close

Training Solutions
Path B to Flow Control Valve
then to charge accumulator,
then closes CV4 not allowing
vent/drain of PC4. Path B to
VR closes LODC and retracts
IBOP cylinder, constant 2000
PSI.

One Company … Unlimited Solutions 13


IBOP Actuator Cylinder - Open

Training Solutions
Path A pressure is temporarily
2000 psi, Path A to CP passes
through LODC, closing CXCD this
allows pressure on both sides of
the cylinder dampening the stroke
to open with 2000 PSI.
Accumulator discharges through
the Flow Control Valve orifice
.010 approximately 40 to 60
seconds then port 3 relieves and
allows PC4 to vent reducing IBOP
open pressure to 400 psi.

One Company … Unlimited Solutions 14


Counterbalance Circuit

Pressure relief protection at cylinders

Accumulator stores

Training Solutions
pressurized fluid for quick
reaction of cylinders.
CV5 is piloted open while
pump is on and closes
when supply is off or fails.
PCC (variable) adjusts
the balance weight of the
Top Drive to 800 pounds,
reducing thread damage
caused by excessive
weight while spin in or
To Tank out.

System Pressure

One Company … Unlimited Solutions 15


Stand Jump Circuit

PCC drains to tank


through SV9 port B to T.

Training Solutions
Stand Jump coil
activation changes vent
path B to P blind port
(closed). The PCC vent
has to pass through SJR
relief valve, SJR is set to
restrict the PCC vent
pressure higher than
counter balance, this
extra pressure allows the
Top Drive to break out
and lift a stand from the
To Tank Rotary Table.

System Pressure

One Company … Unlimited Solutions 16


Rig-up Mode

Rig up manual valve

Training Solutions
directs fluid to the Prefill
valve, this forces fluid to
the piston side of the
counter balance cylinders,
extending them for easy
release of the Pear-Links
from the traveling bock.
Used for rig up and rig
down. There will be
pressure on both sides of
the cylinders but the piston
side is stronger.
To Tank

System Pressure

One Company … Unlimited Solutions 17