RV-1 set-up test pressure at 800psi
to adjust maximum motor torque,
then re-adjust to 2200 PSI, Adjust
UV-1 to 2000 PSI, manifold and Unloading valve, allows the pump
these valves prevent back flow of to discharge at low pressure to
pressure to pump tank. Circulation cooling the pump.
Restriction causes swash plate to
rock into low flow position.
Training Solutions
Set up RV-2 to 400 PSI, if
additional flow is needed rv-2
should be re-adjusted.
Training Solutions
One Company … Unlimited Solutions 3
Rotating Head and Shot Pin
Training Solutions
One Company … Unlimited Solutions 4
Rotating Head and Shot Pin
Training Solutions
One Company … Unlimited Solutions 5
Rotating Head Motor – Rotate Right
Training Solutions
One Company … Unlimited Solutions 6
Link Tilt - Mousehole
Training Solutions
relieving excess pressure
Training Solutions
CV2 must open and CB2
Pilot from path holds set pressure while
V2 will pilot open relieving excess pressure
CV1
Training Solutions
CV2 must open and CB2
holds set pressure while
relieving excess pressure
by pilot pressure on port 2.
Training Solutions
Float solenoid
SV8 path B8 will
pilot open CV1
and CV2
Training Solutions
hole or not. 400 PSI
Training Solutions
4 to lock CV5 closed,
continued path to AR5 reduces
pressure to 500 psi for clamp
release. While B path flow
retracts shot pin.
Training Solutions
Path B to Flow Control Valve
then to charge accumulator,
then closes CV4 not allowing
vent/drain of PC4. Path B to
VR closes LODC and retracts
IBOP cylinder, constant 2000
PSI.
Training Solutions
Path A pressure is temporarily
2000 psi, Path A to CP passes
through LODC, closing CXCD this
allows pressure on both sides of
the cylinder dampening the stroke
to open with 2000 PSI.
Accumulator discharges through
the Flow Control Valve orifice
.010 approximately 40 to 60
seconds then port 3 relieves and
allows PC4 to vent reducing IBOP
open pressure to 400 psi.
Accumulator stores
Training Solutions
pressurized fluid for quick
reaction of cylinders.
CV5 is piloted open while
pump is on and closes
when supply is off or fails.
PCC (variable) adjusts
the balance weight of the
Top Drive to 800 pounds,
reducing thread damage
caused by excessive
weight while spin in or
To Tank out.
System Pressure
Training Solutions
Stand Jump coil
activation changes vent
path B to P blind port
(closed). The PCC vent
has to pass through SJR
relief valve, SJR is set to
restrict the PCC vent
pressure higher than
counter balance, this
extra pressure allows the
Top Drive to break out
and lift a stand from the
To Tank Rotary Table.
System Pressure
Training Solutions
directs fluid to the Prefill
valve, this forces fluid to
the piston side of the
counter balance cylinders,
extending them for easy
release of the Pear-Links
from the traveling bock.
Used for rig up and rig
down. There will be
pressure on both sides of
the cylinders but the piston
side is stronger.
To Tank
System Pressure