The document outlines construction details for masonry retaining walls on the right and left sides of a site. It provides station coordinates and measurements for the base width, height, exposed face, area, and volume of each wall section. The total volume of material needed for both retaining walls is 544.2 cubic meters.
The document outlines construction details for masonry retaining walls on the right and left sides of a site. It provides station coordinates and measurements for the base width, height, exposed face, area, and volume of each wall section. The total volume of material needed for both retaining walls is 544.2 cubic meters.
The document outlines construction details for masonry retaining walls on the right and left sides of a site. It provides station coordinates and measurements for the base width, height, exposed face, area, and volume of each wall section. The total volume of material needed for both retaining walls is 544.2 cubic meters.