• Economic housing and socialized housing have very similar
requirements for
RROW.
• They also have very similar requirements for parks and
playgrounds, and community facilities.
Planting strips and sidewalks
• Requirements are the same for socialized and economic
housing.
• Depends on RROW width
Minimum floor areas
• Socialized = 18 sqm.
• Economic = 22 sqm.
Minimum level of completion
• Economic housing: Complete house based on submitted
specifications
• Socialized housing: Shell house with doors and windows to
enclose the unit
Ceiling heights
• Minimum ceiling height: 2.00m
• Mezannine: 1.80m
Access to property
• Pathwalks may only be used as access to property only for
socialized housing.
Courts
• Minimum horizontal dimension: 2.00m
• Provide a passageway 1.20m wide minimum that leads to a
street or yard
Handrails
• 800-1200mm from floor
• Handrails not required for stairs with less than 4 steps
Winding/circular stairways
• May be used if the required tread dimension is provided at
Exits a point not more
• Less than 10 occupants: 1 than 300mm from the narrow end of the stairway
• 10 or more occupants: 2 • Minimum tread at any point: 150mm
Door heights
• 1.80m for bathroom and mezzanine doors
• 2.00m for all other doors
Door widths
• 800mm = main door
• 700mm = bedroom or service door
• 600mm = bathroom
Off-site parking
• Off-site parking allowed as long as it is NOT more than
100m away.
Minimum floor areas
• 18 sqm. = Socialized housing
• 18 sqm. = BP 220 condominium
• 22 sqm. = Economic housing
Exits and corridors
• Follow the NBC and the Fire Code
Fire suppression systems
• Required for structures more than 15
meters in height
Elevators
• Required for buildings 6 storeys or higher
• The elevator’s design shall conform to the requirements in
the NBC and BP 344.
RROW widths
• Major road: 10.0m minimum
• Minor road: 8.0m minimum
• Applies to both medium cost and open market
Community facilities
• Multi-purpose center required for projects 1 hectare or
bigger
• These areas are non-saleable
Minimum floor areas
• Medium cost = 30 sqm.
• Open market = 42 sqm.
1. Objectives
To allow community of blighted areas or
areas for priority development (APD) to own
the lots they occupy prior to February 25,
1986 and to improve or construct their
houses.
FACTS about CMP
2. Site Requirements
a. lot must be covered with torrens certificate of
title.
b. Schematic site development plan.
c. Intent to sell (owners) and intent to buy
(urban poor organization)
d. Zone as residential with tax declaration
e. Must be free from lien and encumbrances
f. Shall follow / adhere existing laws.
FACTS about CMP
3. Originators
NGO, LGU. NHA, warranty and assistance.
4. Loan Terms
25 years monthly amortization at interest of
6% per annum
STEP-BY-STEP GUIDELINES IN
APPLYING CMP ASSISTANCE
1. Establish a Community Organization (CO)
thru HIGC or Cooperative Dev’t Authority.
2. CO negotiates to landowner, both signs a
MOA
3. CO chooses an Originator – warrants
involvement in community development.
4. Originator applies to NHMFC for project
commitment.
5. CO and Originator submits Loan Documents
STEP-BY-STEP GUIDELINES IN
APPLYING CMP ASSISTANCE
6. NHFMC conducts loan evaluation and
mortgage evaluation.
7. Transfer of property, NHFMC and the owner
thru letter of guarantee
8. Loan and Property take out.
9. NHFMC and CO signs collection agreement
10. Individual members pay amortization to CO
which in turn remits the money to NHFMC.
11. NHFMC monitors collection.
TYPES OF
PLANNINNG
UNITS
PLANNING UNITS- TYPES & FUNCTIONS
• NEIGHBORHOOD
A residential area with homogenous characteristics, of a size
comparable to that usually served by an elementary school.
• Contains large business center, and commonly constitutes a section of the city.
City or School district
• the area designated as the city, town , borough, or village lends
itself to the provision of areas and facilities for use by the entire
population of the political subdivision
• school districts vary widely in size and population, but district wide school planning
involves primarily neighborhoods and communities
ACCESSIBILITY OF EMPLOYMENT FACILITIES
INDUSTRIAL FACILITIES
HOUSING SITE
OFFICE FACILITIES
COMMERCIAL FACILITIES
WALKING – 1/2 MILE MAX.
DRIVING – 10-15 MINS MAX LOCAL (BARANGAY UNIT)
HOUSING SITE
WALKING – 1 MILE MAX.
DRIVING – ½ HOUR MAX
UNIVERSITIES
WALKING – 1-2 MILES MAX.
DRIVING – 1 HOUR MAX
ARENA/STADIUMS
WALKING – 1-2 MILES MAX.
DRIVING – 1 HOUR MAX
HOUSING SITE
THEATERS PARKS
LARGE SCALE DEVELOPMENTS
A Project involves more than one building on a large
site, usually a super block.