Professional Documents
Culture Documents
Instructions:
Actual Sales,
Month
units
1 60
2 65
3 55
4 58
5 64
6 ?
Q2 (total 20 pts) … plot the data on a graph, and verify visually that a linear trend line
is appropriate. Develop a linear trend equation for the following data. Then use the
equation to predict the next two values of the series. Hint: equation of a line is y = a + bx
Period Demand
1 44
2 52
3 50
4 54
5 55
6 55
7 59
8 57
9 62
10 ?
11 ?
a. (5/20 pts) … plot data on a graph; use a separate graphing paper and attached
to this questionnaire properly marked & identified. ________
b. (9/20 pts) … Develop a linear trend equation for the above data; you may use
MS Excel but write down the processes and formula used.
a. (5/20 pts) … What is the capacity of this system? Explain your answer.
Q4 (total 20 pts) …a company must decide which type of machine to buy, and how
many units of that type, give the following information:
Machine
Cost, $
Type
1 10,000
2 14,000
Processing Time/unit
Annual
Product (minutes)
Demand
MT-1 MT-2
A 12,000 4 6
B 10,000 9 9
C 18,000 5 3
a. (5/20 pts) … How many machines of each type would be required to handle
demand if the machines will operate 8 hours a day, 250 days a year, and what
annual capacity cushion in processing time would result for each?
b. (7/20 pts) … With high certainty of annual demand, which type of machine would
be chosen if that an important consideration? With low certainty, which type of
machine would be chosen?