You are on page 1of 2

BILL OF SUPPLY Scan QR code for

kiosk payment
RESIDENTIAL Points Earned

GURUKRUPA REALCON BUILDERS & BILL DATE METER STATUS CYCLE NUMBER TYPE OF SUPPLY
DEVELOPERS 31-Aug-2023 Active 11 SINGLE PHASE
A/1002 PANT NAGAR SETHU CHS LTD,A-WING, CTS
NO 184(PT), GHATKOPAR (EAST)BLDG NO-101, PANT
TARIFF CONNECTION DATE SANCTIONED LOAD (kW) BILL NUMBER
NAGAR, MUMBAI 400075
LT I (B) 07-06-2022 4.00 100161008448
Mobile : 99********31
Email : BILL DISTRIBUTION NO. BILLING STATUS PRESENT READING DATE PREVIOUS READING DATE
PAN : Chembur/Tilak Nagar/ Regular 28-Aug-2023 27-Jul-2023
GST : 11/308/006/006/

CA NO:153263690 Bill Month Units Consumed Current Month Bill Previous Outstanding

Aug-23 323 r2914.37 r1.99


r2910.00 Bill Period: 28-Jul-2023 - 28-Aug-2023 Previous Units : 271

Due Date: 21-Sep-2023


l Round sum paybale by discount date 07-Sep-2023: Amt r2880.00 Discount r24.40
The due date refers to only current bill amount,
previous balance is payable immediately l Round sum paybale after due date 21-Sep-2023 : Amt r2940.00 DPC r36.43
This electricity bill neither reflects a title nor is to be used as a proof of any property or premises.

Nearest Collection Centre (Cash/Cheque)


Scan code to pay your bill via (use any UPI app)
Adani Electricity, Tilak Nagar, Street No -3, Near Sahakar Cinema,
Chembur ,Mumbai-400089

CONSUMPTION TREND Current year Previous year MAJOR BILL COMPONENTS (Rounded off amt)

328 FAC 0

NET PREV 1
246
NET OTHER(Cr) 5

164 FIXED 125

DUTIES/TAXES 474
82
WHEELING 713
208
220
328

235
279
323

323

212
271

46
30
25

18

0
8

0 ENERGY 1,601
Aug Jul Jun May Apr Mar Feb Jan Dec Nov Oct Sep

0 401 802 1203 1604

METER DETAILS HELP CENTER

Meter Present Previous Multiplying


Consumption Units(kWh) 19122 Toll Free No.(24X7) www.adanielectricity.com
Number Reading Reading Factor
helpdesk.mumbaielectricity@adani.com
SM10350509 1372.00 1049.00 1 323
Adani Electricity, Tilak Nagar, Street No -3, Near Sahakar Cinema,
Chembur ,Mumbai-400089

For power interruption complaint or restoration status


SMS POWER<9 digit account no.> to 7065313030 from mobile no.
Whatsapp POWER <9 digit account no> to 9594519122 from any mobile
number
Give us missed call on 1800 532 9998 from your registered mobile no.
Portal Related Complaint call us:19122
For internal complaint redressal system(ICRS), visit our website:
Total Consumption 323 www.adanielectricity.com

Join us on:
IMPORTANT MESSAGE

l Part of your consumption has attracted higher billing due to increase in consumption in this month.

l Please note that all important communication related to your account are being sent on 99******31
registered with us. In case of any change, do inform us immediately to avoid any inconvenience and
enjoy our uninterrupted services
l Tentative meter reading date for your SEP-23 bill is 27/09/2023
1-1

CONSOLIDATED STAMP DUTY PAID BY ORDER NO. LOA/CSD/72/2023/ Validity Period Dt. 01/07/2023 to Dt. 31/03/2025 /2955 DT. 20 JUN 2023 D1/A1/B1/S1/R1 E.&O.E.
HOW YOUR BILL WAS CALCULATED

Heads Rate Amount( r )


Go Paperless to Pay Less
Electrical Energy (HSN Code 27160000)
Paperless billing subscribers can
1. Fixed Charge 125.00 l Avail bill on email/SMS/WhatsApp. Visit
2. Wheeling Charges 713.83 https://www.adanielectricity.com/Billing

3. Green Power Tariff 0.00 l Earn a discount of Rs.10 every month


l In case needed, hard copy available on request
4. Energy Charge 1601.05
l To opt-in for paperless billing visit:
5. Fuel Adjustment Charge (FAC)# Refer Tariff Structure below 0.00
www.adanielectricity.com
6. Government electricity duty 16.00% 390.38

7. Maharashtra Govt. tax on sale of electricity 26.04p/unit 84.11


(A) Current month's bill amount (Sum of 1 to 7) 2914.37 To view supply code SOP, including power quality
a. Others 0.00 regulations 2021, Scan the QR code below or
visit.
b. Delayed payment charge on previous month's bill 0.00
c. Digital Payment discount 5.06Cr https://www.adanielectricity.com/regulatory
d. Paperless E-Bill discount 0.00
PRINCIPAL PLACE OF BUSINESS /
e. Interest on arrears 0.00 CONSUMER GRIEVANCE REDRESSAL FORUM (CGRF)

f. Adjustments 0.00 Address: Adani Electricity, Devidas Lane, Off SVP Road, Near Devidas
(B) Net other charges in current bill (Sum of a to f) 5.06Cr Lane Telephone Exchange, Borivali West, Mumbai 400 103

Current Month charges (A+B) 2909.31 Phone: 022-50745004


Email: consumerforum.mumbaielectricity@adani.com
Previous month's bill amount 5461.99
Website: cgrf.adanielectricity.com
Payment received up to(19-Aug-2023) 5460.00
Prompt payment discount 0.00

(C) Net previous balance 1.99 ELECTRICITY OMBUDSMAN

Total Bill Amount (A+B+C) 2911.30


Address: 107,108 Arcadia, NCPA Marg, Nariman Point, Mumbai
Amount deferred 0.00
400021 Maharashtra
Round Sum Payable with this bill 2910.00 Email: electricityombudsmanmumbai@gmail.com

REGISTERED OFFICE AEML

Your security deposit (SD) with us r 320.00 Address: Adani Corporate House, Shantigram, Near Vaishno Devi Circle,
S. G. Highway, Khodiyar Ahmedabad, Gujarat, India-382421
Your unpaid security deposit (SD)
CIN: U74999GJ2008PLC107256
PAN: AADCD0086F
As per Electricity Supply Code, you can also opt for your own meter (adhering to BIS standars)
GSTIN: 27AADCD0086F1ZW
YOUR TARIFF STRUCTURE (EFFECTIVE FROM 01.04.2023 ) r

LT I (B) Fixed Energy Wheeling FAC Rate


NOTE
RESIDENTIAL Charge Charge Charge Per Unit
Units/Months Per month Per Unit Per Unit Aug-23 l To pay online visit www.adanielectricity.com

0 - 100 85.00 3.45 2.21 0.00 l Get 7% interest on VDS (reducing balance)
l Rs. 10/-discount per month if you opt for Paperless E-Bill. No hard
101 - 300 125.00 5.55 2.21 0.00
copy will be generated. Log on to our website
301 - 500 125.00 7.45 2.21 0.00 (www.adanielectricity.com) for more details.
>500 150.00 8.55 2.21 0.00 l As per MERC, Interest on Security Deposit is at the bank rate declared
by RBI as on 1st April of the financial year. For FY 2023-24. it is 4.25%
Above fixed charges are for single phase connections. Fixed charge of Rs.150 per month will be levied on residential
consumers availing 3 phase supply. Additional Fixed Charge of Rs. 150 per 10 kW load or part thereof above 10kW
load shall be payable.,Temporary supply consumers shall pay 1.5 times the Fixed Charges applicable for this category. l Electricity Duty as per Govt. of Maharashtra Notification No. ELD.
2016/CR[1]252/Energy-1 of 21.10-2016 ELD-2020/CR-34/Energy-1 of
Bill Days Base Days Total Units 1st Slab 2nd Slab 3rd Slab 4th Slab 14.08.2020. Tax on Sale of Electricity as per Govt. of Maharashtra

32 31 323 103 207 13 0 Notification No. VVK-2018/CR[1]161/Energy-1 of 26-12-2018.

ADVANCE PAYMENT DETAILS (r) ADJUSTMENT/TCS DETAILS (r)

Opening Balance Adjustments Interest Closing Balance

LOCATION DETAILS OF GENIUS PAY CENTRE FOR BILL PAYMENTS

LAST PAYMENT DETAILS


Scan this QR code for
Payment Date Payment Amount (r) Payment Mode
Genius Pay Centre (kiosk for bill Payments)
19-08-2023 5460.00 Online

l For Cheque payments: Date of realization of cheque or 3 days from submission of cheque (whichever is earlier) shall be deemed to be the date of receipt of payment (subject to realization)
l cheque should be Account payee of local clearing and not post-dated l Mention A/C no and respective amount on back of cheque while making multiple bill payments by
single cheque
l Make cheque payable to Adani Electricity Mumbai Ltd. A/C No.153263690

You might also like