Professional Documents
Culture Documents
Power Transformer
2
Index sheet
This Photo by Unknown Author is licensed under CC BY
4
Commissioning Services Department
CSD- East
Why electrical power not transfer direct from generation to distribution ???
5
Commissioning Services Department
CSD- East
6
Commissioning Services Department
CSD- East
7
Commissioning Services Department
CSD- East
Type of insulation :
1. Oil transformer 2. dry transformer
Type of using :
1. Power transformer 2. measurement transformer 3. testing transformer 4. welding transformer
Winding number :
1- 3-phase transformer (3-winding) 2. 1-phase transformer (1-winging)
Commissioning Services Department
CSD- East
9
Commissioning Services Department
CSD- East
When an input voltage is applied to the primary winding, alternating current starts to flow in
the primary winding. As the current flows, a changing magnetic field is set up in the
transformer core. As this magnetic field cuts across the secondary winding, alternating voltage
is produced in the secondary winding.
The ratio between the number of actual turns of wire in each coil is the key in determining the
type of transformer and what the output voltage will be. The ratio between output voltage
and input voltage is the same as the ratio of the number of turns between the two windings.
A transformers output voltage is greater than the input voltage if the secondary winding has
more turns of wire than the primary winding. The output voltage is stepped up, and
considered to be a "step-up transformer". If the secondary winding has fewer turns than the
primary winding, the output voltage is lower. This is a "step-down transformer."
10
Commissioning Services Department
CSD- East
11
Commissioning Services Department
CSD- East
12
Commissioning Services Department
CSD- East
13
Commissioning Services Department
CSD- East
14
Commissioning Services Department
CSD- East
15
Commissioning Services Department
CSD- East
16
Commissioning Services Department
CSD- East
17
Commissioning Services Department
CSD- East
18
Commissioning Services Department
CSD- East
19
20
Commissioning Services Department
CSD- East
21
Commissioning Services Department
CSD- East
22
Commissioning Services Department
CSD- East
23
Commissioning Services Department
CSD- East
24
Commissioning Services Department
CSD- East
25
Commissioning Services Department
CSD- East
26
Commissioning Services Department
CSD- East
27
Commissioning Services Department
CSD- East
28
Commissioning Services Department
CSD- East
29
Commissioning Services Department
CSD- East
30
Commissioning Services Department
CSD- East
31
Commissioning Services Department
CSD- East
Commissioning Services Department
CSD- East
33
Commissioning Services Department
CSD- East
34
Commissioning Services Department
CSD- East
35
Commissioning Services Department
CSD- East
Objective
To measure the condition of a major insulation system (the insulating system between a
winding and the ground (core) or between two windings
Test preparation:-
I. Isolate the area by safety warring tape
II. Safety tagging shall be implemented
III. Tester having valid calibration
IV. Clean all Bushing of the transformer
V. May be taken to see that test leads do not touch among themselves and with
Transformer bod
VI. Confirm the tightness of all connections made
VII. Factory test
36
Commissioning Services Department
CSD- East
Test procedure:-
I. Terminals of all HV &LV bushings are shorted together.
II. Connect testing as per connection above with Apply 5 KV DC
III. Measurement insulation resistance and record from 1 minuet to
10 minuets as per test formats
IV. Obtain the Polarization Index= IR at 10Minuet /IR at 1 minuet
V. Acceptable Value IR value > 2M Ω Polarization Index>1.5
Commissioning Services Department
CSD- East
HV to GROUND 14.8 16.9 18.3 19.3 20.2 20.8 21.6 22.2 22.6 23.0 1.55
LV to GROUND 12.1 14.8 16.5 17.8 18.9 20.2 21.0 22.0 22.8 23.6 1.95
HV to LV 12.2 16.0 19.3 22.0 24.4 26.8 28.6 30.4 32.2 33.8 2.77
39
Commissioning Services Department
CSD- East
Objective
To Ensure the condition of the Insulation resistance core -frame by of measuring the core-to-ground
insulation –frame-to ground and between them
Test preparation:-
I. Isolate the area by safety warring tape
II. Safety tagging shall be implemented
III. Tester having valid calibration
IV. Clean all Bushing of the transformer
V. may be taken to see that test leads do not touch among
themselves and with Transformer bod
VI. Confirm the tightness of all connections made
VII. Factory test
VIII. Link to Core and Frame must be removed
40
Commissioning Services Department
CSD- East
I. Test procedure:-
II. Connect testing with applied voltage of 1 KV DC as per test Connection for 1 Min
III. Record the Result insulation resistance on format test
IV. Acceptance Value > 2M Ω
Commissioning Services Department
CSD- East
42
Commissioning Services Department
CSD- East
Object :-
Measuring the resistance of the transformer windings ensures that the connections are correct and
the resistance measurements indicate that there are no severe mismatches or opens
Test Equipment's:-
Low Transformer Ohmmeter (MTO330)/ Transformer Winding Resistance Meter(TRM 40)
Test preparation:-
I. Isolate the area by safety warring tape
II. Safety tagging shall be implemented
III. Tester having valid calibration
IV. Clean all Bushing of the transformer
V. may be taken to see that test leads do not touch among
themselves and with Transformer bod
VI. Factory test
43
Commissioning Services Department
CSD- East
Test procedure:-
I. Connect test as per above connection HV / LV winding Resistance all taps and Record test Result
II. Acceptance Value= should be within ±5% of measure in factory test
WINDING RESISTANCE ()
Average
@ AMBIENT TEMP. * Res/ph @
Res /Ph @ Amb. Winding
TAP NO. 75 C
Temp Connection
()
X1-X0 X2-X0 X3-X0 ()
44
Commissioning Services Department
CSD- East
45
Commissioning Services Department
CSD- East
Objective :-
I. To confirm no loose contact or loose connection in winding or core.
II. To ensure that there is no shorting in the core material.
III. To ensure no inter turn shorting of winding
IV. To measure current that maintain the magnetic flux excitation in the core
Test Equipment's:- voltmeters and ammeters & 3 phase variable input supply,
Test preparation:-
I. Isolate the area by safety warring tape
II. Safety tagging shall be implemented
III. Tester having valid calibration
IV. Clean all Bushing of the transformer
V. may be taken to see that test leads do not touch among themselves and with
Transformer bod
VI. Confirm the tightness of all connections made
VII. Factory test
46
Commissioning Services Department
CSD- East
Test procedure:-
I. Connect as per connection
II. Three phase voltage applied on HV side, by
keeping LV, TV side open.
III. Current measurement carried at HV terminals.
IV. IO% =Average Current /Average Voltage *rated
Voltage/rated current *100
V. Excitation current should not be higher than the
guaranteed value by more than 30%.
47
Commissioning Services Department
CSD- East
MAGNETIZING CURRENT AT
APPLIED VOLTAGE AT
secondary
Tap
Rated Rated
Pos Avg. Avg. Current
Tap Tap Io%
PRIMARY Voltage WINDING IN mA (A)
Voltage Current
WINDING(V)
1 418000 693 366.4 383.2 376.8 375.46 1.5 1.9 1.9 0.00176 0.28
9 380000 763 364.5 380.6 375.5 373.53 2.1 2.5 2.2 0.00266 0.354
21 323000 897 368.00 382.1 370.8 373.63 2.8 3.6 4.8 0.00373 0.359
48
Commissioning Services Department
CSD- East
49
Commissioning Services Department
CSD- East
Objective:-
1- To determine copper losses at full load –to obtain parameters the equivalent circuit
2-To check the occurrence of any inter-turn shorting or shift of the winding during transportation
Test preparation:-
I. Isolate the area by safety warring tape
II. Safety tagging shall be implemented
III. Tester having valid calibration
IV. Clean all Bushing of the transformer
V. may be taken to see that test leads do not touch among
themselves and with Transformer bod
VI. Confirm the tightness of all connections made
VII. Factory test
50
Commissioning Services Department
CSD- East
Test procedure:-
I. Connect test as per above connection (LV shorted)
II. Inject 380 V Power supply at Primary Side (lower tap, normal tap and higher tap.
III. Measured current and Voltage between phases as per above and calculate =
IV. Z=(applied voltage/measured current ×rated current/rated voltage)×100
V. Acceptance Criteria 10 % of specified value
51
Commissioning Services Department
CSD- East
52
Commissioning Services Department
CSD- East
53
Commissioning Services Department
CSD- East
Objective:-
The purpose of this test is to check whether the flux path in the core is uniform and
properly distributed in the core limbs
identify inter turn faults and magnetic imbalance
Test preparation:-
I. Isolate the area by safety warring tape
II. Safety tagging shall be implemented
III. Tester having valid calibration
IV. Clean all Bushing of the transformer
V. may be taken to see that test leads do not touch among themselves and
with Transformer bod
VI. Confirm the tightness of all connections made
VII. Factory test
54
Commissioning Services Department
CSD- East
Test Procedure
I. Inject 220 V/230 V Single phase as per connection above and reading voltage other phases
II. The Sum of these two voltages should give the applied voltage
III. If there is any inter-turn short circuit that may result in the sum of the two voltages not being equal to the applied
voltage
Injection
H1-H0 H2-H0 H3-H0 X1- X0 X2-X0 X3- X0 Y1-Y2 Y2-Y3 Y3-Y1
(V)
H1-H0 219.2 186 22.48 57.52 49.55 4.94 12.22 10.95 1.39
H2-H0 116.1 219.4 102.5 30.17 57.63 27.63 6.25 12.46 6.57
H3-H0 20.57 218.3 218.3 5.20 49.06 57.80 1.46 10.89 12.20
55
Commissioning Services Department
CSD- East
56
Commissioning Services Department
CSD- East
Objective
The zero-sequence impedance is usually measured for all star-connected windings of the transformer
measure zero sequence impedance which is necessary for ground fault protection
Test preparation:-
I. Isolate the area by safety warring tape
II. Safety tagging shall be implemented
III. Tester having valid calibration
IV. Clean all Bushing of the transformer
V. may be taken to see that test leads do not touch among
themselves and with Transformer bod
VI. Confirm the tightness of all connections made
57
Commissioning Services Department
CSD- East
58
Commissioning Services Department
CSD- East
59
Commissioning Services Department
CSD- East
60
Commissioning Services Department
CSD- East
Objective:-
I. To ensure the Turns ratios of the transformer are designed / manufactured as per the
specifications/ requirements.
II. To ensure the Turns ratio errors are within acceptable limits
Test preparation:-
I. Isolate the area by safety warring tape
II. Safety tagging shall be implemented
III. Tester having valid calibration
IV. Clean all Bushing of the transformer
V. may be taken to see that test leads do not touch among themselves
and with Transformer bod
VI. Confirm the tightness of all connections made
VII. Factory test
61
Commissioning Services Department
CSD- East
Test Procedure:-
I. connect the tester as per connection above.
II. Test Ratio at all Taps
Limit :- ± 0.5% of the design
Measured value – Calculated value
* % Error = ------------------------------------------------------- X 100
Calculated value
Compare result with factory report
1 79500 13800 9.5263 9.5374 0.12 0.61 9.5347 0.09 0.42 9.5352 0.09 0.68
2 75038 13800 9.4180 9.4295 0.12 0.61 9.4264 0.09 0.48 9.4278 0.10 0.69
3 74175 13800 9.3098 9.3218 0.13 0.63 9.3207 0.12 0.50 9.3212 0.12 0.70
62
Commissioning Services Department
CSD- East
Vector Group
63
Commissioning Services Department
CSD- East
9-Vector Group
Objective:-
To ensure the vector group of the Transformer is designed/ manufactured as
per the specification.
Test preparation:-
I. Isolate the area by safety warring tape
II. Safety tagging shall be implemented
III. Tester having valid calibration
IV. Clean all Bushing of the transformer
V. may be taken to see that test leads do not touch among
themselves and with Transformer bod
VI. Confirm the tightness of all connections made
VII. Factory test
64
Commissioning Services Department
CSD- East
measured.
65
Commissioning Services Department
CSD- East
66
Commissioning Services Department
CSD- East
The Objective
I. Capacitance and power factor/dissipation factor (PF/DF) measurements are performed to
investigate the condition of the insulation of power transformers and bushings. Both insulation
systems are essential for the reliable operation of the transform
II. To measure the power loss due to leakage current through the transformer insulation
III. To determine material quality of the insulation
IV. The purpose of the measurement is to determine the capacitances between the windings and the
earthed parts and between the different windings of the transformer
67
Commissioning Services Department
CSD- East
Test Equipments :-
The Double power factor insulation test equipment measures the charging current and watts-loss from which the
power factor, capacitance
Test preparation:-
V. may be taken to see that test leads do not touch among themselves and with
Transformer bod
68
Commissioning Services Department
CSD- East
Test Procedure
For Doble equipment, measurement may be done in the following modes.
1CH refers to all insulation between the high voltage winding and grounded parts
CL refers to the same parts and materials between the low voltage windings and grounded parts
CHL refers to all winding insulation, barriers, and oil between high- and low-voltage windings
69
Commissioning Services Department
CSD- East
70
Commissioning Services Department
CSD- East
71
Commissioning Services Department
CSD- East
Frequency Test
72
Commissioning Services Department
CSD- East
Objective:-
detecting damage arising due to dislocation/ movement of core and winding during transportation
or after occurrence any fault
Test preparation:-
I. Isolate the area by safety warring tape
II. Safety tagging shall be implemented
III. Tester having valid calibration
IV. Clean all Bushing of the transformer
V. may be taken to see that test leads do not touch among
themselves and with Transformer bod
VI. Confirm the tightness of all connections made
VII. Factory test
73
Commissioning Services Department
CSD- East
Sensors Test
74
Commissioning Services Department
CSD- East
Objective:-
This is to ensure proper working of temperature indicators within the acceptable tolerance
according to the actual sensing of temperature.
Test preparation:-
I. Isolate the area by safety warring tape
II. Safety tagging shall be implemented
III. Tester having valid calibration
IV. Clean all Bushing of the transformer
V. May be taken to see that test leads do not touch among
themselves and with Transformer bod
VI. Confirm the tightness of all connections made
VII. Factory test
75
Commissioning Services Department
CSD- East
76
Commissioning Services Department
CSD- East
Test Procedure
1-Temperature calibration test is to be done (of thermometer) Bulb of the temperature relays is
to be taken out from pocket and exposed through some liquid medium to slow temperature
rising. By means of thermometer, temperature of medium is to be check and compared to
temperature relays measuring.
Reference Temp. Oil Temp. Indicator HV Winding LV Winding WTI-The dial marking
in ̊ C in ̊ C Temp. Indicator in ̊ C Temp. Indicator in ̊ C
shall be 20 to 160°C
with ±0.5% accuracy.
starting 31 30 31
40 41 40 41
77
Commissioning Services Department
CSD- East
78
Commissioning Services Department
CSD- East
79
Commissioning Services Department
CSD- East
80
Commissioning Services Department
CSD- East
READING
Oil Temp. at start (A) 22
TIME (MIN.) TEMP. READING (° C )
0 22
Oil Temp. at end (B) 23
5 30
10 38
Winding Temp. Before current injection (C) 22
15 40
20 44
Winding Temp. After 45 mins (D) 46
25 45
30 46 Simulated Temp. Rise Measured: [(D-C)-(B-A)] 23
35 46
40 46
45 46
81
Commissioning Services Department
CSD- East
82
Commissioning Services Department
CSD- East
Objective:-
This is one of the points to the ensure condition of oil
Test preparation:-
1- Isolate the area by safety warring tape
2- Safety tagging shall be implemented
3- Tester having valid calibration
4- Position the test equipment on a safe location where possibility
of falling objects is remote to happen..
5- Make sure the bottle is clean and dry
6- Factory test
83
Commissioning Services Department
CSD- East
84
Commissioning Services Department
CSD- East
Test Procedure:-
This test is performed by applying an AC voltage between two
electrodes immersed in an oil sample. When the current arcs
across the gap between the electrodes, the voltage at that instant
is the dielectric breakdown strength
85
Commissioning Services Department
CSD- East
Minimum Strength : 50 KV
86
Commissioning Services Department
CSD- East
87
Commissioning Services Department
CSD- East
88
Commissioning Services Department
CSD- East
Objective:-
To ensure the performance of the fan motor
Test Equipment's :-Digital Multimeter with Clamp Meter and megger for IR test
Test preparation:-
1- Isolate the area by safety warring tape
2- Safety tagging shall be implemented
3- Tester having valid calibration
4- Position the test equipment on a safe location where possibility
of falling objects is remote to happen..
5- Make sure the bottle is clean and dry
6- Factory test
89
Commissioning Services Department
CSD- East
90
Commissioning Services Department
CSD- East
Test Procedures:-
1- Perform insulation Resistance testing through terminal block
2-Measure the Motor starting Current for each cooling fan’s 3phases
3-Measure the running Current for each cooling fan’s 3phases
4-Calculate the total starting and Running current of each group
5- Check the Rotation direction of fan’s
6-Operate the fan separately to ensure that each switch is of the same fan
7-The separation of the fan is ensured by its respective switches by a failure representation
91
Commissioning Services Department
CSD- East
92
Commissioning Services Department
CSD- East
93
Commissioning Services Department
CSD- East
Objective:-
To ensure the proper operation / performance of On Load Tap Changer and its compliance with the
requirements.
Test preparation:-
1- Isolate the area by safety warring tape
2- Safety tagging shall be implemented
3- Tester having valid calibration
4- Position the test equipment on a safe location where possibility
of falling objects is remote to happen..
5- Factory test
94
Commissioning Services Department
CSD- East
Test Procedures
1 Heater, light OK
.2 One complete operation by motor OK
3 One complete operation by hand crank OK
4 Mechanical lock (lower and upper ) limit. OK
5 Electrical lock (lower and upper) limit. OK
6 Interlocking with hand switch. OK
7 Check local OK
8 Tap position indicator. OK
9 Counter operation. OK
10 Check Control switch local/remote/off OK
11 Check voltage and phase sequence OK
I R (A) IY (A) IB (A)
12 OLTC Motor staring current
4.60 4.71 4.65
95
Commissioning Services Department
CSD- East
96
Commissioning Services Department
CSD- East
97
Commissioning Services Department
CSD- East
Functional Check
98
Commissioning Services Department
CSD- East
16-Functional Check
Objective:-
To ensure the proper operation / performance of of these devices
And to fully perform it
Test preparation:-
1- Isolate the area by safety warring tape
2- Safety tagging shall be implemented
3- Tester having valid calibration
4- Position the test equipment on a safe location where possibility
of falling objects is remote to happen..
5- Factory test
99
Commissioning Services Department
CSD- East
Test Procedures:-
1-Check all circuits as per schematic drawing of MK panel and highlight
with yellow if its ok
2- All functions shall be checked as per scheme, checklist, test forms
and settings and all should be recorded in
3- Alarms & trips shall be checked in HMI’s, work stations and
gateways. Trip commands shall be checked actually
100