Professional Documents
Culture Documents
Chris Jones
www.xodusgroup.com
Installation Analysis
> OrcaFlex
Flexcom
http://www.mcskenny.com/software-solutions/flexcom.html
Installation Analysis
Also
> J-Tube Pull-Ins
> Riser Pull-In (e.g. pull in to FPSO)
> etc
Example
Riser Laydown
Example
Riser Minimum
Vessel Position Riser Payout A&R Payout Tensioner A&R Wire Load
Step Bend Radius
(m) (m) (m) Load (Tonnes) (Tonnes)
(m)
1 175 355 - 24.6 - 32
2 275 650 - 44.5 - 50
3 400 900 - 12.8 - 62
4 540 1200 - 37.2 - 48
5 570 1400 - 59.5 - 42
6 610 (1400) 250 - 74 45
7 620 (1400) 425 - 75 42
8 760 (1400) 575 - 60 33
9 890 (1400) 740 - 42 18
Experience from Installation Analysis
The main part of the installation process often provides low risk to the product
> Installation operations with the product in the water are often relatively
straightforward e.g. lowering and laying the product
> Large MBRs
> Wide range of payout and vessel position possible without damaging the product
> Good safety margin
Higher risk is during deck handling, initiation, landing and tie-in operations
Deck Handling
Overboarding
Chute
Carousel Deck
Deflector
Deck
Tensioner
Umbilical
Path
Deck Handling
Example
Deck Handling
Example
Deck Handling
Example
Deck Handling
Example
Deck Handling
Example
Deck Handling
Example
Deck Handling
Example
Deck Handling
Example
Deck Handling
Example
Double Pendulums
Example
https://www.youtube.com/watch?v=ZD8y7Slx2ow
Example
PLET Laydown
Pipelay
Initiation Pipeline
Vessel
Anchor Wire
PLET PLET
Example
Detailed Model
Simplifed Model
PLET Laydown
In Summary….
Buoyancy Rigging
Crane Block
Hydrodynamic
CoG
Properties
Bend Tri-Plate /
Installation Better Restrictors/
Rigging /
Equipment
Definition Stiffener /
Uraduct Lifting Tool
End
Bend
Fitting
Restrictors
www.xodusgroup.com