Rate Analysis for the Signage Items

Item
S. No. Caution Trolley Gradient Turn Out Kilometer Kilometer
Description Curve Board
Indicator Refuge Post Post Board Post-1 Post-2

1 Cost/Pc 6078.08 2404.48 3024 4729.6 4369.6 4448 4448

2 Add for freight @ 10% 607.81 240.45 302.40 472.96 436.96 444.80 444.80

3 Sub-Total-B 6,686 2,645 3,326 5,203 4,807 4,893 4,893

4 Add 15% for CPOH 1,003 397 499 780 721 734 734

5 Sub-Total-C 7,689 3,042 3,825 5,983 5,528 5,627 5,627

6 Add for GST @ 18% 1,384 548 689 1,077 995 1,013 1,013

7 Total Amount 9,073 3,590 4,514 7,060 6,523 6,640 6,640