Wad AlBashier Collecting and Pumping Station – Mar 2016 to Dec 2017
This a complete construction project including above ground water tank of a capacity of 6000 cubic metres,
which collect the water from the many water boreholes in the area during the day, to control the supply of the
drinking water network in Wad AlBashier are in West Omdurman. The site including brick fence on a strip
foundation with a steel grill seizing a land of 140x180m, all site was cleared and levelled to guide the surface
drainage outside the area.
- I tracked the progress of the work done against the planned schedule.
Page 1 of 3
Eng. Bannaga, Eihab S.I.
Summary of training and experience
- I checked the creep of the scope against the contract due to poor contracting documents from the
Client.
- I checked the preparation of the project payments.
- I selected the better options to execute the contract against the available solutions.
- I checked documentation of the variable orders by the Client, to prove any claims (if needed) in
future.
- I compared the better offers of subcontractors (international), and followed their contracts, progress
of execution of their work, payments, testing, shipping, clearance, and transporting of products
according to the schedule of the project.
Upper Atbara & Stetait Dam Residential Township Sanitary Sewer Network & Water Supply Network –
Mar 2015
The project is to construct a PVC wastewater gravity network for a township to be collected to a lift sump of
a wastewater treatment plant. Also to connect the component a water supply network of different sizes and
fittings.
- I checked the documentation of the Change Orders.
- I revised the design of the gravity network against slope and to be as less deep as it can, and
provide the consultant with my notes.
- I prepared the regular payments of work done.
- I prepared the termination claims of the company from the Client due to lack of finance for the
project.
Police Academy – Construction of Wastewater and Irrigation Networks & Rehabilitation of Existing
Extended Aeration Wastewater Treatment Plant – 2008
This project is consisted of rehabilitation of the civil works (mainly concrete tanks) of an existing treatment
plant (Extended Aeration), electromechanical units of the plant, constructing of a collecting sewer network,
constructing of an irrigation tank that collect the treated water, and the irrigation network.
- I was responsible for concrete repair of the plant tanks that constructed by other contractor.
- I was revised the process of the treatment and discussed with the electromechanical parties to
check or replace the unit that affect the running of the plant.
- I was responsible of construction of the additional concrete tanks (Irrigation & collecting tanks).
- I was responsible to issue and follow the project payments with the Client.
Mohammed Salih Omer MBR Wastewater Treatment Plant Project & Operation - 2008
The is a wastewater treatment plant served a student dormitory, the plant capacity was 600 cum/d and
using a MBR (Membrane Bio Reactor) technology, with a collecting lines and an irrigation line.
- I was responsible of the contacts with the overseas subcontractor to and ensure that the units
which will be shipped was adequate to run the plant as it should (during design and purchasing of
the parts).
- I was responsible of construction of the concrete structures of the plant.
- I was responsible to take the right actions to ensure the quality of the product water.
- I was monitoring the daily work of the operators of the plant.
Ali Abd AlFattah Extended Aeration Wastewater Treatment Plant Project & Operation – 2005
The project was to solve treatment of the wastewater of a student hostel, the traditional ways of treatment
cannot treat the capacity of the volume of wastewater. This project was a capacity of 400 cum/d using a
“Extended Aeration”. This is a complete treatment plant with electromechanical units. The project included
an irrigation pipeline of the treated water outside the plant area.
- This the first time to work of this type of projects.
- I was responsible to review the subcontractor’s design with the client.
- I was the coordinator between our company and the subcontractor.
Page 2 of 3
Eng. Bannaga, Eihab S.I.
Summary of training and experience
- I was the Resident Engineer of the project and I was responsible for the labour and constructing of
all of the Civil Works of the plant.
- I was responsible for the operation of the plant for two years after the handover.
- I was responsible to take a correction actions during the daily operation to ensure the quality of the