You are on page 1of 5

BARAA MAZEN ALJAYATWAH CV

 NATIONALITY: JORDANIAN  CURRENT LOCATION: UAE-SHARJAH

 MOBILE-1: 00971-561183727  MOBILE-2: 00971-558446721

 EMAIL: JUSTBARAA@GMAIL.COM  STATUS: MARRIED, TWO CHILDREN

Summary

I am experienced water and wastewater treatment engineer currently based in UAE, working with Metito
overseas Ltd. as senior proposals engineer for water and wastewater treatment solutions since 2012. My work
with METITO coupled with my master’s degree (M.Sc) in water engineering has helped me to combine scientific
methods with management skills to achieve optimum solutions and best performance at work.

Academic & Professional Certificate

1. ACADEMIC
1.1 JORDAN UNIVERSITY OF SCIENCE AND TECHNOLOGY (JUST) - IRBID, JORDAN
JUST university is ranked as the top research university in Jordan & Middle East, and amongst top 500
universities on the world.
o M.Sc. of Water & Environmental Engineering - Civil Engineering Department (May-2011).

1.2 HASHIMITE UNIVERSITY (HU) - ZARQA, JORDAN


HU University is ranked as 3rd best university in Jordan and amongst 10th of best universities of the
Middle East
o BE Degree of Water Technology & Environment - Department of Natural Resources &
Environment (July- 2007).

2. PROFESSIONAL CERTIFICATE
2.1 Surge vessel analysis Program by using numerical equations and KYPIPE software (version 2016) and
numerical equation — Metito, Sharjah (2016).

2.2 International Reverse Osmosis Certification (IROC) Program - international desalination association
academy — Massachusetts, USA (2013).
Area of Expertise

- Preparation of Technical Proposal and filling technical data sheets for tender submission.
- Prepare drawings (PID, layout, civil outline, SLD, others) for tender submission.
- Wastewater treatment process design calculations
- Desalination plant process design calculations
- Mechanical equipment sizing/selection
- Detail design engineering and coordination with engineering team.
- Surge vessels design and Hydraulic calculations related to pumping stations and treatment plants
- Prepare cost estimates for water/wastewater treatment systems
- Reading in details Tender specifications and drawings
- Coordinate with company different departments (process, electrical, mechanical, Civil etc.) to provide the
best solution for each particular case.
- Apply value engineering at the tendering stage which lead to a many successful stories as shown in next
section.
- Participating in execution of awarded projects, preparing rationalize budgets and negotiate with suppliers

Experience

 METITO OVERSEAS LTD (UAE - SHARJAH)


"Senior Proposal Engineer" June-2012 to Present

Responsibilities
• Worked on various technologies related to water and wastewater treatment like reverse osmosis,
ultra-filtration, nano-filtration, extended aeration (EA), Moving bed bio reactor (MBBR), membrane
bioreactor (BMR), fixed film bio-reactor (FBBR), oxidation ditches and others.
• Successfully submitted number of key tenders with wide range of flow capacities (200 - 150,000
m3/day) such as:
A Turnkey project in ALMADINA - ALRAAS ALABYAD Area – KSA (8500 m3/day expandable to
25500 m3/day) – MBR
B Design, supply and install of Al-Rafha University Sewage Treatment Plant based on membrane
bioreactor (MBR) technology (20,736 m3/day-KSA)
C Design, supply and install of Al-Quwayiyah Sewage Treatment Plant based on oxidation ditches
technology (10,000 m3/d - KSA)
D Design supply and install of Al-Madina industrial city WWTP based on extended aeration
technology ( 5000 m3/day - KSA)
E Rehabilitation of Non-potable Well Field Stations and Installation of BWRO Mobile Units (Different
Capacities- Qatar) – turnkey based project

BARAA MAZEN ALJAYATWAH CV 2


F JAFZA Sewage treatment plant - Dubai – UAE (6000 m3/day STP) – MBBR technology
G Design, supply and install of Tabouk Desalination Plant, (150,000 m3/day – KSA) – by using
ceramic membranes (nano-filteration)
H Design, supply and install of North Brida Desalination Plant New Expansion (100,000 m3/day –
KSA). Raw water contains Iron, CO2 manganese, and radium. Treatment scheme was Aeration
tower to remove radon gas, Chemical Oxidation, HMO preparation & injection (MNO2) and
Ceramic membranes.
I Design and supply of Wastewater treatment plant for KTC public infrastructure project based on
moving bed biofilm reactor (MBBR) technology (36,000 m3/day –Kenya)
J Construction of Recycled Water Main Line from YAS Island to Saadiyat Island (31,000 m3/day-
Abu Dhabi) – Turnkey based project
K Expansion, Design and Retrofit of DIP East sewage treatment plant based on biopolus
technology (20,000 m3/day – Dubai)
L Design, supply and install of Sumail Industrial Estate Waste Water Treatment Plants based on
membrane bioreactor (MBR) technology (7200 m3/day & 3000 m3/day - Oman)
M Construct, design, supply and install of Dubai Creek Harbor Development STP based on
membrane bioreactor (MBR) technology (6000 m3/day - Dubai) – Turnkey based project
N Construct, design, supply and install of Al Jada Development - Al Mamsha STP based on moving
bed biofilm reactor (MBBR) technology (4400m3day – Sharjah) – turnkey based project.
O Construct, design, supply and install of Barwa Real Estate Group DCP System Transferring to
TSE for DCP(s) – Barwa City Project based on Ultra-filtration skid followed by RO systems (Two
PWROs, 2000 m3/day Each – Qatar) – turnkey based project
P Construct, design, supply and install of Shams Temporary Sewage Treatment Plant- Phase II &
Pumping Station based on membrane bioreactor (MBR) technology (2400 m3/day - Abu Dhabi) –
turnkey based project
Q Construct, design, supply and install of City Land Mall sewage treatment plant at Global village
based on membrane bioreactor (MBR) technology (1650 m3/day – Dubai) – turnkey based
project
R Construct, design, supply and install of TSE Polishing treatment plant - Nakheel based on
Ultrafiltration skid followed by RO system (400 m3day – Dubai) - turnkey based project
S Construct, design, supply and install of Abu Ali Camp brackish water RO - ARAMCO ( 250
m3/day – KSA)
T Construct, design, supply and install of The Wastewater Treatment Plant at the st. Petersburg
Island - Heart of Europe, The World Project based on moving bed biofilm reactor (MBBR)
technology (Dubai 2600 m3/day)
U Design, supply and install of Wasia Gas Chlorination Systems (2 X 20 kg/day & 2 X 6 kg/day -
KSA)
V Design, Supply and install of STPs related to Sharjah livestock market (200 m3/day and 130
m3/day).
W Sewage treatment plant for EPCF contract for KTC public infrastructure project – Kenya (MBBR
6000 m3/day and Lagoon type STP 150 m3/day)
X Turnkey project at Meriam Island - Sharjah 720 m3/day MBBR plant
Y Design, supply and install of Sharjah Livestock market STPs 200 m3/day EA STP.

BARAA MAZEN ALJAYATWAH CV 3


• Dealing with different types of specifications and standards; such as Abu Dhabi Sewerage Services
Company Specifications (ADSSC), Dubai Municipality Specifications (DM), Ministry of Water &
Electricity – KSA (MOWE), Saudi industrial Property authority (MODON), Qatar Construction
Standards (QCS), Qatar General Electricity & Water (KAHRAMAA), ARAMCO STANDRDS, ADMA
OPCO STANDARDS and Others.
• Attended site visit, pre-bid meeting and post bid technical clarifications.
• Coordinated with suppliers and subcontractors to get quotations and support.
• Prepared process design calculations, equipment selection and sizing
• Generated process flow diagram, Piping & Instrumentation diagram, equipment layout and civil
outline
• Generated cost estimate report for management approval.
• Generated techno-commercial proposal for client submission.
• Coordination with engineering, drafting, electrical and civil departments during all tender stages (pre-
bids, post-bids and executions stages).
• Suggest a creative and integrated solutions for challenging problems
• Worked on new water treatment technologies such as Ceramic Filter Membrane System (CFM), Bio-
Pipe System, Biopulos, Turbo4Bio System and Low-Temperature Distillation System.

BARAA MAZEN ALJAYATWAH CV 4


Experience
 DAR AL-OMRAN INFRASTRUCTURE & ENVIRONEMNT - Jordan
"Environmental Engineer" May-2011 to May-2012

Responsibilities
• In charged of all environmental, Health and safety issues related to Project of Queen Alia
international road upgrading project which was one of the most prestigious projects in Jordan
A Ensured specific, national and international standards are observed
B Defined risks and hazards.
C wrote a daily and monthly reports summarizing the Environmental situation at site
D In charged of monitoring the right execution of excavation works
E Conducted statistical analyses and research studies on site
F Negotiated and managed the health, safety and environment budget
G Participated in public awareness campaigns
H Managed and assured the proper disposal of generated wastes at site; including Land
reclamation and reinstatement
I Prevented any damages for the natural resources and environment.
J Suggested technical solutions for many environmental-related problems at the site.
K Conducted periodic road safety audit for the whole project
L Ensured the implementation of new standards for the health, safety and environment.

Skills
• Working on special programs dedicated to water and environmental issues such as KYPIPE
Software, RO projection software like ROSA, AutoCAD, EPANET 2, SPSS, Arc GIS, MATLAB,
PMWIN, Modeflow, SMADA, and others.
• Superior Computer skills including ability to operate MS Office programs at highly proficient level
• Good analytical and problem-solving skill
• Focusing into details
• Teamwork, honesty and time management
• Highly motivated and results driven
• Good experience in electro-mechanical subcontracting fields
• Posses good communication, interpersonal and leadership skills
• Posses an effective oral and written communication skills

BARAA MAZEN ALJAYATWAH CV 5

You might also like