You are on page 1of 23

Mine Rehab – Mining Services

Rehab Weekly Plan


Week 35
PT. KALTIM PRIMA COAL
MINING SERVICES DEPARTMENT
MINE REHABILITATION SECTION
WEEKLY PLAN
A. FLEET ALLOCATION
Week 35
LOCATION PA US SOIL VOLUME CD CT TRUCK TRUCK TRUCK TRUCK
EQUIPMENT
DEPT PIT LOADING POINT DUMPING POINT (%) (%) (bcm) (km) (min) OPTIMAL ALLOCATION Min Max
B613 KOM-PC800 JUP INE Rehandle TSSP Sanjay TSSP Rahayu 88% 61% 30.559 2,8 28,0 9 9 7 10
B614 KOM-PC800 JUP INE Rehandle TSSP Suwari Spreading Everest Dump 88% 61% 30.559 3,5 33,6 10 9 8 11
B612 KOM-PC800 HT INM Rehandle TSSP Temp Kwest Spreading Everest Dump 88% 61% 30.559 1,8 20,0 6 8 5 7
B609 KOM-PC750 JUP PNS Clearing PNS P4 TSSP Temporary Ricky 88% 61% 30.718 1,5 17,6 6 6 4 6
B608 KOM-PC750 JUP PNS Clearing PNS P4 TSSP Temporary Ricky 88% 61% 30.718 1,1 14,4 5 5 4 5
B606 KOM-PC750 JUP PNS Clearing PNS P4 TSSP Temporary Ricky 88% 61% 30.718 0,9 12,8 4 4 3 5
B610 KOM-PC800 BIG BDP Redisturb Bendili Prima TSSP Kalajengking 88% 61% 30.559 1,6 18,4 6 6 5 7
B605 KOM-PC750 JUP INE Rehandle TSSP Sanjay TSSP Rahayu 88% 61% 30.718 2,8 28,0 9 9 7 10
B607 KOM-PC750 HT INK Rehandle TSSP Suyanto TSSP Koala 88% 61% 30.718 0,9 12,8 4 4 3 5
B611 KOM-PC800 HT INM Rehandle TSSP Temp Kwest Spreading Tiung 88% 61% 30.741 2,4 24,8 8 4 6 9
RB3012 Cat-320D - - - - - -
AVERAGE 88% 61% 306.569 2,19 23,14 67,00 64,00 52,00 75,00

2
6
5
B607
B613 B605
2
B612
B611
1
B614

B606
Prioritas Loading Point: 3
4 B609
1. SPREADING EVEREST (B614)
B608
2. SPREADING TIUNG/SERIWANG (B611 & B612)
B610
3. CLEARING PNS P4 (B606, B608, B609)
4. REDISTURB EASTERN DRAIN BENDILI (B610)
5. REHANDLE TSSP SANJAY (B605 & B613)
6. SPREADING KWEST (PAMA) (B607)
7. CLEARING KOALA EXT
Prioritas Project:

3
1. PROJECT CLEARING AKSES BENGKARAS 3
TSSP
Sanjay

B613

3.5 Km

RK
EVEREST
2.8 Km
TSSP TSSP Suwari
Jupriyanto +100 kBCM
B614

ADT B614 : 10 UNIT


ADT B613 : 8 UNIT 2.8 Km
ADT B605 : 8 UNIT
Spreading Everest Dump
Sisa area Spreading : 2.2 Ha TSSP
Loading : TSSP Pinang Dump Rahayu
Dumping : Everest Dump
Rehandle TSSP Sanjay
Sisa Volume : ±200 kBCM
Loading : TSSP Sanjay
Dumping : TSSP Rahayu / Jupriyanto
SPREADING EVEREST

Limit Area Spreading 5


SPREADING RK

Outstanding Area Spreading 6


REHANDLE TSSP SANJAY

B613

To TSSP Rahayu

Limit Area prioritas Rehandle Akses hauling 7


TSSP RAHAYU & TSSP JUPRIYANTO

2.8 Km

8
TSSP Ricky
0.9 Km
B606

TSSP Temp Palapa


B608 1.1 Km
B609

Clearing PNS P4
1.5 Km

TSSP Echo

ADT B606 : 4 UNIT


ADT B608 : 5 UNIT
ADT B609 : 6 UNIT
Clearing PNS P4
Sisa area Clearing : 103.8 Ha
Loading : Clearing Pinang South P4
Dumping : TSSP Ricky & Temp. Palapa 9
CLEARING PNSP4

B608 B606

TSSP Ricky

B609

Limit Area prioritas topsoiling Akses hauling 10


RB3012

Project Clearing by Dozer TSSP & Dump Rangkok 0.3 Km


Sisa area Clearing : 2.8 Ha
TSSP
Rangkok

2.5 Km

ADT B607 : 4 UNIT


B607
Spreading Kwest (PAMA) 11
1.5 Km
Loading : TSSP Suyanto
Dumping : Spreading Kwest
Clearing Koala Extension
TSSP TSSP Sisa area Clearing : 5.9 Ha
Temp Suyanto Koala Loading : Clearing Koala & Rehandle TSSP Suyanto
Dumping : TSSP Temporary Kwest
SPREADING KWEST (PAMA)

Limit Akses hauling


CLEARING KOALA EXTENSION PIT

Limit area Area prioritas topsoiling Akses hauling 13


TSSP KOALA

RL+58
`
RL+52

14
CLEARING DUMP AREA CHANNEL RANGKOK

Limit area Area TSSP 15


Spreading Seriwang
Sisa area Spreading : 3.0 Ha
Loading : TSSP Temp. KWest
Dumping : Seriwang Dump

1.8 Km

B611

B611

TSSP
Temp. KWest

ADT B612 : 8 UNIT


Spreading Tiung
Sisa area Spreading : 7.0 Ha
Loading : TSSP Temp. KWest
Dumping : Seriwang Dump

2.4 Km

16
SPREADING TIUNG

2. Construct channel
arahkan ke TDS

1. Prioritas ripping &


Akses Penanaman

Area Spreading 17
SPREADING SERIWANG
B611

Area Spreading Akses hauling


18
WIDURA

Soil

Spreading

19
TSSP
Kalajengking

1.8 Km

B610

ADT B610 : 5 UNIT


Spreading Tiung
Sisa area Clearing : 18.0 Ha
Loading : Redisturb Eastern Drain
Dumping : TSSP Kalajengking
20
REDISTURB EASTERN DRAIN BENDILI

B612

21
REDISTURB EASTERN DRAIN BENDILI

B612

22
SEKIAN DAN TERIMAKASIH