Prioritas Loading Point: 3
4 B609
1. SPREADING EVEREST (B614)
B608
2. SPREADING TIUNG/SERIWANG (B611 & B612)
B610
3. CLEARING PNS P4 (B606, B608, B609)
4. REDISTURB EASTERN DRAIN BENDILI (B610)
5. REHANDLE TSSP SANJAY (B605 & B613)
6. SPREADING KWEST (PAMA) (B607)
7. CLEARING KOALA EXT
Prioritas Project:
3
1. PROJECT CLEARING AKSES BENGKARAS 3
TSSP
Sanjay
B613
3.5 Km
RK
EVEREST
2.8 Km
TSSP TSSP Suwari
Jupriyanto +100 kBCM
B614
B613
To TSSP Rahayu
2.8 Km
8
TSSP Ricky
0.9 Km
B606
Clearing PNS P4
1.5 Km
TSSP Echo
B608 B606
TSSP Ricky
B609
2.5 Km
RL+58
`
RL+52
14
CLEARING DUMP AREA CHANNEL RANGKOK
1.8 Km
B611
B611
TSSP
Temp. KWest
2.4 Km
16
SPREADING TIUNG
2. Construct channel
arahkan ke TDS
Area Spreading 17
SPREADING SERIWANG
B611
Soil
Spreading
19
TSSP
Kalajengking
1.8 Km
B610
B612
21
REDISTURB EASTERN DRAIN BENDILI
B612
22