Cost saving project

Area Project Description Apr.

1.1 Actual cost (A) 474,057


1.2 Actual build (B) 2,441,438
1.N2 consumption saving @ SMT 1-8
1.3 Cost/unit (A/B) 0.194
FCOF 1.4 Saving (Bath)
2.1 Plan
2.Overtime management reduction 2.2 Actual
2.3 Saving
1.1 Actual cost (A) 25,890
- Filter 10u pcs 24

- Filter 5u pcs 36

- Filter 1u pcs 36

3.Cleaning filter consumption reduction - Filter 0.5u pcs 6

- Filter 0.45u pcs 40


ACA
- Filter 0.2u pcs 6

- Filter 0.1u pcs 16

1.4 Saving (Bath)


2.1 Plan
4.Overtime management reduction 2.2 Actual
2.3 Saving
May. Ave. Jun. Jul. Aug. Sep. Oct.
Base line
418,599 446,328 373,769 417,163 481,285 330,798 444,608
2,373,139 2,407,289 2,545,975 2,617,108 2,869,137 2,101,000 3,296,397
0.176 0.185 0.147 0.159 0.168 0.157 0.135
97951 67737 50,311 58,477 166,150.83
20470 95518 94544 106358 114189
13502 89729 92181 105247 115676
6968 5789 2363 1111 -1487
25,890 25,890 25,890 21,370 20,290 19,570 21,900
24 24 21 24 24 0
36 36 29 28 28 20
36 36 29 g 28 40
6 6 5 6 6 0
40 40 32 30 30 35
6 6 5 6 4 0
16 16 13 12 12 20
0 4,520 5,600 6,320 3,990
51528 64114 64976 60301 72273
56918 71005 63158 57935 67308
-5390 -6891 1818 2366 4965
Nov. Dec.

0 0

-25890 -25890
Overtime tracking

OT payment
Area Name Position Salary per hr.
(Bath)

ACA 23734
1. Rawat Yang-ngam Supervisor 98.9

16278
2. Athachai Donkerd Technician 2 67.8

14430
3. Nirat Chaithiangtam Technician 2 60.1

28609
6. Patikorn Ponganon Supervisor 119.2

18495
7. Pathiphon Sujaiya Sr.Technician 77.1

10000
8. Thanawut Bapphasit Technician 2 41.7

Total saving (bath)

OT payment
Area Name Position Salary per hr.
(Bath)

FCOF Associate Maintenance 28985


1 Kitsana Sawatmalanon Engineering Pcca 46.0079365079
Engineer

Maintenance 15591
2 Nitikorn Suporn Engineering Pcca 24.7476190476
Technician 2

Maintenance 16924
3 Watcharin Suwan Engineering Pcca 26.8634920635
Technician 2

Senior Maintenance 19000


4 Terawat Hanwichai Engineering Pcca 30.1587301587
Technician 2

Maintenance 28113
5 Jeerasak Boonrod Engineering Technician 44.6238095238
Supervisor 1
Maintenance
5 Jeerasak Boonrod Engineering Technician 44.6238095238
Supervisor 1

Senior Maintenance 19407


6 Warakorn Siranan Engineering Pcca 30.8047619048
Technician 1

Maintenance 16425
7 Pradit Potean Engineering Pcca 26.0714285714
Technician 2

Senior Maintenance 20006


8 Supachai Pitak Engineering Pcca 31.7555555556
Technician 1
Total saving (bath) 20556.4
Oven JCS
S S OF OF L L L L L L OF L S S S S S

10-Jun-23

11-Jun-23

12-Jun-23

13-Jun-23

14-Jun-23

15-Jun-23

16-Jun-23

17-Jun-23
1-Jun-23

2-Jun-23

3-Jun-23

4-Jun-23

5-Jun-23

6-Jun-23

7-Jun-23

8-Jun-23

9-Jun-23
Plan 3.5 1.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 0
Actual 3.5 1.5 0.0 10.5 3.5 3.5 3.5 3.5 0.0 3.5 10.5 3.5 3.5 3.5 3.5 3.5 0.0
Saving 0.0 0.0 0.0 -10.5 0.0 0.0 0.0 0.0 3.5 0.0 -10.5 0.0 0.0 0.0 0.0 0.0 0.0
Plan 3.5 1.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 0
Actual 3.5 1.5 10.5 10.5 3.5 3.5 3.5 3.5 0 3.5 0 3.5 1.5 0 0 3.5 0
Saving 0.0 0.0 -10.5 -10.5 0.0 0.0 0.0 0.0 3.5 0.0 0.0 0.0 2.0 3.5 3.5 0.0 0.0
Plan 3.5 1.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 0
Actual 3.5 1.5 10.5 0 3.5 3.5 3.5 3.5 0 3.5 10.5 3.5 0 3.5 1.5 0 0
Saving 0.0 0.0 -10.5 0.0 0.0 0.0 0.0 0.0 3.5 0.0 -10.5 0.0 3.5 0.0 2.0 3.5 0.0
Plan 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5
Actual 3.5 3.5 10.5 0 3.5 3.5 3.5 3.5 3.5 0 0 3.5 3.5 0 3.5 3.5 0
Saving 0.0 0.0 -10.5 0.0 0.0 0.0 0.0 0.0 0.0 3.5 0.0 0.0 0.0 3.5 0.0 0.0 3.5
Plan 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5
Actual 3.5 0 0 0 3.5 0 3.5 3.5 3.5 0 0 3.5 3.5 3.5 3.5 0 3.5
Saving 0.0 3.5 0.0 0.0 0.0 3.5 0.0 0.0 0.0 3.5 0.0 0.0 0.0 0.0 0.0 3.5 0.0
Plan 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5
Actual 3.5 3.5 10.5 0 3.5 3.5 3.5 3.5 3.5 0 0 3.5 3.5 1.5 3.5 0 3.5
Saving 0.0 0.0 -10.5 0.0 0.0 0.0 0.0 0.0 0.0 3.5 0.0 0.0 0.0 2.0 0.0 3.5 0.0

S S OF OF L L L L L L OF L S S S S S
10-Jun-23

11-Jun-23

12-Jun-23

13-Jun-23

14-Jun-23

15-Jun-23

16-Jun-23

17-Jun-23
1-Jun-23

2-Jun-23

3-Jun-23

4-Jun-23

5-Jun-23

6-Jun-23

7-Jun-23

8-Jun-23

9-Jun-23

Plan 0 0 0 0 3.5 3.5 3.5 3.5 3.5 3.5 0 3.5 0 0 0 0 0


Actual 0 0 0 0 0 3.5 3.5 3.5 0 3.5 0 3.5 0 0 0 0 0
Saving 0.0 0.0 0.0 0.0 3.5 0.0 0.0 0.0 3.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Plan 0 0 0 0 3.5 3.5 3.5 3.5 3.5 3.5 0 3.5 0 0 0 0 0
Actual 0 0 0 0 0 3.5 3.5 3.5 3.5 0 0 3.5 0 0 0 0 0
Saving 0.0 0.0 0.0 0.0 3.5 0.0 0.0 0.0 0.0 3.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Plan 0 0 0 0 3.5 3.5 3.5 3.5 3.5 3.5 0 3.5 0 0 0 0 0
Actual 0 0 0 0 0 3.5 3.5 3.5 3.5 3.5 0 3.5 0 0 0 0 0
Saving 0.0 0.0 0.0 0.0 3.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Plan 0 0 0 0 3.5 3.5 3.5 3.5 3.5 3.5 0 3.5 0 0 0 0 0
Actual 0 0 0 0 0 3.5 3.5 3.5 3.5 3.5 0 3.5 0 0 0 0 0
Saving 0.0 0.0 0.0 0.0 3.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Plan 0 0 0 0 3.5 3.5 3.5 3.5 3.5 3.5 0 3.5 3.5 3.5 3.5 3.5 3.5
Actual 0 0 0 0 0 3.5 3.5 3.5 3.5 0 0 3.5 3.5 1.5 1.5 1.5 1.5
Saving 0.0 0.0 0.0 0.0 3.5 0.0 0.0 0.0 0.0 3.5 0.0 0.0 0.0 2.0 2.0 2.0 2.0
Plan 0 0 0 0 3.5 3.5 3.5 3.5 3.5 3.5 0 3.5 3.5 3.5 3.5 3.5 3.5
Actual 0 0 0 0 3.5 3.5 3.5 3.5 3.5 3.5 0 3.5 3.5 1.5 1.5 0 0
Saving 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 2.0 2.0 3.5 3.5
Plan 0 0 0 0 3.5 3.5 3.5 3.5 3.5 3.5 0 3.5 3.5 3.5 3.5 3.5 3.5
Actual 0 0 0 0 3.5 3.5 3.5 3.5 3.5 3.5 0 3.5 3.5 1.5 1.5 1.5 1.5
Saving 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 2.0 2.0 2.0 2.0
Plan 0 0 0 0 3.5 3.5 3.5 3.5 3.5 3.5 0 3.5 3.5 3.5 3.5 3.5 3.5
Actual 0 0 0 0 3.5 3.5 3.5 3.5 3.5 3.5 0 3.5 3.5 1.5 0 1.5 1.5
Saving 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 2.0 3.5 2.0 2.0
OF S S S S S S OF S S S S S
18-Jun-23

19-Jun-23

20-Jun-23

21-Jun-23

22-Jun-23

23-Jun-23

24-Jun-23

25-Jun-23

26-Jun-23

27-Jun-23

28-Jun-23

29-Jun-23

30-Jun-23
Sum OT Saving
(OT) (Bath)

3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 82 12163.7
0.0 3.5 1.5 1.5 3.5 1.5 1.5 10.5 3.5 0.0 3.5 0.0 0.0 91.5 13572.9
0.0 0.0 2.0 2.0 0.0 2.0 2.0 -10.5 0.0 3.5 0.0 3.5 3.5 -9.5 -1409.20625
3.5 3.5 1.5 3.5 1.5 3.5 3.5 3.5 3.5 3.5 3.5 81.5 8291.6
0 3.5 0 1.5 0 1.5 0 0 3.5 0 0 0 0 62 6307.7
0.0 0.0 3.5 0.0 3.5 0.0 3.5 0.0 0.0 3.5 3.5 3.5 3.5 16 1627.8
3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 82 7395.4
0 3.5 0 3.5 0 3.5 0 10.5 3.5 1.5 1.5 1.5 3.5 84.5 7620.8
0.0 0.0 3.5 0.0 3.5 0.0 3.5 -10.5 0.0 2.0 2.0 2.0 0.0 -2.5 -225.46875
0 0 0 3.5 1.5 3.5 0 3.5 0 3.5 0 64.5 11533.0
10.5 0 0 0 3.5 1.5 3.5 10.5 0 3.5 0 3.5 0 85.5 15287.9
-10.5 0.0 0.0 0.0 0.0 0.0 0.0 -10.5 0.0 0.0 0.0 0.0 0.0 -21 -3754.93125
0 3.5 1.5 3.5 0 3.5 1.5 3.5 0 3.5 1.5 71 8207.2
10.5 1.5 3.5 1.5 3.5 0 0 10.5 1.5 3.5 0 3.5 1.5 76 8785.1
-10.5 -1.5 0.0 0.0 0.0 0.0 3.5 -10.5 0.0 0.0 0.0 0.0 0.0 -5 -577.96875
0 0 0 3.5 0 3.5 0 3.5 0 3.5 0 63 3937.5
10.5 0 0 0 3.5 0 3.5 10.5 0 3.5 0 3.5 0 85.5 5343.8
-10.5 0.0 0.0 0.0 0.0 0.0 0.0 -10.5 0.0 0.0 0.0 0.0 0.0 -22.5 -1406.25
-5746.025

OF S S S S S S OF S S S S S
18-Jun-23

19-Jun-23

20-Jun-23

21-Jun-23

22-Jun-23

23-Jun-23

24-Jun-23

25-Jun-23

26-Jun-23

27-Jun-23

28-Jun-23

29-Jun-23

30-Jun-23

Sum OT Saving
(OT) (Bath)

0 3.5 3.5 3.5 3.5 3.5 3.5 0 3.5 3.5 3.5 3.5 3.5 63 4347.8
0 3.5 0 0 0 0 0 0 3.5 0 0 0 0 24.5 1690.8
0.0 0.0 3.5 3.5 3.5 3.5 3.5 0.0 0.0 3.5 3.5 3.5 3.5 38.5 2657
0 3.5 3.5 3.5 3.5 3.5 3.5 0 3.5 3.5 3.5 3.5 3.5 63 2338.7
0 3.5 1.5 1.5 1.5 1.5 1.5 0 3.5 1.5 1.5 1.5 1.5 38 1410.6
0.0 0.0 2.0 2.0 2.0 2.0 2.0 0.0 0.0 2.0 2.0 2.0 2.0 25 928
0 3.5 3.5 3.5 3.5 3.5 3.5 0 3.5 3.5 3.5 3.5 3.5 63 2538.6
0 3.5 1.5 1.5 1.5 1.5 1.5 0 3.5 1.5 1.5 1.5 1.5 41.5 1672.3
0.0 0.0 2.0 2.0 2.0 2.0 2.0 0.0 0.0 2.0 2.0 2.0 2.0 21.5 866
0 3.5 3.5 3.5 3.5 3.5 3.5 0 3.5 3.5 3.5 3.5 3.5 63 2850.0
0 3.5 1.5 1.5 1.5 1.5 1.5 0 3.5 1.5 1.5 1.5 1.5 41.5 1877.4
0.0 0.0 2.0 2.0 2.0 2.0 2.0 0.0 0.0 2.0 2.0 2.0 2.0 21.5 973
0 0 0 0 0 0 0 0 0 0 0 0 0 42 2811.3
0 0 0 0 0 0 0 0 0 0 3.5 0 0 30.5 2041.5
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 -3.5 0.0 0.0 11.5 770
0 0 0 0 0 0 0 0 0 0 0 0 0 42 1940.7
0 0 0 0 0 0 0 0 0 0 0 0 0 31 1432.4
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 11 508
0 0 0 0 0 0 0 0 0 0 0 0 0 42 1642.5
0 0 0 0 0 0 0 0 0 0 0 0 0 34 1329.6
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 8 313
0 0 0 0 0 0 0 0 0 0 0 0 0 42 2000.6
0 0 0 0 0 0 0 0 0 3.5 3.5 3.5 0 43 2048.2
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 -3.5 -3.5 -3.5 0.0 -1 -48
6967
Overtime tracking
S OF L L

1-Jul-23

2-Jul-23

3-Jul-23

4-Jul-23
Area Name Position

ACA Plan 0 3.5 3.5


1. Rawat Yang-ngam Supervisor Actual 010.5 3.5 3.5
Saving 0.0 -10.5 0.0 0.0
Plan 0 3.5 3.5
2. Athachai Donkerd Technician 2 Actual 0 10.5 3.5 3.5
Saving 0.0 -10.5 0.0 0.0
Plan 1.5 3.5 3.5
3. Nirat Chaithiangtam Technician 2 Actual 1.5 10.5 3.5 3.5
Saving 0.0 -10.5 0.0 0.0
Plan 3.5 3.5 3.5
6. Patikorn Ponganon Supervisor Actual 3.5 10.5 3.5 3.5
Saving 0.0 -10.5 0.0 0.0
Plan 3.5 3.53 3.53
7. Pathiphon Sujaiya Sr.Technician Actual 3.5 10.5 3.5 3.5
Saving 0.0 -10.5 0.0 0.0
Plan 3.5 3.5 3.5
8. Thanawut Bapphasit Technician 2 Actual 3.5 10.5 3.5 3.5
Saving 0.0 -10.5 0.0 0.0

Total saving (bath)

S OF L L
1-Jul-23

2-Jul-23

3-Jul-23

4-Jul-23
Area Name Position

FCOF Associate Maintenance Plan 3.5 0 3.5 3.5


1 Kitsana Sawatmalanon Engineering Pcca Actual 0 0 3.5 3.5
Engineer Saving 3.5 0.0 0.0 0.0
Maintenance Plan 3.5 0 3.5 3.5
2 Nitikorn Suporn Engineering Pcca Actual 1.5 0 3.5 3.5
Technician 2 Saving 2.0 0.0 0.0 0.0
Maintenance Plan 3.5 0 3.5 3.5
3 Watcharin Suwan Engineering Pcca Actual 1.5 0 3.5 3.5
Technician 2 Saving 2.0 0.0 0.0 0.0
Senior Maintenance Plan 3.5 0 3.5 3.5
4 Terawat Hanwichai Engineering Pcca Actual 1.5 0 3.5 3.5
Technician 2 Saving 2.0 0.0 0.0 0.0
Maintenance Plan 3.5 0 7 3.5
5 Jeerasak Boonrod Engineering Technician Actual 3.5 0 7 3.5
Supervisor 1 Saving 0.0 0.0 0.0 0.0
Senior Maintenance Plan 3.5 0 7 3.5
6 Warakorn Siranan Engineering Pcca Actual 3.5 0 7 3.5
Technician 1 Saving 0.0 0.0 0.0 0.0
Maintenance Plan 3.5 0 7 3.5
7 Pradit Potean Engineering Pcca Actual 3.5 0 7 3.5
Technician 2 Saving 0.0 0.0 0.0 0.0
Senior Maintenance Plan 3.5 0 7 3.5
8 Supachai Pitak Engineering Pcca Actual 3.5 0 7 3.5
Technician 1 Saving 0.0 0.0 0.0 0.0
Total saving (bath)
L S S S OF L L L L L L OF L L L L L L

10-Jul-23

11-Jul-23

12-Jul-23

13-Jul-23

14-Jul-23

15-Jul-23

16-Jul-23

17-Jul-23

18-Jul-23

19-Jul-23

20-Jul-23

21-Jul-23

22-Jul-23
5-Jul-23

6-Jul-23

7-Jul-23

8-Jul-23

9-Jul-23
3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5
3.5 2 0 3.5 10.5 3.5 3.5 3.5 3.5 3.5 3.5 0 3.5 0.0 3.5 3.5 3.5 3.5
0.0 -2.0 0.0 0.0 -10.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 3.5 0.0 0.0 0.0 0.0
3.5 0 0 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5
3.5 0 0 3.5 10.5 3.5 3.5 3.5 3.5 3.5 3.5 0 3.5 3.5 3.5 3.5 3.5 3.5
0.0 0.0 0.0 0.0 -10.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3.5 0 0 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5
3.5 0 0 3.5 10.5 3.5 3.5 3.5 3.5 3.5 0 0 3.5 3.5 3.5 0 3.5 3.5
0.0 0.0 0.0 0.0 -10.5 0.0 0.0 0.0 0.0 0.0 3.5 0.0 0.0 0.0 0.0 3.5 0.0 0.0
3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 10.5 3.5 3.5 3.5 3.5 3.5 3.5
3.5 3.5 0 0 10.5 3.5 3.5 3.5 3.5 3.5 3.5 10.5 3.5 3.5 3.5 3.5 0 0
0.0 0.0 3.5 3.5 -10.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 3.5 3.5
3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 10.5 3.5 3.5 3.5 3.5 3.5 3.5
3.5 3.5 3.5 3.5 10.5 3.5 3.5 3.5 3.5 3.5 3.5 10.5 3.5 3.5 3.5 3.5 3.5 3.5
0.0 0.0 0.0 0.0 -10.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3.5 3.5 3.5 3.5 0 3.5 3.5 3.5 3.5 3.5 3.5 10.5 3.5 3.5 3.5 3.5 3.5 3.5
3.5 3.5 1.5 1.5 10.5 3.5 3.5 3.5 3.5 3.5 3.5 0 3.5 3.5 3.5 3.5 3.5 3.5
0.0 0.0 2.0 2.0 -10.5 0.0 0.0 0.0 0.0 0.0 0.0 10.5 0.0 0.0 0.0 0.0 0.0 0.0

L S S S OF L L L L L L OF L L L L L L
10-Jul-23

11-Jul-23

12-Jul-23

13-Jul-23

14-Jul-23

15-Jul-23

16-Jul-23

17-Jul-23

18-Jul-23

19-Jul-23

20-Jul-23

21-Jul-23

22-Jul-23
5-Jul-23

6-Jul-23

7-Jul-23

8-Jul-23

9-Jul-23

3.5 0 0 3.5 0 3.5 3.5 3.5 3.5 3.5 3.5 0 7 3.5 3.5 3.5 3.5 3.5
3.5 0 0 3.5 10.5 3.5 3.5 3.5 3.5 3.5 3.5 0 7 3.5 3.5 3.5 3.5 3.5
0.0 0.0 0.0 0.0 -10.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3.5 0 0 3.5 0 3.5 3.5 3.5 3.5 3.5 3.5 0 7 3.5 3.5 3.5 3.5 3.5
3.5 3.5 0 3.5 10.5 3.5 3.5 3.5 3.5 3.5 3.5 0 7 3.5 3.5 3.5 3.5 3.5
0.0 -3.5 0.0 0.0 -10.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3.5 0 0 3.5 0 3.5 3.5 3.5 3.5 3.5 3.5 0 7 3.5 3.5 3.5 3.5 3.5
3.5 0 0 3.5 0 3.5 3.5 3.5 3.5 3.5 3.5 0 7 3.5 3.5 3.5 3.5 3.5
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3.5 0 0 3.5 0 3.5 3.5 3.5 3.5 3.5 3.5 0 7 3.5 3.5 3.5 3.5 3.5
3.5 0 0 3.5 0 3.5 3.5 3.5 3.5 3.5 3.5 0 7 3.5 3.5 3.5 3.5 3.5
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3.5 3.5 3.5 3.5 0 7 3.5 3.5 3.5 3.5 3.5 0 3.5 3.5 3.5 3.5 3.5 3.5
3.5 3.5 1.5 0 0 0 3.5 3.5 3.5 3.5 3.5 0 3.5 3.5 3.5 3.5 3.5 3.5
0.0 0.0 2.0 3.5 0.0 7.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3.5 3.5 3.5 3.5 0 7 3.5 3.5 3.5 3.5 3.5 0 3.5 3.5 3.5 3.5 3.5 3.5
3.5 3.5 1.5 1.5 0 7 3.5 3.5 3.5 3.5 3.5 0 3.5 3.5 3.5 3.5 3.5 3.5
0.0 0.0 2.0 2.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3.5 3.5 3.5 3.5 0 7 3.5 3.5 3.5 3.5 3.5 0 3.5 3.5 3.5 3.5 3.5 3.5
3.5 3.5 1.5 1.5 0 7 3.5 3.5 3.5 0 0 0 3.5 3.5 3.5 3.5 3.5 3.5
0.0 0.0 2.0 2.0 0.0 0.0 0.0 0.0 0.0 3.5 3.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3.5 3.5 3.5 3.5 0 7 3.5 3.5 3.5 3.5 3.5 0 3.5 3.5 3.5 3.5 3.5 3.5
3.5 3.5 1.5 1.5 0 7 3.5 3.5 3.5 3.5 3.5 0 3.5 3.5 3.5 3.5 3.5 3.5
0.0 0.0 2.0 2.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
OF L L L S OF OF OF L
23-Jul-23

24-Jul-23

25-Jul-23

26-Jul-23

27-Jul-23

28-Jul-23

29-Jul-23

30-Jul-23

31-Jul-23
Sum OT Saving
(OT) (Bath)

3.5 3.5 3.5 3.5 7 3.5 80.5 11941.2


0.0 3.5 3.5 3.5 3.5 0 0 7 3.5 100 14833.8
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 -19.5 -2892.6
3.5 3.5 3.5 3.5 7 3.5 84 8546.0
0 3.5 3.5 3.5 3.5 0 0 3.5 0 94.5 9614.2
0.0 0.0 0.0 0.0 0.0 0.0 0.0 3.5 3.5 -14 -1424.3
3.5 3.5 3.5 3.5 7 3.5 82 7395.4
0 3.5 3.5 3.5 3.5 0 0 0 3.5 89 8026.7
0.0 0.0 0.0 0.0 0.0 0.0 0.0 7.0 0.0 -7 -631.3
7 3.5 3.5 3.5 3.5 3.5 101.5 18148.8
7 0 3.5 3.5 1.5 0 0 0 3.5 103 18417.0
0.0 3.5 0.0 0.0 2.0 0.0 0.0 0.0 0.0 -1.5 -268.2
7 3.5 3.5 3.5 3.5 3.5 101.56 11739.7
7 3.5 3.5 2 0 0 0 0 3.5 117.5 13582.3
0.0 0.0 0.0 1.5 3.5 0.0 0.0 0.0 0.0 -15.97 -1846.0
7 3.5 3.5 3.5 3.5 3.5 101.5 6343.8
7 3.5 3.5 3.5 0 0 0 0 3.5 104.5 6531.3
0.0 0.0 0.0 0.0 3.5 0.0 0.0 0.0 0.0 -3 -187.5
-7250.0

OF L L L S OF OF OF L
23-Jul-23

24-Jul-23

25-Jul-23

26-Jul-23

27-Jul-23

28-Jul-23

29-Jul-23

30-Jul-23

31-Jul-23

Sum OT Saving
(OT) (Bath)

0 7 3.5 3.5 3.5 0 0 0 3.5 84 15217.1


0 7 3.5 3.5 3.5 0 0 0 3.5 91 16485.2
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 -7 -1268.1
0 7 3.5 3.5 3.5 0 0 0 3.5 84 8185.3
0 7 3.5 3.5 3.5 0 0 0 5.5 98 9549.5
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 -2.0 -14 -1364.2
0 7 3.5 3.5 3.5 0 0 0 3.5 84 8885.1
0 7 3.5 3.5 3.5 0 0 0 0 78.5 8303.3
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 3.5 5.5 581.8
0 7 3.5 3.5 3.5 0 0 0 3.5 84 9975.0
0 7 3.5 3.5 3.5 0 0 0 5.5 84 9975.0
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 -2.0 0 0.0
10.5 3.5 3.5 3.5 0 0 0 0 7 101.5 17834.2
10.5 3.5 3.5 3.5 0 0 0 0 0 82 14407.9
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 7.0 19.5 3426.3
10.5 3.5 3.5 3.5 0 0 0 0 7 101.5 12311.3
10.5 3.5 3.5 3.5 0 0 0 0 3.5 94 11401.6
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 3.5 7.5 909.7
10.5 3.5 3.5 3.5 0 0 0 0 7 101.5 10419.6
0 3.5 3.5 3.5 0 0 0 0 3.5 76.5 7853.2
10.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 3.5 25 2566.4
10.5 3.5 3.5 3.5 0 0 0 0 7 101.5 12691.3
10.5 3.5 3.5 3.5 0 0 0 0 3.5 94 11753.5
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 3.5 7.5 937.8
PM HGST line 4by plan 5789.6
Overtime tracking
S OF L L

1-Aug-23

2-Aug-23

3-Aug-23

4-Aug-23
Area Name Position

ACA Plan 3.5 3.5 3.5 3.5


1. Rawat Yang-ngam Supervisor Actual 3.5 3.5 3.5 3.5
Saving 0.0 0.0 0.0 0.0
Plan 3.5 3.5 3.5 3.5
2. Athachai Donkerd Technician 2 Actual 0 3.5 3.5 3.5
Saving 3.5 0.0 0.0 0.0
Plan 3.5 3.5 3.5 3.5
3. Nirat Chaithiangtam Technician 2 Actual 3.5 3.5 3.5 3.5
Saving 0.0 0.0 0.0 0.0
Plan 3.5 3.5 3.5 3.5
6. Patikorn Ponganon Supervisor Actual 3.5 3.5 3.5 3.5
Saving 0.0 0.0 0.0 0.0
Plan 3.5 3.5 3.5 3.5
7. Pathiphon Sujaiya Sr.Technician Actual 3.5 3.5 3.5 3.5
Saving 0.0 0.0 0.0 0.0
Plan 3.5 3.5 3.5 3.5
8. Thanawut Bapphasit Technician 2 Actual 3.5 3.5 3.5 3.5
Saving 0.0 0.0 0.0 0.0

Total saving (bath)

S OF L L
1-Aug-23

2-Aug-23

3-Aug-23

4-Aug-23
Area Name Position

FCOF Associate Maintenance Plan 3.5 3.5 3.5 3.5


1 Kitsana Sawatmalanon Engineering Pcca Actual 3.5 3.5 3.5 3.5
Engineer Saving 0.0 0.0 0.0 0.0
Maintenance Plan 3.5 3.5 3.5 3.5
2 Nitikorn Suporn Engineering Pcca Actual 5.5 5.5 5.5 5.5
Technician 2 Saving -2.0 -2.0 -2.0 -2.0
Maintenance Plan 3.5 3.5 3.5 3.5
3 Watcharin Suwan Engineering Pcca Actual 0 3.5 3.5 3.5
Technician 2 Saving 3.5 0.0 0.0 0.0
Senior Maintenance Plan 3.5 3.5 3.5 3.5
4 Terawat Hanwichai Engineering Pcca Actual 3.5 3.5 3.5 3.5
Technician 2 Saving 0.0 0.0 0.0 0.0
Maintenance Plan 3.5 3.5 3.5 3.5
5 Jeerasak Boonrod Engineering Technician Actual 3.5 3.5 3.5 3.5
Supervisor 1
Maintenance
5 Jeerasak Boonrod Engineering Technician
Supervisor 1 Saving 0.0 0.0 0.0 0.0
Senior Maintenance Plan 3.5 3.5 3.5 3.5
6 Warakorn Siranan Engineering Pcca Actual 3.5 3.5 3.5 3.5
Technician 1 Saving 0.0 0.0 0.0 0.0
Maintenance Plan 3.5 3.5 3.5 3.5
7 Pradit Potean Engineering Pcca Actual 5.5 3.5 5.5 5.5
Technician 2 Saving -2.0 0.0 -2.0 -2.0
Senior Maintenance Plan 3.5 3.5 3.5 3.5
8 Supachai Pitak Engineering Pcca Actual 3.5 3.5 3.5 3.5
Technician 1 Saving 0.0 0.0 0.0 0.0
Total saving (bath)
L S S S OF L L L L L L OF L L L L L L

10-Aug-23

11-Aug-23

12-Aug-23

13-Aug-23

14-Aug-23

15-Aug-23

16-Aug-23

17-Aug-23

18-Aug-23

19-Aug-23

20-Aug-23

21-Aug-23

22-Aug-23
5-Aug-23

6-Aug-23

7-Aug-23

8-Aug-23

9-Aug-23
3.5 7 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 0 3.5 3.5
3.5 7 3.5 3.5 3.5 3.5 1.5 3.5 3.5 3.5 3.5 3.5 3.5 0 3.5 3.5
0.0 0.0 0.0 0.0 0.0 0.0 2.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3.5 0 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 0 3.5 3.5
3.5 0 3.5 3.5 3.5 0 0 3.5 3.5 3.5 3.5 3.5 3.5 0 3.5 3.5
0.0 0.0 0.0 0.0 0.0 3.5 3.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3.5 7 3.5 3.5 3.5 3.5 3.5 0 3.5 3.5 3.5 3.5 3.5 0 3.5 3.5
3.5 7 3.5 3.5 3.5 3.5 0 0 3.5 3.5 3.5 3.5 3.5 0 3.5 3.5
0.0 0.0 0.0 0.0 0.0 0.0 3.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 0 3.5 3.5
3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 0 3.5 3.5
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 0 3.5 3.5
3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 0 3.5 3.5
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 0 3.5 3.5
3.5 7 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 0 3.5 3.5
0.0 -3.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

L S S S OF L L L L L L OF L L L L L L
10-Aug-23

11-Aug-23

12-Aug-23

13-Aug-23

14-Aug-23

15-Aug-23

16-Aug-23

17-Aug-23

18-Aug-23

19-Aug-23

20-Aug-23

21-Aug-23

22-Aug-23
5-Aug-23

6-Aug-23

7-Aug-23

8-Aug-23

9-Aug-23

3.5 3.5 3.5 3.5 0 0 0 0 3.5 3.5 3.5 3.5 3.5 3.5 7 3.5
3.5 3.5 3.5 3.5 0 0 0 0 3.5 3.5 3.5 3.5 3.5 3.5 0 7 3.5
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3.5 3.5 3.5 3.5 0 0 0 0 3.5 3.5 3.5 3.5 3.5 3.5 7 3.5
5.5 5.5 5.5 5.5 0 0 0 0 3.5 3.5 3.5 3.5 3.5 3.5 7 3.5
-2.0 0.0 -2.0 -2.0 -2.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3.5 3.5 3.5 3.5 0 0 0 0 3.5 3.5 3.5 3.5 3.5 3.5 7 3.5
3.5 3.5 3.5 3.5 0 0 0 0 3.5 3.5 3.5 3.5 3.5 3.5 7 3.5
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3.5 3.5 3.5 3.5 0 0 0 0 3.5 3.5 3.5 3.5 3.5 3.5 7 3.5
0 0 0 3.5 0 0 0 0 3.5 3.5 3.5 3.5 3.5 3.5 7 3.5
3.5 0.0 3.5 3.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3.5 0 3.5 3.5 3.5 3.5 0 0 0 3.5 3.5 3.5 3.5 3.5 3.5 10.5 3.5 3.5
3.5 3.5 3.5 3.5 3.5 0 0 0 3.5 3.5 0 3.5 3.5 3.5 10.5 3.5 3.5
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 3.5 0.0 0.0 0.0 0.0 0.0 0.0
3.5 0 3.5 3.5 3.5 3.5 3.5 0 0 3.5 3.5 3.5 3.5 3.5 3.5 10.5 3.5 3.5
3.5 3.5 3.5 3.5 3.5 1.5 0 0 3.5 3.5 3.5 3.5 3.5 3.5 10.5 3.5 3.5
0.0 0.0 0.0 0.0 0.0 0.0 2.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3.5 3.5 3.5 3.5 3.5 0 0 0 3.5 3.5 3.5 3.5 3.5 3.5 10.5 3.5 3.5
5.5 5.5 5.5 5.5 2 0 0 0 3.5 3.5 3.5 3.5 3.5 3.5 10.5 3.5 3.5
-2.0 0.0 -2.0 -2.0 -2.0 1.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3.5 0 3.5 3.5 3.5 3.5 3.5 0 0 3.5 3.5 3.5 3.5 3.5 3.5 10.5 3.5 3.5
3.5 3.5 3.5 3.5 3.5 1.5 0 0 3.5 3.5 3.5 3.5 3.5 3.5 10.5 3.5 3.5
0.0 0.0 0.0 0.0 0.0 0.0 2.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
OF L L L S OF OF OF L
23-Aug-23

24-Aug-23

25-Aug-23

26-Aug-23

27-Aug-23

28-Aug-23

29-Aug-23

30-Aug-23

31-Aug-23
Sum OT Saving
(OT) (Bath)

3.5 3.5 3.5 3.5 0 3.5 3.5 3.5 3.5 98 14537.1


3.5 3.5 3.5 3.5 0 3.5 3.5 3.5 3.5 96 14240.4
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 2 296.7
3.5 3.5 3.5 3.5 0 0 0 0 0 80.5 8189.9
3.5 3.5 3.5 3.5 0 0 0 0 0 66.5 6765.5
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 10.5 1068.2
3.5 3.5 3.5 3.5 0 3.5 3.5 3.5 3.5 94.5 8522.7
3.5 3.5 3.5 3.5 0 3.5 3.5 3.5 3.5 91 8207.1
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 3.5 315.7
3.5 3.5 3.5 3.5 0 3.5 3.5 3.5 3.5 94.5 16897.2
3.5 3.5 3.5 3.5 0 3.5 3.5 3.5 3.5 94.5 16897.2
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 0.0
3.5 3.5 3.5 3.5 0 3.5 3.5 3.5 3.5 94.5 10923.6
3.5 3.5 3.5 3.5 0 3.5 3.5 3.5 3.5 94.5 10923.6
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 0.0
3.5 3.5 3.5 3.5 0 3.5 3.5 3.5 3.5 94.5 5906.3
3.5 3.5 3.5 3.5 0 3.5 3.5 3.5 3.5 98 6125.0
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 -3.5 -218.8
1461.8

OF L L L S OF OF OF L
23-Aug-23

24-Aug-23

25-Aug-23

26-Aug-23

27-Aug-23

28-Aug-23

29-Aug-23

30-Aug-23

31-Aug-23

Sum OT Saving
(OT) (Bath)

3.5 3.5 3.5 3.5 0 3.5 3.5 3.5 0 84 15217.1


3.5 3.5 3.5 0 0 3.5 3.5 3.5 0 80.5 14583.1
0.0 0.0 0.0 3.5 0.0 0.0 0.0 0.0 0.0 3.5 634.0
3.5 3.5 3.5 3.5 0 3.5 3.5 3.5 0 84 8185.3
3.5 3.5 3.5 1.5 0 3.5 3.5 3.5 0 98 9549.5
0.0 0.0 0.0 2.0 0.0 0.0 0.0 0.0 0.0 -14 -1364.2
3.5 3.5 3.5 3.5 0 3.5 3.5 3.5 0 84 8885.1
3.5 3.5 3.5 1.5 0 3.13 3.15 3.02 0 77.3 8176.4
0.0 0.0 0.0 2.0 0.0 0.4 0.4 0.5 0.0 6.7 708.7
3.5 3.5 3.5 3.5 0 3.5 3.5 3.5 0 84 9975.0
3.5 3.5 3.5 0 0 3.09 2.50 2.34 0 64.93 7710.4
0.0 0.0 0.0 3.5 0.0 0.4 1.0 1.2 0.0 16.57 1967.7
3.5 3.5 0 3.5 0 7 3.5 3.5 3.5 98 17219.2
3.5 3.5 0 3.5 0 7 3.5 3.5 3.5 94.5 16604.2
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 3.5 615.0
3.5 3.5 0 3.5 0 7 3.5 3.5 3.5 101.5 12311.3
3.5 3.5 0 3.5 0 7 3.5 3.5 3.5 99.5 12068.7
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 2 242.6
3.5 3.5 0 3.5 0 7 3.5 3.5 3.5 98 10060.3
3.5 3.5 0 3.5 0 6.52 3.5 3.5 3.5 110.02 11294.2
0.0 0.0 0.0 0.0 0.0 0.5 0.0 0.0 0.0 -12.02 -1233.9
3.5 3.5 0 3.5 0 7 3.5 3.5 3.5 101.5 12691.3
3.5 3.5 3.03 3.5 0 5.5 0 3.5 3.5 97.53 12194.9
0.0 0.0 -3.0 0.0 0.0 1.5 3.5 0.0 0.0 3.97 496.4
PM HGST line 4by plan 2066.2
Overtime tracking
L L OF S

1-Sep-23

2-Sep-23

3-Sep-23

4-Sep-23
Area Name Position

ACA Plan 3.5 3.5 0 3.5


1. Rawat Yang-ngam Supervisor Actual 3.5 3.5 0 3.5
Saving 0.0 0.0 0.0 0.0
Plan 3.5 3.5 0 3.5
2. Nirat Chaithiangtam Technician 2 Actual 3.5 3.5 0 3.5
Saving 0.0 0.0 0.0 0.0
Plan 3.5 3.5 0 3.5
3. Thanawut Bapphasit Technician 2 Actual 3.5 3.5 0 3.5
Saving 0.0 0.0 0.0 0.0
Plan 3.5 3.5 0 0
4. Patikorn Ponganon Supervisor Actual 3.5 3.5 0 3.5
Saving 0.0 0.0 0.0 -3.5
Plan 3.5 3.5 0 3.5
5. Pathiphon Sujaiya Sr.Technician Actual 3.5 3.5 0 3.5
Saving 0.0 0.0 0.0 0.0

Total saving (bath)

L L OF S
1-Sep-23

2-Sep-23

3-Sep-23

4-Sep-23
Area Name Position

FCOF Associate Maintenance Plan 0 0 0 3.5


1 Kitsana Sawatmalanon Engineering Pcca Actual 0 0 0 3.5
Engineer Saving 0.0 0.0 0.0 0.0
Maintenance Plan 0 0 0 3.5
2 Nitikorn Suporn Engineering Pcca Actual 0 0 0 6.5
Technician 2 Saving 0.0 0.0 0.0 -3.0
Maintenance Plan 0 0 0 3.5
3 Watcharin Suwan Engineering Pcca Actual 0 0 0 6
Technician 2 Saving 0.0 0.0 0.0 -2.5
Senior Maintenance Plan 0 0 0 3.5
4 Terawat Hanwichai Engineering Pcca Actual 0 0 0 4.5
Technician 2 Saving 0.0 0.0 0.0 -1.0
Maintenance Plan 0 0 0 3.5
5 Jeerasak Boonrod Engineering Technician Actual 0 1.5 0 6.5
Supervisor 1 Saving 0.0 -1.5 0.0 -3.0
Senior Maintenance Plan 0 0 0 3.5
6 Warakorn Siranan Engineering Pcca Actual 1.5 1.5 0 6.5
Technician 1
Senior Maintenance
6 Warakorn Siranan Engineering Pcca
Technician 1 Saving -1.5 -1.5 0.0 -3.0
Maintenance Plan 0 0 0 3.5
7 Pradit Potean Engineering Pcca Actual 1.5 1.5 0 5
Technician 2 Saving -1.5 -1.5 0.0 -1.5
Senior Maintenance Plan 0 0 0 3.5
8 Supachai Pitak Engineering Pcca Actual 1.5 0 0 3.5
Technician 1 Saving -1.5 0.0 0.0 0.0
Total saving (bath)
S S S S S OF S S S S S S OF S S S S S

10-Sep-23

11-Sep-23

12-Sep-23

13-Sep-23

14-Sep-23

15-Sep-23

16-Sep-23

17-Sep-23

18-Sep-23

19-Sep-23

20-Sep-23

21-Sep-23

22-Sep-23
5-Sep-23

6-Sep-23

7-Sep-23

8-Sep-23

9-Sep-23
3.5 3.5 3.5 3.5 4.5 0 3.5 3.5 3.5 3.5 3.5 3.5 0 3.5 3.5 3.5 3.5 3.5
3.5 3.5 3.5 3.5 4.5 0 3.5 3.5 3.5 3.5 3.5 3.5 0 3.5 3.5 3.5 3.5 3.5
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3.5 0 3.5 3.5 3.5 0 3.5 3.5 3.5 3.5 3.5 4.5 0 3.5 3.5 5.5 5.5 3.5
3.5 0 3.5 3.5 3.5 0 3.5 3.5 3.5 3.5 3.5 4.5 0 0 3.5 5.5 5.5 0
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 3.5 0.0 0.0 0.0 3.5
3.5 7 3.5 3.5 3.5 0 3.5 3.5 3.5 3.5 3.5 4.5 0 5.5 5.5 5.5 3.5 5.5
3.5 7 3.5 3.5 3.5 0 3.5 3.5 3.5 3.5 3.5 4.5 0 5.5 5.5 5.5 3.5 5.5
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3.5 3.5 3.5 3.5 4.5 0 3.5 3.5 3.5 3.5 3.5 4.5 0 3.5 3.5 3.5 3.5 3.5
3.5 3.5 3.5 3.5 4.5 0 3.5 3.5 3.5 3.5 3.5 4.5 0 3.5 3.5 0 3.5 3.5
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 3.5 0.0 0.0
3.5 3.5 3.5 3.5 4.5 0 3.5 3.5 3.5 5.5 5.5 6.5 0 3.5 3.5 3.5 3.5 3.5
3.5 3.5 3.5 3.5 4.5 0 3.5 3.5 3.5 5.5 5.5 6.5 0 3.5 3.5 3.5 3.5 3.5
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

S S S S S OF S S S S S S OF S S S S S
10-Sep-23

11-Sep-23

12-Sep-23

13-Sep-23

14-Sep-23

15-Sep-23

16-Sep-23

17-Sep-23

18-Sep-23

19-Sep-23

20-Sep-23

21-Sep-23

22-Sep-23
5-Sep-23

6-Sep-23

7-Sep-23

8-Sep-23

9-Sep-23

3.5 6.5 4.5 4.5 4.5 0 4.5 4.5 4.5 4.5 4.5 4.5 0 4.5 4.5 4.5 4.5 4.5
3.5 7 3.5 3.5 4.5 0 4.5 4.5 4.5 6 4.5 4.5 0 4.5 4.5 4.5 4.5 4.5
0.0 -0.5 1.0 1.0 0.0 0.0 0.0 0.0 0.0 -1.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3.5 6.5 4.5 4.5 4.5 0 6.5 4.5 4.5 4.5 4.5 4.5 0 6.5 4.5 4.5 4.5 4.5
5.5 5.5 4.5 5.5 4.5 0 5.5 2 4.5 5.5 5.5 4 0 6.5 5.5 5.5 0 4
-2.0 1.0 0.0 -1.0 0.0 0.0 1.0 2.5 0.0 -1.0 -1.0 0.5 0.0 0.0 -1.0 -1.0 4.5 0.5
3.5 6.5 4.5 4.5 4.5 0 4.5 4.5 4.5 4.5 4.5 4.5 0 6.5 4.5 4.5 4.5 4.5
3 5 0 5 3.5 0 3 5 3 5 3 5 0 6 3 5 4 3
0.5 1.5 4.5 -0.5 1.0 0.0 1.5 -0.5 1.5 -0.5 1.5 -0.5 0.0 0.5 1.5 -0.5 0.5 1.5
3.5 4.5 4.5 4.5 4.5 0 6.5 4.5 4.5 4.5 4.5 4.5 0 4.5 4.5 4.5 4.5 4.5
5 3 5 4 5 0 6 3 5 3 5 3 0 3 0 0 3.5 5.5
-1.5 1.5 -0.5 0.5 -0.5 0.0 0.5 1.5 -0.5 1.5 -0.5 1.5 0.0 1.5 4.5 4.5 1.0 -1.0
3.5 6.5 4.5 4.5 4.5 0 6.5 4.5 4.5 4.5 4.5 4.5 0 6.5 4.5 4.5 4.5 4.5
5 9 5 3.5 5.5 0 5 5.5 5 5.5 3.5 5.5 0 6.5 5 5.5 5 5.5
-1.5 -2.5 -0.5 1.0 -1.0 0.0 1.5 -1.0 -0.5 -1.0 1.0 -1.0 0.0 0.0 -0.5 -1.0 -0.5 -1.0
3.5 6.5 4.5 4.5 4.5 0 6.5 4.5 4.5 4.5 4.5 4.5 0 6.5 4.5 4.5 4.5 4.5
5 5.5 5 5.5 3.5 0 5 5.5 5 5.5 5 5.5 0 6.5 5.5 5.5 3.5 5.5
-1.5 1.0 -0.5 -1.0 1.0 0.0 1.5 -1.0 -0.5 -1.0 -0.5 -1.0 0.0 0.0 -1.0 -1.0 1.0 -1.0
3.5 4.5 4.5 4.5 4.5 0 6.5 4.5 4.5 4.5 4.5 4.5 0 6.5 4.5 4.5 4.5 4.5
5.5 3.5 5.5 7 3.5 0 6.5 5 5.5 3.5 3.5 5 0 5 7 5 5.5 5
-2.0 1.0 -1.0 -2.5 1.0 0.0 0.0 -0.5 -1.0 1.0 1.0 -0.5 0.0 1.5 -2.5 -0.5 -1.0 -0.5
3.5 4.5 4.5 4.5 4.5 0 6.5 4.5 4.5 4.5 4.5 4.5 0 6.5 4.5 4.5 4.5 4.5
5 3 5 3 6 0 5.5 5 4 3.5 5 3.5 0 5 5 2.5 0 0
-1.5 1.5 -0.5 1.5 -1.5 0.0 1.0 -0.5 0.5 1.0 -0.5 1.0 0.0 1.5 -0.5 2.0 4.5 4.5
S OF S S S S S S
23-Sep-23

24-Sep-23

25-Sep-23

26-Sep-23

27-Sep-23

28-Sep-23

29-Sep-23

30-Sep-23
Sum OT Saving
(OT) (Bath)

3.5 0 3.5 3.5 3.5 3.5 3.5 3.5 92 13647.1


3.5 0 3.5 3.5 3.5 3.5 3.5 3.5 92 13647.1
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 0.0
3.5 0 3.5 3.5 3.5 3.5 3.5 3.5 92.5 9410.7
0 0 3.5 3.5 3.5 3.5 3.5 0 78.5 7986.4
3.5 0.0 0.0 0.0 0.0 0.0 0.0 3.5 14 1424.3
3.5 0 3.5 3.5 3.5 3.5 3.5 3.5 103.5 9334.4
0 0 3.5 3.5 3.5 3.5 3.5 3.5 100 9018.8
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 0.0
3.5 0 3.5 3.5 3.5 3.5 3.5 3.5 89.5 16003.2
3.5 0 3.5 3.5 3.5 3.5 3.5 0 86 15377.3
0.0 0.0 0.0 0.0 0.0 0.0 0.0 3.5 3.5 625.8
3.5 0 3.5 3.5 3.5 5.5 5.5 3.5 103 11906.2
3.5 0 3.5 3.5 3.5 5.5 5.5 3.5 103 11906.2
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 0.0
2050.1

S OF S S S S S S
23-Sep-23

24-Sep-23

25-Sep-23

26-Sep-23

27-Sep-23

28-Sep-23

29-Sep-23

30-Sep-23

Sum OT Saving
(OT) (Bath)

0 0 4.5 4.5 4.5 4.5 4.5 2 101 18296.8


1 0 4.5 4.5 4.5 4.5 4.5 1 101 18296.8
-1.0 0.0 0.0 0.0 0.0 0.0 0.0 1.0 0 0.0
0 0 6.5 4.5 4.5 4.5 4.5 2 107 10426.5
2 0 6.5 5.5 5.5 4 0 2 106 10329.0
-2.0 0.0 0.0 -1.0 -1.0 0.5 4.5 0.0 1 97.4
0 0 4.5 4.5 4.5 4.5 4.5 2 103 10894.8
2 0 3.5 5 3 2 3.5 2 88.5 9361.1
-2.0 0.0 1.0 -0.5 1.5 2.5 1.0 0.0 14.5 1533.7
0 0 4.5 4.5 4.5 4.5 4.5 2 101 11993.8
0 0 3 3.5 7 3 5 0 85 10093.8
0.0 0.0 1.5 1.0 -2.5 1.5 -0.5 2.0 16 1900.0
0 0 6.5 4.5 4.5 4.5 4.5 2 107 18800.6
0 0 5 5.5 0 5.5 5.5 2 117 20557.6
0.0 0.0 1.5 -1.0 4.5 -1.0 -1.0 0.0 -10 -1757.1
0 0 4.5 4.5 4.5 4.5 4.5 0 103 12493.3
2 0 3.5 5.5 5 5.5 0 0 113.5 13766.8
-2.0 0.0 1.0 -1.0 -0.5 -1.0 4.5 0.0 -10.5 -1273.6
0 0 6.5 4.5 4.5 4.5 4.5 0 103 10573.6
2 0 6.5 5 5.5 5 0 0 113.5 11651.5
-2.0 0.0 0.0 -0.5 -1.0 -0.5 4.5 0.0 -10.5 -1077.9
0 0 6.5 4.5 4.5 4.5 4.5 0 103 12878.9
1 0 5.5 3 5 3.5 4 1.5 89.5 11190.9
-1.0 0.0 1.0 1.5 -0.5 1.0 0.5 -1.5 13.5 1688.0
PM HGST line 4by plan 1110.6
Overtime tracking
OF L L L

1-Oct-23

2-Oct-23

3-Oct-23

4-Oct-23
Area Name Position

ACA Plan 0 3.5 3.5 3.5


1. Rawat Yang-ngam Supervisor Actual 0 3.5 3.5 3.5
Saving 0.0 0.0 0.0 0.0
Plan 0 3.5 3.5 3.5
2. Nirat Chaithiangtam Technician 2 Actual 0 3.5 3.5 3.5
Saving 0.0 0.0 0.0 0.0
Plan 0 3.5 3.5 3.5
3. Thanawut Bapphasit Technician 2 Actual 0 3.5 3.5 3.5
Saving 0.0 0.0 0.0 0.0
Plan 0 3.5 3.5 3.5
4. Patikorn Ponganon Supervisor Actual 0 3.5 3.5 0
Saving 0.0 0.0 0.0 3.5
Plan 0 3.5 3.5 3.5
5. Pathiphon Sujaiya Sr.Technician Actual 0 3.5 3.5 3.5
Saving 0.0 0.0 0.0 0.0

Total saving (bath)

OF L L L
1-Oct-23

2-Oct-23

3-Oct-23

4-Oct-23
Area Name Position

FCOF Associate Maintenance Plan 0 3.5 3.5 3.5


1 Kitsana Sawatmalanon Engineering Pcca Actual 0 3.5 3.5 3.5
Engineer Saving 0.0 0.0 0.0 0.0
Maintenance Plan 0 3.5 3.5 3.5
2 Nitikorn Suporn Engineering Pcca Actual 0 0 0 3.5
Technician 2 Saving 0.0 3.5 3.5 0.0
Maintenance Plan 0 3.5 3.5 3.5
3 Watcharin Suwan Engineering Pcca Actual 0 3 3 3.5
Technician 2 Saving 0.0 0.5 0.5 0.0
Senior Maintenance Plan 0 3.5 3.5 3.5
4 Terawat Hanwichai Engineering Pcca Actual 0 3 2.5 3
Technician 2 Saving 0.0 0.5 1.0 0.5
Maintenance Plan 0 7 3.5 3.5
5 Jeerasak Boonrod Engineering Technician Actual 0 7 3.5 3.5
Supervisor 1 Saving 0.0 0.0 0.0 0.0
Senior Maintenance Plan 0 7 3.5 3.5
6 Warakorn Siranan Engineering Pcca Actual 0 3 3.5 3.5
Technician 1 Saving 0.0 4.0 0.0 0.0
Maintenance Plan 0 7 3.5 3.5
7 Pradit Potean Engineering Pcca Actual 0 7 3.5 3.5
Technician 2
Maintenance
7 Pradit Potean Engineering Pcca
Technician 2 Saving 0.0 0.0 0.0 0.0
Senior Maintenance Plan 0 7 3.5 3.5
8 Supachai Pitak Engineering Pcca Actual 0 6.5 3 0
Technician 1 Saving 0.0 0.5 0.5 3.5
Total saving (bath)
L L L OF L L L L L OF OF L L L L L L OF

10-Oct-23

11-Oct-23

12-Oct-23

13-Oct-23

14-Oct-23

15-Oct-23

16-Oct-23

17-Oct-23

18-Oct-23

19-Oct-23

20-Oct-23

21-Oct-23

22-Oct-23
5-Oct-23

6-Oct-23

7-Oct-23

8-Oct-23

9-Oct-23
3.5 3.5 3.5 0 7 3.5 3.5 3.5 3.5 3.5 14 3.5 3.5 3.5 3.5 3.5 3.5 0
3.5 3.5 3.5 0 7.0 0.0 3.5 3.5 3.5 3.5 0 3.5 3.5 3.5 3.5 3.5 3.5 0
0.0 0.0 0.0 0.0 0.0 3.5 0.0 0.0 0.0 0.0 14.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3.5 3.5 3.5 0 7 3.5 3.5 3.5 3.5 3.5 14 3.5 3.5 3.5 3.5 3.5 3.5 0
3.5 3.5 3.5 0 7 3.5 3.5 3.5 3.5 3.5 14 3.5 3.5 3.5 3.5 3.5 3.5 0
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3.5 3.5 3.5 0 7 3.5 3.5 3.5 3.5 3.5 14 3.5 3.5 3.5 3.5 3.5 3.5 0
3.5 3.5 3.5 0 7.0 3.5 3.5 3.5 3.5 3.5 14 3.5 3.5 3.5 3.5 3.5 3.5 0
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3.5 3.5 3.5 0 3.5 3.5 3.5 3.5 3.5 3.5 10.5 3.5 3.5 3.5 3.5 3.5 3.5 0
0 3.5 3.5 0 3.5 3.5 3.5 3.5 3.5 3.5 10.5 3.5 3.5 3.5 3.5 3.5 3.5 0
3.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3.5 3.5 3.5 0 3.5 3.5 3.5 3.5 3.5 3.5 10.5 3.5 3.5 3.5 3.5 3.5 3.5 0
3.5 3.5 3.5 0 3.5 0 3.5 3.5 3.5 3.5 10.5 3.5 3.5 3.5 3.5 3.5 3.5 0
0.0 0.0 0.0 0.0 0.0 3.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

L L L OF L L L L L OF OF L L L L L L OF
10-Oct-23

11-Oct-23

12-Oct-23

13-Oct-23

14-Oct-23

15-Oct-23

16-Oct-23

17-Oct-23

18-Oct-23

19-Oct-23

20-Oct-23

21-Oct-23

22-Oct-23
5-Oct-23

6-Oct-23

7-Oct-23

8-Oct-23

9-Oct-23

3.5 3.5 3.5 0 7 3.5 3.5 3.5 3.5 0 10.5 3.5 3.5 3.5 3.5 3.5 3.5 0
3.5 3.5 3.5 0 7 3.5 3.5 3.5 3.5 0 10.5 3.5 3.5 3.5 3.5 3.5 3.5 0
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3.5 3.5 3.5 0 7 3.5 3.5 3.5 3.5 0 10.5 3.5 3.5 3.5 3.5 3.5 3.5 10.5
3.5 2.5 7 0 7 3.5 3.5 3.5 3.5 0 14 3.5 3.5 3.5 3.5 3.5 3.5 10.5
0.0 1.0 -3.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 -3.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3.5 3.5 3.5 0 7 3.5 3.5 3.5 3.5 0 10.5 3.5 3.5 3.5 3.5 3.5 3.5 0
3.5 3 3 0 7 3.5 3.5 3.5 3.5 0 14 3.5 3.5 3.5 3.5 3.5 3.5 0
0.0 0.5 0.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 -3.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3.5 3.5 3.5 0 7 3.5 3.5 3.5 3.5 0 10.5 3.5 3.5 3.5 3.5 3.5 3.5 0
3.5 2.5 2.5 0 7 3.5 3.5 3.5 3.5 0 14 3.5 3.5 3.5 3.5 3.5 3.5 0
0.0 1.0 1.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 -3.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3.5 3.5 3.5 10.5 3.5 3.5 3.5 3.5 3.5 0 10.5 3.5 3.5 3.5 3.5 3.5 3.5 0
3.5 3.5 3.5 10.5 3.5 0 0 3.5 2.5 0 10.5 3.5 3.5 3.5 3.5 3.5 2.5 0
0.0 0.0 0.0 0.0 0.0 3.5 3.5 0.0 1.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.0 0.0
3.5 3.5 3.5 10.5 3.5 3.5 3.5 3.5 3.5 0 10.5 3.5 3.5 3.5 3.5 3.5 3.5 10.5
3.5 3.5 3.5 10.5 3.5 3.5 3.5 3.5 3.5 0 10.5 3.5 3.5 3.5 3.5 3.5 3.5 10.5
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3.5 3.5 3.5 10.5 3.5 3.5 3.5 3.5 3.5 0 10.5 3.5 3.5 3.5 3.5 3.5 3.5 0
3.5 3.5 3.5 10.5 3.5 3.5 3.5 3.5 3.5 0 10.5 3.5 3.5 0 3.5 3.5 3.5 0
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 3.5 0.0 0.0 0.0 0.0
3.5 3.5 3.5 10.5 3.5 3.5 3.5 3.5 3.5 0 10.5 3.5 3.5 3.5 3.5 3.5 3.5 0
0 0 3 10.5 3.5 3.5 3.5 3.5 3 0 10.5 3 3.5 3 3.5 3 3.5 0
3.5 3.5 0.5 0.0 0.0 0.0 0.0 0.0 0.5 0.0 0.0 0.5 0.0 0.5 0.0 0.5 0.0 0.0
OF
23-Oct-23 L L L L L OF L L

24-Oct-23

25-Oct-23

26-Oct-23

27-Oct-23

28-Oct-23

29-Oct-23

30-Oct-23

31-Oct-23
Sum OT Saving
(OT) (Bath)

0 3.5 3.5 3.5 3.5 3.5 10.5 3.5 3.5 115.5 17133.0
0 3.5 3.5 3.5 3.5 3.5 10.5 3.5 3.5 98 14537.1
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 17.5 2595.9
0 3.5 3.5 3.5 3.5 3.5 10.5 3.5 3.5 115.5 11750.7
0 3.5 3.5 3.5 3.5 3.5 10.5 0 0 108.5 11038.5
0.0 0.0 0.0 0.0 0.0 0.0 0.0 3.5 3.5 7 712.2
0 3.5 3.5 3.5 3.5 3.5 10.5 3.5 3.5 115.5 10416.7
0 3.5 3.5 3.5 3.5 3.5 10.5 3.5 3.5 115.5 10416.7
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 0.0
0 7 3.5 3.5 3.5 3.5 10.5 3.5 3.5 112 20026.3
0 7 3.5 3.5 3.5 3.5 10.5 3.5 3.5 105 18774.7
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 7 1251.6
0 7 3.5 3.5 3.5 3.5 10.5 3.5 3.5 112 12946.5
0 7 3.5 3.5 3.5 3.5 10.5 3.5 3.5 108.5 12541.9
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 3.5 404.6
4964.3

OF L L L L L OF L L
23-Oct-23

24-Oct-23

25-Oct-23

26-Oct-23

27-Oct-23

28-Oct-23

29-Oct-23

30-Oct-23

31-Oct-23

Sum OT Saving
(OT) (Bath)

0 7 3.5 3.5 3.5 3.5 10.5 3.5 7 105 19021.4


0 3.5 3.5 3.5 0 0 0 0 7 91 16485.2
0.0 3.5 0.0 0.0 3.5 3.5 10.5 3.5 0.0 24.5 2536.2
0 7 3.5 3.5 3.5 3.5 10.5 3.5 7 115.5 11254.8
0 6.5 5.5 5.5 3.5 2.5 12.5 4.5 5.5 129 12570.2
0.0 0.5 -2.0 -2.0 0.0 1.0 -2.0 -1.0 1.5 -3 -1315.5
0 3.5 3.5 3.5 3.5 3.5 10.5 3.5 3.5 98 10366.0
0 0 0 0 4.5 5 12 5 3 104.5 11053.5
0.0 3.5 3.5 3.5 -1.0 -1.5 -1.5 -1.5 0.5 4 -687.5
0 7 3.5 3.5 3.5 3.5 10.5 3.5 7 105 12468.8
0 6.5 5 5 3 4.5 0 5 5 107 12706.3
0.0 0.5 -1.5 -1.5 0.5 -1.0 10.5 -1.5 2.0 8.5 -237.5
0 7 3.5 3.5 3.5 3.5 10.5 3.5 7 115.5 20294.1
0 6.5 5 5.5 5 5.5 14 0 5.5 122 21436.2
0.0 0.5 -1.5 -2.0 -1.5 -2.0 -3.5 3.5 1.5 4 -1142.1
0 7 3.5 3.5 3.5 3.5 10.5 3.5 7 126 15283.0
0 6.5 5.5 5.5 4 0 0 0 8 120 14555.3
0.0 0.5 -2.0 -2.0 -0.5 3.5 10.5 3.5 -1.0 16.5 727.8
0 7 3.5 3.5 3.5 3.5 10.5 3.5 3.5 112 11497.5
0 5 4.5 5 3.5 7 12.5 5.5 0 123.5 12678.0
0.0 2.0 -1.0 -1.5 0.0 -3.5 -2.0 -2.0 3.5 -1 -1180.5
0 7 3.5 3.5 3.5 3.5 10.5 3.5 3.5 112 14004.2
0 5.5 5 5 4 4.5 12.5 3.5 3.5 113.5 14191.8
0.0 1.5 -1.5 -1.5 -0.5 -1.0 -2.0 0.0 0.0 9 -187.6
PM HGST line 4by plan -1486.8