You are on page 1of 2

Subscribe to DeepL Pro to translate larger documents.

Visit www.DeepL.com/pro for more information.


1

CONSTRUCTION OF RAINWATER HARVESTING


INSTALLATION (IPAH)
Lerep Village, West Ungaran District, Semarang Regency
1.Background Indonesia, which has a tropical climate, has two seasons: the
dry season and the rainy season. Along with global climate
change, the dry and rainy season cycle has shifted, which has
an impact on the availability of water for agricultural irrigation,
clean water, drinking water and so on.
Climate change has also resulted in some areas experiencing
extreme differences in rainfall during the dry and wet seasons.
During the rainy season, some areas are prone to flooding and
landslides, while others are prone to drought.
The average rainfall in Semarang Regency is 1,979 mm with
104 rainy days. This condition is mainly influenced by the
geographical location of Semarang Regency which is
surrounded by mountains and rivers.
Although hydrologically rich in water resources, the high
amount of rainfall is a potential that can be utilized. The
potential of rainwater can be utilized for household and
agricultural purposes so as to reduce groundwater
consumption. By doing so, the availability of water resources
will be sustainable.
Adequate rainwater harvesting systems are necessary for the
conservation of water resources. Rainwater harvesting will
reduce run off, especially in densely populated urban areas
with limited green open space. Furthermore, the collected
rainwater can be used for bathing, washing (MCK) and
watering plants daily or for other purposes. In addition, it can
provide education and increase community capacity in climate
change adaptation actions.
Considering this, the Central Java Provincial Environment and
Forestry Agency will facilitate the provision of a Rainwater
Harvesting Installation (IPAH) to the ProKlim Sokaku Asri
group, Lerep Village, West Ungaran Sub-district, Semarang
Regency for the provision of clean water, reducing run off, and
learning tools for climate change adaptation.
In order to obtain IPAH building results that are sustainably
beneficial to the community, planning is required.
good activities.

2. Purpose The purpose of this activity is to provide rainwater collection


and facilities so that they can be utilized to meet clean water needs.
Objectives The purpose of this work is to anticipate the occurrence of a
clean water crisis as well as an effort to conserve water
resources and educate the community to
utilizing rainwater.
2

3. Target The objectives of the Rainwater Harvesting Installation (IPAH)


Construction Work are:
1. The availability of 1 (Package) functioning Rainwater
Harvesting Installation (IPAH) building.
2. Utilization of rainwater for clean water purposes.

4.Work Location Lerep Village, West Ungaran District, Semarang Regency

5. Funding The source of funds for the entire Rainwater Harvesting


Source Installation (IPAH) Development Work in Lerep Village, West
Ungaran District, Semarang Regency in the Activity of Pollution
Prevention and / or Damage to the Environment, comes from
the Central Java Provincial Budget in 2023,
Account Number:
2.11.3.29.0.00.02.0002.2.11.03.1.01.02. 5.1.5.5.3.2.01.01.03
Ceiling Value: IDR 55,000,000,-

6. Name and Ir. TRI ASTUTI Head Field PSLB3P2KLH


Committing Officer Central Java Provincial Environment and Forestry Service
Organization As Commitment Making Officer (PPKom)
SKPD: Environment and Forestry Service Prov. Central Java

SCOPE

7. Scope of Activities 1. Conduct a survey and re-measurement of the construction


site of the Rainwater Harvesting Installation (IPAH) in
Lerep Village, West Ungaran District, Semarang Regency.
2. Construction of Rainwater Harvesting Installation (IPAH)
hybrid infiltration wells in the amount of 1 package (2
locations) along with its installation with a volume of 3,100
liters each.
3. Ensure the infrastructure and facilities of the Rainwater
Harvesting Installation (IPAH) are functioning properly.
4. Make repairs to all work items (if required) during the
maintenance period.

8. Output 1 package (2 locations) Rainwater Harvesting Installation


(IPAH) capacity of 3,100 liters along with its installation.

9. Equipment, Technical Drawing (DED) and technical specification of


Materials, Rainwater Harvesting Installation Planning in Semarang
Personnel and Regency.
Facilities of the
Contracting
Officer
Komitm
10. Timeframe for The construction work of the Rainwater Harvesting Installation
Completion of Work (IPAH) construction requires an implementation time of 45
(forty-five) calendar days, counted from
the signing of the Work Start Order (SPMK).