CONSTRUCTION OF RAINWATER HARVESTING
INSTALLATION (IPAH) Lerep Village, West Ungaran District, Semarang Regency 1.Background Indonesia, which has a tropical climate, has two seasons: the dry season and the rainy season. Along with global climate change, the dry and rainy season cycle has shifted, which has an impact on the availability of water for agricultural irrigation, clean water, drinking water and so on. Climate change has also resulted in some areas experiencing extreme differences in rainfall during the dry and wet seasons. During the rainy season, some areas are prone to flooding and landslides, while others are prone to drought. The average rainfall in Semarang Regency is 1,979 mm with 104 rainy days. This condition is mainly influenced by the geographical location of Semarang Regency which is surrounded by mountains and rivers. Although hydrologically rich in water resources, the high amount of rainfall is a potential that can be utilized. The potential of rainwater can be utilized for household and agricultural purposes so as to reduce groundwater consumption. By doing so, the availability of water resources will be sustainable. Adequate rainwater harvesting systems are necessary for the conservation of water resources. Rainwater harvesting will reduce run off, especially in densely populated urban areas with limited green open space. Furthermore, the collected rainwater can be used for bathing, washing (MCK) and watering plants daily or for other purposes. In addition, it can provide education and increase community capacity in climate change adaptation actions. Considering this, the Central Java Provincial Environment and Forestry Agency will facilitate the provision of a Rainwater Harvesting Installation (IPAH) to the ProKlim Sokaku Asri group, Lerep Village, West Ungaran Sub-district, Semarang Regency for the provision of clean water, reducing run off, and learning tools for climate change adaptation. In order to obtain IPAH building results that are sustainably beneficial to the community, planning is required. good activities.
2. Purpose The purpose of this activity is to provide rainwater collection
and facilities so that they can be utilized to meet clean water needs. Objectives The purpose of this work is to anticipate the occurrence of a clean water crisis as well as an effort to conserve water resources and educate the community to utilizing rainwater. 2
3. Target The objectives of the Rainwater Harvesting Installation (IPAH)
Construction Work are: 1. The availability of 1 (Package) functioning Rainwater Harvesting Installation (IPAH) building. 2. Utilization of rainwater for clean water purposes.
4.Work Location Lerep Village, West Ungaran District, Semarang Regency
5. Funding The source of funds for the entire Rainwater Harvesting
Source Installation (IPAH) Development Work in Lerep Village, West Ungaran District, Semarang Regency in the Activity of Pollution Prevention and / or Damage to the Environment, comes from the Central Java Provincial Budget in 2023, Account Number: 2.11.3.29.0.00.02.0002.2.11.03.1.01.02. 5.1.5.5.3.2.01.01.03 Ceiling Value: IDR 55,000,000,-
6. Name and Ir. TRI ASTUTI Head Field PSLB3P2KLH
Committing Officer Central Java Provincial Environment and Forestry Service Organization As Commitment Making Officer (PPKom) SKPD: Environment and Forestry Service Prov. Central Java
SCOPE
7. Scope of Activities 1. Conduct a survey and re-measurement of the construction
site of the Rainwater Harvesting Installation (IPAH) in Lerep Village, West Ungaran District, Semarang Regency. 2. Construction of Rainwater Harvesting Installation (IPAH) hybrid infiltration wells in the amount of 1 package (2 locations) along with its installation with a volume of 3,100 liters each. 3. Ensure the infrastructure and facilities of the Rainwater Harvesting Installation (IPAH) are functioning properly. 4. Make repairs to all work items (if required) during the maintenance period.
(IPAH) capacity of 3,100 liters along with its installation.
9. Equipment, Technical Drawing (DED) and technical specification of
Materials, Rainwater Harvesting Installation Planning in Semarang Personnel and Regency. Facilities of the Contracting Officer Komitm 10. Timeframe for The construction work of the Rainwater Harvesting Installation Completion of Work (IPAH) construction requires an implementation time of 45 (forty-five) calendar days, counted from the signing of the Work Start Order (SPMK).