You are on page 1of 2
‘THERMAL OPERATION UNIT U.P. RAJYA VIDYUT UTPADAN NIGAM LTD. 14" FLOOR, SHAKTI BHAWAN Extn, LUCKNOW. Ph, No, - 0522-2287873 Deepak Kumar Chief Engineer (L-1) Fe Email ID - ogm.to@uprvunl.org _ | COIN: U4ot0T1UP198086C005065 Letter No. 1388/CE (TO) HQ Date: - 20.10.2023 Chief General Manager, AnparalObralParichhalHarduaganj TPS By e-mail Subject:- Status on Grid related issues. Kindly arrange to provide the latest updated status on following points for each Unit of TPS. 4. Status of PSS tuning in given format. She | Name othe | Date oflasiPSS | Dato oflast Sop Ropod | Tenaive dale of] Reraaieion | Generating tuning tuning Response Tet suomitod Ne Slop taken | stan a Unt no. |_ pemad in oerormed(n TONRLOC | response test PSS | | DDRIMYYY format). | DDINIAYYYY oma | (Yes/No) tung - = = aa Ee eae ae : 2. Status of FGMO in given format. ae a [SWo]Stahon | Unto. | nsales Sats oF RENO ErabwDisable data | Remark Capacty |, of FOMO co G tet = 3._Status of Bus-bar protection of 220kV and above voltage Sub-Station in given format. [SNOT Nane ot | Vota eve! BUSba | Sttus(Operaonal | Reason x | —Expecied dato of eval Subsaion ProtectonisiledN | “Non Operaional | outage sealers tints) eS ial 4. Status of replacement of Electromechanical and Static relays with numerical relay in 220kV and above station. 5. Regarding Station event logger of sub-station in given format. [ S. | Name of ] Voltage | Availability | Healthiness | Is station event | Date of commissioning / Remarks | No. | the | Level | ofstation | of Station | logger time | rectification of station station | (in kV) event Event synchronized | event logger (in case of logger Logger with GPS non-existence or | (YesiNo) unhealthy EL) eles 6. Time synchronization of protection relay in given format. 7. Regarding status of System Protection Scheme. 8. Installation of PMU in UP control area. PAV G00 23 (Deepak Kumar) Chief Engineer (L-1) CC: - Director (Technical) UNL. 8" floor, Shakti Bhawan Extn, Lucknow.

You might also like