‘THERMAL OPERATION UNIT
U.P. RAJYA VIDYUT UTPADAN NIGAM LTD.
14" FLOOR, SHAKTI BHAWAN Extn, LUCKNOW.
Ph, No, - 0522-2287873
Deepak Kumar
Chief Engineer (L-1)
Fe Email ID - ogm.to@uprvunl.org
_ | COIN: U4ot0T1UP198086C005065
Letter No. 1388/CE (TO) HQ Date: - 20.10.2023
Chief General Manager,
AnparalObralParichhalHarduaganj TPS By e-mail
Subject:- Status on Grid related issues.
Kindly arrange to provide the latest updated status on following points for each Unit of
TPS.
4. Status of PSS tuning in given format.
She | Name othe | Date oflasiPSS | Dato oflast Sop Ropod | Tenaive dale of] Reraaieion
| Generating tuning tuning Response Tet suomitod Ne Slop taken
| stan a Unt no. |_ pemad in oerormed(n TONRLOC | response test PSS
| | DDRIMYYY format). | DDINIAYYYY oma | (Yes/No) tung
- = =
aa Ee eae ae :
2. Status of FGMO in given format. ae a
[SWo]Stahon | Unto. | nsales Sats oF RENO ErabwDisable data | Remark
Capacty |, of FOMO
co
G
tet =
3._Status of Bus-bar protection of 220kV and above voltage Sub-Station in given format.
[SNOT Nane ot | Vota eve! BUSba | Sttus(Operaonal | Reason x | —Expecied dato of eval
Subsaion ProtectonisiledN | “Non Operaional | outage
sealers tints) eS
ial
4. Status of replacement of Electromechanical and Static relays with numerical relay in 220kV
and above station.
5. Regarding Station event logger of sub-station in given format.
[ S. | Name of ] Voltage | Availability | Healthiness | Is station event | Date of commissioning / Remarks
| No. | the | Level | ofstation | of Station | logger time | rectification of station
station | (in kV) event Event synchronized | event logger (in case of
logger Logger with GPS non-existence or
| (YesiNo) unhealthy EL)
eles6. Time synchronization of protection relay in given format.
7. Regarding status of System Protection Scheme.
8. Installation of PMU in UP control area.
PAV G00 23
(Deepak Kumar)
Chief Engineer (L-1)
CC: - Director (Technical) UNL. 8" floor, Shakti Bhawan Extn, Lucknow.