a Cold Rolting Gave for &x210 mn, ‘A'TPS, Auiporra pee aapaae
fe
Starb vacuum vais! @ ms Pron. ~ 20 kaye
a a HPILP Bypass PS Pres. Y SO KG Jeet
a 3- Turtle Ro: ov ~prm @ mS Prom 40 Top: 508 0 t Pap.
S| 4- Turbine Rolltixh) at 2000 rpm @ ms Prem-~ So ek, Teams arotioe ls C
7 S- Full toad on) Unit (210mg) 6 MS Prem: v 145 Re bed, Temp. 540%.
i
2 i
ae Lead (210 ms> £
a 93 Temp. (~ 5408) ;
yoo 5
“ 5
we ha
Why MS Prem (145 way)
ae
Turine Speed (S200 rpm)
hse
3
=
|
3
§
E
3
3
q
5
g
:
60 0 Time (sbonsted)a HP|LP eypans I @ ms Prom. ~ Bo “kalo
t Be meh. Roti oe Goorpm @ MS Prom: 40 keluk , Temp. 7850 'e ns a
4> Turbine Roll ak Bow vpm @ MS Prem. 46 Kg lo? , Texp. 370 + lo%e
S Full Load on OUnit (210 mio@ ms Pros. ~ 145 Kur, Tap. ~ 540%
‘i Womm Ralling. Curve for_3x210 mw, "ATRS, Aupara (epost
1+ Stork Vacuuown Ses MS Press: ~ 15 kg Junk
MS Tex. (~ 540°C)
Load (210 mw)
WE Prom: (145 kg le?)
WIMIWLEDGALARY,COM ~ Goo! Stuff for Nerdy Teachers
eee ce 120 160 190 ase 270 Goo 360 420 480 Ze0
Time (Minute)Hot Rolling Cureve, -for_3X210 Div , TPS, feet (sittin 24 Ins of Tsipping’)
T+ Start vouwun. Yousi, ta ere ae
@ M3 Prem. ~
2- Choy rete 6y ei
3 Tuxbhe TEE co ypr2 @ Ms Prose. Temp. ee
4 Tarbine pra ak Bom ypm (2 ms Phakic ep reset
B- Full Lead on U Unit (210mMW)\A ms Pron. nw i4sialee | Temp 640% set
nb teap. C0
Turbine Speed (rpm)
Ms Prose. City
P: G5t0%)
TE Fieem: (145 Ky)
j
i
3
i
i
Turbine Speed (S000 rpm)
i aoa i om ts Sata case ech)Kwu HP smp less than 150 d
MSS temp should be between 320 to 350 deg C, pressure around 35 to 40kg/em2 and temp of
stop valve body more than 250 deg. C before opening HP Control valve.
Ensuring proper vacuum open control valve and set rpm of turbine 600 RPM for soaking.
Soaking will be in service till reaching HP casing temp more than 210Deg. Centigradeand
overall expansion of HP turbine more than 6.0mm
‘After reaching HP casing temp more than 210 Degree C. And overall expansion more than
6.0 mm put unit on 3000 rpm.
‘Soaking will be in service tll reaching IP rotor temp more than 210deg. C
‘After reaching above parameters unit will be synchronized and gradually load will increase
keeping overall expansion in limit by controlling MS and HRH temp.
Warm light up 210MW KWU Turbine( HP casing temp<350 deg. Cand>150 deg. C)
1
MS temp must be more than around 70 degCthan HP casing temp. before opening HP control
valve.
Ensure soaking to minimize casing TOP- Bottom temp difference less than 30 deg. C
Ensuring HP casing temp more than 210 deg. C. Put unit on 3000 rpm and when achieve IP
rotor temp more than 210degC, synchronize the unit and increase load keeping overall
expansion in limit by controlling MS and HRH temp.
up 210MW KWU Turbine( HP casin; more than 350 di
MSS temp must be around 70 deg C (but main steam temp should be kept< 545deg C) higher
thanHP casing temp. before opening HP control valve.
Ensure soaking to minimize casing TOP -Bottom temp difference lessthan 30 degC
Ensuring HP casing temp more than 210 deg C, put unit on 3000 rpm and when achieve IP
rotor temp more than 2100degC, synchronize the unit and increase load keeping overall
‘expansion in limit by controlling MS and HRH temp.