Professional Documents
Culture Documents
Attention : / Tel/Email: /
Project Name: Construction of the third ring road / انشاء الطريق الدائري الثالث
Samples Info
Increments of
0.25 mm Ring Factor 0.024478
Flowmeter gage
Test Results
Volume of core
Sample NO. 3 Stability Correlation Ratio Corrected Stability (Kg) Flow (mm)
(cm )