□ Interim
√ Final
Stage of inspection :
Before manufacturing Main Conclusions & Remarks:
During manufacturing
Final - See recommendation’s and perform corrective action
Packing accordingly.
Type of inspection:
Pre-inspection meeting Document
and QC record review Visual
examination, checks Witnessing Next visit scheduled:
tests
Manufacturing progress status Not Applicable
Vendor assessment
Final inspection
Packing
(for details see continuation sheet)
Stamping :
No
□ Interim
√ Final
Introduction:
MAZADA Consortium Limited has signed Third Party Inspection contract with Bureau Veritas
(Bangladesh) Private limited, Bangladesh. BV Bangladesh conducted the inspection on 26/11/2023 at
Mazada equipment yard, Madanpur, Narayanganj and the attendee was as under:
Md. Ariful Islam, Industrial Surveyor, Bureau Veritas (Bangladesh) Private limited.
□ Interim
√ Final
□ Interim
√ Final
Load calibration:
Actions Recommended:
1. Counterweight cylinder pressure seal found damage; needs to be change it.
2. Boom hoist or lift cylinder seal found leakage; needs to be change it.
3. Proper maintenance should be followed as per manufacturer schedule and record.
4. Based on thorough visual examination, functional and proof load test the equipment described
above was found unsatisfactory at the time of inspection.
The inspection results are valid at time and place of inspection. The above inspection has been carried out according to Bureau
Veritas general conditions of service, the issuance of this inspection report does not release the contractual parties from their
own responsibilities and the fulfilment of their obligations.