INSPECTION TEST PLAN FOR EOT CRANE
ITP NO. :- SH/002 CUSTOMER:- TPES PVT LTD
Rev. – 00 , Date : - 06/07/2021 Consignee: -
SH JOB NO. :- 76 PROJECT:-
M/S SHANIT GLOBAL CAPACITY:- 15.0 TON LOCATION-
PLOT NO-492, SECTOR-68, IMT
ITEM :- DOUBLE GIRDER EOT CRANE PO No.:- :- 1002
FARIDABAD 121004 HARYANA INDIA
Mobile – 9999922177/9625259477
Email : info@shanitglobal.com
P- Performed by W- Witnessed by V - Verified by/Reviewed Y – Yes N – No 1 –TPES/ TPIA 2-Supplier (SHANIT) 3 – Sub Supplier
INSPECTION TEST PLAN FOR EOT CRANE
ITP NO. :- SH/002 CUSTOMER:- TPES PVT LTD
Rev. – 00 , Date : - 06/07/2021 Consignee: -
SH JOB NO. :- 76 PROJECT:-
M/S SHANIT GLOBAL CAPACITY:- 15.0 TON LOCATION-
PLOT NO-492, SECTOR-68, IMT
ITEM :- DOUBLE GIRDER EOT CRANE PO No.:- :- 1002
FARIDABAD 121004 HARYANA INDIA
Mobile – 9999922177/9625259477
Email : info@shanitglobal.com
Spare & Accessories Visual / As per PO & As per PO , PR & Spare Packing List
7.0
Verification (If Applicable)
Minor
Measurement
100%
Spare Parts list Parts list/Annexure
Y 2 - 1
Note 1:- BACK WALL ECHO SET AT 100% ON CRT SCREEN:- A) DEFECT ECHO SHOULD NOT EXCEED 20% B) BACK WALL SHOULD BE MINIMUM 80% IN ANY AREA