ARABIAN PETROCHEMICAL COMPANY


Form No.: INSP-045-01
Rev. No.: 4 SHUT DOWN JOB CARD
Dated: 07/2017
SMP / WI No.: SMP-INSP-045
INSPECTION DEPARTMENT
Page: 1 of 1

1. Card No.: 1 Year: 2019

2. Plant: VCM Unit: 11 T/A Job No.: 19VCM0111015

3. Equipment Tag No.: TMU-1105 Equipment Service: Air compressor Sucntion Silencer

4. Job Description: Internal / external visual inspection, UT, DPT and repair as required

Job Details:

- INSPECTION BY PK INSPECTION AND REPAIR IF REQUIRED.

6. Inspection requirements:

6.1 Scaffolding Requirement: Yes: No:

Ext. Int.

6.2 Insulation to be removed: Yes: No:

6.3 Cleaning: Yes: No:

6.4 Others:

7. Tools & equipment: UT thickness gauge, Inspection mirror, Camera, Pit gauge, Flashlight,
& Set of DPT

8. Safety requirements:

8.1 SWP class: Hot work permit

8.2 Entry Attendant Requirement: NOT APPLICABLE

8.3 Others: Barricade the area during hydro test & install signboard

9. Attachment:

Previous inspection report Drawing Forms

Yes: No: Yes: No: Yes: No:

10. Remarks:

Prepared by: Mark Reviewed by: Shaf Al-Harbi


Date: 30-9-2019 Date: 30-9-2019
Classification: General Business Use
ARABIAN PETROCHEMICAL COMPANY

Form No.: INSP-046-01


Rev. No.: 8 PRESSURE VESSEL INSPECTION REPORT
Dated: 08/2017
SMP / WI No.: SMP-INSP-046
INSPECTION DEPARTMENT
Page: 1 of 1

Plant : VCM Eqpt. No.: TMU-1105 Description : AIR COMPRESSOR SILENCER

Shell Cold: Hot: No:


Service : Insulated :
side :

Tube
side :

Internal : External : Request


Inspection type : Report No.: 960565685
No.:
Item Item
Inspection items Conditions Recommendations Inspection Items Conditions Recommendations
No No
1 Shell 10 Thickness data
2 Heads 11 Ext. Metal Surfaces
3 Nozzles 12 Insulation
4 Lining 13 Foundation/supports
5 Demister 14 Ground Connection
6 Tube sheets 15 Auxiliary Equipment
7 Tube 16 Ladders, Stairways & Platforms
8 Coils
9 Internal Parts

DESCRIPTION *

Conditions Recommendations
Classification: General Business Use
ARABIAN PETROCHEMICAL COMPANY

Good Condition (GC) Corroded (CO) To be repaired (RR) To be replaced (RP)


Leaking (LK) Cracked (CK) To be cleaned (CL) Repaint / Touch-up (RT)
Pitted (PT) Broken / Ruptured (BR) Repair insulation (RI) Provide reinforcement (PR)
Loose (LS) Dented / Damaged (DT) To be de-plugged (DP) To be corrected (TC)
Eroded (ER) Dirty (DY) No action required (NR) To be monitored (TM)
Missing (MS) Paint Peeled Off / Flaked (PF) Repair foundation (RF)
Blistered (BL) Plugged / Choked (PL)
Thickness (Metal Loss) (TH) Thickness within limits (WL)

Inspector (s) : Date : Cc: Operation ( )

Maintenance ( )

Inspection Engineer : Date :

* Action taken if any on recommended items to be described


Classification: General Business Use

ARABIAN PETROCHEMICAL COMPANY

Equipment / Line
No.: TMU-1105 Report No.:

INSP Page 2 of 3
Classification: General Business Use

ARABIAN PETROCHEMICAL COMPANY

Note: This blank sheet is not controlled and can be used for writing additional remarks / description in case the provided space on
respective inspection report is not sufficient.

Equipment / Line
No.: TMU-1105 Report No.:
Classification: General Business Use

ARABIAN PETROCHEMICAL COMPANY

INSP Page 3 of 3

Note: This blank sheet is not controlled and can be used for writing additional remarks / description in case the provided space on respective
inspection report is not sufficient.
Classification: General Business Use

Form No.: INSP-046-02


Rev. No.: 8 EQUIPMENT / PIPING THICKNESS MEASUREMENT SHEET
Dated: 08/2017
SMP / WI No.: SMP-INSP-046
INSPECTION DEPARTMENT
Page: 1 of 1
Classification: General Business Use

Thickness Thickness Reading


Drawing / Sketch Orig.
Measurement (mm)
Thk. Remark(s)
Location *
(mm) 0 90 180 270 N E S W
(TMLs)
Classification: General Business Use
Classification: General Business Use

Thickness Gauge S.R. No. :


Calibration date :
Probe # and Frequency :
Classification: General Business Use

Applicable Procedure :
Criteria for passing Inspection :
Eqpt. / Piping Material : CARBON STEEL
Corrosion Allowance (mm) :
Corrosion Rate (mm / Year) :
Remaining Life (Year) :
Classification: General Business Use

Surface Temperature (ºC) :


Condition of Piping : Satisfactory Unsatisfactory
Recommendation (if any) :
Classification: General Business Use
Classification: General Business Use

Plant : VCM - (UNIT-11) Description : AIR COMPRESSOR SILENCER Inspector(s) : Date :


Eqpt / Line No. : TMU-1105 Service : AIR

* Nozzle size to be specified


Classification: General Business Use

ARABIAN PETROCHEMICAL COMPANY


Classification: General Business Use

ARABIAN PETROCHEMICAL COMPANY


Classification: General Business Use

ARABIAN PETROCHEMICAL COMPANY


Form No.: INSP-041-01
Rev. No.: 8 LIQUID PENETRANT INSPECTION REPORT
Dated: 08/2017
SMP / WI No.: SMP-INSP-041
INSPECTION DEPARTMENT
Page: 1 of 1

PLANT : VCM EQUIPMENT / LINE NO. : TMU-1105

REPORT NO. : REQUEST NO. : 960565685

ITEM EXAMINED:
Forging : Casting : Plate/Pipe : Weld end prep :

Bar : Bolting : Weld : Others :

SURFACE CONDITION :
Casting : Ground : Sand Blasted : Excavation :

Forging : Machined : As Welded : Others :

WELD / PART MATERIAL SIZE /THK. JOINT TYPE ROOT FINAL PASS FAIL

Remark(s) :

TEST METHOD: Fluorescent : Visible :

EXAMINATION TYPE BRAND NAME DWELL TIME


Solvent Removable: X Penetrant: SKL-SP1 10 Minutes
Water Washable: -- Cleaner: SKL-SP1 ---
Post Emulsified: -- Developer: SKD-S2 10 Minutes

Inspector (s): Inspection Supervisor:


Date: Date:
Cc:
Classification: General Business Use

ARABIAN PETROCHEMICAL COMPANY


Classification: General Business Use

ATTACHMENT - 1
ARABIAN PETROCHEMICAL COMPANY

Plant: : VCM Inspector :


Eqpt. No. : ’s
Descriptio : PHOTOGRAPHS
n
Service : Date :
Page 1 of 2
Classification: General Business Use

ATTACHMENT - 1
ARABIAN PETROCHEMICAL COMPANY

Plant: : VCM Inspector :


Eqpt. No. : ’s
PHOTOGRAPHS
Descriptio :
n
Service : Date :
Page 2 of 2