Permit to work for Chemical Works

` Item Addressed Compliant Comments

Y N N/A

1 Is the activity related method statement and associated risk assessment


(COSHH) conducted to define suitable controls?

2 Is Safety Data sheet for the chemical/s being used is available and related
awareness is made among users?

3 All PPEs (e.g., chemical gloves, appropriate mask ...etc) required as per risk
assessment are avaialble?

4 Proper and sufficient fire prevention/protection methods are implemented (if


necessary as per risk assessment)?

5 Is their adequate arrangement to manage Emergency /spill incidences at work


place? and are the associated people made aware of the required response

6 People associated with chemical handling work are competent/ skilled/


medically fit to perform the job safely?

7 Is the area is barricaded to prevent unauthorised entry and warning signs


posted?

8 Activity will be conducted under competent supervision?

9 Waste disposal arrangements are available and adequate?

10 any other point needed to be ensured shall be added here


----------------------------------------------------------------------------------

Assessment Completed By : Responsibility Accepted By

Date/Time: Permit reference No: