Sarovar Inspection Details

Title Details

Sarovar ID 121658

Sarovar Name Renovation of pond Chuharpur Amrit Sarovar

Sarovar Type Renovation

State HARYANA

State Code 06

District Gurugram

District Code 086

Village Chuharpur (203)

Panchayat Gram Panchyat Chuharpur

Date of Visit 05-07-2023

1.) Whether Sarovar distance/ location from community kept in mind while deciding Yes
the site for Sarovar
(applicable for New Sarovars):

2.) Whether the Sarovar Inlet channels are made/treated properly No

3.) Whether the Sarovar outlet channels are made/ treated properly Yes

4.) Are catchment treatment measures identified Yes

5.) Are catchment treatment measures implemented Yes

6.) Are silt traps installed as necessary No

7.) Are the masonry structures provided as required Yes

8.) Is adequate embankment slope provided Yes

9.) Are berms provided along the embankment for better stability Yes

10.) Is the bund treatment done around structure ensuring layer wise compaction Yes

11.) Have additional requirements like encroachments, treatment of grey water been No
identified

a.) Has action being taken to address the requirements Yes

b.) Remarks need to require proper facilities for water recharge

12.) Is area of the Sarovar and water holding capacity (Depth of Sarovar) as per the Yes
guideline

I. Area of Sarovar (In Acre) 1

II. Average Depth of Sarovar (In Meters) 2.44

13.) Is PLO/ PP linked with the Sarovar Yes

14.) Is User Group created/ linked to Sarovar

a.) Name Of User Group Gram Panchyat Chuharpur Amrit Sarovar Group

b.) Number Of Members 4


15.) Purpose of the User group and livelihood activity for using Sarovar water

a.) Feedback of the associated user group. (Max 100 words) benefit for stray animal and agriculture purpose

16.) Usage of excavated Silt/ soil by community/ line departments no use

17.) No. of silt beneficiaries 0

18.) Have native trees been planted around the Sarovar Yes

a.) How will you rate the plantation Very good

19.) Is the flag hoisting stand-post constructed Yes

20.) Is the Signage board installed with standard size and logo Yes

21.) Is the District/PLO uploading related data on the Portal Yes

22.) As per the observation of visiting team is community mobilized for Sarovar Yes

a.) In what manner: inspection Purpose

23.) Is Community able to use the Sarovar for celebration of social events Yes

24.) Feedback from the Community members in terms of socio-economic and good for stray animal
environmental benefits from Sarovar: (Remark it should also include the overall location is good and renovation of pond is good as
quality of construction/rejuvenation of Sarovar) per requirement

25.) Remarks/Feedback of the Visiting team/officer environmental purpose very Good location plantation
are good.
so recharge water frequently

Team Members ---