Professional Documents
Culture Documents
Test Case Migo EPX
Test Case Migo EPX
A ) all test cases have been done with these parameters in ZBC_MAINT_PARAM
B) the purchase burden component of the standard cost showed is always related the valid
one during the good receipt creation date . It is directly got from MM03 , are inserted
material in scope and plant , is chosen tab costing 2 , is clicked the current button
Good receipt
Good receipt
3 ) PO in year 2022, 1 material 32, good receipt in year 2023(with
different standard cost, this scenario is not currently working in EPP)
Good receipt
on line 530400 the value -186,18 is wrong the correct one -177,06.
Good receipt
5) check the custom code doesn’t work if I remove the plant 1760 in tcode
ZBC_MAINT_PARAM
Good receipt
6) check the custom code doesn’t work if I add the PO type in in table
ZPARAM
PO
Good receipt
Good receipt
Invoice receipt ,Acc.doc
7) PO creation material 30 with surcharge evaluated in costing sheet
PO created
good receipt
8)Replicate test case from production, PO created in 2022 ,good receipt
created in 2023
good receipt in EPP is not getting the purchase burden from standard cost at good receipt
creation date 43,56
Replicate the case in EPX
PO
9)check the PPV sign change from positive to negative,PIR equal 5,84 ,PO
creation ,good receipt with PPV positive,new PO, PIR changes to 6,64,
new cost roll,good receipt check negative PPV,
PIR value 5,84
PO 4500077627
PIR 50 in 2023
standard cost
NEW PO in 2023
good receipt in 2023,check the PPV negative sign
NEW PO in 2023
PIR changes from 50 to 40
initial ppv = 0
price change in info record in 2023 from 139,70 to 150, becomes more expensive
initial po in 2022
initial ppv = 0
price change in info record from 410,20 to 400 in 2023, becomes more expensive
new PO creation in 2022
13) case with PPV change from 0 to 0 changing the % material overhead
in costing sheet
inforecord price 404,18
new PO in 2022
good receipt ,PPV 0
new po in 2022
change %material overhead in costing sheet from 12,19 to 16
15)Po in year 2022, cost PIR change, new cost roll, Good receipt mov
101 , change PIR cost, new cost roll, mov 102 Reversal
Material 284 PIR equal to 12 in 2022
Material 293 PIR equal to 19 in 2022
Good receipt
PIR CHANGES
Material 284 PIR changes from 8 to 6
PO creation
good receipt creation
mov 102 creation
17) PO in year 2023 material 33290 with 12,19 % in costing sheet , change
8% in costing sheet , new cost roll, good receipt with new overhead
initial % in costing sheet 12,19%
53,04*8%=4,24
good receipt
44,20*8% = 3,53 , OK
18) PO in year 2023 material 32 with 12,19 % in costing sheet , 12,19 % in
MEK32, change 8% in MEK32 , new cost roll, good receipt with new
overhead
initial % in costing sheet 12,19%
good receipt
72,20 * 12,9% = 9,31 , OK it is using the value in standard cost
Good receipt in 2023,overhead ok , PPV = 0 , but price changed from 19 to 20 this is not the
business request , so KO
info record
inforecord price in 2022 equal to 19
Good receipt in 2023,overhead ko , PPV = 18,34 , but price changed from 19 to 20 this is
not the business request , so KO