You are on page 1of 8

Enhance Your Skills For

BETTER Tomorrow

Web Based Training Calendar


Switchgear Training Centre
January 2023 - December 2023
TRAINING PROGRAMME DETAILS

• LV switchgear terminologies & Relevant standards


• Selection & Application of ACB, MCCB, MPCB, SDF, HRC Fuse,
Contactor, Relay, MCB, RCCB etc. • Consultants
Selection & • Fault Level calculation for LV system • Panel Builders
W-LT01 Application of 06 • Motor Starter Selection with Type 2 co-ordination • End User - 19,000
LV Switchgear • Advance releases & Selectivity (Co-ordination) among various Project Team
switchgears • OEM
• Overview of Industrial Communication & Selection of Smart
Switchgear

• LV Switchboard Terminologies
• Panel Design Aspects as per IEC 61439
• Fault level Calculation for LV System
Electrical Design • Forms of Separations, Ingress Protection (IP) • Consultants
of Switchgear • Busbar design • Panel Builders
W-LT05 03 • Thermal Management in Switchboards
• End User - Projects 14,000
Assembly • OEM
• Selection of CTs & Power Cables • Contractors
• Importance & Sizing of Control Transformers
• Design Verification & Routine Test as per IEC 61439
• Earthing as applicable to Switchboard

• What is SMART Panel ? • Consultants


• Elements of SMART PCC, MCC, DB…… • Panel Builders
Design of Smart
W-LT05A 01 • Smart Solution Architecture • End User - Projects 5,000
Panel Solutions • Integration of SMART switchgear in Panel • OEM
• Basics of Industrial Communication • Contractors

• Elements of Power Distribution in buildings


• Load estimation, sizing of Transformers, DG sets & UPS. • Consultants
Power • Panel Builders
• Selection of Low Voltage switchgears, Distribution boards
W-LT06 Distribution 03 • Selection of BBT & Cables
• Builders - 9,900
in Buildings • Fault Level calculations
Project Team
• Contractors
• Earthing basics, relevant IE rules

• Importance of Safety, Type of Hazards


• Safety in Residential, Industrial and Commercial premises • End Users -
Safety Officer, Plant
• Hazard identification, detection and control. Maintenance
W-LT07 Electrical Safety 01 • Fire, Shock, Arc flash Hazards and its prevention • Contractors
5,000
• Requirements by norms, PPE, LOTO, Work Permit • Electrical personnel in
• OHSAS requirement, First aid in case of Electric shock and burns. Oil & Gas industry
• Achieving Safety with Switchgear

• Basics of LV Motors & Special Duty (Inverter Duty) Motors


• OEMs
Selection & • VFDs Construction, Selection, Wiring, Testing & Troubleshooting
• End User -
• Application based Programing with Case Study
W-LT08 Application of 03 • Energy saving with VFD
Projects, O&M Team 14,500
LV AC Drives • Panel Builders
• VFD vs Soft Starter • System Integrators
• Communication with VFDs

• Need for Power Factor Improvement & Utility Regulations


Power Quality • Methods of Reactive power management • Consultants
Solution - • APFC Panel Design, Dynamic compensation • End Users -
W-LT09 Reactive Power 03 • Harmonics in power systems, source, types & their effects O&M Team 11,250
& Harmonic • Harmonics Mitigation Techniques: • Panel Builders
Passive, Active (AHF) & Hybrid Harmonic filters • Contractors
Mitigation
• Maintenance & Troubleshooting of APFC Panel

• Consultants
• Detailed Study of AHF - Principle of working, Its Sizing for • End Users - O&M Team
Green Field Project with Case Study etc • Panel Builders
Advance Power • Voltage Harmonics: Its Impact & Solutions • Contractors
W-LT09A* Quality Solutions 01 5,000
• PF correction & Harmonic mitigation in Solar installation
• Typical Cases - Transformer compensation, Importance of * for attending LT09A,
linearity & Q factor in Reactor etc. prerequisite is LT09

• Selection & Installation of VCB & MV Panels


Selection & • Testing, Protection and Maintenance of MV Panels. • Panel Builders
Maintenance of • Fault Level calculation in MV System • End User -
W-LT10 03 Projects, O&M Team
10,500
MV Switchgear • Vacuum Vs SF6, MV metal clad panel
(VCB) • MV panel bus bar design • Contractors
• Introduction of RMU & CSS

• Introduction to protective relaying, terminologies, ANSI codes


Industrial • Power System Protection as per IEC60255
• End Users -
Protection • Selection of Switching Devices & Instrument Transformers
Projects, O&M Team
W-LT11 with Numerical 05 • Fault Level calculations with Case Study • Consultants
19,000
• Feeder & Motor protection, Relay Settings • Panel Builders
Relays • Relay co-ordination with Case Study
• Transformer & Generator protection (excludes distance protections)

Note: GST Extra as Applicable. Present rate of GST is 18%


Special One day Free refresher programme will also be provided for the practical Sessions
• Importance of Energy Conservation & Management (ECM)
• Concepts, Terminologies, Energy Efficient Technologies in
Conservation electrical Installations • Contractors
& Management • Energy Conservation Act, ECBC, etc. including some case studies • End Users - Projects
W-LT12 03 • Conservation of Energy with Latest technologies in Motors, • Consultants 10,000
of Electrical
Energy Transformers, Generators, VFDs, PQS, Switchgears etc. with case • OEMs
studies
• Energy Monitoring & Management through EMS with Demo

Classification, • Importance of Earthing, Types & Classification


Types & • Facts about earthing
• Understanding of System & Equipment Earthing • End Users -
Requirement Projects, O&M Team
W-LT13 03 • Earthing of Generators, Transformers, Sensitive Electronic 11,000
of System & equipment & Lightning Protection Earthing • Contractors
Equipment • Earth Fault & Earth Leakage protection • Consultants
Earthing • Sizing of Earth Electrodes with case studies

Modernisation • Improving Plant efficiency using Advance Technologies


of Plants & • Intelligent MCC, Energy Efficient Motors • End Users
W-LT15 01 • Control & Monitoring of Energy through EMS • Consultants 5,000
Trends in LV • Improving Plant Reliability through Smart Switching & Protection • Panel Builders
Switchgear Devices

• Industry 4.0 Overview, Benefits and Applications • Maintenance


Industry 4.0 & Managers
• IOT, IIOT, Cloud Computing, Overview of AI, ML, Robotics,
Integrating • OEM
W-LT16 01 AR / VR etc. • Panel Builders
5,000
Smart
• SMART switchgear features, Benefits, Applications • System Integrators
Switchgears • How to integrate SMART switchgear in your system • Consultants

Selection, • Selection & Maintenance of Transformer


• Routine tests for transformer • Consultants
Protection & • Contractors
W-LT17 03 • Health Life index & Failure analysis of transformer 10,750
Maintenance • Protection of transformer • End Users -
of Transformer • Relevant IS / IEC standards. Projects, O&M Team

Power Cable • Introduction & Selection of Power Cable


• Laying of Power Cable • Contractors
Selection,
W-LT18 01 • Cable Jointing , Termination and Cable accessories • Panel Builders 5,000
Laying & • Testing of Power Cables & Cable Joints • Electricians
Testing • Cables fault detection using test instruments

• Over view of PV Solar plants, Elements, schemes, Design considerations


Switchgear • Fault current calculations and Selection of Switchgear • EPC Consultants
• Earthing system design considerations • EPC Contractors
W-LT19 Solution for 02 • Pre Commissioning check points and maintenance guidelines for • End Users -
6,000
PV- Solar Plant switchgear Projects, Team
• Key Design considerations with IEC 60947

Selection of LV
Switchgear for • LV Switchgear terminologies as per IEC 60947 • Consultants
Motor Starter • Different starting techniques of motor • Panel Builders
W-LT20 03 • Motor Protection Concepts & Type - II coordination • End Users: 9,750
Feeder as Per • Control Schemes for Motor Starters Projects, O&M Team
Type 2 • Overview of iMCC & Soft Starters • OEMs
Co-ordination

• LV Switchgear terminologies as per IEC 60947 • Consultants


Selection of LV • Selection of SDF, MCCB, ACB & Change Over Switches
Switchgear for • Panel Builders
• Advance Protection Releases and their settings
W-LT21 Power Distribution 03 • Fault Level Calculation with case studies
• End Users: 9,750
Projects, O&M Team
with Selectivity • Selectivity applicable to LV Switchgear • OEMs
• Overview of Industrial Communication & Selection of Smart Switchgear

• Fundamentals of Control circuits, Graphical Symbols & Guidelines for


Design of Design as per relevant IS / IEC standards.
• Design of Power & Control Circuits for : • Consultants
Electrical - Motor Starter, ACB Incomers & Bus coupler Schemes • Panel Builders
W-LT22 Schemes for 03 - Auto Source Transfer, DG Synchronisation & Load Sharing Schemes • End Users - 10,000
LV Switchgear - CT/PT circuits, Redundant Control Supply Schemes Project Team
Assembly • Electrical / Mechanical Safety Interlocks in control circuits • OEMs
• Design / Selection of Control Devices

Note: GST Extra as Applicable. Present rate of GST is 18%


Special One day Free refresher programme will also be provided for the practical Sessions
WEB BASED TRAINING CALENDAR 2023
PROGRAMME JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC
CODE DAYS
NAME 2023 2023 2023 2023 2023 2023 2023 2023 2023 2023 2023 2023

Selection & Application of


W-LT01 6 16-21 10-15 03-08 02-07
LV Switchgear

Electrical Design of
W-LT05 3 06-08 29-31 07-09 20-22
Switchgear Assembly

W-LT05A Design of Smart Panel Solutions 1 09 01 10 23

Power Distribution
W-LT06 3 27-29 26-28 13-15 18-20
in Buildings

W-LT07 Electrical Safety 1 27 02 12 11

Selection & Application of


W-LT08 3 09-11 19-21 10-12 11-13
LV AC Drives

Power Quality Solution -


W-LT09 Reactive Power & Harmonic 3 20-22 08-10 01-03 27-29
Mitigation

Advance Power
W-LT09A 1 23 11 04 30
Quality Solutions

Selection & Maintenance of


W-LT10 3 13-15 11-13
MV Switchgear (VCB)

Industrial Protection
W-LT11 5 24-28 30 Oct - 3 Nov
with Numerical Relays

Conservation & Management


W-LT12 3 12-14 18-20
of Electrical Energy

Classification, Types &


W-LT13 Requirement of System & 3 01-03 04-06
Equipment Earthing

Modernisation of Plants &


W-LT15 1 22 05
Trends in LV Switchgear

Industry 4.0 & Integrating


W-LT16 1 10 01
Smart Switchgears

Selection, Protection &


W-LT17 3 20-22 25-27
Maintenance of Transformer

Power Cable Selection,


W-LT18 1 12 08
Laying & Testing

Switchgear Solution for 09-10


W-LT19 2 21-22
PV- Solar Plant

Selection of LV Switchgear for


W-LT20 Motor Starter Feeder as Per 3 16-18 10-12 03-05 02-04
Type 2 Co-ordination
Selection of LV Switchgear
W-LT21 for Power Distribution 3 19-21 13-15 06-08 05-07
with Selectivity

Design of Electrical Schemes


W-LT22 3 19-21 04-06
for LV Switchgear Assembly
TRAINING PROGREMMES ON IEC STANDARD

PROGRAMME DURATION PROGRAM


STANDARD DESCRIPTION (HRS.) PROGRAM CONTENT FOR WHOM INVESTMENT
CODE DATE

• Introduction to IEC 60947-2 24th Mar 23


• Scope of Standard • Panel Builders
IEC 60947-2 - Low-Voltage • Consultants
• Various Specifications & related
W-STD01 Switchgear and Controlgear - 03 • Contractors 4,500
Tests as per standard
Circuit Breakers • End Users
• Significance of Type Test &
• Design engineers 21st Aug 23
routine Tests

• Introduction to Switches,
Disconnectors, Switch 18th May 23
IEC 60947-3 - Low-Voltage Disconnectors and Fuse • Panel Builders
Switchgear and Controlgear - Combination Units • Consultants
W-STD02 Switches, Disconnector, 03 • Scope, Constructional, and • Contractors 4,500
Switch-Disconnector & performance requirements • End Users
Fuse Combination Units • Significance of Type Test & • Design engineers
27th Sep 23
routine Tests

• Overview of Contactor, Relay • Panel Builders 28th Apr 23


IEC 60947-4 - Low-Voltage and Starter • Consultants
W-STD03 Switchgear and Controlgear - 03 • Importance of IEC 60947-4 • Contractors 4,500
Contactors and Motor Starters • Scope, Constructional & • End Users
Performance Requirements • Design engineers 19th Oct 23

• Introduction to IEC 61439 • Panel Builders


• Consultants, 25th Jan 23
• Changes in IEC 61439 Vs IEC
IEC 61439 - Low-Voltage • Contractors
60439 4,500
W-STD04 Switchgear and Controlgear 03 • End Users -
• Design & Routine Verification Projects
Assemblies
• Constructional & Performance • Design engineers 14th Jul 23

IEC 60898 - Electrical


Accessories - Circuit-Breakers • Overview of MCB and RCCB
for Overcurrent Protection • Importance of IEC 60898 & IEC 22nd May 23
for Household and Similar 61008
Installations • Scope, Constructional &
Performance Requirements • Consultants
W-STD05 03 • Significance of Type tests and • Contractors 4,500
IEC 61008 - Residual Current • Design Engineers
Routine tests
Operated Circuit-Breakers • Product evaluation and
Without Integral Over certification
Current Protection for 24th Nov 23
Household and Similar
Uses (RCCBs)

• Feeder Protection Concept as per


IEC 60255 -151
• Understanding IEC based setting
of Overcurrent (51 & 50) 16th Jun 23
Protection
• Standard Curves : Normal Inverse , • Panel Builders
Very Inverse, Extremely Inverse etc. • Consultants,
IEC 60255 - Feeder & • Contractors
W-STD06 03 • Motor Protection Concept 4,500
Motor Protection Concept • End Users -
IEC 60255 -149 Projects
• Difference between IEC60947 & • Design engineers
IEC 60255 Thermal Overload
Protection 22th Dec 23
• Understanding Motor thermal
curves and thermal level setting
calculation
REGISTRATION PROCESS

To register for Training Programs:


1. Please click on below link or scan QR Code and provide participants details

https://forms.office.com/r/7H15mneKBm

After submission of above form, you will be contacted by Switchgear Training Centre.
2. Fees should be paid in advance by way of NEFT / RTGS / UPI to our bank a/c below:
Beneficiary Account Name : SCHNEIDER ELECTRIC INDIA PVT LTD
Bank Name : Citibank N.A.
Branch : DLF Capitol Point, Baba Kharak Singh Marg, New Delhi-110001
IFSC code : CITI0000002
Current Account No : 0019955354
SWIFT Code : CITIINBX
PAN No. : AABCS1624G

Sr. No. STC GST No.


1 Pune 27AABCS1624G2ZM
2 Lucknow 09AABCS1624G2ZK
3 Coonoor 33AABCS1624G2ZT
4 Vadodara 24AABCS1624G2ZS
5 Delhi 07AABCS1624G2ZO
6 Kolkata 19AABCS1624G2ZJ

Please Note
a) For Online training program participant should plan to attend only after they receive email confirmation of
their registration
b) For Offline Training program, participant should plan their travel only after they receive email confirmation of
their registration.
c) In case seats are unavilable for the selected course, participants will be offered an opportunity to participate in
the next training session for that programme.
d) All programmes are conducted on a ‘best effort basis’. Programmes are subject to cancellation or postponement
due to unforeseen circumstances or lack of sufficient enrolment. L&T Electrical & Automation reserve all cancellation
rights of the training programmme and will not be responsible for any consequential losses.
e) Participants are expected to make their own arrangements for lodging and boarding.
f) “L&T Electrical & Automation” will not be responsible for any injury, damage or loss during the programme..
g) The transfer of fees for any change of participant or programme is subject to confirmation in writing by the Training
Centre.
h) Course Fees specified are valid upto December 31, 2023 only.
) Fees are not refundable under any circumstances.

Course Fees - Terms & Conditions


Inclusions
1. For Offline Programmes: Stationery, Hand-outs & use of workshop facilities. Complimentary Breakfast, Working
Lunch & Tea / Coffee shall be provided.
2. For Online Programmes: Access will be provided to “Training Material” & “Hand-outs” as applicable.
Exclusions
1. GST as applicable on the services.

You might also like