• LV Switchboard Terminologies
• Panel Design Aspects as per IEC 61439
• Fault level Calculation for LV System
Electrical Design • Forms of Separations, Ingress Protection (IP) • Consultants
of Switchgear • Busbar design • Panel Builders
W-LT05 03 • Thermal Management in Switchboards
• End User - Projects 14,000
Assembly • OEM
• Selection of CTs & Power Cables • Contractors
• Importance & Sizing of Control Transformers
• Design Verification & Routine Test as per IEC 61439
• Earthing as applicable to Switchboard
• Consultants
• Detailed Study of AHF - Principle of working, Its Sizing for • End Users - O&M Team
Green Field Project with Case Study etc • Panel Builders
Advance Power • Voltage Harmonics: Its Impact & Solutions • Contractors
W-LT09A* Quality Solutions 01 5,000
• PF correction & Harmonic mitigation in Solar installation
• Typical Cases - Transformer compensation, Importance of * for attending LT09A,
linearity & Q factor in Reactor etc. prerequisite is LT09
Selection of LV
Switchgear for • LV Switchgear terminologies as per IEC 60947 • Consultants
Motor Starter • Different starting techniques of motor • Panel Builders
W-LT20 03 • Motor Protection Concepts & Type - II coordination • End Users: 9,750
Feeder as Per • Control Schemes for Motor Starters Projects, O&M Team
Type 2 • Overview of iMCC & Soft Starters • OEMs
Co-ordination
Electrical Design of
W-LT05 3 06-08 29-31 07-09 20-22
Switchgear Assembly
Power Distribution
W-LT06 3 27-29 26-28 13-15 18-20
in Buildings
Advance Power
W-LT09A 1 23 11 04 30
Quality Solutions
Industrial Protection
W-LT11 5 24-28 30 Oct - 3 Nov
with Numerical Relays
• Introduction to Switches,
Disconnectors, Switch 18th May 23
IEC 60947-3 - Low-Voltage Disconnectors and Fuse • Panel Builders
Switchgear and Controlgear - Combination Units • Consultants
W-STD02 Switches, Disconnector, 03 • Scope, Constructional, and • Contractors 4,500
Switch-Disconnector & performance requirements • End Users
Fuse Combination Units • Significance of Type Test & • Design engineers
27th Sep 23
routine Tests
https://forms.office.com/r/7H15mneKBm
After submission of above form, you will be contacted by Switchgear Training Centre.
2. Fees should be paid in advance by way of NEFT / RTGS / UPI to our bank a/c below:
Beneficiary Account Name : SCHNEIDER ELECTRIC INDIA PVT LTD
Bank Name : Citibank N.A.
Branch : DLF Capitol Point, Baba Kharak Singh Marg, New Delhi-110001
IFSC code : CITI0000002
Current Account No : 0019955354
SWIFT Code : CITIINBX
PAN No. : AABCS1624G
Please Note
a) For Online training program participant should plan to attend only after they receive email confirmation of
their registration
b) For Offline Training program, participant should plan their travel only after they receive email confirmation of
their registration.
c) In case seats are unavilable for the selected course, participants will be offered an opportunity to participate in
the next training session for that programme.
d) All programmes are conducted on a ‘best effort basis’. Programmes are subject to cancellation or postponement
due to unforeseen circumstances or lack of sufficient enrolment. L&T Electrical & Automation reserve all cancellation
rights of the training programmme and will not be responsible for any consequential losses.
e) Participants are expected to make their own arrangements for lodging and boarding.
f) “L&T Electrical & Automation” will not be responsible for any injury, damage or loss during the programme..
g) The transfer of fees for any change of participant or programme is subject to confirmation in writing by the Training
Centre.
h) Course Fees specified are valid upto December 31, 2023 only.
) Fees are not refundable under any circumstances.