You are on page 1of 4

1

0.9

0.8

0.7

0.6
Qty no.
Total hrs
0.5
Quantity 150#
Total hrs
0.4

0.3

0.2

0.1

0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
<25 37-50 62-75 100 150 200 250 300 350 400 450 500 600 750 900 1050 1200
<1 1.5-2 2.5-3 4 6 8 10 12 14 16 18 20 24 30 36 42 48
1

0.9

0.8

0.7

0.6
Qty no.
Total hrs
0.5
Quantity 150#
Total hrs
0.4

0.3

0.2

0.1

0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
<25 37-50 62-75 100 150 200 250 300 350 400 450 500 600 750 900 1050 1200
<1 1.5-2 2.5-3 4 6 8 10 12 14 16 18 20 24 30 36 42 48
PE3. PIPING ESTIMATE - MANHOURS TO ERECT STAINLESS STEEL PIPING ON PIPE TRACKS AT GROUND LEVEL
Measure/cut/bevel s.s pipe for Erect pipe incl. lift, place, align, Install valves incl. Make flanges incl. prep faces, Weld stainless steel butts or slip on
welding. Enter no. off pipe temp support, bolt &/or tack. collect from store, install gasket & bolt up. Enter flanges. Enter number of welds by
ends per dia/sched Enter ft OR m lift, align.Enter no. qtys by rating dia/schedule

Pipe dia Quantity(By sch) Total Quantity Total Qty Total Quantity Total Quantity(By schedule)
Inch mm 20-80 160 hrs ft m hrs no. hrs 150# 300# hrs 20 40 80 160
<1 <25 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
1.5-2 37-50 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
2.5-3 62-75 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
4 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
6 150 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8 200 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
10 250 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
12 300 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
14 350 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
16 400 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
18 450 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
20 500 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
24 600 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
30 750 0 0 0 0 0 0 0 0 0 0
36 900 0 0 0 0 0 0 0 0 0 0
42 1050 0 0 0 0 0 0 0 0 0
48 1200 0 0 0 0 0 0 0

Total est manhour cost


Enter average Piping manhour cost rate 0 Total manhours 0 0
LEVEL
ess steel butts or slip on
ter number of welds by
dia/schedule

Total
hrs
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

otal est manhour cost


0