You are on page 1of 2

Icraft Quality Control / Production Checklist

SKU: Date:

Subcon: QC Name:

PO No.: Process:

Checked Not Checked


1- Material Grade :

2- Dimension / Hole Size


Checked Not Checked
a) Top
Checked Not Checked
b) Left
Checked Not Checked
c) Right
Checked Not Checked
d) Bottom
Checked Not Checked
e) Back
Checked Not Checked
f) Shelf
Checked Not Checked
g) Others (please specific):

3- MC Checking:

Parts Name P1 P2 P3 P1 + P2 + P3/3

Checked Not Checked


4- Construction / Moveable Parts Checking / Function Test
Checked Not Checked
5- Compare with Master Sample

Checked Not Checked


6- Compare with Drawing

Checked Not Checked


7- Color Panel Comparison

Checked Not Checked


8- Assembly Test / Hardware

Checked Not Checked


9- Interchangeble Test

Checked Not Checked


10- Packing Material

Checked Not Checked


11- Shipping Mark & Label

Remarks:

Checked By: Verified By:

Date: Date:

You might also like