PROCEDURES
First, before the pipe installation preparation
1. the installation equipment: roller slot machines, tapping machine, cutting machine, bracket.
2. material preparation: the pipeline to be safe, torque wrench, vernier caliper, a level, neutral lubricant (such
as washing clean).
3. check the mechanical equipment to ensure integrity. Roller slot machines should be placed in a spacious flat
place to avoid machine vibration and impact upon the quality of the pressure tank rolling groove, according to
the size of the pipe regulate bracket, ensure that the machine and the pipe to ensure that level.