This document outlines different scales of geological and geotechnical mapping used at various stages of hydroelectric project development, from initial reconnaissance to construction. Scales range from 1:50,000 for early satellite/aerial studies to select sites, down to 1:100 for detailed logging of exploratory structures. More detailed mapping at scales from 1:1000 to 1:5000 is used for investigation and pre-construction planning of structures, tunnels, and reservoir areas, while the finest scales of 1:500 or 1:100 are employed for mapping foundations during construction.
This document outlines different scales of geological and geotechnical mapping used at various stages of hydroelectric project development, from initial reconnaissance to construction. Scales range from 1:50,000 for early satellite/aerial studies to select sites, down to 1:100 for detailed logging of exploratory structures. More detailed mapping at scales from 1:1000 to 1:5000 is used for investigation and pre-construction planning of structures, tunnels, and reservoir areas, while the finest scales of 1:500 or 1:100 are employed for mapping foundations during construction.
This document outlines different scales of geological and geotechnical mapping used at various stages of hydroelectric project development, from initial reconnaissance to construction. Scales range from 1:50,000 for early satellite/aerial studies to select sites, down to 1:100 for detailed logging of exploratory structures. More detailed mapping at scales from 1:1000 to 1:5000 is used for investigation and pre-construction planning of structures, tunnels, and reservoir areas, while the finest scales of 1:500 or 1:100 are employed for mapping foundations during construction.
Scale of Contour Reconnaissance or Investigation or Pre-construction stage Construction Stage
mapping intervals or Pre-feasibility stage feasibility stage topographic maps 1:50, 000 Satellite imagery/aerial -- -- -- to photographic studies 1:25, 000 a. for selection of dam sites b. for choice of tunnel and hydel channel alignments c. for reservoir area geological & structural features. 1:50,000 20 m Regional geological -- -- -- to studies of dam sites 1:25, 000 tunnel and hydel channel alignment power house sites, construction material sites. 1:50,000 -- -- Interpretation of aerial -- -- to photographic studies 1:25,000 would be a useful adjunct to surface mapping to collect further Scale of Contour Reconnaissance or Investigation or Pre-construction stage Construction Stage mapping intervals or Pre-feasibility stage feasibility stage topographic maps information about surface conditions around the probable sites selected. Will help to locate the types and characteristics of construction materials. 1: 15, 000 5m -- Geological mapping of -- -- to channel / tunnel 1:10, 000 alignment, powerhouse site, dam and appurtenant structures, construction materials sites and reservoir area. 1:5000 5m to 2.5m -- Geological mapping of -- -- to areas of special 1:2000 geological and economical importance in the reservoir area for example, landslides, mineral deposits. 1:2000 to 2.5m to -- Geological mapping of -- -- 1:5000 5.0m quarry sites and borrow areas. 1:1000 2.5m -- Geological mapping of -- -- to dam site and appurtenant 1:5000 structures, powerhouse Scale of Contour Reconnaissance or Investigation or Pre-construction stage Construction Stage mapping intervals or Pre-feasibility stage feasibility stage topographic maps site 1:100 -- Logging of exploratory -- -- drifts, drill holes pits and trenches 1:1000 to 5m -- -- Update geological -- 1:15000 plans of tunnel/channel & reservoir areas 1:5000 to 5m to 2.5m -- -- Update geological -- 1:2000 plans of areas of special interest in the reservoir borrow areas/quarry sites 1:2000 4m -- -- Geological mapping of -- areas of special interest like access roads, adits etc. Geological mapping of borrow areas/quarry sites 1:1000 2.5m -- -- Update geological -- plans of dam & ancillary structures, powerhouse areas. Geological mapping of critical areas in open channel area 1:500 2m -- -- Geological mapping of -- Scale of Contour Reconnaissance or Investigation or Pre-construction stage Construction Stage mapping intervals or Pre-feasibility stage feasibility stage topographic maps (1:1000) (2m) all tunnel portals 1:100 -- -- Logging/updating of -- exploratory drifts, pilot tunnels, pits, trenches & drill holes 1:500 2m -- -- -- Foundation grade (1:500) (2m) geotechnical mapping of earth & rock fill dams 1:100 1m for -- -- -- Foundation grade (1:200 for concrete geotechnical mapping of tunnels) dam concrete dam blocks, surface & underground powerhouse excavations. Geological logging of tunnels.
Paper - Origin and Evolution of Sedimentary Basins Their Energy and Mineral Resources With Reference To International Issues in The Mediterranean Sea State of The Art