COATING INSPECTION REPORT
Project Title : Blanket Order Chemical Coating Glass Th 2021/ TA Pabrik 7 NPK
Job No :
Client : PT. Pupuk Kalimantan Timur
Main Contractor : PT. Nuscaco Anti Korosi Indonesia
Sub-Contractor :-
DFT Reading and Visual Method : Hand Play
Inspection Type of Equipment
Weather Condition Clear Cloudy Rain
Ambient Temperature : 29 ◦C Wet : 26 ◦C // Steel Temperature : 29 ◦C
Relative Humidity : 65 % Dew Point : 26 ◦C
Painting Material / Colour : Off White Thinner : Styrene
Manufacture : PT. NAKI Batch No : TJ.0816
Lot No : 2021 Add Thinner : 0,5 %
Expire Date : 2022 DFT Spec : 1500 microns
Mixing Ratio/ Pot Life : 100 : 2 : 5 Induction Time : 30 menit