Professional Documents
Culture Documents
Monitoring Check List Updated
Monitoring Check List Updated
Title Comment
Agreements –
➢ CDA- Dateof CDA must be Before IEC Documents Submission
➢ CTA-Should be signed by both parties & Date should be Before
IEC DocumentsSubmission
➢ Insurance Policy -
➢ Budget –SignedCopy (Institute Head,CRO Authorized person)
➢ IU-Version,mentioned Study team , Signed & Date (must be
before IEC DocumentsSubmission same as Delegation Log )
Feasibility-
Protocol –Signed Protocol with Site address and stamp, Version, All
previous versions present.Amended Version.
Lab Contact Log - All Labs Contact No and Mail ID (like ECG, X-ray,
ABG, Lab investigations)
Duty Delegation Log (Start date of Duties and responsibilities with sign
of PI-Date should be before IEC Submission same as in IU),
Visit schedule log- Date scheduled and attended, Missed visit reason (If
Applicable)
ICF signed verification Log- Check sign done by subject or not, Cross
check
Telephonic Log- AE and SAE happen or not, Dose, missed dose reason,
subject call record, subject communication record need to cake Narration
of Telephonic Withdraw Consent ,Visit wise Calling.
Monitoring log, Site training log, Site visit log, IP & Non IP shipment
Log, Communication log, subject call record log ,
CRF- Site No., Version, Date, Amendment, Activity chart, Inclusion &
Exclusion criteria, , Check the Filling of CRF done by study delegated
person
AE & SAE Reporting/Form- PI Sign, Date, Time With initial and final
report, Concomitant medication, AE and SAE log
Calibration Certificate of instruments used in study- Check working
properly or not, Check the all-calibration certificates are valid or not, all
instruments are available or not at site. Backup available
Narration of AE & SAE- Source, CRF, Log, Form, ICP -Need to check
details of AE /SAE is Same in CRF, Log, AE Form, SAE Report ,ICP
and Call record narration.